fd13 flight plan revision - nasa · fd13 flight plan revision 121 ; 17 - 18 fd13 mission summary;...

24
STS-131/19A FD 13 Execute Package MSG Page(s) Title 120A 1 - 16 FD13 Flight Plan Revision 121 17 - 18 FD13 Mission Summary 122 19 FD13 Transfer Message 123 20 - 21 RMS Maneuver to OBSS Hover 124 22 Entry Locker Layout 125A 23 FD13 Crew Choice Downlink Approved by FAO: L. Rush Last Updated: Apr 17 2010 3:45 AM GMT JEDI (Joint Execute package Development and Integration), v3.0 Richard Jones has always been Ron Spencer’s idol. When Richard was a FDO, Ron wanted to be a FDO. When Richard became Flight Director, Ron wanted to be a Flight Director. When Richard appeared on the cover of the Execute Package, Ron wanted to appear on the cover of the Execute Package. When Richard wore a silly, orange wig over his crew cut, Ron wanted to wear a silly, orange wig over his less than a crew cut. We’ve heard that after the STS131 Landing, Richard will be running around the country hosting wiener dog races. Ron …. ?

Upload: others

Post on 22-Jun-2020

27 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

STS-131/19A FD 13 Execute Package MSG Page(s) Title

120A 1 - 16 FD13 Flight Plan Revision

121 17 - 18 FD13 Mission Summary

122 19 FD13 Transfer Message

123 20 - 21 RMS Maneuver to OBSS Hover

124 22 Entry Locker Layout

125A 23 FD13 Crew Choice Downlink Approved by FAO: L. Rush Last Updated: Apr 17 2010 3:45 AM GMT JEDI (Joint Execute package Development and Integration), v3.0

 

 

 

 

 

 

 

 

 

 

 

• Richard Jones has always been Ron Spencer’s idol. 

• When Richard was a FDO, Ron wanted to be a FDO. 

• When Richard became Flight Director, Ron wanted to be a Flight Director. 

• When Richard appeared on the cover of the Execute Package, Ron wanted to appear on the cover of the Execute Package. 

• When Richard wore a silly, orange wig over his crew cut, Ron wanted to wear a silly, orange wig over his less than a crew cut. 

• We’ve heard that after the STS‐131 Landing, Richard will be running around the country hosting wiener dog races.  Ron …. ?  

Page 2: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

MSG 120A - FD13 FLIGHT PLAN REVISION

1 MSG INDEX 2

3 MSG NO. TITLE 4

5 6 7 8 9

10 11 12

MSG-120 FD13 Flight Plan Revision MSG-121 FD13 Mission Summary MSG-122 FD13 Transfer Message MSG-123 RMS Maneuver to OBSS Hover MSG-124 Entry Locker Layout MSG-125 FD13 Crew Choice Downlink 1. Post-Sleep Cryo Config 13 14

15 16

17 18

19 20

21 22 23

For today's post-sleep cryo config, O2 and H2 tanks 1 and 4 will be active. R1 O2,H2 MANF VLV TK1 (two) - OP (tb-OP)

A11 CRYO TK4 HTRS H2 A,B (two) - AUTO A15 CRYO TK5 HTRS H2 A,B (two) - OFF Pre-Sleep Cryo Config 24

25

26 27

28

29 30

31

32

33

34 35

√MCC for deltas prior to configuring for pre-sleep. For tonight's pre-sleep cryo config, manifold 1 will be closed with O2 tanks 1 and 3 and H2 tanks 1 and 4 active. R1 O2,H2 MANF VLV TK1 (two) - CL (tb-CL) O2 TK3 HTR A - AUTO A11 CRYO TK4 HTR O2 A - OFF

2. Comm Loop Overview for Flight Day 13 36

S/G 1 & A/G 1 S/G 2 A/G 2 37 38 39 40 41 42 43 44 45 46 47 48 49 50

Undocking Russian Ops MPLM Pressure Check Exercise Constraints PMA 2 Config All other STS Comm DPC All other ISS Comm

END OF PAGE 1 OF 16, MSG 120A 1

Page 3: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

MSG 120A - FD13 FLIGHT PLAN REVISION

1 3. MMT Summary 2

The MMT met briefly today to review orbiter systems and mission progress. 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22

Discovery continues to perform very well. A testament to the dedication and hard work that went into getting her ready for the 131/19A mission. The MMT gave a unanimous GO for undocking. The teams wanted to express their gratitude and congratulations on a very successful docked mission. The ISS hates to see you go but thoroughly enjoyed the visit. An amazing joint team effort. Great job on completing the Docked Late Inspection. The STS-134 team was happy to get it flight tested. As of the MMT, 3 of the 5 tapes have been down linked and ~ 4% of the Level 2 screening had been completed by the DAT. We will get you the final results as soon as we receive them. Today was also “Movie Day” at the MMT. Both the Imagery and ISS teams provided unbelievable videos and pictures of the mission to date. This is the last Crew MMT summary of the flight. We just wanted to say job well done, Good Luck, Godspeed, and a safe trip home.

4. Final Mail Synch 23

Prior to hatch close, we will downlink your Outlook Personal Folders so that you may have them when you return to Houston. Please move any messages that you would like to keep from your INBOX, SENT ITEMS and UPLINKED BY CAPCOM folders to your Personal Folder before MET 11/21:00. We will also perform one final mail synch at the same time to deliver any last minute messages you want to send.

24 25 26 27 28 29

5. KFX Relocate 30 Reconfigure the network per the PGSC Post-Undock Usage Chart. This moves the KFX PGSC to the Flight Deck to support TriDAR and undock activities.

31 32 33

6. STL Rail Status Check 34

Stephanie and Naoko: STL Rails 1 and 2 have completed their science experiments, and this may cause their temperature to be out of range. We'd still like you to continue to call down the status checks, but you don't need to perform the star block for these temperature variations.

35

36 37 38 39

7. MERLIN Pack 40 Stephanie: The LADA VPU sample was not harvested and will not be returning in MERLIN. Please make the following P&I changes to the MERLIN 19A Pack for Return procedure.

41 42 43

Items to Unstow Within Procedure: Delete LADA VPU 44 45 Delete Step 3.4

Figure 1. MERLIN Descent Packing Configuration: Delete LADA-VPU 46

47 48 49 50

END OF PAGE 2 OF 16, MSG 120A 2

Page 4: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

MSG 120A - FD13 FLIGHT PLAN REVISION

1 8. SHUTTLE CONDENSATE CHANGEOUT 2

Swap out condensate CWC s/n 1062 with CWC s/n 5096. Condensate CWC s/n 5096 is temp stowed on the Middeck. Transfer ISS CWC s/n 1062 to JPM1_F6 for processing. Notify MCC when complete.

3 4 5 6

9. WATER DUMP DETAILS 7 Today you will be performing a simo supply/waste water dump using SUPPLY/WASTE 8 WATER DUMP (ORB OPS, ECLS), p.5-3. MCC will TMBU limits in steps B and K. 9

10 11 12 13 14

Supply nozzle open time will be approximately 15 minutes. Dump the waste tank to 5%. Nozzle open time will be approximately 45 minutes.

10. TriDAR Summary Status 15

The TriDAR team would like to thank you for your hard work recovering the TriDAR 16 17 18 19 20

21

22 23 24 25

27 28

system on FD03, the system did provide useable data. Ground testing since then has been able to confirm that your issues were likely caused by the RJ45 cable interface. The plan for undock involves obtaining the backup LCS cable and using it in place of the prerouted TriDAR cable (they are identical with the exception of labeling). Your activation and deactivation procedures have been modified accordingly. We are hoping that a well seated cable at the PGSC will clear up these issues for undock. Note also that the CL Camera Repeater can run on the KFX machine at the same time as TriDAR with no issues.

