fdot tentative work program 2016-2020
DESCRIPTION
ÂTRANSCRIPT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
July 1, 2015 Through June 30, 2020
COUNTYPOLK
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
-
DRAFT
2016 2020
TENTATIVE WORK PROGRAM REPORT
Tentative Work Program Fiscal Years
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 111/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
COUNTYPOLK
MISSION STATEMENT The Department will provide a safe, interconnected statewide transportation system for Florida's citizens and visitors that ensures the mobility of people and goods, while enhancing economic prosperity and sustaining the quality of our environment.
July 1, 2015 Through June 30, 2020
DRAFTTENTATIVE WORK PROGRAM REPORT
Robin StublenCommunications SpecialistDistrict One Headquarters801 North BroadwayP.O. Box 1249Bartow, FL 33831(863) 519-2362
Debbie TowerCommunications DirectorSouthwest Area Office10041 Daniels ParkwayFort Myers, FL 33913(239) 461-4300
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 211/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
COUNTYPOLK
July 1, 2015 Through June 30, 2020
CURRENTLY REPORTED ACTIVE FUND CODES
DRAFTTENTATIVE WORK PROGRAM REPORT
ACSU
BRRP State Bridge Repair And Rehab
CIGP County Incentive Grant Program
CM Congestion Mitigation – ACQ
DDR District Dedicated Revenue
DI State-Statewide Inter/Intrastate Highway
DIH State In-house Product Support
DITS Statewide ITS - State 100%
DPTO State PTO
DS State Primary Highways and PTO
DU State Primary/Federal Reimbursement
DWS Weigh Stations - State 100%
FAA Federal Aviation Administration
FTA Federal Transit Administration
FTAT FHWA Transfer to FTA (non-bud)
HSP Highway Safety Program
LF Local Funds
LFP Local Fund for Participating
PKYI Tpk Improvement
PKYR Tpk Maintenance Reserve
PL Metro Plan (85% FA; 15% other)
RHH Rail-Highway Xings – Hazard
SA STP, Any Area
SL STP, Areas < 200k
SU STP, Urban Areas > 200k
TRIP Trans Regional Incentive Prog
ACBZ
ACNP
ACTU
NHRE
TALT
TALU
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 311/14/2014Run Date: SnapShot Date: 11/12/2014
Advance Construction (SU)
Advance Construction BRTZ
Advance Construction NHPP
NAT HWY Perform Resurfacing
Advance Construction TALU
Transportation ALTS ANY AREATransportation ALTS >200K
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
HIGHWAYS
FPN: 4136441 Project/Location: AUBURNDALE TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.820
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 10.690 End Mile Post: 11.510
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DDR $25,536 $26,303 $27,092 $27,904 $28,741
$25,536 $26,303 $27,092 $27,904 $28,741Project Total:
FPN: 4328091 Project/Location: BAKER ST FROM N VAN FLEET DR TO BRITTS
LANE-XING #624503-T
Project Length: 0.201
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.201
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
RRU RHH $270,600
$270,600Project Total:
FPN: 4367951 Project/Location: BARTOW ADAPTIVE DBOM US 98 FROM MANOR
DR TO US 17
Project Length: 1.111
Desc: ATMS - ARTERIAL TRAFFIC MGMT
Comments:
Begin Mile Post: 1.194 End Mile Post: 1.994
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE DI $75,000
DSB DI $793,046
DSB DIH $25,675
OPS DI $109,334 $109,334
$893,721 $109,334 $109,334Project Total:
FPN: 4313521 Project/Location: BARTOW NORTHERN CONNECTOR PHASE II
FROM US 17 TO SR 60
Project Length: 2.000
Desc: NEW ROAD CONSTRUCTION
Comments:
Begin Mile Post: 2.062 End Mile Post: 4.062
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST CIGP $467,864
CST LFP $9,819,995
CST TRIP $2,998,420
$13,286,279Project Total:
FPN: 4136451 Project/Location: BARTOW TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 1.002
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 16.896 End Mile Post: 17.898
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DDR $36,480 $37,575 $38,702 $39,863 $41,059
$36,480 $37,575 $38,702 $39,863 $41,059Project Total:
FPN: 4332571 Project/Location: BELLA VISTA FROM MLK JR AVE TO LAKE
PARKER DRIVE
Project Length: 0.000
Desc: BIKE PATH/TRAIL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
LAR ACTU $320,287
$320,287Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 411/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4345081 Project/Location: BOMBER ROAD AT SPRUCE ROAD AND GERBER
ROAD
Project Length: 1.000
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 0.000 End Mile Post: 1.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ENV SA $10,000 $20,000
CST HSP $661,193
CST SA $10,530
$10,000 $691,723Project Total:
FPN: 4351071 Project/Location: BRUNNELL PARKWAY FROM MEMORIAL BLVD
TO TENTH STREET
Project Length: 0.556
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.844 End Mile Post: 1.400
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST SU $151,090
$151,090Project Total:
FPN: 4316411 Project/Location: CENTRAL POLK PWKY FROM POLK PWKY (SR
540) TO SR 35 (US 17)
Project Length: 7.103
Desc: NEW ROAD CONSTRUCTION
Comments:
Begin Mile Post: 0.000 End Mile Post: 7.103
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ROW DDR $1,966,740 $1,985,083
ROW DIH $151,944 $136,943
$2,118,684 $2,122,026Project Total:
FPN: 4316412 Project/Location: CENTRAL POLK PWKY FROM SR 35 (US 17) TO
LOGISTICS PARKWAY
Project Length: 5.794
Desc: NEW ROAD CONSTRUCTION
Comments:
Begin Mile Post: 7.103 End Mile Post: 12.897
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ROW DDR $4,611,162 $3,479,790
ROW DIH $506,479 $456,479
$5,117,641 $3,936,269Project Total:
FPN: 4316418 Project/Location: CENTRAL POLK PWKY FROM US 17/US 92 TO I-
4
Project Length: 0.001
Desc: NEW ROAD CONSTRUCTION
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE DDR $9,212,000
PE DIH $110,000
$9,322,000Project Total:
FPN: 1976204 Project/Location: CITY OF LAKELAND LEASE OF FIBER OPTIC
NETWORK
Project Length: 0.000
Desc: TRAFFIC CONTROL DEVICES/SYSTEM
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS SL $20,278 $20,278 $20,278 $20,278 $20,278
$20,278 $20,278 $20,278 $20,278 $20,278Project Total:
FPN: 4367891 Project/Location: COLEMAN RD RECKER HWY TO 26TH ST X-ING #
625397R
Project Length: 0.122
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 1.021 End Mile Post: 1.143
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
RRU RHH $276,600
$276,600Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 511/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4317721 Project/Location: COW CAMP ROAD BRIDGE NO. 160400 OVER
ROSALIE/ZIPPRER CANAL
Project Length: 0.001
Desc: BRIDGE REPLACEMENT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST ACBZ $1,668,600
$1,668,600Project Total:
FPN: 4367871 Project/Location: CR 542 OLD TAMPA HWY FROM GAY RD TO DOC
GAY RD X-ING #624214S
Project Length: 0.199
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 2.659 End Mile Post: 2.858
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
RRU RHH $119,671
$119,671Project Total:
FPN: 4367911 Project/Location: CR 542 OLD TAMPA HWY FROM GAY RD TO GAY
RDX-ING #624215Y
Project Length: 0.034
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 2.625 End Mile Post: 2.659
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
RRU RHH $119,671
$119,671Project Total:
FPN: 4332721 Project/Location: CR 544 AT SR 17
Project Length: 0.001
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST LF $70,485
CST SU $1,000,182
$1,070,667Project Total:
FPN: 4332741 Project/Location: CR 655 (RIFLE RANGEROAD) FROM 10TH STREET
E TO BOMBER ROAD
Project Length: 0.865
Desc: SIDEWALK
Comments:
Begin Mile Post: 9.645 End Mile Post: 10.510
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST SU $295,146
$295,146Project Total:
FPN: 4349421 Project/Location: CREWS LAKE RD FROM LAKELAND HIGHLANDS
RD TO KITTY FOX
Project Length: 2.770
Desc: TRAFFIC OPS IMPROVEMENT
Comments:
Begin Mile Post: 0.000 End Mile Post: 2.770
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST HSP $1,483,046
CST SA $8,424
$1,491,470Project Total:
FPN: 4350691 Project/Location: CRYSTAL LAKE DR FROM US 98 TO NEW JERSEY
RD
Project Length: 0.343
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.326 End Mile Post: 0.669
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST ACSU $550,159
CST SU $1,000
$551,159Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 611/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4350941 Project/Location: DAVENPORT COMPLETE STREET PHASE I AND
PHASE II
Project Length: 0.001
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE TALU $225,000
$225,000Project Total:
FPN: 4136461 Project/Location: DAVENPORT TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.094
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 3.768 End Mile Post: 3.862
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DDR $3,040 $3,132 $3,226 $3,322 $3,422
$3,040 $3,132 $3,226 $3,322 $3,422Project Total:
FPN: 4361451 Project/Location: DRAINAGE IMPROVEMENT CTY OF LAKE
ALFRED FROM E HOFFMAN ST TO E ORANGE ST
Project Length: 0.199
Desc: DRAINAGE IMPROVEMENTS
Comments:
Begin Mile Post: 15.215 End Mile Post: 15.414
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST DIH $5,135
CST DS $374,757
CST LF $51,350
$431,242Project Total:
FPN: 4136471 Project/Location: DUNDEE TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 1.065
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 28.850 End Mile Post: 29.915
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DDR $9,728 $10,020 $10,321 $10,631 $10,949
$9,728 $10,020 $10,321 $10,631 $10,949Project Total:
FPN: 4136481 Project/Location: EAGLE LAKE TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.440
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 25.390 End Mile Post: 25.830
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DDR $9,120 $9,394 $9,676 $9,966 $10,265
$9,120 $9,394 $9,676 $9,966 $10,265Project Total:
FPN: 4332291 Project/Location: EAST LAKE HOWARD TRAIL
Project Length: 0.000
Desc: BIKE PATH/TRAIL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST TALT $342,360
CST TALU $256,475
$598,835Project Total:
FPN: 4309181 Project/Location: EASTSIDE ELEMENTARY SCHOOL SAFETY
SIDEWALKS
Project Length: 0.000
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST TALT $174,758
$174,758Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 711/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4345021 Project/Location: EWELL ROAD AT LUNN RD
Project Length: 5.000
Desc: SKID HAZARD OVERLAY
Comments:
Begin Mile Post: 0.000 End Mile Post: 5.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE HSP $96,293
CST HSP $463,342
CST SA $10,530
$96,293 $473,872Project Total:
FPN: 4136491 Project/Location: FROSTPROOF TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 1.443
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 4.750 End Mile Post: 6.193
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DDR $7,752 $7,985 $8,225 $8,471 $8,725
$7,752 $7,985 $8,225 $8,471 $8,725Project Total:
FPN: 4136501 Project/Location: FT MEADE TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.700
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 7.000 End Mile Post: 7.700
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DDR $8,360 $8,611 $8,870 $9,136 $9,410
$8,360 $8,611 $8,870 $9,136 $9,410Project Total:
FPN: 4136511 Project/Location: HAINES CITY TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 1.270
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 21.500 End Mile Post: 22.770
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DDR $38,912 $40,080 $41,282 $42,521 $43,796
