fahim, nanji - fndfnd.com.pk/upload/downloads/fnd profile 24 november 2015.pdf · 2015-11-27 ·...

53

Upload: others

Post on 10-Jul-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History
Page 2: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History
Page 3: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Prof i le - 2014

Ab

ou

t F

ND

2

Overview of FND

About Fahim, Nanji & deSouza (Pvt.) Limited

"Fahim, Nanji & deSouza (Pvt.) Limited” is a firm of Consulting Engineers, specializing in Mechanical- Electrical-Plumbing (MEP) Building Services. The firm is based in Karachi with a small office in Islamabad, and has to its credit projects all over the country.

With a track record of over 25 years, FND is recognized as one of the largest & foremost engineering consultants in the private sector building services field in Pakistan. The firm is registered with Pakistan Engineering Council, and the Principals of the firm are recognized members of a number of national and international professional societies & bodies.

FND offers comprehensive engineering consultancy services for MEP Systems in all kinds of buildings, in the commercial, institutional, educational, residential, industrial, hospitality, retail, and cultural market segments.

FND applies the latest project and data management technologies combining experience with innovation. The Firm is completely independent of construction firms, manufacturers and/or financial institutions, and exclusively represents the interests of clients.

A wide spectrum of consultancy services is provided: • Studies, Reports, Investigations, Surveys & Evaluations • Cost Estimates & Feasibility • Detailed Designs & Drawings • Documentation for Tender, Specifications, Bill of Quantities • Scrutiny & Analysis of Bids • Supervision & Management of Construction or Contracts • Quality Control, Testing & Commissioning• Retainer Consultancy

FND’s aspiration for outstanding professionalism, diverse background in the building industry and services fields, and a commitment to quality, brings to the firm's projects a formula for excellence, and provides to Clients a “one window” solution to the needs of their projects.

FND is recognized for its professional work, reflected in the:• integrity of its designs,• conformance to relevant & applicable standards,• single window MEP coordinated solutions,• designs that emphasize maintainability, accessibility and replaceability,• adoption of innovative, energy efficient & “green” solution based on life-cycle costing,• high quality & timely construction by adequate supervision during construction process,• ensuring proper operation of systems by due diligence during commissioning & testing stage,• preparation of complete record of construction, as well as operations & maintenance manuals to undertake effective operations of systems beyond construction,• adequate training of client personnel to achieve proper operation of systems.

Page 4: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Ab

ou

t F

ND

3

Company History

In July 1987 , Fahim I . Siddiqui ,Ghulam Abbas Nanji & Roland deSouza , decided to pool their exper iences in the f ie ld of mechanical , c iv i l & electr ical engineer ing under one roof, wi th aspirat ions to bui ld an SOM in Pakistan. Fahim, Nanji & deSouza , was establ ished as a registered partnership by these pr incipals, and quickly became popular as FND .

FND’s one window solut ion was much appreciated by the c l ients and a l l ied professionals and many projects had complete engineer ing designs provided by FND. Ghulam Abbas Nanj i ret i red f rom the f i rm in 1992, and the remaining pr incipals decided to c lose down the structural department, and the f i rm now provided only Mechanical & Electr ical Bui ld ing Services Engineer ing, but the name cont inued as FND.

In 2011, i t was fe l t by the Pr incipals that the ownership of the f i rm should be broadened, and as a step in that d i rect ion the f i rm was converted to a Pr ivate Limited Company and addi t ional share holders were inducted into the company.

Since i ts incept ion in 1987,FND has now completed over a thousand projects of var ious s izes for a diverse roster of sat isf ied c l ients: industr ia l is ts, commercial f i rms, bui ld ing owners and developers, archi tects, c iv i l engineers, contractors, faci l i ty managers and publ ic agencies. These projects range from smal l tenant improvements, to large new off ices and schools, to major industr ia l and medical t reatment faci l i t ies.

Board of Directors

Page 5: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Ab

ou

t F

ND

4

Organizat ion Chart

FND ORGANIZATION CHART DATED: 29th July 2015

Team Leader Fahim I. Siddiqui

C.E.O

Director/Project Manager

Fahad Abdullah

Director/Project Manager

Osama Qazi

Asst. Project Engr. M. Aadil

Director/Project Manager

Zafar Ahmed

Asst. Project Engr. Adnan Ahmed

Iqbal Ali Waqar Sami

Director/Project Manager

Naveed Jabbar

MECHANICAL DEPT. ELECTRICAL DEPT.

Senior Engineer Sohail Akhter

• CAD Operator M. Alamgir Qureshi • CAD Operator Muhammad Zubair • CAD Operator Mirza Iqbal Baig • CAD Operator Muhammad Babar • CAD Operator Adnan Ahmed • CAD Operator Adnan Bhatti • CAD Operator Abdul Wajid • CAD Operator Kashan Ahmed • CAD Operator Jibran Ali • CAD Operator M. Ayaz Siddiqui • Word Operator Muhammad Adil • Word Operator ZaffarUddin

FAHIM, NANJI & DESOUZA (PVT.)LIMITED.

Team Leader Roland deSouza

Chairman

• CAD Operator Bilal Baig • CAD Operator Rufin Bhatti • CAD Operator Noman Ali • CAD Operator Muhammad Ali • CAD Operator Muhammad Ali • CAD Operator Faheem • CAD Operator Furqan

Asst. Project Engr Waqas Qureshi Imran Bhatti

Norman Dennis Amit Boyet

Project Engr. Naveed Shahid

M. Usman Tanveer-ul-Islam

Abdul Subhan Omer Sheikh

Project Engr. Adnan Hanif Nazir Khan

ADMINISTRATION DEPT.

Construction Engr. Yousuf Khan

Mazhar Malik Mahad Kaleem

• HR Manager Shoaib Arshad • Accountant Iqbal Hussain • Account Asst. Amir Ali • I.T Administrator. Danish Kamal • Executive Assistant. Humayun Khan • Receptionist. Shani Yaseen • Office Boy Abdul Rasheed • Office Boy M. Islam • Office Boy Cajetan Misquitta • Peon Anil • Rider Adnan Gill

Director/Project Manager

Waqas Jafri

Project Engineer Abdul Ghias Nizamuddin

Project Engineer M. Abdullah

M. Abdul Rehman Amjad Ali

Juzer Mustaq Rida Ansari

Kiran Ainuddin

Senior Project Coordinator Aamir Ali Quettawala

Norbert Anis Durr-e-Shana

Page 6: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Ab

ou

t F

ND

5

Mechanical Engineering Department:Fahim I. Siddiqui Principal Mechanical Consultant/CEO

Fahad Abdullah Project Manager/Director

Osama Qazi Project Manager/Director

Zafar Ahmed Project Manager/Director

Waqas Jafri Project Manager/Director

Mohammad Sohail Akhter Senior Engineer

Muhammad Yousuf Senior Engineer Construction (Islamabad)

Mazhar Malik Construction Manager

Ahmed Ghias Project Engineer

Tanveer Ul Islam Project Engineer

Adnan Hanif Project Engineer

Muhammad Usman Project Engineer

Naveed Shahid Project Engineer

Nazir Khan Project Engineer

Adnan Ahmed Assistant Engineer

Iqbal Ali Assistant Engineer

Omer Sheikh Assistant Engineer

Muhammad Aadil Assistant Engineer

Tanveer Ul Islam Assistant Engineer

Muhammad Adil Secretary - Mechanical Department

Zaffaruddin Assistant - Mechanical Department

Mohammad Alamgir AutoCAD Operator

Iqbal Baig AutoCAD Operator

Jibran Ali AutoCAD Operator

Babar Khan AutoCAD Operator

Abdul Wajid AutoCAD Operator

Adnan Bhatti AutoCAD Operator

Muhammad Zubair AutoCAD Operator

Electrical Engineering Department:Roland deSouza Principal Electrical Consultant/Chairman