11. REPLACE PAGES 2-48, 2-50 AND 3-142 THROUGH 3-151. 26 Happy Undock Day from …

29 30 The STS-131 O1 Team

END OF PAGE 3 OF 16, MSG 120A 3

Page 5: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

MSG 120A - FD13 FLIGHT PLAN REVISION

END OF PAGE 4 OF 16, MSG 120A

1 2

3 4 5

The STS-131 O2 Team

6 7 The STS-131 O3 Team

4

Page 6: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

FLT PLN/131/FLT

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

FD13

β =

23

REPLANNED

U N D O C K *

*UNDOCK 012/02:31

SEP1^SEP2^

2-48

S T S - 1 3 1

05

06

07

08

09

10

11

12

13

14

15

16

GMT 04/17/10 (107)

18

19

20

21

22

23

012/00

01

02

03

04

05

06

MET

Day 011

CDR

H / O *

G R P B

P W R U P

M N V R

D U M P

G R P B

P W R D N

MEAL

C A B T

C O M M 1

S S O R

D E A C T

I M U

UNDOCK

OPS

FLYAROUND

F A R E

W E L L

P T V 0 5

D E A C T

H T R B

P C S

C/L

CAMR

INST

P T V 0 4

S / UPOST SLEEP

EXERCISE

POST

SLEEP

PLT

MNVR

UNDK

G R P B

P W R U P

UNDOCK

OPS

FLYAROUND

G R P B

P W R D N

SIMO

INIT

MEAL

F A R E

W E L L

S S V - 3

POST SLEEP

S P L Y

T E R M

EXERCISE

MS1

P/TV03 UNDOCK

P T V 0 3

D E A C T

MEAL

E V A

U N P A C K

& S T O W

EXERCISE

LEAK

CHECK

HATCH

CLOSE

F A R E

W E L L

P/TV

03

S/U

STS O2 P/B

TEARDOWN

POST SLEEP

EVA XFER

TO STS

MS2

UNDOCK

OPS

FLYAROUND

MEAL

M C I U

LEAK

CHECK

HATCH

CLOSE

F A R E

W E L L

T R D R %

T R D R ^

O P C U @

POST SLEEP

EXER

X F E R

T A G U P

MS3

L O G

UNDOCK

OPS

FLYAROUND

MEAL

M D D K

F A R E

W E L L

RNDZ TOOLS

CHECKOUT

MERLIN

PACK

SMP

XFR

RVW

M R L N

M R L N

EXERCISE

POST SLEEP

MS4

L O G

UNDOCK

OPS

FLYAROUND

MEAL

EXER

CISE

F A R E

W E L L

M R L N

V I D E O

P/TV

09

S/U

C/L

CAMR

INST

S S V - 4

P/TV

04

HATCH

CLOSE

P T V 0 4

POST SLEEP

X F E R

T A G U P

X F E R

B R I E F

MDDK

XFER

MDDK

XFER

MS5

L O G

UNDOCK

OPS

FLYAROUND

MEAL

E V A

U N P A C K

& S T O W

F A R E

W E L L

RNDZ TOOLS

CHECKOUT

C O N D

C H G / O

POST SLEEP

EVA XFER

TO STS

TDRS

W E ZDAY/NIGHT

ORBIT

186

187

188

189

190

191

192

193

194

BIAS -XLV -ZVV

UNDK/FLYAROUND/SEP

ORB ATT

TDRS

AVAIL

*CMG to STS

%ACT

^DEACT

@DEACT

NOTES

2-48

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

FD13

β =

23

REPLANNED

U N D O C K *

*UNDOCK 012/02:31

SEP1^SEP2^

S T S - 1 3 1

05

06

07

08

09

10

11

12

13

14

15

16

GMT 04/17/10 (107)

18

19

20

21

22

23

012/00

01

02

03

04

05

06

MET

Day 011

CDR

H / O *

G R P B

P W R U P

M N V R

D U M P

G R P B

P W R D N

MEAL

C A B T

C O M M 1

S S O R

D E A C T

I M U

UNDOCK

OPS

FLYAROUND

F A R E

W E L L

P T V 0 5

D E A C T

H T R B

P C S

C/L

CAMR

INST

P T V 0 4

S / UPOST SLEEP

EXERCISE

POST

SLEEP

PLT

MNVR

UNDK

G R P B

P W R U P

UNDOCK

OPS

FLYAROUND

G R P B

P W R D N

SIMO

INIT

MEAL

F A R E

W E L L

S S V - 3

POST SLEEP

S P L Y

T E R M

EXERCISE

MS1

P/TV03 UNDOCK

P T V 0 3

D E A C T

MEAL

E V A

U N P A C K

& S T O W

EXERCISE

LEAK

CHECK

HATCH

CLOSE

F A R E

W E L L

P/TV

03

S/U

STS O2 P/B

TEARDOWN

POST SLEEP

EVA XFER

TO STS

MS2

UNDOCK

OPS

FLYAROUND

MEAL

M C I U

LEAK

CHECK

HATCH

CLOSE

F A R E

W E L L

T R D R %

T R D R ^

O P C U @

POST SLEEP

EXER

X F E R

T A G U P

MS3

L O G

UNDOCK

OPS

FLYAROUND

MEAL

M D D K

F A R E

W E L L

RNDZ TOOLS

CHECKOUT

MERLIN

PACK

SMP

XFR

RVW

M R L N

M R L N

EXERCISE

POST SLEEP

MS4

L O G

UNDOCK

OPS

FLYAROUND

MEAL

EXER

CISE

F A R E

W E L L

M R L N

V I D E O

P/TV

09

S/U

C/L

CAMR

INST

S S V - 4

P/TV

04

HATCH

CLOSE

P T V 0 4

POST SLEEP

X F E R

T A G U P

X F E R

B R I E F

MDDK

XFER

MDDK

XFER

MS5

L O G

UNDOCK

OPS

FLYAROUND

MEAL

E V A

U N P A C K

& S T O W

F A R E

W E L L

RNDZ TOOLS

CHECKOUT

C O N D

C H G / O

POST SLEEP

EVA XFER

TO STS

TDRS

W E ZDAY/NIGHT

ORBIT

186

187

188

189

190

191

192

193

194

ORB ATT

BIAS -XLV -ZVV

UNDK/FLYAROUND/SEP

TDRS

AVAIL

NOTES

*CMG to STS

%ACT

^DEACT

@DEACT

5

Page 7: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

FLT PLN/131/FLT

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

FD13

β =

25

#STATUS CK

REPLANNED

2-50

S T S - 1 3 1

17

18

19

20

21

22

23

04/18

01

02

03

04

GMT 04/17/10 (107)

06

07

08

09

10

11

12

13

14

15

16

17

18

MET

Day 012

CDR

PRE SLEEP

SLEEP

PMC

A/G

M N V R

- Z L V

PRE SLEEP

D A P U / D

PLT

OBSS BERTH

R M S

P W R D N

PRE SLEEP

SLEEP

W A S T E

T E R M

R C S ^

MS1

E V A

U N P A C K

& S T O W

SLEEP

A P C U *

A P C U @

PRE SLEEP

K U S T O W

P S L P

PRE SLEEP

MS2

OBSS BERTH

R M S

P W R D N

SLEEP

PRE SLEEP

O B S S *

E X E R

MS3

A E M #

M D D K

SLEEP

O B S S *

PRE SLEEP

MS4

EXER

CISE

SLEEP

PRE SLEEP

MS5

E V A

U N P A C K

& S T O W

PRE SLEEP

EXERCISE

SLEEP

TDRS

W E ZDAY/NIGHT

ORBIT

194

195

196

197

198

199

200

201

-ZLV -XVV

ORB ATT

TDRS

AVAIL

^REG RCNFG

*ACT

@DEACT

*HOVER

NOTES

2-50

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

FD13

β =

25

#STATUS CK

REPLANNED

S T S - 1 3 1

17

18

19

20

21

22

23

04/18

01

02

03

04

GMT 04/17/10 (107)