$38,912 $40,080 $41,282 $42,521 $43,796Project Total:
FPN: 4301853 Project/Location: I-4 @ SR 33 INTERCHANGE
MODIFICATION
Project Length: 0.650
Desc: INTERCHANGE IMPROVEMENT
Comments:
Begin Mile Post: 12.032 End Mile Post: 12.682
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ENV SA $1,300,000
ROW DIH $271,270
ROW DS $33,489
ROW SA $2,483,295
$1,300,000 $2,788,054Project Total:
FPN: 2012178 Project/Location: I-4 AT CSX RAILROAD
Project Length: 0.004
Desc: REPLACE RAILROAD BRIDGE
Comments:
Begin Mile Post: 4.887 End Mile Post: 4.891
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE ACNP $1,690,000
$1,690,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 811/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 2012153 Project/Location: I-4 AT SR 557
Project Length: 1.610
Desc: INTERCHANGE IMPROVEMENT
Comments:
Begin Mile Post: 21.767 End Mile Post: 22.878
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ENV DI $100,000
RRU ACNP $4,500,000
CST ACNP $54,664,218
CST DIH $508,099
$100,000 $59,672,317Project Total:
FPN: 4273152 Project/Location: I-4 FROM EAST OF POLK PARKWAY TO OSCEOLA
COUNTY LINE
Project Length: 16.235
Desc: ITS FREEWAY MANAGEMENT
Comments:
Begin Mile Post: 15.787 End Mile Post: 32.022
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE HSP $75,000
DSB DIH $23,621
DSB HSP $3,635,366
$3,733,987Project Total:
FPN: 4328041 Project/Location: INTERLACHEN PKWY FROM FERN RD TO E
GARY RD-XING# 624155-S
Project Length: 0.091
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 0.168 End Mile Post: 0.259
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
RRU RHH $281,300
$281,300Project Total:
FPN: 4136521 Project/Location: LAKE ALFRED TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.010
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 15.590 End Mile Post: 15.600
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DDR $10,336 $10,647 $10,966 $11,294 $11,634
$10,336 $10,647 $10,966 $11,294 $11,634Project Total:
FPN: 4351091 Project/Location: LAKE HOWARD DR FROM AVE D SW TO 15TH ST
SW
Project Length: 0.001
Desc: BIKE PATH/TRAIL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE LF $155,000
CST TALT $83,773
CST TALU $344,752
$155,000 $428,525Project Total:
FPN: 4136531 Project/Location: LAKE WALES TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 1.017
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 18.968 End Mile Post: 19.985
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DDR $33,440 $34,444 $35,477 $36,541 $37,638
$33,440 $34,444 $35,477 $36,541 $37,638Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 911/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4371071 Project/Location: LAKELAND TMC OPS FUND CITY
WIDE
Project Length: 0.001
Desc: OTHER ITS
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DS $159,000 $159,000
$159,000 $159,000Project Total:
FPN: 4136541 Project/Location: LAKELAND TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 4.770
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 23.830 End Mile Post: 28.600
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DDR $345,372 $355,733 $369,727 $380,819
OPS DITS $335,312
$335,312 $345,372 $355,733 $369,727 $380,819Project Total:
FPN: 4367901 Project/Location: LEM CARNES RD CR 547N TO SR 600/US 17 X-ING
#622960T
Project Length: 0.010
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.010
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
RRU RHH $270,600
$270,600Project Total:
FPN: 4350611 Project/Location: LINCOLN AVE SIDEWALKS
Project Length: 0.498
Desc: SIDEWALK
Comments:
Begin Mile Post: 1.226 End Mile Post: 1.724
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST ACSU $231,540
CST SU $1,000
$232,540Project Total:
FPN: 4298831 Project/Location: LK ALFRED TR AT US 17/92 BRIDGE
Project Length: 0.100
Desc: PEDESTRIAN/WILDLIFE OVERPASS
Comments:
Begin Mile Post: 14.406 End Mile Post: 14.506
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ENV TALT $50,000
CST CM $1,524,600
CST DDR $48,444
CST SA $214,087
$1,837,131Project Total:
FPN: 4136551 Project/Location: MULBERRY TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 2.500
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 18.450 End Mile Post: 20.950
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DDR $18,240 $18,788 $19,351 $19,932 $20,530
$18,240 $18,788 $19,351 $19,932 $20,530Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 1011/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4332581 Project/Location: NEW JERSEY TRAIL FROM CRYSTAL LAKE
DRIVE TO EDGEWOOD DRIVE
Project Length: 0.000
Desc: BIKE PATH/TRAIL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
LAR ACSU $269,314
$269,314Project Total:
FPN: 4332601 Project/Location: NEW YORK CYCLE TRACK (LIME STREET) FROM
SIKES BLVD TO NEW YORK AVENUE
Project Length: 0.000
Desc: BIKE PATH/TRAIL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE LF $115,307
PE TALU $1,000
CST TALU $532,500
$116,307 $532,500Project Total:
FPN: 4344891 Project/Location: OLD DIXIE HIGHWAY/ SADDLE CREEK
ROAD
Project Length: 0.500
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.500
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST HSP $679,483
CST SA $10,530
$690,013Project Total:
FPN: 4353911 Project/Location: OLD DIXIE TRAIL FROM AUBURNDALE TO
HAINES CITY
Project Length: 0.001
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PDE SU $1,048,752
$1,048,752Project Total:
FPN: 4367881 Project/Location: PAYNE ST SR 600/US92 - BLUE JAY AVE X-ING
#623084U
Project Length: 0.001
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
RRU RHH $255,600
$255,600Project Total:
FPN: 4350461 Project/Location: POLK COUNTY SCOUR COUNTERMEASURE AT
VARIOUS LOCATIONS
Project Length: 4.484
Desc: BRIDGE-REPAIR/REHABILITATION
Comments:
Begin Mile Post: 25.276 End Mile Post: 25.298
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST BRRP $163,791
CST DIH $24,488
$188,279Project Total:
FPN: 4126751 Project/Location: POLK COUNTY TRAFFICSIGNALS
REIMBURSEMENT
Project Length: 12.175
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 2.300 End Mile Post: 14.475
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DDR $374,649 $385,888 $400,787 $412,810
OPS DITS $363,736
$363,736 $374,649 $385,888 $400,787 $412,810Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 1111/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4125301 Project/Location: POLK TPO IDENTIFIED OPERATIONAL
IMPROVEMENTS- FUNDING
Project Length: 0.000
Desc: TRAFFIC OPS IMPROVEMENT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE SU $220
ROW SU $220
CST SU $3,059,726 $5,952,956 $4,987,260 $5,951,368
$3,059,726 $5,952,956 $4,987,260 $5,951,808Project Total:
FPN: 4351041 Project/Location: ROSE STREET SIDEWALKS AT VARIOUS
LOCATIONS
Project Length: 0.533
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.144 End Mile Post: 0.677
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE LF $70,000
CST TALT $13,542
CST TALU $256,576
$70,000 $270,118Project Total:
FPN: 4333791 Project/Location: SR 17 AT HUNT BROTHERS ROAD
Project Length: 0.296
Desc: ROUNDABOUT
Comments:
Begin Mile Post: 17.203 End Mile Post: 17.499
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
INC DDR $40,000
$40,000Project Total:
FPN: 4344881 Project/Location: SR 33 (LAKELAND HILLS BLVD) AT N SOCRUM
LOOP RD
Project Length: 0.206
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 3.510 End Mile Post: 3.716
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST DDR $6,967
CST DIH $25,816
CST HSP $168,366 $6,318
$201,149 $6,318Project Total:
FPN: 4333961 Project/Location: SR 33 AT DEEN STILL ROAD
Project Length: 0.285
Desc: ROUNDABOUT
Comments:
Begin Mile Post: 19.580 End Mile Post: 19.865
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
INC DDR $32,000
$32,000Project Total:
FPN: 4312911 Project/Location: SR 33 FROM HAYNES CIRCLE TO
WITHLACOOCHEE BRIDGE
Project Length: 12.535
Desc: RESURFACING
Comments:
Begin Mile Post: 14.603 End Mile Post: 27.138
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ENV DS $50,000
CST DDR $3,561,825
CST DIH $154,050
CST DS $3,602,942
$7,368,817Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 1211/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4366731 Project/Location: SR 35/700 (US 98) FROM N. OF WEST SOCRUM
LOOP RD TO SR 471
Project Length: 7.531
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 9.005 End Mile Post: 16.536
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PDE DIH $200,000
PDE DS $2,100,000
$2,300,000Project Total:
FPN: 1975624 Project/Location: SR 35/700 (US98) FROM EDGEWOOD DRIVE TO E
MAIN STREET
Project Length: 3.033
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 9.189 End Mile Post: 12.222
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ROW CM $1,723,607 $1,723,454
ROW SA $1,522,651 $4,242,750
$3,246,258 $5,966,204Project Total:
FPN: 4312781 Project/Location: SR 35/SR 555/US 17 FROM BARTOW RD TO BEAR
CREEK APTS
Project Length: 3.050
Desc: RESURFACING
Comments:
Begin Mile Post: 15.969 End Mile Post: 18.511
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ENV DS $50,000
CST DDR $154,050
CST DIH $107,835
CST SA $5,040,708
$5,352,593Project Total:
FPN: 4345071 Project/Location: SR 37 AT LAKE HARRIS DRIVE
Project Length: 0.285
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 23.436 End Mile Post: 23.721
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST DDR $31,982
CST HSP $641,240
CST SA $10,530
$683,752Project Total:
FPN: 4349371 Project/Location: SR 37 FROM CR 630 TO CR 640 (PINECREST
RD)
Project Length: 7.571
Desc: RESURFACING
Comments:
Begin Mile Post: 7.386 End Mile Post: 14.957
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
RRU DS $100,000
CST DIH $95,536
CST DS $6,522,511
$100,000 $6,618,047Project Total:
FPN: 4366011 Project/Location: SR 37 FROM SR 60 TO N OF VIRGINIA
ST
Project Length: 0.796
Desc: RESURFACING
Comments:
Begin Mile Post: 18.209 End Mile Post: 19.005
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE DIH $100,000
CST SA $1,818,211
$100,000 $1,818,211Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 1311/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4106662 Project/Location: SR 542 FROM 1ST STREET TO BUCKEYE LOOP
RD
Project Length: 2.305
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 0.380 End Mile Post: 2.685
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ENV DS $40,000 $200,000
RRU DDR $1,000,000
RRU LF $2,951,628
ROW SU $5,241,467 $1,221,060
CST DDR $15,736,323
CST DIH $331,800
$5,281,467 $1,421,060 $20,019,751Project Total:
FPN: 4106664 Project/Location: SR 542 FROM 1ST STREET TO BUCKEYE LOOP
ROAD
Project Length: 2.476
Desc: LANDSCAPING
Comments:
Begin Mile Post: 0.000 End Mile Post: 2.476
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST DIH $5,670
CST DS $234,396
$240,066Project Total:
FPN: 4106663 Project/Location: SR 542 FROM BUCKEYE LOOP ROAD TO US
27
Project Length: 3.648
Desc: WIDEN/RESURFACE EXIST LANES
Comments:
Begin Mile Post: 2.779 End Mile Post: 6.427
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ROW DDR $5,402,004 $6,810,022
ROW DIH $477,405 $477,405
$5,879,409 $7,287,427Project Total:
FPN: 4352841 Project/Location: SR 546 (MEMORIAL) FROM CHESTNUT RD E TO
BRUNNELL PKWY
Project Length: 0.856
Desc: BIKE PATH/TRAIL
Comments:
Begin Mile Post: 3.876 End Mile Post: 4.732
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE DIH $10,000
CST DIH $15,405
CST DS $883,672
$909,077Project Total:
FPN: 4365691 Project/Location: SR 546 (US 92) FROM WABASH AVENUE TO N.
