Feasibility Scope of Work

Sandy Fire District No. 72 (SFD) and Clackamas Fire District No. 1 (CFD) are

seeking assistance analyzing options for service delivery, organizational structure, and financial

sustainability. To support this analysis the consultant will include the following Options:

• Evaluate the effectiveness of the current cooperative agreement /

Intergovernmental Agreement (IGA) between both Fire Districts to include

service delivery, efficiencies gained, or challenges created and resource

distribution and concentration

• Provide financial analysis to include micro and macroeconomics, growth

projections, review of capital assets (facilities, apparatus, real property) and

organizational structure

For future analysis:

• Describe opportunities and challenges of further collaboration or integration.

• Provide recommendations regarding various proposed options for each agency

remaining autonomous, working within the current or amended Intergovernmental

Agreement, Contract for Service and/or legal integration

The successful proposer will be required to prepare a detailed schedule of all tasks listed

in this Request for Qualification (RFQ). Throughout the duration of the professional services, the

consultant will be required to update the schedule created with progress.

If either Fire District determines any deliverables are not acceptable and any deficiencies

are the responsibility of the consultant, the Fire District shall prepare a detailed written

Page 3: Feasibility Scope of Work

description of deficiencies with associated time frame for correction and deliver such notice to

the consultant. The Consultant will correct any deficiencies at no cost to the districts.

If the corrective work causes any project delays, the Consultant will submit a plan

to return to the project schedule for the remaining work under the contract, unless otherwise

allowed by both fire districts. If the Fire Districts determine the contract schedule must be

modified, a contract amendment will be initiated.

Lastly, evaluation and analysis of data and related information will consider local and

national standards, Insurance Services Office (ISO) schedules, accreditation criteria, state and

federal regulations and industry best practices.

Background:

Fire districts in Clackamas County have a long-standing history of collaborative

governance and economies of scale through intergovernmental agreements and

consolidations. No other year in our history has better illustrated the need for such efforts than

2020. A world-wide pandemic, devastating wildfires and severe weather events have stretched

resources and challenged agencies to continue with current levels of service delivery.

During the last several years Clackamas Fire District #1 and Estacada Rural Fire District

#69 have engaged in several Intergovernmental Agreements. Ultimately, resulting in a full

contract for service and proposed merger of the two fire districts. Subsequently, Estacada voters

rejected the proposed merger in the November 2020 general election leaving both Districts to

unwind efforts and put a fire department back together. This has led to heightened awareness

Page 4: Feasibility Scope of Work

of communities, elected officials and organizations as to the efficiencies and effectiveness gained

through such collaboration as well as the strain and political toll if efforts are not successful.

This study and scope of work shall serve as a road map to avoid the challenges

experienced in Estacada, placing the service levels to our communities and sustainability of our

efforts as the top priority.

A detailed scope of work shall be included in the proposal to address the following:

Phase I: Project Initiation

Task 1-A: Project Initiation & Development of Work Plan

The consultant team members will converse with the project teams of SFD and CFD, to gain a

comprehensive understanding of each Fire District’s background, goals, and expectations for the

project. This meeting will also help to establish working relationships, make logistical

arrangements, and determine an appropriate line of communications. The consultant's project

manager will develop and refine a work plan that will guide the project team. This work plan will

be developed identifying:

• Primary tasks to be performed — as outlined below

o Person(s) responsible for each task

o Timetable for each objective to be completed

o Method of evaluating results

o Resources to be utilized

o Possible obstacles or problem areas associated with the accomplishment of

each task

Page 5: Feasibility Scope of Work

Deliverable: At the conclusion of Task 1-A, the consultant will provide a copy of

timelines to each district.

