Page 1: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

A Case Study of Energy Cost Optimization in Monroe Water

Distribution System

Fatemeh Alighalehbabakhani Carol J. Miller

Shawn McElmurry S. Mohsen Sadatiyan A.

Page 2: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Content

1

Introduction Case StudyComputational

EnginesResult and Conclusion

Page 3: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Introduction

2

Environmental Hazard of

EnergyEnergy CostsEnergy Used

Page 4: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Introduction

3

Environmental Benefit

Cost Reduction

Increased Sustainability

Page 5: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Case Study

4

Page 6: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Case Study

5

Item Unit Amount

Design Population

People 40,000

Average Demand

MGD 5.6

Maximum Demand

MGD 11.2

Service Area

Completely served Areas

City of Monroe

City of Petersburg

Monroe Charter

Township

Raisinville Township

Village of Dundee

Maybee

Partially Served Area

LaSalle

Exeter

London

Ida Townships

Page 7: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Case Study Details

6

Items Unit Amount

Maximum Pipe Diameter

Inches 99

Minimum Pipe Diameter

Inches 2

Pipes Number 1,943

Constant Speed Pumps

Number 11

Variable Speed Pumps

Number 2

Elevated Tanks Number 3

Page 8: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Tanks

7

Tank Name Min Water Elevation (ft)

Max Water Elevation (ft)

Volume ( MG)

T- 2 741.25 772.00 0.25

T- 3 772.50 797.00 0.25

T- 5 713.25 745.50 0.54

Page 9: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Areas that Elevated Tank Meet Demand

8

Page 10: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Specific Volume Curve

9

Page 11: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Maybee Elevated Tank ( T-3)

10

Page 12: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

11

Energy and Hydraulic Demand for the System

Average daily variation in hydraulic demand for the Monroe system in 2005

On- Peak Hours for Hydraulic Demand

On- Peak Hours for Energy Demand

Page 13: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

3

Reduce Energy CostReduce Emission

These tanks could supply water during on-peak hours and be refilled during off-peak hours to minimize costs and emission.

Goals

12

Page 14: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Pressure Control Nodes Specification - Area1

13

Page 15: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Pressure Control Nodes Specification- Area 2

14

Page 16: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Modeling Runs Specifications

15

Run No. Name of Run Capacity of

Tank 2 (MG)Capacity of

Tank 3 (MG)Capacity of

Tank 5 (MG)

Total Capacity

(MG)

1 Base 0.25 0.25 0.54 1.04

2 Second Run 0.54 0.54 0.54 1.62

3 Third Run 0.25 0.25 1.08 1.58

4 Fourth Run 0.54 0.54 1.08 2.16

Page 17: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Result

16

Item Unit Base Run Second Run Third Run Fourth Run

Daily cost $ 209 196 205 197

Pump cost $ 217 201 212 201

Storage cost $ 8 5 7 4

Energy used KWh/MG 600 568 596 571

Energy cost /$MG 24 23 24 24

Carbon emission lb/day 10,300 9,500 10,100 9,600

On-peak pump use % 38 33 36 33.5

Page 18: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Conclusion

17

Incr

ease

d T

ank

Cap

acit

y

Decrease Energy Cost

Decrease Energy Consumption

Decrease Emission

Page 19: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Conclusion

Not all elevated storage tanks provide the same amount of reductions in energy consumption, financial costs or pollutant emissions. Modeling similar to what has been presented here can identify the optimal tank size and system scheduling for maximized benefit.

18

Page 20: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Thanks for your attention

19

Page 21: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

20

WaterGEMS Output

First Run) Base Run(

Second Run

Page 22: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

21

WaterGEMS Output

Third Run Fourth Run

Page 23: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

22

First Run

Page 24: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

23

First RunTime PMP-544 W-12 E-3 W-11 E-4 W-10 E-5 W-9 E-6 W-8 E-7 PMP-9 E-2

0 0.85 0 0 0 0 0 0 0 1 0 0 0 01 0 0 0 0 0 0 0 0 0 0 1 0 0

1.79 0 0 0 0 0 0 0 0 0 0 1 0 02 0 1 0 0 0 0 1 0 0 0 0 1 0

2.45 0 1 0 0 0 0 1 0 0 0 0 1 03 0.9 0 0 0 0 0 0 0 0 1 0 1 04 0 0 0 0 1 0 0 0 0 0 0 0 05 0 1 0 0 0 0 0 0 0 0 0 0 06 0 1 0 0 0 0 1 0 0 0 0 0.9 07 0.95 1 0 0 0 0 0 0 0 1 0 0 08 0.7 1 0 0 0 0 0 0 0 1 0 0 09 0 1 0 0 0 0 0 0 0 1 0 0.95 0

10 0.65 1 0 0 0 0 0 0 0 0 0 0 011 0.9 1 0 0 1 0 0 0 0 1 0 0 012 0 1 0 0 0 0 0 0 0 0 0 0 013 0 0 0 0 0 0 0 0 0 1 0 0.7 0

13.21 0 0 0 0 0 0 0 0 0 1 0 0.7 014 0 1 0 0 0 0 0 0 0 1 0 0.8 015 0.85 0 0 0 0 0 0 0 0 1 0 0.95 016 0 1 0 0 0 0 0 0 0 0 0 0.75 017 0.8 0 0 0 0 0 0 0 0 1 0 0.75 018 0 0 0 0 0 0 0 0 0 1 0 0.85 019 0 1 0 0 0 0 1 0 0 0 0 0 020 1 1 0 0 0 0 0 0 0 0 1 0 021 0.95 0 0 0 0 0 0 0 0 1 0 0 022 0 1 0 0 0 0 0 0 0 1 0 0.65 023 0.95 0 0 0 0 0 0 0 0 1 0 0 0

23.85 0.95 0 0 0 0 0 0 0 0 1 0 0 024 0.85 0 0 0 0 0 0 0 1 0 0 0 0

Page 25: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

24

Second Run

Page 26: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

25

Second RunTime PMP-544 W-12 E-3 W-11 E-4 W-10 E-5 E-7 W-9- E-6 W-8 PMP-9 E-2

0 0.75 1 0 0 0 0 0 0 0 0 0 0 01 0.75 1 0 0 0 0 0 0 0 0 0 0 02 0.95 0 0 0 0 0 0 0 0 0 1 0 03 0 0 0 0 0 0 0 0 0 0 1 0.65 04 0 0 0 0 0 0 0 0 0 0 0 0 05 0 0 0 0 1 0 0 0 0 0 0 0.8 06 1 1 1 1 0 0 0 0 0 0 0 0 07 0 1 0 0 0 0 0 0 0 0 0 0.85 18 0 1 0 0 0 0 0 0 0 0 1 0.9 09 0 1 0 0 0 0 0 0 0 0 0 0.65 0

10 0 1 0 0 0 0 0 0 0 0 1 0.85 011 0 1 0 0 0 0 0 0 0 0 0 0 012 0.65 0 0 0 0 0 0 0 0 0 1 0 0

12.75 0.65 0 0 0 0 0 0 0 0 0 1 0 013 0.8 0 0 0 0 0 0 0 0 0 1 0 014 0.7 0 0 0 0 0 0 0 0 0 1 0 015 0 1 0 0 0 0 0 0 0 0 1 0.95 016 0 1 0 0 0 0 0 0 0 0 0 0.65 017 0 0 1 0 0 0 0 0 0 0 1 0.95 018 0 1 0 0 0 0 0 0 0 0 0 0 019 0.65 0 0 0 0 0 0 0 0 0 1 0 0

19.41 0.65 0 0 0 0 0 0 0 0 0 1 0 020 0.65 1 0 0 0 0 0 0 0 0 0 0 021 0 1 0 0 0 0 0 0 0 0 1 1 022 0 0 0 0 0 0 0 0 0 0 1 0.8 023 0 0 0 0 0 0 0 0 0 0 1 0.95 024 0.75 1 0 0 0 0 0 0 0 0 0 0 0

Page 27: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

26

Third Run

Page 28: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Third RunTime E-7 PMP-544 W-12 E-3 W-11 E-4 W-10 E-5 W-9- E-6 W-8 PMP-9 E-2

