FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work AL AAL AK JNU Juneau International P 65 $ 2,200,312.00 $ 2,200,312.00 $ - Expand Aircraft Rescue & Fire Fighting Building AL AAL AK CDB Cold Bay CS 12 $ 2,954,573.00 $ 1,000,000.00 $ 1,954,573.00 Expand Aircraft Rescue & Fire Fighting Building AL AAL AK SMK St Michael GA 3 $ 12,172,398.00 $ 6,172,398.00 $ 6,000,000.00 Improve Snow Removal Equipment Building, Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate Runway - 02/20 AL AAL AK ADQ Kodiak P 20 $ 576,130.00 $ 576,130.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle AL AAL AK *AKS State of Alaska 22 $ 2,000,000.00 $ 2,000,000.00 $ - Update State System Plan Study AL AAL AK HOM Homer P 14 $ 3,704,868.00 $ 1,204,868.00 $ 2,500,000.00 Improve Seaplane Base AL AAL AK JNU Juneau International P 68 $ 656,250.00 $ 656,250.00 $ - Rehabilitate Taxiway AL AAL AK FAI Fairbanks International P 48 $ 659,042.00 $ 659,042.00 $ - Acquire Snow Removal Equipment AL AAL AK +08O Kaktovik (Proposed CS) 6 $ 2,793,619.00 $ 2,793,619.00 $ - Construct New Airport AL AAL AK FAI Fairbanks International P 47 $ 3,376,008.00 $ 3,376,008.00 $ - Acquire Safety Equipment and/or Fencing AL AAL AK SXQ Soldotna GA 15 $ 5,791,364.00 $ 5,791,364.00 $ - Rehabilitate Apron, Rehabilitate Taxiway AL AAL AK *AKV Various Locations in Alaska 106 $ 5,771,127.00 $ 5,771,127.00 $ - Acquire Snow Removal Equipment (Ambler; Aniak; Brevig Mission; Chevak; Cold Bay; Emmonak; Kaltag; Kipnuk; Koyuk Alfred Adams; McGrath; Mekoryuk; Nome; Savoonga; Seward; Skwentna) AL AAL AK BRW Wiley Post-Will Rogers Memorial P 15 $ 13,146,509.00 $ 8,446,509.00 $ 4,700,000.00 Construct Aircraft Rescue & Fire Fighting Building, Construct Sand and Chemical Storage Building, Construct Snow Removal Equipment Building AL AAL AK MRI Merrill Field P 66 $ 7,500,000.00 $ 500,000.00 $ 7,000,000.00 Rehabilitate Apron, Rehabilitate Taxiway AL AAL AK SXQ Soldotna GA 16 $ 431,067.00 $ 431,067.00 $ - Acquire Snow Removal Equipment AL AAL AK ANC Ted Stevens Anchorage International P 177 $ 22,132,902.00 $ 11,394,458.00 $ 10,738,444.00 Rehabilitate Taxiway, Rehabilitate Taxiway AL AAL AK *AKV Various Locations in Alaska 109 $ 4,351,100.00 $ 4,351,100.00 $ - Rehabilitate Runway (Alakanuk - 16/34; Bethel - 01L/19R; Chuathbaluk - 09/27; Cold Bay - 15/33; Deadhorse - 05/23; Elim - 01/19; Goose Bay - 08/26; Haines - 08/26; Homer - 04/22; Hoonah - 06/24; Hope - 16/34; Huslia - 03/21; Iliamna - 17/35; Ketchikan Int AL AAL AK GLV Golovin GA 4 $ 11,222,469.00 $ 4,222,469.00 $ 7,000,000.00 Construct Apron, Construct Taxiway, Rehabilitate Runway - 02/20, Rehabilitate Runway Lighting - 02/20 AL AAL AK ENM Emmonak CS 5 $ 2,518,725.00 $ 2,518,725.00 $ - Construct Snow Removal Equipment Building AL AAL AK OME Nome P 25 $ 416,827.00 $ 416,827.00 $ - Acquire Safety Equipment and/or Fencing AL AAL AK ANC Ted Stevens Anchorage International P 179 $ 2,311,070.00 $ 2,311,070.00 $ - Acquire Snow Removal Equipment AL AAL AK YAK Yakutat P 21 $ 503,088.00 $ 503,088.00 $ - Rehabilitate Runway - 11/29 AL AAL AK ANC Ted Stevens Anchorage International P 178 $ 1,990,579.00 $ 1,990,579.00 $ - Security Enhancements AL AAL AK ENA Kenai Municipal P 55 $ 355,915.00 $ 355,915.00 $ - Improve Airport Drainage AL AAL AK TKA Talkeetna GA 5 $ 6,515,580.00 $ 6,515,580.00 $ - Construct Apron, Construct Taxiway, Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate Taxiway, Remove Obstructions AL AAL AK *AKV Various Locations in Alaska 107 $ 304,154.00 $ 304,154.00 $ - Install Miscellaneous NAVAIDS (Chevak; Chignik Lagoon; Crooked Creek; Deering; Eek; Kongiganak; Napaskiak; Old Harbor) AL AAL AK HPB Hooper Bay CS 8 $ 3,437,364.00 $ 3,437,364.00 $ - Construct Snow Removal Equipment Building, Rehabilitate Access Road AL AAL AK AKN King Salmon P 13 $ 2,359,092.00 $ 1,000,000.00 $ 1,359,092.00 Construct Sand and Chemical Storage Building AL AAL AK PSG Petersburg James A Johnson P 16 $ 15,000.00 $ 15,000.00 $ - Acquire Easement For Approaches AL AAL AK AQT Nuiqsut GA 2 $ 1,124,632.00 $ 124,632.00 $ 1,000,000.00 Rehabilitate Runway - 05/23 AL AAL AK JNU Juneau International P 66 $ 3,333,750.00 $ 658,408.00 $ 2,675,342.00 Construct Apron Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 1 of 49

Upload: truongkien

Post on 01-Oct-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

AL AAL AK JNU Juneau International P 65 $ 2,200,312.00 $ 2,200,312.00 $ - Expand Aircraft Rescue & Fire Fighting Building

AL AAL AK CDB Cold Bay CS 12 $ 2,954,573.00 $ 1,000,000.00 $ 1,954,573.00 Expand Aircraft Rescue & Fire Fighting Building

AL AAL AK SMK St Michael GA 3 $ 12,172,398.00 $ 6,172,398.00 $ 6,000,000.00

Improve Snow Removal Equipment Building, Rehabilitate Access

Road, Rehabilitate Apron, Rehabilitate Runway - 02/20

AL AAL AK ADQ Kodiak P 20 $ 576,130.00 $ 576,130.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

AL AAL AK *AKS State of Alaska 22 $ 2,000,000.00 $ 2,000,000.00 $ - Update State System Plan Study

AL AAL AK HOM Homer P 14 $ 3,704,868.00 $ 1,204,868.00 $ 2,500,000.00 Improve Seaplane Base

AL AAL AK JNU Juneau International P 68 $ 656,250.00 $ 656,250.00 $ - Rehabilitate Taxiway

AL AAL AK FAI Fairbanks International P 48 $ 659,042.00 $ 659,042.00 $ - Acquire Snow Removal Equipment

AL AAL AK +08O Kaktovik (Proposed CS) 6 $ 2,793,619.00 $ 2,793,619.00 $ - Construct New Airport

AL AAL AK FAI Fairbanks International P 47 $ 3,376,008.00 $ 3,376,008.00 $ - Acquire Safety Equipment and/or Fencing

AL AAL AK SXQ Soldotna GA 15 $ 5,791,364.00 $ 5,791,364.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

AL AAL AK *AKV Various Locations in Alaska 106 $ 5,771,127.00 $ 5,771,127.00 $ -

Acquire Snow Removal Equipment (Ambler; Aniak; Brevig

Mission; Chevak; Cold Bay; Emmonak; Kaltag; Kipnuk; Koyuk

Alfred Adams; McGrath; Mekoryuk; Nome; Savoonga; Seward;

Skwentna)

AL AAL AK BRW Wiley Post-Will Rogers Memorial P 15 $ 13,146,509.00 $ 8,446,509.00 $ 4,700,000.00

Construct Aircraft Rescue & Fire Fighting Building, Construct

Sand and Chemical Storage Building, Construct Snow Removal

Equipment Building

AL AAL AK MRI Merrill Field P 66 $ 7,500,000.00 $ 500,000.00 $ 7,000,000.00 Rehabilitate Apron, Rehabilitate Taxiway

AL AAL AK SXQ Soldotna GA 16 $ 431,067.00 $ 431,067.00 $ - Acquire Snow Removal Equipment

AL AAL AK ANC Ted Stevens Anchorage International P 177 $ 22,132,902.00 $ 11,394,458.00 $ 10,738,444.00 Rehabilitate Taxiway, Rehabilitate Taxiway

AL AAL AK *AKV Various Locations in Alaska 109 $ 4,351,100.00 $ 4,351,100.00 $ -

Rehabilitate Runway (Alakanuk - 16/34; Bethel - 01L/19R;

Chuathbaluk - 09/27; Cold Bay - 15/33; Deadhorse - 05/23; Elim -

01/19; Goose Bay - 08/26; Haines - 08/26; Homer - 04/22;

Hoonah - 06/24; Hope - 16/34; Huslia - 03/21; Iliamna - 17/35;

Ketchikan Int

AL AAL AK GLV Golovin GA 4 $ 11,222,469.00 $ 4,222,469.00 $ 7,000,000.00

Construct Apron, Construct Taxiway, Rehabilitate Runway -

02/20, Rehabilitate Runway Lighting - 02/20

AL AAL AK ENM Emmonak CS 5 $ 2,518,725.00 $ 2,518,725.00 $ - Construct Snow Removal Equipment Building

AL AAL AK OME Nome P 25 $ 416,827.00 $ 416,827.00 $ - Acquire Safety Equipment and/or Fencing

AL AAL AK ANC Ted Stevens Anchorage International P 179 $ 2,311,070.00 $ 2,311,070.00 $ - Acquire Snow Removal Equipment

AL AAL AK YAK Yakutat P 21 $ 503,088.00 $ 503,088.00 $ - Rehabilitate Runway - 11/29

AL AAL AK ANC Ted Stevens Anchorage International P 178 $ 1,990,579.00 $ 1,990,579.00 $ - Security Enhancements

AL AAL AK ENA Kenai Municipal P 55 $ 355,915.00 $ 355,915.00 $ - Improve Airport Drainage

AL AAL AK TKA Talkeetna GA 5 $ 6,515,580.00 $ 6,515,580.00 $ -

Construct Apron, Construct Taxiway, Rehabilitate Apron,

Rehabilitate Runway - 18/36, Rehabilitate Taxiway, Remove

Obstructions

AL AAL AK *AKV Various Locations in Alaska 107 $ 304,154.00 $ 304,154.00 $ -

Install Miscellaneous NAVAIDS (Chevak; Chignik Lagoon;

Crooked Creek; Deering; Eek; Kongiganak; Napaskiak; Old

Harbor)

AL AAL AK HPB Hooper Bay CS 8 $ 3,437,364.00 $ 3,437,364.00 $ -

Construct Snow Removal Equipment Building, Rehabilitate

Access Road

AL AAL AK AKN King Salmon P 13 $ 2,359,092.00 $ 1,000,000.00 $ 1,359,092.00 Construct Sand and Chemical Storage Building

AL AAL AK PSG Petersburg James A Johnson P 16 $ 15,000.00 $ 15,000.00 $ - Acquire Easement For Approaches

AL AAL AK AQT Nuiqsut GA 2 $ 1,124,632.00 $ 124,632.00 $ 1,000,000.00 Rehabilitate Runway - 05/23

AL AAL AK JNU Juneau International P 66 $ 3,333,750.00 $ 658,408.00 $ 2,675,342.00 Construct Apron

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 1 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

AL AAL AK AKW Klawock CS 10 $ 305,662.00 $ 305,662.00 $ - Conduct Aeronautical Survey for RNAV Approach

AL AAL AK GAL Edward G Pitka Sr P 6 $ 17,261,630.00 $ 3,405,000.00 $ 13,856,630.00

Rehabilitate Runway - 07/25, Rehabilitate Runway Lighting -

07/25, Rehabilitate Taxiway

AL AAL AK ANI Aniak P 9 $ 5,700,000.00 $ 1,450,000.00 $ 4,250,000.00 Construct Runway - 10/28

AL AAL AK CDV Merle K (Mudhole) Smith P 14 $ 9,800,318.00 $ 900,318.00 $ 8,900,000.00

Construct Access Road, Construct Apron, Construct Taxiway,

Install Perimeter Fencing required by 14 CFR 139, Rehabilitate

Apron, Rehabilitate Taxiway

AL AAL AK MRI Merrill Field P 67 $ 656,250.00 $ 272,250.00 $ 384,000.00 Install Runway Lighting - 05/23

AL AAL AK ENA Kenai Municipal P 53 $ 1,951,221.00 $ 1,951,221.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

AL AAL AK ENA Kenai Municipal P 54 $ 467,749.00 $ 467,749.00 $ - Rehabilitate Runway - 01L/19R, Rehabilitate Taxiway

AL AAL AK HNS Haines CS 5 $ 1,384,284.00 $ 1,384,284.00 $ - Rehabilitate Apron

AL AAL AK ATK Atqasuk Edward Burnell Sr Memorial GA 6 $ 980,156.00 $ 180,156.00 $ 800,000.00 Rehabilitate Runway - 06/24

AL AAL AK TOG Togiak GA 1 $ 2,037,833.00 $ 2,037,833.00 $ - Construct Snow Removal Equipment Building

AL AAL AK ANC Ted Stevens Anchorage International P 176 $ 1,000,000.00 $ - $ 1,000,000.00 Widen Taxiway [Taxiway K], Widen Taxiway [Taxiway Y]

AL AAL AK CDB Cold Bay CS 11 $ 17,036,076.00 $ 150,000.00 $ 16,886,076.00

Construct Apron, Rehabilitate Runway - 08/26, Rehabilitate

Runway - 15/33

AL AAL AK OTZ Ralph Wien Memorial P 21 $ 7,116,500.00 $ 5,600,000.00 $ 1,516,500.00 Construct Taxiway, Expand Apron

AL AAL AK +07E Angoon (Proposed GA) 6 $ 250,000.00 $ 250,000.00 $ - Conduct Environmental Study

AL AAL AK *AKV Various Locations in Alaska 105 $ 542,669.00 $ 542,669.00 $ - Remove Obstructions

AL AAL AK JNU Juneau International P 67 $ 16,694,036.00 $ - $ 16,694,036.00

Construct Snow Removal Equipment Building, Construct Snow

Removal Equipment Building

AL AAL AK SCC Deadhorse P 17 $ 987,171.00 $ 987,171.00 $ - Install Perimeter Fencing required by 14 CFR 139

AL AAL AK PAQ Palmer Municipal GA 20 $ 60,700.00 $ 60,700.00 $ - Conduct Airport Master Plan Study

AL AAL AK *AKV Various Locations in Alaska 108 $ 1,383,158.00 $ 1,383,158.00 $ -

Acquire Snow Removal Equipment (Minchumina; Yakutat),

Rehabilitate Runway (Akutan - 09/27; Clarks Point - 18/36;

Gustavus - 11/29; Merle K (Mudhole) Smith - 09/27; Petersburg

James A Johnson - 05/23; Wrangell - 10/28; Yakutat - 02/20),

Remove Obstructions

AL AAL AK KTN Ketchikan International P 23 $ 2,196,390.00 $ 2,196,390.00 $ - Improve Aircraft Rescue & Fire Fighting Building

AL AAL AK AKN King Salmon P 14 $ 576,130.00 $ 576,130.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

CE ACE IA AWG Washington Municipal GA 9 $ 704,275.00 $ 704,275.00 $ - Expand Apron

CE ACE IA SKI Sac City Municipal GA 12 $ 273,960.00 $ 273,960.00 $ - Rehabilitate Runway - 18/36

CE ACE IA LRJ Le Mars Municipal GA 12 $ 60,300.00 $ 60,300.00 $ - Conduct Environmental Study

CE ACE IA TVK Centerville Municipal GA 8 $ 48,420.00 $ 48,420.00 $ - Construct Taxiway

CE ACE IA VTI Vinton Veterans Memorial Airpark GA 10 $ 370,800.00 $ 370,800.00 $ - Rehabilitate Runway - 16/34

CE ACE IA HNR Harlan Municipal GA 9 $ 284,347.00 $ 284,347.00 $ - Rehabilitate Runway Lighting - 15/33

CE ACE IA AMW Ames Municipal GA 23 $ 150,000.00 $ 150,000.00 $ - Construct Terminal Building

CE ACE IA DBQ Dubuque Regional P 61 $ 923,643.00 $ 443,492.00 $ 480,151.00 Construct Terminal Building

CE ACE IA MIW Marshalltown Municipal GA 14 $ 59,400.00 $ 59,400.00 $ - Rehabilitate Runway - 18/36, Rehabilitate Taxiway

CE ACE IA DNS Denison Municipal GA 13 $ 93,314.00 $ 93,314.00 $ - Construct Runway - 18/36

CE ACE IA CAV Clarion Municipal GA 12 $ 152,137.00 $ 152,137.00 $ - Install Runway Vertical/Visual Guidance System - 14/32

CE ACE IA DVN Davenport Municipal GA 19 $ 426,487.00 $ 426,487.00 $ - Rehabilitate Runway - 15/33

CE ACE IA CID The Eastern Iowa P 50 $ 889,887.00 $ 889,887.00 $ - Expand Apron

CE ACE IA FOD Fort Dodge Regional GA 32 $ 820,056.00 $ 820,056.00 $ - Rehabilitate Apron

CE ACE IA C25 Waverly Municipal GA 7 $ 164,672.00 $ 164,672.00 $ - Extend Runway - 11/29

CE ACE IA OQW Maquoketa Municipal GA 9 $ 314,164.00 $ 314,164.00 $ - Remove Obstructions

CE ACE IA MEY James G Whiting Memorial Field GA 6 $ 489,521.00 $ 489,521.00 $ - Construct Building

CE ACE IA DEH Decorah Municipal GA 11 $ 495,000.00 $ 495,000.00 $ - Construct Building

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 2 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

CE ACE IA SDA Shenandoah Municipal GA 13 $ 270,340.00 $ 270,340.00 $ - Construct Taxiway

CE ACE IA 0K7 Humboldt Municipal GA 10 $ 29,700.00 $ 29,700.00 $ - Acquire Snow Removal Equipment

CE ACE IA ADU Audubon County GA 10 $ 128,700.00 $ 128,700.00 $ - Rehabilitate Taxiway

CE ACE IA BRL Southeast Iowa Regional CS 36 $ 794,330.00 $ 794,330.00 $ - Rehabilitate Apron

CE ACE IA DSM Des Moines International P 66 $ 261,561.00 $ 261,561.00 $ - Rehabilitate Runway - 13/31

CE ACE IA 3Y3 Winterset Municipal GA 9 $ 435,012.00 $ 435,012.00 $ - Acquire Land For Approaches

CE ACE IA TNU Newton Municipal-Earl Johnson Field GA 15 $ 214,200.00 $ 214,200.00 $ - Update Airport Master Plan Study

CE ACE IA LWD Lamoni Municipal GA 10 $ 572,466.00 $ 572,466.00 $ - Extend Runway - 18/36

CE ACE IA CAV Clarion Municipal GA 13 $ 167,970.00 $ 167,970.00 $ - Acquire Snow Removal Equipment

CE ACE IA MCW Mason City Municipal GA 42 $ 379,347.00 $ 379,347.00 $ - Update Airport Master Plan Study