Task 1-B: Acquisition & Review of Background Information

The consultant will request pertinent information and data from each district’s assigned

project manager. This data will be used extensively in the analysis and development of the report

document. The documents and information relevant to this project will include, but not be

limited to, the following:

• Agency accreditation, emergency services studies or research

• Census data, demographics, regional growth projections

• Financial data, including debt information, long-range financial plans

and projections

• District administrative policies and procedures

• Standard Operating Guidelines (SOGs) and service delivery practices

• Current service delivery objectives for each District

• Facilities and apparatus inventories

• Local collective bargaining agreements

• Clackamas fire defense board mutual aid agreements

• Five years of records management data, including National Fire Incident

Reporting System (NFIRS) incident data

• Five years of Computer-Aided Dispatch (CAD) incident records

• Local Geographic Information Systems (GIS) data via both agencies current

vendor

Page 6: Feasibility Scope of Work

Task 1-C: Stakeholder Input

The consultant project team will conduct District site or virtual visits depending on state

and local COVID-19 risk levels, for the purpose of obtaining additional perspective on

operational, economic, and policy issues facing each agency. In addition, the project team will

learn more about availability of data necessary to meet projected goals and provide estimated

hours of input with costs associated with them.

Key personnel included:

• Fire District Board of Directors for both SFD and CFD (five each)

• Fire District chief officers

• Local 1159 / Local 1660 (labor leadership or designees)

• Volunteer Associations (Association Officers or designees from both agencies)

• Finance staff

• Human resource staff

• Department Heads

• Physician Advisor and/or EMS Coordinator

• C-COM Director

• Clackamas County Disaster Manager

• Clackamas County Fire Defense Board representative

• One neighborhood association from each Fire District (principal member or

designee)

Page 7: Feasibility Scope of Work

• One law enforcement agency from each Fire District (principal member or

designee)

• Others as they may contribute to this project

Deliverable: At the conclusion of Phase I, the consultant will provide a document

summarizing the data collection and stakeholder input process.

Phase II: Baseline Agency Evaluations

The initial phases of the study focus on a baseline assessment of the current

organizational conditions of each Fire District and previous five years' service performance of

the districts separately and the study area in its entirety. Previous reports, studies and

accreditation documents will be reviewed as background and context. The consultant will

conduct an organizational review of the Fire Districts based on the elements included in the

following tasks. The purpose of this evaluation is to assess the Fire Districts’ operations in

comparison to industry standards and best practices, as well as to create a benchmark against

which the options for future service delivery can be measured.

Task 2-A: Organization Overview

An overview of each organization and community will be developed discussing:

• Service area population and demographics

• History, formation, and general description of the Fire Districts today

• Description of the current service delivery infrastructure

• Governance and lines of authority

• Policy documents

Page 8: Feasibility Scope of Work

• Organizational design

• Contracts, IGAs and MOUs between participating agencies and labor groups

• Operating budget, funding, fees, taxation, and financial resources to include both

micro and macroeconomics in a five-year projection

Task 2-B: Management Components

Each organization’s basic management processes will be reviewed, including:

• Organizational structure

• Mission, vision, strategic planning, succession plans, goals, and objectives

• Internal and external assessment of critical issues

• Internal and external assessment of future challenges

• Internal and external communications processes

• Document control and security

• Reporting and recordkeeping

• Departments, Divisions, and other sub-groups within the Fire Districts (E.G., but

not limited to: Information Technology Systems, Volunteer associations,

Wellness, etc.)

Task 2-C: Capital Assets and Capital Improvement Programs

The consultant will review capital improvement plans, work products, review the status

of current major capital assets (facilities and apparatus) and analyze needs relative to the existing

condition of those assets and their viability for continued use in future service delivery,

including:

Page 9: Feasibility Scope of Work

Facilities — Tour and make observations in areas related to station efficiency and

functionality. Items to be contained in the report include:

• Design • Code compliance

• Construction • Staff facilities

• Safety • Efficiency

• Environmental issues • Future viability

Apparatus / Vehicles — Review and make observations regarding inventory of apparatus and

equipment. Items to be reviewed include:

• Age, condition, and serviceability

• Distribution and deployment

• Maintenance

• Regulation's compliance

• Future needs

In lieu of touring and reviewing apparatus or facilities, SFD and/or CFD may request that

the consultant review its existing work products, plans or reports concerning facilities, apparatus,

and vehicles and may deem them as sufficient for the purposes of the feasibility study. In such an

occurrence, the consultant shall adjust its pricing accordingly based on two proposed cost

estimates.