INGRAHAM AVENUE
Project Length: 3.311
Desc: RIGID PAVEMENT REHABILITATION
Comments:
Begin Mile Post: 1.738 End Mile Post: 5.049
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE DIH $10,000
CST NHRE $3,696,305
CST SA $4,839,609
$10,000 $8,535,914Project Total:
FPN: 4350711 Project/Location: SR 555 (US 17) FROM AVENUE G SW TO AVENUE A
SW
Project Length: 0.497
Desc: RESURFACING
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.497
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST DDR $2,084,013
CST DIH $17,646
$2,101,659Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 1411/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4350851 Project/Location: SR 563 (SIKES BLVD)FROM LIME ST TO SR 539
(MLK JR BLVD)
Project Length: 0.417
Desc: RIGID PAVEMENT REHABILITATION
Comments:
Begin Mile Post: 0.006 End Mile Post: 0.423
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE DIH $10,000
CST DDR $980,530
CST DIH $111,290
$10,000 $1,091,820Project Total:
FPN: 4345091 Project/Location: SR 60 AT BAILEY RD
Project Length: 0.303
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 2.848 End Mile Post: 3.151
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST DDR $25,300
CST HSP $596,354
CST SA $54,963
$676,617Project Total:
FPN: 4312941 Project/Location: SR 60 FROM CR 630 TO KISSIMMEE RIVER
BR
Project Length: 5.876
Desc: RESURFACING
Comments:
Begin Mile Post: 18.634 End Mile Post: 24.510
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST DDR $803,563
CST DIH $205,400
CST DS $4,549,309
$5,558,272Project Total:
FPN: 4356061 Project/Location: SR 60 HILLSBOROUGH C/L DIESEL
RD
Project Length: 5.281
Desc: RESURFACING
Comments:
Begin Mile Post: 0.000 End Mile Post: 5.281
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
RRU DS $275,000
CST DDR $3,425,710
CST NHRE $5,966,364
CST SA $105,300
$275,000 $9,497,374Project Total:
FPN: 4349381 Project/Location: SR 600 (US 92) FROM W OF THOMPSON RD TO E
OF FISH HATCHERY RD
Project Length: 0.164
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 3.859 End Mile Post: 4.023
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
RRU DS $75,000
CST DIH $130,536
CST DS $996,463
$75,000 $1,126,999Project Total:
FPN: 4350751 Project/Location: SR 600 (US 92) FROM E OF WALKER RD TO SR
544
Project Length: 1.868
Desc: RESURFACING
Comments:
Begin Mile Post: 9.236 End Mile Post: 11.104
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST DDR $4,626,710
CST DIH $28,756
$4,655,466Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 1511/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4350761 Project/Location: SR 600 (US 92) FROM E OF SR 544 TO W OF JERSEY
RD
Project Length: 0.824
Desc: RESURFACING
Comments:
Begin Mile Post: 11.104 End Mile Post: 11.928
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST DDR $1,204,970
CST DIH $16,432
$1,221,402Project Total:
FPN: 4366721 Project/Location: SR35/700 US 98 FROM WEST DAUGHTERY ROAD
TO NORTH OF WEST SOCRUM LOOP RD
Project Length: 3.382
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 5.623 End Mile Post: 9.005
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PDE DIH $150,000
PDE SA $1,500,000
$1,650,000Project Total:
FPN: 4347621 Project/Location: SR546 (MEMORIAL BLVD) FROM I-4 TO WABASH
AVE
Project Length: 1.412
Desc: RIGID PAVEMENT RECONSTRUCTION
Comments:
Begin Mile Post: 0.300 End Mile Post: 1.712
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ENV DDR $75,000
CST DDR $9,620,274
CST DIH $46,831
CST DS $1,667,620
INC DDR $480,000
$11,409,725 $480,000Project Total:
FPN: 4350781 Project/Location: US 17 AND 544 BUS STOP
IMPROVEMENTS
Project Length: 0.000
Desc: PUBLIC TRANSPORTATION SHELTER
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST FTAT $49,661
CST SU $49,661
$99,322Project Total:
FPN: 4313511 Project/Location: US 17/92 HINSON AVE FROM SR 17 (10TH STREET)
TO 17TH STREET
Project Length: 0.310
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 22.460 End Mile Post: 22.770
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PDE DIH $20,000
PDE DS $150,998 $800,000
$170,998 $800,000Project Total:
FPN: 4313512 Project/Location: US 17/92 HINSON AVE FROM SR 17 (10TH STREET)
TO 17TH STREET
Project Length: 0.310
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 22.460 End Mile Post: 22.770
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE DIH $3,000
PE DS $1,350,000
$1,353,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 1611/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4345061 Project/Location: US 27 AT MAIN ST/CRUMP RD
Project Length: 0.379
Desc: LIGHTING
Comments:
Begin Mile Post: 10.303 End Mile Post: 10.682
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE HSP $64,437
CST DDR $12,925
CST HSP $264,801
CST SA $10,530
$64,437 $288,256Project Total:
FPN: 4192434 Project/Location: US 27 FROM PRESIDENTS DRIVE TO SR
60
Project Length: 5.178
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 13.638 End Mile Post: 18.816
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ENV DI $195,000 $500,000
CST DDR $52,843,410
CST DIH $941,628
$195,000 $500,000 $53,785,038Project Total:
FPN: 4312061 Project/Location: US 92 (SR 600) FROM CHURCHILL AVE TO SLOAN
AVE
Project Length: 2.663
Desc: RESURFACING
Comments:
Begin Mile Post: 2.469 End Mile Post: 5.132
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ENV DS $100,000
RRU DS $5,000
CST DIH $82,160
CST DS $4,326,132
$4,513,292Project Total:
FPN: 4312081 Project/Location: US 92 (SR 600) FROM REYNOLDS RD TO
SCHALAMAR CREEK ENT
Project Length: 1.250
Desc: BRIDGE REPLACEMENT
Comments:
Begin Mile Post: 4.327 End Mile Post: 5.577
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST DDR $884,467
CST DIH $386,374
CST DS $10,635,796
INC DS $392,000
$11,906,637 $392,000Project Total:
FPN: 4335582 Project/Location: US 92 FROM COUNTY LINE ROAD TO WABASH
AVENUE
Project Length: 4.131
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 0.000 End Mile Post: 4.131
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE SA $4,450,000
$4,450,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 1711/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4351081 Project/Location: US 92 FROM HOLIDAY MPH ENTRANCE TO N
CHESTNUT RD
Project Length: 1.504
Desc: SIDEWALK
Comments:
Begin Mile Post: 2.486 End Mile Post: 3.990
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE SU $345,000
CST DS $45,093
CST SU $965,076
$345,000 $1,010,169Project Total:
FPN: 4298131 Project/Location: US 92 -NEW TAMPA HWY AT WABASH
AVE
Project Length: 0.200
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 4.031 End Mile Post: 4.231
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ENV DDR $10,000 $30,000
CST DDR $818,466
CST DIH $1,000
$10,000 $30,000 $819,466Project Total:
FPN: 4348862 Project/Location: US 98 (PEACE RIVER-FT MEADE) AT BRIDGE NO
0064 (JOHN SINGLETARY BRIDGE)
Project Length: 0.103
Desc: BRIDGE REPLACEMENT
Comments:
Begin Mile Post: 1.189 End Mile Post: 1.292
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE DIH $100,000
PE SA $2,000,000
$2,100,000Project Total:
FPN: 4313121 Project/Location: US 98 (SR 35) FROM LAKE BONNY PARK TO MAIN
STREET
Project Length: 0.893
Desc: RESURFACING
Comments:
Begin Mile Post: 11.329 End Mile Post: 12.222
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST DIH $51,350
CST SA $1,860,303
$1,911,653Project Total:
FPN: 4353421 Project/Location: US 98 (SR35 & SR700) VIRTUAL WEIGH STATION
STUDY
Project Length: 8.745
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 9.005 End Mile Post: 17.750
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PDE DWS $1,000,000
$1,000,000Project Total:
FPN: 4313531 Project/Location: WESTGATE-CENTRAL TRAIL FROM WEST
BELMAR ST TO OAKHILL STREET
Project Length: 0.790
Desc: BIKE PATH/TRAIL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.790
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST LF $182,005
CST SU $127,595
CST TALT $97,851
CST TALU $333,722
$741,173Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 1811/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4371081 Project/Location: WINTER HAVEN TMC OPS CITY
WIDE
Project Length: 0.001
Desc: OTHER ITS
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DS $43,500 $43,500
$43,500 $43,500Project Total:
FPN: 4136561 Project/Location: WINTER HAVEN TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 2.880
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 27.760 End Mile Post: 30.640
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DDR $89,832 $92,527 $95,303 $98,162 $101,107
$89,832 $92,527 $95,303 $98,162 $101,107Project Total:
HIGHWAYS TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20
$82,415,719 $54,804,203 $19,625,560 $60,639,156 $139,956,731
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 1911/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
TRANSPORTATION PLANNING
FPN: 4348551 Project/Location: POLK COUNTY MPO 2018/2019 UPWP
Project Length: 0.000
Desc: TRANSPORTATION PLANNING
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PLN PL $615,778 $615,778
$615,778 $615,778Project Total:
FPN: 4256691 Project/Location: POLK COUNTY MPO FY 2015/2016
UPWP
Project Length: 0.000
Desc: TRANSPORTATION PLANNING
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PLN PL $615,778
$615,778Project Total:
FPN: 4318091 Project/Location: POLK COUNTY MPO FY 2017/2018
UPWP
Project Length: 0.000
Desc: TRANSPORTATION PLANNING
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PLN PL $615,778 $615,778
$615,778 $615,778Project Total:
TRANSPORTATION PLANNING TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20
$615,778 $615,778 $615,778 $615,778 $615,778
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 2011/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
TURNPIKE
FPN: 4289721 Project/Location: PAINT BRIDGES - POLK
PKWY(160249,160250,160251 ,160252,160253,160254)
Project Length: 7.400
Desc: BRIDGE - PAINTING
Comments:
Begin Mile Post: 0.000 End Mile Post: 5.600
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE PKYR $218,419
CST PKYR $1,653,771
$218,419 $1,653,771Project Total:
FPN: 4311232 Project/Location: PAINT BRIDGES - POLK PARKWAY (160267 &
160268)
Project Length: 0.958
Desc: BRIDGE - PAINTING
Comments:
Begin Mile Post: 13.568 End Mile Post: 14.526