CE ACE IA IKV Ankeny Regional R 21 $ 85,797.00 $ 85,797.00 $ - Conduct Environmental Study

CE ACE IA IKV Ankeny Regional R 22 $ 64,203.00 $ 64,203.00 $ - Install Runway Vertical/Visual Guidance System - 18/36

CE ACE IA DBQ Dubuque Regional P 60 $ 556,508.00 $ 556,508.00 $ - Construct Terminal Building

CE ACE IA MUT Muscatine Municipal GA 21 $ 146,226.00 $ 146,226.00 $ - Update Airport Master Plan Study

CE ACE IA 4K6 Bloomfield Municipal GA 9 $ 37,851.00 $ 37,851.00 $ - Conduct Environmental Study

CE ACE IA GGI Grinnell Regional GA 14 $ 181,800.00 $ 181,800.00 $ - Rehabilitate Runway - 13/31

CE ACE IA CSQ Creston Municipal GA 12 $ 175,499.00 $ 175,499.00 $ - Install Runway Vertical/Visual Guidance System

CE ACE IA CKP Cherokee County Regional GA 13 $ 76,500.00 $ 76,500.00 $ - Update Airport Master Plan Study

CE ACE IA DSM Des Moines International P 64 $ 1,802,442.00 $ 1,802,442.00 $ - Rehabilitate Apron

CE ACE IA EBS Webster City Municipal GA 13 $ 399,924.00 $ 399,924.00 $ - Construct Fuel Farm

CE ACE IA IFA Iowa Falls Municipal GA 9 $ 753,778.00 $ 753,778.00 $ - Construct Taxiway

CE ACE IA OOA Oskaloosa Municipal GA 10 $ 61,710.00 $ 61,710.00 $ - Improve Airport Drainage

CE ACE IA EST Estherville Municipal GA 11 $ 117,130.00 $ 117,130.00 $ - Update Airport Master Plan Study

CE ACE IA FFL Fairfield Municipal GA 15 $ 84,166.00 $ 84,166.00 $ - Construct Terminal Building

CE ACE IA +09B New 10 $ 4,372,205.00 $ 1,563,460.00 $ 2,808,745.00 Construct New Airport

CE ACE IA SUX Sioux Gateway/Col Bud Day Field P 50 $ 1,927,872.00 $ 1,000,000.00 $ 927,872.00 Rehabilitate Taxiway

CE ACE IA DSM Des Moines International P 65 $ 614,295.00 $ 614,295.00 $ - Rehabilitate Runway - 13/31

CE ACE KS FSK Fort Scott Municipal GA 17 $ 477,209.00 $ 477,209.00 $ - Rehabilitate Apron

CE ACE KS 8K8 Cimarron Municipal GA 9 $ 2,310,328.00 $ 477,377.00 $ 1,832,951.00 Rehabilitate Runway - 01/19

CE ACE KS OJC Johnson County Executive R 30 $ 3,198,440.00 $ 2,091,561.00 $ 1,106,879.00 Rehabilitate Apron, Rehabilitate Taxiway

CE ACE KS MEJ Meade Municipal GA 13 $ 536,913.00 $ 536,913.00 $ - Construct Building

CE ACE KS CNK Blosser Municipal GA 11 $ 344,121.00 $ 344,121.00 $ - Construct Runway - 17/35

CE ACE KS TQK Scott City Municipal GA 15 $ 77,944.00 $ 77,944.00 $ - Construct Building

CE ACE KS IXD New Century Aircenter R 28 $ 1,642,418.00 $ 300,000.00 $ 1,342,418.00 Rehabilitate Apron

CE ACE KS SLN Salina Regional GA 36 $ 2,298,925.00 $ 300,000.00 $ 1,998,925.00 Rehabilitate Taxiway

CE ACE KS OJC Johnson County Executive R 29 $ 309,150.00 $ 309,150.00 $ - Rehabilitate Runway - 18/36

CE ACE KS ADT Atwood-Rawlins County City-County GA 12 $ 82,737.00 $ 82,737.00 $ - Acquire Land For Approaches

CE ACE KS UKL Coffey County GA 11 $ 591,586.00 $ 591,586.00 $ - Rehabilitate Apron

CE ACE KS 3JC Freeman Field GA 12 $ 143,928.00 $ 143,928.00 $ - Update Airport Master Plan Study

CE ACE KS 48K Ness City Municipal GA 9 $ 2,528,865.00 $ 604,079.00 $ 1,924,786.00

Construct Runway [Beacon Relocation] - 17/35, Construct

Runway [Runway Grading and Paving] - 17/35

CE ACE KS CBK Shalz Field GA 16 $ 393,215.00 $ 393,215.00 $ - Extend Runway - 17/35

CE ACE KS HYS Hays Regional CS 33 $ 156,018.00 $ 156,018.00 $ - Acquire Snow Removal Equipment

CE ACE KS WLD Strother Field GA 21 $ 1,672,576.00 $ 300,000.00 $ 1,372,576.00

Rehabilitate Runway - 13/31, Rehabilitate Runway Lighting -

13/31

CE ACE KS MPR McPherson GA 16 $ 29,852.00 $ 29,852.00 $ - Install Runway Vertical/Visual Guidance System - 18/36

CE ACE KS K82 Smith Center Municipal GA 13 $ 73,785.00 $ 73,785.00 $ - Rehabilitate Runway - 17/35

CE ACE KS GCK Garden City Regional P 35 $ 624,315.00 $ 624,315.00 $ - Acquire Snow Removal Equipment [Acquire snow blower]

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 3 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

CE ACE KS ICT Wichita Dwight D Eisenhower National P 71 $ 132,660.00 $ 132,660.00 $ - Update Miscellaneous Study

CE ACE KS TOP Philip Billard Municipal GA 19 $ 54,513.00 $ 54,513.00 $ - Wildlife Hazard Assessments [WHA]

CE ACE KS IDP Independence Municipal GA 22 $ 535,970.00 $ 535,970.00 $ - Rehabilitate Taxiway

CE ACE KS EQA El Dorado/Captain Jack Thomas Memorial GA 11 $ 405,000.00 $ 405,000.00 $ - Rehabilitate Runway - 15/33

CE ACE KS PTS Atkinson Municipal GA 16 $ 944,049.00 $ 944,049.00 $ - Rehabilitate Runway - 16/34

CE ACE KS JHN Stanton County Municipal GA 11 $ 884,691.00 $ 884,691.00 $ - Construct Building

CE ACE KS 36K Lakin GA 5 $ 445,713.00 $ 445,713.00 $ - Construct Taxiway

CE ACE KS K34 Gardner Municipal GA 12 $ 202,001.00 $ 202,001.00 $ - Acquire Land For Approaches

CE ACE KS 53K Osage City Municipal GA 10 $ 530,287.00 $ 530,287.00 $ - Construct Runway - 17/35

CE ACE KS MHK Manhattan Regional P 47 $ 1,236,278.00 $ 1,093,620.00 $ 142,658.00 Acquire Miscellaneous Land

CE ACE KS LQR Larned-Pawnee County GA 15 $ 396,000.00 $ 396,000.00 $ - Construct Snow Removal Equipment Building

CE ACE KS RPB Belleville Municipal GA 12 $ 131,911.00 $ 131,911.00 $ - Acquire Land For Approaches, Rehabilitate Apron

CE ACE KS OWI Ottawa Municipal GA 13 $ 150,894.00 $ 150,894.00 $ - Update Airport Master Plan Study

CE ACE KS HUT Hutchinson Regional GA 32 $ 4,518,800.00 $ 1,950,199.00 $ 2,568,601.00

Rehabilitate Runway - 17/35, Rehabilitate Runway Lighting -

17/35

CE ACE KS AAO Colonel James Jabara R 22 $ 259,581.00 $ 259,581.00 $ - Acquire Land For Approaches

CE ACE KS 9K8 Kingman Airport - Clyde Cessna Field GA 15 $ 89,730.00 $ 89,730.00 $ - Conduct Environmental Study

CE ACE KS DDC Dodge City Regional CS 30 $ 644,387.00 $ 644,387.00 $ - Rehabilitate Runway - 14/32

CE ACE KS EWK Newton-City-County R 31 $ 173,888.00 $ 173,888.00 $ - Acquire Snow Removal Equipment

CE ACE KS FOE Topeka Regional P 36 $ 205,135.00 $ 205,135.00 $ - Rehabilitate Runway - 13/31

CE ACE KS GCK Garden City Regional P 38 $ 1,383,864.00 $ 1,383,864.00 $ - Improve Service Road, Rehabilitate Taxiway

CE ACE KS K51 Medicine Lodge GA 9 $ 298,780.00 $ 298,780.00 $ - Rehabilitate Runway - 16/34

CE ACE KS 3K7 Mark Hoard Memorial GA 6 $ 239,400.00 $ 239,400.00 $ - Construct Runway - 17/35

CE ACE KS HRU Herington Regional GA 8 $ 600,000.00 $ 600,000.00 $ -Improve Access Road, Rehabilitate Apron, Rehabilitate Taxiway

CE ACE KS FOE Topeka Regional P 35 $ 9,367,704.00 $ 1,040,352.00 $ 8,327,352.00 Rehabilitate Runway - 13/31

CE ACE KS 3AU Augusta Municipal GA 17 $ 207,224.00 $ 207,224.00 $ - Update Airport Master Plan Study

CE ACE KS OEL Oakley Municipal GA 13 $ 206,100.00 $ 206,100.00 $ - Update Airport Master Plan Study

CE ACE KS PTS Atkinson Municipal GA 17 $ 1,217,581.00 $ 105,642.00 $ 1,111,939.00 Extend Runway - 16/34

CE ACE KS ICT Wichita Dwight D Eisenhower National P 72 $ 3,715,004.00 $ 3,715,004.00 $ - Construct Terminal Building

CE ACE MO COU Columbia Regional P 43 $ 548,179.00 $ 548,179.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

CE ACE MO STL Lambert-St Louis International P 151 $ 498,848.00 $ - $ 498,848.00 Rehabilitate Runway Lighting

CE ACE MO COU Columbia Regional P 40 $ 11,009,894.00 $ 451,821.00 $ 10,558,073.00

Extend Runway - 13/31, Extend Taxiway, Install Guidance Signs,

Install Runway Lighting - 13/31, Install Runway Vertical/Visual

Guidance System

CE ACE MO *MOB Missouri State Block Grant Program 75 $ 1,847,580.00 $ - $ 1,847,580.00 Non primary development projects in state block grant program

CE ACE MO *MOB Missouri State Block Grant Program 74 $ 12,150,000.00 $ 12,150,000.00 $ -Non primary development projects in state block grant program

CE ACE MO JLN Joplin Regional P 37 $ 5,430,299.00 $ 1,388,822.00 $ 4,041,477.00

Construct Taxiway [Taxiway B], Construct Taxiway [Taxiway N],

Install Guidance Signs [Taxiway B], Install Guidance Signs

[Taxiway N], Install Taxiway Lighting [Taxiway B], Install Taxiway

Lighting [Taxiway N]

CE ACE MO MCI Kansas City International P 74 $ 19,037,868.00 $ 2,398,279.00 $ 16,639,589.00

Install Guidance Signs, Rehabilitate Taxiway, Rehabilitate

Taxiway Lighting

CE ACE MO *MOS State of Missouri 12 $ 201,474.00 $ - $ 201,474.00 Update State System Plan Study

CE ACE MO SGF Springfield-Branson National P 52 $ 3,121,125.00 $ 3,121,125.00 $ - Construct Apron, Construct Terminal Building

CE ACE MO STL Lambert-St Louis International P 149 $ 150,494.00 $ - $ 150,494.00 Rehabilitate Runway - 12L/30R

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 4 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

CE ACE MO STL Lambert-St Louis International P 148 $ 7,395,111.00 $ 2,587,348.00 $ 4,807,763.00

Install Guidance Signs, Rehabilitate Taxiway, Rehabilitate

Taxiway Lighting

CE ACE MO STL Lambert-St Louis International P 150 $ 590,366.00 $ - $ 590,366.00

Install Airfield Guidance Signs, Rehabilitate Taxiway, Rehabilitate

Taxiway, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

CE ACE MO *MOB Missouri State Block Grant Program 73 $ 4,740,495.00 $ 4,740,495.00 $ -Non primary development projects in state block grant program

CE ACE MO *MOB Missouri State Block Grant Program 77 $ 1,587,142.00 $ - $ 1,587,142.00 Non primary development projects in state block grant program

CE ACE MO *MOB Missouri State Block Grant Program 76 $ 9,372,772.00 $ - $ 9,372,772.00 Non primary development projects in state block grant program

CE ACE NE AFK Nebraska City Municipal GA 14 $ 1,264,758.00 $ 1,264,758.00 $ - Construct Taxiway

CE ACE NE LBF North Platte Regional Airport Lee Bird Field CS 30 $ 533,645.00 $ 533,645.00 $ - Acquire Snow Removal Equipment

CE ACE NE OFK Norfolk Regional/Karl Stefan Memorial Field GA 20 $ 470,000.00 $ 470,000.00 $ - Improve Airport Drainage

CE ACE NE 0F4 Loup City Municipal GA 6 $ 265,000.00 $ 265,000.00 $ - Install Runway Vertical/Visual Guidance System - 16/34

CE ACE NE OGA Searle Field GA 11 $ 682,000.00 $ 682,000.00 $ - Rehabilitate Building, Rehabilitate Parking Lot

CE ACE NE AIA Alliance Municipal GA 18 $ 736,000.00 $ 736,000.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

CE ACE NE 12K Superior Municipal GA 5 $ 205,900.00 $ 205,900.00 $ - Install Runway Vertical/Visual Guidance System - 14/32

CE ACE NE 8V2 Stuart-Atkinson Municipal GA 7 $ 600,000.00 $ 600,000.00 $ - Construct Building

CE ACE NE CZD Cozad Municipal GA 9 $ 306,000.00 $ 306,000.00 $ - Rehabilitate Building

CE ACE NE OMA Eppley Airfield P 68 $ 12,700,000.00 $ 5,359,699.00 $ 7,340,301.00 Rehabilitate Apron

CE ACE NE VTN Miller Field GA 10 $ 663,000.00 $ 663,000.00 $ - Construct Building

CE ACE NE FNB Brenner Field GA 11 $ 156,000.00 $ 156,000.00 $ - Improve Fuel Farm

CE ACE NE LBF North Platte Regional Airport Lee Bird Field CS 31 $ 381,232.00 $ 381,232.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

CE ACE NE *NES State of Nebraska 23 $ 57,600.00 $ 57,600.00 $ - Update State System Plan Study

CE ACE NE 07K Central City Municipal - Larry Reineke Field GA 5 $ 784,000.00 $ 784,000.00 $ - Construct Building

CE ACE NE LXN Jim Kelly Field GA 14 $ 421,155.00 $ 421,155.00 $ -

Rehabilitate Runway Lighting - 14/32, Rehabilitate Taxiway

Lighting

CE ACE NE BTA Blair Municipal GA 15 $ 194,400.00 $ 194,400.00 $ - Update Airport Master Plan Study

CE ACE NE PMV Plattsmouth Municipal GA 11 $ 648,920.00 $ 648,920.00 $ - Construct Taxiway

CE ACE NE GGF Grant Municipal GA 7 $ 710,300.00 $ 710,300.00 $ - Construct Building

CE ACE NE MCK McCook Ben Nelson Regional GA 14 $ 559,000.00 $ 559,000.00 $ - Construct Building

CE ACE NE HSI Hastings Municipal GA 14 $ 459,400.00 $ 459,400.00 $ -

Install Runway Vertical/Visual Guidance System - 04/22,

Rehabilitate Runway - 04/22

CE ACE NE EAR Kearney Regional CS 30 $ 1,080,000.00 $ 1,080,000.00 $ - Rehabilitate Runway - 18/36, Rehabilitate Taxiway

CE ACE NE BFF Western Nebraska Regional/William B Heilig Field CS 40 $ 457,250.00 $ 457,250.00 $ - Expand Snow Removal Equipment Building

CE ACE NE LNK Lincoln P 52 $ 1,827,709.00 $ 1,827,709.00 $ - Rehabilitate Runway Lighting - 18/36

EA BKW WV 6L4 Logan County GA 13 $ 136,529.00 $ 136,529.00 $ -

Install Runway Vertical/Visual Guidance System - 06/24,

Rehabilitate Apron

EA BKW WV I18 Jackson County GA 21 $ 661,192.00 $ 661,192.00 $ - Rehabilitate Apron

EA BKW WV HLG Wheeling Ohio County GA 30 $ 341,722.00 $ 341,722.00 $ - Update Airport Master Plan Study

EA BKW WV MRB Eastern WV Regional/Shepherd Field R 34 $ 359,420.00 $ 359,420.00 $ - Update Airport Master Plan Study

EA BKW WV BLF Mercer County GA 29 $ 138,833.00 $ 138,833.00 $ - Rehabilitate Taxiway

EA BKW WV EKN Elkins-Randolph County-Jennings Randolph Field GA 23 $ 139,971.00 $ 139,971.00 $ - Conduct Environmental Study

EA BKW WV MGW Morgantown Municipal-Walter L Bill Hart Field P 39 $ 135,022.00 $ 135,022.00 $ - Acquire Snow Removal Equipment

EA BKW WV LWB Greenbrier Valley CS 35 $ 412,300.00 $ 412,300.00 $ - Update Airport Master Plan Study

EA BKW WV 3I2 Mason County GA 22 $ 125,231.00 $ 125,231.00 $ - Rehabilitate Runway - 07/25

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 5 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

EA BKW WV W22 Upshur County Regional GA 30 $ 85,463.00 $ 85,463.00 $ -

Remove Obstructions [Land Acquisition], Remove Obstructions

[Tree Removal]

EA BKW WV PKB Mid-Ohio Valley Regional CS 45 $ 387,600.00 $ 387,600.00 $ - Update Airport Master Plan Study

EA BKW WV MPG Marshall County GA 22 $ 269,876.00 $ 269,876.00 $ -

Improve Airport Drainage, Improve Airport Drainage, Install

Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542,

Remove Obstructions

EA BKW WV W99 Grant County GA 21 $ 180,545.00 $ 180,545.00 $ - Rehabilitate Runway - 13/31

EA BKW WV EBD Appalachian Regional GA 6 $ 653,610.00 $ 653,610.00 $ - Construct Building

EA BKW WV CKB North Central West Virginia P 41 $ 1,052,571.00 $ 1,052,571.00 $ - Acquire Snow Removal Equipment

EA BKW WV HTS Tri-State/Milton J Ferguson Field P 54 $ 2,656,935.00 $ 1,262,217.00 $ 1,394,718.00 Rehabilitate Apron

EA BKW WV HLG Wheeling Ohio County GA 31 $ 298,207.00 $ 298,207.00 $ - Remove Obstructions

EA BKW WV MGW Morgantown Municipal-Walter L Bill Hart Field P 38 $ 498,552.00 $ 498,552.00 $ - Install Taxiway Lighting

EA BKW WV BKW Raleigh County Memorial CS 35 $ 394,549.00 $ 394,549.00 $ - Construct Taxiway

EA HAR DE *DES State of Delaware 12 $ 55,332.00 $ 55,332.00 $ - Conduct State System Plan Study

EA HAR DE ILG New Castle P 41 $ 4,240,191.00 $ 546,488.00 $ 3,693,703.00 Expand Apron

EA HAR DE GED Delaware Coastal GA 32 $ 225,549.00 $ 225,549.00 $ - Conduct Aeronautical Survey for RNAV Approach