Naveed Jabbar General Manager/Director

Amir Ali Quettawala Senior Project Engineer

Dennis Michael Senior Project Coordinator

Abdullah Siddiqui Project Engineer

Durr e Shana Project Engineer

Juzer Mushtaq Project Engineer

Kiran Ainuddin Project Engineer

Rida Ansari Project Engineer

Waqas Qureshi Assistant Engineer

Zeeshan Ikram Assistant Engineer

Imran Bhatti Assistant Engineer

Amit Boyet Assistant Engineer

Muhammad Ali AutoCAD Operator

Mirza Bilal Baig AutoCAD Operator

Rufin Bhatti AutoCAD Operator

Muhammad Ali AutoCAD Operator

Administration Department:Wasay Iqbal Siddiqui Management Executive

Shoaib Arshad Mahmood HR Manager

Iqbal Hussain Accountant

Danish Kamal I T Administrator

Humayun Khan Executive Assistant

Organizat ional Setup

Page 7: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Ab

ou

t F

NDKey Personnel

Fahim Iqbal SiddiquiCEOPrincipal Mechanical Consultant

B.E. (Mechanical)Karachi, Pakistan, [email protected] EngineerPakistan Engineering Council (PEC)Registration No. MECH-363

Professional Membership� Association of Consulting Engineers of Pakistan (ACEP)� American Society of Heating, Refrigeration, Air-conditioning Engineers (ASHRAE)� National Fire Protection Association (NFPA)� Fire Protection Association of Pakistan (FPAP)� American Society of Mechanical Engineers (ASME)

FellowInstitution of Engineers, Pakistan ( IEP)

Past - PresidentPakistan HVACR Society (PHVACRS)

PresidentASHRAE Pakistan Chapter (APC)

Life PresidentCactus & Succulent Society of Pakistan(CSSP)

Chairperson Horticultural Society of Pakistan (HSP)

Roland deSouzaChairpersonPrincipal Electrical Consultant

B.E. (Electrical)Karachi, Pakistan, [email protected] EngineerPakistan Engineering Council (PEC)Registration No. ELECT-3103

Member� Indian Society of Lighting Engineers ( ISLE)

Fellow� Institution of Electrical & Electronic Engineers, Pakistan ( IEEEP)

� Institution of Engineers Pakistan ( IEP)

Hon. FellowInstitute of Architects Pakistan ( IAP)

FellowAshoka- Innovators for the Public, USA

Past ChairpersonShehri- Citizens for a Better Environment

Council MemberHuman Rights Commission of Pakistan(HRCP)

Page 8: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Ab

ou

t F

ND

7

Directors

Fahad Abdullah Director Project Manager (Mechanical)

B.E. (Mechanical) Karachi, Pakistan, 2006 [email protected] Professional Engineer Pakistan Engineering Council (PEC) Registration No. MECH-19840

Naveed Jabbar Director General Manager (Electrical)

B.E. (Electrical) Karachi, Pakistan, 1993 [email protected] Professional Engineer Pakistan Engineering Council (PEC) Registration No. ELECT- -12047

Osama Qazi Director Project Manager (Mechanical)

B.E. (Mechanical) 2007 M.E. (Energy System) 2010 Karachi, Pakistan. [email protected] Professional Engineer Pakistan Engineering Council (PEC) Registration No. MECH-20172

Zafar Ahmed Director Project Manager (Mechanical)

B.E. (Mechanical) 2006 M.E. (Energy System) 2010 Karachi, Pakistan. [email protected] Professional Engineer Pakistan Engineering Council (PEC) Registration No. MECH-20055

Muhammad Waqas Jafri Director Project Manager (Mechanical)

B.E. (Mechanical) 2007 M.E. (Energy System) 2010 Karachi, Pakistan. [email protected] Professional Engineer Pakistan Engineering Council (PEC) Registration No. MECH-20171

Page 9: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Ce

rti�

ca

tio

ns

8

Professional Registration / Certif ication / Awards

Page 10: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History
Page 11: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History
Page 12: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History
Page 13: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History
Page 14: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History
Page 15: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Prof i le - 2012

Se

rv

ice

s

14

Field of ServicesMECHANICAL SYSTEMS

• Heating, Ventilation, Air-Conditioning (HVAC) Systems o Unitary Air-Conditioning Systems o Central Air-Conditioning Systems o Chilled Water Systems o District Cooling Systems o Specialized Air-Conditioning for Clean Rooms, Operation Theaters, Data Centers, etc. o Industrial Ventilation & Exhaust o Ground Source Heat Pumps o Building Management Systems

• Plumbing System o Water Supply o Drainage & Sewerage Systems o Building Plumbing Systems o Water Filtration & Purification Systems o Waste Water & Sewerage Treatment Plants o RO Plants o Gas Distribution

• Mechanical Systems o Instrumentation & Control Systems o Compressed Air Systems o Steam Plants o Oil Storage & Distribution Systems o Medical Gases for Hospitals o Industrial Utilities- Steam, Gas, Compressed Air

• Refrigeration Systems o Cold Storages o Abattoirs

• Pharmaceutical Plants CGMP Design of HVAC, Electrical & Mechanical Systems for:

o Oral Solid Manufacturing & Packaging o Oral Liquid Manufacturing & Packaging o Sterile Manufacturing o Warehouse o Cephalosporin Manufacturing o CNS Products Manufacturing o DI & WFI Plants

Page 16: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Prof i le - 2012

Se

rv

ice

s

15

ELECTRICAL SYSTEMS • Electrical Systems

o Lighting Distribution o Power Distribution o Power Generation o Fire & Security Alarm System o Communications System o CCTV o Structured Cabling o Access Control o Building Management System o Electrical Safety Audit

• Vertical Transportation: o Elevators o Escalators o Traffic Analysis & Surveys o Modernization & Refurbishment

ENERGY SYSTEMS • Energy Systems

o Cogeneration Systems o Heat Recovery Systems o Combined Cycle Power Plants o Gas & Steam Turbines o Thermal Storage System

• Alternate Energy Systems/Sustainable Engineering o Thermal Analysis of Building Envelope o Gas Engine Based Cogeneration o Gas Turbine Based Cogeneration o Solar Photo Voltaic Systems o Solar Thermal Power o Solar Air-Conditioning via Absorption Chillers o Ground Source Cooling & Heating o Energy Recovery from Industrial Waste o Direct & Indirect Free Cooling

o Recycling of Water / Rain Water Harvesting

FIRE SUPPRESSION SYSTEMS • Fire Suppression Systems

o Fire Pumps o Fire Water Storage o Hydrants & Hose Reels o Building Sprinklers o Deluge Sprinklers o Double Interlocked Sprinkler o Foam Extinguishment o Gas Extinguishment o Fire Safety Audits

Page 17: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

16

Reference Projec ts - HOSPITALSFF NN DD PP RR OO FF II LL EE OO NN HH OO SS PP II TT AA LL SS

SCOPE OF SERVICES

FND offers comprehensive engineering consultation services for Mechanical, Electrical & Plumbing (MEP) systems for hospitals. With many years of experience in building MEP Systems for hospitals, as shown on this profile, FND is familiar with special systems needed for hospitals and is conversant with international standards IEEE, USA: Recommended practice for Electrical Systems in Health care facilities Department of Health, UK Govt.: Technical Memorandum06-01, Electrical services supply and

considerations ASHRAE, USA : STANDARD 90.1 Energy code NFPA99- Health Care Facilities Code

Mechanical Systems Electrical Systems • Heating, Ventilation & Air-Conditioning System • Electrical System • Plumbing System- cold & hot water & drainge • Vertical Transportation System • Refrigeration System • Fire Detection System • Fire Suppression System • CCTV & Security Systems • Medical Gas System • Communication System • Cogeneration Systems

FND has substantial experience of MEP services for hospitals and the following is a representative list of hospital projects designed by FND:

1. Project No: 265 Kidney Center, Karachi

The Kidney Centre project was built entirely out of donations, and specializes in the treatment of urinary diseases. The 6 storied building has the usual hospital areas, and special areas such as Dialysis Room, six OT’s, ICU, and 80 patient beds. FND designed the electrical & HVAC Systems for this hospital. The project was completed in 1990.

2. Project No: 373

Murshid Hospital, Karachi This is a charitable hospital, and FND designed the air-conditioning system for four operation theatres and ancillary areas.

The project was completed in 1991.