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE PKYI $1,500 $200,000
CST PKYI $1,541
CST PKYR $403,276
$3,041 $200,000 $403,276Project Total:
FPN: 4365201 Project/Location: RESURFACE POLK PKWY, MP 0.00-8.00 & 17.24-
18.09
Project Length: 18.090
Desc: RESURFACING
Comments:
Begin Mile Post: 0.000 End Mile Post: 18.090
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE PKYR $566,685
CST PKYR $6,375,211
$566,685 $6,375,211Project Total:
FPN: 4365202 Project/Location: THERMOPLASTIC OF POLK PKWY RESURFACING
FROM MP 0.00-8.00 & 17.24-18.09
Project Length: 18.090
Desc: SIGNING/PAVEMENT MARKINGS
Comments:
Begin Mile Post: 0.000 End Mile Post: 18.090
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CST PKYR $303,440
$303,440Project Total:
TURNPIKE TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20
$3,041 $985,104 $8,432,258 $303,440
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 2111/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FLP: AVIATION
FPN: 4363721 Project/Location: AIRFIELD PAVEMENT MARKINGS AT BARTOW
MUNICIPAL AIRPORT
Project Length: 0.000
Desc: AVIATION PRESERVATION PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DPTO $266,308
CAP LF $66,577
$332,885Project Total:
FPN: 4370601 Project/Location: BARTOW MINICIPAL AIRPORT CAPITAL
IMPROVEMENTS
Project Length: 0.000
Desc: AVIATION REVENUE/OPERATIONAL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $600,000 $600,000
CAP LF $150,000 $150,000
$750,000 $750,000Project Total:
FPN: 4336461 Project/Location: BARTOW MUNICIPAL AIRPORT
Project Length: 0.000
Desc: AVIATION PRESERVATION PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $640,000
CAP LF $160,000
$800,000Project Total:
FPN: 4348191 Project/Location: BARTOW MUNICIPAL AIRPORT CAPITAL
IMPROVEMENTS
Project Length: 0.000
Desc: AVIATION CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DPTO $405,000
CAP LF $101,250
$506,250Project Total:
FPN: 4336371 Project/Location: LAKE WALES MUNICIPAL AIRPORT
Project Length: 0.000
Desc: AVIATION REVENUE/OPERATIONAL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $197,993
CAP LF $49,498
$247,491Project Total:
FPN: 4204181 Project/Location: LAKELAND LINDER REGIONAL AIRPORT
CAPITAL IMPROVEMENTS
Project Length: 0.000
Desc: AVIATION SECURITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DPTO $300,000
CAP LF $75,000
$375,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 2211/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4204231 Project/Location: LAKELAND LINDER REGIONAL
AIRPORT
Project Length: 0.000
Desc: AVIATION SAFETY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $800,000 $1,192,481
CAP LF $200,000
$1,000,000 $1,192,481Project Total:
FPN: 4309681 Project/Location: LAKELAND LINDER REGIONAL AIRPORT
CAPITAL IMPROVEMENT
Project Length: 0.000
Desc: AVIATION REVENUE/OPERATIONAL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $340,000
CAP DPTO $354,442
CAP LF $88,610 $85,000
$443,052 $425,000Project Total:
FPN: 4313701 Project/Location: LAKELAND LINDER REGIONAL AIRPORT
CAPITAL IMPROVEMENTS
Project Length: 0.000
Desc: AVIATION SAFETY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $41,742
CAP DPTO $208,258
CAP FAA $4,500,000
CAP LF $250,000
$5,000,000Project Total:
FPN: 4336381 Project/Location: LAKELAND LINDER REGIONAL
AIRPORT
Project Length: 0.000
Desc: AVIATION PRESERVATION PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $5,000 $96,000 $1,587,200
CAP DPTO $32,200
CAP FAA $1,800,000
CAP LF $1,100 $24,000 $396,800
$1,806,100 $152,200 $1,984,000Project Total:
FPN: 4362011 Project/Location: LAKELAND LINDER REGIONAL AIRPORT
AIRSIDE CENTER ROOF
Project Length: 0.000
Desc: AVIATION PRESERVATION PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $200,000
CAP DPTO $522,500 $522,500
CAP LF $522,500 $522,500 $200,000
$1,045,000 $1,045,000 $400,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 2311/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4369751 Project/Location: LAKELAND LINDER REGIONAL AIRPORT
CAPITAL IMPROVEMENT
Project Length: 0.000
Desc: AVIATION PRESERVATION PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DPTO $37,500
CAP FAA $675,000
CAP LF $37,500
$750,000Project Total:
FPN: 4369771 Project/Location: LAKELAND LINDER REGIONAL AIRPORT
CAPITAL IMPROVEMENT
Project Length: 0.000
Desc: AVIATION PRESERVATION PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DPTO $63,750
CAP FAA $1,147,500
CAP LF $63,750
$1,275,000Project Total:
FPN: 4369781 Project/Location: LAKELAND LINDER REGIONAL AIRPORT
CAPITAL IMPROVEMENT
Project Length: 0.000
Desc: AVIATION PRESERVATION PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $146,590
CAP DPTO $13,410
CAP FAA $2,880,000
CAP LF $160,000
$3,200,000Project Total:
FPN: 4370771 Project/Location: LAKELAND LINDER REGIONAL AIRPORT
CAPITAL IMPROVEMENT
Project Length: 0.000
Desc: AVIATION CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $775,000
CAP LF $258,333
$1,033,333Project Total:
FPN: 4370781 Project/Location: LAKELAND LINDER REGIONAL AIRPORT
CAPITAL IMPROVEMENTS
Project Length: 0.000
Desc: AVIATION REVENUE/OPERATIONAL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $490,000
CAP LF $490,000
$980,000Project Total:
FPN: 4370791 Project/Location: LAKELAND LINDER REGIONAL AIRPORT
CAPITAL IMPROVEMENT
Project Length: 0.000
Desc: AVIATION REVENUE/OPERATIONAL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DPTO $440,000
CAP LF $440,000
$880,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 2411/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FLP: AVIATION TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20
$8,783,985 $2,238,052 $3,774,691 $4,592,064 $6,984,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 2511/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FLP: INTERMODAL
FPN: 4309701 Project/Location: BARTOW MUNICIPAL AIRPORT CAPITAL
IMPROVEMENTS
Project Length: 0.000
Desc: AVIATION CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $605,573
CAP DPTO $994,427 $390,000
CAP LF $400,000 $97,500
$2,000,000 $487,500Project Total:
FPN: 4370591 Project/Location: BARTOW MUNICIPAL AIRPORT CAPITAL
IMPROVEMENTS
Project Length: 0.000
Desc: AVIATION REVENUE/OPERATIONAL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DPTO $600,000
CAP LF $600,000
$1,200,000Project Total:
FPN: 4358231 Project/Location: LAKELAND LINDER REGIONAL AIRPORT
FACILITY REHABILITATION
Project Length: 0.000
Desc: AVIATION CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $112,184
CAP LF $28,046
$140,230Project Total:
FPN: 4369901 Project/Location: LAKELAND LINDER REGIONAL AIRPORT
CAPITAL IMPROVEMENT
Project Length: 0.000
Desc: AVIATION PRESERVATION PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $100,000 $1,140,000
CAP DPTO $1,500,000 $1,500,000
CAP LF $100,000 $1,500,000 $1,500,000 $1,140,000
$200,000 $3,000,000 $3,000,000 $2,280,000Project Total:
FLP: INTERMODAL TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20
$2,340,230 $3,487,500 $3,000,000 $2,280,000 $1,200,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 2611/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FLP: RAIL
FPN: 4366561 Project/Location: NEW YORK AVENUE PEDESTRIAN
UNDERPASS
Project Length: 0.000
Desc: RAIL CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE TRIP $1,500,000
ENV TRIP $25,000
RRU TRIP $30,000 $400,000
ROW DIH $28,000
ROW TRIP $153,000
CST DIH $481,500
$2,036,500 $181,000 $400,000Project Total:
FLP: RAIL TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20
$2,036,500 $181,000 $400,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 2711/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FLP: TRANSIT
FPN: 4101491 Project/Location: LAKELAND - LAMTD FTA 5307
Project Length: 0.000
Desc: CAPITAL FOR FIXED ROUTE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP FTA $638,412 $638,412 $638,412 $638,412 $638,412
CAP LF $159,603 $159,603 $159,603 $159,603 $159,603
$798,015 $798,015 $798,015 $798,015 $798,015Project Total:
FPN: 4101492 Project/Location: LAKELAND - LAMTD FTA SECTION 5307
OPERATING
Project Length: 0.000
Desc: OPERATING FOR FIXED ROUTE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS FTA $1,915,235 $1,915,235 $1,915,235 $1,915,235 $1,915,235
OPS LF $1,915,235 $1,915,235 $1,915,235 $1,915,235 $1,915,235
$3,830,470 $3,830,470 $3,830,470 $3,830,470 $3,830,470Project Total:
FPN: 4101421 Project/Location: LAKELAND AREA MASS TRANSIT - OPERATING
ASSISTANCE STATE BLOCK GRANT
Project Length: 0.000
Desc: OPERATING FOR FIXED ROUTE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DPTO $784,359 $783,999 $804,267 $830,819 $872,359
OPS LF $784,359 $783,999 $804,267 $830,819 $872,359
$1,568,718 $1,567,998 $1,608,534 $1,661,638 $1,744,718Project Total:
FPN: 4140631 Project/Location: LAKELAND AREA MASS TRANSIT (LAMTD)-
OPERATING ASSISTANCE - CORRIDOR
Project Length: 0.000
Desc: URBAN CORRIDOR IMPROVEMENTS
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DPTO $452,852 $709,151 $762,481 $795,083 $818,945
OPS LF $452,852 $709,151 $762,481 $795,083 $818,945
$905,704 $1,418,302 $1,524,962 $1,590,166 $1,637,890Project Total:
FPN: 4328381 Project/Location: LAKELAND AREA MASS TRANSIT DISTRICT
CAPITAL IMPROVEMENT
Project Length: 0.000
Desc: CAPITAL FOR FIXED ROUTE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DPTO $50,000
CAP LF $12,500
$62,500Project Total:
FPN: 4101161 Project/Location: POLK COUNTY TPO TRANSIT PLANNING - FTA
SECTION 5305 (D)
Project Length: 0.000
Desc: MODAL SYSTEMS PLANNING
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PLN DPTO $14,745 $14,745 $15,187 $15,187 $15,195
PLN DU $117,962 $117,962 $121,501 $121,501 $121,559
PLN LF $14,745 $14,745 $15,187 $15,187 $15,195
$147,452 $147,452 $151,875 $151,875 $151,949Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 2811/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FPN: 4101281 Project/Location: POLK COUNTY TRANSIT OPERATING
ASSISTANCE FTA SECTION 5311
Project Length: 0.000
Desc: OPERATING/ADMIN. ASSISTANCE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DU $712,856 $712,856 $712,856 $712,856 $897,295
OPS LF $712,856 $712,856 $712,856 $712,856 $897,295
$1,425,712 $1,425,712 $1,425,712 $1,425,712 $1,794,590Project Total:
FPN: 4357711 Project/Location: POLK TRANSIT FTA SECT 5339 CAPITAL ASSIST
LKLD/WH UZA
Project Length: 0.000
