CASE-1:FAULT ANALYSIS ON SWITCHED MODE POWER SUPPLY.
Fault : National Network Operating Centre (NNOC) Panel officer
called me and told one of site was Out Of Service for 40 minutes, before 30 minutes at 14:30 hrs, now site is radiating normal and no alarm appeared in Craft shell Network Management System or Clarity Network Management System.
I started towards site and at half way NNOC Panel officer called me and told site was once again Out Of Service for 37 minutes, before 10 minutes, at 16:27 hrs, now site is radiating normal and no alarm appeared in Craft shell Network Management System or Clarity Network Management System.
Fault analysis :I reached the site at 18:00 hrs, checked the Lucent Modcell 4.0 CDMA system, Nortel transport system, Optical Fiber system, SMPS, Battery, Precision Air Conditioner and Diesel Generator found all are working normal and load was on State electricity Board supply.
While I was carrying out checks the State electricity Board supply was interrupted, before Diesel Generator fed power, the site was isolated. I was in front of SMPS and noticed 30 sec (approximately) there was no indication on Main Control Unit of SMPS Controller. Now I am sure the Fault area was either SMPS or Battery Bank.
I requested from Maintenance Engineer Mr K. Sampath and NNOC for checking of the SMPS and Battery. I was permitted to carry out my checks at the Maintenance window at 00:00 hrs to 06:00 hrs.
At 00:00 hrs the Site was put down by removing the power to Lucent Modcell 4.0 CDMA system, Nortel transport system.
I removed the Alternating Current to SMPS. The SMPS did not provide any out put.
I Checked the MCU, which is responsible for giving power to Low Voltage Disconnect Contractor at the given terminals 50.2 V DC was available.
I checked the voltage at the input and output end of DC Contractor’s and found no out put at out put end but DC contractor’s Coil is being fed 50.2 V DC by MCU.
I removed the DC Contractor from SMPS and Dismantled. I checked the resistance of coil found infinity.
I replaced the DC Contractor Coil with New coil and fitted on SMPS.
Checked the SMPS as per procedure and its functions are normal.
Conclusion :The site was Out of Service Thrice Due to the Failure of
SMPS DC Contractor’s Coil was open.
The Single line power supply diagram of Base Transreceiver Station
415 V 3Φ50 HZ SEB Incomer
DG Auto Mains Failure
Change OverSwitch
Lighting Circuits
Alternating Current Distribution Box
PAC SMPS
DC 48 V OUTPUT
Fire AlarmSystem
Security AutomationSystem
Nortel TN-1C
Modcell4.0
48V DC to 12 V DC-DC Converter
Battery Bank48 V 280 AH
CASE-2:FAULT ANALYSIS ON SWITCHED MODE POWER SUPPLY.
Fault : National Network Operating Centre (NNOC) Panel officer
called me and told one of site was Out Of Service for 40 minutes, before 30 minutes at 10:30 hrs, now site is radiating normal and no alarm appeared in Craft shell Network Management System or Clarity Network Management System.
I started towards site and at half way NNOC Panel officer called me and told site was once again Out Of Service for 37 minutes, before 10 minutes, at 11:57 hrs, now site is radiating normal and no alarm appeared in Craft shell Network Management System or Clarity Network Management System.
Fault analysis :I reached the site at 17:00 hrs, checked the Lucent Modcell
4.0 CDMA system, Nortel transport system, Optical Fiber system, SMPS, Battery, Precision Air Conditioner and Diesel Generator found all are working normal and load was on State electricity Board supply.
While I was carrying out checks the State electricity Board supply was interrupted, before Diesel Generator fed power, the site was isolated. I was in front of SMPS and noticed 30 sec (approximately) there was no indication on Main Control Unit of SMPS Controller. Now I am sure the Fault area was either SMPS or Battery Bank.
I requested Maintenance Engineer Mr K Sampath and NNOC for checking of the SMPS and Battery but they permitted to carry out my checks at the Maintenance window at 00:00 hrs to 06:00 hrs.
At 00:00 hrs the Site was put down by removing the power to Lucent Modcell 4.0 CDMA system, Nortel transport system.
I removed the Alternating Current to SMPS. The SMPS did not provide any out put.
I Checked the MCU, which is responsible for giving power to Battery Contractor terminals 50.2 V DC was available.
I checked the voltage at the input and output end of DC Contractor’s and found no out put at out put end and also no input power to DC contractor’s Coil and MCU is Blank.
During Load transfer from SMPS to Battery, Battery Bank Voltage Dropped to 2.4 V.
I checked the Individual Cell voltage and found one cell voltage was 0.8 V, when the load was applied to Battery Bank this cell did not provide any current hence the Bank Voltage dropped to 2.4 V.
I replaced the Battery cell with a new cell.
Checked the SMPS as per procedure and its functions are normal.
Conclusion :The site was Out of Service twice Due to the Failure of One
Weak Battery cell.