EA HAR DE ILG New Castle P 40 $ 776,850.00 $ 776,850.00 $ - Acquire Snow Removal Equipment

EA HAR DE 33N Delaware Airpark GA 19 $ 3,478,891.00 $ 475,283.00 $ 3,003,608.00 Construct Runway - 09/27

EA HAR NJ WWD Cape May County GA 37 $ 2,954,252.00 $ 650,111.00 $ 2,304,141.00 Extend Taxiway, Rehabilitate Runway - 01/19

EA HAR NJ MMU Morristown Municipal CS 51 $ 823,203.00 $ 150,000.00 $ 673,203.00 Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

EA HAR NJ MIV Millville Municipal GA 41 $ 2,341,458.00 $ 2,341,458.00 $ - Rehabilitate Taxiway

EA HAR NJ ACY Atlantic City International P 95 $ 313,320.00 $ 313,320.00 $ - Rehabilitate Access Road

EA HAR NJ OBI Woodbine Municipal GA 23 $ 53,614.00 $ 53,614.00 $ - Rehabilitate Taxiway

EA HAR NJ TTN Trenton Mercer P 50 $ 3,021,476.00 $ 1,793,788.48 $ 1,227,687.52 Rehabilitate Runway - 06/24

EA HAR NJ ACY Atlantic City International P 93 $ 473,199.00 $ 473,199.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

EA HAR NJ ACY Atlantic City International P 94 $ 1,137,252.00 $ 1,137,252.00 $ - Improve Airport Erosion Control

EA HAR NJ 4N1 Greenwood Lake GA 9 $ 386,892.00 $ 386,892.00 $ - Update Airport Master Plan Study

EA HAR NJ MIV Millville Municipal GA 42 $ 1,084,050.00 $ - $ 1,084,050.00 Acquire Land for Development

EA HAR NJ MIV Millville Municipal GA 40 $ 594,000.00 $ 594,000.00 $ - Rehabilitate Runway - 10/28

EA HAR NJ MJX Ocean County GA 27 $ 728,964.00 $ 150,000.00 $ 578,964.00 Rehabilitate Runway Lighting - 06/24

EA HAR NJ MMU Morristown Municipal CS 50 $ 110,296.00 $ - $ 110,296.00 Remove Obstructions

EA HAR NJ SMQ Somerset R 15 $ 445,117.00 $ 445,117.00 $ - Improve Airport Drainage

EA HAR NJ VAY South Jersey Regional R 14 $ 354,709.00 $ 354,709.00 $ - Conduct Environmental Study

EA HAR NJ *NJS State of New Jersey 4 $ 327,582.00 $ 327,582.00 $ - Conduct Miscellaneous Study

EA HAR PA *PAB Pennsylvania State Block Grant Program 84 $ 1,093,575.00 $ 1,093,575.00 $ -Non primary development projects in state block grant program

EA HAR PA DUJ Dubois Regional CS 42 $ 55,427.00 $ 55,427.00 $ - Rehabilitate Aircraft Rescue & Fire Fighting Building

EA HAR PA W05 Gettysburg Regional GA 13 $ 1,029,081.00 $ 1,029,081.00 $ - Rehabilitate Runway - 06/24

EA HAR PA CXY Capital City R 33 $ 921,312.00 $ 921,312.00 $ - Improve Airport Drainage

EA HAR PA *PAB Pennsylvania State Block Grant Program 81 $ 1,034,068.00 $ - $ 1,034,068.00 Non primary development projects in state block grant program

EA HAR PA ABE Lehigh Valley International P 100 $ 797,794.00 $ 797,794.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

EA HAR PA ABE Lehigh Valley International P 102 $ 189,450.00 $ 189,450.00 $ - Rehabilitate Runway - 06/24

EA HAR PA LBE Arnold Palmer Regional P 51 $ 703,429.00 $ 703,429.00 $ - Construct Parking Lot

EA HAR PA LBE Arnold Palmer Regional P 50 $ 1,243,304.00 $ 1,243,304.00 $ - Rehabilitate Taxiway

EA HAR PA CXY Capital City R 34 $ 186,957.00 $ 186,957.00 $ - Remove Obstructions

EA HAR PA LNS Lancaster CS 39 $ 2,118,415.00 $ 1,100,415.00 $ 1,018,000.00 Construct Taxiway

EA HAR PA FWQ Rostraver R 24 $ 148,834.00 $ 148,834.00 $ - Rehabilitate Taxiway

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 6 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

EA HAR PA @01N Delaware Valley Region 17 $ 192,034.00 $ - $ 192,034.00 Conduct Metropolitan System Plan Study

EA HAR PA XLL Allentown Queen City Municipal GA 20 $ 135,000.00 $ 135,000.00 $ - Conduct Miscellaneous Study

EA HAR PA ERI Erie International/Tom Ridge Field P 64 $ 553,062.00 $ 553,062.00 $ - Acquire Snow Removal Equipment

EA HAR PA JST John Murtha Johnstown-Cambria County CS 49 $ 1,548,183.00 $ 150,000.00 $ 1,398,183.00

Rehabilitate Taxiway [B], Rehabilitate Taxiway [C], Rehabilitate

Taxiway [F, F1 & F2], Rehabilitate Taxiway [Taxilanes D & E]

EA HAR PA *PAB Pennsylvania State Block Grant Program 82 $ 2,022,057.00 $ - $ 2,022,057.00 Non primary development projects in state block grant program

EA HAR PA PIT Pittsburgh International P 121 $ 1,398,339.00 $ 1,398,339.00 $ - Rehabilitate Apron

EA HAR PA UNV University Park P 62 $ 1,465,116.00 $ 1,465,116.00 $ - Rehabilitate Apron

EA HAR PA AVP Wilkes-Barre/Scranton International P 62 $ 628,564.00 $ 628,564.00 $ - Rehabilitate Taxiway

EA HAR PA ERI Erie International/Tom Ridge Field P 63 $ 312,180.00 $ 312,180.00 $ - Update Airport Master Plan Study

EA HAR PA *PAB Pennsylvania State Block Grant Program 83 $ 635,000.00 $ 635,000.00 $ -Non primary development projects in state block grant program

EA HAR PA *PAS Commonwealth of Pennsylvania 13 $ 163,196.00 $ 163,196.00 $ - Conduct State System Plan Study

EA HAR PA ABE Lehigh Valley International P 101 $ 1,182,600.00 $ 1,182,600.00 $ - Update Airport Master Plan Study

EA HAR PA RDG Reading Regional/Carl A Spaatz Field GA 56 $ 149,822.00 $ 149,822.00 $ - Install Perimeter Fencing required by 14 CFR 139

EA HAR PA BFD Bradford Regional GA 45 $ 133,438.00 $ 133,438.00 $ - Conduct Miscellaneous Study

EA HAR PA AGC Allegheny County R 37 $ 2,402,341.00 $ 361,551.00 $ 2,040,790.00 Install Perimeter Fencing

EA HAR PA *PAB Pennsylvania State Block Grant Program 79 $ 2,747,114.00 $ 2,747,114.00 $ -Non primary development projects in state block grant program

EA HAR PA IPT Williamsport Regional P 48 $ 1,715,922.00 $ 1,715,922.00 $ - Rehabilitate Runway - 09/27

EA HAR PA MDT Harrisburg International P 81 $ 10,826,467.00 $ 10,826,467.00 $ - Rehabilitate Runway - 13/31

EA HAR PA AVP Wilkes-Barre/Scranton International P 63 $ 2,568,928.00 $ 1,287,493.00 $ 1,281,435.00 Extend Taxiway

EA HAR PA ERI Erie International/Tom Ridge Field P 65 $ 405,744.00 $ 405,744.00 $ - Rehabilitate Runway - 02/20, Rehabilitate Taxiway

EA HAR PA *PAB Pennsylvania State Block Grant Program 80 $ 202,886.00 $ 202,886.00 $ -Non primary development projects in state block grant program

EA HAR PA PHL Philadelphia International P 109 $ 13,986,135.00 $ 5,986,135.00 $ 8,000,000.00 Extend Runway - 09R/27L

EA HAR PA *PAB Pennsylvania State Block Grant Program 78 $ 4,156,425.00 $ 4,156,425.00 $ -Non primary development projects in state block grant program

EA HAR PA DUJ Dubois Regional CS 43 $ 100,130.00 $ 100,130.00 $ - Remove Obstructions

EA NYC NJ TEB Teterboro R 55 $ 596,427.00 $ 596,427.00 $ - Improve Runway Safety Area - 01/19

EA NYC NJ EWR Newark Liberty International P 139 $ 1,917,309.00 $ 1,917,309.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

EA NYC NY SYR Syracuse Hancock International P 145 $ 1,980,000.00 $ 1,980,000.00 $ - Improve Terminal Building

EA NYC NY PTD Potsdam Municipal/Damon Field/ GA 32 $ 243,815.00 $ 243,815.00 $ - Acquire Snow Removal Equipment

EA NYC NY ELM Elmira/Corning Regional P 66 $ 12,439,181.00 $ 2,841,173.00 $ 9,598,008.00 Construct Taxiway, Rehabilitate Apron

EA NYC NY ROC Greater Rochester International P 94 $ 2,849,400.00 $ 2,849,400.00 $ - Construct Taxiway

EA NYC NY PEO Penn Yan GA 35 $ 445,364.00 $ 445,364.00 $ - Construct Taxiway, Rehabilitate Taxiway

EA NYC NY RME Griffiss International GA 40 $ 2,198,340.00 $ 150,000.00 $ 2,048,340.00 Rehabilitate Taxiway

EA NYC NY JHW Chautauqua County/Jamestown CS 44 $ 745,750.00 $ 745,750.00 $ -

Rehabilitate Parking Lot [Reconstruct], Rehabilitate Parking Lot

[Rehabilitate]

EA NYC NY ROC Greater Rochester International P 95 $ 1,005,892.00 $ 398,466.00 $ 607,426.00 Rehabilitate Taxiway

EA NYC NY ALB Albany International P 129 $ 1,123,784.00 $ 1,123,784.00 $ - Security Enhancements

EA NYC NY FRG Republic P 50 $ 53,082.00 $ 53,082.00 $ - Rehabilitate Runway - 14/32

EA NYC NY ART Watertown International P 48 $ 186,708.00 $ 186,708.00 $ -

Acquire Easement For Approaches [Runway 10/28 Approach],

Acquire Easement For Approaches [Runways 7, 10/28 Runway

Protection Zones], Acquire Land For Approaches

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 7 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

EA NYC NY PBG Plattsburgh International P 55 $ 210,900.00 $ 210,900.00 $ - Rehabilitate Aircraft Rescue & Fire Fighting Building

EA NYC NY OLE Cattaraugus County-Olean GA 21 $ 150,300.00 $ 150,300.00 $ - Acquire Snow Removal Equipment

EA NYC NY 1B1 Columbia County GA 33 $ 89,910.00 $ 89,910.00 $ - Wildlife Hazard Assessments

EA NYC NY 9G0 Buffalo Airfield R 25 $ 136,895.00 $ 136,895.00 $ - Acquire Land for Development, Remove Obstructions

EA NYC NY OIC Lt Warren Eaton GA 34 $ 516,024.00 $ 516,024.00 $ - Remove Obstructions

EA NYC NY 1B1 Columbia County GA 34 $ 194,886.00 $ 194,886.00 $ -

Improve Runway Safety Area - 03/21, Install Runway

Vertical/Visual Guidance System [Precision Approach Path

Indicator] - 03/21, Install Runway Vertical/Visual Guidance

System [Runway End Identifier Lights] - 03/21

EA NYC NY 9G0 Buffalo Airfield R 24 $ 119,089.00 $ 119,089.00 $ -

Acquire Land for Development, Acquire Snow Removal

Equipment

EA NYC NY 9G3 Akron R 23 $ 346,510.00 $ 346,510.00 $ -

Acquire Land for Development, Install Miscellaneous NAVAIDS,

Install Runway Vertical/Visual Guidance System [Precision

Approach Path Indicator] - 07/25, Install Runway Vertical/Visual

Guidance System [Runway End Identifier Lights] - 07/25,

Rehabilitate Ru

EA NYC NY SYR Syracuse Hancock International P 142 $ 225,000.00 $ 225,000.00 $ - Improve Airport Drainage

EA NYC NY SYR Syracuse Hancock International P 144 $ 499,500.00 $ 499,500.00 $ - Construct Taxiway

EA NYC NY PBG Plattsburgh International P 56 $ 706,800.00 $ 706,800.00 $ - Remove Obstructions

EA NYC NY MGJ Orange County GA 37 $ 7,166,280.00 $ 300,000.00 $ 6,866,280.00

Construct Runway [Environmental Mitigation] - 03/21, Construct

Runway [Northern Section] - 03/21, Construct Runway [Parallel

Taxiway A-Northern Section] - 03/21

EA NYC NY DKK Chautauqua County/Dunkirk GA 52 $ 101,160.00 $ 101,160.00 $ - Rehabilitate Taxiway

EA NYC NY HWV Brookhaven R 34 $ 265,582.00 $ 265,582.00 $ - Install Taxiway Lighting

EA NYC NY JHW Chautauqua County/Jamestown CS 43 $ 107,730.00 $ 107,730.00 $ -

Acquire Safety Equipment and/or Fencing, Rehabilitate Apron,

Rehabilitate Taxiway

EA NYC NY BUF Buffalo Niagara International P 90 $ 8,362,258.00 $ 1,586,077.00 $ 6,776,181.00

Install Guidance Signs, Install Runway Distance-To-Go Signs -

14/32, Install Runway Lighting - 14/32, Rehabilitate Runway -

14/32

EA NYC NY FRG Republic P 49 $ 529,639.00 $ 529,639.00 $ - Install Airport Beacons

EA NYC NY ART Watertown International P 46 $ 91,390.00 $ 91,390.00 $ - Conduct Miscellaneous Study

EA NYC NY ART Watertown International P 45 $ 527,136.00 $ 527,136.00 $ - Acquire Snow Removal Equipment

EA NYC NY IAG Niagara Falls International P 46 $ 212,855.00 $ 212,855.00 $ - Conduct Environmental Study

EA NYC NY ALB Albany International P 130 $ 211,513.00 $ 211,513.00 $ - Acquire Emergency Generator

EA NYC NY HTF Hornell Municipal GA 22 $ 534,109.00 $ 534,109.00 $ - Construct Snow Removal Equipment Building

EA NYC NY 44N Sky Acres R 28 $ 64,246.00 $ 64,246.00 $ - Remove Obstructions

EA NYC NY SYR Syracuse Hancock International P 143 $ 607,500.00 $ 607,500.00 $ - Acquire Snow Removal Equipment

EA NYC NY 7N1 Corning-Painted Post GA 21 $ 289,959.00 $ 289,959.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 14/32, Rehabilitate

Taxiway [Parallel], Rehabilitate Taxiway [T-hangar]

EA NYC NY MAL Malone-Dufort GA 33 $ 463,967.00 $ 463,967.00 $ - Rehabilitate Apron

EA NYC NY SLK Adirondack Regional CS 63 $ 1,696,405.00 $ 150,000.00 $ 1,546,405.00

Expand Aircraft Rescue & Fire Fighting Building, Expand Snow

Removal Equipment Building

EA NYC NY MSS Massena International-Richards Field CS 73 $ 209,000.00 $ 209,000.00 $ - Acquire Snow Removal Equipment

EA NYC NY ALB Albany International P 131 $ 3,036,119.00 $ 3,036,119.00 $ - Rehabilitate Terminal Building

EA NYC NY ROC Greater Rochester International P 93 $ 109,980.00 $ 109,980.00 $ - Conduct Environmental Study

EA NYC NY HPN Westchester County P 121 $ 2,649,291.00 $ 2,649,291.00 $ - Improve Airport Drainage

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 8 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

EA NYC NY FZY Oswego County GA 45 $ 514,350.00 $ 514,350.00 $ -

Install Runway Vertical/Visual Guidance System - 06/24, Light

Obstructions, Rehabilitate Runway Lighting - 06/24

EA NYC NY GVQ Genesee County R 36 $ 222,750.00 $ 222,750.00 $ - Rehabilitate Runway - 10/28

EA NYC NY SCH Schenectady County R 51 $ 2,636,291.00 $ 300,000.00 $ 2,336,291.00

Install Airfield Guidance Signs, Rehabilitate Runway - 10/28,

Rehabilitate Runway Lighting - 10/28

EA NYC NY MSS Massena International-Richards Field CS 72 $ 485,450.00 $ 485,450.00 $ -

Install Runway Vertical/Visual Guidance System [Runway 27

PAPI] - 09/27, Install Runway Vertical/Visual Guidance System

[Runway 9 REIL] - 09/27, Rehabilitate Runway Lighting - 05/23,

Rehabilitate Runway Lighting - 09/27, Rehabilitate Taxiway

Lighting

EA NYC NY 5B2 Saratoga County GA 33 $ 872,908.00 $ 872,908.00 $ - Rehabilitate Apron

EA NYC NY FZY Oswego County GA 46 $ 843,300.00 $ - $ 843,300.00

Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway

D], Rehabilitate Taxiway Lighting [Taxiway A], Rehabilitate

Taxiway Lighting [Taxiway D]

EA NYC NY BGM Greater Binghamton/Edwin A Link Field P 69 $ 10,705,035.00 $ 1,119,300.00 $ 9,585,735.00

Rehabilitate Runway [RW 16 Touchdown Zone] - 16/34,

Rehabilitate Runway - 16/34, Rehabilitate Runway Lighting -

16/34

EA NYC NY LGA Laguardia P 144 $ 10,301,757.00 $ 10,301,757.00 $ - Rehabilitate Runway - 13/31

EA NYC NY MSV Sullivan County International GA 35 $ 89,820.00 $ 89,820.00 $ - Conduct Miscellaneous Study

EA NYC NY GFL Floyd Bennett Memorial GA 59 $ 606,600.00 $ 606,600.00 $ -

Install Runway Vertical/Visual Guidance System - 12/30, Light

Obstructions, Remove Obstructions

EA NYC NY ISP Long Island MacArthur P 97 $ 11,294,310.00 $ 7,419,753.00 $ 3,874,557.00 Construct Aircraft Rescue & Fire Fighting Building

EA NYC NY HPN Westchester County P 120 $ 573,657.00 $ 573,657.00 $ - Rehabilitate Access Road

EA NYC NY SYR Syracuse Hancock International P 141 $ 117,900.00 $ 117,900.00 $ - Remove Obstructions

EA NYC NY ROC Greater Rochester International P 91 $ 1,930,500.00 $ 1,930,500.00 $ - Construct Deicing Containment Facility

EA NYC NY N66 Oneonta Municipal GA 19 $ 275,073.00 $ 275,073.00 $ - Expand Apron

EA NYC NY OLE Cattaraugus County-Olean GA 22 $ 369,000.00 $ 369,000.00 $ - Install Perimeter Fencing

EA NYC NY RME Griffiss International GA 41 $ 2,808,000.00 $ - $ 2,808,000.00 Construct Snow Removal Equipment Building

EA NYC NY JFK John F Kennedy International P 186 $ 2,924,604.00 $ 2,924,604.00 $ -

Construct Taxiway [Taxiway EE], Construct Taxiway [Taxiway

GG], Improve Runway Safety Area - 04L/22R, Widen Runway -

04L/22R

EA NYC NY ITH Ithaca Tompkins Regional P 76 $ 149,400.00 $ 149,400.00 $ -

Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway

C]

EA NYC NY 01G Perry-Warsaw GA 28 $ 194,862.00 $ 194,862.00 $ - Acquire Snow Removal Equipment