Desc: CAPITAL FOR FIXED ROUTE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP FTA $490,708 $490,708 $490,708 $490,708 $480,121
CAP LF $122,678 $122,678 $122,678 $122,678 $120,030
$613,386 $613,386 $613,386 $613,386 $600,151Project Total:
FPN: 4350771 Project/Location: TRANSIT STOP IMPROVEMENTS @ VARIOUS
LOCATIONS FTAT TRANSFER
Project Length: 0.000
Desc: TRANSIT IMPROVEMENT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP FTAT $174,028
CAP SU $174,028
$348,056Project Total:
FPN: 4101501 Project/Location: WINTER HAVEN AREA MASS TRANSIT FTA
SECTION 5307 CAPITAL ASSISTANCE
Project Length: 0.000
Desc: CAPITAL FOR FIXED ROUTE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP FTA $500,743 $500,743 $500,743 $500,743 $515,092
CAP LF $125,186 $125,186 $125,186 $125,186 $128,773
$625,929 $625,929 $625,929 $625,929 $643,865Project Total:
FPN: 4101502 Project/Location: WINTER HAVEN AREA MASS TRANSIT FTA
SECTION 5307 OPERATING ASSISTANCE
Project Length: 0.000
Desc: OPERATING FOR FIXED ROUTE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS FTA $1,502,230 $1,502,230 $1,502,230 $1,502,230 $1,545,276
OPS LF $1,502,230 $1,502,230 $1,502,230 $1,502,230 $1,545,276
$3,004,460 $3,004,460 $3,004,460 $3,004,460 $3,090,552Project Total:
FPN: 4101431 Project/Location: WINTER HAVEN AREA TRANSIT (WHAT)
OPERATING STATE TRANSIT BLOCK GRANT
Project Length: 0.000
Desc: OPERATING FOR FIXED ROUTE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
OPS DPTO $711,773 $711,446 $729,838 $753,933 $791,629
OPS LF $711,773 $711,446 $729,838 $753,933 $791,629
$1,423,546 $1,422,892 $1,459,676 $1,507,866 $1,583,258Project Total:
FPN: 4328391 Project/Location: WINTER HAVEN AREA TRANSIT CAPITAL
IMPROVEMENT
Project Length: 0.000
Desc: CAPITAL FOR FIXED ROUTE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
CAP DDR $50,000
CAP LF $12,500
$62,500Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 2911/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FLP: TRANSIT TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20
$14,816,448 $14,854,616 $15,043,019 $15,209,517 $15,875,458
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 3011/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
FLORIDA RAIL ENTERPRISE
FPN: 4366501 Project/Location: ITS IMPROVEMENT TO TRAFFIC OPERATIONS IN
THE DOWNTOWN AREA
Project Length: 0.000
Desc: RAIL CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE DIH $50,000
PE TRIP $75,000
DSB DIH $179,273
DSB TRIP $1,842,225
RRU DPTO $300,000
$350,000 $2,096,498Project Total:
FPN: 4366531 Project/Location: KENTUCKY AVENUE PEDESTRIAN
OVERPASS
Project Length: 0.000
Desc: RAIL CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE TRIP $1,000,000
ENV DPTO $20,000
RRU TRIP $30,000 $400,000
ROW DIH $54,000
ROW TRIP $88,000
CST DIH $258,000
$20,000 $1,288,000 $142,000 $400,000Project Total:
FPN: 4365601 Project/Location: RECKER HIGHWAY CONSTRUCT A BRIDGE
SPANNING THE CSX RR TRACK IN POLK CO
Project Length: 0.000
Desc: RAIL CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
PE TRIP $2,700,000
ENV TRIP $25,000
RRU TRIP $30,000
ROW DIH $70,000
ROW TRIP $3,517,000
$2,755,000 $3,587,000Project Total:
FPN: 4365591 Project/Location: SR60 GRADE SEPARATION OVER CSX
RAILROAD
Project Length: 0.000
Desc: RAIL CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
ENV TRIP $75,000
RRU DPTO $500,000
CST DPTO $24,739,633
CST TRIP $2,300,000
$500,000 $27,114,633Project Total:
FLORIDA RAIL ENTERPRISE TOTAL 2015/16 2016/17 2017/18 2018/19 2019/20
$370,000 $3,884,498 $29,869,633 $142,000 $3,987,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 3111/24/2014Run Date: SnapShot Date: 11/12/2014
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2015 Through June 30, 2020 COUNTYPOLK
DRAFT
COUNTY TOTALSPOLK
Phase Fund Total2015/16 2016/17 2017/18 2018/19 2019/20
$109,345,201 $82,906,251 $80,360,939 $83,962,955 $169,018,967COUNTY Total: $525,594,313
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 3211/24/2014Run Date: SnapShot Date: 11/12/2014
H a r d e e C o \ LH a r d e e C o \ L
Hills
boro
ugh
Co\ L
H il l s
b or o
ugh
Co\ L
O s c e o l a Co \ L
Osc eo l a Co \ L
A v o n P a r kA v o n P a r kB o m b i n g R a n g eB o m b i n g R a n g e
G r e e n S w a m pG r e e n S w a m pP a s c oP a s c oC o \ LC o \ L
Sumter
Sumter
Co\LCo\L
L a k e C o \ LL a k e C o \ L O r a n g e C o \ LO r a n g e C o \ L
®q
®q
®q
®q
ÜÜÜ17
ÜÜÜ37
ÜÜÜ33
ÜÜÜ60
ÜÜÜ570
ÜÜÜ544
ÜÜÜ540
ÜÜÜ659
ÜÜÜ542ÜÜÜ655ÜÜÜ572
ÜÜÜ471
ÜÜÜ563
ÜÜÜ674
ÜÜÜ559
ÜÜÜ540ÜÜÜ570
ÜÜÜ570
ÜÜÜ17
ÜÜÜ60ÜÜÜ60
ÜÜÜ64
ÜÜÜ544
ÜÜÜ33
ÜÜÜ33
ÜÜÜ35
ÜÜÜ35
ÜÜÜ35ÜÜÜ700
ÜÜÜ540
(((27
(((17
(((92
(((98
(((17
(((98
(((92
(((17
(((27
(((27
(((98
(((98
(((92
(((92
(((17
(((17
(((17
(((192
%&'(4
%&'(4
4567557
4567640
L a k eL a k eK i s s i m m e eK i s s i m m e e
L a k eL a k eW e o h y a k a p k aW e o h y a k a p k a
L a k eL a k eR o s a l i eR o s a l i e
T i g e rT i g e r L a k e L a k e
R e e d yR e e d yL a k eL a k e
Lak e A r b u c k l e
L ak e A r b u c k l e
C r o o k e dC r o o k e dL a k eL a k e
L a k eL a k eP i e r c eP i e r c e
L a k e L a k eH a t c h i n e h aH a t c h i n e h a
L a k eL a k eH a n c o c kH a n c o c k
L a k eL a k eP a r k e rP a r k e r
L a k eL a k eB u f f u mB u f f u m
L a k eL a k eM a r i o nM a r i o n
B ar t o wB ar t o wM u n ic ip a lM u n ic ip a l
A i rp o r tA i rp o r t
L ake W a l esL ake W a l esM u n ic ip a lM u n ic ip a l
A i rp o r tA i rp o r t
La ke la n d-La ke la n d-L in de rL in de r
Re g i ona lRe g i ona lAi rp or tAi rp or t
W in t er Ha v enW in t er Ha v en M un ic ip a l M un ic ip a l A i rp or t A i rp or t
D u n d e eD u n d e e
F o r tM e a d e
W i n t e rH a v e n
L a k eW a l e s
C r o o k e dC r o o k e dL a k eL a k eP a r kP a r k
L a k e L a k eH a m i l t o nH a m i l t o n
B a r t o wM u l b e r r yM u l b e r r y
H a i n e s C i t y
L a k e l a n dL a k eL a k e
A l f r e dA l f r e d
C y p r e s sC y p r e s sG a r d e n sG a r d e n s
P o l kP o l kC i t yC i t y
D a v e n p o r tD a v e n p o r t
F r o s t p r o o fF r o s t p r o o f
11/20/2014Map Source: FDOT Roads/Linear Referencing System, Disclaimer: This map is for reference purposes only. FDOT assumes no responsibility for errors or omissions in the data.
L a ke l an d - L i n d e rL a ke l an d - L i n d e rR eg io n a l A i r p o r tR eg io n a l A i r p o r t
®q
(((92
(((98
(((92
(((98
ÜÜÜ659
ÜÜÜ572
ÜÜÜ563ÜÜÜ570
ÜÜÜ33
ÜÜÜ539
ÜÜÜ546
ÜÜÜ600
ÜÜÜ35
ÜÜÜ37
ÜÜÜ35
%&'(4
45675824567542A
456733A
4567542
L a k eL a k eP a r k e rP a r k e r
L a k eL a k eB o n n yB o n n y
C OM B
E EC O
M BE E
GALL
OWAY
GALL
OWAY
E D G E W O O DE D G E W O O D
G R I F F I N R DG R I F F I N R D
1 0 t h S T1 0 t h S T
M E M O R I A L B L V DM E M O R I A L B L V D
B A R T O W R D
B A R T O W R D
FLOR
IDA
AVE
FLOR
IDA
AVE
O L D T A M P AO L D T A M P A H W Y H W Y
B E L L A V I S T A S TB E L L A V I S T A S T
A R I A N A S TA R I A N A S T
RDRD
AIRP
ORT
AIRP
ORT
RDRD
K A T H L E E NK A T H L E E N
R DR D
LAKE
L AN D
HI L
L SL A
K EL A
N D H
I LL S
B LV D
B LV D R DR D
L AK E
L AK E
P AR K
E R A
V EP A
R KE R
AV E
WAB
ASH
WAB
ASH
AVE
AVE
N E W T A M P AN E W T A M P A
H W YH W Y
P O L KP O L K P K W YP K W Y HARD
ENHA
RDEN
BLVD
BLVD D RD R
L a k e l a n d
®q
®q
®q
®q (((17
(((92
(((92
(((17(((27
(((17
ÜÜÜ544
ÜÜÜ540
ÜÜÜ542ÜÜÜ655
ÜÜÜ540
ÜÜÜ559
ÜÜÜ570
ÜÜÜ544
4567550
4567542
4567655
4567546
L a k e L a k eH a m i l t o nH a m i l t o n
L a k eL a k eH e n r yH e n r y
L a k e L a k eF a n n i eF a n n i e
L a k eL a k eR o c h e l l eR o c h e l l e
L a k e L a k eA r i a n aA r i a n a L a k e L a k e
M a r i a n n a M a r i a n n a
L a k eL a k eA l f r e dA l f r e d
L a k e L a k eH a i n e sH a i n e s
L a k eL a k eS h i p pS h i p p
Wi n t er H a venWi n t er H a venMu n i c i p a lMu n i c i p a l
Ai r p o r tAi r p o r t
42ND
42ND STST
D U N D E E R DD U N D E E R D
D E R B Y A V ED E R B Y A V E
3RD
ST3R
D ST
A V E N U E GA V E N U E G
A V E TA V E T
1ST
ST1S
T ST
6TH
ST6T
H ST
W I N T E R L A K EW I N T E R L A K ER DR D
O L DO L DL A K E L A N D R DL A K E L A N D R D
H W YH W YR E C K E RR E C K E R
B L V DB L V D
H A V E N D A L E
H A V E N D A L E
L U CL U C P A R KP A R K R DR DE R N EE R N E
D RD RO V E R L O O KO V E R L O O K
C Y P R E S SC Y P R E S S G A R D E N SG A R D E N SB L V DB L V D
W i n t e rH a v e n
L a k e A l f r e dL a k e A l f r e d
C y p r e s sC y p r e s sG a r d e n sG a r d e n s
A u b u r n d a l eA u b u r n d a l e
µ
Revision #
ÆÆ88
ÆÆ99
0 5Miles
0 10Miles
POLK COUNTYRESURFACING PROJECTS
LEGEND
Interstate HighwaysState Roads and US HighwaysCity/County Roads
Resurfacing Projects
ÆÆ66
ÆÆ55
ÆÆ1212
ÆÆ1111
ÆÆ44
ÆÆ1010
ÆÆ1515
ÆÆ1616
ÆÆ11
ÆÆ33ÆÆ1717
DRAFT TENTATIVE WORK PROGRAMFY 2015/2016 - FY 2019/2020
ÆÆ77
ÆÆ1414
ÆÆ1313
ÆÆ22
# FPN Facility Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
4345021
Description: SKID HAZARD OVERLAY
EWELL ROAD AT LUNN RD 1 CST HSP $0 $463,342 $0 $0 $0
CST SA $0 $10,530 $0 $0 $0
PE HSP $96,293 $0 $0 $0 $0
$96,293 $473,872 $0 $0 $0Project Total:
4365201
Description: RESURFACING
RESURFACE POLK PKWY,
MP 0.00-8.00 & 17.24-18.092 CST PKYR $0 $0 $6,375,211 $0 $0
PE PKYR $0 $566,685 $0 $0 $0
$0 $566,685 $6,375,211 $0 $0Project Total:
4312911
Description: RESURFACING
SR 33 FROM HAYNES CIRCLE
TO WITHLACOOCHEE
BRIDGE
3 CST DDR $3,561,825 $0 $0 $0 $0
CST DIH $154,050 $0 $0 $0 $0
CST DS $3,602,942 $0 $0 $0 $0
ENV DS $50,000 $0 $0 $0 $0
$7,368,817 $0 $0 $0 $0Project Total:
4312781
Description: RESURFACING
SR 35/SR 555/US 17 FROM
BARTOW RD TO BEAR
CREEK APTS
4 CST DDR $154,050 $0 $0 $0 $0
CST DIH $107,835 $0 $0 $0 $0
CST SA $5,040,708 $0 $0 $0 $0
ENV DS $50,000 $0 $0 $0 $0
$5,352,593 $0 $0 $0 $0Project Total:
4349371
Description: RESURFACING
SR 37 FROM CR 630 TO CR
640 (PINECREST RD) 5 CST DIH $0 $95,536 $0 $0 $0
CST DS $0 $6,522,511 $0 $0 $0
RRU DS $100,000 $0 $0 $0 $0
$100,000 $6,618,047 $0 $0 $0Project Total:
4366011
Description: RESURFACING
SR 37 FROM SR 60 TO N OF
VIRGINIA ST 6 CST SA $0 $1,818,211 $0 $0 $0
PE DIH $100,000 $0 $0 $0 $0
$100,000 $1,818,211 $0 $0 $0Project Total:
4106663
Description: WIDEN/RESURFACE EXIST LANES
SR 542 FROM BUCKEYE
LOOP ROAD TO US 27
7 ROW DDR $5,402,004 $6,810,022 $0 $0 $0
ROW DIH $477,405 $477,405 $0 $0 $0
$5,879,409 $7,287,427 $0 $0 $0Project Total:
4365691
Description: RIGID PAVEMENT REHABILITATION
SR 546 (US 92) FROM
WABASH AVENUE TO N.
