California Construction Authority OC FAIR & EVENT CENTER 88 Fair Drive Costa Mesa, California 92626
www.EMGcorp.com | 800.733.0660
PREPARED BY: EMG | A Bureau Veritas Company 10461 Mill Run Circle, Suite 1100 Owings Mills, Maryland 21117 800.733.0660 www.emgcorp.com
EMG CONTACT: Mark Surdam Program Manager 800.733.0660 x6251 [email protected]
EMG PROJECT #: 139212.19R000-00A.354
DATE OF REPORT: July 7, 2020
ON SITE DATE: December, 2019 – March, 2020
SUMMARY REPORT 88 Fair Drive Costa Mesa, California
FACILITY CONDITION ASSESSMENT
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
1 www.EMGcorp.com p 800.733.0660
TABLE OF CONTENTS 1. Executive Summary ............................................................................................................................. 1
Background ............................................................................................................................................. 1 Scope of Assessment ............................................................................................................................. 1 Key Findings ........................................................................................................................................... 5 Facility Condition Index Charts ............................................................................................................... 9
2. Immediate Repairs .............................................................................................................................. 11 3. Replacment Reserves ........................................................................................................................ 17 4. Plan Types ........................................................................................................................................... 20 5. Prioritization of Repairs ..................................................................................................................... 21 6. Opinions of Probable Costs .............................................................................................................. 22
Methodology ......................................................................................................................................... 22 Definitions ............................................................................................................................................. 22
7. Certification ......................................................................................................................................... 24
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
1 www.EMGcorp.com p 800.733.0660
1 . Ex e c u t i v e Su m m a r y
Background
The California Construction Authority retained EMG to perform a Facility Condition Assessments (FCA) of the OC Fair & Event Center (OCFEC), located in Costa Mesa California. The facility consists of approximately 76 buildings on a single, contiguous 150-acre parcel. The site and buildings have been grouped into 7 Zones representing similar activities, and a Facility Condition Assessment report has been prepared for each Zone as well a separate report covering utility services and broadband (wireless) technology infrastructure.
Zone Map
An FCA will locate and evaluate materials and building system defects that might significantly affect the value of the property and will determine if the present condition of the property will have a significant impact on its continued operations.
The FCAs were prepared by EMG in collaboration with the staff of the OC Fair & Event Center. EMG was retained to render an opinion as to each facility’s current general physical condition on the day of the site visits. The condition assessments are primarily intended to assess the overall physical condition of each building in the facility to support capital investment decisions by OCFEC. The reports also identify observed or reported defects that may constitute safety concerns or potential service delays.
This FCA Executive Summary Report combines the individual assessments into one consolidated report, presenting general conclusions and an overall cost and condition summary. The report documents the identified immediate repair needs and anticipates replacement/repair needs based on useful life expectancy of the various systems, components and/or assets at each building.
Scope of Assessment
Based on observations, interviews and document reviews, the FCA reports identify any significant deferred maintenance issues and existing deficiencies which affect the facility. The reports also identify systems or components that have realized or exceeded their typical expected useful lives. Opinions are rendered as to a site or facility’s overall condition.
The standard scope of the Facility Condition Assessment includes the following:
▪ Visit the Property to evaluate the general condition of the buildings and site improvements, review available construction documents to familiarize ourselves with, and be able to comment on, the in-place construction systems, life safety, mechanical, electrical, and plumbing systems, and the general built environment.
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
2 www.EMGcorp.com p 800.733.0660
▪ Identify those components that are exhibiting deferred maintenance issues and provide cost estimates for Immediate Costs and Replacement Reserves based on observed conditions, maintenance history and industry standard useful life estimates. This will include the review of documented capital improvements completed within the last five-year period and work currently contracted for, if applicable.
▪ Provide a full description of the Property with descriptions of in-place systems and commentary on observed conditions.
▪ Provide a high-level categorical general statement regarding the subject Property’s compliance to Title III of the Americans with Disabilities Act. This will not constitute a full ADA survey, but will help identify exposure to issues and the need for further review.
▪ Obtain background and historical information about the facility from a building engineer, property manager, maintenance staff, or other knowledgeable source. The preferred methodology is to have the client representative or building occupant complete a Pre-Survey Questionnaire (PSQ) in advance of the site visit. Common alternatives include a verbal interview just prior to or during the walk-through portion of the assessment.
▪ Review maintenance records and procedures with the in-place maintenance personnel.
▪ Observe a representative sample of the interior spaces/units, including vacant spaces/units, to gain a clear understanding of the Property’s overall condition. Other areas to be observed include the exterior of the Property, the roofs, interior common areas, and the significant mechanical, electrical and elevator equipment rooms.
▪ Provide recommendations for additional studies, if required, with related budgetary information.
▪ Provide an Executive Summary at the beginning of this report, which highlights key findings and includes a Facility Condition Index as a basis for comparing the relative conditions of the buildings within the portfolio.
▪ Prepare a mechanical inventory list.
The scope of this assessment also included an analysis of the domestic water supply, domestic and stormwater drain lines, natural gas, electrical supply and broadband (wireless) technology infrastructure. Additionally, an infra-red photographic examination was made of the main electrical distribution panels servicing the buildings and site.
The Zones illustrated on the map above contain the following buildings (listed in alphabetical order).
FCA Assessment
Building Use Construction
Date Area (SF)
Zone 1
Administration Office 2009 15,000
Campground Restrooms Trailer Restroom 2013 400
Maintenance – Event Operations Office / Warehouse Operations 1981 6,700
Maintenance – Operations Operations 1981 3,150
Maintenance – Shop Operations 1981 7,485
Picnic Gazebo Recreation 1992 1,700
Zone 2
Box Office Plaza Pacific - East Sales 2013 180
Box Office Plaza Pacific - West Sales 2013 180
Pac Amp Backstage Production Office/Kitchen Administration 2008 2,600
Pac Amp Box Office Sales 1983 1,285
Pac Amp Concession Stand 1st Base Food Vending 1983 1,291
Pac Amp Concession Stand 3rd Base Food Vending 1983 1,318
Pac Amp Dressing Room Trailers #1 & #2 Administration 2002 1,452
Pac Amp Elevator Building Mechanical 2008 224
Pac Amp Lobby Entertainment 2013 4,300
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
3 www.EMGcorp.com p 800.733.0660
FCA Assessment
Building Use Construction
Date Area (SF)
Pac Amp Restroom 1st Base #1 Restroom 1983 2,660
Pac Amp Restroom 1st Base #2 Restroom 1983 2,181
Pac Amp Restroom 3rd Base #1 Restroom 1983 2,149
Pac Amp Restroom 3rd Base #2 Restroom 1983 3,882
Pac Amp Seating Area Entertainment 1983 49,000
Pac Amp Stage Structure Entertainment 1983 5,330
Pac Amp Video/Laundry Administration 2008 400
Restrooms North Plaza Pacific Restroom 2013 1,500
Restrooms South Plaza Pacific Restroom 2013 1,500
Round Concession Stand 1st Base Food Vending 1983 250
Round Concession Stand 3rd Base Food Vending 1983 250
Zone 3
Building 15 (Farmhouse) Exhibition, Education Pre-1950 4,840
Heroes Hall Museum Pre-1950/2016 5860
Marketplace Office/Concession Stand Concession Stand, Office 1990 5258
Marketplace Restroom - East Restrooms 1989 800
Marketplace Restroom - South Restrooms 2018 350
Marketplace Restroom - West Restrooms 1981 1024
Marketplace Snack Stand - Banana Concession Stand, 1981 2300
Millennium Building Exhibition, Education 2002 4,600
Park Plaza Restroom Restrooms 1985 700
Silo Building Exhibition, Education 1997 2,900
Small Red (Century) Barn Exhibition, Education 1998 2,027
Zone 4
Anaheim Exhibition Space 1960 / 2009 16,985
Costa Mesa Exhibition Space 1954 / 2008 41,559
Hanger Exhibition Space 2008 30,676
Huntington Beach (Incl. Courtyard Restrooms) Exhibition Space 1966 / 2006 33,484
Los Alamitos Exhibition Space 1962 / 2007 20,729
OC Promenade Exhibition Space 2008 20,000
Parade of Products / Santa Ana Pavilion Exhibition Space 1995 / 2008 15,000
Zone 5
Arena Trailer Restroom Restroom 1995 937
Baja Blues Concession Stand Pre-1950 5,600
Block Restrooms Restroom Unknown 1,000
Department of Public Safety Administration Pre-1950 1,526
Exhibits & Education Exhibition, Education 1987 1,900
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
4 www.EMGcorp.com p 800.733.0660
FCA Assessment
Building Use Construction
Date Area (SF)
Grandstand Arena Entertainment Unknown 10,700
Judging Arena Entertainment Unknown 40,000
Livestock Restrooms Restroom 1997 1,500
Ranch Building Administration 1987 5,100
Spectra Office/Arena Restrooms Administration 2007 2,760
Zone 6
EQC Shop & Storage Operations 1967 3,000
Equestrian Center Barn F Exhibition Space 1979 3,500
Equestrian Center Barn G Exhibition Space 1979 3,500
Equestrian Center Barn H Exhibition Space 1979 3,500
Equestrian Center Barn I Exhibition Space 1979 3,500
Equestrian Center Barn J Exhibition Space 1979 3,500
Equestrian Center Barn K Exhibition Space 1979 3,500
Equestrian Center Barn L Exhibition Space 1979 3,500
Equestrian Center Barn M Exhibition Space 1979 3,100
Equestrian Center Barn N Exhibition Space 1979 5,000
Livestock Barn 1 Exhibition Space Pre-1950 4,500
Livestock Barn 2 Exhibition Space Pre-1950 4,500
Livestock Barn 3 Exhibition Space Pre-1950 3,100
Spectra Kitchen Administration 2009 18,423
Zone Site Elements Site Pre-1950 NA
Zone 7
Area Use Parking Count Area (SF)
Lot A Parking 2,230 1,003,000
Lot B Parking 1,280 418,000
Lot C Parking 1,020 360,000
Lot D Parking 764 285,000
Lot E Parking 527 196,500
Lot F Parking 295 95,600
Lot G Parking 967 348,000
Lot H Parking 399 149,000
Lot I Parking 710 268,000
Zone 1 Lot Parking 475 175,000
Driveways Access 0 415,000
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
5 www.EMGcorp.com p 800.733.0660
Key Findings
One of the major goals of the Facility Condition Analysis is to calculate the FCI, or Facility Condition Index, which gives an
indication of a building’s overall condition. The FCI was first used by the Federal Government for buildings owned and
managed by government. The purpose is to be able to compare buildings of differing sizes or types against a standard
benchmark. The values are based on a scale from 0 to 100 percent and are derived by dividing the immediate repair needs
for a facility by the calculated replacement value.
By definition, the FCI is defined as the ratio of the cost of current needs divided by current replacement value (CRV) of the
building. The chart below presents the industry standard ranges and cut-off points.
FCI = Repair Costs [Immediate]
Current Replacement Value of Building
FCI Ranges and Description
0 – 5% In new or well-maintained condition, with little or no visual evidence of wear or other deficiencies.
5 – 10% Subjected to wear but is still in a serviceable and functioning condition.
10 – 30% Subjected to hard or long-term wear. Nearing the end of its useful or serviceable life.
30% and above Has reached the end of its useful or serviceable life. Renewal is now necessary.
The deficiencies and lifecycle needs identified in this assessment provide the basis for a facility-wide capital improvement funding strategy. In addition to the current FCI, which is a reflection of the maintenance practices at the facility, extended FCI’s have been developed to provide owners the intelligence needed to plan and budget for the “keep-up costs” for their facilities. As such the 3-year, 5-year, and 10-year FCI’s are calculated by dividing the anticipated needs of those respective time periods by current replacement value. As a final point, the FCI’s ultimately provide more value when used to relatively compare buildings across a facility or portfolio instead of being over-analyzed and scrutinized as stand-alone values.
The table below summarizes the individual building findings for this FCA:
Facility Cost/SF Total
SF Replacement
Value Current 3-Year 5-Year 10-Year
Zone 1
Administration $275 15,000 $4,125,000 0.70% 3.30% 4.00% 10.20%
Campground Restrooms Trailer $125 400 $50,000 0.00% 9.80% 15.30% 39.70%
Event Operations Office/Warehouse $195 4,900 $955,500 0.20% 0.20% 1.00% 13.40%
Maintenance Operations $225 3,150 $708,750 0.90% 0.90% 8.40% 25.90%
Maintenance Shops $225 7,485 $1,684,125 1.80% 3.80% 13.20% 19.40%
Picnic Gazebo $145 1,600 $232,000 0.00% 0.00% 2.20% 13.40%
Zone 2
Box Office Plaza Pacific - East $300 180 $54,000 0.00% 0.00% 0.00% 0.90%
Box Office Plaza Pacific - West $300 180 $54,000 0.00% 0.00% 0.00% 0.90%
Pac Amp Backstage Production Office/Kitchen
$285 2,600 $741,000 1.90% 3.40% 13.60% 31.80%
Pac Amp Box Office $285 1,285 $366,225 1.20% 5.70% 8.20% 26.50%
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
6 www.EMGcorp.com p 800.733.0660
Pac Amp Concession Stand 1st Base
$225 1,291 $290,475 1.10% 1.60% 10.50% 33.40%
Pac Amp Concession Stand 3rd Base
$225 1,318 $296,550 1.90% 4.70% 17.80% 51.50%
Pac Amp Dressing Rooms Trailers #1 & #2
$175 1,452 $254,100 24.70% 25.80% 36.20% 53.90%
Pac Amp Elevator Building $300 224 $67,200 0.00% 0.00% 18.70% 49.40%
Pac Amp Lobby $250 4,300 $1,075,000 0.00% 0.00% 0.00% 1.50%
Pac Amp Restrooms 1st Base #1 $225 2,660 $598,500 1.60% 15.30% 25.10% 69.80%
Pac Amp Restrooms 1st Base #2 $225 2,181 $490,725 0.00% 21.90% 27.10% 72.20%
Pac Amp Restrooms 3rd Base #1 $225 2,149 $483,525 0.00% 31.50% 39.20% 86.40%
Pac Amp Restrooms 3rd Base #2 $225 3,882 $873,450 0.50% 12.20% 16.50% 49.10%
Pac Amp Seating Area $65 49,000 $3,185,000 0.00% 0.60% 0.80% 1.50%
Pac Amp Stage Structure $195 5,330 $1,039,350 0.00% 0.50% 79.10% 89.90%
Pac Amp Video/Laundry $225 400 $90,000 0.00% 0.00% 7.90% 40.90%
Plaza Pacific Restrooms - North $225 1,500 $337,500 0.00% 0.00% 0.00% 2.50%
Plaza Pacific Restrooms - South $225 1,500 $337,500 0.00% 0.00% 0.00% 2.50%
Round Concession Stand 1st Base $250 250 $62,500 0.00% 34.50% 65.60% 70.80%
Round Concession Stand 3rd Base $250 250 $62,500 0.00% 30.40% 81.70% 81.70%
Zone 3
Building 15 $285 4,850 $1,382,250 0.60% 0.60% 3.10% 7.70%
Century Barn $245 2,027 $496,615 0.00% 0.00% 0.00% 0.80%
Heroes Hall $285 5,860 $1,670,100 0.00% 0.00% 0.00% 8.20%
Market Place Office/Concession Stand
$295 5,860 $1,728,700 0.20% 1.50% 8.60% 27.00%
Market Place Restrooms - East $175 800 $140,000 0.00% 15.80% 19.20% 40.70%
Market Place Restrooms - South $155 350 $54,250 0.00% 5.10% 21.70% 32.30%
Market Place Restrooms - West $195 1,024 $199,680 0.00% 12.30% 12.30% 26.70%
Market Place Snack Stand - Banana $245 2,750 $673,750 0.00% 0.00% 1.10% 23.30%
Millennium Barn $245 4,600 $1,127,000 0.00% 0.00% 1.90% 5.80%
Park Plaza Restroom $155 700 $108,500 1.50% 7.50% 7.50% 14.60%
Silo Building $285 2,900 $826,500 0.00% 0.00% 0.00% 2.20%
Zone 4
Anaheim Building $225 16,985 $3,821,625 0.10% 3.10% 3.20% 21.40%
Costa Mesa Building $225 41,559 $9,350,775 0.00% 10.70% 10.80% 20.30%
Hangar Building $225 30,676 $6,902,100 0.00% 3.10% 3.30% 25.90%
Huntington Beach Building $225 33,484 $7,533,900 0.00% 3.10% 3.40% 18.30%
Los Alamitos Building $225 20,729 $4,664,025 0.10% 3.20% 6.20% 20.00%
OC Promenade $190 20,000 $3,800,000 0.00% 0.00% 0.00% 4.10%
Parade of Products / Courtyard Restroom
$190 15,000 $2,850,000 0.00% 0.00% 0.00% 5.00%
Zone 5
Arena Trailer Restroom $175 937 $163,975 1.70% 1.70% 3.10% 6.40%
Baja Blues $275 5,600 $1,540,000 0.20% 2.70% 11.10% 39.30%
Block Restrooms $175 1,000 $175,000 0.00% 0.00% 0.00% 11.40%
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
7 www.EMGcorp.com p 800.733.0660
Department of Public Safety $245 1,526 $373,870 0.00% 1.40% 1.60% 8.70%
Exhibits & Education $245 1,900 $465,500 0.00% 1.40% 1.40% 8.90%
Exhibits & Education Trailer $175 720 $126,000 9.30% 13.40% 23.20% 28.30%
Grandstand Arena $190 40,000 $7,600,000 0.00% 0.00% 0.20% 1.50%
Judging Arena $145 40,000 $5,800,000 0.00% 0.00% 0.10% 0.30%
Livestock Restroom $175 1,500 $262,500 0.00% 0.00% 2.30% 12.50%
Ranch Building $245 5,100 $1,249,500 0.00% 2.80% 2.80% 12.60%
Spectra Office/Arena Restroom $245 2,760 $676,200 0.00% 2.90% 3.70% 10.80%
Spectra Shed East $115 2,185 $251,275 3.20% 3.20% 3.30% 3.30%
Spectra Shed West $115 2,022 $232,530 8.30% 8.30% 11.80% 27.60%
Spectra Storage Shed $115 3,055 $351,325 6.50% 6.50% 6.70% 6.80%
Zone 6
EQC Shop & Storage $225 1,500 $337,500 0.00% 15.90% 25.90% 58.10%
Equestrian Center Barn F $75 3,500 $262,500 1.50% 15.00% 24.60% 26.20%
Equestrian Center Barn G $75 3,500 $262,500 1.50% 15.00% 32.40% 37.00%
Equestrian Center Barn H $75 3,500 $262,500 1.50% 53.70% 72.00% 107.60%
Equestrian Center Barn I $75 3,500 $262,500 1.90% 8.90% 10.10% 28.90%
Equestrian Center Barn J $75 3,500 $262,500 1.50% 32.50% 34.50% 82.30%
Equestrian Center Barn K $75 3,500 $262,500 1.50% 15.00% 16.60% 57.20%
Equestrian Center Barn L $75 3,500 $262,500 2.60% 16.10% 16.60% 67.00%
Equestrian Center Barn M $75 3,100 $232,500 1.40% 27.00% 28.00% 72.80%
Equestrian Center Barn N $75 5,000 $375,000 1.70% 25.40% 26.20% 68.90%
Livestock Barn 1 $85 4,500 $382,500 2.00% 5.40% 15.90% 24.00%
Livestock Barn 2 $85 4,500 $382,500 1.20% 18.60% 22.10% 28.50%
Livestock Barn 3 $85 3,100 $263,500 2.90% 3.10% 3.80% 28.30%
Spectra Kitchen $145 18,423 $2,671,335 0.00% 2.40% 6.80% 29.40%
The above chart illustrates the facilities in need of the most attention. Key elements affecting the Short-Term Needs common through the zones are as follows:
▪ HVAC equipment replacement
▪ Roof repairs and replacements
▪ Plumbing system and fixture replacement
▪ Exterior finishes
▪ Interior finishes
▪ Parking lot and sidewalk improvements
▪ Upgrade of the security and video surveillance systems
▪ Modernization of the electrical distribution system and main electrical system components
Recommended Addit ional Studies (Infrastructure)
Electrical:
Southern California Edison provides service to the site via underground lines to onsite pad mounted transformers (PMTs). That system is owned and upgraded periodically by the utility company.
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
8 www.EMGcorp.com p 800.733.0660
An infra-red study of the main distribution panels was conducted as part of the facility condition assessments. The results of the study do not reflect actual working conditions as the sampling was done during the off season when the panels were not fully loaded. Due to the age of and condition of the equipment, EMG recommends conducting the study at a time when the facility is fully occupied and during the evening when lighting is on.
In addition, an arc flash study is recommended to help mitigate hazards of injury and death by calculating the limited and restricted approach boundaries inside which workers must use appropriate personal protective equipment and placing labels on the equipment, per the requirement of the National Electric Code (NEC).
Domestic Water:
Fed by three perimeter locations, onsite distribution is via 6”, 8” and 10” cast iron pipe (CIP) and 8” and 10” asbestos clay pipe (ACP). Much of this system dates to the initial development of the site in the 1940s and 1950s and the underground systems are well past their estimated useful life. EMG recommends replacement of the domestic water system within the short term to eliminate ongoing and anticipated issues with water pressure and leakage.
Sanitary Sewer:
Available as-builts from the Costa Mesa Sanitation District do not accurately match observed field notes and Maintenance crew knowledge of sewer utilities. EMG recommends a video scoping of the main sanitation lines to verify condition and the preparation of accurate as-built plans for future maintenance and planning uses.
The cost of the current repair needs is estimated at $940,355. Over the next 20 years, the total estimate repair needs, including the current repair needs and adjusted for inflation, are estimated at $100,099,242.
Specific details for each building can be found in Section 2 in the Immediate Repair Tables and in the Facility Condition Assessment Reports.
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
9 www.EMGcorp.com p 800.733.0660
Facil i ty Condit ion Index Charts
The table below shows the current FCI for each of the facility buildings. Where no blue bar exists, the current deferred maintenance or needed repairs are negligible
0
0.05
0.1
0.15
0.2
0.25
0.3
Zon
e 1
Ad
min
istr
atio
n
Cam
pgr
ou
nd
Res
tro
om
s Tr
aile
r
Even
t O
pe
rati
on
s O
ffic
e/W
areh
ou
se
Mai
nte
nan
ce O
pe
rati
on
s
Mai
nte
nan
ce S
ho
ps
Pic
nic
Gaz
ebo
Zon
e 2
Bo
x O
ffic
e P
laza
Pac
ific
- E
ast
Bo
x O
ffic
e P
laza
Pac
ific
- W
est
Pac
Am
p B
acks
tage
Pro
du
ctio
n O
ffic
e/K
itch
en
Pac
Am
p B
ox
Off
ice
Pac
Am
p C
on
cess
ion
Sta
nd
1st
Bas
e
Pac
Am
p C
on
cess
ion
Sta
nd
3rd
Bas
e
Pac
Am
p D
ress
ing
Ro
om
s Tr
aile
rs #
1 &
#2
Pac
Am
p E
leva
tor
Bu
ildin
g
Pac
Am
p L
ob
by
Pac
Am
p R
estr
oo
ms
1st
Bas
e #1
Pac
Am
p R
estr
oo
ms
1st
Bas
e #2
Pac
Am
p R
estr
oo
ms
3rd
Bas
e #1
Pac
Am
p R
estr
oo
ms
3rd
Bas
e #2
Pac
Am
p S
eati
ng
Are
a
Pac
Am
p S
tage
Str
uct
ure
Pac
Am
p V
ideo
/Lau
nd
ry
Pla
za P
acif
ic R
estr
oo
ms
- N
ort
h
Pla
za P
acif
ic R
estr
oo
ms
- So
uth
Ro
un
d C
on
cess
ion
Sta
nd
1st
Bas
e
Ro
un
d C
on
cess
ion
Sta
nd
3rd
Bas
e
Zon
e 3
Bu
ildin
g 1
5
Cen
tury
Bar
n
Her
oes
Hal
l
Mar
ket
Pla
ce O
ffic
e/C
on
cess
ion
Sta
nd
Mar
ket
Pla
ce R
estr
oo
ms
- Ea
st
Mar
ket
Pla
ce R
estr
oo
ms
- So
uth
Mar
ket
Pla
ce R
estr
oo
ms
- W
est
Mar
ket
Pla
ce S
nac
k St
and
- B
anan
a
Mill
enn
ium
Bar
n
Par
k P
laza
Res
tro
om
Silo
Bu
ildin
g
Zon
e 4
An
ahei
m B
uild
ing
Co
sta
Mes
a B
uild
ing
Han
gar
Bu
ildin
g
Hu
nti
ngt
on
Bea
ch B
uild
ing
Los
Ala
mit
os
Bu
ildin
g
OC
Pro
men
ade
Par
ade
of
Pro
du
cts
/ C
ou
rtya
rd R
estr
oo
m
Zon
e 5
Are
na
Trai
ler
Res
tro
om
Baj
a B
lue
s
Blo
ck R
estr
oo
ms
Dep
artm
ent
of
Pu
blic
Saf
ety
Exh
ibit
s &
Ed
uca
tio
n
Exh
ibit
s &
Ed
uca
tio
n T
raile
r
Gra
nd
stan
d A
ren
a
Jud
gin
g A
ren
a
Live
sto
ck R
estr
oo
m
Ran
ch B
uild
ing
Spec
tra
Off
ice
/Are
na
Res
tro
om
Spec
tra
She
d E
ast
Spec
tra
She
d W
est
Spec
tra
Sto
rage
Sh
ed
Zon
e 6
EQC
Sh
op
& S
tora
ge
Equ
est
rian
Cen
ter
Bar
n F
Equ
est
rian
Cen
ter
Bar
n G
Equ
est
rian
Cen
ter
Bar
n H
Equ
est
rian
Cen
ter
Bar
n I
Equ
est
rian
Cen
ter
Bar
n J
Equ
est
rian
Cen
ter
Bar
n K
Equ
est
rian
Cen
ter
Bar
n L
Equ
est
rian
Cen
ter
Bar
n M
Equ
est
rian
Cen
ter
Bar
n N
Live
sto
ck B
arn
1
Live
sto
ck B
arn
2
Live
sto
ck B
arn
3
Spec
tra
Kit
chen
Current FCI
GOOD
FAIR
POOR
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
10 www.EMGcorp.com p 800.733.0660
The table below combines the current FCI for each of the buildings with a bar for the current, 3-year, 5-Year and 10-year FCI, if no capital improvement funds are expended on the building. The costs for those configurations are discussed in Section 2, 3 & 6 of this report. It should be noted that current FCI reflects current maintenance practices while the 3 and 10 year FCI are reflective of building condition and age.
0
0.2
0.4
0.6
0.8
1
1.2
Zon
e 1
Ad
min
istr
atio
n
Cam
pgr
ou
nd
Res
tro
om
s Tr
aile
r
Even
t O
pe
rati
on
s O
ffic
e/W
areh
ou
se
Mai
nte
nan
ce O
pe
rati
on
s
Mai
nte
nan
ce S
ho
ps
Pic
nic
Gaz
ebo
Zon
e 2
Bo
x O
ffic
e P
laza
Pac
ific
- E
ast
Bo
x O
ffic
e P
laza
Pac
ific
- W
est
Pac
Am
p B
acks
tage
Pro
du
ctio
n O
ffic
e/K
itch
en
Pac
Am
p B
ox
Off
ice
Pac
Am
p C
on
cess
ion
Sta
nd
1st
Bas
e
Pac
Am
p C
on
cess
ion
Sta
nd
3rd
Bas
e
Pac
Am
p D
ress
ing
Ro
om
s Tr
aile
rs #
1 &
#2
Pac
Am
p E
leva
tor
Bu
ildin
g
Pac
Am
p L
ob
by
Pac
Am
p R
estr
oo
ms
1st
Bas
e #1
Pac
Am
p R
estr
oo
ms
1st
Bas
e #2
Pac
Am
p R
estr
oo
ms
3rd
Bas
e #1
Pac
Am
p R
estr
oo
ms
3rd
Bas
e #2
Pac
Am
p S
eati
ng
Are
a
Pac
Am
p S
tage
Str
uct
ure
Pac
Am
p V
ideo
/Lau
nd
ry
Pla
za P
acif
ic R
estr
oo
ms
- N
ort
h
Pla
za P
acif
ic R
estr
oo
ms
- So
uth
Ro
un
d C
on
cess
ion
Sta
nd
1st
Bas
e
Ro
un
d C
on
cess
ion
Sta
nd
3rd
Bas
e
Zon
e 3
Bu
ildin
g 1
5
Cen
tury
Bar
n
Her
oes
Hal
l
Mar
ket
Pla
ce O
ffic
e/C
on
cess
ion
Sta
nd
Mar
ket
Pla
ce R
estr
oo
ms
- Ea
st
Mar
ket
Pla
ce R
estr
oo
ms
- So
uth
Mar
ket
Pla
ce R
estr
oo
ms
- W
est
Mar
ket
Pla
ce S
nac
k St
and
- B
anan
a
Mill
enn
ium
Bar
n
Par
k P
laza
Res
tro
om
Silo
Bu
ildin
g
Zon
e 4
An
ahei
m B
uild
ing
Co
sta
Mes
a B
uild
ing
Han
gar
Bu
ildin
g
Hu
nti
ngt
on
Bea
ch B
uild
ing
Los
Ala
mit
os
Bu
ildin
g
OC
Pro
men
ade
Par
ade
of
Pro
du
cts
/ C
ou
rtya
rd R
estr
oo
m
Zon
e 5
Are
na
Trai
ler
Res
tro
om
Baj
a B
lue
s
Blo
ck R
estr
oo
ms
Dep
artm
ent
of
Pu
blic
Saf
ety
Exh
ibit
s &
Ed
uca
tio
n
Exh
ibit
s &
Ed
uca
tio
n T
raile
r
Gra
nd
stan
d A
ren
a
Jud
gin
g A
ren
a
Live
sto
ck R
estr
oo
m
Ran
ch B
uild
ing
Spec
tra
Off
ice
/Are
na
Res
tro
om
Spec
tra
She
d E
ast
Spec
tra
She
d W
est
Spec
tra
Sto
rage
Sh
ed
Zon
e 6
EQC
Sh
op
& S
tora
ge
Equ
est
rian
Cen
ter
Bar
n F
Equ
est
rian
Cen
ter
Bar
n G
Equ
est
rian
Cen
ter
Bar
n H
Equ
est
rian
Cen
ter
Bar
n I
Equ
est
rian
Cen
ter
Bar
n J
Equ
est
rian
Cen
ter
Bar
n K
Equ
est
rian
Cen
ter
Bar
n L
Equ
est
rian
Cen
ter
Bar
n M
Equ
est
rian
Cen
ter
Bar
n N
Live
sto
ck B
arn
1
Live
sto
ck B
arn
2
Live
sto
ck B
arn
3
Spec
tra
Kit
chen
10 Year Facility Condition Index Progression
Current 3-Year 5-Year 10-Year
VERY POOR
POOR
FAIR
GOOD
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
11 www.EMGcorp.com p 800.733.0660
2 . I m m e d i a t e R e p a i r s
The FCA reports have identified Immediate Repairs at the below buildings.
Facility/Building Total Items Total Cost
Infrastructure 7 $103,778
Zone 1 15 $83,510
Zone 2 12 $103,578
Zone 3 3 $13,538
Zone 4 2 $7,002
Zone 5 13 $74,991
Zone 6 22 $75,323
Zone 7 8 $478,636
Total 82 $940,355
Immediate Repair Detail
Location Location Description Description Condition Plan Type Cost
INFRASTRUCTURE
Natural Gas Back of the Baja Blues Building
Natural Gas, In-Line Seismic Shut-Off Valve, Install NA Safety $1,191
Natural Gas Marketplace Building
Natural Gas, In-Line Seismic Shut-Off Valve, Install NA Safety $1,191
Natural Gas Back of the Costa Mesa Building
Natural Gas, In-Line Seismic Shut-Off Valve, Install NA Safety $1,191
Natural Gas Maintenance & Operations Building
Natural Gas, In-Line Seismic Shut-Off Valve, Install NA Safety $1,191
Domestic Waste Throughout Site
Sanitary Sewer Piping and Manholes, CCTV Scope and Prepare As-built Plans Fair
Modernization / Adaptation $33,221
Electrical Throughout
Engineer, Electrical, Infra Red Study, Full Load, Evaluate/Report NA
Performance / Integrity $17,057
Electrical Throughout site
Engineer, Electrical, Arc Flash Study & Labeling, Evaluate/Report NA Safety $48,735
Total (7 items) $103,778
ZONE 1
Site Site Parking Lots, Asphalt Pavement, Seal & Stripe Poor
Performance / Integrity $13,889
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
12 www.EMGcorp.com p 800.733.0660
Immediate Repair Detail
Location Location Description Description Condition Plan Type Cost
Maintenance Shops Roof
Exterior Wall, any Painted Surface, 1-2 Stories, Prep & Paint Poor
Performance / Integrity $6,498
Maintenance Shops Building exterior Soffit Vent, Screen, Repair Poor Performance / Integrity $1,462
Maintenance Shops Roof Packaged Unit (RTU), 3 TON, Replace Failed
Performance / Integrity $8,123
Maintenance Shops Building interior Exit Sign Light Fixture, LED, Replace Poor Safety $2,383
Maintenance Shops Building exterior Dust Collection System, Replace Poor
Performance / Integrity $11,404
Maintenance Shops Site
Fences & Gates, any Painted Surface, Prep & Paint Poor
Performance / Integrity $1,137
Maintenance Operations Building Exterior
Exterior Wall, any Painted Surface, 1-2 Stories, Prep & Paint Poor
Performance / Integrity $3,899
Maintenance Operations Roof Roof, Limited Area, Repair NA Safety $1,191
Maintenance Operations Site
Fences & Gates, any Painted Surface, Prep & Paint Poor
Performance / Integrity $975
Event Operations Office/Warehouse Building exterior
Roof Gutter Downspout, any type per man-day, Repair Poor
Performance / Integrity $1,191
Event Operations Office/Warehouse Site
Parking Lots, Asphalt Pavement - Limited Area, Cut & Patch Poor Safety $493
Administration OC, Arlington conference rooms
Interior Floor Finish, Carpet Commercial Standard, Replace Poor Safety $8,123
Administration Patio
Concrete Pavement (Patio), Concrete Sections/Small Areas, Replace Poor Safety $21,660
Administration Patio area Pedestrian Gate, Wrought Iron, Repair Poor
Performance / Integrity $1,083
Total (15 items) $83,510
Zone 2
Pac Amp Restrooms 3rd Base #2 Roof
Condensing Unit/Heat Pump, Split System, 2.5 Ton, Replace Poor
Performance / Integrity $4,115
Pac Amp Restrooms 1st Base #1 Roof
Roof, Fiberglass Dome, Replace Poor
Performance / Integrity $5,597
Pac Amp Restrooms 1st Base #1 Building exterior
Drinking Fountain, Outside/Site Style, Replace Failed
Performance / Integrity $3,899
Pac Amp Dressing Rooms Trailers #1 & #2 Structure
Structural Flooring/Decking, Wood, Repair Poor
Performance / Integrity $17,298
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
13 www.EMGcorp.com p 800.733.0660
Immediate Repair Detail
Location Location Description Description Condition Plan Type Cost
Pac Amp Dressing Rooms Trailers #1 & #2 Building exterior
ADA, Site, Ramp, Wood, Up to 48' Wide, Install (2 @ 30') NA Accessibility $45,486
Pac Amp Concession Stand 3rd Base Roof
Evaporative Cooler, 2500 CFM, Replace Poor
Performance / Integrity $2,274
Pac Amp Concession Stand 3rd Base Roof
Exhaust Fan, 2000 CFM, Replace Poor
Performance / Integrity $3,249
Pac Amp Concession Stand 1st Base Roof
Exhaust Fan, 2000 CFM, Replace Poor
Performance / Integrity $3,249
Pac Amp Box Office Roof
Condensing Unit/Heat Pump, Split System, 3 Ton, Replace Poor
Performance / Integrity $4,332
Pac Amp Backstage Production Office/Kitchen Roof Roof, Built-Up, Replace Poor
Performance / Integrity $12,888
Pac Amp Backstage Production Office/Kitchen
North corner 1st floor
Interior Wall Finish, Gypsum Board/Plaster, Repair Poor
Performance / Integrity $379
Pac Amp Backstage Production Office/Kitchen
North corner 1st floor
Mold/Biological Growth, Remediation, Prepare and Clean/Remove Poor
Performance / Integrity $812
Total (12 items) $103,578
ZONE 3
Park Plaza Restroom Building Exterior Mold/Biological Growth, Remediation, Replace Poor
Performance / Integrity $1,625
Market Place Office/Concession Stand
Marketplace Office/Concession Stand
Exhaust Fan, 3000 CFM, Replace Poor
Performance / Integrity $3,249
Building 15 (Farmhouse) Building Exterior
Exterior Wall, Stucco, 1-2 Stories, Replace Failed
Performance / Integrity $8,664
Total (3 items) $13,538
ZONE 4
Location Location
Description Description Condition Plan Type Cost
Los Alamitos Building Roof Roof, Spray Polyurethane Foam, Repair Poor
Performance / Integrity $4,619
Anaheim Building Roof, any type per man-day, Repair Failed
Performance / Integrity $2,383
Total (2 items) $7,002
ZONE 5
Location Location
Description Description Condition Plan Type Cost
Zone Site Elements
Ponding locations adjacent to Storage Sheds
Parking Lots, Asphalt Pavement, Overlay Poor
Performance / Integrity $5,415
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
14 www.EMGcorp.com p 800.733.0660
Immediate Repair Detail
Location Location Description Description Condition Plan Type Cost
Zone Site Elements Site - Gates 5 and 7
Fences & Gates, any Painted Surface, Prep & Paint Poor
Performance / Integrity $1,625
Spectra Storage Shed Throughout building
Lighting System, Interior, Low Density & Standard Fixtures, Replace Poor
Performance / Integrity $22,743
Spectra Shed West Throughout building Interior Stairs, Metal or Pan-Filled, Replace Poor Safety $6,238
Spectra Shed West Throughout building
Lighting System, Interior, Low Density & Standard Fixtures, Replace Poor
Performance / Integrity $13,139
Spectra Shed East (Ovations) Throughout building
Lighting System, Interior, Low Density & Standard Fixtures, Replace Poor
Performance / Integrity $8,025
Exhibits & Education Trailer Roof
Roof, Spray Polyurethane Foam, Coat existing metal Poor
Performance / Integrity $5,092
Exhibits & Education Trailer Throughout building
Lighting System, Interior, Low Density & Standard Fixtures, Replace Poor
Performance / Integrity $4,679
Exhibits & Education Trailer Building exterior
Light Fixture, Exterior Flood (any type w/ LED Replacement), 100 W, Replace Poor
Performance / Integrity $704
Exhibits & Education Trailer Rear of traler
Parking Lots, Asphalt Pavement, Slope to eliminate ponding Poor
Performance / Integrity $1,300
Baja Blues Kitchen Interior Stair/Ramp Rails, Wood, Repair/Install Failed Safety $162
Baja Blues Building exterior Exterior Wall, Concrete, 1-2 Stories, Repair Poor
Performance / Integrity $3,141
Arena Trailer Restroom
Building perimeter at base
Pavement, Curbs or Berms, Asphalt, Build for drainage Failed
Performance / Integrity $2,729
Total (13 items) $74,991
ZONE 6
Zone Site Elements Site Perimeter Fences & Gates, Metal Tube, 6' High, Replace Failed
Performance / Integrity $4,332
Equestrian Center Barns F, G, H, I, J, K, L, M & N Building Structure
Architect/Engineer, Building Envelope, Light Steel Framing, Evaluate/Report NA
Performance / Integrity $9,206
Spectra Kitchen Building Exterior Roof, any type per man-day, Repair Poor
Performance / Integrity $1,191
Livestock Barn 3 Building Exterior
Exterior Wall, any Painted Surface, 1-2 Stories, Prep & Paint Poor
Performance / Integrity $3,249
Livestock Barn 3 Building Exterior Exterior Wall, Stucco, 1-2 Stories, Repair Poor
Performance / Integrity $4,332
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
15 www.EMGcorp.com p 800.733.0660
Immediate Repair Detail
Location Location Description Description Condition Plan Type Cost
Livestock Barn 2 Building Exterior
Exterior Wall, any Painted Surface, 1-2 Stories, Prep & Paint Poor
Performance / Integrity $3,249
Livestock Barn 2 Building Exterior Fences & Gates, Wood Board, 4' High, Replace Poor
Performance / Integrity $1,300
Livestock Barn 1 Building Exterior Exterior Wall, Stucco, 1-2 Stories, Repair Poor
Performance / Integrity $4,332
Livestock Barn 1 Building Exterior Exterior Wall, Wood Door Frame, Repair Poor
Performance / Integrity $3,141
Equestrian Center Barn L Building Exterior
Exterior Floor, any Painted Surface, 1-2 Stories, Prep & Paint Poor
Performance / Integrity $975
Equestrian Center Barn I Building Exterior
Exterior Wall, any Painted Surface, 1-2 Stories, Prep & Paint Poor
Performance / Integrity $975
Equestrian Center Barn N Building Exterior
Exterior Floor, any Painted Surface, 1-2 Stories, Prep & Paint Poor
Performance / Integrity $1,137
Equestrian Center Barn L Building Exterior
Exterior Floor, any Painted Surface, 1-2 Stories, Prep & Paint Failed
Performance / Integrity $1,949
Equestrian Center Barn M Stable Stalls
Commercial Water Basin, Stainless Steel, 1-Bowl, Replace Poor
Performance / Integrity $3,249
Equestrian Center Barn L Stable Stalls
Commercial Water Basin, Stainless Steel, 1-Bowl, Replace Poor
Performance / Integrity $3,899
Equestrian Center Barn K Stable Stalls
Commercial Water Basin, Stainless Steel, 1-Bowl, Replace Poor
Performance / Integrity $3,899
Equestrian Center Barn J Stable Stalls
Commercial Water Basin, Stainless Steel, 1-Bowl, Replace Poor
Performance / Integrity $3,899
Equestrian Center Barn I Stable Stalls
Commercial Water Basin, Stainless Steel, 1-Bowl, Replace Poor
Performance / Integrity $3,899
Equestrian Center Barn H Stable Stalls
Commercial Water Basin, Stainless Steel, 1-Bowl, Replace Poor
Performance / Integrity $3,899
Equestrian Center Barn G Stable Stalls
Commercial Water Basin, Stainless Steel, 1-Bowl, Replace Poor
Performance / Integrity $3,899
Equestrian Center Barn F Stable Stalls
Commercial Water Basin, Stainless Steel, 1-Bowl, Replace Poor
Performance / Integrity $3,899
Equestrian Center Barn N Stable Stalls
Commercial Water Basin, Stainless Steel, 1-Bowl, Replace Poor
Performance / Integrity $5,415
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
16 www.EMGcorp.com p 800.733.0660
Immediate Repair Detail
Location Location Description Description Condition Plan Type Cost
Total (22 items) $75,323
ZONE 7
Zone 7 Parking Lots Lot H Parking Lots, Asphalt Pavement, Seal & Stripe Poor
Performance / Integrity $72,615
Zone 7 Parking Lots Zone 1 Asphalt Pavement, Seal Cracks, Repair Poor
Performance / Integrity $1,232
Zone 7 Parking Lots Lot F Asphalt Pavement, Seal Cracks, Repair Poor
Performance / Integrity $1,346
Zone 7 Parking Lots Lot I Asphalt Pavement, Seal Cracks, Repair Poor
Performance / Integrity $9,433
Zone 7 Parking Lots Lot A Asphalt Pavement, Seal Cracks, Repair Poor
Performance / Integrity $35,303
Zone 7 Parking Lots Lot H Asphalt Pavement, Seal Cracks, Repair Poor
Performance / Integrity $10,489
Zone 7 Parking Lots Lot G Asphalt Pavement, Seal Cracks, Repair Poor
Performance / Integrity $1,225
Zone 7 Site Perimeter
Pedestrian Pavement, Sidewalk, Concrete Sections/Small Areas, Replace Poor
Performance / Integrity $346,993
Total (8 items) $478,636
Grand Total $940,356
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
17 www.EMGcorp.com p 800.733.0660
3 . R e p l a c m e n t R e s e r v e s
The table below shows the summary Replacement Reserve Table for each of the facility buildings.
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Total
Escalated Estimate
Infrastructure
Infrastructure $103,778 $3,421,766 $0 $142,011 $0 $0 $193,974 $0 $0 $922,169 $0 $179,895 $0 $0 $0 $0 $191,169 $0 $221,248 $19,940 $1,343,785 $6,739,734
Zone 1
Administration $30,866 $0 $103,406 $17,396 $11,519 $217,891 $0 $8,991 $0 $31,794 $351,290 $14,152 $0 $23,379 $317,307 $160,038 $0 $246,935 $0 $0 $534,873 $2,069,837
Campground
Restrooms Trailer $0 $4,908 $0 $2,367 $366 $0 $2,716 $0 $0 $9,503 $0 $22,112 $12,044 $0 $5,733 $2,362 $3,650 $2,327 $3,687 $10,635 $0 $82,410
Event Operations
Office/Warehouse $1,684 $0 $0 $0 $7,496 $0 $13,966 $80,916 $2,607 $21,761 $0 $43,250 $0 $0 $15,972 $0 $18,769 $4,296 $2,212 $42,349 $188,169 $443,448
Maintenance
Operations $6,065 $0 $0 $10,592 $43,180 $14,124 $0 $18,048 $0 $91,284 $9,315 $6,371 $32,735 $3,817 $69,375 $18,982 $0 $13,425 $0 $44,770 $8,802 $390,886
Maintenance Shops $31,006 $21,752 $11,834 $24,970 $132,741 $0 $0 $0 $6,750 $97,332 $15,355 $7,196 $27,176 $26,242 $114,112 $0 $0 $26,851 $0 $18,611 $32,763 $594,692
Picnic Gazebo $0 $0 $0 $0 $4,998 $0 $0 $5,248 $0 $20,800 $0 $6,296 $0 $0 $9,665 $0 $0 $0 $0 $0 $0 $47,007
Site $13,889 $0 $1,723 $0 $183 $16,102 $0 $0 $0 $0 $18,666 $0 $2,316 $0 $23,180 $72,258 $0 $0 $23,969 $0 $25,086 $197,372
Zone 2
Box Office Plaza
Pacific - East $0 $0 $0 $0 $0 $0 $0 $480 $0 $0 $6,520 $0 $0 $0 $0 $2,430 $0 $644 $0 $0 $41,076 $51,150
Box Office Plaza
Pacific - West $0 $0 $0 $0 $0 $0 $0 $480 $0 $0 $6,520 $0 $0 $0 $0 $2,430 $0 $644 $0 $0 $41,076 $51,150
Pac Amp Backstage
Production
Office/Kitchen $14,079 $11,378 $0 $75,189 $0 $7,533 $18,492 $0 $107,887 $1,272 $6,550 $15,291 $0 $39,848 $0 $10,124 $24,852 $0 $146,485 $1,709 $11,736 $492,424
Pac Amp Box Office $4,332 $16,621 $0 $8,994 $0 $35,600 $12,932 $0 $18,583 $0 $18,382 $0 $849 $0 $0 $28,599 $0 $0 $7,688 $0 $12,030 $164,609
Pac Amp Concession
Stand 1st Base $3,249 $1,339 $0 $22,248 $3,779 $35,480 $5,819 $4,129 $21,059 $0 $105,594 $0 $0 $24,811 $0 $5,821 $0 $25,776 $0 $5,887 $57,703 $322,693
Pac Amp Concession
Stand 3rd Base $5,523 $8,366 $0 $38,935 $0 $29,040 $6,207 $10,256 $54,465 $0 $93,863 $0 $0 $41,987 $0 $14,426 $14,425 $22,196 $9,403 $0 $67,874 $416,966
Pac Amp Dressing
Rooms Trailers #1 &
#2 $62,784 $2,900 $0 $26,291 $0 $5,371 $17,458 $0 $22,143 $0 $0 $0 $0 $2,227 $0 $0 $23,462 $0 $33,077 $0 $75,264 $270,975
Pac Amp Elevator
Building $0 $0 $0 $12,574 $0 $377 $3,879 $0 $16,364 $0 $0 $0 $0 $17,433 $0 $506 $5,214 $0 $110,624 $0 $0 $166,971
Pac Amp Lobby $0 $0 $0 $0 $0 $2,411 $0 $0 $13,445 $0 $116,291 $0 $0 $0 $0 $378,575 $0 $0 $18,069 $0 $12,616 $541,406
Pac Amp Restrooms
1st Base #1 $9,496 $82,280 $0 $58,500 $0 $65,377 $198,254 $0 $3,773 $0 $0 $29,323 $0 $0 $0 $10,124 $30,326 $0 $18,069 $0 $14,083 $519,604
Pac Amp Restrooms
1st Base #2 $0 $107,288 $0 $25,893 $0 $23,867 $197,116 $0 $0 $0 $0 $47,852 $0 $0 $0 $16,873 $28,536 $0 $13,828 $0 $21,125 $482,378
Pac Amp Restrooms
3rd Base #1 $0 $152,271 $0 $37,462 $0 $27,702 $200,277 $0 $0 $0 $0 $88,424 $0 $0 $0 $33,239 $39,301 $0 $13,828 $0 $26,993 $619,498
Pac Amp Restrooms
3rd Base #2 $4,115 $95,853 $6,549 $37,475 $0 $77,756 $201,940 $0 $4,939 $0 $9,169 $37,778 $0 $0 $0 $10,461 $33,541 $0 $27,103 $0 $39,120 $585,800
Pac Amp Seating Area $0 $14,289 $4,596 $5,917 $0 $0 $23,277 $0 $0 $0 $0 $0 $101,911 $0 $0 $0 $53,545 $0 $0 $0 $0 $203,534
Pac Amp Stage
Structure $0 $0 $5,055 $816,562 $0 $0 $55,140 $0 $57,620 $0 $0 $0 $0 $0 $0 $0 $74,104 $0 $77,437 $0 $0 $1,085,919
Pac Amp
Video/Laundry $0 $0 $0 $7,101 $0 $19,648 $0 $2,597 $7,504 $0 $1,747 $0 $0 $3,181 $0 $16,957 $0 $0 $22,125 $0 $0 $80,860
Plaza Pacific
Restrooms - North $0 $0 $0 $0 $0 $741 $0 $0 $3,293 $4,239 $15,428 $0 $0 $0 $0 $111,225 $0 $0 $4,425 $5,697 $5,477 $150,525
Plaza Pacific
Restrooms - South $0 $0 $0 $0 $0 $741 $0 $0 $3,293 $4,239 $15,428 $0 $0 $0 $0 $111,225 $0 $0 $4,425 $5,697 $5,477 $150,525
Round Concession
Stand 1st Base $0 $11,155 $10,398 $3,432 $16,029 $0 $3,233 $0 $0 $0 $0 $7,196 $1,544 $4,612 $491 $0 $0 $0 $0 $0 $0 $58,090
Round Concession
Stand 3rd Base $0 $9,147 $9,881 $6,390 $25,658 $0 $0 $0 $0 $0 $0 $4,497 $0 $4,612 $4,177 $0 $0 $0 $0 $1,044 $0 $65,408
Site $0 $0 $354,740 $142,011 $55,583 $0 $0 $14,984 $23,987 $0 $0 $0 $17,371 $502,255 $74,699 $403,260 $0 $20,138 $1,119,855 $0 $213,206 $2,942,089
Zone 3
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
18 www.EMGcorp.com p 800.733.0660
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Total
Escalated Estimate
Building 15
(Farmhouse) $8,664 $0 $0 $33,964 $0 $188 $13,889 $24,055 $26,341 $0 $0 $0 $0 $41,669 $7,535 $130,950 $17,344 $32,328 $13,091 $0 $0 $350,018
Century Barn $0 $0 $0 $0 $0 $188 $3,932 $0 $0 $0 $0 $855 $25,039 $0 $0 $213,070 $5,284 $0 $0 $0 $65,854 $314,222
Heroes Hall $0 $0 $0 $0 $0 $0 $4,267 $40,918 $92,330 $0 $0 $22,487 $0 $0 $0 $157,457 $96,801 $37,090 $1,383 $0 $86,123 $538,855
Market Place
Office/Concession
Stand $3,249 $21,752 $201 $104,378 $19,626 $34,087 $78,783 $106,440 $56,111 $42,675 $132,593 $1,499 $66,822 $4,771 $48,490 $171,320 $96,666 $65,198 $14,566 $0 $263,573 $1,332,798
Market Place
Restrooms - East $0 $11,601 $10,513 $4,734 $0 $26,616 $3,492 $0 $0 $0 $15,719 $0 $29,956 $0 $0 $30,152 $4,692 $0 $7,375 $0 $70,025 $214,875
Market Place
Restrooms - South $0 $781 $2,011 $7,101 $1,889 $2,134 $3,621 $0 $0 $0 $46,284 $1,049 $0 $2,545 $3,899 $7,002 $0 $3,133 $0 $950 $6,455 $88,852
Market Place
Restrooms - West $0 $11,713 $12,942 $0 $0 $0 $194 $200 $28,193 $0 $0 $0 $12,649 $0 $0 $20,247 $261 $269 $0 $0 $90,927 $177,594
Market Place Snack
Stand - Banana $0 $0 $0 $7,456 $0 $26,805 $67,103 $29,037 $26,341 $0 $41,772 $0 $20,845 $24,461 $54,714 $107,901 $58,811 $0 $35,953 $0 $137,410 $638,608
Millennium Barn $0 $0 $0 $21,775 $0 $0 $1,151 $10,656 $31,554 $0 $1,310 $8,995 $99,069 $38,965 $18,839 $21,142 $1,547 $11,814 $0 $0 $565,211 $832,027
Park Plaza Restroom $1,625 $0 $6,549 $0 $0 $0 $7,694 $0 $0 $0 $277 $9,220 $21,231 $0 $0 $56,018 $10,340 $0 $0 $0 $65,135 $178,089
Silo Building $0 $0 $0 $0 $0 $6,529 $7,274 $0 $4,253 $0 $4,570 $0 $86,161 $0 $55,836 $98,048 $9,776 $0 $0 $0 $436,975 $709,420
Zone Site Elements $0 $0 $0 $0 $182 $189 $0 $1,598 $0 $0 $23,287 $0 $14,515 $11,451 $245 $151,299 $21,898 $2,148 $0 $0 $56,529 $283,341
Zone 4
Anaheim Building $2,383 $0 $117,090 $2,840 $1,097 $287,804 $81,146 $134,687 $182,087 $8,478 $336,605 $0 $8,354 $7,475 $40,462 $192,008 $420,623 $182,422 $1,122,816 $79,285 $89,390 $3,297,052
Costa Mesa Building $0 $710,790 $286,496 $11,006 $0 $436,346 $87,288 $31,301 $338,444 $0 $300,547 $19,788 $524,487 $3,380 $16,381 $959,193 $267,462 $635,738 $2,878,561 $113,943 $33,448 $7,654,599
Hangar Building $0 $0 $211,472 $13,432 $0 $277,763 $262,097 $0 $622,659 $404,138 $7,947 $0 $0 $12,120 $0 $373,291 $0 $329,466 $552,169 $0 $0 $3,066,554
Huntington Beach
Building $0 $0 $230,830 $0 $24,379 $530,959 $228,863 $33,032 $326,954 $1,696 $671,736 $0 $13,434 $0 $6,389 $1,038,359 $63,607 $359,625 $1,967,516 $0 $26,602 $5,523,981
Los Alamitos Building $4,619 $1,807 $142,900 $140,165 $1,097 $244,307 $1,293 $172,888 $224,507 $0 $451,394 $0 $2,224 $5,885 $0 $328,412 $287,928 $253,870 $1,418,544 $54,882 $16,655 $3,753,375
OC Promenade $0 $0 $0 $0 $0 $131,325 $0 $0 $26,066 $0 $234,708 $0 $973 $0 $0 $188,638 $0 $0 $7,375 $0 $0 $589,084
Parade of Products
(Santa Ana Pavilion) /
Courtyard Restroom $0 $0 $0 $0 $0 $128,186 $0 $0 $13,033 $0 $182,602 $0 $0 $0 $0 $174,127 $0 $0 $0 $0 $0 $497,948
Site $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $140,513 $0 $0 $2,004,487 $35,314 $0 $0 $0 $0 $2,180,314
Zone 5
Arena Trailer Restroom $2,729 $0 $0 $0 $2,284 $0 $3,492 $0 $1,921 $0 $0 $15,267 $0 $0 $3,070 $22,409 $71,316 $0 $0 $0 $68,265 $190,753
Baja Blues $3,303 $0 $38,605 $86,579 $43,089 $59,008 $76,426 $82,680 $2,744 $212,130 $0 $49,441 $0 $14,250 $227,537 $54,837 $35,974 $73,882 $118,737 $41,779 $28,362 $1,249,363
Block Restrooms $0 $0 $0 $0 $0 $9,165 $0 $7,059 $3,704 $0 $44,100 $0 $24,798 $0 $0 $16,873 $0 $9,487 $18,990 $0 $40,098 $174,276
Department of Public
Safety $0 $0 $5,260 $710 $0 $24,645 $1,940 $0 $0 $0 $42,657 $0 $10,114 $954 $0 $33,646 $9,211 $18,575 $8,297 $0 $60,979 $216,987
Exhibits & Education $0 $0 $6,549 $0 $0 $6,591 $1,940 $26,319 $0 $0 $31,001 $0 $17,757 $0 $0 $34,387 $2,607 $56,314 $0 $0 $46,749 $230,215
Exhibits & Education
Trailer $11,774 $5,075 $0 $11,479 $853 $6,516 $0 $0 $0 $0 $0 $0 $0 $6,680 $0 $4,539 $0 $0 $0 $4,558 $28,784 $80,258
Grandstand Arena $0 $0 $0 $15,976 $0 $24,859 $0 $71,260 $1,811 $0 $61,158 $0 $19,456 $21,471 $0 $185,263 $0 $15,573 $433,499 $0 $13,692 $864,018
Judging Arena $0 $0 $0 $7,101 $0 $377 $0 $0 $12,347 $0 $96,352 $0 $9,265 $9,543 $0 $506 $0 $0 $23,969 $0 $17,995 $177,453
Livestock Restroom $0 $0 $0 $6,035 $0 $5,148 $0 $3,996 $0 $17,522 $59,528 $0 $36,132 $8,111 $21,623 $14,004 $0 $5,370 $0 $0 $8,020 $185,490
Ranch Building $0 $0 $35,158 $0 $0 $1,507 $13,578 $46,498 $27,027 $33,716 $102,319 $26,160 $0 $0 $50,209 $19,319 $18,248 $147,606 $0 $0 $196,775 $718,120
Spectra Office/Arena
Restroom $0 $10,039 $9,513 $5,325 $0 $14,187 $15,518 $10,656 $7,573 $0 $52,193 $13,492 $32,210 $7,157 $0 $20,500 $10,427 $43,104 $26,771 $0 $97,097 $375,763
Spectra Shed East
(Ovations) $8,025 $0 $0 $0 $183 $0 $0 $0 $0 $0 $0 $0 $0 $0 $246 $97,525 $0 $0 $0 $0 $20,533 $126,512
Spectra Shed West $19,377 $0 $0 $8,177 $0 $10,609 $17,070 $8,924 $0 $0 $9,169 $0 $0 $0 $0 $53,318 $0 $0 $60,475 $0 $150,001 $337,120
Spectra Storage Shed $22,743 $0 $0 $710 $0 $565 $0 $0 $0 $0 $252,377 $0 $9,882 $0 $0 $8,774 $0 $0 $0 $0 $58,192 $353,243
Zone Site Elements $7,040 $0 $0 $102,780 $0 $0 $0 $899,735 $119,151 $0 $2,183 $3,898 $0 $138,128 $0 $16,029 $0 $31,952 $160,128 $0 $2,934 $1,483,958
Zone 6
EQC Shop & Storage $0 $5,689 $47,969 $33,846 $0 $57,251 $1,940 $0 $49,526 $0 $28,745 $4,947 $49,411 $0 $0 $20,079 $2,607 $32,221 $47,753 $0 $163,328 $545,310
Equestrian Center Barn
F $3,899 $29,114 $6,434 $25,207 $0 $4,143 $0 $0 $0 $0 $185,353 $0 $4,632 $0 $0 $17,379 $0 $0 $0 $0 $7,433 $283,594
Equestrian Center Barn
G $3,899 $29,114 $6,434 $45,562 $0 $12,116 $0 $0 $0 $0 $129,682 $0 $4,632 $0 $0 $1,519 $0 $0 $0 $0 $7,433 $240,390
Equestrian Center Barn
H $3,899 $29,114 $108,002 $47,929 $0 $93,409 $0 $0 $0 $0 $14,773 $0 $4,632 $0 $0 $19,741 $0 $0 $0 $0 $0 $321,499
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
19 www.EMGcorp.com p 800.733.0660
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Total
Escalated Estimate
Equestrian Center Barn
I $4,874 $15,394 $2,987 $3,373 $0 $49,278 $0 $0 $0 $0 $130,628 $4,497 $0 $0 $0 $19,488 $0 $0 $0 $0 $1,760 $232,279
Equestrian Center Barn
J $3,899 $29,114 $52,277 $5,207 $0 $113,120 $0 $0 $12,347 $0 $59,881 $0 $0 $3,817 $0 $19,741 $0 $0 $0 $0 $0 $299,404
Equestrian Center Barn
K $3,899 $29,114 $6,434 $4,142 $0 $106,591 $0 $0 $0 $0 $55,503 $0 $4,632 $2,386 $0 $19,741 $0 $0 $0 $0 $0 $232,442
Equestrian Center Barn
L $6,823 $29,114 $6,434 $1,183 $0 $124,106 $0 $0 $8,231 $0 $46,720 $0 $4,632 $0 $0 $19,741 $0 $0 $0 $0 $5,281 $252,267
Equestrian Center Barn
M $3,249 $29,650 $29,873 $2,367 $0 $104,018 $0 $0 $0 $0 $49,413 $0 $0 $0 $0 $13,751 $834 $0 $0 $0 $7,433 $240,587
Equestrian Center Barn
N $6,552 $33,799 $55,035 $2,959 $0 $159,950 $0 $0 $0 $0 $84,344 $0 $3,706 $0 $0 $18,391 $0 $0 $0 $0 $9,487 $374,223
Livestock Barn 1 $7,473 $13,051 $0 $40,355 $0 $27,370 $0 $0 $3,430 $0 $61,129 $15,741 $0 $26,242 $0 $506 $2,085 $0 $0 $0 $22,005 $219,387
Livestock Barn 2 $4,549 $0 $66,639 $13,491 $0 $24,231 $0 $0 $0 $0 $56,763 $0 $0 $18,131 $0 $40,579 $0 $0 $0 $0 $5,868 $230,251
Livestock Barn 3 $7,581 $535 $0 $1,775 $0 $64,620 $0 $0 $0 $0 $15,646 $0 $0 $2,386 $0 $19,066 $834 $0 $0 $0 $5,868 $118,312
Spectra Kitchen $1,191 $0 $63,502 $0 $116,304 $2,637 $15,386 $0 $172,477 $414,508 $27,217 $0 $422,001 $0 $107,682 $39,145 $13,726 $98,933 $387,774 $260,806 $0 $2,143,288
Zone Site Elements $13,538 $0 $21,026 $30,177 $77,889 $64,407 $0 $0 $617 $90,295 $20,668 $0 $1,853 $40,556 $104,677 $142,828 $0 $17,184 $918,641 $121,349 $80,490 $1,746,195
Zone 7
Zone 7 $478,636 $2,858,824 $1,046,410 $63,384 $68,565 $420,030 $1,724,532 $1,843,756 $24,694 $1,629,976 $7,951,031 $6,735,617 $637,172 $129,683 $138,832 $1,459,671 $2,317,627 $463,171 $2,112,459 $106,821 $1,435,823 $33,646,716
Grand Total $940,356 $7,866,499 $3,143,728 $2,434,991 $658,969 $4,303,637 $3,878,586 $3,731,823 $2,814,181 $4,059,528 $12,912,002 $7,442,586 $2,559,135 $1,276,618 $1,541,377 $10,286,331 $4,424,745 $3,289,707 $14,214,397 $940,712 $7,379,335 $100,099,242
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
20 www.EMGcorp.com p 800.733.0660
4 . P l a n T y p e s
Each line item in the cost database is assigned a Plan Type, which is the primary reason or rationale for the recommended replacement, repair, or other corrective action. This is the “why” part of the equation. A cost or line item may commonly have more than one applicable Plan Type; however, only one Plan Type will be assigned based on the “best” fit, typically the one with the greatest significance.
Plan Type Descriptions
Safety An observed or reported unsafe condition that if left unaddressed could result in injury; a system or component that presents potential liability risk.
Performance/Integrity Component or system has failed, is almost failing, performs unreliably, does not perform as intended, and/or poses risk to overall system stability.
Accessibility Does not meet ADA, UFAS, and/or other handicap accessibility requirements.
Environmental Improvements to air or water quality, including removal of hazardous materials from the building or site.
Retrofit/Adaptation Components, systems, or spaces recommended for upgrades in in order to meet current standards, facility usage, or client/occupant needs.
Lifecycle/Renewal Any component or system that is not currently deficient or problematic but for which future replacement or repair is anticipated and budgeted.
Based on 20 year term
Accessibility0%
Lifecycle/Renewal84%
Modernization/Adaptation2%
Performance/Integrity13%
Safety1%
PLAN TYPE CHART
Accessibility
Lifecycle/Renewal
Modernization/AdaptationPerformance/Integrity
Safety
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
21 www.EMGcorp.com p 800.733.0660
5 . P r i o r i t i z a t i o n o f R e p a i r s
EMG’s cost database has a prioritization model that assigns four categories to each repair cost in the database. The categories are rated on a scale of 1 to 10 where 10 is the most important.
The categories are as follows:
1. Building: Buildings can be assigned a rating to identify a building or type of building that is more important. For the initial ranking all buildings were assigned the same rating.
2. Building System: The various systems are rated with life Safety systems having the highest rating (10) and landscape material the lowest rating (1).
3. Remaining Useful Life: The number of years remaining before the material or system will require replacement. Materials of systems that have failed are assigned the highest rating and those with 10 years or more of remaining useful life have the lowest rating.
4. Plan Type: As previously discussed, each cost has plan type. The plan types are assigned the below ratings.
a. Safety -
b. Performance/Integrity -
c. Environmental -
d. Accessibility -
e. Modernization/Adaptation -
f. Lifecycle Replacement -
A weighted calculation is used to assign a numerical ranking from 1 to 100, where 100 is the most important of the identified repairs. Some repairs may have the same numerical ranking, especially if the same system in different buildings requires replacement.
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
22 www.EMGcorp.com p 800.733.0660
6 . Op i n i o n s o f P r o b a b l e C o s t s
Cost estimates are attached throughout this report, with the Replacement Reserves in the appendix.
These estimates are based on construction costs developed by construction resources such as R.S. Means, CBRE Whitestone, and Marshall & Swift, EMG’s experience with past costs for similar properties, city cost indexes, and assumptions regarding future economic conditions.
Opinions of probable costs should only be construed as preliminary, order of magnitude budgets. Actual costs most probably will vary from the consultant’s opinions of probable costs depending on such matters as type and design of suggested remedy, quality of materials and installation, manufacturer and type of equipment or system selected, field conditions, whether a physical deficiency is repaired or replaced in whole, phasing or bundling of the work (if applicable), quality of contractor, quality of project management exercised, market conditions, use of subcontractors, and whether competitive pricing is solicited, etc. Certain opinions of probable costs cannot be developed within the scope of this guide without further study. Opinions of probable cost for further study should be included in the FCA.
Methodology
Based upon site observations, research, and judgment, along with referencing Expected Useful Life (EUL) tables from various industry sources, EMG opines as to when a system or component will most probably necessitate replacement. Accurate historical replacement records, if provided, are typically the best source of information. Exposure to the elements, initial quality and installation, extent of use, the quality and amount of preventive maintenance exercised, etc., are all factors that impact the effective age of a system or component. As a result, a system or component may have an effective age that is greater or less than its actual chronological age. The Remaining Useful Life (RUL) of a component or system equals the EUL less its effective age, whether explicitly or implicitly stated. Projections of Remaining Useful Life (RUL) are based primarily on age and condition with the presumption of continued use and maintenance of the Property similar to the observed and reported past use and maintenance practices, in conjunction with the professional judgment of EMG’s assessors. Significant changes in occupants and/or usage may affect the service life of some systems or components.
Where quantities could not be or were not derived from an actual construction document take-off or facility walk-through, and/or where systemic costs are more applicable or provide more intrinsic value, budgetary square foot and gross square foot costs are used. Estimated costs are based on professional judgment and the probable or actual extent of the observed defect, inclusive of the cost to design, procure, construct and manage the corrections.
Definit ions
Immediate Needs
Immediate Needs are line items that require immediate action as a result of: (1) material existing or potential unsafe conditions, (2) failed or imminent failure of mission critical building systems or components, or (3) conditions that, if not addressed, have the potential to result in, or contribute to, critical element or system failure within one year or will most probably result in a significant escalation of its remedial cost.
For database and reporting purposes the line items with RUL=0, and commonly associated with Safety or Performance/Integrity Plan Types, are considered Immediate Needs.
Replacement Reserves
Cost line items traditionally called Replacement Reserves (equivalently referred to as Lifecycle/Renewals) are for recurring probable renewals or expenditures, which are not classified as operation or maintenance expenses. The replacement reserves should be budgeted for in advance on an annual basis. Replacement Reserves are reasonably predictable both in terms of frequency and cost. However, Replacement Reserves may also include components or systems that have an indeterminable life but, nonetheless, have a potential for failure within an estimated time period.
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
23 www.EMGcorp.com p 800.733.0660
Replacement Reserves generally exclude systems or components that are estimated to expire after the reserve term and are not considered material to the structural and mechanical integrity of the subject property. Furthermore, systems and components that are not deemed to have a material effect on the use of the Property are also excluded. Costs that are caused by acts of God, accidents, or other occurrences that are typically covered by insurance, rather than reserved for, are also excluded.
Replacement costs are solicited from ownership/property management, EMG’s discussions with service companies, manufacturers' representatives, and previous experience in preparing such schedules for other similar facilities. Costs for work performed by the ownership’s or property management’s maintenance staff are also considered.
EMG’s reserve methodology involves identification and quantification of those systems or components requiring capital reserve funds within the assessment period. The assessment period is defined as the effective age plus the reserve term. Additional information concerning system’s or component’s respective replacement costs (in today's dollars), typical expected useful lives, and remaining useful lives were estimated so that a funding schedule could be prepared. The Replacement Reserves Schedule presupposes that all required remedial work has been performed or that monies for remediation have been budgeted for items defined as Immediate Needs.
For the purposes of ‘bucketizing’ the System Expenditure Forecasts in this report, the Replacement Reserves have been subdivided and grouped as follows: Short Term (years 1-3), Near Term (years 4-5), Medium Term (years 6-10), and Long Term (years 11-20).
Key Findings
In an effort to highlight the most significant cost items and not be overwhelmed by the Replacement Reserves report in its totality, a subsection of Key Findings is included within the Executive Summary section of this report. Key Findings typically include repairs or replacements of deficient items within the first five-year window, as well as the most significant high-dollar line items that fall anywhere within the ten-year term. Note that while there is some subjectivity associated with identifying the Key Findings, the Immediate Needs are always included as a subset.
OC FAIR & EVENT CENTER EMG PROJECT NO.: 139212.19R000-00A.354
24 www.EMGcorp.com p 800.733.0660
7 . C e r t i f i c a t i o n
EMG has completed a Facility Condition Assessment of the subject property, OC Fair & Events Center, located at 88 Fair Drive in Costa Mesa, Orange County, California, 92626. The FCA was performed December, 2019 through March, 2020.
It is our understanding that the primary interest of the Client is to locate and evaluate materials and building system defects that might significantly affect the value of the property and to determine if the present Property has conditions that will have a significant impact on its continued operations.
The conclusions and recommendations presented in this report are based on the brief review of the plans and records made available to our Project Manager during the site visit, interviews of available property management personnel and maintenance contractors familiar with the Property, appropriate inquiry of municipal authorities, our Project Manager’s walk-through observations during the site visit, and our experience with similar properties.
No testing, exploratory probing, dismantling or operating of equipment or in-depth studies were performed unless specifically required under the Purpose and Scope section of this report. This assessment did not include engineering calculations to determine the adequacy of the Property’s original design or existing systems. Although walk-through observations were performed, not all areas may have been observed (see Section 1 for specific details). There may be defects in the Property, which were in areas not observed or readily accessible, may not have been visible, or were not disclosed by management personnel when questioned. The report describes property conditions at the time that the observations and research were conducted.
This report has been prepared on behalf of and exclusively for the use of the Client for the purpose stated within the Purpose and Scope section of this report. The report, or any excerpt thereof, shall not be used by any party other than the Client or for any other purpose than that specifically stated in our agreement or within the Purpose and Scope section of this report without the express written consent of EMG.
Any reuse or distribution of this report without such consent shall be at the Client and the recipient’s sole risk, without liability to EMG.