EA NYC NY 06N Randall R 32 $ 119,230.00 $ 119,230.00 $ - Acquire Land for Development, Rehabilitate Apron

EA NYC NY BQR Buffalo-Lancaster Regional R 24 $ 42,063.00 $ 42,063.00 $ -

Acquire Land for Development, Rehabilitate Apron, Rehabilitate

Runway - 08/26, Rehabilitate Taxiway [Parallel Taxiway],

Rehabilitate Taxiway [T-Hangar Taxilanes]

EA NYC NY LKP Lake Placid GA 41 $ 439,200.00 $ 439,200.00 $ -

Install Airfield Guidance Signs, Install Runway Vertical/Visual

Guidance System - 14/32, Rehabilitate Taxiway Lighting

EA NYC NY GVQ Genesee County R 37 $ 559,350.00 $ 559,350.00 $ - Install Perimeter Fencing, Remove Obstructions

EA NYC NY IAG Niagara Falls International P 45 $ 943,875.00 $ 943,875.00 $ - Acquire Land For Approaches

EA NYC NY D38 Canandaigua R 37 $ 65,000.00 $ 65,000.00 $ - Construct Snow Removal Equipment Building

EA NYC NY SCH Schenectady County R 52 $ 497,500.00 $ 497,500.00 $ - Install Perimeter Fencing

EA NYC NY ITH Ithaca Tompkins Regional P 78 $ 717,300.00 $ 717,300.00 $ - Acquire Snow Removal Equipment

EA NYC NY 01G Perry-Warsaw GA 27 $ 43,200.00 $ 43,200.00 $ - Install Weather Reporting Equipment

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 9 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

EA NYC NY 20N Kingston-Ulster R 23 $ 71,200.00 $ 71,200.00 $ - Acquire Land for Development, Remove Obstructions

EA NYC NY 5G0 Le Roy R 27 $ 853,858.00 $ 853,858.00 $ -

Acquire Land for Development, Improve Airport Drainage,

Rehabilitate Airport Beacons, Rehabilitate Runway - 10/28,

Rehabilitate Runway Lighting - 10/28

EA NYC NY PBG Plattsburgh International P 53 $ 505,400.00 $ 505,400.00 $ - Rehabilitate Runway - 17/35

EA NYC NY DSV Dansville Municipal GA 26 $ 337,500.00 $ 337,500.00 $ -

Conduct Airport Master Plan Study, Conduct Miscellaneous

Study

EA NYC NY OGS Ogdensburg International CS 48 $ 11,077,682.00 $ 182,145.00 $ 10,895,537.00

Construct Apron, Extend Runway [Extend Runway 27 and

Parallel Taxiway B] - 09/27, Extend Runway [Obstruction

Removal] - 09/27, Extend Runway [Realign State Route] - 09/27,

Extend Runway [Wetland Mitigation] - 09/27, Strengthen

Taxiway

EA NYC NY GFL Floyd Bennett Memorial GA 58 $ 72,000.00 $ 72,000.00 $ -Install Airfield Guidance Signs, Rehabilitate Runway - 01/19

EA NYC NY GFL Floyd Bennett Memorial GA 60 $ 180,000.00 $ 180,000.00 $ - Acquire Land For Approaches

EA NYC NY ART Watertown International P 47 $ 194,766.00 $ 194,766.00 $ - Rehabilitate Apron

EA NYC NY PBG Plattsburgh International P 54 $ 47,500.00 $ 47,500.00 $ - Install Perimeter Fencing required by 49 CFR 1542

EA NYC NY ITH Ithaca Tompkins Regional P 77 $ 136,800.00 $ 136,800.00 $ - Acquire Friction Measuring Equipment

EA NYC NY ITH Ithaca Tompkins Regional P 75 $ 162,000.00 $ 162,000.00 $ - Install Perimeter Fencing, Rehabilitate Apron

EA NYC NY MSV Sullivan County International GA 36 $ 657,863.00 $ 657,863.00 $ -

Improve Airport Miscellaneous Improvements, Install Emergency

Generator, Install Runway Vertical/Visual Guidance System

[Precision Approach Path Indicator] - 15/33, Install Runway

Vertical/Visual Guidance System [Runway End Identifier Lights] -

15/33

EA NYC NY N23 Sidney Municipal GA 19 $ 1,149,000.00 $ 1,149,000.00 $ - Construct Taxiway

EA NYC NY ELZ Wellsville Municipal Airport,Tarantine Field GA 30 $ 587,714.00 $ 587,714.00 $ - Remove Obstructions

EA NYC NY MGJ Orange County GA 38 $ 65,160.00 $ 65,160.00 $ - Remove Obstructions

EA NYC NY POU Dutchess County GA 47 $ 313,200.00 $ 313,200.00 $ -

Construct Aircraft Rescue & Fire Fighting Building, Construct

Snow Removal Equipment Building

EA NYC NY FOK Francis S Gabreski GA 19 $ 4,981,512.00 $ 150,000.00 $ 4,831,512.00 Rehabilitate Runway - 15/33

EA NYC NY GVQ Genesee County R 38 $ 1,411,200.00 $ 1,411,200.00 $ - Construct Apron, Extend Taxiway, Remove Obstructions

EA NYC NY *NYS State of New York 11 $ 307,172.00 $ 307,172.00 $ - Conduct State System Plan Study

EA NYC NY SDC Williamson-Sodus R 31 $ 143,413.00 $ 143,413.00 $ - Rehabilitate Runway - 10/28, Rehabilitate Taxiway

EA NYC NY ROC Greater Rochester International P 92 $ 123,210.00 $ 123,210.00 $ - Conduct Miscellaneous Study

EA NYC NY SWF Stewart International P 73 $ 1,717,911.00 $ 1,717,911.00 $ - Rehabilitate Runway - 09/27, Rehabilitate Runway - 16/34

EA WAS DC HEF Manassas Regional/Harry P Davis Field R 42 $ 230,107.00 $ 230,107.00 $ - Conduct Environmental Study

EA WAS DC HEF Manassas Regional/Harry P Davis Field R 41 $ 186,550.00 $ 186,550.00 $ - Rehabilitate Apron

EA WAS DC IAD Washington Dulles International P 54 $ 5,428,115.00 $ 2,069,383.00 $ 3,358,732.00

Rehabilitate Taxiway [Taxilane C], Rehabilitate Taxiway [Taxiway

Z]

EA WAS DC IAD Washington Dulles International P 53 $ 7,597,496.00 $ - $ 7,597,496.00 Construct Runway - Plan-1

EA WAS DC DCA Ronald Reagan Washington National P 31 $ 14,224,050.00 $ 4,959,530.00 $ 9,264,520.00 Rehabilitate Runway - 04/22, Rehabilitate Taxiway

EA WAS DC @008 Washington Metropolitan Area 13 $ 250,000.00 $ 250,000.00 $ - Conduct Metropolitan System Plan Study

EA WAS MD OXB Ocean City Municipal GA 22 $ 89,804.00 $ 89,804.00 $ - Conduct Miscellaneous Study

EA WAS MD HGR Hagerstown Regional-Richard A Henson Field P 54 $ 989,625.00 $ 989,625.00 $ - Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

EA WAS MD HGR Hagerstown Regional-Richard A Henson Field P 53 $ 2,171,663.00 $ - $ 2,171,663.00 Rehabilitate Taxiway

EA WAS MD 2W6 St Mary's County Regional GA 22 $ 1,336,554.00 $ 1,336,554.00 $ -

Extend Runway [Design Only] - 11/29, Extend Runway [Design

Taxiway Relocation] - 11/29, Extend Runway [Utilities and

Wetland Mitigation] - 11/29

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 10 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

EA WAS MD 2W6 St Mary's County Regional GA 23 $ 391,950.00 $ 391,950.00 $ - Extend Runway - 11/29

EA WAS MD CBE Greater Cumberland Regional GA 22 $ 637,425.00 $ 306,000.00 $ 331,425.00 Rehabilitate Runway - 05/23

EA WAS MD GAI Montgomery County Airpark R 28 $ 5,477,702.00 $ 150,000.00 $ 5,327,702.00 Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

EA WAS MD FDK Frederick Municipal R 42 $ 4,069,722.00 $ 266,726.00 $ 3,802,996.00 Remove Obstructions

EA WAS MD BWI Baltimore/Washington International Thurgood Marshall P 94 $ 3,900,145.00 $ 3,900,145.00 $ - Construct Taxiway

EA WAS MD ESN Easton/Newnam Field GA 43 $ 175,681.00 $ 175,681.00 $ - Update Miscellaneous Study

EA WAS MD W29 Bay Bridge GA 23 $ 194,586.00 $ 194,586.00 $ - Remove Obstructions

EA WAS MD SBY Salisbury-Ocean City Wicomico Regional P 51 $ 637,170.00 $ 637,170.00 $ - Rehabilitate Terminal Building

EA WAS MD W41 Crisfield-Somerset County GA 12 $ 165,358.00 $ 165,358.00 $ - Remove Obstructions

EA WAS MD FME Tipton R 20 $ 1,237,000.00 $ 1,237,000.00 $ - Rehabilitate Apron

EA WAS VA SHD Shenandoah Valley Regional CS 39 $ 1,679,715.00 $ 1,679,715.00 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow

Removal Equipment

EA WAS VA LYH Lynchburg Regional/Preston Glenn Field P 38 $ 597,250.00 $ 597,250.00 $ - Construct Building

EA WAS VA XSA Tappahannock-Essex County GA 15 $ 30,600.00 $ 30,600.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 10/28, Rehabilitate

Taxiway

EA WAS VA MKJ Mountain Empire GA 26 $ 2,879,820.00 $ 354,816.00 $ 2,525,004.00 Rehabilitate Runway - 08/26

EA WAS VA FKN Franklin Municipal-John Beverly Rose GA 19 $ 112,500.00 $ 112,500.00 $ - Extend Taxiway

EA WAS VA MFV Accomack County GA 17 $ 55,800.00 $ 55,800.00 $ - Conduct Environmental Study, Remove Obstructions

EA WAS VA AVC Mecklenburg-Brunswick Regional GA 15 $ 4,132,557.00 $ 795,385.00 $ 3,337,172.00 Rehabilitate Runway - 01/19

EA WAS VA LUA Luray Caverns GA 18 $ 59,868.00 $ 59,868.00 $ - Conduct Environmental Study

EA WAS VA LKU Louisa County/Freeman Field GA 19 $ 76,500.00 $ 76,500.00 $ - Install Perimeter Fencing

EA WAS VA SFQ Suffolk Executive GA 26 $ 163,800.00 $ 163,800.00 $ - Conduct Environmental Study

EA WAS VA CJR Culpeper Regional GA 21 $ 124,784.00 $ 124,784.00 $ - Rehabilitate Taxiway

EA WAS VA DAN Danville Regional GA 28 $ 2,778,960.00 $ 344,097.00 $ 2,434,863.00 Rehabilitate Taxiway

EA WAS VA CPK Chesapeake Regional GA 21 $ 121,500.00 $ 121,500.00 $ - Acquire Easement For Approaches

EA WAS VA *VAS Commonwealth of Virginia 9 $ 670,771.00 $ 670,771.00 $ - Update Miscellaneous Study

EA WAS VA ORF Norfolk International P 65 $ 2,255,380.00 $ 2,255,380.00 $ -Conduct Miscellaneous Study, Rehabilitate Terminal Building

EA WAS VA PVG Hampton Roads Executive R 17 $ 103,500.00 $ 103,500.00 $ - Conduct Environmental Study

EA WAS VA ROA Roanoke-Blacksburg Regional/Woodrum Field P 56 $ 4,242,708.00 $ 4,242,708.00 $ - Rehabilitate Terminal Building

EA WAS VA W96 New Kent County GA 15 $ 53,200.00 $ 53,200.00 $ - Rehabilitate Runway Lighting - 11/29

EA WAS VA OFP Hanover County Municipal GA 28 $ 4,542,165.00 $ 150,000.00 $ 4,392,165.00 Construct Apron

EA WAS VA PHF Newport News/Williamsburg International P 49 $ 1,100,000.00 $ 1,100,000.00 $ - Improve Terminal Building

EA WAS VA RIC Richmond International P 63 $ 4,002,106.00 $ 4,002,106.00 $ -

Rehabilitate Taxiway [Construction], Rehabilitate Taxiway

[Design]

EA WAS VA SFQ Suffolk Executive GA 25 $ 351,000.00 $ 351,000.00 $ -

Rehabilitate Runway - 04/22, Rehabilitate Runway Lighting -

04/22

EA WAS VA BCB Virginia Tech/Montgomery Executive GA 21 $ 4,155,337.00 $ 150,000.00 $ 4,005,337.00 Extend Runway - 12/30

EA WAS VA HWY Warrenton-Fauquier R 21 $ 529,935.00 $ 529,935.00 $ - Construct Access Road

EA WAS VA ROA Roanoke-Blacksburg Regional/Woodrum Field P 55 $ 270,330.00 $ 270,330.00 $ - Rehabilitate Taxiway

EA WAS VA HLX Twin County GA 14 $ 944,100.00 $ 449,287.00 $ 494,813.00 Rehabilitate Apron, Rehabilitate Taxiway

EA WAS VA OKV Winchester Regional GA 35 $ 2,473,650.00 $ 696,358.00 $ 1,777,292.00 Construct Taxiway

EA WAS VA PTB Dinwiddie County GA 19 $ 1,114,200.00 $ 1,114,200.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

EA WAS VA FRR Front Royal-Warren County GA 17 $ 723,600.00 $ 723,600.00 $ - Remove Obstructions

EA WAS VA EMV Emporia-Greensville Regional GA 12 $ 1,480,489.00 $ 1,480,489.00 $ - Extend Taxiway

EA WAS VA CHO Charlottesville-Albemarle P 46 $ 11,872,035.00 $ 4,482,152.00 $ 7,389,883.00 Rehabilitate Runway - 03/21, Rehabilitate Taxiway

GL CHI IL BMI Central IL Regional Airport at Bloomington-Normal P 65 $ 891,915.00 $ 891,915.00 $ - Acquire Snow Removal Equipment

GL CHI IL BMI Central IL Regional Airport at Bloomington-Normal P 66 $ 1,195,649.00 $ 1,195,649.00 $ - Rehabilitate Runway - 02/20, Rehabilitate Runway - 11/29

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 11 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

GL CHI IL ORD Chicago O'Hare International P 161 $ 801,000.00 $ - $ 801,000.00 Conduct Environmental Study

GL CHI IL CMI University of Illinois-Willard P 31 $ 4,807,367.00 $ 1,251,650.00 $ 3,555,717.00 Construct Runway - 18/36

GL CHI IL MLI Quad City International P 84 $ 1,178,382.00 $ 677,130.00 $ 501,252.00 Rehabilitate Taxiway

GL CHI IL *ILB Illinois State Block Grant Program 131 $ 1,200,000.00 $ - $ 1,200,000.00 Non primary development projects in state block grant program

GL CHI IL ORD Chicago O'Hare International P 154 $ 20,000,000.00 $ - $ 20,000,000.00 Construct Runway - Plan-1

GL CHI IL *ILB Illinois State Block Grant Program 138 $ 330,103.00 $ - $ 330,103.00 Non primary development projects in state block grant program

GL CHI IL *ILB Illinois State Block Grant Program 136 $ 283,480.00 $ - $ 283,480.00 Non primary development projects in state block grant program

GL CHI IL SPI Abraham Lincoln Capital P 69 $ 1,277,404.00 $ 1,277,404.00 $ - Rehabilitate Service Road

GL CHI IL BLV Scott AFB/Midamerica P 32 $ 1,299,823.00 $ 1,299,823.00 $ - Construct Service Road

GL CHI IL *ILB Illinois State Block Grant Program 133 $ 16,611,694.00 $ 16,611,694.00 $ -Non primary development projects in state block grant program

GL CHI IL *ILB Illinois State Block Grant Program 134 $ 850,000.00 $ - $ 850,000.00 Non primary development projects in state block grant program

GL CHI IL ORD Chicago O'Hare International P 159 $ 162,000.00 $ - $ 162,000.00 Acquire Equipment

GL CHI IL SPI Abraham Lincoln Capital P 70 $ 800,000.00 $ - $ 800,000.00 Acquire Aircraft Rescue & Fire Fighting Vehicle

GL CHI IL ORD Chicago O'Hare International P 160 $ 8,689,000.00 $ - $ 8,689,000.00 Rehabilitate Runway - 10L/28R

GL CHI IL RFD Chicago/Rockford International P 78 $ 2,176,238.00 $ 1,532,693.00 $ 643,545.00 Rehabilitate Taxiway

GL CHI IL *ILB Illinois State Block Grant Program 135 $ 1,600,890.00 $ - $ 1,600,890.00 Non primary development projects in state block grant program

GL CHI IL RFD Chicago/Rockford International P 76 $ 455,869.00 $ 455,869.00 $ - Construct Apron

GL CHI IL *ILB Illinois State Block Grant Program 130 $ 2,929,127.00 $ - $ 2,929,127.00 Non primary development projects in state block grant program

GL CHI IL RFD Chicago/Rockford International P 77 $ 6,012,390.00 $ - $ 6,012,390.00 Expand Terminal Building

GL CHI IL MWA Williamson County Regional P 33 $ 1,610,693.00 $ 1,000,000.00 $ 610,693.00

Rehabilitate Runway - 11/29, Rehabilitate Runway Lighting -

11/29

GL CHI IL ORD Chicago O'Hare International P 158 $ 12,487,534.00 $ 12,487,534.00 $ - Construct Runway - Plan-2

GL CHI IL MDW Chicago Midway International P 90 $ 17,500,000.00 $ - $ 17,500,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

GL CHI IL *ILB Illinois State Block Grant Program 128 $ 720,000.00 $ - $ 720,000.00 Non primary development projects in state block grant program

GL CHI IL *ILB Illinois State Block Grant Program 129 $ 1,033,151.00 $ - $ 1,033,151.00 Non primary development projects in state block grant program

GL CHI IL MLI Quad City International P 82 $ 881,497.00 $ 881,497.00 $ - Security Enhancements

GL CHI IL *ILS State of Illinois 8 $ 500,000.00 $ - $ 500,000.00 Conduct State System Plan Study

GL CHI IL MDW Chicago Midway International P 91 $ 72,000.00 $ - $ 72,000.00 Acquire Equipment

GL CHI IL MDW Chicago Midway International P 89 $ 11,790,715.00 $ 2,640,715.00 $ 9,150,000.00 Rehabilitate Runway - 04R/22L

GL CHI IL ORD Chicago O'Hare International P 156 $ 20,000,000.00 $ - $ 20,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

GL CHI IL PIA General Downing - Peoria International P 63 $ 4,426,130.00 $ 2,608,597.00 $ 1,817,533.00 Rehabilitate Apron

GL CHI IL *ILB Illinois State Block Grant Program 137 $ 2,101,470.00 $ - $ 2,101,470.00 Non primary development projects in state block grant program

GL CHI IL UIN Quincy Regional-Baldwin Field P 37 $ 951,158.00 $ 951,158.00 $ - Install Perimeter Fencing required by 14 CFR 139

GL CHI IL *ILB Illinois State Block Grant Program 132 $ 285,264.00 $ - $ 285,264.00 Non primary development projects in state block grant program

GL CHI IL MDW Chicago Midway International P 92 $ 1,984,784.00 $ 694,784.00 $ 1,290,000.00 Rehabilitate Runway - 04R/22L

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 12 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

GL CHI IL ORD Chicago O'Hare International P 157 $ 3,587,891.00 $ - $ 3,587,891.00 VALE Infrastructure