3. Project No: 374 Shifa International Hospital- Block-A, Islamabad Block-A of this hospital was the pre-cursor to the huge hospital that is operational today. The design of Block-A set the standards for the construction of the rest of the hospital. The 6 storied Block-A building has an area of approximately 150,000 sft and houses diagnostic and treatment facilities of a complete hospital.

Page 18: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Prof i le - 2012

Pro

jec

ts

17

FND designed the mechanical, HVAC, electrical & plumbing systems for this project, which was successfully completed in 1991.

4. Project No: 466 Altamash Dental Clinic, Karachi The HVAC System for the then state of the art dental clinic was designed by FND. The project is a two storied building with an approximate area of 9000 sft. FND designed the complete MEP system for this clinic, which was successfully completed in 1997.

5. Project No: 628 Bone Marrow Transplant Center, Army Medical City, Rawalpindi

This project was part of the Army Medical City in Rawalpindi. The Bone Marrow Transplant Centre required a special HVAC design, where not only the temperature and humidity was controlled to precise limits, but as the patients were very susceptible of infection due to very reduced immune function, it was extremely important to achieve a high degree of filtration and a positive pressurization to ensure that there was no ingress of contamination from external sources, and also no cross contamination. Each transplant room was designed to be fully independently controlled to meet the comfort and therapeutic needs of each patient. The project was completed in 1997.

6. Project No: 657 Children Hospital, Quetta

This German funded project was entirely built under the supervision of German engineers. The prime EPC contractors were Siemens, who appointed FND to design the HVAC & plumbing system. The project has central heating using hot water radiators. The project was completed in 1997.

7. Project No: 783

Katrak Wing of Lady Dufferin Hospital, Karachi The Lady Dufferin Hospital is a pre-partition project, devoted to gynecological medical facilities. Due to the need to incorporate modern medical treatment facilities, the Katrak wing was modified and a 5 storied building covering an area of approximately 50,000 sft. FND designed the electrical & HVAC system for this project. The HVAC Works of Katrak Wing, extension of Lady Dufferin Hospital was divided into following two phases:

The project was commissioned and completed in 2002.

Page 19: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Prof i le - 2012

Pro

jec

ts

18

8. Project No: 868 Extension & Upgrading Works in Main Kitchen at Aga Khan Hospital, Karachi The main kitchen at AKU Hospital was expanded and underwent a major upgrading of MEP services. The hot kitchen was entirely relocated. This was a very challenging project which required retro-fitting new equipment into existing HVAC & plumbing system and re-using substantial portions of the installed equipment, ducting and piping. The hot kitchen was entirely re-located and a new ventilation system designed, by modifying existing 20ft long kitchen hoods to allow fresh air addition and extraction, while maintaining comfortable conditions in this hot area, which was not air-conditioned. A new grease trapping system was designed to replace the existing system which caused the drainage system to continuously become clogged by cooking grease. The project was commissioned and completed in 2005.

9. Project No: 871 AKU Clifton Medical Facilities, Clifton, Karachi

This is a satellite facility of the Aga Khan Hospital. The four storied building has a total covered area of 35,000 sft. FND provided consultancy services for the design of HVAC, plumbing and fire suppression system. The project was acclaimed for its high quality and economical solutions adopted by the architectural & engineering team. The project was completed in 2005.

10. Project No: 1000 Indus Hospital, Karachi

Indus Hospital, located in Korangi, is a 150-bed charitable hospital. The building has five stories with a total covered area of 62,600 sft.

FND was responsible for the design of the electrical & mechanical system of this hospital. The HVAC system is based on electric operated water cooled chillers, having a total capacity of 160 TR.

The project was completed in 2008.

11. Project No: 1011 National Institute of Kidney and Urological Disease, Karachi

This four storied hospital specializes in care of urinary diseases, and is built in the precincts of Karachi University. FND designed the HVAC System which has a total capacity of 235 TR. The design was completed in 2005, and the first phase commissioned in 2006, while construction for the remaining hospital is proceeding in phases.

Page 20: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Prof i le - 2012

Pro

jec

ts

19

PP RR LL SS

for Mechanical, Electrical & Plumbing (MEP)

-01, Electrical services supply and

four operation theatres

The 6 storied Block-A building has an area of approximately 150,000 sft and houses diagnostic and treatment facilities of a complete hospital.

12. Project No: 1047 & 1056 Patient Wards at Aga Khan Hospital, Karachi

The patient wards at Aga Khan Hospital were originally not provided with air-conditioning. FND was commissioned to design a retro-fitted central air-conditioning system, in Ward Blocks B, C, & D. Chilled water was tapped off from the hospital’s central chilled water plant. The challenge was to install the HVAC System in an operating hospital, and the project was complete over a 5 year period from 2007 to 2012.

13. Project No: 1072 National Medical Center, Karachi

The National Medical Centre is a 120 bed hospital housed in a four storied building, with a total covered area of approx 50,000 ft2. The hospital covers a wide range of hospital facilities including Radiology, Pathology, Orthopaedics, Neurology, Trauma Centre, OT’s, ICU, CCU, etc.

FND was commissioned to refurbish the complete central air-conditioning system, which was based on air-cooled reciprocating chilled water system, which was not able to provide adequate comfort levels in the hospital, nor meet code requirements of special areas, such as the CCU, ICU, & OT’s.

FND converted the chilled water central plant to gas operated absorption chillers (2 X 250 TR), replaced all existing AHU’s with high quality AHU’s suitable for hospital application, and added further FCU’s in areas that had deficient air-conditioning. Special areas were provided with individual AHU’s with HEPA filtration, laminar air-flow arrangement for OT’s, required pressure gradients to maintain required cleanliness levels, etc. Again this project presented the challenge of retro-fitting the air-conditioning system in a running hospital, and the project has been successfully completed in 2011.

14. Project No: 1163 Civil Hospital, Badin

FND designed a central air-conditioning system for the Surgical Block-E at Civil Hospital, Badin. The air-conditioning system serves the Operation Suite, consisting of 5 OT’s & their ancillary rooms. The design uses two water cooled screw chillers providing 60 TR of cooling. The design was delivered to the Client in 2010, and awaits funding for implementation.

15. Project No: 1162 Operation Theatres at AKU Karachi

The project consisted of constructing 3 new operation theatres and ancillary spaces adjacent to existing theatres by converting other spaces available. FND was commissioned by Aga Khan Hospital to design the HVAC system for these theatres. The OT’s are designed as a state of the art facility with Laminar Flow Ceilings, individual temperature and humidity control, HEPA filtration, positive pressurization, etc. The project was successfully commissioned in June 2012.

Page 21: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 201420

16. Project No: 1194 Civil Hospital, Karachi Dow Alumni of 1982 has built 4 X Gynae Operation Theatres & ancillary spaces at Civil Hospital. FND was commissioned to design the central air-conditioning system, which is based on individual AHU’s with air-cooled condensing units, which have a total load of 50TR. The challenge on this project was to design the system after the civil construction had been completed, and the surrounding spaces had many constrains, which were overcome by designing a complete structural platform external to the building to install the AHU’s. The Project is in the final stages of completion and expected to be commissioned in August 2012.

1. Project No: 1210 Alvi Dental Clinic, Karachi Alvi Dental Clinic is proposed to be constructed at Block 4, Clifton. The clinic consists of a basement, Ground and First floor. The total covered area is 6,000 sq.ft. FND is providing complete MEP services for the project including the design of Medical Gas system, and the project is in initial design stage.

2. Project No: 1220 Imam Clinic, Karachi Imam Clinic is one of the oldest hospitals in the vicinity of North Nazimabad. The hospital comprises of more than 50 beds serving the patients in different fields of medicine.

Currently, Imam Clinic is carrying out an expansion project at the ground floor and the basement level. There is a plan to further extend the building by adding two floors. The Clinic is undergoing renovation & expansion, and the MEP services need to be planned out accordingly for which the Clinic has acquired FND’s services.

3. Project No: 1232 KHAS Hospital, Shikarpur Khas Hospital, is proposed to be a 150 bed hospital, and when fully built will have a total covered area of 145,000 sft, with construction planned in four phases.

The first phase, covering an area of 55,000 sft, is proposed to be constructed immediately with completion planned for November 2013. This block has functions of OPD, Radiology, Pathology, Orthopaedics, Laboratories, etc.