INGRAHAM AVENUE
8 CST NHRE $0 $0 $3,696,305 $0 $0
CST SA $0 $0 $4,839,609 $0 $0
PE DIH $10,000 $0 $0 $0 $0
$10,000 $0 $8,535,914 $0 $0Project Total:
4350711
Description: RESURFACING
SR 555 (US 17) FROM
AVENUE G SW TO AVENUE A
SW
9 CST DDR $0 $2,084,013 $0 $0 $0
CST DIH $0 $17,646 $0 $0 $0
$0 $2,101,659 $0 $0 $0Project Total:
4350851
Description: RIGID PAVEMENT REHABILITATION
SR 563 (SIKES BLVD)FROM
LIME ST TO SR 539 (MLK JR
BLVD)
10 CST DDR $0 $0 $0 $0 $980,530
CST DIH $0 $0 $0 $0 $111,290
PE DIH $0 $0 $10,000 $0 $0
$0 $0 $10,000 $0 $1,091,820Project Total:
4312941
Description: RESURFACING
SR 60 FROM CR 630 TO
KISSIMMEE RIVER BR
11 CST DDR $803,563 $0 $0 $0 $0
CST DIH $205,400 $0 $0 $0 $0
CST DS $4,549,309 $0 $0 $0 $0
$5,558,272 $0 $0 $0 $0Project Total:
4356061
Description: RESURFACING
SR 60 HILLSBOROUGH C/L
DIESEL RD 12 CST DDR $0 $3,425,710 $0 $0 $0
CST NHRE $0 $5,966,364 $0 $0 $0
CST SA $0 $105,300 $0 $0 $0
RRU DS $275,000 $0 $0 $0 $0
$275,000 $9,497,374 $0 $0 $0Project Total:
4350751
Description: RESURFACING
SR 600 (US 92) FROM E OF
WALKER RD TO SR 544
13 CST DDR $4,626,710 $0 $0 $0 $0
CST DIH $28,756 $0 $0 $0 $0
$4,655,466 $0 $0 $0 $0Project Total:
# FPN Facility Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
4350761
Description: RESURFACING
SR 600 (US 92) FROM E OF
SR 544 TO W OF JERSEY RD14 CST DDR $1,204,970 $0 $0 $0 $0
CST DIH $16,432 $0 $0 $0 $0
$1,221,402 $0 $0 $0 $0Project Total:
4347621
Description: RIGID PAVEMENT RECONSTRUCTION
SR546 (MEMORIAL BLVD)
FROM I-4 TO WABASH
AVE
15 CST DDR $9,620,274 $0 $0 $0 $0
CST DIH $46,831 $0 $0 $0 $0
CST DS $1,667,620 $0 $0 $0 $0
ENV DDR $75,000 $0 $0 $0 $0
INC DDR $0 $480,000 $0 $0 $0
$11,409,725 $480,000 $0 $0 $0Project Total:
4312061
Description: RESURFACING
US 92 (SR 600) FROM
CHURCHILL AVE TO SLOAN
AVE
16 CST DIH $82,160 $0 $0 $0 $0
CST DS $4,326,132 $0 $0 $0 $0
ENV DS $100,000 $0 $0 $0 $0
RRU DS $5,000 $0 $0 $0 $0
$4,513,292 $0 $0 $0 $0Project Total:
4313121
Description: RESURFACING
US 98 (SR 35) FROM LAKE
BONNY PARK TO MAIN
STREET
17 CST DIH $51,350 $0 $0 $0 $0
CST SA $1,860,303 $0 $0 $0 $0
$1,911,653 $0 $0 $0 $0Project Total:
®q
®q
®q
®q
B a r t o wB a r t o wM u n ic ip a lM u n ic ip a l
A i r p o r tA i r p o r t
L ak e W a le sL ak e W a le sM u n ic ip a lM u n ic ip a l
A i r p o r tA i r p o r t
La k e la n d-La k e la n d-L i nd e rL i nd e r
Re g io na lRe g io na lAi r po r tAi r po r t
W i n t e r H av e nW i nt e r H av e n M u n ic i pa l M u n ic i pa l A i rp or t A i rp or t
H a r d e e C o \ LH a r d e e C o \ L
Hills
boro
ugh
Co\ L
H il l s
b or o
ugh
Co\ L
O s c e o l a C o \ L
Osc eo l a C o \ L
A v o n P a r kA v o n P a r kB o m b i n g R a n g eB o m b i n g R a n g e
G r e e n S w a m pG r e e n S w a m pP a s c oP a s c oC o \ LC o \ L
Sumter
Sumter
Co\LCo\L
L a k e C o \ LL a k e C o \ L O r a n g e C o \ LO r a n g e C o \ L
D u n d e eD u n d e e
F o r tM e a d e
W i n t e rH a v e n
L a k eW a l e s
L a k e L a k eH a m i l t o nH a m i l t o n
E a g l eE a g l eL a k eL a k e
B a r t o wM u l b e r r yM u l b e r r y
H a i n e s C i t y
L a k e l a n d
L a k eL a k eA l f r e dA l f r e d
P o l kP o l kC i t yC i t y
D a v e n p o r tD a v e n p o r t
F r o s t p r o o fF r o s t p r o o f
(((27
(((17
(((92
(((98
(((17
(((98
(((92
(((17
(((27
(((27
(((98
(((98
(((92
(((92
(((17
(((17
(((17
(((192
ÜÜÜ17
ÜÜÜ37
ÜÜÜ33
ÜÜÜ60
ÜÜÜ570
ÜÜÜ544
ÜÜÜ540
ÜÜÜ659
ÜÜÜ542ÜÜÜ655ÜÜÜ572
ÜÜÜ471
ÜÜÜ563
ÜÜÜ674
ÜÜÜ559
ÜÜÜ540
ÜÜÜ570
ÜÜÜ570
ÜÜÜ17
ÜÜÜ60ÜÜÜ60
ÜÜÜ64
ÜÜÜ544
ÜÜÜ33
ÜÜÜ33
ÜÜÜ35
ÜÜÜ35
ÜÜÜ35ÜÜÜ700
ÜÜÜ540
!C
!C
89:Z 89:m
89:m!C
!Õ
!C
89:m89:D
89:m
!C
89:m
!Ï!C
89:D
89:l
89:D
89:D
89:m O
!C
89:D
89:D
89:l
89:m
89:l89:l89:l
!C !½
L a k eL a k eK i s s i m m e eK i s s i m m e e
L a k eL a k eW e o h y a k a p k aW e o h y a k a p k a
L a k eL a k eR o s a l i eR o s a l i e
T i g e rT i g e r L a k e L a k e
R e e d yR e e d yL a k eL a k e
Lak e A r b u ck l e
L ak e A r b u ck l e
C r o o k e dC r o o k e dL a k eL a k e
L a k eL a k eP i e r c eP i e r c e
L a k e L a k eH a t c h i n e h aH a t c h i n e h a
L a k e L a k eH a m i l t o nH a m i l t o n
L a k eL a k eH a n c o c kH a n c o c k
L a k eL a k e
P a r k e rP a r k e r
L a k eL a k eB u f f u mB u f f u m
L a k eL a k eM a r i o nM a r i o n
%&'(4
%&'(4
11/20/2014Map Source: FDOT Roads/Linear Referencing System, Disclaimer: This map is for reference purposes only. FDOT assumes no responsibility for errors or omissions in the data.