06

07

08

09

10

11

12

13

14

15

16

17

18

MET

Day 012

CDR

PRE SLEEP

SLEEP

PMC

A/G

M N V R

- Z L V

PRE SLEEP

D A P U / D

PLT

OBSS BERTH

R M S

P W R D N

PRE SLEEP

SLEEP

W A S T E

T E R M

R C S ^

MS1

E V A

U N P A C K

& S T O W

SLEEP

A P C U *

A P C U @

PRE SLEEP

K U S T O W

P S L P

PRE SLEEP

MS2

OBSS BERTH

R M S

P W R D N

SLEEP

PRE SLEEP

O B S S *

E X E R

MS3

A E M #

M D D K

SLEEP

O B S S *

PRE SLEEP

MS4

EXER

CISE

SLEEP

PRE SLEEP

MS5

E V A

U N P A C K

& S T O W

PRE SLEEP

EXERCISE

SLEEP

TDRS

W E ZDAY/NIGHT

ORBIT

194

195

196

197

198

199

200

201

ORB ATT

-ZLV -XVV

TDRS

AVAIL

NOTES

^REG RCNFG

*ACT

@DEACT

*HOVER

6

Page 8: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

FLT PLN/131/FLT

FD13

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

REPLANNED

FD13 EZ ACTIVITIES:

TEP

C (O

RB O

PS,

CREW

SYS

TEMS

)

Chec

k St

atus

OCAC Inspection

Check MDDK Duct

Scr

een

Har

d re

boot

all PGSCs not

shut down over

night.

3-142

STS-

131/

19A

FD

03:00

04:00

05:00

06:00

GMT

Date

04/17

(107)

16:00

17:00

18:00

19:00

20:00

MET

Day 011

WE

Z

T D R S

~~

~

D / N

O R B 1 8 5 1 8 6 1 8 7

~ ~B I A S - X L V - Z V VS T S A T T

CDR

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

PLT

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

MS2

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-142

FD13

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

REPLANNED

FD13 EZ ACTIVITIES:

TEP

C (O

RB O

PS,

CREW

SYS

TEMS

)

Chec

k St

atus

OCAC Inspection

Check MDDK Duct

Scr

een

Har

d re

boot

all PGSCs not

shut down over

night.

STS-

131/

19A

FD

03:00

04:00

05:00

06:00

GMT

Date

04/17

(107)

16:00

17:00

18:00

19:00

20:00

MET

Day 011

WE

Z

T D R SD / N

O R B 1 8 5 1 8 6 1 8 7

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

PLT

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

MS2

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

NOTES

7

Page 9: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

FLT PLN/131/FLT

FD13

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

REPLANNED

3-143

STS-

131/

19A

FD

03:00

04:00

05:00

06:00

GMT

Date

04/17

(107)

16:00

17:00

18:00

19:00

20:00

MET

Day 011

WE

Z

T D R S

~~

~

D / N

O R B 1 8 5 1 8 6 1 8 7

~ ~B I A S - X L V - Z V VS T S A T T

MS1

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

MS3

SLEEP LOGBOOK (SDBI 1634)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

MS4

SLEEP LOGBOOK (SDBI 1634)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

MS5

SLEEP LOGBOOK (SDBI 1634)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-143

FD13

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

REPLANNED

STS-

131/

19A

FD

03:00

04:00

05:00

06:00

GMT

Date

04/17

(107)

16:00

17:00

18:00

19:00

20:00

MET

Day 011

WE

Z

T D R SD / N

O R B 1 8 5 1 8 6 1 8 7

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

MS3

SLEEP LOGBOOK (SDBI 1634)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

MS4

SLEEP LOGBOOK (SDBI 1634)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

MS5

SLEEP LOGBOOK (SDBI 1634)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

NOTES

8

Page 10: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

FLT PLN/131/FLT

FD13

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

JOINT OPS: 4.102 SHUTTLE/ISS

DUCT REMOVAL & HATCH CLOSING

MCC-H can perform steps 2 & 3 on

crew request

REPLANNED

P/TV05 ISS INTERNAL OPS

(P/TV, SCENES) Perform DEACTIVATION

Ref. Middeck Transfer List:

Resupply Item 9

3-144

STS-

131/

19A

FD

07:00

08:00

09:00

10:00

GMT

Date

04/17

(107)

20:00

21:00

22:00

23:00

00:00

MET

Day 011

WE

Z

T D R S

~~

~

D / N

O R B 1 8 7 1 8 8 1 8 9 1 9 0

~ ~B I A S - X L V - Z V VS T S A T T

CDR

MEAL

FAREWELL

P/TV04 INGRESS/EGRESS

(P/TV, SCENES)

SETUP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

MEAL

FAREWELL

SSV OUTRATE - 3

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

MS2

MEAL

L17 Check MCIU filter screen

~

FAREWELL

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

TRANSFER TAGUP

Coordinate with transfer

counterparts

NOTES

3-144

FD13

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

JOINT OPS: 4.102 SHUTTLE/ISS

DUCT REMOVAL & HATCH CLOSING

MCC-H can perform steps 2 & 3 on

crew request

REPLANNED

P/TV05 ISS INTERNAL OPS

(P/TV, SCENES) Perform DEACTIVATION

Ref. Middeck Transfer List:

Resupply Item 9

STS-

131/

19A

FD

07:00

08:00

09:00

10:00

GMT

Date

04/17

(107)

20:00

21:00

22:00

23:00

00:00

MET

Day 011

WE

Z

T D R SD / N

O R B 1 8 7 1 8 8 1 8 9 1 9 0

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

MEAL

FAREWELL

P/TV04 INGRESS/EGRESS

(P/TV, SCENES)

SETUP

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EXERCISE

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

MEAL

FAREWELL

SSV OUTRATE - 3

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EXERCISE

MS2

MEAL

L17 Check MCIU filter screen

~

FAREWELL

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

TRANSFER TAGUP

Coordinate with transfer

counterparts

NOTES

9

Page 11: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

FLT PLN/131/FLT

FD13

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

MERLIN STATUS CK (Cue Card)

GLACIER STATUS CK (Cue Card)

STL STATUS CK (Cue Card)

JOINT OPS: 4.102 SHUTTLE/ISS

DUCT REMOVAL & HATCH CLOSING

MCC-H can perform steps 2 & 3 on

crew request

REPLANNED

SHUTTLE CONDENSATE COLLECTION

(ORB OPS, ECLS)

Perform CHANGEOUT

Ref. MSG 120, item 8

MERLIN 19A PACK FOR RETURN

(ASSY OPS, PAYLOADS)

Ref. MSG 120, item 7

Ref. Middeck Transfer List:

Return Item 713

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SAMPLE TRANSFER REVIEW

Review Only: MERLIN 19A PACK

FOR RETURN (ASSY OPS, PAYLOADS)

Ref. MSG 120, item 7

3-145

STS-

131/

19A

FD

07:00

08:00

09:00

10:00

GMT

Date

04/17

(107)

20:00

21:00

22:00

23:00

00:00

MET

Day 011

WE

Z

T D R S

~~

~

D / N

O R B 1 8 7 1 8 8 1 8 9 1 9 0

~ ~B I A S - X L V - Z V VS T S A T T

MS1

MEAL

~

FAREWELL

JOINT OPS: 3.122 PREBREATHE

USING SHUTTLE O2 TEARDOWN

Steps 2-7; MCC-H will perform

steps 2.4 and 5.5

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EVA TRANSFER TO SHUTTLE

(EVA, AIRLOCK CONFIG)

Ref. MDDK Transfer List:

Items 703 & 704

MS3

MEAL

FAREWELL

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~

MERLIN STATUS CK (Cue Card)

EXERCISE

~

MS4

MEAL

FAREWELL

P/TV09 MIDDECK PAYLOADS

(P/TV, SCENES)

OPS, Item 2, MERLIN Video

P/TV09 MIDDECK PAYLOADS

(P/TV, SCENES)

SETUP

P/TV04 INGRESS/EGRESS

(P/TV, SCENES) OPS

Hatch Close & Egress, Item 1

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

TRANSFER TAGUP

Coordinate with transfer

counterparts

TRANSFER BRIEF

Call down status to MCC

VIA A/G 1

TRANSFER OPS

Ref. MDDK Transfer List

and MSG 122

TRANSFER OPS

Ref. MDDK Transfer List

and MSG 122

MS5

MEAL

FAREWELL

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EVA TRANSFER TO SHUTTLE

(EVA, AIRLOCK CONFIG)

Ref. MDDK Transfer List:

Items 703 & 704

TFL 192

NOTES

3-145

FD13

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

MERLIN STATUS CK (Cue Card)

GLACIER STATUS CK (Cue Card)

STL STATUS CK (Cue Card)

JOINT OPS: 4.102 SHUTTLE/ISS

DUCT REMOVAL & HATCH CLOSING

MCC-H can perform steps 2 & 3 on

crew request

REPLANNED

SHUTTLE CONDENSATE COLLECTION

(ORB OPS, ECLS)

Perform CHANGEOUT

Ref. MSG 120, item 8

MERLIN 19A PACK FOR RETURN

(ASSY OPS, PAYLOADS)

Ref. MSG 120, item 7

Ref. Middeck Transfer List:

Return Item 713

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SAMPLE TRANSFER REVIEW

Review Only: MERLIN 19A PACK

FOR RETURN (ASSY OPS, PAYLOADS)

Ref. MSG 120, item 7

STS-

131/

19A

FD

07:00

08:00

09:00

10:00

GMT

Date

04/17

(107)

20:00

21:00

22:00

23:00

00:00

MET

Day 011

WE

Z

T D R SD / N

O R B 1 8 7 1 8 8 1 8 9 1 9 0

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

MEAL

~

FAREWELL

JOINT OPS: 3.122 PREBREATHE

USING SHUTTLE O2 TEARDOWN

Steps 2-7; MCC-H will perform

steps 2.4 and 5.5

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA TRANSFER TO SHUTTLE

(EVA, AIRLOCK CONFIG)

Ref. MDDK Transfer List:

Items 703 & 704

MS3

MEAL

FAREWELL

~

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

MERLIN STATUS CK (Cue Card)

EXERCISE

~

MS4

MEAL

FAREWELL

P/TV09 MIDDECK PAYLOADS

(P/TV, SCENES)

OPS, Item 2, MERLIN Video

P/TV09 MIDDECK PAYLOADS

(P/TV, SCENES)

SETUP

~

P/TV04 INGRESS/EGRESS

(P/TV, SCENES) OPS

Hatch Close & Egress, Item 1

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

TRANSFER TAGUP

Coordinate with transfer

counterparts

TRANSFER BRIEF

Call down status to MCC

VIA A/G 1

TRANSFER OPS

Ref. MDDK Transfer List

and MSG 122

TRANSFER OPS

Ref. MDDK Transfer List

and MSG 122

MS5

MEAL

FAREWELL

~

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA TRANSFER TO SHUTTLE

(EVA, AIRLOCK CONFIG)

Ref. MDDK Transfer List:

Items 703 & 704

NOTES

TFL 192

10

Page 12: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

FLT PLN/131/FLT

FD13

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

H/O ATT CNTRL CMG TA TO ORB A

O6 S TRK PWR -Z - ON

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN)

Steps 12 (IMU 3),6 (Triple G2)

Remain in FREE Drift

A √A

12/FREE/VERN

When ISS in Free Drift, DAP: LVLH,

When jet activity stopped for > 5 sec,

DAP: FREE > 2 sec, Then DAP: AUTO

O6 S TRK PWR -Z - ON

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN)

Steps 12 (IMU 3),6 (Triple G2)

Remain in FREE Drift

B A15 OPCU 1,2 CONV (two) - OFF

R1 MN BUS TIE B - OFF (tb-OFF)

C - OFF (tb-OFF)

UNDOCK AT 12/02:31

< SEP 1 TIG (12/03:46:00)

REPLANNED

3-146

STS-

131/

19A

FD

11:00

12:00

13:00

14:00

GMT

Date

04/17

(107)

00:00

01:00

02:00

03:00

04:00

MET

Day 012

WE

Z

T D R S

~~

~

D / N

O R B 1 9 0 1 9 1 1 9 2

~ B I A S - X L V - Z V V ~U N D K / F L Y A R O U N D / S E PS T S A T T

CDR

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

UNDOCKING/SEPARATION TIMELINE

(RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

~

C/L CAMR INSTALL

(P/TV, C/L CAMR)

Perform Step 1 only

PLT

MNVR (TRK) -XLV +ZVV (Undock)

TG=2 BV=5 P=180 Y=0 OM=0

A12/AUTO/VERN, Init TRK

UNDOCKING/SEPARATION TIMELINE

(RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

~

MS2

UNDOCKING/SEPARATION TIMELINE

(RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

~

JOINT OPS: 4.104 ODS VEST/PMA

DPRS & HATCH LEAK CHECK

JOINT OPS: 4.102 SHUTTLE/ISS

DUCT REMOVAL & HATCH CLOSING

MCC-H can perform steps 2 & 3 on

crew request

~

TRIDAR ACTIVATION

Ref. MSG 087

SSPTS OPCU DEACT B

NOTES

3-146

FD13

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

H/O ATT CNTRL CMG TA TO ORB A

O6 S TRK PWR -Z - ON

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN)

Steps 12 (IMU 3),6 (Triple G2)

Remain in FREE Drift

A √A

12/FREE/VERN

When ISS in Free Drift, DAP: LVLH,

When jet activity stopped for > 5 sec,

DAP: FREE > 2 sec, Then DAP: AUTO

O6 S TRK PWR -Z - ON

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN)

Steps 12 (IMU 3),6 (Triple G2)

Remain in FREE Drift

B A15 OPCU 1,2 CONV (two) - OFF

R1 MN BUS TIE B - OFF (tb-OFF)

C - OFF (tb-OFF)

UNDOCK AT 12/02:31

< SEP 1 TIG (12/03:46:00)

REPLANNED

STS-

131/

19A

FD

11:00

12:00

13:00

14:00

GMT

Date

04/17

(107)

00:00

01:00

02:00

03:00

04:00

MET

Day 012

WE

Z

T D R SD / N

O R B 1 9 0 1 9 1 1 9 2

S T S A T T ~ B I A S - X L V - Z V V ~U N D K / F L Y A R O U N D / S E P

CDR

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

UNDOCKING/SEPARATION TIMELINE

(RNDZ, UNDOCKING/SEP TIMELINE)

~

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

C/L CAMR INSTALL

(P/TV, C/L CAMR)

Perform Step 1 only

PLT

MNVR (TRK) -XLV +ZVV (Undock)

TG=2 BV=5 P=180 Y=0 OM=0

A12/AUTO/VERN, Init TRK

UNDOCKING/SEPARATION TIMELINE

(RNDZ, UNDOCKING/SEP TIMELINE)

~

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

MS2

UNDOCKING/SEPARATION TIMELINE

(RNDZ, UNDOCKING/SEP TIMELINE)

~

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

JOINT OPS: 4.104 ODS VEST/PMA

DPRS & HATCH LEAK CHECK

~JOINT OPS: 4.102 SHUTTLE/ISS

DUCT REMOVAL & HATCH CLOSING

MCC-H can perform steps 2 & 3 on

crew request

TRIDAR ACTIVATION

Ref. MSG 087

SSPTS OPCU DEACT B

NOTES

11

Page 13: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

FLT PLN/131/FLT

FD13

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

UNDOCK AT 12/02:31

C/L CAMR INSTALL

(P/TV, C/L CAMR)

Perform Step 1 only

REPLANNED

3-147

STS-

131/

19A

FD

11:00

12:00

13:00

14:00

GMT

Date

04/17

(107)

00:00

01:00

02:00

03:00

04:00

MET

Day 012

WE

Z

T D R S

~~

~

D / N

O R B 1 9 0 1 9 1 1 9 2

~ B I A S - X L V - Z V V ~U N D K / F L Y A R O U N D / S E PS T S A T T

MS1

P/TV03 UNDOCK

(P/TV, SCENES)

OPS

~

JOINT OPS: 4.104 ODS VEST/PMA

DPRS & HATCH LEAK CHECK

JOINT OPS: 4.102 SHUTTLE/ISS

DUCT REMOVAL & HATCH CLOSING

MCC-H can perform steps 2 & 3 on

crew request

~

P/TV03 UNDOCK

(P/TV, SCENES)

SETUP

MS3

UNDOCKING/SEPARATION TIMELINE

(RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

~

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~

MERLIN STATUS CK (Cue Card)

MS4

UNDOCKING/SEPARATION TIMELINE

(RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

~

P/TV04 INGRESS/EGRESS

(P/TV, SCENES) OPS

Hatch Close & Egress, Item 1

~

P/TV04 INGRESS/EGRESS

(P/TV, SCENES) DEACTIVATION

MS5

UNDOCKING/SEPARATION TIMELINE

(RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

~

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~

NOTES

3-147

FD13

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

UNDOCK AT 12/02:31

C/L CAMR INSTALL

(P/TV, C/L CAMR)

Perform Step 1 only

REPLANNED

STS-

131/

19A

FD

11:00

12:00

13:00

14:00

GMT

Date

04/17

(107)

00:00

01:00

02:00

03:00

04:00

MET

Day 012

WE

Z

T D R SD / N

O R B 1 9 0 1 9 1 1 9 2

S T S A T T ~ B I A S - X L V - Z V V ~U N D K / F L Y A R O U N D / S E P

MS1

~

P/TV03 UNDOCK

(P/TV, SCENES)

OPS

JOINT OPS: 4.104 ODS VEST/PMA

DPRS & HATCH LEAK CHECK

~JOINT OPS: 4.102 SHUTTLE/ISS

DUCT REMOVAL & HATCH CLOSING

MCC-H can perform steps 2 & 3 on

crew request

P/TV03 UNDOCK

(P/TV, SCENES)

SETUP

MS3

UNDOCKING/SEPARATION TIMELINE

(RNDZ, UNDOCKING/SEP TIMELINE)

~

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

~RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

MERLIN STATUS CK (Cue Card)

MS4

UNDOCKING/SEPARATION TIMELINE

(RNDZ, UNDOCKING/SEP TIMELINE)

~

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

~P/TV04 INGRESS/EGRESS

(P/TV, SCENES) OPS

Hatch Close & Egress, Item 1

P/TV04 INGRESS/EGRESS

(P/TV, SCENES) DEACTIVATION

MS5

UNDOCKING/SEPARATION TIMELINE

(RNDZ, UNDOCKING/SEP TIMELINE)

~

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

~RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

NOTES

12

Page 14: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

FLT PLN/131/FLT

FD13

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

RCS REGULATOR RECONFIG (ORB OPS, RCS)

Perform on Left and Fwd RCS only

< SEP 2 TIG (12/04:14:00)

REPLANNED

PCS 1(2) CONFIG (ORB OPS, ECLS)

Work () steps to activate PCS 2

3-148

STS-

131/

19A

FD

15:00

16:00

17:00

18:00

GMT

Date

04/17

(107)

04:00

05:00

06:00

07:00

08:00

MET

Day 012

WE

Z

T D R S

~ ~

~

~

D / N

O R B 1 9 3 1 9 4 1 9 5

~ B I A S - Z L V + Y V V ~- Z L V - X V VS T S A T T

CDR

MNVR (TRK) BIAS -ZLV +YVV (Dump)

TG=2 BV=3 OM=310

A1/AUTO/VERN, Init TRK

PRIORITY PWRDN GRP B

(ORB PKT, PRIOR PWRDN)

Steps 5,6 (Single G2),9,10,12 (IMU 3)

CABIN TEMP CONTROLLER RECNFG 2(1)

(ORB OPS, ECLS)

COMM STRING 1 C/O (PART A COMMAND TO STRING 1)

(ORB OPS, COMM/INST)

JOINT OPS: 6.106 SSOR DEACTIVATION

~

HEATER RECONFIG-CONFIG B (ORB OPS, EPS)

O6 √U

HF MODE - OFF

L9 PAYLOAD STATION A/G (two) - OFF

PRIVATE MEDICAL CONFERENCE VIA A/G 2

~

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A14/AUTO/VERN, Init TRK

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Prior to MNVR TO OBSS HOVER:

DAP: A14/AUTO/VERN

PLT

~

OBSS BERTH

(PDRS, OBSS OPERATIONS)

RMS PWRDN

(PDRS, RMS PWRDN)

PRIORITY PWRDN GRP B

(ORB PKT, PRIOR PWRDN)

Steps 5,6 (Single G2),9,10,12 (IMU 3)

SUPPLY/WASTE WATER DUMP (Simo Init)

(ORB OPS, ECLS)

Ref. MSG 120, item 9

~

SUPPLY/WASTE WATER DUMP (Supply Term)

(ORB OPS, ECLS)

Ref. MSG 120, item 9

SUPPLY/WASTE WATER DUMP (Waste Term)

(ORB OPS, ECLS)

Ref. MSG 120, item 9

MS2

~

OBSS BERTH

(PDRS, OBSS OPERATIONS)

RMS PWRDN

(PDRS, RMS PWRDN)

TRIDAR DEACTIVATION

Ref. MSG 087

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MNVR TO OBSS HOVER

Ref. MSG 123

EXERCISE

NOTES

3-148

FD13

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

RCS REGULATOR RECONFIG (ORB OPS, RCS)

Perform on Left and Fwd RCS only

< SEP 2 TIG (12/04:14:00)

REPLANNED

PCS 1(2) CONFIG (ORB OPS, ECLS)

Work () steps to activate PCS 2

STS-

131/

19A

FD

15:00

16:00

17:00

18:00

GMT

Date

04/17

(107)

04:00

05:00

06:00

07:00

08:00

MET

Day 012

WE

Z

T D R SD / N

O R B 1 9 3 1 9 4 1 9 5

S T S A T T ~ B I A S - Z L V + Y V V ~- Z L V - X V V

CDR

MNVR (TRK) BIAS -ZLV +YVV (Dump)

TG=2 BV=3 OM=310

A1/AUTO/VERN, Init TRK

PRIORITY PWRDN GRP B

(ORB PKT, PRIOR PWRDN)

Steps 5,6 (Single G2),9,10,12 (IMU 3)

CABIN TEMP CONTROLLER RECNFG 2(1)

(ORB OPS, ECLS)

COMM STRING 1 C/O (PART A COMMAND TO STRING 1)

(ORB OPS, COMM/INST)

JOINT OPS: 6.106 SSOR DEACTIVATION

~

HEATER RECONFIG-CONFIG B (ORB OPS, EPS)

~

O6 √U

HF MODE - OFF

L9 PAYLOAD STATION A/G (two) - OFF

PRIVATE MEDICAL CONFERENCE VIA A/G 2

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A14/AUTO/VERN, Init TRK

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Prior to MNVR TO OBSS HOVER:

DAP: A14/AUTO/VERN

PLT

~

OBSS BERTH

(PDRS, OBSS OPERATIONS)

RMS PWRDN

(PDRS, RMS PWRDN)

PRIORITY PWRDN GRP B

(ORB PKT, PRIOR PWRDN)

Steps 5,6 (Single G2),9,10,12 (IMU 3)

SUPPLY/WASTE WATER DUMP (Simo Init)

(ORB OPS, ECLS)

Ref. MSG 120, item 9

~

SUPPLY/WASTE WATER DUMP (Supply Term)

(ORB OPS, ECLS)

Ref. MSG 120, item 9

SUPPLY/WASTE WATER DUMP (Waste Term)

(ORB OPS, ECLS)

Ref. MSG 120, item 9

MS2

~

OBSS BERTH

(PDRS, OBSS OPERATIONS)

RMS PWRDN

(PDRS, RMS PWRDN)

TRIDAR DEACTIVATION

Ref. MSG 087

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MNVR TO OBSS HOVER

Ref. MSG 123

EXERCISE

NOTES

13

Page 15: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

FLT PLN/131/FLT

FD13

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

REPLANNED

AEM UNIT#1 CK (Cue Card)

AEM UNIT#2 CK (Cue Card)

MERLIN STATUS CK (Cue Card)

GLACIER STATUS CK (Cue Card)

STL STATUS CK (Cue Card)

TFL 199

MPLM

PRESSURE

CHECK

TFL 188

3-149

STS-

131/

19A

FD

15:00

16:00

17:00

18:00

GMT

Date

04/17

(107)

04:00

05:00

06:00

07:00

08:00

MET

Day 012

WE

Z

T D R S

~ ~

~

~

D / N

O R B 1 9 3 1 9 4 1 9 5

~ B I A S - Z L V + Y V V ~- Z L V - X V VS T S A T T

MS1

P/TV03 UNDOCK

(P/TV, SCENES)

OPS

~

P/TV03 UNDOCK

(P/TV, SCENES)

DEACTIVATION

EVA UNPACK AND STOW

(EVA, AIRLOCK CONFIG)

EXERCISE

On MCC GO: A15 APCU 1 OUTPUT-ON

CONV -ON

KU-BD STOW

Ref. MSG 027

Perform STOW DEPLOYED ASSEMBLY

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

~

MNVR TO OBSS HOVER

Ref. MSG 123

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

~

EXERCISE

SSV OUTRATE - 4

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS5

~

EVA UNPACK AND STOW

(EVA, AIRLOCK CONFIG)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

NOTES

3-149

FD13

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUND

FLYAROUND

SEP BURNS

TERMINATE SEP OPS

(RNDZ, UNDOCKING/SEP TIMELINE)

REPLANNED

AEM UNIT#1 CK (Cue Card)

AEM UNIT#2 CK (Cue Card)

MERLIN STATUS CK (Cue Card)

GLACIER STATUS CK (Cue Card)

STL STATUS CK (Cue Card)

TFL 199

MPLM

PRESSURE

CHECK

TFL 188

STS-

131/

19A

FD

15:00

16:00

17:00

18:00

GMT

Date

04/17

(107)

04:00

05:00

06:00

07:00

08:00

MET

Day 012

WE

Z

T D R SD / N

O R B 1 9 3 1 9 4 1 9 5

S T S A T T ~ B I A S - Z L V + Y V V ~- Z L V - X V V

MS1

~P/TV03 UNDOCK

(P/TV, SCENES)

OPS

P/TV03 UNDOCK

(P/TV, SCENES)

DEACTIVATION

EVA UNPACK AND STOW

(EVA, AIRLOCK CONFIG)

EXERCISE

On MCC GO: A15 APCU 1 OUTPUT-ON

CONV -ON

KU-BD STOW

Ref. MSG 027

Perform STOW DEPLOYED ASSEMBLY

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

~

MNVR TO OBSS HOVER

Ref. MSG 123

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

EXERCISE

SSV OUTRATE - 4

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS5

~

EVA UNPACK AND STOW

(EVA, AIRLOCK CONFIG)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EXERCISE

NOTES

14

Page 16: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

FLT PLN/131/FLT

FD13

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

O6 √U

HF MODE - OFF

L9 PAYLOAD STATION A/G (two) - OFF

PRIVATE MEDICAL CONFERENCE VIA A/G 2

REPLANNED

CREW WAKEUP AT 12/18:00

3-150

STS-

131/

19A

FD

19:00

20:00

21:00

22:00

GMT

Date

04/17

(107)

08:00

09:00

10:00

11:00

12:00

MET

Day 012

WE

Z

T D R S

~

~

~ ~

D / N

O R B 1 9 5 1 9 6 1 9 7 1 9 8

~ ~- Z L V - X V VS T S A T T

CDR

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS) SLEEP

~~

PLT

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

MS2

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-150

FD13

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

O6 √U

HF MODE - OFF

L9 PAYLOAD STATION A/G (two) - OFF

PRIVATE MEDICAL CONFERENCE VIA A/G 2

REPLANNED

CREW WAKEUP AT 12/18:00

STS-

131/

19A

FD

19:00

20:00

21:00

22:00

GMT

Date

04/17

(107)

08:00

09:00

10:00

11:00

12:00

MET

Day 012

WE

Z

T D R SD / N

O R B 1 9 5 1 9 6 1 9 7 1 9 8

S T S A T T ~ ~- Z L V - X V V

CDR

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

PLT

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

15

Page 17: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

FLT PLN/131/FLT

FD13

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

REPLANNED

CREW WAKEUP AT 12/18:00

TFL 188

3-151

STS-

131/

19A

FD

19:00

20:00

21:00

22:00

GMT

Date

04/17

(107)

08:00

09:00

10:00

11:00

12:00

MET

Day 012

WE

Z

T D R S

~

~

~ ~

D / N

O R B 1 9 5 1 9 6 1 9 7 1 9 8

~ ~- Z L V - X V VS T S A T T

MS1

SLEEP

~

On MCC GO: A15 APCU 1 CONV - OFF

OUTPUT - OFF

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS5

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-151

FD13

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

REPLANNED

CREW WAKEUP AT 12/18:00

TFL 188

STS-

131/

19A

FD

19:00

20:00

21:00

22:00

GMT

Date

04/17

(107)

08:00

09:00

10:00

11:00

12:00

MET

Day 012

WE

Z

T D R SD / N

O R B 1 9 5 1 9 6 1 9 7 1 9 8

S T S A T T ~ ~- Z L V - X V V

MS1

~

SLEEP

On MCC GO: A15 APCU 1 CONV - OFF

OUTPUT - OFF

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS5

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

NOTES

16

Page 18: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

MSG 121 - FD13 MISSION SUMMARY

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Congratulations on an outstanding docked mission Discovery! Enjoy the flyaround today (Go Air Force!) - we are looking forward to some beautiful new pictures of the ISS. YOUR CURRENT ORBIT IS: 189 X 182 NM NOTAMS (DELETED ILM)

EDW - EDT 22R/04L IN USE. EDW 22/04 CLOSED FOR CONSTRUCTION. EDW - LAKEBED RWYS RED. NOR - LAKEBED RWYS GREEN. FOK - RWY 06/24 CLOSED. DOV - RWY 32 REIL OTS. FMH - RWY 23 ALS OTS. YYT - TACAN UYT23 AZIMUTH OTS. YQX - DME YQX74 OTS. JTY - RWY 18 ALS OTS. MYR - RWY 18/36 CLOSED FROM 0340 - 0930 GMT. KKI - TACAN RIY92 OTS. MRN - RWY 20 THRESHOLD DISPLACED. RWY 02/20 LDA = 9085 FT. PTN - RWY 14/32 CLOSED. IKF - NOT USABLE. NO AGREEMENT. BEN - NOT RECOMMENDED/NOT SUPPORTED.

NEXT 2 PLS OPPORTUNITIES: 26

27 28 29 30

KSC15 ORB 191 – 12/02:17 FEW025 FEW250 7 150/06P08 EDT22L ORB 207 – 13/02:32 SCT100 BKN200 7 220/08P14 OMS TANK FAIL CAPABILITY: 31

32 33 34 35

L OMS FAILS: NO R OMS FAILS: NO LEAKING OMS PRPLT BURN: 36

37 38 39 40

L OMS LEAK: ALWAYS BURN RETROGRADE R OMS LEAK: ALWAYS BURN RETROGRADE OMS QUANTITIES(%) 41

42 43 44 45 46 47 48 49 50 51

L OMS OX = 34.08 R OMS OX = 35.26 FU = 33.60 FU = 35.19

END OF PAGE 1 OF 2, MSG 121 17

Page 19: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

MSG 121 - FD13 MISSION SUMMARY

END OF PAGE 2 OF 2, MSG 121

1 DELTA V AVAILABLE: 2

3 4

OMS 340 FPS ARCS (TOTAL ABOVE QTY1) 23 FPS 5

6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

TOTAL IN THE AFT 363 FPS ARCS (TOTAL ABOVE QTY2) 53 FPS FRCS (ABOVE QTY 1) 20 FPS AFT QTY 1 78 % AFT QTY 2 41 % THERE ARE NO FAILURE/IMPACT/WORK AROUNDS FOR TODAY.

18

Page 20: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

MSG 122 (23-0328) - FD13 TRANSFER MESSAGE Page 1 of 1

1 2 3 4 5 6 7 8 9

10 11 12

Good Morning Naoko and Steph, Thank you for a great transfer mission! Today you’ll be transferring the last few items to the middeck prior to hatch closure. The Transfer List Excel file, FD13_Transfer_List_STS131.xls, locations are:

• Shuttle: C:\OCA-up\transfer (KFX machine) • Station: K:\OCA-up\transfer

Transfer Notes 13

14

16 17

19 20 21

• CWC Sample Bags: Naoko, please report the quantity of CWC Sample Bags (Middeck 15

Resupply Item 48) transferred to ISS.

• Updated Middeck Return Layouts: Middeck Stowage has sent you an updated 18 Middeck Return layout today in MSG124.

FD13 Choreography (in timeline order) 22

24

29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

• Item 713: Transfer MERLIN return samples to the middeck per the MERLIN PACK 23 activity.

• Items 703 and 704: Transfer EMUs 3008 and 3017 back to shuttle. 25

• Item 702: Transfer Double Coldbag to middeck per DCB XFER activity. 26

• Item 9: Transfer BPSMU to ISS following P/TV05 DEACT activity. 27

• Item 720: Transfer 5 MLE Bag G to middeck. 28

NO CHANGE PAGES, SECOND DAY IN A ROW!! Great work! - The STS-131 Transfer Team

Page 1 of 1, MSG 122 (23-0328) 19

Page 21: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

MNVR TO OBSS HOVER

WARNING For UNDOCKED ops only

1. SETUP

SM 94 PDRS CONTROL PL ID – ITEM 3 +1 EXEC PL INIT ID – ITEM 24 +1 EXEC

Verify at OBSS UNDOCK posn:

X Y Z PITCH YAW ROLL PL ID √ -1041 -362 -602 44 270 0 1 * SY SP EP WP WY WR √ +25.8 +66.3 -49.0 -85.9 +10.7 -100.7 *Display singularity

MON 1 D MON 2 B DNLK ELBOW(RSC) DTV A

CCTV A (0,20) ELBOW (-65,0) 2. MNVR TO OBSS HOVER

SM 94 PDRS CONTROLEND POS – ITEM 18 -6 8 0 +1 3 3 -5 1 7 EXEC END ATT – ITEM 21 +0 +0 +3 4 1 EXEC CMD CK – ITEM 25 EXEC (GOOD)

RHC RATE – as reqd (VERN within 10 ft)

BRAKES – OFF (tb-OFF) MODE – OPR CMD, ENTER (READY lt on)

AUTO SEQ – PROCEED (IN PROG lt on)

When AUTO SEQ IN PROG lt – off:

BRAKES – ON (tb-ON)

MSG 123 - RMS MANEUVER TO OBSS HOVER

END OF PAGE 1 of 2, MSG 123 20

Page 22: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

OBSS HOVER posn: (04:38) X Y Z PITCH YAW ROLL PL ID √ -680 +133 -517 0 0 341 1 SY SP EP WP WY WR √ -89.9 +80.2 -118.8 -59.8 +0.0 +109.9

CCTV D (-5,15) CCTV C (10,10)

ELBOW (5,-30) CCTV A (-40,20)

Go to OBSS BERTH (PDRS, OBSS OPERATIONS)

MSG 123 - RMS MANEUVER TO OBSS HOVER

END OF PAGE 2 of 2, MSG 123 21

Page 23: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

 

CTB # 431 

MER

LIN

MF28E/G

GLACIER

3006

‐304

1908

‐309

(INBD

)(2) C

WC'S

HYG

IENE

STL

AEM

 MODULE 2

AEM

 MODULE 1

‐301

1151

PORT

STBD

   EC

OK (2)/WIRE TIES

PHASE VI G

LOVE

SSTORM

M‐DTO

 #718

  (STO

WAGE BA

G)

BIOCIDE FILTER

S #412

.11

WORK

LIGHTS(2) #

7191800

RFTA

 (FILLED) #

614

 ERA

DK

B/U DTV

 HDWR

GAP STOWAGE BA

GRE

‐ENTR

Y GRM

NTS‐

CTB(em

pty)

CTB 412 PH

OTO

/TV 183

5‐30

1HCT

B G1 CA

M

1770

‐307

0696

‐309

1779

‐303

MA16

L

ZIPLOCK

S (36X

36) (10)

L10A

I:         M

PC/AVIU/TAPES

(668

6‐34

4) M

PC POWER

 SUPP

LYL10A

2:        D

TVL11:             PDIP 2

L11A

2: A3  OIU PAN

ELS

L12A

1:        SSP 1

L12A

2:        SSP 2

L12A

3:        PDIP 1

R12A

1:       VPU

   C/D JS

C  SJD3312

1911

‐302

   P/D JSC  SJD33

121909

‐302

   C/D KSC

  SJD33

121912

‐301

   P/D KSC

   SJD331219

10‐301

   CE

IT KIT    SJD33

122122

‐318

   ISS LABE

L    (SGG33

111614

‐301

)

CORE

 CC SYSTEM

 BAG

DTV

 CAMER

A BAG

HAT

CH TOOL

QUICK DON M

ASKS (4)

QUICK DON M

ASKS(3)

CABIN AIR CLEAN

ER/

SPOTLIGHT(FLASH

LIGHT)

G1 CA

MCD

R/  FLASH

D2X

/400

 MM/12‐24

MM

LENS

BOGEN

 ARM

S(2)

CORE

 CAMER

A BAG

PGSC

 DESK(2)

PILO

T HAND CONTR

OL

DIDB(6)

85' TETHER

, BSPLATE

MINI W

RKSTN

CCC(8)    LCV

G(4)

EMU BATT

1777

‐305

‐305

5473

‐340

6697

R12A

2:       OPP

/SPA

SP

7 G‐SUITS

CTB

MA9F

‐302

8723

6256

‐309

5962

‐303

LIGHT STICKS/M

AK

8047

‐304

CTB

CTB #428

(JAX

A)

(425

9‐34

5)

LW M

AR

MA16F

1772

‐306

6300

‐351

IFM TOOLS

2‐EM

Us

EXT A/L FLO

OR

1768

1783

1776

MA1

6J

IFM CABLES & HOSES

WINDOW SHADES

MA16

D‐311

8737

LIOH BOX (743

5‐340):

2 INSTALLED

29 IN

 LIOIH BOX

(MA4D

/J)

MF43O

1437

‐303

MF57O

B/U C/L CAM

LEAK DETEC

TOR

(OBD

)EV

A ACC

ESS

TOWELS AND

1641

‐330

1st D

AY CLO

TH

RESU

PPLY ITEM

SWMC DISPENSER

1789

1769

1786

1775

1773

‐345

‐340

GFE TV CN

TRLR

PRIM

E C/L CA

M

(554

8‐38

3)

PANEL COVE

RS

MD FLO

OR

(STB

D 1)

MD FLO

OR

MD FLO

OR

(STB

D 2)

(PORT

 1)

MD FLO

OR

(PORT

 2)

MD CEIL

(STB

D 2)

(STB

D 1)

MD CEIL

(PORT

 2)

MD CEIL

(MD52C)

MD CEIL

(PORT

 1)

CREW

:VE

HICLE

FLIGHT

LAUNCH

:DATE:

LEADER

:VA

NESSA

 OSBORN

  4‐15

‐201

0NET

 4‐5‐10

STS‐13

1/19

AOV‐10

37 PERSONS 14

 + 0 + 2 DAY

SNAOKO

 YAMAZ

AKI

DORO

THY METCA

LF‐LINDEN

BURG

ERRICH

ARD

 MASTRA

CCHIO

STEPHANIE W

ILSO

N

JAMES DUTTON

ALAN POINDEX

TER

M/S #4

RQMTS:

NO RCR

S, SLEEPING

BAGS, EXT

 A/L, ERG

OMETER

, RMS,

CLAYTON ANDER

SON

TBD

10SGL

TBD2

HLF

RETU

RNLAUNCH

CTB

7432

‐343

‐326

7436

VOL B

NON EDO

7425

‐329

VOL 3B

7490

‐312

A16

‐304

7424

A17

‐306

1403

NOT INSTALLED

VOLU

ME D

8065

WASTE MGMT

CONT UCD

sWET TRA

SH

(MD76

M)

VOLU

ME F

1800

‐346

(MD80R)

VOLU

ME G

   EM

U SER

V. KIT

EVA ACC

ESS

6014

‐312

ML60M

ML60E

‐311

0695

PANTR

Y FO

OD

PANTR

Y FO

OD

HCT

B

(MA23R)

VOLU

ME H

8068

4575

‐321

0914

WMC

‐332

5557

EXT A/L

MA1

6N

6299

‐329

MA1

6G

1903

‐305

MA9L

MA9J

‐309

8719

1154 301

MA9

G

MA9D

1778

‐302

MF71O

MF71C

MF71E

MF71G

MF71H

‐305

1901

6231

‐380

MF71K

MF71M

‐304

3005

MF57M

MF57K

MF57H

MF57G

1900

‐308

MF57E

MF57C

‐327

8965

1792

MF43C

MF43E

‐314

6269

6250

‐359

MF43G

MF43K

‐301

1151

1902

‐308

MF43H

MF43M

‐307

1904

2766

‐305

MF14O

MF28O

‐309

2769

2768

‐303

MF28M

MF14M

‐304

2765

2764

‐306

MF14K

MF28K

‐301

1771

6684

‐340

MF28H

MF14H

‐304

2763

2762

‐307

MF14G

MF14E

‐319

2760

5555

MIDDEC

K FO

RWARD

MIDDEC

K AFT

31 LIOH TOTA

L + 1 AT

COWINDOW SHADE BA

G

4980

‐310

8071

‐328

8070

‐304

(MA75J)

(MA82

H)

DWG NO. SGD321044

54

HALF CARG

O TRA

NSFER

 BAG

6013

‐311

MODULAR LO

CKER

 LAYO

UT

/USR/DWGS/LO

CKER

/STS‐131

CCFE: A

LAURN

A HOOEY

(281

) 483

‐460

8

1622

‐308

‐308

1622

PANTR

Y FO

OD

MF57A

‐302

1622

LW M

AR

ML60B

CDR

PLT

NOT APP

ROVE

D

M/S #5

*L‐24

 LATE

 LOAD

TRANSFER

 HARD

WARE

,

SWAP

MA9N

SOFT STW

G BAGS

PHK'S  (7

)

BRKT

S/CC

K/RE

‐ENT

RSTR

NTS/RE‐EN

TFIBE

RSCO

PE

1152

‐302

‐330

5452

‐3011150

M/S #1

M/S #2

M/S #3

CARG

O TRA

NSFER

 BAG

CTB

NOTE: LOCK

ER LAYO

UTS ARE

 FOR RE

FERE

NCE

 ONLY & ARE

 NOT RE

LEASED DWGS.  FOR RE

LEASED DRA

WING

PLEA

SE REFER

 TO THE CR

EW COMPA

RTMEN

T CO

NFIGURA

TION DRA

WING FOR TH

IS FLIGHT (SGD3210

4454

)

DESCE

NT

SJD32

1089

29‐370

‐307

‐310

‐307

‐304

‐312

‐306

‐304

‐330

‐318

ACT

IWATC

HES/ LO

GBO

OKS

TILE REPAIR

ZIPLOCK

S (24X

24) (6)

BRT

RFTA

 (FILLED) #

613

ACE

S GLO

VES (1) P

R

‐305

‐304

HCT

B #425

‐306

CATA

LYTIC RE

ACT

OR ORU

#721

                     

PGT (W

/FOAM) #

707

1836

‐301

DOUBLE CO

LDBA

G  

(LADA/SMPLS)

 #70

SILVER

 BIOCIDE #717

D2X

S CA

MER

A

EDV #664

  HCT

B #618

 CA

BIN FILTER #625

HEPA FLTR #646

GAPS

WATER SA

MPLES

CTB:43

8(CP

A:qty1)   

EDV #665

 CW

Cs(2) #

953 #954

CSA‐CP RSPLY #700

CTB: #436

IMAGE PR

OC UNT #950

MS

G 1

24-E

NTR

Y L

OC

KE

R L

AY

OU

T

EN

D O

F P

AG

E1

of 1

22

Page 24: FD13 FLIGHT PLAN REVISION - NASA · FD13 Flight Plan Revision 121 ; 17 - 18 FD13 Mission Summary; 122 FD13 Transfer Message; 19 123 ; 20 - 21 RMS Maneuver to OBSS Hover; 124 Entry

MSG 125A (23-0333A) - FD13 CREW CHOICE DOWNLINK

Page 1 of 1

1

2

3

The following times indicate good Shuttle Sband on A/G 2 and ISS Ku for crew choice downlink.

AOS LOS Delta (min) Notes 11/18:41 11/19:11 30 11/19:55 11/21:03 68 A/G 20 second H/O at 20:09:36

KU gap from 20:25-20:28 KU H/O at 20:38:11

A/G 20 second H/O at 20:47:58 11/21:30 11/22:51 81 A/G 20 second H/O at 21:46:49

KU H/O at 22:00:53 A/G 20 second H/O at 22:21:34

11/23:08 11/23:25 17 A/G 20 second H/O at 23:25:30 11/23:30 11/23:44 14

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

Note: Please notify MCC-H 10 minutes prior to the event to allow for ground network configuration.

Page 1 of 1, MSG 125A (23-0333A)

23