FND is providing complete MEP consultancy services for this hospital.

Pro

jec

ts

Page 22: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Reference Projec ts - HIGH-RISE BUILDINGS

Scope of Services Provides

FND offers a comprehensive range of engineering consultation services in a wide spectrum of electrical & mechanical fields. We serve clients in the commercial, institutional, educational, residential, industrial, hospitality, retail, and cultural market segments. We are one of the largest private sector engineering consultants in Pakistan and regularly undertake projects in many parts of the country. We analyze the specific problems of our clients and suggest optimal state-of-the-art solutions. FND offers services at all stages of a project, from feasibility studies to project planning, design, specifications, bills of quantities, bidding process and monitoring of construction. In 2010, we completed more than 1200 projects for a diverse roster of satisfied clients: industrialists, commercial firms, building owners and developers, architects, civil engineers, contractors, facility managers and public agencies. These projects range from small tenant improvements, to large new offices and schools, to major industrial and treatment facilities. All the projects indicated in this profile were designed by FND and executed under the supervision of FND.

1. Project No.: 812

Muslim Commercial Bank, Karachi – Mechanical & Electrical System Muslim Commercial Bank is a multi-storied high rise office building, on I. I. Chundrigar Road, Karachi. With a height of 116m, this building has the prestigious distinction of being the tallest building in Pakistan. The building has twenty stories above ground and three basements used for parking. The building above ground has approx. 174,000 sft covered area, utilized as office; restaurants, plant rooms, and core area on each floor containing stair cases, lifts, toilets, pantry, foyer, communication room, air handling unit room and shafts for building mechanical and electrical services. The work was completed & commissioned in 2005.

2. Project No.: 931 Dolmen City Clifton, Karachi – HVAC & Fire Suppression System Dolmen City, located on the southern end of Karachi on the sea coast, is a multi-purpose development consisting of the following features.

• Executive Tower – 17 storied office tower • Harbor Front - 19 storied office tower • Shopping Mall

The design of the project started in 1987, but the progress was in fits & starts. The first tower to be completed was the Executive Tower, whose air-conditioning system was commissioned in circa 2006. A temporary plant room area was built with 2 X 1000 TR chillers to serve the Executive Tower & Harbor Front. In 2006 FND carried out a study to evaluate the use of sea-water for cooling of chiller condensers. Four options were evaluated:

• Direct use of sea-water into condensers. • Indirect use of sea-water in condensers. • Use of sea water cooling towers. • Use of RO Plant to produce fresh water from sea-water.

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 201421

Pro

jec

ts

Page 23: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

22

These options were compared to use of fresh water obtained through tankers. Due to many constraints in the installation of a sea-water intake system, and the assurance of the city government that piped fresh water, at comparatively very reasonable rates, would be available to the project, the project owners decided to drop the option of using sea-water. Construction gained momentum in 2006, and the Shopping Mall opened in November 2011. The complex has two basements of approx 390,000 sqft with ductless ventilation system (Impulse ventilation system). The central plant room of 7250 ton is commissioned in 2011 to serve Executive Tower, Harbor Front & Shopping Mall. The plant room is located on 8th floor above the open parking area. The complete complex has a dedicated fire suppression system as per NFPA with UL/FM fire suppression pump of 1250gpm.

1. Project No.: 1043 NADRA Provincial Headquarters Building, Islamabad – Electrical & Mechanical System NADRA (National Database Registration Authority) Provincial Headquarters Building Islamabad is a seven storey office building comprising of two basements (lower & upper levels) & five floors above ground level. HVAC services were provided in the following areas: a) Cooling and heating system for all offices from ground floor to

4th floor. b) Cooling and heating system for 5th floor VIP residential areas.

Small split units shall also be provided for night operation. Heating shall be via hot water panel radiators.

c) Dormitory areas shall be provided with Hot Water Radiator heating.

d) Ventilation system for Mechanical and Electrical Plant Rooms

& Car Park in Lower /Upper basement. e) Ventilation system for Toilets and Pantries from ground floor to

5th floor.

Page 24: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

23

The work was completed & commissioned in 2009.

1. Project No.: 1055 PEMRA Head Office Building, Islamabad – Electrical & Mechanical System PEMRA (Pakistan Electronic Media Regulator Authority) Building Islamabad is a nine storey office building comprising of one basement, one lower ground floor & five stories above ground level HVAC (Heating, Ventilation & Air-Conditioning) services were provided in the following areas: a) Cooling for all office areas from ground floor to 5th floor. b) Ventilation system for mechanical and electrical plant rooms & car

park in Lower & upper basement floors. c) Ventilation & Exhaust system for Toilets & Kitchen areas from

ground floor to 5th floor. d) Ventilation system for AHU room from ground to 5th floor.

The work was completed & commissioned in 2011.

Page 25: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

24

1. Project No.: 1065 Citi Towers, Karachi – Mechanical & Plumbing System

Citi Towers, a 19 storey building consist of six parking floors and ten offices floors plus entrance lobby at ground floor, with a total covered area of approximately 190,000sft. The offices were provided with a central air conditioning & plumbing system, capable of maintaining a comfortable indoor environment, using chilled water obtained from central chilled water plant located at roof. Toilets & pantries were provided with a mechanical exhaust system.

The work was completed & commissioned in 2008.

2. Project No.: 1083 PTET Tele House, Islamabad – Mechanical System PTET Telehouse is an office building consisting of two basements (upper and lower), and 9 office floors above ground floor level. HVAC (Heating, Ventilation & Air-Conditioning) services were provided in the following areas: a) Cooling for all office areas from ground floor to 9th floor. b) Ventilation system for mechanical and electrical plant rooms &

car park in Lower & upper basement floors. c) Ventilation & Exhaust system for Toilets & Kitchen areas from

ground floor to 9th floor. d) Ventilation system for AHU room from ground to 9th floor. e) Liftwell pressurization The work was completed & commissioned in 2011.

Page 26: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

25

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 201

Pro

jec

ts

2

Electrical, Mechanical System & Fire Suppression System

complete Electrical, Mechanical & Fire is provided in the 17 storey fire-gutted

-conditioning through 3x 380 TR absorption chillers. Each floor

for data centers.

The fire suppression is carried out as per NFPA standards. All equipment is UL Listed/FM approved.

Each floor staircase landing has been provided with one fire hose cabinet with one hose reel.

8. Project No.: 1097

Building Centre, Karachi –

Shara-e-

and three (03) generally

2nd phase.

a) Cooling for b)

car parking. c) d)

1. Project No.: 1096 PNSC, Karachi – Electrical, Mechanical System & Fire Suppression System Refurbishment of the complete Electrical, Mechanical & Fire Suppression services is provided in the 17 storey fire-gutted building. Five floors are occupied by the client itself while eleven floors will be rented out to tenants.

The building is equipped with the central air-conditioning through chilled water obtained from 3x 380 TR absorption chillers. Each floor has been provided with the provision for 24 hr cooling water service for data centers. The fire suppression is carried out as per NFPA standards. All equipment is UL Listed/FM approved.

2. Project No.: 1097

Building Centre, Karachi – Mechanical System (Under Design) This project is under design. Building Centre building located at Shara-e-Faisal is a mixed used development (MUD) project which includes retails and offices. The building is proposed to be constructed in 2 phases. In phase 01 one basement, ground floor and three (03) floors above ground will be constructed which generally includes retails only. In 2nd phase seven (07) office floors will be constructed. Also 6 parking floors will also be constructed in 2nd phase. HVAC (Heating, Ventilation & Air-Conditioning) services will be provided in the following areas: a) Cooling for all retails, corridors and office areas. b) Ventilation system for mechanical and electrical plant

rooms & car parking. c) Ventilation & Exhaust system for Toilets & Kitchen areas.

Page 27: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

26

a) Ventilation system for AHU room. b) Stair well and Lift well pressurization. c) Smoke management system. Phase 1 has been completed and commissioned in January 2015.

