    Fall Construction

    Technical Briefing

  • 7/30/2019 Fall construction in Ottawa

    2/32

    Introduction

    Future landscape of Ottawa ischanging

    Unprecedented period of growth

    and transformation

    Ottawa on the Move andinfrastructure investments

    Significant mobility investments

    Short-term pain for long term gain

    Coordinated effort to build a better

    Ottawa

  • 7/30/2019 Fall construction in Ottawa

    3/32

    Overview

    1. Recap of Summer Activities

    2. Light Rail Construction Activities

    3. Fall Construction Highlights and Impacts toMobility

    4. Mitigation Efforts

    5. Wrap-Up

  • 7/30/2019 Fall construction in Ottawa

    4/32

    Recap of Summer Activities

  • 7/30/2019 Fall construction in Ottawa

    5/32

    Hwy 417 rapid bridge lifts

    O-Train service resumes

    Carling Avenue resurfacing

    Laurier at Nicholas intersection

    Mackenzie King Bridge

    Hazeldean watermain

    Baseline Transitway structure

    Woodroffe Avenue repaving

    Rideau Street Phase I

    Ogilvie Road resurfacing

    Major Projects Completed end of August

  • 7/30/2019 Fall construction in Ottawa

    6/32

    Ottawas Infrastructure Program

    375 major projects

    underway

    6 km of sidewalks

    renewed (completed or

    underway)

    100 km of roads resurfaced

    (completed or underway)

    investments in cycling

    infrastructure

  • 7/30/2019 Fall construction in Ottawa

    7/32

    Changing Commuting Habits

    Plan around construction

    Stagger work hours

    Use technology in the workplace

    to reduce traffic

    Avoid traveling during peak

    periods

    Take transit, cycle, walk or use a

    mix

    Carpool

    Consider alternative work

    arrangements

  • 7/30/2019 Fall construction in Ottawa

    8/32

    Light Rail Construction ActivitiesFall 2013

  • 7/30/2019 Fall construction in Ottawa

    9/32

    Confederation Line

    Preparatory work underway at

    East and West Tunnel Entrances

    Central Tunnel Shaft work begins

    in early September

    Excavations at these sites includes

    piling and, if required, blasting

    Demolition continues at the

    Maintenance & Storage Facility

  • 7/30/2019 Fall construction in Ottawa

    10/32

    O-Train Expansion

    O-Train service will

    resume September 3

    Completion of work will

    continue after hours

    train controls and signals

    passing tracks

    commissioning and testing ofnew trains

  • 7/30/2019 Fall construction in Ottawa

    11/32

    Highway 417 construction

    Fixing the Split Stage 1

    Concrete barrier to prevent westbound Highway 417 traffic

    from accessing the St. Laurent exit

    Dedicated exit lane and two through lanes on the OR 174westbound

    OR 174 lane reductions will be removed

    Construction ongoing from Nicholas to the Split

    Work ongoing on bridge structures

  • 7/30/2019 Fall construction in Ottawa

    12/32

    Upcoming Highway 417 construction

    Short-term off-peak lane reductions and ramp

    closures will continue through the project limits

    No additional significant closures planned for 2013

  • 7/30/2019 Fall construction in Ottawa

    13/32

    Queen Street Construction Project

    Queen Street watermain from Bronson Avenue to Elgin Street.

    Project completion: December 2013.

    Portions of Queen Street reduced to one lane in each direction

    and on-street parking will not be available.

  • 7/30/2019 Fall construction in Ottawa

    14/32

    Fall Construction Highlights and Impacts

    to Mobility

  • 7/30/2019 Fall construction in Ottawa

    15/32

    Traffic Control Center extendedhours

    Traffic Management monitoring

    during peak hours

    Strategic construction scheduling

    Establishment of Critical Road

    Network

    Enhanced operations at start of

    major projects

    Dedicated traffic management

    inspector

    Traffic Management Enhancements

  • 7/30/2019 Fall construction in Ottawa

    16/32

    Projects Impacting Traffic

    completed by the end of August

    OR 174 lanereductions

    BaselineStructure

    CarlingResurfacing

    Hwy 417 RapidBridge Lifts

    Woodroffe finallift of asphalt

    O-Trainshutdown

    Laurier at Nicholasand Waller

    intersections

    HazeldeanWatermain

    Ogilvieresurfacing

    RockcliffeParkway

    resurfacing

  • 7/30/2019 Fall construction in Ottawa

    17/32

    Fall 2013 Construction Update

    Hwy 417 Widening

    JockvaleWidening

    Trim Widening

    MeadowlandsReconstruction

    Churchill

    Reconstruction

    Hunt Club 417Interchange

    Huntmar Bridge

    March RoadRamp Closure

    (Sep-Oct)

    Gas main construction

    Potential Traffic Impacts

    High Impact (>20min)

    Medium Impact (10min to 20min)