Task 2-D: Staffing and Personnel Management

The consultant will review each district’s staffing, responsibilities, and activity levels of

all personnel. Areas to be considered include:

• Analyze current standards of coverage and staffing performance for incidents

Page 10: Feasibility Scope of Work

• Review career and volunteer firefighter/EMS staff distribution

• Review and evaluate administration and support staffing levels

• Review and evaluate operational staffing levels

• Review staff allocation to various functions and divisions

• Review staff scheduling methodology

Personnel management systems of the districts will also be evaluated, focusing on:

• Human resources policies and handbooks

• Quality and status of job descriptions

• Personnel reports and recordkeeping

• Compensation systems

• Disciplinary process

• Counseling services

• Application and recruitment processes

• Testing, measuring, and promotion processes

• Member retention efforts and programs

Task 2-E: Service Delivery and Performance

The consultant will review and make observations in areas specifically involved in, or

affecting, service levels and performance of the districts, either individually or when operating in

concert with one another. Areas to be evaluated shall include, but not necessarily be limited to:

• Demand Study –

o Analysis of current service demand by incident type and temporal

variation for each Fire District

Page 11: Feasibility Scope of Work

o Analysis and geographic display of annual service demand density for the

previous five years within the study area

• Distribution Study –

o Overview of the current facility and apparatus deployment strategy,

analyzed through Geographical Information Systems software, with

identification of service gaps and redundancies. This distribution study

will be conducted for the study area, with all existing facilities included in

the analysis

• Concentration Study –

o Analysis of geographic display of the response time necessary to achieve

full effective response force for arrival in the study area using existing

distribution of all organizational resources. Effective response force shall

be defined by Clackamas Fire’s standard of cover document

o Analysis of company- and staff- distribution and ambulance

resources as it relates to effective response force assembly in the

study area

• Reliability Study –

o Analysis of current workload, including unit hour utilization, other

assignments, and down time of individual companies (to the extent data is

complete)

o Review of actual or estimated failure rates of individual companies (to the

extent data is complete)

Page 12: Feasibility Scope of Work

o Analysis of call concurrency and impact on effective response force

assembly

• Performance Summary –

o Analysis of system response time performance analyzed by individual

companies (to the extent data is available). Performance analysis will be

conducted for each district individually and for the study area.

• Incident control and management methods

• Mutual and automatic aid systems

Task 2-F: Support Programs

The consultant will review and make overall observations involving support programs

within each District. Critical areas to be reviewed include:

Life Safety Services (Fire Prevention)

• Code enforcement activities

• New construction inspection and involvement

• General inspection program

• Fire and Life-Safety public education programs

• Fire investigation programs

• Pre-incident planning

• Statistical collection and analysis

Communications

• Alarm systems and communications infrastructure

• PSAP and Dispatch Center capabilities and methods

Page 13: Feasibility Scope of Work

• Dispatch center staffing

• Funding obligations for CAD upgrade and radio system upgrade and equipment

Program practices and procedures, recordkeeping, administration / oversight for

the following departments:

• Logistics

• Fleet Maintenance

• Facilities

• Human resources

• Finance department

Task 2-G: Emergency Medical Services Support and System Oversight

Evaluate each Fire District’s Emergency Medical Services (EMS) support and oversight

mechanisms to include, but not limited to, the following:

• Review of EMS logistical support services

• Review of current medical control and oversight

• Review of quality assurance/quality improvement mechanisms in place

• Review of system integrity regarding required credentialing

Task 2-H: Technical Rescue Services Support and Response Capability

Evaluate the agencies’ capabilities regarding technical rescue incident response to

include, but not limited to, the following:

• Review of physical and personnel resources

• Review of training and educational compliance

Page 14: Feasibility Scope of Work

• Review of historical staffing performance regarding technical rescue responses

• Review certification and deployment of key personnel and resources

Task 2-I: Emergency Management

Evaluate the emergency management program and activities of each district.