0 0 0 1 0 0 0 0 0 0 0 0 0 00.1 0 0 1 0 0 0 0 0 0 0 0 0 01 0 0.9 1 0 0 0 0 1 0 0 0 0 0

1.76 0 0.9 1 0 0 0 0 1 0 0 0 0 02 0 0 0 0 0 0 0 0 0 0 1 0.7 03 0 1 1 0 0 0 0 0 0 0 0 0 04 0 0 0 0 0 0 0 0 0 0 0 0 05 1 0.95 1 0 0 0 0 0 0 0 0 0 06 0 0 0 0 0 0 0 0 0 0 1 0.8 07 0 0.85 0 0 0 0 0 0 0 0 1 0 08 1 0.75 1 0 0 0 0 0 0 0 0 0 09 0 0.65 1 0 0 0 0 0 0 0 0 0 0

10 0 0 0 0 0 0 0 0 0 0 1 0 011 0 0 1 0 0 0 0 0 0 0 0 0 012 0 0 1 0 0 1 0 0 0 1 0 1 0

12.67 0 0 1 0 0 1 0 0 0 1 0 1 013 0 0 0 0 0 0 0 0 0 0 1 0.7 014 0 0 0 0 0 0 0 0 0 0 1 0.9 015 1 0 1 0 0 0 0 0 0 0 0 0.75 016 0 0.95 1 0 0 0 0 0 0 0 1 0.95 017 1 0 1 0 0 0 0 0 0 0 0 0.7 018 0 0.85 0 0 0 0 0 0 0 0 1 0.75 019 0 0.95 0 0 0 0 0 0 0 0 1 0.9 020 0 0 0 0 0 0 0 0 0 0 1 0 021 0 0 1 0 0 0 0 1 0 0 1 1 022 0 0 1 0 0 0 0 0 0 0 1 0.85 023 0 0.75 0 0 0 0 0 0 0 0 1 0 024 0 0 1 0 0 0 0 0 0 0 0 0 0

27

Page 29: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Fourth Run

28

Page 30: Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A

Fourth RunTime

PMP-544 W-12 E-3 W-11 E-4 W-10 E-5 W-9 E-6 W-8 E-7 PMP-9 E-2

0 0.75 1 0 0 0 0 0 0 0 0 0 0 01 0.75 1 0 0 0 0 0 0 0 0 0 0 02 0.95 0 0 0 0 0 0 0 0 1 0 0 03 0 0 0 0 0 0 0 0 0 1 0 0.65 04 0 0 0 0 0 0 0 0 0 0 0 0 05 0 0 0 0 1 0 0 0 0 0 0 0.8 06 1 1 1 1 0 0 0 0 0 0 0 0 07 0 1 0 0 0 0 0 0 0 0 0 0.85 18 0 1 0 0 0 0 0 0 0 1 0 0.9 09 0 1 0 0 0 0 0 0 0 0 0 0.65 0

10 0 1 0 0 0 0 0 0 0 1 0 0.85 011 0 1 0 0 0 0 0 0 0 0 0 0 012 0.65 0 0 0 0 0 0 0 0 1 0 0 0

12.64 0.65 0 0 0 0 0 0 0 0 1 0 0 013 0.8 0 0 0 0 0 0 0 0 1 0 0 014 0.7 0 0 0 0 0 0 0 0 1 0 0 015 0 1 0 0 0 0 0 0 0 1 0 0.95 016 0 1 0 0 0 0 0 0 0 0 0 0.65 017 0 0 1 0 0 0 0 0 0 1 0 0.95 018 0 1 0 0 0 0 0 0 0 0 0 0 019 0.65 0 0 0 0 0 0 0 0 1 0 0 0

19.35 0.65 0 0 0 0 0 0 0 0 1 0 0 020 0.65 1 0 0 0 0 0 0 0 0 0 0 021 0 1 0 0 0 0 0 0 0 1 0 1 022 0 0 0 0 0 0 0 0 0 1 0 0.8 023 0 0 0 0 0 0 0 0 0 1 0 0.95 024 0.75 1 0 0 0 0 0 0 0 0 0 0 0

29