®q
C OM B
E EC O
M BE E
GALL
OWAY
GALL
OWAY
E D G E W O O DE D G E W O O D
G R I F F I N R DG R I F F I N R D
1 0 t h S T1 0 t h S T
M E M O R I A L B L V DM E M O R I A L B L V D
B A R T O W R D
B A R T O W R D
FLOR
IDA
AVE
FLOR
IDA
AVE
O L D T A M P AO L D T A M P A H W Y H W Y
B E L L A V I S T A S TB E L L A V I S T A S T
A R I A N A S TA R I A N A S TRDRD
AIRP
ORT
AIRP
ORT
RDRD
K A T H L E E NK A T H L E E N
R DR D
LAKE
L AN D
HI L
L SL A
K EL A
N D H
I LL S
B LV D
B LV D R DR D
L AK E
L AK E
P AR K
E R A
V EP A
R KE R
AV E
WAB
ASH
WAB
ASH
AVE
AVE
N E W T A M P AN E W T A M P A
H W YH W Y
P O L KP O L K P K W YP K W Y HARD
ENHA
RDEN
BLVD
BLVD D RD R
La k e l a n d - L i n de rLa k e l a n d - L i n de rR e gi on a l A i r p or tR e gi on a l A i r p or t
!C
89:m
!C
!C
89:m
89:D
89:m
!C
89:D
89:l
89:D
89:m 89:l89:l(((92
(((98
(((92
(((98
ÜÜÜ659
ÜÜÜ572
ÜÜÜ563ÜÜÜ570
ÜÜÜ33
ÜÜÜ539
ÜÜÜ546
ÜÜÜ600
ÜÜÜ35
ÜÜÜ37
ÜÜÜ35
%&'(4
45675824567542A
456733A
4567542L a k eL a k e
B o n n yB o n n y
L a k e l a n d
L a k e L a k eH a m i l t o nH a m i l t o n
L a k eL a k eH e n r yH e n r y
L a k e L a k eF a n n i eF a n n i e
L a k eL a k eR o c h e l l eR o c h e l l e
L a k e L a k eA r i a n aA r i a n a
L a k eL a k eH o w a r dH o w a r d
L a k e L a k e M a r i a n n a M a r i a n n a
L a k eL a k eA l f r e dA l f r e d
L a k e L a k eH a i n e sH a i n e s
L a k eL a k eC a n n o nC a n n o n
L a k eL a k eS h i p pS h i p p
L a k eL a k eL u l uL u l u
42ND
42ND STST
D U N D E E R DD U N D E E R D
D E R B Y A V ED E R B Y A V E
3RD
ST3R
D ST
A V E N U E GA V E N U E G
A V E TA V E T
1ST
ST1S
T ST
6TH
ST6T
H ST
W I N T E R L A K EW I N T E R L A K ER DR D
O L DO L DL A K E L A N D R DL A K E L A N D R D
H W YH W YR E C K E RR E C K E R
B L V DB L V D
H A V E N D A L E
H A V E N D A L E
L U CL U C P A R KP A R K R DR DE R N EE R N E
D RD RO V E R L O O KO V E R L O O K
C Y P R E S SC Y P R E S S G A R D E N SG A R D E N SB L V DB L V D
®q
!C
!Õ89:m
!Ï
O
89:l89:l
!C!½
(((17
(((92
(((92
(((17(((27
(((17
ÜÜÜ544
ÜÜÜ540
ÜÜÜ542ÜÜÜ655
ÜÜÜ540
ÜÜÜ559
ÜÜÜ570
ÜÜÜ544
4567550
4567542
4567655
4567546
Wi n te r Ha ve nWi n te r Ha ve nMu n i c ip a lMu n i c ip a l
A i r p o r tA i r p o r t
W i n t e rH a v e n
L a k e A l f r e dL a k e A l f r e d
C y p r e s sC y p r e s sG a r d e n sG a r d e n s
A u b u r n d a l eA u b u r n d a l e
µ
Revision #
0 12.5Miles
POLK COUNTYTRAFFIC OPERATIONSAND OTHER PROJECTS
ÆÆ2121
ÆÆ3232
ÆÆ3030
ÆÆ55
ÆÆ1717
ÆÆ1414
ÆÆ2222
ÆÆ1919
ÆÆ1818
ÆÆ2424
ÆÆ44
ÆÆ2626
ÆÆ22
ÆÆ77
ÆÆ1212
ÆÆ1111
ÆÆ33
ÆÆ3131
ÆÆ1616
ÆÆ1313ÆÆ66
ÆÆ2525
ÆÆ1515
ÆÆ99 ÆÆ88
ÆÆ3131
ÆÆ2020
ÆÆ2323
ÆÆ2929
ÆÆ1010
LEGEND
DRAFT TENTATIVE WORK PROGRAMFY 2015/2016 - FY 2019/2020
ÆÆ2727
Traffic Signal Update
ÆÆ11
ÆÆ2828
Interstate Highways State Roads and US HighwaysITS Freeway Management City/County Roads
89:l Bike Path
"¾àDDA Add Turn Lane
Lighting
Landscaping!Ï
Pedestrian/Wildlife Overpass!ÕSidewalks8m
Intersection89:D
Rail Safety Project!CPublic Transportation Shelter!½
O Traffic Ops Improvement89:Z
# FPN Facility Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
4328091
Description: RAIL SAFETY PROJECT
BAKER ST FROM N VAN
FLEET DR TO BRITTS LANE-
XING #624503-T
1 RRU RHH $270,600 $0 $0 $0 $0
$270,600 $0 $0 $0 $0Project Total:
4345081
Description: INTERSECTION IMPROVEMENT
BOMBER ROAD AT SPRUCE
ROAD AND GERBER
ROAD
2 CST HSP $0 $661,193 $0 $0 $0
CST SA $0 $10,530 $0 $0 $0
ENV SA $10,000 $20,000 $0 $0 $0
$10,000 $691,723 $0 $0 $0Project Total:
4351071
Description: SIDEWALK
BRUNNELL PARKWAY FROM
MEMORIAL BLVD TO TENTH
STREET
3 CST SU $0 $151,090 $0 $0 $0
$0 $151,090 $0 $0 $0Project Total:
4367891
Description: RAIL SAFETY PROJECT
COLEMAN RD RECKER HWY
TO 26TH ST X-ING # 625397R4 RRU RHH $276,600 $0 $0 $0 $0
$276,600 $0 $0 $0 $0Project Total:
4367871
Description: RAIL SAFETY PROJECT
CR 542 OLD TAMPA HWY
FROM GAY RD TO DOC GAY
RD X-ING #624214S
5 RRU RHH $119,671 $0 $0 $0 $0
$119,671 $0 $0 $0 $0Project Total:
4367911
Description: RAIL SAFETY PROJECT
CR 542 OLD TAMPA HWY
FROM GAY RD TO GAY RDX-
ING #624215Y
6 RRU RHH $119,671 $0 $0 $0 $0
$119,671 $0 $0 $0 $0Project Total:
4332721
Description: INTERSECTION IMPROVEMENT
CR 544 AT SR 17
7 CST LF $70,485 $0 $0 $0 $0
CST SU $1,000,182 $0 $0 $0 $0
$1,070,667 $0 $0 $0 $0Project Total:
4332741
Description: SIDEWALK
CR 655 (RIFLE RANGEROAD)
FROM 10TH STREET E TO
BOMBER ROAD
8 CST SU $295,146 $0 $0 $0 $0
$295,146 $0 $0 $0 $0Project Total:
4349421
Description: TRAFFIC OPS IMPROVEMENT
CREWS LAKE RD FROM
LAKELAND HIGHLANDS RD
TO KITTY FOX
9 CST HSP $0 $1,483,046 $0 $0 $0
CST SA $0 $8,424 $0 $0 $0
$0 $1,491,470 $0 $0 $0Project Total:
4350691
Description: SIDEWALK
CRYSTAL LAKE DR FROM US
98 TO NEW JERSEY RD
10 CST ACSU $550,159 $0 $0 $0 $0
CST SU $1,000 $0 $0 $0 $0
$551,159 $0 $0 $0 $0Project Total:
4332291
Description: BIKE PATH/TRAIL
EAST LAKE HOWARD
TRAIL 11 CST TALT $342,360 $0 $0 $0 $0
CST TALU $256,475 $0 $0 $0 $0
$598,835 $0 $0 $0 $0Project Total:
4309181
Description: SIDEWALK
EASTSIDE ELEMENTARY
SCHOOL SAFETY
SIDEWALKS
12 CST TALT $174,758 $0 $0 $0 $0
$174,758 $0 $0 $0 $0Project Total:
4273152
Description: ITS FREEWAY MANAGEMENT
I-4 FROM EAST OF POLK
PARKWAY TO OSCEOLA
COUNTY LINE
13 DSB DIH $23,621 $0 $0 $0 $0
DSB HSP $3,635,366 $0 $0 $0 $0
PE HSP $75,000 $0 $0 $0 $0
$3,733,987 $0 $0 $0 $0Project Total:
4328041
Description: RAIL SAFETY PROJECT
INTERLACHEN PKWY FROM
FERN RD TO E GARY RD-
XING# 624155-S
14 RRU RHH $281,300 $0 $0 $0 $0
$281,300 $0 $0 $0 $0Project Total:
4351091
Description: BIKE PATH/TRAIL
LAKE HOWARD DR
FROM AVE D SW TO
15TH ST SW
15 CST TALT $0 $0 $0 $83,773 $0
CST TALU $0 $0 $0 $344,752 $0
PE LF $0 $155,000 $0 $0 $0
$0 $155,000 $0 $428,525 $0Project Total:
4367901
Description: RAIL SAFETY PROJECT
LEM CARNES RD CR 547N
TO SR 600/US 17 X-ING
#622960T
16 RRU RHH $270,600 $0 $0 $0 $0
$270,600 $0 $0 $0 $0Project Total:
# FPN Facility Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
4350611
Description: SIDEWALK
LINCOLN AVE
SIDEWALKS 17 CST ACSU $231,540 $0 $0 $0 $0
CST SU $1,000 $0 $0 $0 $0
$232,540 $0 $0 $0 $0Project Total:
4298831
Description: PEDESTRIAN/WILDLIFE OVERPASS
LK ALFRED TR AT US 17/92
BRIDGE 18 CST CM $1,524,600 $0 $0 $0 $0
CST DDR $48,444 $0 $0 $0 $0
CST SA $214,087 $0 $0 $0 $0
ENV TALT $50,000 $0 $0 $0 $0
$1,837,131 $0 $0 $0 $0Project Total:
4332601
Description: BIKE PATH/TRAIL
NEW YORK CYCLE TRACK
(LIME STREET) FROM SIKES
BLVD TO NEW YORK AVENUE
19 CST TALU $0 $0 $532,500 $0 $0
PE LF $0 $115,307 $0 $0 $0
PE TALU $0 $1,000 $0 $0 $0
$0 $116,307 $532,500 $0 $0Project Total:
4344891
Description: SIDEWALK
OLD DIXIE HIGHWAY/
SADDLE CREEK
ROAD
20 CST HSP $0 $679,483 $0 $0 $0
CST SA $0 $10,530 $0 $0 $0
$0 $690,013 $0 $0 $0Project Total:
4367881
Description: RAIL SAFETY PROJECT
PAYNE ST SR 600/US92 -
BLUE JAY AVE X-ING
#623084U
21 RRU RHH $255,600 $0 $0 $0 $0
$255,600 $0 $0 $0 $0Project Total:
4344881
Description: INTERSECTION IMPROVEMENT
SR 33 (LAKELAND HILLS
BLVD) AT N SOCRUM LOOP
RD
22 CST DDR $6,967 $0 $0 $0 $0
CST DIH $25,816 $0 $0 $0 $0
CST HSP $168,366 $6,318 $0 $0 $0
$201,149 $6,318 $0 $0 $0Project Total:
4345071
Description: INTERSECTION IMPROVEMENT
SR 37 AT LAKE HARRIS
DRIVE 23 CST DDR $0 $31,982 $0 $0 $0
CST HSP $0 $641,240 $0 $0 $0
CST SA $0 $10,530 $0 $0 $0
$0 $683,752 $0 $0 $0Project Total:
4106664
Description: LANDSCAPING
SR 542 FROM 1ST STREET
TO BUCKEYE LOOP
ROAD
24 CST DIH $0 $0 $0 $0 $5,670
CST DS $0 $0 $0 $0 $234,396
$0 $0 $0 $0 $240,066Project Total:
4352841
Description: BIKE PATH/TRAIL
SR 546 (MEMORIAL) FROM
CHESTNUT RD E TO
BRUNNELL PKWY
25 CST DIH $15,405 $0 $0 $0 $0
CST DS $883,672 $0 $0 $0 $0
PE DIH $10,000 $0 $0 $0 $0
$909,077 $0 $0 $0 $0Project Total:
4345091
Description: INTERSECTION IMPROVEMENT
SR 60 AT BAILEY
RD 26 CST DDR $0 $25,300 $0 $0 $0
CST HSP $0 $596,354 $0 $0 $0
CST SA $0 $54,963 $0 $0 $0
$0 $676,617 $0 $0 $0Project Total:
4349381
Description: RAIL SAFETY PROJECT
SR 600 (US 92) FROM W OF
THOMPSON RD TO E OF FISH
HATCHERY RD
27 CST DIH $0 $130,536 $0 $0 $0
CST DS $0 $996,463 $0 $0 $0
RRU DS $75,000 $0 $0 $0 $0
$75,000 $1,126,999 $0 $0 $0Project Total:
4350781
Description: PUBLIC TRANSPORTATION SHELTER
US 17 AND 544 BUS STOP
IMPROVEMENTS 28 CST FTAT $49,661 $0 $0 $0 $0
CST SU $49,661 $0 $0 $0 $0
$99,322 $0 $0 $0 $0Project Total:
4345061
Description: LIGHTING
US 27 AT MAIN ST/CRUMP RD
29 CST DDR $0 $12,925 $0 $0 $0
CST HSP $0 $264,801 $0 $0 $0
CST SA $0 $10,530 $0 $0 $0
PE HSP $64,437 $0 $0 $0 $0
$64,437 $288,256 $0 $0 $0Project Total:
# FPN Facility Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
4351081
Description: SIDEWALK
US 92 FROM HOLIDAY MPH
ENTRANCE TO N CHESTNUT
RD
30 CST DS $0 $0 $0 $45,093 $0
CST SU $0 $0 $0 $965,076 $0
PE SU $0 $345,000 $0 $0 $0
$0 $345,000 $0 $1,010,169 $0Project Total:
4298131
Description: INTERSECTION IMPROVEMENT
US 92 -NEW TAMPA HWY AT
WABASH AVE 31 CST DDR $0 $0 $818,466 $0 $0
CST DIH $0 $0 $1,000 $0 $0
ENV DDR $10,000 $30,000 $0 $0 $0
$10,000 $30,000 $819,466 $0 $0Project Total:
4313531
Description: BIKE PATH/TRAIL
WESTGATE-CENTRAL TRAIL
FROM WEST BELMAR ST TO
OAKHILL STREET
32 CST LF $0 $182,005 $0 $0 $0
CST SU $0 $127,595 $0 $0 $0
CST TALT $0 $97,851 $0 $0 $0
CST TALU $0 $333,722 $0 $0 $0
$0 $741,173 $0 $0 $0Project Total:
H a r d e e C o \ LH a r d e e C o \ L
Hills
boro
ugh
Co\ L
H il l s
b or o
ugh
Co\ L
O s c e o l a Co \ L
Osc eo l a Co \ L
A v o n P a r kA v o n P a r kB o m b i n g R a n g eB o m b i n g R a n g e
G r e e n S w a m pG r e e n S w a m pP a s c oP a s c oC o \ LC o \ L
Sumter
Sumter
Co\LCo\L
L a k e C o \ LL a k e C o \ L O r a n g e C o \ LO r a n g e C o \ L
®q
®q
®q
®qà
à
à
(((27
(((17
(((92
(((98
(((17
(((98
(((92
(((17
(((27
(((27
(((98
(((98
(((92
(((92
(((17
(((17
(((17
(((192
ÜÜÜ17
ÜÜÜ37
ÜÜÜ33
ÜÜÜ60
ÜÜÜ570
ÜÜÜ544
ÜÜÜ540
ÜÜÜ659
ÜÜÜ542ÜÜÜ655ÜÜÜ572
ÜÜÜ471
ÜÜÜ563
ÜÜÜ674
ÜÜÜ559
ÜÜÜ540
ÜÜÜ570
ÜÜÜ570
ÜÜÜ17
ÜÜÜ60ÜÜÜ60
ÜÜÜ544
ÜÜÜ33
ÜÜÜ33
ÜÜÜ35
ÜÜÜ35
ÜÜÜ35ÜÜÜ700
ÜÜÜ540
%&'(4
%&'(4
L a k eL a k eK i s s i m m e eK i s s i m m e e
L a k eL a k eW e o h y a k a p k aW e o h y a k a p k a
L a k eL a k eR o s a l i eR o s a l i e
T i g e rT i g e r L a k e L a k e
R e e d yR e e d yL a k eL a k e
Lak e A r b u c k l e
L ak e A r b u c k l e
C r o o k e dC r o o k e dL a k eL a k e
L a k eL a k eP i e r c eP i e r c e
L a k e L a k eH a t c h i n e h aH a t c h i n e h a
L a k e L a k eH a m i l t o nH a m i l t o n
L a k eL a k eP a r k e rP a r k e r
L a k eL a k eB u f f u mB u f f u m
L a k eL a k eM a r i o nM a r i o n
B ar t o wB ar t o wM u n ic ip a lM u n ic ip a l
A i rp o r tA i rp o r t
L ake W a l esL ake W a l esM u n ic ip a lM u n ic ip a l
A i rp o r tA i rp o r t
La ke la n d-La ke la n d-L in de rL in de r
Re g i ona lRe g i ona lAi rp or tAi rp or t
W in t er Ha v enW in t er Ha v en M un ic ip a l M un ic ip a l A i rp or t A i rp or t
D u n d e eD u n d e e
F o r tM e a d e
W i n t e rH a v e n
L a k eW a l e s
C r o o k e dC r o o k e dL a k eL a k eP a r kP a r k
L a k e L a k eH a m i l t o nH a m i l t o n
B a r t o wM u l b e r r yM u l b e r r y
H a i n e s C i t y
L a k e l a n dL a k eL a k e
A l f r e dA l f r e d
C y p r e s sC y p r e s sG a r d e n sG a r d e n s
P o l kP o l kC i t yC i t y
D a v e n p o r tD a v e n p o r t
F r o s t p r o o fF r o s t p r o o f
11/20/2014Map Source: FDOT Roads/Linear Referencing System, Disclaimer: This map is for reference purposes only. FDOT assumes no responsibility for errors or omissions in the data.
µ 0 5Miles
ÆÆ22
Revision #
ÆÆ33 ÆÆ55
ÆÆ11
ÆÆ99
ÆÆ1010
ÆÆ1313
ÆÆ44
ÆÆ1515
ÆÆ1010
ÆÆ1212ÆÆ1111
ÆÆ66
POLK COUNTYCAPACITY PROJECTS
State Roads and US Highways
LEGEND
Interstate Highways
City/County Roads
Bridge Projects
Capacity - Design PhaseCapacity - PD&E Phase
à
Capacity - Right-of-Way PhaseCapacity - Construction Phase
ÆÆ1414
ÆÆ77ÆÆ88
DRAFT TENTATIVE WORK PROGRAMFY 2015/2016 - FY 2019/2020
ÆÆ1717
ÆÆ1616
# FPN Facility Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
4313521
Description: NEW ROAD CONSTRUCTION
BARTOW NORTHERN
CONNECTOR PHASE II FROM
US 17 TO SR 60
1 CST CIGP $0 $0 $0 $467,864 $0
CST LFP $0 $0 $0 $9,819,995 $0
CST TRIP $0 $0 $0 $2,998,420 $0
$0 $0 $0 $13,286,279 $0Project Total:
4316411
Description: NEW ROAD CONSTRUCTION
CENTRAL POLK PWKY FROM
POLK PWKY (SR 540) TO SR
35 (US 17)
2 ROW DDR $0 $0 $0 $1,966,740 $1,985,083
ROW DIH $0 $0 $0 $151,944 $136,943
$0 $0 $0 $2,118,684 $2,122,026Project Total:
4316412
Description: NEW ROAD CONSTRUCTION
CENTRAL POLK PWKY FROM
SR 35 (US 17) TO LOGISTICS
PARKWAY
3 ROW DDR $0 $0 $0 $4,611,162 $3,479,790
ROW DIH $0 $0 $0 $506,479 $456,479
$0 $0 $0 $5,117,641 $3,936,269Project Total:
4316418
Description: NEW ROAD CONSTRUCTION
CENTRAL POLK PWKY FROM
US 17/US 92 TO I-4
4 PE DDR $0 $9,212,000 $0 $0 $0
PE DIH $0 $110,000 $0 $0 $0
$0 $9,322,000 $0 $0 $0Project Total:
4317721
Description: BRIDGE REPLACEMENT
COW CAMP ROAD BRIDGE
NO. 160400 OVER
ROSALIE/ZIPPRER CANAL
5 CST ACBZ $0 $1,668,600 $0 $0 $0
$0 $1,668,600 $0 $0 $0Project Total:
4301853
Description: INTERCHANGE IMPROVEMENT
I-4 @ SR 33 INTERCHANGE
MODIFICATION 6 ENV SA $0 $0 $1,300,000 $0 $0
ROW DIH $0 $0 $0 $271,270 $0
ROW DS $0 $0 $0 $33,489 $0
ROW SA $0 $0 $0 $2,483,295 $0
$0 $0 $1,300,000 $2,788,054 $0Project Total:
2012153
Description: INTERCHANGE IMPROVEMENT
I-4 AT SR 557
7 CST ACNP $0 $0 $0 $0 $54,664,218
CST DIH $0 $0 $0 $0 $508,099
ENV DI $0 $0 $100,000 $0 $0
RRU ACNP $0 $0 $0 $0 $4,500,000
$0 $0 $100,000 $0 $59,672,317Project Total:
4366731
Description: PD&E/EMO STUDY
SR 35/700 (US 98) FROM N.
OF WEST SOCRUM LOOP RD
TO SR 471
8 PDE DIH $0 $0 $0 $0 $200,000
PDE DS $0 $0 $0 $0 $2,100,000
$0 $0 $0 $0 $2,300,000Project Total:
1975624
Description: ADD LANES & RECONSTRUCT
SR 35/700 (US98) FROM
EDGEWOOD DRIVE TO E
MAIN STREET
9 ROW CM $0 $0 $0 $1,723,607 $1,723,454
ROW SA $0 $0 $0 $1,522,651 $4,242,750
$0 $0 $0 $3,246,258 $5,966,204Project Total:
4106662
Description: ADD LANES & RECONSTRUCT
SR 542 FROM 1ST STREET
TO BUCKEYE LOOP RD
10 CST DDR $0 $0 $0 $15,736,323 $0
CST DIH $0 $0 $0 $331,800 $0
ENV DS $40,000 $200,000 $0 $0 $0
ROW SU $5,241,467 $1,221,060 $0 $0 $0
RRU DDR $0 $0 $0 $1,000,000 $0
RRU LF $0 $0 $0 $2,951,628 $0
$5,281,467 $1,421,060 $0 $20,019,751 $0Project Total:
4366721
Description: PD&E/EMO STUDY
SR35/700 US 98 FROM WEST
DAUGHTERY ROAD TO
NORTH OF WEST SOCRUM
LOOP RD
11 PDE DIH $0 $0 $0 $0 $150,000
PDE SA $0 $0 $0 $0 $1,500,000
$0 $0 $0 $0 $1,650,000Project Total:
4313511
Description: PD&E/EMO STUDY
US 17/92 HINSON AVE FROM
SR 17 (10TH STREET) TO
17TH STREET
12 PDE DIH $20,000 $0 $0 $0 $0
PDE DS $150,998 $800,000 $0 $0 $0
$170,998 $800,000 $0 $0 $0Project Total:
4313512
Description: ADD LANES & RECONSTRUCT
US 17/92 HINSON AVE FROM
SR 17 (10TH STREET) TO
17TH STREET
13 PE DIH $0 $0 $0 $3,000 $0
PE DS $0 $0 $0 $1,350,000 $0
$0 $0 $0 $1,353,000 $0Project Total:
# FPN Facility Phase Fund 2015/16 2016/17 2017/18 2018/19 2019/20
4192434
Description: ADD LANES & RECONSTRUCT
US 27 FROM PRESIDENTS
DRIVE TO SR
60
14 CST DDR $0 $0 $0 $0 $52,843,410
CST DIH $0 $0 $0 $0 $941,628
ENV DI $0 $0 $195,000 $500,000 $0
$0 $0 $195,000 $500,000 $53,785,038Project Total:
4312081
Description: BRIDGE REPLACEMENT
US 92 (SR 600) FROM
REYNOLDS RD TO
SCHALAMAR CREEK ENT
15 CST DDR $884,467 $0 $0 $0 $0
CST DIH $386,374 $0 $0 $0 $0
CST DS $10,635,796 $0 $0 $0 $0
INC DS $0 $392,000 $0 $0 $0
$11,906,637 $392,000 $0 $0 $0Project Total:
4335582
Description: ADD LANES & RECONSTRUCT
US 92 FROM COUNTY LINE
ROAD TO WABASH
AVENUE
16 PE SA $0 $0 $0 $4,450,000 $0
$0 $0 $0 $4,450,000 $0Project Total:
4348862
Description: BRIDGE REPLACEMENT
US 98 (PEACE RIVER-FT
MEADE) AT BRIDGE NO 0064
(JOHN SINGLETARY BRIDGE)
17 PE DIH $0 $0 $0 $0 $100,000
PE SA $0 $0 $0 $0 $2,000,000
$0 $0 $0 $0 $2,100,000Project Total: