Federal AviationAdministrationWhat’s New In
Instrument Flight Procedures
Jerry Lebar,
Eastern Flight Procedures Office
March 3, 2010
Hershey Airports Conference
Federal AviationAdministration
2Instrument Flight Procedures
Wednesday March 3, 2010
Overview• Introduction
– AeroNav Services– What We Do
• Getting an Instrument Flight Procedure – Preliminary Actions/Requirements/Request– Timeline
• LPV Approach
• RNP Approach
• Approach Cancellation Program
Federal AviationAdministration
3Instrument Flight Procedures
Wednesday March 3, 2010
AeroNav Services
Federal AviationAdministration
4Instrument Flight Procedures
Wednesday March 3, 2010
National Flight Procedures Office (NFPO) in OKC and 3 Regional Flight Procedures Offices (FPO) (ATL, SEA, and DFW)
• Design and develop instrument flight procedures
Flight Inspection Operations Office in OKC and 6 field offices (ATL, ACY, BTL, OKC, SAC & ANC)
• Operate and maintain a fleet of flight inspection aircraft for airborne evaluation
National Aeronautical Charting Office (NACO)• Publish aeronautical charts and digital products for aviation
around the world
Federal AviationAdministration
5Instrument Flight Procedures
Wednesday March 3, 2010
How to request an IAP
• Requests can be received from anyone. Requests from ATC should be coordinated through the OSG.
• The request can be made via the internet at “avn.faa.gov” or through written request to our office.
Federal AviationAdministration
6Instrument Flight Procedures
Wednesday March 3, 2010
Considerations for Getting an Instrument Flight Procedure
• Costs/Benefits/Traffic Count/Safety• Airport Design/Aircraft Types• Approach Types/Minimums• Surrounding Terrain/Obstacles• Construction plans• Facility availability/restrictions
Federal AviationAdministration
7Instrument Flight Procedures
Wednesday March 3, 2010
Eastern Flight Procedures Office
http://avn.faa.gov
Federal AviationAdministration
8Instrument Flight Procedures
Wednesday March 3, 2010
Points of Contact
Federal AviationAdministration
9Instrument Flight Procedures
Wednesday March 3, 2010
Instrument Flight Procedure Problem Areas
• Data Issues– Conflicting Runway Data based on new surveys/NFDD– Untimely Updates (facility ID, airport ID/name)
• Timely Obstacle Data– Survey complete and load data, tree removal– Do you have the proper survey -- VG or NVG
• Late notification of project commissioning dates• Last minute design requests
Federal AviationAdministration
10Instrument Flight Procedures
Wednesday March 3, 2010
Regional Airspace and Procedures Team (RAPT) Responsibilities for Flight Procedures
• FAA’s single point of contact for requests of flight procedures
• Processing Requests (WEB site)
• Coordinating• Prioritizing• Evaluating• Responding• Tracking
Federal AviationAdministration
11Instrument Flight Procedures
Wednesday March 3, 2010
RAPT Priorities• Priority 1 - Safety, anything to correct a known safety deficiency• Priority 2 - Newly installed or relocated NAVAIDs or airport runway
addition/change• Priority 3 - Procedures which test or implement an FAA initiative• Priority 4 - Procedures at airports with no existing IFR approach• Priority 5 - Procedures providing a reduction in minima• Priority 6 - Procedures which eliminate the requirement for a waiver
or NOTAM• Priority 7 - Procedures providing flow improvement• Priority 8 - Procedures providing other benefits, new criteria
compliance• Priority 9 - Public use procedures not included in 1 through 8• Priority 10 - Special and private procedures not providing benefits of
1 thru 8
Federal AviationAdministration
12Instrument Flight Procedures
Wednesday March 3, 2010
Timeline for Instrument Procedures
• Establish Pub Date: – Production Cycle (174 days). Full capacity thru 05/31/2012 (2,600 pending tasks between now and then)
• Example Flow based on Sept 23, 2010 pub date:– Feb 2010: FPO should have all data for their review– 4/2/10: FPO must fwd project to NFPO– 5/17/10: NFPO must fwd project to QC (45 days)– 6/16/10: QC fwd to FC for scheduling (30 days)– 7/24/10: SAT FC must be posted. (38 days)– 7/27/10: NFPO must fwd pkg NACO/NFDC (3 Days)– 9/23/10: Procedure published (56 day TPP cycle)
Federal AviationAdministration
13Instrument Flight Procedures
Wednesday March 3, 2010
•An LPV is a satellite based Approach procedure with vertical guidance.
•An LPV can provide minimums as low as CAT I ILS
(w/ approach lights and appropriate infrastructure). •An LPV Approach requires a “VG” survey.
•An LPV must have a clear GQS.
•Missed approach needs to go straight ahead initially
(until 8260.54 implemented)
What is an LPV?
Federal AviationAdministration
14Instrument Flight Procedures
Wednesday March 3, 2010
What is an RNP?
• An RNP is a satellite based Approach procedure with vertical guidance that includes onboard performance monitoring and alerting capability.
• Required Navigation Performance has different widths available (RNP 1.0, RNP 0.3, RNP 0.2, RNP 0.11)
• Radius-to-fix turns (RF) commonly used to reduce flight distances and avoid airspace/obstacles. (Not all RNP equipped aircraft have RF capability)
• Most airlines now equipped and all Commercial and Gulfstreams coming from factory with RNP. Training and certification are still required.
Federal AviationAdministration
15Instrument Flight Procedures
Wednesday March 3, 2010
Instrument Approach Procedure (IAP) Cancellation Program
• Cancellation Program was developed to identify those procedures which can be eliminated with little or no impact.
• The goal has been a 2 to 1 ratio, 1 cancellation for every two procedures added to the NAS
• Over 1,000 Procedure have been Cancelled in the last three years
NDB IAPs
VOR/DME RNAV procedures
VOR – Seldom used approaches
Federal AviationAdministration
16Instrument Flight Procedures
Wednesday March 3, 2010
Benefits of Cancellation Program
• Transition to Satellite based navigation; RNP, VNAV, LPV procedures provides lower minimums than the procedures they typically replace
(ie: NDB; VOR)• Less Cost to Technical Operations • Reduced Airspace Complexity• Reduced Flight Inspection Operational
Costs
Federal AviationAdministrationPennsylvania
Maryland andWashington DC
Jerry Lebar
404-305-7400
Federal AviationAdministration
18Instrument Flight Procedures
Wednesday March 3, 2010
Eastern Flight Procedures Office
Questions ?????