GL CHI IL ORD Chicago O'Hare International P 155 $ 25,000,000.00 $ - $ 25,000,000.00 Construct Runway - Plan-2

GL CHI IL MLI Quad City International P 83 $ 1,158,508.00 $ 1,158,508.00 $ - Expand Service Road

GL CHI IN HHG Huntington Municipal GA 14 $ 441,003.00 $ 441,003.00 $ - Expand Apron

GL CHI IN IWH Wabash Municipal GA 16 $ 85,340.00 $ 85,340.00 $ - Install Runway Vertical/Visual Guidance System - 09/27

GL CHI IN JVY Clark Regional R 29 $ 1,485,000.00 $ 150,000.00 $ 1,335,000.00 Extend Runway - 18/36

GL CHI IN OKK Kokomo Municipal GA 24 $ 513,958.00 $ 150,000.00 $ 363,958.00

Rehabilitate Taxiway [Taxiway C], Rehabilitate Taxiway [Taxiway

D]

GL CHI IN PPO La Porte Municipal GA 23 $ 150,000.00 $ 150,000.00 $ - Acquire Land for Development

GL CHI IN TYQ Indianapolis Executive R 27 $ 251,578.00 $ 251,578.00 $ -

Extend Runway - 18/36, Install Perimeter Fencing not Required

by 14 CFR 139/49 CFR 1542

GL CHI IN BMG Monroe County GA 32 $ 226,187.00 $ 226,187.00 $ - Acquire Snow Removal Equipment

GL CHI IN DCY Daviess County GA 16 $ 604,966.00 $ 604,966.00 $ - Construct Taxiway

GL CHI IN HNB Huntingburg GA 16 $ 266,970.00 $ 266,970.00 $ -

Acquire Easement For Approaches, Extend Runway - 09/27,

Remove Obstructions

GL CHI IN SIV Sullivan County GA 18 $ 28,800.00 $ 28,800.00 $ - Improve Fuel Farm

GL CHI IN AID Anderson Municipal-Darlington Field GA 30 $ 2,174,947.00 $ 150,000.00 $ 2,024,947.00 Rehabilitate Runway - 12/30

GL CHI IN TEL Perry County Municipal GA 11 $ 150,000.00 $ 150,000.00 $ - Construct Building

GL CHI IN BFR Virgil I Grissom Municipal GA 14 $ 108,000.00 $ 108,000.00 $ -

Conduct Environmental Study [Runway 6/24], Conduct

Environmental Study [Taxiway A]

GL CHI IN UWL New Castle-Henry Co Municipal GA 16 $ 2,617,531.00 $ 150,000.00 $ 2,467,531.00 Construct Runway - Plan-1

GL CHI IN MZZ Marion Municipal GA 25 $ 992,202.00 $ 150,000.00 $ 842,202.00 Construct Taxiway

GL CHI IN IND Indianapolis International P 147 $ 3,776,258.00 $ 3,776,258.00 $ - Rehabilitate Taxiway

GL CHI IN C65 Plymouth Municipal GA 19 $ 266,099.00 $ 266,099.00 $ - Rehabilitate Building

GL CHI IN MGC Michigan City Municipal-Phillips Field GA 20 $ 150,000.00 $ 150,000.00 $ - Conduct Environmental Study

GL CHI IN HUF Terre Haute International-Hulman Field GA 44 $ 3,424,504.00 $ 150,000.00 $ 3,274,504.00 Construct Taxiway

GL CHI IN CEV Mettel Field GA 23 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 18/36

GL CHI IN SMD Smith Field GA 17 $ 126,040.00 $ 126,040.00 $ - Construct Taxiway

GL CHI IN GYY Gary/Chicago International GA 35 $ 4,250,000.00 $ 150,000.00 $ 4,100,000.00 Rehabilitate Runway - 12/30

GL CHI IN MIE Delaware County Regional GA 30 $ 1,893,871.00 $ 164,569.00 $ 1,729,302.00 Rehabilitate Runway - 14/32

GL CHI IN GWB De Kalb County GA 23 $ 602,543.00 $ 602,543.00 $ - Extend Runway - 09/27

GL CHI IN 50I Kentland Municipal GA 12 $ 193,350.00 $ 193,350.00 $ - Acquire Land For Approaches, Construct Apron

GL CHI IN I83 Salem Municipal GA 17 $ 2,054,210.00 $ 150,000.00 $ 1,904,210.00 Construct Apron, Construct Runway - Plan-1

GL CHI IN OVO North Vernon GA 19 $ 150,000.00 $ 150,000.00 $ - Construct Building

GL CHI IN FWA Fort Wayne International P 67 $ 2,134,621.00 $ 1,290,900.00 $ 843,721.00 Construct Taxiway, Rehabilitate Runway - 14/32

GL CHI IN EVV Evansville Regional P 59 $ 1,910,974.00 $ 1,910,974.00 $ - Rehabilitate Apron

GL CHI IN EYE Eagle Creek Airpark R 22 $ 237,000.00 $ 237,000.00 $ - Construct Taxiway

GL CHI IN BAK Columbus Municipal GA 28 $ 394,064.00 $ 150,000.00 $ 244,064.00 Rehabilitate Taxiway Lighting

GL CHI IN FKR Frankfort Municipal GA 19 $ 617,659.00 $ 617,659.00 $ - Rehabilitate Taxiway

GL CHI IN VPZ Porter County Regional GA 28 $ 1,043,550.00 $ 150,000.00 $ 893,550.00 Rehabilitate Taxiway

GL CHI IN GGP Logansport/Cass County GA 21 $ 529,654.00 $ 529,654.00 $ -

Install Perimeter Fencing not Required by 14 CFR 139/49 CFR

1542

GL CHI IN BMG Monroe County GA 31 $ 501,752.00 $ 150,000.00 $ 351,752.00 Install Perimeter Fencing

GL CHI IN LAF Purdue University GA 39 $ 2,935,278.00 $ 150,000.00 $ 2,785,278.00 Strengthen Runway - 10/28

GL CHI IN FWA Fort Wayne International P 68 $ 5,202,609.00 $ 1,337,336.00 $ 3,865,273.00 Rehabilitate Runway - 14/32

GL CHI IN ANQ Tri-State Steuben County GA 17 $ 317,400.00 $ 317,400.00 $ - Install Runway Vertical/Visual Guidance System - 05/23

GL CHI IN UMP Indianapolis Metropolitan R 23 $ 867,513.00 $ 441,490.00 $ 426,023.00 Rehabilitate Runway Lighting - 15/33

GL CHI IN *INS State of Indiana 14 $ 181,996.00 $ 181,996.00 $ - Update State System Plan Study

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 13 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

GL CHI IN IND Indianapolis International P 145 $ 2,614,949.00 $ - $ 2,614,949.00 Zero Emissions Vehicle/Infrastructure

GL CHI IN GYY Gary/Chicago International GA 34 $ 4,906,500.00 $ - $ 4,906,500.00 Extend Runway - 12/30

GL CHI IN IND Indianapolis International P 144 $ 713,250.00 $ 210,000.00 $ 503,250.00 Construct Deicing Containment Facility

GL CHI IN UMP Indianapolis Metropolitan R 24 $ 480,532.00 $ - $ 480,532.00 Rehabilitate Apron

GL CHI IN SBN South Bend International P 49 $ 2,398,022.00 $ 2,398,022.00 $ - Modify Terminal Building

GL CHI IN PLD Portland Municipal GA 13 $ 509,584.00 $ 509,584.00 $ - Acquire Land For Approaches

GL CHI IN 1I9 Delphi Municipal GA 13 $ 273,160.00 $ 273,160.00 $ - Extend Runway - 18/36

GL CHI IN FRH French Lick Municipal GA 16 $ 1,589,702.00 $ 150,065.00 $ 1,439,637.00 Rehabilitate Taxiway

GL CHI IN MCX White County GA 17 $ 2,597,391.00 $ 150,000.00 $ 2,447,391.00 Extend Runway - 18/36, Install Perimeter Fencing

GL CHI IN HFY Greenwood Municipal GA 30 $ 36,000.00 $ 36,000.00 $ - Construct Taxiway

GL CHI IN IND Indianapolis International P 146 $ 86,440.00 $ 86,440.00 $ - Acquire Safety Equipment and/or Fencing

GL CHI IN I76 Peru Municipal GA 19 $ 205,347.00 $ 205,347.00 $ - Improve Fuel Farm

GL CHI IN IMS Madison Municipal GA 19 $ 429,057.00 $ 429,057.00 $ - Install Perimeter Fencing, Rehabilitate Runway - 03/21

GL CHI IN 8A4 Indianapolis Downtown GA 14 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Apron

GL CHI IN RZL Jasper County GA 11 $ 150,000.00 $ 150,000.00 $ -

Install Runway Vertical/Visual Guidance System - 18/36,

Rehabilitate Airport Beacons

GL CHI IN 4I7 Putnam County Regional GA 17 $ 308,930.00 $ 150,000.00 $ 158,930.00 Install Perimeter Fencing

GL CHI IN MQJ Indianapolis Regional R 17 $ 360,000.00 $ 360,000.00 $ - Rehabilitate Runway - 16/34

GL CHI IN I42 Paoli Municipal GA 13 $ 1,677,960.00 $ 150,000.00 $ 1,527,960.00 Extend Runway - 02/20

GL CHI IN CFJ Crawfordsville Municipal GA 15 $ 593,797.00 $ 593,797.00 $ - Install Taxiway Lighting

GL CHI IN IND Indianapolis International P 148 $ 3,305,826.00 $ 1,838,685.00 $ 1,467,141.00 Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

GL CHI WI ATW Appleton International P 51 $ 549,000.00 $ - $ 549,000.00 Energy Efficiency Equipment/Infrastructure

GL CHI WI EAU Chippewa Valley Regional P 40 $ 598,706.00 $ 598,706.00 $ -

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual

Guidance System, Rehabilitate Runway - 04/22

GL CHI WI MSN Dane County Regional-Truax Field P 56 $ 3,341,224.00 $ 3,341,224.00 $ - Improve Terminal Building

GL CHI WI MSN Dane County Regional-Truax Field P 55 $ 472,500.00 $ 472,500.00 $ - Improve Terminal Building

GL CHI WI CWA Central Wisconsin P 46 $ 1,751,613.00 $ 1,751,613.00 $ -

Acquire Snow Removal Equipment, Rehabilitate Runway - 08/26,

Wildlife Hazard Assessments

GL CHI WI *WIB Wisconsin State Block Grant Program 83 $ 435,000.00 $ - $ 435,000.00 Non primary development projects in state block grant program

GL CHI WI MKE General Mitchell International P 89 $ 1,721,900.00 $ 504,696.00 $ 1,217,204.00 Rehabilitate Taxiway

GL CHI WI *WIB Wisconsin State Block Grant Program 80 $ 2,625,000.00 $ - $ 2,625,000.00 Non primary development projects in state block grant program

GL CHI WI *WIB Wisconsin State Block Grant Program 81 $ 1,517,546.00 $ - $ 1,517,546.00 Non primary development projects in state block grant program

GL CHI WI *WIB Wisconsin State Block Grant Program 84 $ 765,000.00 $ - $ 765,000.00 Non primary development projects in state block grant program

GL CHI WI *WIB Wisconsin State Block Grant Program 87 $ 454,344.00 $ - $ 454,344.00 Non primary development projects in state block grant program

GL CHI WI MKE General Mitchell International P 85 $ 1,063,185.00 $ 1,063,185.00 $ -

Groove Runway - 13/31, Install Guidance Signs, Install Runway

Vertical/Visual Guidance System - 01L/19R, Rehabilitate

Taxiway, Rehabilitate Taxiway

GL CHI WI LSE La Crosse Regional P 39 $ 1,288,238.00 $ 1,288,238.00 $ - Install Perimeter Fencing, Rehabilitate Access Road

GL CHI WI CWA Central Wisconsin P 45 $ 480,270.00 $ 480,270.00 $ - Conduct Airport Master Plan Study

GL CHI WI ATW Appleton International P 52 $ 280,800.00 $ 280,800.00 $ - Expand Terminal Building, Rehabilitate Terminal Building

GL CHI WI *WIB Wisconsin State Block Grant Program 79 $ 15,575,860.00 $ 15,575,860.00 $ -Non primary development projects in state block grant program

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 14 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

GL CHI WI MKE General Mitchell International P 87 $ 320,921.00 $ - $ 320,921.00 Sustainable Management Plan

GL CHI WI *WIB Wisconsin State Block Grant Program 78 $ 244,955.00 $ - $ 244,955.00 Non primary development projects in state block grant program

GL CHI WI *WIB Wisconsin State Block Grant Program 82 $ 1,015,135.00 $ - $ 1,015,135.00 Non primary development projects in state block grant program

GL CHI WI MKE General Mitchell International P 88 $ 401,759.00 $ 401,759.00 $ - Rehabilitate Taxiway Lighting

GL CHI WI ATW Appleton International P 50 $ 1,931,898.00 $ 1,931,898.00 $ - Expand Snow Removal Equipment Building

GL CHI WI RHI Rhinelander-Oneida County P 38 $ 543,990.00 $ 543,990.00 $ - Expand Snow Removal Equipment Building

GL CHI WI MKE General Mitchell International P 84 $ 220,748.00 $ - $ 220,748.00 Install Perimeter Fencing

GL CHI WI *WIB Wisconsin State Block Grant Program 88 $ 745,080.00 $ - $ 745,080.00 Non primary development projects in state block grant program

GL CHI WI *WIB Wisconsin State Block Grant Program 85 $ 1,444,746.00 $ - $ 1,444,746.00 Non primary development projects in state block grant program

GL CHI WI EAU Chippewa Valley Regional P 39 $ 398,790.00 $ 398,790.00 $ -

Improve Airport Miscellaneous Improvements, Rehabilitate

Building

GL CHI WI GRB Austin Straubel International P 48 $ 3,009,780.00 $ 3,009,780.00 $ -

Construct Apron, Construct Taxiway, Install Runway Distance-To-

Go Signs - 06/24, Install Runway Distance-To-Go Signs - 18/36

GL CHI WI *WIB Wisconsin State Block Grant Program 86 $ 472,650.00 $ - $ 472,650.00 Non primary development projects in state block grant program

GL DET MI LAN Capital Region International P 55 $ 3,271,791.00 $ 3,271,791.00 $ - Rehabilitate Taxiway

GL DET MI TVC Cherry Capital P 41 $ 1,439,753.00 $ 1,439,753.00 $ -

Acquire Land For Approaches, Conduct Environmental Study,

Remove Obstructions, Update Airport Master Plan Study

GL DET MI APN Alpena County Regional P 22 $ 921,500.00 $ 921,500.00 $ - Construct Terminal Building

GL DET MI SAW Sawyer International P 40 $ 175,135.00 $ 175,135.00 $ - Rehabilitate Runway - 01/19

GL DET MI PLN Pellston Regional Airport of Emmet County P 34 $ 399,705.00 $ 399,705.00 $ -

Rehabilitate Runway - 14/32, Rehabilitate Runway Lighting -

14/32

GL DET MI DTW Detroit Metropolitan Wayne County P 112 $ 20,654,150.00 $ 5,654,150.00 $ 15,000,000.00

Rehabilitate Runway [Phase 1] - 04L/22R, Rehabilitate Runway

[Phase 2] - 04L/22R

GL DET MI *MIB Michigan State Block Grant Program 96 $ 18,110,561.00 $ 18,110,561.00 $ -Non primary development projects in state block grant program

GL DET MI AZO Kalamazoo/Battle Creek International P 43 $ 246,710.00 $ - $ 246,710.00 Conduct Miscellaneous Study

GL DET MI IMT Ford P 20 $ 609,423.00 $ 609,423.00 $ -

Rehabilitate Runway - 01/19, Rehabilitate Runway - 13/31,

Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway

E], Rehabilitate Taxiway [Taxiways B, C, F, G, H]

GL DET MI MBS MBS International P 51 $ 500,914.00 $ 500,914.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate

Taxiway

GL DET MI GRR Gerald R Ford International P 53 $ 2,548,780.00 $ 2,548,780.00 $ - Update Airport Master Plan Study

GL DET MI CMX Houghton County Memorial P 41 $ 562,425.00 $ 562,425.00 $ - Acquire Snow Removal Equipment

GL DET MI *MIB Michigan State Block Grant Program 97 $ 5,000,000.00 $ - $ 5,000,000.00 Non primary development projects in state block grant program

GL DET MI CVX Charlevoix Municipal CS 20 $ 1,254,411.00 $ 1,254,411.00 $ -

Install Runway Vertical/Visual Guidance System - 09/27,

Rehabilitate Runway - 09/27, Rehabilitate Runway Lighting -

09/27, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting,

Remove Obstructions

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 15 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

GL DET MI ESC Delta County P 39 $ 317,832.00 $ 317,832.00 $ -

Acquire Aircraft Rescue & Fire Fighting Safety Equipment,

Rehabilitate Runway - 09/27, Rehabilitate Runway - 18/36,

Rehabilitate Runway Lighting - 18/36, Rehabilitate Taxiway [A],

Rehabilitate Taxiway [B and C], Rehabilitate Taxiway Lighting

GL DET MI GRR Gerald R Ford International P 54 $ 1,683,699.00 $ 1,683,699.00 $ - Rehabilitate Apron, Rehabilitate Runway - 08L/26R

GL DET MI MKG Muskegon County P 40 $ 426,189.00 $ 426,189.00 $ -

Acquire Land for Development, Rehabilitate Runway - 06/24,

Rehabilitate Runway - 14/32, Rehabilitate Taxiway

GL DET MI CIU Chippewa County International P 37 $ 914,049.00 $ 914,049.00 $ -

Acquire Snow Removal Equipment, Install Runway Lighting -

10/28, Install Taxiway Lighting, Rehabilitate Runway - 10/28,

Rehabilitate Runway - 16/34, Rehabilitate Taxiway [B],

Rehabilitate Taxiway [E]

GL DET OH 89D Kelleys Island Land Field GA 11 $ 151,470.00 $ 151,470.00 $ - Rehabilitate Runway - 09/27

GL DET OH 7W5 Henry County GA 10 $ 49,500.00 $ 49,500.00 $ -

Rehabilitate Runway - 10/28, Rehabilitate Taxiway, Wildlife

Hazard Assessments

GL DET OH 2G2 Jefferson County Airpark GA 18 $ 292,108.00 $ 292,108.00 $ -

Rehabilitate Apron, Rehabilitate Taxiway, Wildlife Hazard

Assessments

GL DET OH FDY Findlay GA 26 $ 2,003,552.00 $ 2,003,552.00 $ - Rehabilitate Runway - 18/36

GL DET OH CAK Akron-Canton Regional P 62 $ 4,209,536.00 $ 4,209,536.00 $ -

Construct Sand and Chemical Storage Building, Rehabilitate

Taxiway, Rehabilitate Terminal Building

GL DET OH I66 Clinton Field GA 11 $ 49,673.00 $ 49,673.00 $ -

Improve Airport Drainage, Install Runway Vertical/Visual

Guidance System - 03/21

GL DET OH CGF Cuyahoga County R 27 $ 5,383,303.00 $ - $ 5,383,303.00 Rehabilitate Runway - 06/24

GL DET OH YNG Youngstown-Warren Regional P 44 $ 711,000.00 $ 711,000.00 $ -

Acquire Snow Removal Equipment, Conduct Miscellaneous

Study

GL DET OH VES Darke County GA 2 $ 104,521.00 $ 104,521.00 $ - Extend Runway - 09/27

GL DET OH 22I Vinton County GA 12 $ 1,058,508.00 $ 1,058,508.00 $ - Improve Airport Drainage

GL DET OH OWX Putnam County GA 11 $ 153,837.00 $ 153,837.00 $ -

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual

Guidance System - 09/27, Rehabilitate Apron, Remove

Obstructions, Wildlife Hazard Assessments

GL DET OH HTW Lawrence County Airpark GA 8 $ 72,783.00 $ 72,783.00 $ -Remove Obstructions [Design], Remove Obstructions [Study]

GL DET OH LCK Rickenbacker International P 42 $ 1,518,886.00 $ 1,518,886.00 $ - Update Airport Master Plan Study

GL DET OH I68 Warren County/John Lane Field GA 17 $ 215,507.00 $ 215,507.00 $ - Acquire Land For Approaches

GL DET OH LNN Willoughby Lost Nation Municipal R 13 $ 266,976.00 $ 150,000.00 $ 116,976.00 Acquire Snow Removal Equipment

GL DET OH 4G5 Monroe County GA 15 $ 83,375.00 $ 83,375.00 $ -

Rehabilitate Airport Beacons, Remove Obstructions, Wildlife

Hazard Assessments

GL DET OH PMH Greater Portsmouth Regional GA 19 $ 468,566.00 $ 468,566.00 $ - Install Perimeter Fencing, Rehabilitate Apron

GL DET OH VNW Van Wert County GA 18 $ 56,630.00 $ 56,630.00 $ -Acquire Snow Removal Equipment, Install Airport Beacons

GL DET OH 5G7 Bluffton GA 14 $ 263,250.00 $ 263,250.00 $ -Update Airport Master Plan Study, Wildlife Hazard Assessments

GL DET OH 1G3 Kent State University GA 16 $ 398,700.00 $ 398,700.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

GL DET OH I19 Greene County-Lewis A Jackson Regional GA 22 $ 151,487.00 $ 151,487.00 $ - Construct Apron, Construct Parking Lot, Construct Taxiway

GL DET OH CMH Port Columbus International P 84 $ 6,070,391.00 $ 1,536,376.00 $ 4,534,015.00 Construct Runway - 10R/28L

GL DET OH 5A1 Norwalk-Huron County GA 9 $ 287,997.00 $ 287,997.00 $ - Rehabilitate Apron, Update Airport Master Plan Study

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 16 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

GL DET OH MNN Marion Municipal GA 24 $ 115,416.00 $ 115,416.00 $ -

Install Airfield Guidance Signs, Rehabilitate Runway - 13/31,

Rehabilitate Taxiway

GL DET OH AOH Lima Allen County GA 18 $ 4,037,161.00 $ 4,037,161.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 10/28, Rehabilitate

Taxiway

GL DET OH 3T7 Middle Bass Island GA 18 $ 387,202.00 $ 387,202.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 10/28, Rehabilitate

Taxiway

GL DET OH LPR Lorain County Regional R 24 $ 817,948.00 $ 817,948.00 $ - Rehabilitate Taxiway

GL DET OH DLZ Delaware Municipal - Jim Moore Field GA 22 $ 56,935.00 $ 56,935.00 $ - Rehabilitate Taxiway [A], Rehabilitate Taxiway [C]

GL DET OH UYF Madison County GA 19 $ 150,000.00 $ 150,000.00 $ - Construct Building

GL DET OH CLE Cleveland-Hopkins International P 108 $ 4,976,505.00 $ - $ 4,976,505.00 Acquire Snow Removal Equipment

GL DET OH CLE Cleveland-Hopkins International P 111 $ 1,973,109.00 $ 1,973,109.00 $ - Construct Runway - 06L/24R

GL DET OH LHQ Fairfield County GA 26 $ 314,763.00 $ 314,763.00 $ -Install Runway Lighting - 10/28, Rehabilitate Runway - 10/28

GL DET OH 8G6 Harrison County GA 13 $ 172,269.00 $ 172,269.00 $ - Rehabilitate Runway - 13/31

GL DET OH 4I9 Morrow County GA 12 $ 118,807.00 $ 118,807.00 $ -

Rehabilitate Apron [A], Rehabilitate Apron [B], Rehabilitate

Runway - 10/28, Rehabilitate Taxiway [A], Rehabilitate Taxiway

[B], Rehabilitate Taxiway [C]

GL DET OH CQA Lakefield GA 17 $ 455,136.00 $ 455,136.00 $ - Construct Building, Wildlife Hazard Assessments

GL DET OH AXV Neil Armstrong GA 18 $ 91,973.00 $ 91,973.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

GL DET OH SGH Springfield-Beckley Municipal GA 24 $ 359,820.00 $ 359,820.00 $ -Update Airport Master Plan Study, Wildlife Hazard Assessments

GL DET OH LCK Rickenbacker International P 43 $ 7,186,681.00 $ 1,819,591.00 $ 5,367,090.00

Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway

B], Rehabilitate Taxiway [Taxiway C]

GL DET OH FZI Fostoria Metropolitan GA 16 $ 114,309.00 $ 114,309.00 $ - Rehabilitate Runway - 09/27, Rehabilitate Taxiway

GL DET OH EOP Pike County GA 12 $ 297,967.00 $ 297,967.00 $ - Acquire Land For Approaches

GL DET OH TZR Bolton Field R 24 $ 228,979.00 $ 228,979.00 $ - Rehabilitate Runway - 04/22

GL DET OH TOL Toledo Express P 77 $ 538,561.00 $ 538,561.00 $ - Modify Terminal Building, Rehabilitate Apron

GL DET OH HZY Northeast Ohio Regional GA 15 $ 7,527,002.00 $ 150,000.00 $ 7,377,002.00

Rehabilitate Runway [Runway Safety Area] - 09/27, Rehabilitate

Runway - 09/27

GL DET OH MFD Mansfield Lahm Regional GA 27 $ 151,800.00 $ 151,800.00 $ - Construct Taxiway, Install Miscellaneous NAVAIDS

GL DET OH PHD Harry Clever Field GA 13 $ 81,936.00 $ 81,936.00 $ - Rehabilitate Runway - 14/32

GL DET OH 6G5 Barnesville-Bradfield GA 11 $ 319,212.00 $ 319,212.00 $ - Acquire Land For Approaches

GL DET OH LUK Cincinnati Municipal Airport Lunken Field R 23 $ 202,500.00 $ 202,500.00 $ - Rehabilitate Runway - 03L/21R

GL DET OH 1G0 Wood County GA 27 $ 220,482.00 $ 220,482.00 $ - Update Airport Master Plan Study

GL DET OH I40 Richard Downing GA 21 $ 86,365.00 $ 86,365.00 $ -

Install Airport Beacons, Rehabilitate Apron, Rehabilitate

Taxiway, Wildlife Hazard Assessments

GL DET OH 7G8 Geauga County GA 19 $ 156,376.00 $ 156,376.00 $ -

Install Runway Lighting - 11/29, Install Runway Vertical/Visual

Guidance System - 11/29, Rehabilitate Runway - 11/29,

Rehabilitate Taxiway

GL DET OH BJJ Wayne County GA 23 $ 75,930.00 $ 75,930.00 $ - Rehabilitate Taxiway

GL DET OH I86 Perry County GA 12 $ 113,807.00 $ 113,807.00 $ - Install Runway Vertical/Visual Guidance System - 08/26

GL DET OH 17G Port Bucyrus-Crawford County GA 8 $ 155,118.00 $ 155,118.00 $ -

Improve Airport Drainage, Rehabilitate Apron, Rehabilitate

Runway - 04/22

GL DET OH 3G3 Wadsworth Municipal GA 18 $ 779,975.00 $ 779,975.00 $ - Rehabilitate Runway - 02/20

GL DET OH 1G5 Medina Municipal R 14 $ 64,800.00 $ 64,800.00 $ - Rehabilitate Taxiway

GL DET OH SCA Sidney Municipal GA 19 $ 227,650.00 $ 227,650.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate

Taxiway [A], Rehabilitate Taxiway [B]

GL DET OH CGF Cuyahoga County R 26 $ 8,983,527.00 $ 150,000.00 $ 8,833,527.00 Rehabilitate Runway - 06/24

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 17 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

GL DET OH TSO Carroll County-Tolson GA 11 $ 211,059.00 $ 211,059.00 $ - Rehabilitate Runway - 07/25

GL DET OH POV Portage County GA 28 $ 396,630.00 $ 396,630.00 $ - Rehabilitate Runway - 09/27

GL DET OH 02G Columbiana County GA 18 $ 57,327.00 $ 57,327.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 07/25, Rehabilitate

Taxiway

GL DET OH CLE Cleveland-Hopkins International P 110 $ 8,000,000.00 $ - $ 8,000,000.00 Construct Snow Removal Equipment Building

GL DMA MN AXN Chandler Field GA 13 $ 1,234,874.00 $ 480,898.00 $ 753,976.00

Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate

Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway B]

GL DMA MN XVG Longville Municipal GA 12 $ 305,235.00 $ 305,235.00 $ - Conduct Airport Master Plan Study, Rehabilitate Taxiway

GL DMA MN HIB Range Regional P 37 $ 121,714.00 $ 121,714.00 $ -

Install Runway Lighting - 13/31, Install Runway Vertical/Visual

Guidance System - 13/31, Install Taxiway Lighting, Rehabilitate

Airport Beacons

GL DMA MN EVM Eveleth-Virginia Municipal GA 12 $ 115,009.00 $ 115,009.00 $ - Conduct Miscellaneous Study, Rehabilitate Taxiway

GL DMA MN JKJ Moorhead Municipal GA 11 $ 88,814.00 $ 88,814.00 $ - Conduct Airport Master Plan Study, Rehabilitate Taxiway

GL DMA MN MVE Montevideo-Chippewa County GA 15 $ 83,831.00 $ 83,831.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

GL DMA MN 12Y Le Sueur Municipal GA 12 $ 108,000.00 $ 108,000.00 $ - Remove Obstructions

GL DMA MN OTG Worthington Municipal GA 14 $ 116,730.00 $ 116,730.00 $ - Rehabilitate Taxiway

GL DMA MN Y63 Elbow Lake Municipal - Pride of the Prairie GA 8 $ 356,670.00 $ 356,670.00 $ - Update Airport Master Plan Study

GL DMA MN SAZ Staples Municipal GA 11 $ 172,106.00 $ 172,106.00 $ -

Rehabilitate Runway - 14/32, Rehabilitate Taxiway [Hangar

Taxilanes], Rehabilitate Taxiway [Taxiway A]

GL DMA MN LXL Little Falls/Morrison County-Lindbergh Field GA 17 $ 211,540.00 $ 211,540.00 $ - Acquire Land for Development

GL DMA MN ROS Rush City Regional GA 8 $ 340,593.00 $ 340,593.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

GL DMA MN 55Y Rushford Municipal GA 8 $ 268,338.00 $ 268,338.00 $ - Construct Fuel Farm

GL DMA MN 12D Tower Municipal GA 11 $ 494,961.00 $ 494,961.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 08/26, Rehabilitate

Taxiway

GL DMA MN GYL Glencoe Municipal GA 5 $ 221,895.00 $ 221,895.00 $ - Update Airport Master Plan Study

GL DMA MN BBB Benson Municipal GA 9 $ 111,345.00 $ 111,345.00 $ -

Install Miscellaneous NAVAIDS, Rehabilitate Apron, Rehabilitate

Runway - 14/32, Rehabilitate Taxiway

GL DMA MN AEL Albert Lea Municipal GA 17 $ 124,654.00 $ 124,654.00 $ -

Acquire Snow Removal Equipment, Construct Parking Lot,

Construct Terminal Building

GL DMA MN 1D6 Hector Municipal GA 9 $ 243,000.00 $ 243,000.00 $ - Construct Building, Construct Fuel Farm

GL DMA MN RRT Warroad International Memorial GA 16 $ 552,076.00 $ 157,071.00 $ 395,005.00 Install Perimeter Fencing

GL DMA MN OWA Owatonna Degner Regional GA 19 $ 204,319.00 $ 204,319.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate

Taxiway

GL DMA MN PNM Princeton Municipal GA 12 $ 178,692.00 $ 178,692.00 $ - Construct Taxiway, Modify Access Road

GL DMA MN MWM Windom Municipal GA 11 $ 255,645.00 $ 255,645.00 $ - Update Airport Master Plan Study

GL DMA MN 10D Winsted Municipal GA 6 $ 173,401.00 $ 173,401.00 $ - Conduct Environmental Study

GL DMA MN 04Y Hawley Municipal GA 10 $ 466,949.00 $ 466,949.00 $ -

Conduct Miscellaneous Study, Construct Building, Rehabilitate

Apron, Rehabilitate Runway - 16/34, Rehabilitate Taxiway

GL DMA MN 21D Lake Elmo R 11 $ 306,933.00 $ 306,933.00 $ - Rehabilitate Taxiway

GL DMA MN CHU Houston County GA 6 $ 140,377.00 $ 140,377.00 $ -

Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate

Runway - 13/31

GL DMA MN BDE Baudette International GA 15 $ 252,513.00 $ 252,513.00 $ - Construct Taxiway

GL DMA MN *MNS State of Minnesota 8 $ 180,000.00 $ 180,000.00 $ - Conduct State System Plan Study

GL DMA MN DLH Duluth International P 60 $ 7,695,047.00 $ 1,578,632.00 $ 6,116,415.00

Install Perimeter Fencing required by 14 CFR 139, Rehabilitate

Runway - 09/27

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 18 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

GL DMA MN CKN Crookston Municipal Kirkwood Field GA 12 $ 369,900.00 $ 369,900.00 $ -

Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate

Taxiway

GL DMA MN FFM Fergus Falls Municipal-Einar Mickelson Field GA 13 $ 756,815.00 $ 756,815.00 $ - Acquire Snow Removal Equipment, Construct Taxiway

GL DMA MN HCO Hallock Municipal GA 8 $ 218,805.00 $ 218,805.00 $ -

Construct Building, Install Miscellaneous NAVAIDS [Precision

Approach Path Indicators], Install Miscellaneous NAVAIDS

[Runway End Identifier Lights]

GL DMA MN RWF Redwood Falls Municipal GA 15 $ 152,100.00 $ 152,100.00 $ - Acquire Land For Approaches, Remove Obstructions

GL DMA MN DYT Sky Harbor GA 11 $ 588,150.00 $ 588,150.00 $ - Construct Runway - 14/32

GL DMA MN ELO Ely Municipal GA 16 $ 2,836,567.00 $ 309,802.00 $ 2,526,765.00 Construct Taxiway, Remove Obstructions

GL DMA MN CNB Myers Field GA 12 $ 958,000.00 $ 958,000.00 $ -

Construct Building, Construct Snow Removal Equipment

Building, Construct Taxiway

GL DMA MN INL Falls International-Einarson Field P 29 $ 5,901,659.00 $ 4,330,816.00 $ 1,570,843.00

Expand Terminal Building, Rehabilitate Runway - 13/31,

Rehabilitate Taxiway

GL DMA MN RST Rochester International P 36 $ 7,348,270.00 $ 2,815,319.00 $ 4,532,951.00 Modify Terminal Building

GL DMA MN AIT Aitkin Municipal-Steve Kurtz Field GA 16 $ 177,516.00 $ 177,516.00 $ - Construct Fuel Farm

GL DMA MN MSP Minneapolis-St Paul International/Wold-Chamberlain P 113 $ 493,624.00 $ 493,624.00 $ - Install Perimeter Fencing

GL DMA MN STP St Paul Downtown Holman Field R 24 $ 2,540,242.00 $ 150,000.00 $ 2,390,242.00 Construct Taxiway, Rehabilitate Runway - 14/32

GL DMA MN SBU Blue Earth Municipal GA 13 $ 60,170.00 $ 60,170.00 $ - Construct Snow Removal Equipment Building

GL DMA MN D39 Sauk Centre Municipal GA 7 $ 1,964,672.00 $ 1,964,672.00 $ -

Improve Airport Miscellaneous Improvements, Install Airport

Beacons, Install Runway Vertical/Visual Guidance System -

14/32, Rehabilitate Apron, Rehabilitate Runway - 14/32,

Rehabilitate Taxiway

GL DMA MN DXX Lac qui Parle County GA 11 $ 98,396.00 $ 98,396.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 14/32, Rehabilitate

Taxiway

GL DMA MN ADC Wadena Municipal GA 9 $ 565,906.00 $ 565,906.00 $ -

Install Perimeter Fencing, Install Runway Vertical/Visual

Guidance System - 16/34

GL DMA MN CKC Grand Marais/Cook County GA 16 $ 180,435.00 $ 180,435.00 $ - Rehabilitate Terminal Building

GL DMA MN MOX Morris Municipal - Charlie Schmidt Field GA 7 $ 2,567,160.00 $ 2,567,160.00 $ - Construct Taxiway, Rehabilitate Runway - 14/32

GL DMA MN LVN Airlake R 9 $ 176,498.00 $ 176,498.00 $ - Rehabilitate Taxiway

GL DMA MN MKT Mankato Regional GA 23 $ 182,700.00 $ 182,700.00 $ - Install Airfield Guidance Signs

GL DMA MN CFE Buffalo Municipal GA 13 $ 220,449.00 $ 220,449.00 $ - Improve Access Road, Rehabilitate Parking Lot

GL DMA MN STC St. Cloud Regional P 28 $ 195,117.00 $ 195,117.00 $ - Conduct Environmental Study, Rehabilitate Taxiway

GL DMA MN BRD Brainerd Lakes Regional P 41 $ 1,253,575.00 $ 1,253,575.00 $ -

Rehabilitate Taxiway [Hangar Area Taxiways], Rehabilitate

Taxiway [Taxiway B], Rehabilitate Terminal Building

GL DMA MN BJI Bemidji Regional P 32 $ 1,778,430.00 $ 1,778,430.00 $ -

Acquire Aircraft Rescue & Fire Fighting Safety Equipment,

Conduct Environmental Study, Construct Snow Removal

Equipment Building

GL DMA MN RGK Red Wing Regional GA 14 $ 27,742.00 $ 27,742.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 09/27, Rehabilitate

Taxiway

GL DMA MN BDH Willmar Municipal-John L Rice Field GA 10 $ 348,766.00 $ 348,766.00 $ - Rehabilitate Taxiway, Update Airport Master Plan Study

GL DMA MN FRM Fairmont Municipal GA 15 $ 346,241.00 $ 346,241.00 $ - Rehabilitate Taxiway

GL DMA MN TOB Dodge Center GA 10 $ 653,551.00 $ 653,551.00 $ - Construct Building

GL DMA MN JMR Mora Municipal GA 11 $ 1,285,615.00 $ 1,285,615.00 $ - Construct Runway - Plan-1, Wildlife Hazard Assessments

GL DMA MN TVF Thief River Falls Regional GA 20 $ 357,707.00 $ 357,707.00 $ - Acquire Snow Removal Equipment

GL DMA MN PEX Paynesville Municipal GA 10 $ 88,200.00 $ 88,200.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 11/29, Rehabilitate

Taxiway

GL DMA MN PKD Park Rapids Municipal-Konshok Field GA 15 $ 1,517,745.00 $ 680,445.00 $ 837,300.00 Rehabilitate Apron, Rehabilitate Taxiway

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 19 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

GL DMA MN DTL Detroit Lakes-Wething Field GA 12 $ 3,891,125.00 $ 438,708.00 $ 3,452,417.00