• Analysis of this functional area; including content and staffing.

Task 2-J: Current Cooperative Services between SFD and CFD

Evaluate the current and

draft Intergovernmental Agreement and Other Shared Services between the Fire Districts. The

project report shall include:

Analysis of these functional areas; including their content and staffing.

• Staffing of station 18 in the Eagle Creek community

o Year 1: Staffing provided by CFD with (1/3) funded by SFD

o Year 2: Staffing of one shift provided and funded by SFD with other two

shifts funded and staffed by CFD

• Command and control

• Fleet Services

• Training

• Identification of the effectiveness and efficiency gained by each agency through

the agreement.

Deliverable: At the conclusion of Phase II the consultant will provide a summary

outlining findings and observations in the focus area(s) and tasks.

Page 15: Feasibility Scope of Work

Phase III: Future Opportunities for Cooperative Efforts

The consultant will use the completed baseline assessment of each Fire District to

identify opportunities and feasibility for cooperative efforts. The project team will identify areas

of duplication that can be reduced through consolidation efforts, as well as potential service

improvements that can be accomplished. Experience has shown that this frequently becomes the

overriding influence for public fire service consolidation efforts.

Task 3-A: General Partnering Strategies

The various partnering strategies are described, beginning with a do-nothing approach,

and ending with complete consolidation of the agencies into a new emergency service provider.

The following alternatives will be evaluated, discussed and recommendations for best options

provided:

• Continuation of existing IGAs (status quo)

• Amendments to existing IGAs

• Operational unification (contract for service)

• Legal Integration

Task 3-B: Options for Shared Services

The study considers the many shared issues that face the two Fire Districts, and how such

matters affect the effort to construct a regional model for efficient service. These issues are

identified and analyzed. Within each presented option for shared services, the consultant will

evaluate and discuss the following:

• Level of cooperation

Page 16: Feasibility Scope of Work

• Estimated timeline for completion

• Affected section, e.g., Administration, Operations, Support Services

• Affected stakeholders

• Objective of strategy

• Summary of strategy

• Guidance

• Fiscal considerations

• Economic considerations

• Political considerations

• Social considerations

• Policy actions

Task 3-C: Fiscal Analysis

Fiscal analysis is a vital component of the emergency services evaluation. The consultant

determines the fiscal state of each Fire District and develops recommendations on improving the

financial resources available for emergency services. The consultant will provide Oregon state

department, Office of Economic Analysis (OEA) and census data along with budgets for

each district to allow a comparative examination of the actual public costs for each

Fire District and as a tool for analyzing the financial effects of any type of general partnering

strategies. Funding mechanisms will be identified, and comprehensive financial outcomes

provided for each consolidation strategy offered.

Page 17: Feasibility Scope of Work

All recommendations are consistent with the Fire Districts’ financial capabilities to

provide adequate, cost-effective services to citizens. In addition, budgeting practices are

thoroughly examined, and alternate methodologies may be suggested. Within each presented

option for consolidation strategies, the consultant will evaluate and discuss the following:

• Review and analyze district budgets, revenues, expenditures, employment

costs, compression analysis, audit reports and long-range financial plans.

• Comparative analysis demonstrating cost, funding and efficiency in relation to

neighboring jurisdiction and similar jurisdictions

• Review and analyze the impacts of potential changes may have on

each jurisdiction under the options (as identified in Task 3-A)

• Financial projections for each option (as identified in Task 3-A) extending

five years.

