FEA and Deepwater Project Summary (2007 - 2014) APS/AWE TUI Expansion Conceptual Project for Magnum Subsea System, New Zealand. 2 water injection manifolds and 2 Gas Lift manifolds conceptual design project. Riser stalk on lifting with 13 degrees tilt, Riser upending analysis - Horizontal position 0º, 15º position, 30º position, 45º position, 60º position, 75º position and 90º position 1

Upload: raja-muazzam

Post on 15-Feb-2017

367 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FEA and Deepwater Project Summary 2007-2015

FEA and Deepwater Project Summary (2007 - 2014)

APS/AWE TUI Expansion Conceptual Project for Magnum Subsea System, New Zealand. 2 water injection manifolds and 2 Gas Lift manifolds

conceptual design project.

Riser stalk on lifting with 13 degrees tilt, Riser upending analysis - Horizontal position 0º, 15º position, 30º position, 45º position, 60º position, 75º position and 90º position

1

Page 2: FEA and Deepwater Project Summary 2007-2015

Apache Van Gogh Project, Gas Injection Manifold Systems For Exxonmobil, Australia

Light Weight Substructure research and development for OPE Company.

2

Page 3: FEA and Deepwater Project Summary 2007-2015

9th Well Manifold, Tahiti Development Subsea Project For Chevron North America Exploration & Production Company.

)

Figure 5.0b: Isometric View of 9th well manifold Structure (SACS Model)

Kizomba Manifold Development FEED Project For Exxonmobil, Angola, West Africa.

Isometric View of SDU Structure (SACS Model)

3

Page 4: FEA and Deepwater Project Summary 2007-2015

Isometric View of UTA Structure (SACS Model)

Isometric View of SDU UTA Structure (SACS Model)

Puffin Development Subsea Manifolds Design for AED.

4

Page 5: FEA and Deepwater Project Summary 2007-2015

Tahiti North (2 slot) Water Injection Pipeline End Manifold (PLEM) Systems For Chevron North America Exploration & Production Company

5

Page 6: FEA and Deepwater Project Summary 2007-2015

Tahiti South (4 slot) Water Injection Pipeline End Manifold (PLEM) Systems For Chevron North America Exploration & Production Company

Hub GHO 6"-6" capacity check analysis

6

Page 7: FEA and Deepwater Project Summary 2007-2015

Hub HCS 28"-23" capacity check analysis

Blind Flange 12" capacity check analysis

7

Page 8: FEA and Deepwater Project Summary 2007-2015

Blind Flange 24" capacity check analysis

Blind Flange 6" capacity check analysis

8

Page 9: FEA and Deepwater Project Summary 2007-2015

Test Hub 12" capacity check analysis

GHO strength capacity of guide funnel and guide rods

9

Page 10: FEA and Deepwater Project Summary 2007-2015

Guide funnel and guide rods welding Capacity

Normal operation Inboard support structure with reaction plate strength capacity analysis - 1st End (6" GHO System)

10

Page 11: FEA and Deepwater Project Summary 2007-2015

Normal operation Inboard support structure with reaction plate strength capacity analysis - 2nd End (6" GHO System)

Normal operation Inboard support structure with reaction plate strength capacity analysis - 1st End (12" GHO System)

11

Page 12: FEA and Deepwater Project Summary 2007-2015

Normal operation Inboard support structure with reaction plate strength capacity analysis - 2nd End (12" GHO System)

Wellhead protection structures

12

Page 13: FEA and Deepwater Project Summary 2007-2015

Pig launcher

Lifting Clamp Analysis

13

Page 14: FEA and Deepwater Project Summary 2007-2015

10’ Pulp Piece + Blind Flange

Xmas Hydrotest Hub + Blind Hub

14

Page 15: FEA and Deepwater Project Summary 2007-2015

Water Injection Hub Analysis

Lifting analysis

15

Page 16: FEA and Deepwater Project Summary 2007-2015

Hydrotest pressure - 8’ Pulp Piece + Blind Flange

Stinger – Trunnion Capacity Check

16

Page 17: FEA and Deepwater Project Summary 2007-2015

Gangway’s Support Capacity Check

Stern padeye Capacity Check

17

Page 18: FEA and Deepwater Project Summary 2007-2015

18