APS/AWE TUI Expansion Conceptual Project for Magnum Subsea System, New Zealand. 2 water injection manifolds and 2 Gas Lift manifolds
conceptual design project.
Riser stalk on lifting with 13 degrees tilt, Riser upending analysis - Horizontal position 0º, 15º position, 30º position, 45º position, 60º position, 75º position and 90º position
1
Apache Van Gogh Project, Gas Injection Manifold Systems For Exxonmobil, Australia
Light Weight Substructure research and development for OPE Company.
2
9th Well Manifold, Tahiti Development Subsea Project For Chevron North America Exploration & Production Company.
)
Figure 5.0b: Isometric View of 9th well manifold Structure (SACS Model)
Kizomba Manifold Development FEED Project For Exxonmobil, Angola, West Africa.
Isometric View of SDU Structure (SACS Model)
3
Isometric View of UTA Structure (SACS Model)
Isometric View of SDU UTA Structure (SACS Model)
Puffin Development Subsea Manifolds Design for AED.
4
Tahiti North (2 slot) Water Injection Pipeline End Manifold (PLEM) Systems For Chevron North America Exploration & Production Company
5
Tahiti South (4 slot) Water Injection Pipeline End Manifold (PLEM) Systems For Chevron North America Exploration & Production Company
Hub GHO 6"-6" capacity check analysis
6
Hub HCS 28"-23" capacity check analysis
Blind Flange 12" capacity check analysis
7
Blind Flange 24" capacity check analysis
Blind Flange 6" capacity check analysis
8
Test Hub 12" capacity check analysis
GHO strength capacity of guide funnel and guide rods
9
Guide funnel and guide rods welding Capacity
Normal operation Inboard support structure with reaction plate strength capacity analysis - 1st End (6" GHO System)
10
Normal operation Inboard support structure with reaction plate strength capacity analysis - 2nd End (6" GHO System)
Normal operation Inboard support structure with reaction plate strength capacity analysis - 1st End (12" GHO System)
11
Normal operation Inboard support structure with reaction plate strength capacity analysis - 2nd End (12" GHO System)
Wellhead protection structures
12
Pig launcher
Lifting Clamp Analysis
13
10’ Pulp Piece + Blind Flange
Xmas Hydrotest Hub + Blind Hub
14
Water Injection Hub Analysis
Lifting analysis
15
Hydrotest pressure - 8’ Pulp Piece + Blind Flange
Stinger – Trunnion Capacity Check
16
Gangway’s Support Capacity Check
Stern padeye Capacity Check
17
18