• Revenue projections (growth/population analysis, compression analysis, assessed

value analysis)

• Property type diversity/revenue stability analysis

• Financial issue identification and analysis

• Identify areas of short and long-term savings and costs

• Projected costs to property owners for each option (as identified in Task 3-A)

• Existing or potential liabilities (e.g., PERS (Public Employees Retirement

System), Urban Renewal, legacy costs)

Page 18: Feasibility Scope of Work

In addition to the fiscal state evaluation of each Fire District, the consultant will present

an evaluation of various funding alternatives to assist in quantifying the cost of providing any

consolidated or merged emergency services as identified in Task 3-A. Presented alternatives will

include, but not necessarily be limited to, the following funding based on:

• Redirected funds

o Grants

o Disaster relief funds

o American recovery act

o Ground Emergency Medical Transport

• Charitable foundations

• Local Option Levy

• Future bond measures

• Cost allocation based on:

o Area

o Assessed value

o Deployment

o Service demand

o Permanent rate

o Population

o Multiple variables

Task 3-D: Findings, Recommendations, and Plan of Implementation

Page 19: Feasibility Scope of Work

Any cooperative venture between the districts presents the Fire District leaders with a

series of challenges. Successful implementation of any recommendation will require that

significant matters be addressed. Those issues will be identified here.

• Findings

o Feasibility of each option will be presented

• Preferred Option

o The preferred option or options will be presented and discussed at length

• Policy Action

o Necessary policy action by the elected bodies will be described

• Timelines

o The recommendations outlined in this section provide general completion

timelines offered to guide the agencies in developing a more detailed

listing during the formal planning process

• Process Issues

o Strategic planning, legal considerations, management and governance,

funding and other issues will be provided in detail

Deliverable: The consultant will provide six (6) copies per district of a draft

version of the written report, along with an electronic version in .pdf file

format for review.

Phase IV: Development, Review, and Delivery of Project Report

Task 4-A: Development and Review of Draft Project Report

Page 20: Feasibility Scope of Work

The consultant will develop and produce six (6) copies per district of a draft version of

the written report in loose leaf single print format, along with an electronic version in .pdf file

format for review. Client feedback is a critical part of this project and adequate opportunity will

be provided for review and discussion of the draft report prior to finalization. The report will

include:

• Narrative analysis of each report component structured in easy-to-read sections

and accompanied by explanatory support to encourage understanding by both

staff and civilian readers

• Clearly designated recommendations highlighted for easy reference and cataloged

as necessary in a report appendix

• Supportive charts, graphs, and diagrams, where appropriate

• Supportive maps, utilizing GIS analysis as necessary

Deliverable: The consultant will provide six (6) copies per district of a draft version of

the written report, along with an electronic version in .pdf file format for review.

Task 4-B: Delivery and Presentation of Final Project Report

The consultant will complete any necessary revisions of the draft and produce six (6)

copies per district of the bound, final version of the written report, along with an electronic

version in .pdf file format. Three formal presentations of the project report will be made by the

consultant project team member(s). The presentations will be delivered in-person or in virtual

settings based on state and local COVID-19 restrictions and risk levels.

Page 21: Feasibility Scope of Work

Presentations will include the following:

• A summary of the report, methods of analysis, primary findings, and critical

recommendations

• Review and explanation of primary supportive charts, graphs, diagrams, and

maps, where appropriate

• Opportunity for questions and answers, as needed

• All presentation materials, files, graphics, and written material will be provided to

the client at the conclusion of the presentation(s)

Deliverable: The Consultant will provide six (6) copies per Fire District of the bound,

final version of the written report, along with an electronic version in .pdf file format.

The consultant will conduct three presentations.

(Optional Services)

Public Input Meetings

At the conclusion of all phases, each district may request that the consultant staff

facilitate one or more community public input meetings. These meetings are intended to provide

information to, and gather input from, members of the public, community organizations, and

neighborhood associations.