    Low Impact (

  • 7/30/2019 Fall construction in Ottawa

    18/32

    September 2013

    OrleansWatermain Link

    GladstoneReconstruction

    Bronsonreconstruction

    BankResurfacing

    Confederation LineEast Portal

    RideauReconstruction

    OrleansWatermain Link

    Hwy 417 WideningSt. Laurent

    lane reductions

    SussexReconstruction

    Confederation LineWest Portal

    Potential Traffic Impacts

    High Impact (>20min)

    Medium Impact (10min to 20min)

    Low Impact (

  • 7/30/2019 Fall construction in Ottawa

    19/32

    October 2013

    OrleansWatermain Link

    GladstoneReconstruction

    Queen WatermainConfederation Line

    East Portal

    RideauReconstruction

    OrleansWatermain Link

    Hwy 417 Widening

    SussexReconstruction

    St. Laurentlane reductions

    Potential Traffic Impacts

    High Impact (>20min)

    Medium Impact (10min to 20min)

    Low Impact (

  • 7/30/2019 Fall construction in Ottawa

    20/32

    November 2013 to Spring 2014

    OrleansWatermain Link

    GladstoneReconstruction

    Confederation LineEast Portal

    RideauReconstruction

    OrleansWatermain Link

    Hwy 417 Widening

    SussexReconstruction

    Potential Traffic Impacts

    High Impact (>20min)

    Medium Impact (10min to 20min)

    Low Impact (

  • 7/30/2019 Fall construction in Ottawa

    21/32

    Upcoming Traffic Management Enhancements

    Dedicated staff pushing traveller information

    Installation of electronic overhead Highway signs

    417 Eastbound near Parkdale

    417 Westbound near Innes174 Westbound near Blair

  • 7/30/2019 Fall construction in Ottawa

    22/32

    Mitigation Efforts

  • 7/30/2019 Fall construction in Ottawa

    23/32

    Public Information Sharing

    Communications effortsunderway to help minimize public

    disruption

    Continuous, predictable and

    accurate communication is key

    Regular updates on planned

    construction

    Rapid notification of emergencyroad closures

    Media as partners

  • 7/30/2019 Fall construction in Ottawa

    24/32

    Stay Informed

    New

    Daily Mobility Update

    Online Magazine

    Fall Radio Campaign

    Open Data

  • 7/30/2019 Fall construction in Ottawa

    25/32

    Stay Informed

    Ongoing

    Ottawa.ca

    Twitter

    @ottawacity

    @Ottawa_Traffic

    @OCTranspoLive

    Public Service Announcements

    3-1-1

    Client Service Centres

    Regular Updates

    Announcements

    Public Open House

  • 7/30/2019 Fall construction in Ottawa

    26/32

    Mobility Options

    Residents can avoid congestion:

    When possible, avoid

    traveling during peak

    periods

    Be prepared check reliable

    traffic sources for up-to-

    date information

    Consider carpooling, using

    transit, cycling or a mix to

    commute or travel

    Walk or cycle if you live

    within 5km of your

    workplace or school

  • 7/30/2019 Fall construction in Ottawa

    27/32

    Room for Growth on Transit

    OC Transpo has capacity to carry more

    customers from the east

    750 more customers from the east during the morning

    peak hour

    950 more customers to the east during the afternoonpeak hour and the second main bullet to

    Even room available with trip time

    shifting to slightly earlier or later in the

    morning or afternoon

    OC Transpo will be monitoring

    ridership and adjusting capacity

  • 7/30/2019 Fall construction in Ottawa

    28/32

    Supporting Emergency Services

    Drivers are reminded to drive carefully and

    remain patient

    Pull over to the right and come to a complete

    stop

    If you are involved in an accident please move

    your vehicles to the side of the road

    If you experience mechanical issues please

    move your vehicle to the side of the road

    Consider taking transit, or other alternative

    transportation Please respect all parking signage (regulations

    and hours) to ensure that lanes are clear to

    traffic

  • 7/30/2019 Fall construction in Ottawa

    29/32

    Working with Stakeholders

    The City is working with the

    freight and service industry to

    provide information about

    construction activity on the

    Citys transportation networks

    Provide information andsupport through online tools

    Encourage freight and service

    organizations to plan travel

    and deliveries to avoid peakhours where possible

  • 7/30/2019 Fall construction in Ottawa

    30/32

    Working with Stakeholders

    Employers can influence commuting

    behaviour, increases employee happiness

    and economic benefits

    City will be engaging key employers to keep

    people and our economy moving.

    Encourage off-peak commuting

    Reduce single-vehicle commuters

    Increase mixed-mode commuting

    The City of Ottawa is leading by example,

    implementing practical solutions for ouremployees.

  • 7/30/2019 Fall construction in Ottawa

    31/32

    Wrap-Up

  • 7/30/2019 Fall construction in Ottawa

    32/32

    Tips to Prepare

    This is a collaborative effort tobuild a better Ottawa:

    Be aware of construction

    activity

    Plan your route

    Maximize mobility

    options

    Consider alternative workarrangements to reduce

    disruption