Construct Runway Safety Area [Phase 1 - Land Acquisiton] -

13/31, Construct Runway Safety Area [Phase 2 - Design] - 13/31

GL DMA MN PQN Pipestone Municipal GA 9 $ 514,800.00 $ 514,800.00 $ - Rehabilitate Runway - 18/36, Rehabilitate Taxiway

GL DMA ND DVL Devils Lake Regional CS 35 $ 117,279.00 $ 117,279.00 $ - Rehabilitate Runway - 03/21, Rehabilitate Taxiway

GL DMA ND Y37 Park River - W C Skjerven Field GA 10 $ 504,584.00 $ 504,584.00 $ - Construct Building

GL DMA ND 5H4 Harvey Municipal GA 13 $ 507,082.00 $ 507,082.00 $ -

Install Airfield Guidance Signs, Install Airport Beacons, Install

Miscellaneous NAVAIDS, Install Miscellaneous NAVAIDS, Install

Runway Vertical/Visual Guidance System - 11/29, Rehabilitate

Runway Lighting - 11/29, Rehabilitate Taxiway Lighting

GL DMA ND 6L3 Lisbon Municipal GA 13 $ 301,410.00 $ 301,410.00 $ - Rehabilitate Runway - 14/32, Rehabilitate Taxiway

GL DMA ND 5N8 Casselton Robert Miller Regional GA 22 $ 251,478.00 $ 251,478.00 $ - Update Airport Master Plan Study

GL DMA ND Y19 Mandan Municipal GA 21 $ 238,500.00 $ 238,500.00 $ - Acquire Snow Removal Equipment

GL DMA ND 46D Carrington Municipal GA 10 $ 208,800.00 $ 208,800.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate

Taxiway

GL DMA ND DIK Dickinson - Theodore Roosevelt Regional P 36 $ 675,000.00 $ 675,000.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 07/25, Rehabilitate

Runway - 14/32, Rehabilitate Taxiway

GL DMA ND GFK Grand Forks International P 50 $ 1,732,447.00 $ 1,732,447.00 $ - Construct Taxiway

GL DMA ND 4V4 Northwood Municipal-Vince Field GA 13 $ 90,061.00 $ 90,061.00 $ - Rehabilitate Runway - 08/26, Rehabilitate Taxiway

GL DMA ND JMS Jamestown Regional CS 41 $ 63,000.00 $ 63,000.00 $ - Wildlife Hazard Assessments

GL DMA ND 3P3 Mott Municipal GA 14 $ 117,000.00 $ 117,000.00 $ - Install Airport Beacons, Install Miscellaneous NAVAIDS

GL DMA ND MOT Minot International P 52 $ 990,460.00 $ 990,460.00 $ -

Acquire Snow Removal Equipment, Construct Terminal Building,

Install Airfield Guidance Signs

GL DMA ND BIS Bismarck Municipal P 57 $ 13,860,613.00 $ 2,121,363.00 $ 11,739,250.00

Rehabilitate Runway [Phase 1] - 13/31, Rehabilitate Runway

[Phase 2] - 13/31

GL DMA ND 08D Stanley Municipal GA 14 $ 1,019,700.00 $ 1,019,700.00 $ - Expand Apron, Extend Taxiway

GL DMA ND S25 Watford City Municipal GA 17 $ 292,500.00 $ 292,500.00 $ - Conduct Environmental Study

GL DMA ND D57 Glen Ullin Regional GA 14 $ 115,767.00 $ 115,767.00 $ - Conduct Aeronautical Survey for RNAV Approach

GL DMA ND 51D Edgeley Municipal GA 15 $ 697,500.00 $ 697,500.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 14/32, Rehabilitate

Taxiway

GL DMA ND D05 Garrison Municipal GA 13 $ 58,210.00 $ 58,210.00 $ -

Install Airport Beacons, Install Miscellaneous NAVAIDS,

Rehabilitate Apron, Rehabilitate Taxiway

GL DMA ND +09N New 2 $ 27,556,670.00 $ 1,556,669.99 $ 26,000,000.01 Construct New Airport

GL DMA ND GAF Hutson Field GA 9 $ 230,400.00 $ 230,400.00 $ - Update Airport Master Plan Study

GL DMA ND 2D5 Oakes Municipal GA 11 $ 36,000.00 $ 36,000.00 $ -

Construct Snow Removal Equipment Building, Construct

Terminal Building

GL DMA ND BAC Barnes County Municipal GA 16 $ 27,004.00 $ 27,004.00 $ - Wildlife Hazard Assessments

GL DMA ND FAR Hector International P 46 $ 5,393,507.00 $ 3,153,134.00 $ 2,240,373.00 Rehabilitate Taxiway [A3], Rehabilitate Taxiway [T]

GL DMA ND PMB Pembina Municipal GA 9 $ 149,041.00 $ 149,041.00 $ - Rehabilitate Runway - 15/33, Rehabilitate Taxiway

GL DMA ND RUG Rugby Municipal GA 13 $ 79,129.00 $ 79,129.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 12/30, Rehabilitate

Runway Lighting - 12/30, Rehabilitate Taxiway

GL DMA ND D55 Robertson Field GA 12 $ 627,462.00 $ 627,462.00 $ - Rehabilitate Runway - 14/32, Rehabilitate Taxiway

GL DMA ND D09 Bottineau Municipal GA 14 $ 305,277.00 $ 305,277.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate

Taxiway, Widen Taxiway

GL DMA ND JMS Jamestown Regional CS 42 $ 779,400.00 $ 94,998.00 $ 684,402.00 Environmental Mitigation

GL DMA SD 1D8 Redfield Municipal GA 9 $ 522,000.00 $ 465,000.00 $ 57,000.00 Construct Runway - Plan-1, Wildlife Hazard Assessments

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 20 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

GL DMA SD *SDV Various Locations in South Dakota 22 $ 657,000.00 $ 657,000.00 $ -

Rehabilitate Apron (Bison Municipal; Chan Gurney Municipal;

Flandreau Municipal; Gregory Municipal - Flynn Field; Milbank

Municipal; Mobridge Municipal; Rosebud Sioux Tribal; Sisseton

Municipal; Winner Regional), Rehabilitate Runway (Bison

Municipal - 11/

GL DMA SD 8D7 Clark County GA 10 $ 153,000.00 $ 153,000.00 $ - Update Airport Master Plan Study

GL DMA SD RAP Rapid City Regional P 48 $ 2,776,944.00 $ 2,776,944.00 $ -

Acquire Snow Removal Equipment, Rehabilitate Apron,

Rehabilitate Terminal Building

GL DMA SD 600000 Wilder GA 11 $ 328,500.00 $ 328,500.00 $ -

Improve Access Road, Install Perimeter Fencing not Required by

14 CFR 139/49 CFR 1542

GL DMA SD 8D3 Sisseton Municipal GA 12 $ 31,500.00 $ 31,500.00 $ - Environmental Mitigation

GL DMA SD 1D3 Platte Municipal GA 9 $ 1,926,000.00 $ 1,926,000.00 $ - Rehabilitate Runway - 14/32, Rehabilitate Taxiway

GL DMA SD EFC Belle Fourche Municipal GA 11 $ 435,759.00 $ 435,759.00 $ - Construct Fuel Farm

GL DMA SD 9D0 Highmore Municipal GA 8 $ 748,700.00 $ 748,700.00 $ - Construct Taxiway

GL DMA SD FSD Joe Foss Field P 50 $ 7,048,235.00 $ 3,609,163.00 $ 3,439,072.00 Rehabilitate Runway - 03/21, Rehabilitate Taxiway

GL DMA SD 7G9 Canton Municipal GA 6 $ 82,563.00 $ 82,563.00 $ - Install Perimeter Fencing

GL DMA SD 49B Sturgis Municipal GA 13 $ 122,992.00 $ 122,992.00 $ - Rehabilitate Apron

GL DMA SD 4P3 Flandreau Municipal GA 9 $ 153,000.00 $ 153,000.00 $ - Update Airport Master Plan Study

GL DMA SD 1D8 Redfield Municipal GA 10 $ 135,000.00 $ 135,000.00 $ - Update Airport Master Plan Study

GL DMA SD 98D Onida Municipal GA 9 $ 306,000.00 $ 306,000.00 $ - Extend Taxiway, Rehabilitate Taxiway, Widen Taxiway

GL DMA SD ATY Watertown Regional GA 30 $ 7,875,000.00 $ 1,151,693.00 $ 6,723,307.00

Rehabilitate Runway - 12/30, Rehabilitate Taxiway, Rehabilitate

Taxiway Lighting

GL DMA SD MKA Miller Municipal GA 9 $ 409,500.00 $ 409,500.00 $ - Rehabilitate Apron

GL DMA SD HSR Hot Springs Municipal GA 12 $ 994,174.00 $ 994,174.00 $ - Construct Taxiway

GL DMA SD BKX Brookings Regional GA 28 $ 81,000.00 $ 81,000.00 $ - Rehabilitate Runway - 17/35

GL DMA SD ABR Aberdeen Regional P 36 $ 6,075,000.00 $ 1,003,201.00 $ 5,071,799.00 Construct Runway - 17/35

GL DMA SD Y14 Marv Skie-Lincoln County GA 13 $ 943,187.00 $ 943,187.00 $ - Rehabilitate Taxiway

GL DMA SD 9V6 Martin Municipal GA 11 $ 46,000.00 $ 46,000.00 $ - Install Perimeter Fencing

GL DMA SD 6V4 Wall Municipal GA 7 $ 295,000.00 $ 295,000.00 $ - Update Airport Master Plan Study

GL DMA SD CUT Custer County GA 12 $ 60,000.00 $ 60,000.00 $ - Rehabilitate Apron

GL DMA SD MDS Madison Municipal GA 13 $ 1,077,910.00 $ 1,077,910.00 $ - Environmental Mitigation

GL DMA SD PIR Pierre Regional CS 36 $ 2,180,000.00 $ 157,757.00 $ 2,022,243.00 Construct Aircraft Rescue & Fire Fighting Building

GL DMA SD PIR Pierre Regional CS 37 $ 745,000.00 $ - $ 745,000.00 Update Airport Master Plan Study

GL DMA SD AGZ Wagner Municipal GA 12 $ 427,500.00 $ 427,500.00 $ -

Acquire Easement For Approaches, Rehabilitate Runway - 14/32,

Rehabilitate Taxiway

GL DMA SD IEN Pine Ridge GA 14 $ 592,000.00 $ 592,000.00 $ - Expand Apron

GL DMA SD ICR Winner Regional GA 14 $ 36,900.00 $ 36,900.00 $ - Expand Apron

GL DMA SD HON Huron Regional GA 34 $ 261,000.00 $ 261,000.00 $ - Update Airport Master Plan Study

GL DMA SD D07 Faith Municipal GA 8 $ 289,800.00 $ 289,800.00 $ - Construct Fuel Farm

GL DMA SD 8V3 Parkston Municipal GA 11 $ 479,079.00 $ 479,079.00 $ - Construct Apron, Construct Parking Lot, Construct Taxiway

GL DMA SD 9D1 Gregory Municipal - Flynn Field GA 13 $ 27,000.00 $ 27,000.00 $ - Expand Apron

NE ANE CT HVN Tweed-New Haven P 46 $ 926,973.00 $ 738,946.00 $ 188,027.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

NE ANE CT BDL Bradley International P 64 $ 678,780.00 $ 1.00 $ 678,779.00 Improve Airport Drainage

NE ANE CT BDL Bradley International P 62 $ 2,107,911.00 $ 2,107,911.00 $ - Improve Airport Drainage

NE ANE CT MMK Meriden Markham Municipal GA 19 $ 100,539.00 $ 100,539.00 $ - Conduct Environmental Study

NE ANE CT DXR Danbury Municipal R 39 $ 249,239.00 $ 249,239.00 $ - Acquire Snow Removal Equipment

NE ANE CT HVN Tweed-New Haven P 45 $ 505,530.00 $ 505,530.00 $ - Update Airport Master Plan Study

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 21 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

NE ANE MA LWM Lawrence Municipal R 36 $ 9,405,000.00 $ 3,163,247.00 $ 6,241,753.00

Construct Runway Safety Area - 05/23, Rehabilitate Runway -

05/23

NE ANE MA ORH Worcester Regional P 50 $ 7,749,620.00 $ 1,150,000.00 $ 6,599,620.00 Construct Taxiway

NE ANE MA GDM Gardner Municipal GA 16 $ 171,000.00 $ 171,000.00 $ - Acquire Snow Removal Equipment

NE ANE MA MVY Martha's Vineyard P 43 $ 8,310,285.00 $ 3,941,920.00 $ 4,368,365.00 Construct Aircraft Rescue & Fire Fighting Building

NE ANE MA CEF Westover ARB/Metropolitan GA 34 $ 2,500,000.00 $ 6,364.00 $ 2,493,636.00 Acquire Land for Noise Compatibility within 65 - 69 DNL

NE ANE MA 1B9 Mansfield Municipal GA 31 $ 168,750.00 $ 168,750.00 $ - Remove Obstructions

NE ANE MA 3B0 Southbridge Municipal GA 23 $ 150,000.00 $ 150,000.00 $ - Construct Building

NE ANE MA BAF Westfield-Barnes Regional GA 50 $ 2,499,999.00 $ - $ 2,499,999.00 Acquire Land for Noise Compatibility within 65 - 69 DNL

NE ANE MA EWB New Bedford Regional CS 54 $ 120,600.00 $ - $ 120,600.00 Remove Obstructions

NE ANE MA HYA Barnstable Municipal-Boardman/Polando Field P 65 $ 124,200.00 $ 124,200.00 $ - Rehabilitate Apron

NE ANE MA BED Laurence G Hanscom Field R 38 $ 743,148.00 $ 743,148.00 $ - Rehabilitate Runway - 05/23, Rehabilitate Taxiway

NE ANE MA TAN Taunton Municipal - King Field GA 26 $ 77,580.00 $ 77,580.00 $ - Wildlife Hazard Assessments

NE ANE MA ACK Nantucket Memorial P 65 $ 575,100.00 $ 575,100.00 $ - Modify Terminal Building, Security Enhancements

NE ANE MA BOS General Edward Lawrence Logan International P 125 $ 1,346,250.00 $ - $ 1,346,250.00 Conduct Miscellaneous Study

NE ANE MA LWM Lawrence Municipal R 37 $ 399,632.00 $ - $ 399,632.00 Construct Runway Safety Area - 05/23

NE ANE MA PVC Provincetown Municipal P 41 $ 443,412.00 $ 443,412.00 $ - Rehabilitate Runway Lighting - 07/25

NE ANE MA BOS General Edward Lawrence Logan International P 124 $ 5,357,114.00 $ 5,357,114.00 $ - Rehabilitate Taxiway

NE ANE MA EWB New Bedford Regional CS 52 $ 117,900.00 $ 117,900.00 $ - Acquire Miscellaneous Land

NE ANE MA PVC Provincetown Municipal P 33 $ 243,900.00 $ 243,900.00 $ - Environmental Mitigation

NE ANE MA ORH Worcester Regional P 51 $ 1,443,188.00 $ - $ 1,443,188.00 Install Taxiway Lighting

NE ANE MA HYA Barnstable Municipal-Boardman/Polando Field P 63 $ 6,721,200.00 $ 1,334,014.00 $ 5,387,186.00

Rehabilitate Runway [Rehabilitate Taxiway B] - 15/33,

Rehabilitate Runway [Rehabilitate Taxiway C] - 15/33,

Rehabilitate Runway - 15/33

NE ANE MA ACK Nantucket Memorial P 64 $ 1,148,850.00 $ 1,148,850.00 $ - Improve Airport Miscellaneous Improvements

NE ANE MA BAF Westfield-Barnes Regional GA 49 $ 261,269.00 $ 261,269.00 $ - Rehabilitate Runway - 02/20

NE ANE MA PYM Plymouth Municipal GA 44 $ 88,621.00 $ 88,621.00 $ - Conduct Miscellaneous Study

NE ANE MA HYA Barnstable Municipal-Boardman/Polando Field P 64 $ 88,465.00 $ - $ 88,465.00 Rehabilitate Runway - 15/33

NE ANE MA EWB New Bedford Regional CS 53 $ 58,770.00 $ 32,100.00 $ 26,670.00 Remove Obstructions

NE ANE ME LRG Lincoln Regional GA 12 $ 60,570.00 $ 60,570.00 $ - Remove Obstructions

NE ANE ME B21 Sugarloaf Regional GA 8 $ 397,170.00 $ 397,170.00 $ - Construct Fuel Farm

NE ANE ME FVE Northern Aroostook Regional GA 19 $ 315,000.00 $ 315,000.00 $ - Construct Fuel Farm

NE ANE ME PWM Portland International Jetport P 80 $ 218,700.00 $ 218,700.00 $ - Conduct Environmental Study

NE ANE ME LRG Lincoln Regional GA 11 $ 66,015.00 $ 66,015.00 $ - Remove Obstructions

NE ANE ME IWI Wiscasset GA 18 $ 81,000.00 $ 81,000.00 $ - Remove Obstructions

NE ANE ME AUG Augusta State CS 29 $ 522,839.00 $ 522,839.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 08/26, Rehabilitate

Runway - 08/26, Rehabilitate Runway - 17/35, Rehabilitate

Taxiway [Taxiway B], Remove Obstructions

NE ANE ME BST Belfast Municipal GA 15 $ 190,561.00 $ 190,561.00 $ - Remove Obstructions

NE ANE ME CAR Caribou Municipal GA 18 $ 306,000.00 $ 306,000.00 $ - Construct Taxiway

NE ANE ME RKD Knox County Regional P 52 $ 250,200.00 $ 250,200.00 $ -

Install Airport Beacons, Rehabilitate Runway - 03/21,

Rehabilitate Taxiway Lighting

NE ANE ME LEW Auburn/Lewiston Municipal R 22 $ 809,532.00 $ 809,532.00 $ - Rehabilitate Apron

NE ANE ME 81B Oxford County Regional GA 11 $ 180,990.00 $ 180,990.00 $ - Update Airport Master Plan Study

NE ANE ME IWI Wiscasset GA 19 $ 162,900.00 $ 162,900.00 $ - Remove Obstructions

NE ANE ME B19 Biddeford Municipal GA 11 $ 126,000.00 $ 126,000.00 $ - Remove Obstructions

NE ANE ME BHB Hancock County-Bar Harbor CS 41 $ 590,267.00 $ 590,267.00 $ - Install Guidance Signs, Install Miscellaneous NAVAIDS

NE ANE ME PNN Princeton Municipal GA 7 $ 216,000.00 $ 216,000.00 $ - Remove Obstructions

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 22 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

NE ANE ME BGR Bangor International P 70 $ 1,763,719.00 $ 1,763,719.00 $ - Improve Terminal Building

NE ANE ME BST Belfast Municipal GA 16 $ 215,635.00 $ 215,635.00 $ - Construct Taxiway, Remove Obstructions

NE ANE ME OLD Dewitt Field, Old Town Municipal GA 15 $ 82,350.00 $ 82,350.00 $ - Install Airport Beacons

NE ANE ME PWM Portland International Jetport P 81 $ 3,596,746.00 $ 3,596,746.00 $ - Expand Apron

NE ANE ME 3B1 Greenville Municipal GA 18 $ 2,976,300.00 $ 1,962,183.00 $ 1,014,117.00 Construct Taxiway

NE ANE ME 3B1 Greenville Municipal GA 19 $ 32,400.00 $ 32,400.00 $ - Construct Taxiway

NE ANE ME WVL Waterville Robert Lafleur GA 22 $ 119,700.00 $ 119,700.00 $ - Acquire Easement For Approaches