1. Project No.: 1188 FFBL Head Office Building, Islamabad – Mechanical System (Under Design) This project is under design. FFBL head office building located at Islamabad is a single-tenant office building consisting of two basements, and seven office floors above ground floor level. Total building area is 155,000 sqft out of which 87,000 sqft is the air-conditioned area. HVAC (Heating, Ventilation & Air-Conditioning) services include the following: a) Cooling for all office areas from ground floor to 7th floor. b) Heat recovery between building exhaust and outside air. c) Ventilation system for mechanical and electrical plant rooms. d) Impulse Ventilation system for car park area. e) Ventilation & Exhaust system for Toilets & Kitchen areas from

ground floor to 7th floor. f) Stairwell pressurization g) Lift well pressurization h) Smoke management system The HVAC work completed and commissioned in 2013.

2. Project No.: 1191

OEC Tower, Islamabad – Mechanical, Plumbing and Fire Suppression System (Under Construction) This project is being awarded to the contractor and is under construction. OEC Tower located at Islamabad is a multi-tenant office building consisting of two basements, and nine office floors above ground floor level. Total building area is 185,000 sqft out of which 92,000 sqft is the air-conditioned area. HVAC (Heating, Ventilation & Air-Conditioning) services include the following: a) Cooling for all office areas from ground floor to 9th

floor. b) Heat recovery between building exhaust and

outside air. c) Ventilation system for mechanical and electrical

plant rooms. d) Impulse Ventilation system for car park area. e) Ventilation & Exhaust system for Toilets & Kitchen

areas from ground floor to 9th floor. f) Stairwell pressurization g) Lift well pressurization h) Smoke management system

Page 28: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

27

waste water for external

include the following:

& UL/FM fire suppression

by November

FFNNDD PPRROOFFIILLEE OONN HHIIGGHH--RRIISSEE BBUUIILLDDIINNGG

Plumbing services include the following: a) Cold water distribution system using Hydro-pneumatic pumps. b) Hot water distribution system. c) Plumbing fixtures & fittings. d) Sanitary drainage & vent piping. e) Connection of sanitary drainage to existing manholes system running outside of the building. f) Condensate drains piping of HVAC equipments. g) Storm water drainage system for roof and plot. h) Natural gas piping distribution for kitchen. i) Rain water storage and harvesting j) Re-use of building waste water for external irrigation. k) Drip irrigation Fire Suppression services include the following: a) Water based Fire Suppression system including fire sprinkler system as per NFPA 13 & fire hydrant

& fire hose reel system as per NFPA 14. b) Dedicated fire water storage to provide 60 minutes of fire suppression capability. c) NFPA -20 compliant & UL/FM fire suppression pumps. d) Supervision & Monitoring of fire suppression system at fire alarm panel The Mechanical, Plumbing and Fire Suppression work are in final stages of construction.

1. Project No.: 1283 Dolmen City Clifton, Karachi –Towers A & B- Complete MEP Design

This project’s Phase-2 consists of two towers each of 36 stories, with a total covered area of approximately 1.5 million sft.

• Tower A – 38 storied office tower • Tower B – 19 storied office tower • Tower B – 18 storied hotel tower

FND is designing the complete MEP System for both the towers. The design work is in an advanced stage of completion.

Page 29: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

28

Scope of Services Provides

FND offers a comprehensive range of engineering consultation services in a wide spectrum of electrical & mechanical fields. We serve clients in the commercial, institutional, educational, residential, industrial, hospitality, retail, and cultural market segments. We are one of the largest private sector engineering consultants in Pakistan and regularly undertake projects in many parts of the country. We analyze the specific problems of our clients and suggest optimal state-of-the-art solutions. FND offers services at all stages of a project, from feasibility studies to project planning to realization and commissioning. In 2010, we completed more than 1200 projects for a diverse roster of satisfied clients: industrialists, commercial firms, building owners and developers, architects, civil engineers, contractors, facility managers and public agencies. These projects range from small tenant improvements, to large new offices and schools, to major industrial and treatment facilities.

• Cogeneration Systems • Heat Recovery Systems • Combined Cycle Power Plants • Gas & Steam Turbines • Thermal Storage System

1. Project No.: 707 Allied Engineering & Services, Karachi – Office / Work Shop M&P Services and Cogeneration System Design

0.7 MW gas genset cogeneration system, running absorption chillers, as a cogen show case project for Caterpillar Gensets.

The work was completed & commissioned in 1995.

2. Project No.: 851 Pearl Continental Hotel, Lahore – Waste Heat Recovery System for 4x1020 kVA Existing Gensets PC Lahore has 4 x 1000 kW diesel engines. The waste heat recovery scheme produces hot water for domestic needs from the engine jacket water heating circuit and exhaust gases are used in waste heat recovery steam generator to provide steam for laundry and other areas.

The work was completed & commissioned in 2001.

3. Project No.: 1049 International Industries Ltd., Karachi – 4th Genset for Cogeneration

Heat recovery from a 1Mw gas genset, and running absorption chillers on steam & hot water for process cooling.

The work was completed & commissioned in 2006.

4. Project No.: 1052 International Industries Ltd., Karachi – 18MW CHP Plant for Cold Rolling Mill

6 X 3 MW gas gensets, with heat recovery producing steam at 15.5 bars and operating a steam turbine at rated capacity of 1.25 MW. Hot water recovery operates absorption chillers for process cooling.

Reference Projec ts - COGENERATION PLANTS

Page 30: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

29

The work was completed & commissioned in 2008.

5. Project No.: 1054 Pakistan State Oil Company Ltd., Karachi – Rehabilitation of LMT HVAC & Heat Recovery System 2 MW cogeneration plant. Waste heat of 2 gas engines is used to produce chilled water for the process needs and air conditioning of the Lube Manufacturing terminal at Korangi. During feasibility study, various options were explored and their financial results and other technical details were shared with the client along with clear recommendations. Selected option is based on multi-energy direct exhaust fired absorption chillers. Only one type of chiller is able to handle the exhaust gases and HT circuit water heat of engines. Moreover it has a dual fuel burner to provide chilling via natural gas or diesel in case of non-operation of the gas engines. Day load is about 1040 kW and we are able to get 250-270 TR. The work was completed & commissioned in 2007.

6. Project No.: 1064 Pakistan Cables Ltd., Karachi – Combined Heat & Power (CHP) Plant

2 X 1 MW GE Jenbacher Gas Engines (Model JMS 320) synchronized with KESC has been installed to produce electricity. � Power at Engine:1095 kW � Power at Alternator:1063 kW � Max Continuous power available at

45°C:1000 kW � Max Continuous power with

combustion air cooling at 34°C:1000 kW

The work was completed & commissioned in 2009.

7. Project No.: 1095 Pak Gulf Construction (Pvt.) Ltd., Islamabad – Feasibility Study for Co-generation of Hotel Building at Centaurus 4 MW co-generation. feasibility study included various combinations of 2Mw turbine + gas gen sets, with heat recovery to operate the air-conditioning system of Centaurus Hotel, having a cooling demand of 2600 TR. The work was completed & commissioned in 2008.

8. Project No.: 1141 Procter & Gamble Pakistan (Pvt.) Ltd., Karachi – Feasibility Study for Energy Plant for Bin Qasim Factory 16 MW co-generation plant. Feasibility study included various combinations of 3.36 Mw gas turbine + gas gen sets, with heat recovery to produce steam + oil heating + chilled water for process cooling & air-conditioning. The work was completed & commissioned in 2009.

Page 31: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

30

9. Project No.: 1186 Aga Khan University & Hospital, Karachi – Waste Heat Recovery System for 2 x 1.54 MW + 1.75 MW Gas Gensets Maximum operating load on gas engines is 4.5 MW. The waste heat of exhaust gases & jacket water (H.T. circuit) is to be used for air conditioning. Feasibility study of the project for selection of waste heat recovery system is in process. Under Design

10. Project No.: 1195 Novatex Ltd, Karachi – Waste Heat Recovery System for 8 x 1.0 MW Gas Gensets Average operating load on gas engines is 4.2 MW. At average load condition, 6 gas engines will be operating at 70% load. The waste heat in the form of exhaust gases at 490˚C from the gas engine first pre-heat synthetic oil which is used for heating in the process. Oil enters the waste heat oil heater at a temperature of 291˚C and leaves at about 303˚C. Exhaust gases leaves the oil heater at 360˚C and have enough energy to be further captured. Therefore exhaust gases from oil heater enters in a double effect exhaust fixed absorption chiller to produce 5.6˚C chilled water. H.T circuit heat in the form of hot water at 84/74˚C is used to produce chilled water at 6.7˚C. The following are the bottom recoveries from the waste heat scheme, construction of which is under process. • 20.5 kg/S heating of synthetic oil from 291˚C to 303˚C in waste heat recovery oil heater. • 462 TR chilled water at 5.6˚C from the waste exhaust waste heat oil heater. • 472 TR chilled water at 6.7˚C from the waste heat in the form of hot water from engine H.T circuit. Installation in progress. Commissioning by July, 2012.

11. Project No.: 1208 Atlas Honda Limited, Karachi – Waste Heat Recovery System on the Self Power Generation Plant at Shaikhupura Factory Gas gensets were installed to run on full time basis and diesel gensets were stand-by. However, we are informed that the present gas load shedding scenario in Shaikhupura does not allow Atlas Honda to run the gas gensets all the time. Even in summer months, gas is available for 2-3 days per week only, therefore the annual operating hours of diesel gensets are much more than gas gensets. • 3 X JGS-320 (1000 kW) Jenbacher gas gensets • 1 X JGS-320 Jenbacher gas genset recently installed • 3 X KTA-50-G3 (1250 kVA or about 1079 kW) Cummins diesel gensets • 1 X KTA-50-G8 (1675 kVA or about 1400 kW) Cummins diesel gensets Feasibility completed. Detailed design in progress.

1.54MW Gas

Engine

1.54MW Gas

Engine

1.75MW Gas

Engine

150 TR Hot Water Absorption Chiller

450 TR Exhaust Fired Absorption

Chiller

150 TR Hot Water Absorption Chiller

450 TR Exhaust Fired Absorption

Chiller

520 TR Exhaust Fired Absorption

Chiller

Supplementary Firing by Natural

Gas

Supplementary Firing by Natural

Gas

Supplementary Firing by Natural

Gas

Hot Water

Hot Water

Exhaust Gas

Exhaust Gas

Exhaust Gas

Fuel Input

Chilled Water Return Temperature = 57 °F

Chilled Water Supply Temp = 42 °F, Load = 1263 TR Output at gas engine running @ 85% Load

Page 32: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

31

12. Project No.: 1209 Merck (Pvt.) Ltd., Quetta – Co-Generation / CHP Plant Gas engine and gas turbine will be evaluated during feasibility study for power generation. Power supply from QESCO will be stand-by, further backed up by existing diesel engines. Waste heat from gas turbine will be in the form of 450 to 500°C exhaust gases whereas that in the case of gas engine will be in the form of 450 to 500°C exhaust gases as well as jacket water heat at 90°C. The waste heat may be used for:

• Air-conditioning from hot water circuit of gas engine using 1-stage hot water absorption chillers.

The same circuit may be used for winter heating as well. • Exhaust gases may be used to produced 10 bar steam in a waste heat steam generator. The

produced steam may fulfill the process and (or) air-conditioning demand by using 2 stage steam absorption chiller.

• Electrical power may be produced from exhaust gases using steam turbine running from the steam which is produced from the waste heat.

• Further possible options will be explored during feasibility study. Feasibility Study completed on May, 2012.

13. Project No. 1290 Getz ASTOLA, Karachi 9 MW co-generation. Feasibility study included various combinations of Gas turbine + Steam turbine + gas & diesel gen sets, with heat recovery to operate the air-conditioning system of the entire plant, having a cooling demand of 3800 TR.

Page 33: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Reference Projec ts - PHARMACEUTICAL PLANTS

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

32

Scope of Services Provides

FND offers a comprehensive range of engineering consultation services in a wide spectrum of electrical & mechanical fields. We serve clients in the commercial, institutional, educational, residential, industrial, hospitality, retail, and cultural market segments. We are one of the largest private sector engineering consultants in Pakistan and regularly undertake projects in many parts of the country. We analyze the specific problems of our clients and suggest optimal state-of-the-art solutions. FND offers services at all stages of a project, from feasibility studies to project planning to realization and commissioning. In 2010, we completed more than 1200 projects for a diverse roster of satisfied clients: industrialists, commercial firms, building owners and developers, architects, civil engineers, contractors, facility managers and public agencies. These projects range from small tenant improvements, to large new offices and schools, to major industrial and treatment facilities. CGMP Design of HVAC, Electrical & Mechanical Systems for:

• Oral Solid Manufacturing & Packaging • Oral Liquid Manufacturing & Packaging • Sterile Manufacturing • Warehouse • Cephalosporin Manufacturing • CNS Products Manufacturing • DI & WFI Plants

1. Johnson & Johnson Pakistan (Pvt.) Ltd., Karachi

The partners of FND were responsible for the complete design of the mechanical & electrical systems for the new plant, consisting of the following.

• HVAC System • Compressed Air System • Steam Distribution System • Water Supply System • Drainage System • Fire Protection System • Medium and Low Voltage Power Distribution • Interior and Exterior Lighting • Communication Systems • Fire Alarm • Switchgear & Earthing • PFI Plant • Standby Generator

The work was completed & commissioned in 1985.

2. Roche Pakistan Ltd., Karachi-

Mechanical System

Complete mechanical works for the new factory at Korangi was designed and supervised by Fahim I. Siddiqui, consisting of the following:

• HVAC System • Water Supply System • Drainage System • Fire Protection System • Steam Plant & Distribution System

Page 34: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

33

• Compressed Air System • Oil Storage & Distribution System • Synthesis Laboratory

The plant was completed & commissioned in 1986.

3. Merck Sharp & Dohme of Pakistan Ltd., Karachi-Electrical System

• Medium and Low Voltage Power Distribution • Interior and Exterior Lighting • Communication Systems • Fire Alarm • Switchgear & Earthing • PFI Plant • Standby Generator The work was completed & commissioned in 1983 by Mr. Roland deSouza.

4. Project No: 295 Cynamid Pakistan Ltd., Karachi-Complete Mechanical System

Complete mechanical system for the new plant consisting of the following.

• HVAC System • Compressed Air System • Steam Distribution System • Water Supply System • Drainage System • Fire Protection System

The work was completed & commissioned in 1990. 5. Project No: 317

Roche Pakistan Ltd., Karachi-Microbiology Lab

The work was completed & commissioned in 1989. 6. Project No: 344

Pfizer Laboratories, Karachi

Complete upgrading of electrical & mechanical systems consisting of the following:

• HVAC System for Sterile Areas (Class 100 & Class 10,000 areas) • HVAC System for Admin. & Cafeteria • Steam Plant & Distribution System • Compressed Air System • Water Supply & Drainage System • Fire Protection System • D.I. System • WFI System • Substation • Interior and Exterior Lighting • Communication Systems • Fire Alarm • Switchgear & Earthing

Page 35: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

34

• PFI Plant • Standby Generator

The work was completed & commissioned in 1993.

7. Project No: 505 Roche Pakistan Ltd., Karachi-Granulation Area

Separation & Additional AHU for Granulation Area

The work was completed & commissioned in 1994.

8. Project No: 590

Roche Pakistan Ltd., Karachi-Granulation Oven

Design & construction of two Granulation Ovens with heating system to dry granules at 80°C. Construction. The work was completed & commissioned in 1995.

9. Project No: 621 Upjohn Pakistan Plant, Rawalpindi

Complete electrical & mechanical design for the new pharma plant consisting of the following works:

• HVAC System for Dry Manufacturing Areas • HVAC System for Liquid Manufacturing • CNS Room HVAC System • XP Area HVAC System • Steam System • Compressed Air System • DI Water System • Soft & Non-Soft Water System • Drainage System • Substation • PABX • Security/ Fire Alarm System • Interior & Exterior Lighting

The work was completed & commissioned in 1996.

10. Project No: 654

Abbott Laboratories, Karachi

HVAC System Upgrade for Dry Manufacturing Area to Maintain Low Relative Humidity. The work was completed & commissioned in 1995.

11. Project No: 673 Roche Pakistan Ltd., Karachi-Ointment Plant

Electrical & Mechanical services for Ointment Plant. The work was completed & commissioned in 1996.

Page 36: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

35

12. Project No: 729 Pfizer Laboratories, Karachi-MEP Upgrading

Electrical & Mechanical services for complete upgrading of Dry Manufacturing & Packaging Area. The work was completed & commissioned in 1998.

13. Project No: 795

Pharmacia Upjohn Pakistan Plant, Rawalpindi Extension of Dry Manufacturing Area with Low relative Humidity (25% RH) application. The work was completed & commissioned in 1999.

14. Project No: 796 Roche Pakistan Ltd., Karachi-Rocephin Packaging

MEP services for Rocephin Packaging Area. The work was completed & commissioned in 1998.

15. Project No: 802

Novartis, Jamshoro New Electrical / Mechanical services plant, with new substation and generators, boiler and chiller plant. The work was completed & commissioned in 1998.

16. Project No: 805

Roche Pakistan Ltd., Karachi-Pharma Extension MEP works for Extension of Dry Manufacturing Area & Packaging Area. The work was completed & commissioned in 2001.

17. Project No: 838 Roche Pakistan Ltd., Karachi-Conversion of Existing Area into New Zone Concept

Conversion of existing HVAC System into “New Zone” concept, to improve cross- contamination control.

The work was completed & commissioned in 2002.

18. Project No: 858 Parke Davis & Company Ltd., Karachi

Upgradation & expansion of substation at SITE plant. The work was completed & commissioned in 2002.

Page 37: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

36

19. Project No: 866 Glaxo Smith Kline Pakistan Ltd., Karachi MEP works for New Corporate Offices. The work was completed & commissioned in 2002.

20. Project No: 872 Parke Davis & Company Ltd., Karachi- Plant Consolidation Project

MEP services for shifting of Pfizer, West Wharf manufacturing facilities into Parke Davis SITE plant. The work was completed & commissioned in 2003. Project No: 879 Roche Pakistan Ltd., Karachi-Sampling Booth, Karachi

Detailed design & construction drawings for fabrication of Sampling Booth locally. Booth uses state of the art laminar flow & filtration technology. The work was completed & commissioned in 2003.

21. Project No: 887 Roche Pakistan Ltd., Karachi-Moritz Drying Oven, Karachi

Design of MEP services for installation of Mortiz Oven. The work was completed & commissioned in 2003.

22. Project No: 898

Procter & Gamble, Karachi Design and construction of Amalgamator Room using polyurethane pre-insulated sandwich panels. Design and construction completed & commissioned in 3 months The work was completed & commissioned in 2002.

23. Project No: 906 Roche Pakistan Ltd., Karachi-Replacement of AHU

Replacement of AHU’s & conversion of the areas to new zone concept, including addition of a dehumidifier for low humidity dry product areas The work was completed & commissioned in 2004.

Page 38: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

37

24. Project No: 908 Parke Davis & Company Ltd., Karachi-Access Control & CCTV

Automatic Access Control System & CCTV for SITE. The work was completed & commissioned in 2002.

25. Project No: 926 Pfizer Laboratories, Karachi

Design of MEP services for corporate offices at their West Wharf site. The work was completed & commissioned in 2004.

26. Project No.929

Roche Pakistan Ltd., Karachi-Fire Alarm System Fire Alarm System. The work was completed & commissioned in 2004.

27. Project No: 934

Parke Davis & Company Ltd., Karachi-Sewerage System Design of Sewerage System for entire complex & connection to a new sewerage treatment plant. The work was completed & commissioned in 2004.

28. Project No.935

Parke Davis & Company Ltd., Karachi-Compressed Air System & Utilities Piping Rationalization Relocation of Rotary Compressor from West Wharf site to SITE, refurbishment of compressed air distribution system, and design of a complete utilities piping services support system. The work was completed & commissioned in 2006.

29. Project No.936 Parke Davis & Company Ltd., Karachi-Steam System Relocation of Steam Boiler from West Wharf site to SITE, refurbishment of steam distribution system, and condensate return system. The work was completed & commissioned in 2004.

30. Project No: 937 Parke Davis & Company Ltd., Karachi-Water Distribution System

Design of central city water storage, filtration, chlorination & distribution system for the entire pharma complex. The work was completed & commissioned in 2006.

Page 39: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

38

31. Project No: 1165 Tetra Pak New Factory, Lahore-MEP Works

The project schematic design was made by SE Konsult (a Swedish consultant) and detailing was done by FND. FND was also responsible for resident site supervision. The work was completed & commissioned in 2010.

32. Project No.938 Parke Davis & Company Ltd., Karachi-Chilled Water System Design of a central chilled water plant and rationalization of existing chilled water distribution system to feed existing AHU’s as well as new installation. Under Construction

33. Project No.939 Parke Davis & Company Ltd., Karachi-Fire Protection System Design of a new fire protection system consisting of electric & diesel engine driven fire pumps, fire water storage, yard hydrant piping, hose reels, external hydrants and automatic sprinklers. The work was completed & commissioned in 2009.

34. Project No.956 Roche Pakistan Ltd., Karachi-MEP Services in Granulation Room Replacement of flat bed dryers with a fluid bed dryer and complete refurbishment of the air-handling system, and utilities piping. The work was completed & commissioned in 2005.

35. Project No.962 Glaxo Smith Kline Pakistan Ltd., Karachi-Evaluation of Aqueous Coating De-humidification System Evaluation of existing low RH system serving coating pan, for suitability for conversion to aqueous coating. Evaluation report completed & commissioned in 2004.

36. Project No.974 Glaxo Smith Kline Pakistan Ltd., Karachi-Low RH Design for HSSL Filling Area 25% RH design for HSSL Filling Area. The work was completed & commissioned in 2005.

Page 40: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

39

37. Project No.976 Gelcaps Pakistan Ltd., Karachi-A/C System for Capsule Making Machine Conditioned air-supply to hard gelatin capsule making machine, consisting of low RH low temperature air, HEPA filtered to required cleanliness. The work was completed & commissioned in 2006.

38. Project No.985 Roche Pakistan Ltd., Karachi-Walk-in-Cold Storage Walk in cold storage of size 15’ X 13’ X 12’ (h), designed for 2°C. The work was completed & commissioned in 2005. Project No.991 Sanofi Aventis, Karachi-Liquid Manufacturing Area HVAC, Plumbing & Fire System Design of HVAC & Mechanical services for liquid manufacturing plant, including shifting of equipment from Wah factory to Karachi factory. The work was completed & commissioned in 2009.

39. Project No.995 Roche Pakistan Ltd., Karachi-Replacement of Diesel Generator Set 1X 650-kVA-diesel generator with sound suppressed canopy, and auto-synchronization & load sharing with existing generators. The work was completed & commissioned in 2007.

40. Project No.999 Parke Davis & Company Ltd., Karachi-XANAX Manufacture Design of HVAC & Mechanical services for manufacturing of highly potent CNS drug, Xanax, including shifting of equipment from Pharmacia-Upjohn factory at Islamabad to Karachi factory. The work was completed & commissioned in 2008.

41. Project No.1014 Roche Pakistan Ltd., Karachi-Isolators for Primary Packaging Line Design of air-conditioning system for the Isolators on existing primary packaging lines to meet manufacturing standards to avoid cross contamination & to protect the operators from contamination. The work was completed & commissioned in 2007.

Page 41: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Prof i le - 2012

Pro

jec

ts

40

42. Project No.1029 Gelcaps Pakistan Ltd., Karachi-Two New Hard Gelatin Capsule Manufacturing Machines Addition of 200TR direct fired absorption chiller with existing chilled water system The work was completed & commissioned in 2007.

43. Project No.1030 Parke Davis & Company Ltd., Karachi Upgradation of standby power generation system. The work was completed & commissioned in 2007.

44. Project No.1036 Roche Pakistan Ltd., Karachi-Ventilation System Upgradation of ventilation system for male & female locker rooms. The work was completed & commissioned in 2007.

45. Project No.1038 Parke Davis & Company Ltd., Karachi-Chilled and Condenser Water System Upgradation of chilled and condenser water system. Under Construction.

46. Project No.1044 Roche Pakistan Ltd., Karachi-Walk-in Cold Storage Design of refrigeration unit for walk-in cold storage. The work was completed & commissioned in 2008.