Data and input gathered from the meeting will be summarized and the consultant will

analyze impact the public’s feedback would have on any of the preferred options. The consultant

will amend its recommendations as it determines appropriate. The consultant shall report the

Page 22: Feasibility Scope of Work

above in an addendum to the study. The consultant produces six (6) copies per district the

addendum and analysis, along with an electronic version in .pdf file format.

Deliverable: Should either agency request the consultant conduct community meetings,

the consultant will provide six (6) copies per district, the addendum along with an electronic

version in .pdf file format.

Timeline

It is anticipated the study will take 120 days from receipt of background information.

Appendix A:

Evaluation Process:

Proposals will be evaluated by the districts using the following two components:

1. Formal presentation of proposal utilizing the consultant project team members identified

for the project and Introductory letter. The consultant team members shall be the

identified and dedicated members for the project, accompanied by professional

biographies for each. (Pass/Fail)

2. Proposal evaluation by district teams for those consultants that passed component one.

Proposals will be evaluated by the districts using the following criteria: (Pass/Fail)

a. Availability and capability to perform the needed services described in this.

RFP.

b. Staff experience and expertise with similar projects.

Page 23: Feasibility Scope of Work

c. Ability to successfully complete similar services on time and within budget, including

Proposer’s record of satisfactory performance and references.

d. Project understanding.

e. Ability to synthesize information and clearly communicate orally and in

writing.

f. Description of proposed interactions with Fire District staff, Boards, and

community.

g. Understanding of and approach to the respective project communities.

h. Ability to make site visits to both Fire Districts facilities.

i. Cost of services and overall affordability of the proposal.

Lastly, proposals will be evaluated under the above criteria and weights, by an evaluation

committee made up of both the Board of Directors’ Interagency Committee and district’s staff.

The Committee reserves the right to interview one or more proposer, by invitation only, to be

presented to the joint districts interagency committee, in-person and teleconference.

Questions and requests for additional information, including the contract for this work,

should be addressed to either agency representative, at the addresses/numbers listed below.

Pursuant to ORS 279B.070 and Clackamas District Rule 137-047-0270 governing

intermediate procurements, Clackamas Fire District #1 and Sandy Fire District No. 72 will

receive sealed proposals no later than 5:00pm PST July 19, 2021. Please provide an electronic

copy via email and a hard copy by mail or delivered in person. Complete proposals must be

received by both agencies, addressed as follows, by the closing date and time, or they will be

rejected as non-responsive.

Page 24: Feasibility Scope of Work

Clackamas Fire District #1

Logistics Manager DeAnn Cordes

15800 SE 130th Avenue

Clackamas, OR 97015

[email protected]

(503) 742-2697

Sandy Fire District No. 72

Office Manager Nannette Howland

17460 Bruns Avenue

Sandy, Oregon 97055

[email protected]

503-668-8093

RESERVED RIGHTS

District reserved rights:

• Make clarifications, corrections, or changes in this RFP at any time prior to the

deadline for the submission of proposals. All prospective Proposers will be

informed of said clarifications, corrections, or changes.

• Reject any or all proposals not in compliance with all public procedures and

requirements;

• Reject any proposal not meeting the specifications set forth herein;

• Waive any or all irregularities in proposals submitted;

• Terminate this RFP at any time, for any reason;

• Reject any and all proposals without penalty, prior to the execution of a contract.

• Negotiate services and cost within the scope of this RFP with the highest ranked

Proposer. In the event Districts are unable to negotiate a contract with the highest

ranked Proposer, to commence contract negotiations with the next highest ranked

Proposer and to continue this process until a contract is executed;

• Award any or all parts of any proposal; and

Page 25: Feasibility Scope of Work

• Request references and other data to determine responsiveness.

• Request clarification of information submitted and to request additional

information of one or more potential Proposers.

• Accept the proposal that is, in its judgement, the best and most favorable to the

interests of Districts and to the public and to reject a low price proposal.