Page 1: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministrationWhat’s New In

Instrument Flight Procedures

Jerry Lebar,

Eastern Flight Procedures Office

March 3, 2010

Hershey Airports Conference

Page 2: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

2Instrument Flight Procedures

Wednesday March 3, 2010

Overview• Introduction

– AeroNav Services– What We Do

• Getting an Instrument Flight Procedure – Preliminary Actions/Requirements/Request– Timeline

• LPV Approach

• RNP Approach

• Approach Cancellation Program

Page 3: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

3Instrument Flight Procedures

Wednesday March 3, 2010

AeroNav Services

Page 4: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

4Instrument Flight Procedures

Wednesday March 3, 2010

National Flight Procedures Office (NFPO) in OKC and 3 Regional Flight Procedures Offices (FPO) (ATL, SEA, and DFW)

• Design and develop instrument flight procedures

Flight Inspection Operations Office in OKC and 6 field offices (ATL, ACY, BTL, OKC, SAC & ANC)

• Operate and maintain a fleet of flight inspection aircraft for airborne evaluation

National Aeronautical Charting Office (NACO)• Publish aeronautical charts and digital products for aviation

around the world

Page 5: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

5Instrument Flight Procedures

Wednesday March 3, 2010

How to request an IAP

• Requests can be received from anyone. Requests from ATC should be coordinated through the OSG.

• The request can be made via the internet at “avn.faa.gov” or through written request to our office.

Page 6: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

6Instrument Flight Procedures

Wednesday March 3, 2010

Considerations for Getting an Instrument Flight Procedure

• Costs/Benefits/Traffic Count/Safety• Airport Design/Aircraft Types• Approach Types/Minimums• Surrounding Terrain/Obstacles• Construction plans• Facility availability/restrictions

Page 7: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

7Instrument Flight Procedures

Wednesday March 3, 2010

Eastern Flight Procedures Office

http://avn.faa.gov

Page 8: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

8Instrument Flight Procedures

Wednesday March 3, 2010

Points of Contact

Page 9: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

9Instrument Flight Procedures

Wednesday March 3, 2010

Instrument Flight Procedure Problem Areas

• Data Issues– Conflicting Runway Data based on new surveys/NFDD– Untimely Updates (facility ID, airport ID/name)

• Timely Obstacle Data– Survey complete and load data, tree removal– Do you have the proper survey -- VG or NVG

• Late notification of project commissioning dates• Last minute design requests

Page 10: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

10Instrument Flight Procedures

Wednesday March 3, 2010

Regional Airspace and Procedures Team (RAPT) Responsibilities for Flight Procedures

• FAA’s single point of contact for requests of flight procedures

• Processing Requests (WEB site)

• Coordinating• Prioritizing• Evaluating• Responding• Tracking

Page 11: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

11Instrument Flight Procedures

Wednesday March 3, 2010

RAPT Priorities• Priority 1 - Safety, anything to correct a known safety deficiency• Priority 2 - Newly installed or relocated NAVAIDs or airport runway

addition/change• Priority 3 - Procedures which test or implement an FAA initiative• Priority 4 - Procedures at airports with no existing IFR approach• Priority 5 - Procedures providing a reduction in minima• Priority 6 - Procedures which eliminate the requirement for a waiver

or NOTAM• Priority 7 - Procedures providing flow improvement• Priority 8 - Procedures providing other benefits, new criteria

compliance• Priority 9 - Public use procedures not included in 1 through 8• Priority 10 - Special and private procedures not providing benefits of

1 thru 8

Page 12: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

12Instrument Flight Procedures

Wednesday March 3, 2010

Timeline for Instrument Procedures

• Establish Pub Date: – Production Cycle (174 days). Full capacity thru 05/31/2012 (2,600 pending tasks between now and then)

• Example Flow based on Sept 23, 2010 pub date:– Feb 2010: FPO should have all data for their review– 4/2/10: FPO must fwd project to NFPO– 5/17/10: NFPO must fwd project to QC (45 days)– 6/16/10: QC fwd to FC for scheduling (30 days)– 7/24/10: SAT FC must be posted. (38 days)– 7/27/10: NFPO must fwd pkg NACO/NFDC (3 Days)– 9/23/10: Procedure published (56 day TPP cycle)

Page 13: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

13Instrument Flight Procedures

Wednesday March 3, 2010

•An LPV is a satellite based Approach procedure with vertical guidance.

•An LPV can provide minimums as low as CAT I ILS

(w/ approach lights and appropriate infrastructure). •An LPV Approach requires a “VG” survey.

•An LPV must have a clear GQS.

•Missed approach needs to go straight ahead initially

(until 8260.54 implemented)

What is an LPV?

Page 14: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

14Instrument Flight Procedures

Wednesday March 3, 2010

What is an RNP?

• An RNP is a satellite based Approach procedure with vertical guidance that includes onboard performance monitoring and alerting capability.

• Required Navigation Performance has different widths available (RNP 1.0, RNP 0.3, RNP 0.2, RNP 0.11)

• Radius-to-fix turns (RF) commonly used to reduce flight distances and avoid airspace/obstacles. (Not all RNP equipped aircraft have RF capability)

• Most airlines now equipped and all Commercial and Gulfstreams coming from factory with RNP. Training and certification are still required.

Page 15: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

15Instrument Flight Procedures

Wednesday March 3, 2010

Instrument Approach Procedure (IAP) Cancellation Program

• Cancellation Program was developed to identify those procedures which can be eliminated with little or no impact.

• The goal has been a 2 to 1 ratio, 1 cancellation for every two procedures added to the NAS

• Over 1,000 Procedure have been Cancelled in the last three years

NDB IAPs

VOR/DME RNAV procedures

VOR – Seldom used approaches

Page 16: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

16Instrument Flight Procedures

Wednesday March 3, 2010

Benefits of Cancellation Program

• Transition to Satellite based navigation; RNP, VNAV, LPV procedures provides lower minimums than the procedures they typically replace

(ie: NDB; VOR)• Less Cost to Technical Operations • Reduced Airspace Complexity• Reduced Flight Inspection Operational

Costs

Page 17: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministrationPennsylvania

Maryland andWashington DC

Jerry Lebar

[email protected]

404-305-7400

Page 18: Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports

Federal AviationAdministration

18Instrument Flight Procedures

Wednesday March 3, 2010

Eastern Flight Procedures Office

Questions ?????