47. Project No.1063 Procter & Gamble, Karachi MEP Design Works. The work was completed & commissioned in 2010.

48. Project No.1111

Roche Pakistan Ltd., Karachi Installation of 2nd Boiler in Boiler Room at Roche Factory. The work was completed & commissioned in 2008.

Page 42: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

41

49. Project No.1115 Roche Pakistan Ltd., Karachi Separation of Primary and Secondary Packaging Lines for Implementation of New Zone Concept and New Blister Packaging Machines. The work was completed & commissioned in 2008.

50. Project No.1152 Parke Davis & Company Ltd., Karachi-Amenity cum Office Building Park Davis is now constructing a new amenity cum office block. FND has designed all MEP services. Under construction

51. Project No.1160 Roche Pakistan Ltd., Karachi-Warehouse Air-conditioning of warehouse of about 2500 sq.ft. The required room temperature is 24 C. with 24 hr/ day and 365 a year air conditioning. Day operation is by central chiller plant, whereas for night time operation, separate 25 TR chiller has been installed. The work was completed & commissioned in 2010.

52. Project No.1231 Wyeth Pakistan Ltd., Karachi-New Boiler Installation of New Boiler (3.1TPH) at Wyeth Pakistan Ltd. The work is in progress.

53. Project No. 1231 Pfizer Pakistan, Ltd, Karachi. Procurement of Steam Boiler (3.12TPH x 2) for Pfizer & Wyeth The scope of work tender includes the supply of 2 x 3.12 TPH Steam Boiler feed water tank & stack economizers & handing over to the local works Contractor for installation. The scope of the supply also includes assistance to installation contractor, commissioning of equipment, supply of O&M manuals and four weeks test run.

54. Project No. 1290 Getz ASTOLA, Karachi The Getz ASTOLA Project has an overall covered area of 1.5 million sft & is going to the largest Pharma Plant in Pakistan.

FND is responsible for the following works:

1. Complete HVAC, Plumbing, Fire Suppression & Electrical services for the Main Plant in Utility Block.

2. Complete Electrical Works for the whole project including power distribution, lighting, IBMS, Switchgear & stand-by Gensets.

3. Complete Fire Suppression Works.

4. Design of Effluent Treatment Plant & complete drainage works.

5. Design of Water Supply plant along with RO with battery limit to each building.

6. Design of Oil Storage & distribution system.

7. The project is expected to be completed in 2017

Page 43: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

42

Scope of Services Provided

FND offers a comprehensive range of engineering consultation services in a wide spectrum of electrical & mechanical fields. We serve clients in the commercial, institutional, educational, residential, industrial, hospitality, retail, and cultural market segments. We are one of the largest private sector engineering consultants in Pakistan and regularly undertake projects in all parts of the country. FND offers services from feasibility studies to project planning, design, specifications, bills of quantities, bidding process and construction supervision. Since its inception in 1987, FND has completed more than 1300 projects for a diverse roster of satisfied clients.

1. Project No.: 1264

Emporium Mall, Lahore – MEP Systems Emporium Mall is a 2.8 million sft project consisting of Retail Mall, Banquet Halls & a Hotel. The project is due for completion in early 2016, and FND is responsible for the complete design of the mechanical & electrical systems for the project, consisting of the following services:

• HVAC System • Fire Protection System • Water Supply System • RO Plant • Steam Distribution System • Sanitary Drainage System • Storm Water Drainage System • Gas Distribution System • Medium and Low Voltage Power Distribution • Interior and Exterior Lighting • ELV Systems- Fire Alarm, Communications, CCTV, Access Control, PA • Switchgear & Earthing • PFI Plant • Standby Generators • Building Management System

.

Reference Projec ts - HIGH-RISE BUILDINGS

Page 44: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

43

1. Project No.: 1289 Packages Mall, Lahore – MEP Systems

Packages Mall is a Retail Mall having a total covered area of 1 million sft.

The project is due for completion by end 2016, and FND is responsible for the complete design of the mechanical & electrical systems for the project, consisting of the following services:

• HVAC System • Fire Protection System • Water Supply System • Sanitary Drainage System • Storm Water Drainage System • Gas Distribution System • Medium and Low Voltage Power Distribution • Interior and Exterior Lighting • ELV Systems- Fire Alarm, Communications, CCTV, Access Control, PA • Switchgear & Earthing • PFI Plant • Standby Generators • Building Management System

Page 45: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

44

1. Project No.: 1097 Building Centre, Karachi – HVAC System Building Centre located at Shara-e-Faisal, Karachi is a mixed used development which includes retails and offices & has a total area of 350,000 sft. The 1st phase (80,000 sft) consisting of Retails has been completed & commissioned in early 2015. The 2nd phase (270,000 sft) consisting of offices is under design & due for completion in 2017. FND is responsible for the design & supervision of the complete HVAC system for this project.

Page 46: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

45

1. Project No.: 0931 Dolmen City Clifton, Karachi – MEP Systems Dolmen City, located on the southern end of Karachi on the sea coast, is a 3 million sft multi-purpose development consisting of the following features.

• Executive Tower – 17 storied office tower • Harbor Front – 19 storied office tower • Shopping Mall – 03 storied Mall • Office Towers – 2x36 storied office towers

The Executive Tower was completed in 2005, the Harbor Front in 2007 & the Shopping Mall opened in November 2011. The complex has two basements of approx 390,000 sqft with ductless ventilation system (Impulse ventilation system). The central plant room of 7250 ton was commissioned in 2011 to serve Executive Tower, Harbor Front & Shopping Mall. The plant room is located on 8th floor above the open parking area. The complete complex has a dedicated water based fire suppression system designed to NFPA standards with UL/FM fire pumps. FND provided services for the design and supervision of the complete HVAC & Fire Supression System for the Executive Tower, the Harbour Front & the Shopping Mall. For the 2x36 storied towers FND is providing complete MEP services.

2. Project No.: 0670 Dolmen Mall, Tariq Road Karachi – HVAC & Fire System Dolmen Mall Tariq Road was inaugurated in 2001. The mall has a gross area of 450,000 square feet, spread over six floors, and contains 300 retail outlets, a large food court and a family entertainment area. FND provided services for the design and supervision of the complete HVAC & Fire Suppression System

Page 47: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Pro

jec

ts

46

FFNNDD PPRROOFFIILLEE OONN SSHHOOPPPPIINNGG MMAALLLLSS

1. Project No.: 0963 Dolmen Mall Hyderi Karachi – HVAC System

Dolmen Mall Hyderi, located in North Nazimabad, caters to the densely populated northern part of Karachi, and opened its doors in 2008.

The mall has a gross area of 100,000 square feet, spread over six floors, and contains 50 retail outlets, a food court and a family entertainment area. FND provided services for the design and supervision of the complete HVAC System.

Page 48: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Cli

en

t R

efe

ren

ce

s

47

Cl ient References

Page 49: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Ce

rti�

ca

tes

48

Page 50: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Ce

rti�

ca

tes

49

Page 51: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Ce

rti�

ca

tes

50

Page 52: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Ce

rti�

ca

tes

51

Page 53: Fahim, Nanji - FNDfnd.com.pk/upload/downloads/FND profile 24 November 2015.pdf · 2015-11-27 · Fahim, Nanji & deSouza (Pvt.) Ltd. Corporate Pro˜le - 2014 About FND 3 Company History

Fahim, Nanj i & deSouza (Pvt . ) Ltd. Corporate Pro�le - 2014

Co

nta

ct

52

LOCATION Head Office Fahim, Nanji & deSouza (Pvt.) Ltd. Office No. 10, ILACO House,

State Life Building No. 5,

Abdullah Haroon Road, Saddar,

Karachi - 75400, Pakistan

Tel. No.: + 92 21 3563 7878-82

Fax No.: + 92 21 3521 1634

Email: [email protected]

[email protected]

Website: www.fnd.com.pk

Islamabad Office Fahim, Nanji & deSouza (Pvt.) Ltd. Block No.: 18, First Floor,

Agha Khan Road,

F-6, Markaz, Super Market,

Islamabad

Cell No: + 92 300-3543215; 0321-2427136

Email: [email protected]