Federal Aviation Administration 1 FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 Airports Division Great Lakes Region Overview of Key Functions and Response to Bidder Questions Federal Aviation Administration Presentation to: Prospective Privatization Bidders Chicago Midway International Airport Name: Jeri Alles Manager, Airports Division Great Lakes Region Date: Wednesday, July 30, 2008

Upload: heather-wells

Post on 30-Dec-2015

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 1

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

Airports DivisionGreat Lakes Region

Overview of Key Functions and Response to Bidder Questions

Federal AviationAdministration

Presentation to: Prospective Privatization BiddersChicago Midway International Airport

Name: Jeri AllesManager, Airports DivisionGreat Lakes Region

Date: Wednesday, July 30, 2008

Page 2: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 2

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

• Planning

• Environmental Processing

• Financial Assistance Programs

• Part 139 Certification

• Design/Construction Standards

• Compliance

Major Functions of the FAA’s Airports Division

Page 3: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 3

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

• To ensure that airports meet safety standards, 14 CFR Part 139 requires certain airports to obtain Airport Operating Certificates (AOCs).

• FAA roles in administering Part 139:

— Conduct annual inspection of certificated Airports to:

– Ensure compliance with the regulation

– Ensure FAA design standards are being followed

– Check for operational and construction safety

– Verify airport emergency response capability

— Disseminate national and regional standards and policies.

— Conduct continuous educational outreach to disseminate best practices in airport management.

Overview of Part 139 Airport Certification

Page 4: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 4

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

• Airport Operations Staffing

• Aircraft Rescue and Firefighting (ARFF)

• Airport Emergency Preparedness

• Wildlife Hazard Management

• Airfield Maintenance, Operation and Repair

• Snow and Ice Control

• Airport Personnel Training

• Ground Vehicle Operations Training

• Hazardous Materials Storage & Handling

• Safety During Construction

Major Airport Responsibilities Under Part 139

Page 5: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 5

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

Chicago Midway International Airport

• Certificated as a 14 CFR Part 139 Class I Airport.

• Classified as an Index C Aircraft Rescue & Firefighting (ARFF) airport.

• Last periodic inspection May 19-21, 2008.

• Over the past 12 years, MDW has received 11 annual inspections with zero discrepancies and one inspection with a single violation.

• No open Part 139 discrepancies.

• Recognized by FAA Airports Division with an Airport Safety Excellence Award.

Page 6: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 6

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

Part 139 Application Process

• Application for Certificate should be submitted to the FAA’s Airports Division, Great Lakes Regional Office.

• Application may be obtained: http://www.faa.gov/airports_airtraffic/airports/resources/forms/media/part139_5280-1.pdf

Page 7: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 7

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

Part 139 Application Process (cont’d)

• Two copies of the Airport Certification Manual (ACM) and all associated documentation must be submitted, including:

— Airport Emergency Plan

— Wildlife Hazard Management Plan

— New Letters of Agreement

— Organizational charts reflecting current line of succession for all operational responsibilities

• Part 139.303(f)(1, 2 and 3) requires that the ACM must include a description of responsibilities and duties that will be assumed by an independent organization or designee.

Page 8: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 8

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

Sample Part 139 Application Process (cont’d)

Operator prepares ACM

FAA Reviews ACM

Operator conducts all necessary training

FAA inspects airport

FAA issues new AOC

Page 9: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 9

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

Overview of Design/Construction Standards

• Airfield geometry:

— Critical dimensions

— Critical surfaces

— Critical separations

— Critical areas

• Engineering design standards

• Equipment specifications

• Approved systems

• Construction standards and processes

Page 10: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 10

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

Non-Standard Conditions

• Because standards change over time, existing facilities that originally met standards may no longer do so.

• We do not consider a non-standard condition to be grandfathered.

• The singular event of a change in airport ownership and/or control would not require non-standard features at MDW to be upgraded to FAA standards.

• However, our goal is to correct non-standard conditions where practical.

• If Federal funds are used to rehabilitate a non-standard facility, FAA would require it to be brought up to standards.

Page 11: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 11

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

Modifications to Standards

• In cases where non-standard features are studied and determined to provide an acceptable level of safety, the FAA may issue a “Modification to Standards.”

• A Modification to Standards may contain specific restrictions on use of a facility or timetable for correction of the non-standard condition.

Page 12: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 12

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

Overview of Design/Construction Standards (cont’d)

• Potential widening and lengthening of Runway 13R/31L?

• Any proposed airfield modifications would require extensive environmental, airspace, safety risk analysis and capacity analysis before a determination could be made.

Page 13: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 13

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

• Runways 13C/31C and 4R/22L are the only two runways certified under Part 139 for air carrier use.

• Runways 4L/22R and 13L/31R are available for air carrier taxi only.

• Runway 13R/31L unavailable for air carrier taxiing.

• Taxiways A and F are closed to aircraft over 79’ wingspan.

• Note: Any changes to the above restrictions must be studied through the airspace process.

Part 139 Constraints of Existing Airfield Configuration

Page 14: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 14

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

Obstruction Data

• Obstruction data for approaches to each runway end can be found in the City of Chicago’s latest 405 Survey.

Page 15: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 15

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

Engineered Material Arresting System (EMAS) at Midway

Page 16: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 16

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

• Chicago Airports District Office (ADO) ManagerJim Keefer(847) [email protected]

• Planning/Programming Branch ManagerElliott Black(847) [email protected]

• Safety/Standards Branch ManagerClaude Nuñez(847) [email protected]

• Airport Certification Safety Inspector (ACSI)Tricia Halpin(847) [email protected]

FAA Points of Contact

Page 17: Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, 2008 1 Airports Division Great Lakes

Federal AviationAdministration 17

FAA Presentation to Prospective BiddersChicago Midway International AirportJuly 30, 2008

Thank you!

Questions?

Federal AviationAdministration