NE ANE ME 59B Newton Field GA 14 $ 91,944.00 $ 91,944.00 $ - Conduct Aeronautical Survey for RNAV Approach

NE ANE ME IZG Eastern Slopes Regional GA 18 $ 666,900.00 $ 666,900.00 $ - Rehabilitate Apron

NE ANE ME 1B0 Dexter Regional GA 11 $ 76,570.00 $ 76,570.00 $ - Update Airport Master Plan Study

NE ANE ME BXM Brunswick Executive GA 25 $ 1,558,098.00 $ - $ 1,558,098.00 Rehabilitate Building [Military Airport Program]

NE ANE ME RKD Knox County Regional P 51 $ 93,600.00 $ 93,600.00 $ - Conduct Environmental Study

NE ANE ME MVM Machias Valley GA 10 $ 133,200.00 $ 133,200.00 $ - Install Airport Beacons

NE ANE ME 0B1 Bethel Regional GA 13 $ 385,200.00 $ 385,200.00 $ -

Install Airport Beacons, Rehabilitate Runway Lighting - 14/32,

Rehabilitate Taxiway Lighting

NE ANE ME PQI Northern Maine Regional Airport at Presque Isle P 45 $ 4,940,000.00 $ 999,905.00 $ 3,940,095.00 Rehabilitate Taxiway

NE ANE ME B19 Biddeford Municipal GA 12 $ 384,300.00 $ 271,097.00 $ 113,203.00 Remove Obstructions

NE ANE ME BGR Bangor International P 69 $ 1,649,999.00 $ 1,649,999.00 $ - Modify Terminal Building

NE ANE ME BXM Brunswick Executive GA 23 $ 119,304.00 $ 119,304.00 $ - Rehabilitate Apron

NE ANE ME BXM Brunswick Executive GA 26 $ 71,100.00 $ 71,100.00 $ - Conduct Environmental Study

NE ANE ME 1B0 Dexter Regional GA 12 $ 81,900.00 $ 81,900.00 $ - Rehabilitate Runway - 16/34

NE ANE ME BXM Brunswick Executive GA 24 $ 2,900,000.00 $ - $ 2,900,000.00 Rehabilitate Building [Military Airport Program]

NE ANE NH LEB Lebanon Municipal P 53 $ 2,301,300.00 $ 2,301,300.00 $ - Rehabilitate Taxiway

NE ANE NH *NHB New Hampshire State Block Grant Program 22 $ 1,157,679.00 $ 1,157,679.00 $ -Non primary development projects in state block grant program

NE ANE NH MHT Manchester P 105 $ 1,568,737.00 $ 1,568,737.00 $ - Modify Terminal Building

NE ANE NH MHT Manchester P 107 $ 3,515,400.00 $ 2,807,472.00 $ 707,928.00 Rehabilitate Taxiway

NE ANE NH PSM Portsmouth International at Pease P 56 $ 491,265.00 $ 491,265.00 $ - Rehabilitate Terminal Building, Security Enhancements

NE ANE NH *NHB New Hampshire State Block Grant Program 24 $ 1,943,541.00 $ - $ 1,943,541.00 Non primary development projects in state block grant program

NE ANE NH PSM Portsmouth International at Pease P 57 $ 360,000.00 $ - $ 360,000.00 Construct Aircraft Rescue & Fire Fighting Training Facility

NE ANE NH LEB Lebanon Municipal P 52 $ 396,000.00 $ 396,000.00 $ - Remove Obstructions

NE ANE NH *NHB New Hampshire State Block Grant Program 23 $ 1,196,073.00 $ 1,196,073.00 $ -Non primary development projects in state block grant program

NE ANE NH MHT Manchester P 106 $ 89,775.00 $ 89,775.00 $ - Conduct Miscellaneous Study

NE ANE RI PVD Theodore Francis Green State P 118 $ 887,032.00 $ - $ 887,032.00 Acquire Land for Noise Compatibility within 70 - 74 DNL

NE ANE RI PVD Theodore Francis Green State P 119 $ 8,435,954.00 $ - $ 8,435,954.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

NE ANE RI PVD Theodore Francis Green State P 120 $ 6,847,510.00 $ 2,484,142.00 $ 4,363,368.00

Extend Runway [Engineered Materials Arresting System] - 05/23,

Extend Runway [Pavement Construction] - 05/23

NE ANE RI PVD Theodore Francis Green State P 117 $ 14,152,490.00 $ 2,397,885.00 $ 11,754,605.00

Extend Runway [Phase 7 - NAVAIDS] - 05/23, Extend Runway

[Phase 8 - Site Work, Mobilization, Jetblast Fence, and

Construction Traffic Safety] - 05/23

NE ANE RI PVD Theodore Francis Green State P 121 $ 6,065,247.00 $ - $ 6,065,247.00 Acquire Land for Noise Compatibility within 70 - 74 DNL

NE ANE VT RUT Rutland - Southern Vermont Regional CS 47 $ 3,989,242.00 $ - $ 3,989,242.00 Construct Taxiway

NE ANE VT BTV Burlington International P 107 $ 3,267,528.00 $ 1,161,672.00 $ 2,105,856.00 Rehabilitate Apron

NE ANE VT BTV Burlington International P 110 $ 405,000.00 $ - $ 405,000.00 Conduct Noise Compatibility Plan Study

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 23 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

NE ANE VT *VTV Various Locations in Vermont 12 $ 291,501.00 $ 291,501.00 $ -

Rehabilitate Apron (Edward F Knapp State; Hartness State

(Springfield); Middlebury State; Newport State; Rutland -

Southern Vermont Regional; William H Morse State),

Rehabilitate Runway (Edward F Knapp State - 17/35; Hartness

State (Springfield) - 05/23;

NE ANE VT 6B0 Middlebury State GA 11 $ 33,750.00 $ 33,750.00 $ - Remove Obstructions

NE ANE VT RUT Rutland - Southern Vermont Regional CS 46 $ 150,000.00 $ 150,000.00 $ - Acquire Snow Removal Equipment

NE ANE VT 6B0 Middlebury State GA 12 $ 2,859,393.00 $ 96,444.00 $ 2,762,949.00

Extend Runway [Construct Extension] - 01/19, Extend Runway

[Construct Runway Safety Area] - 01/19, Extend Taxiway

NE ANE VT *VTS State of Vermont 13 $ 483,109.00 $ 483,109.00 $ - Conduct State System Plan Study

NE ANE VT BTV Burlington International P 106 $ 2,172,069.00 $ 2,172,069.00 $ - Rehabilitate Apron

NE ANE VT FSO Franklin County State GA 8 $ 162,180.00 $ 162,180.00 $ - Remove Obstructions

NE ANE VT MVL Morrisville-Stowe State GA 16 $ 305,100.00 $ 305,100.00 $ - Update Airport Master Plan Study

NE ANE VT BTV Burlington International P 108 $ 2,090,226.00 $ - $ 2,090,226.00 Acquire Land for Noise Compatibility within 70 - 74 DNL

NE ANE VT BTV Burlington International P 109 $ 13,995,000.00 $ - $ 13,995,000.00 Acquire Land for Noise Compatibility within 70 - 74 DNL

NE ANE VT CDA Caledonia County GA 4 $ 269,856.00 $ 269,856.00 $ - Conduct Environmental Study

NM DEN CO MTJ Montrose Regional P 46 $ 1,024,987.00 $ 1,024,987.00 $ - Rehabilitate Taxiway

NM DEN CO 1V6 Fremont County GA 15 $ 260,272.00 $ 260,272.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

NM DEN CO AKO Colorado Plains Regional GA 18 $ 120,000.00 $ 120,000.00 $ - Install Runway Vertical/Visual Guidance System - 11/29

NM DEN CO GJT Grand Junction Regional P 55 $ 2,216,716.00 $ 2,216,716.00 $ - Construct Runway - 11/29

NM DEN CO STK Sterling Municipal GA 14 $ 154,462.00 $ 154,462.00 $ - Install Perimeter Fencing

NM DEN CO DEN Denver International P 89 $ 3,731,487.00 $ 2,633,209.00 $ 1,098,278.00 Rehabilitate Taxiway Lighting

NM DEN CO EGE Eagle County Regional P 56 $ 8,612,649.00 $ 1,662,649.00 $ 6,950,000.00 Rehabilitate Apron

NM DEN CO AKO Colorado Plains Regional GA 17 $ 300,000.00 $ 300,000.00 $ - Conduct Airport Master Plan Study

NM DEN CO 4V1 Spanish Peaks Airfield GA 7 $ 200,000.00 $ 200,000.00 $ - Expand Apron, Install Airport Beacons

NM DEN CO DEN Denver International P 88 $ 2,940,702.00 $ 2,940,702.00 $ - Rehabilitate Taxiway

NM DEN CO HDN Yampa Valley P 42 $ 1,100,000.00 $ 1,100,000.00 $ -Acquire Snow Removal Equipment, Install Airport Beacons

NM DEN CO DEN Denver International P 87 $ 1,969,942.00 $ 1,969,942.00 $ - Rehabilitate Taxiway

NM DEN CO GJT Grand Junction Regional P 54 $ 4,226,773.00 $ 4,226,773.00 $ - Rehabilitate Apron

NM DEN CO 4V0 Rangely GA 12 $ 223,622.00 $ 223,622.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 06/24, Rehabilitate

Taxiway

NM DEN CO MTJ Montrose Regional P 47 $ 224,349.00 $ 224,349.00 $ - Acquire Land For Approaches

NM DEN CO TAD Perry Stokes GA 9 $ 4,789,454.00 $ 4,789,454.00 $ -

Install Runway Vertical/Visual Guidance System - 03/21,

Rehabilitate Runway - 03/21, Rehabilitate Runway Lighting -

03/21

NM DEN CO DRO Durango-La Plata County P 47 $ 261,668.00 $ 261,668.00 $ - Rehabilitate Runway - 03/21

NM DEN CO TEX Telluride Regional CS 34 $ 6,029,595.00 $ 174,500.00 $ 5,855,095.00 Improve Runway Safety Area - 09/27

NM DEN CO HEQ Holyoke GA 11 $ 450,000.00 $ 450,000.00 $ - Construct Taxiway

NM DEN CO EIK Erie Municipal GA 16 $ 50,689.00 $ 50,689.00 $ - Construct Snow Removal Equipment Building

NM DEN CO CAG Craig-Moffat GA 15 $ 225,000.00 $ 225,000.00 $ - Conduct Airport Master Plan Study

NM DEN CO ALS San Luis Valley Regional/Bergman Field CS 20 $ 93,366.00 $ 93,366.00 $ - Install Airfield Guidance Signs

NM DEN CO BJC Rocky Mountain Metropolitan R 59 $ 6,290,000.00 $ - $ 6,290,000.00 Rehabilitate Runway - 12R/30L, Rehabilitate Taxiway Lighting

NM DEN CO PSO Stevens Field GA 23 $ 296,755.00 $ 296,755.00 $ - Rehabilitate Apron, Rehabilitate Runway - 01/19

NM DEN CO APA Centennial R 50 $ 7,109,595.00 $ 150,000.00 $ 6,959,595.00 Rehabilitate Runway - 17L/35R

NM DEN CO 2V5 Wray Municipal GA 15 $ 145,000.00 $ 145,000.00 $ - Install Runway Vertical/Visual Guidance System - 17/35

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 24 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

NM DEN CO ALS San Luis Valley Regional/Bergman Field CS 21 $ 206,634.00 $ 206,634.00 $ - Rehabilitate Runway - 02/20

NM DEN CO GUC Gunnison-Crested Butte Regional P 51 $ 7,375,810.00 $ 1,069,133.00 $ 6,306,677.00 Rehabilitate Runway - 06/24

NM DEN CO FMM Fort Morgan Municipal GA 12 $ 150,000.00 $ 150,000.00 $ - Conduct Airport Master Plan Study

NM DEN CO GXY Greeley-Weld County GA 25 $ 5,879,666.00 $ 16,484.00 $ 5,863,182.00 Rehabilitate Runway - 17/35, Rehabilitate Taxiway

NM DEN CO LMO Vance Brand GA 15 $ 253,429.00 $ 253,429.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

NM DEN CO 2V6 Yuma Municipal GA 13 $ 216,000.00 $ 216,000.00 $ - Conduct Airport Master Plan Study

NM DEN CO COS City of Colorado Springs Municipal P 59 $ 10,398,640.00 $ 3,660,640.00 $ 6,738,000.00 Rehabilitate Taxiway

NM DEN CO DRO Durango-La Plata County P 48 $ 164,520.00 $ 164,520.00 $ - Rehabilitate Taxiway

NM DEN CO CAG Craig-Moffat GA 16 $ 205,000.00 $ 205,000.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 07/25, Rehabilitate

Taxiway

NM DEN CO TAD Perry Stokes GA 10 $ 1,473,633.00 $ 1,473,633.00 $ - Rehabilitate Runway - 03/21

NM DEN CO EEO Meeker Coulter Field GA 11 $ 224,636.00 $ 224,636.00 $ - Rehabilitate Apron, Rehabilitate Runway - 03/21

NM DEN UT U52 Beaver Municipal GA 14 $ 1,651,000.00 $ 1,651,000.00 $ - Rehabilitate Runway - 13/31

NM DEN UT U64 Monticello GA 9 $ 232,000.00 $ 232,000.00 $ - Expand Apron, Improve Service Road

NM DEN UT U34 Green River Municipal GA 11 $ 464,567.00 $ 464,567.00 $ -Construct Fuel Farm, Construct Taxiway, Remove Obstructions

NM DEN UT U42 South Valley Regional R 17 $ 2,675,000.00 $ 2,260,477.00 $ 414,523.00

Construct Taxiway, Rehabilitate Runway - 16/34, Rehabilitate

Runway Lighting - 16/34

NM DEN UT CDC Cedar City Regional P 31 $ 1,030,279.00 $ 895,895.00 $ 134,384.00 Rehabilitate Apron, Rehabilitate Taxiway

NM DEN UT 1L9 Parowan GA 16 $ 895,170.00 $ 895,170.00 $ - Acquire Land for Development

NM DEN UT RIF Richfield Municipal GA 17 $ 300,000.00 $ 300,000.00 $ - Construct Snow Removal Equipment Building

NM DEN UT LGU Logan-Cache GA 28 $ 275,039.00 $ 275,039.00 $ - Rehabilitate Taxiway

NM DEN UT PVU Provo Municipal P 40 $ 750,000.00 $ 750,000.00 $ - Update Airport Master Plan Study

NM DEN UT SLC Salt Lake City International P 109 $ 6,910,000.00 $ 2,982,308.00 $ 3,927,692.00

Rehabilitate Runway - 17/35, Rehabilitate Runway Lighting -

17/35

NM DEN UT SGU St George Regional P 26 $ 815,670.00 $ 815,670.00 $ -

Acquire Snow Removal Equipment, Install Perimeter Fencing,

Rehabilitate Apron

NM DEN UT PVU Provo Municipal P 42 $ 585,000.00 $ 585,000.00 $ - Acquire Snow Removal Equipment

NM DEN UT BCE Bryce Canyon GA 17 $ 305,030.00 $ 305,030.00 $ - Update Airport Master Plan Study

NM DEN UT BDG Blanding Municipal GA 15 $ 219,000.00 $ 219,000.00 $ - Rehabilitate Runway - 17/35

NM DEN UT U96 Cal Black Memorial GA 15 $ 280,953.00 $ 280,953.00 $ - Update Airport Master Plan Study

NM DEN UT CNY Canyonlands Field CS 29 $ 50,000.00 $ 50,000.00 $ - Rehabilitate Runway - 03/21

NM DEN UT 36U Heber City Municipal - Russ McDonald Field GA 27 $ 1,305,547.00 $ 1,305,547.00 $ - Acquire Land For Approaches

NM DEN UT PUC Carbon County Regional/Buck Davis Field GA 17 $ 127,500.00 $ 127,500.00 $ - Install Perimeter Fencing

NM DEN UT VEL Vernal Regional CS 33 $ 16,005,505.00 $ 340,198.00 $ 15,665,307.00 Construct Runway - 16/34

NM DEN UT SLC Salt Lake City International P 110 $ 10,000,000.00 $ 1,073,976.00 $ 8,926,024.00 Rehabilitate Apron

NM DEN UT OGD Ogden-Hinckley P 43 $ 718,221.00 $ 718,221.00 $ -

Acquire Snow Removal Equipment, Install Airfield Guidance

Signs, Rehabilitate Taxiway Lighting

NM DEN WY SHR Sheridan County CS 49 $ 542,511.00 $ 542,511.00 $ - Install Perimeter Fencing

NM DEN WY GCC Gillette-Campbell County P 42 $ 1,014,963.00 $ 1,014,963.00 $ -

Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS,

Install Runway Vertical/Visual Guidance System - 03/21, Install

Runway Vertical/Visual Guidance System - 16/34, Rehabilitate

Apron, Rehabilitate Runway Lighting - 03/21, Rehabilitate

Runway L

NM DEN WY CYS Cheyenne Regional/Jerry Olson Field CS 51 $ 1,150,000.00 $ 1,150,000.00 $ - Construct Terminal Building

NM DEN WY GEY South Big Horn County GA 20 $ 2,035,000.00 $ 2,035,000.00 $ - Rehabilitate Apron

NM DEN WY EAN Phifer Airfield GA 8 $ 177,874.00 $ 177,874.00 $ - Acquire Land For Approaches

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 25 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

NM DEN WY COD Yellowstone Regional P 35 $ 1,350,000.00 $ 1,350,000.00 $ -

Install Runway Vertical/Visual Guidance System - 04/22,

Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

NM DEN WY RIW Riverton Regional CS 42 $ 355,550.00 $ 355,550.00 $ - Modify Aircraft Rescue & Fire Fighting Building

NM DEN WY LND Hunt Field GA 13 $ 184,770.00 $ 184,770.00 $ -

Improve Runway Safety Area - 03/21, Rehabilitate Runway -

03/21, Rehabilitate Runway Lighting - 03/21

NM DEN WY U68 North Big Horn County GA 13 $ 193,755.00 $ 193,755.00 $ - Expand Apron, Rehabilitate Apron

NM DEN WY LND Hunt Field GA 14 $ 1,083,697.00 $ 1,083,697.00 $ -

Improve Runway Safety Area - 03/21, Rehabilitate Runway -

03/21, Rehabilitate Runway Lighting - 03/21

NM DEN WY LSK Lusk Municipal GA 14 $ 310,500.00 $ 310,500.00 $ - Update Airport Master Plan Study

NM DEN WY JAC Jackson Hole P 56 $ 8,629,497.00 $ 1,350,781.00 $ 7,278,716.00 Rehabilitate Apron

NM DEN WY CPR Casper/Natrona County International P 56 $ 1,317,664.00 $ 1,317,664.00 $ - Construct Snow Removal Equipment Building

NM DEN WY WRL Worland Municipal GA 22 $ 300,000.00 $ 300,000.00 $ - Acquire Snow Removal Equipment

NM DEN WY EVW Evanston-Uinta County Burns Field GA 27 $ 320,950.00 $ 320,950.00 $ - Acquire Snow Removal Equipment

NM DEN WY LSK Lusk Municipal GA 13 $ 152,110.00 $ 152,110.00 $ - Install Runway Vertical/Visual Guidance System - 10/28

NM DEN WY SAA Shively Field GA 25 $ 145,000.00 $ 145,000.00 $ - Rehabilitate Runway - 05/23

NM DEN WY RIW Riverton Regional CS 41 $ 660,000.00 $ 660,000.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

NM DEN WY FBR Fort Bridger GA 12 $ 177,418.00 $ 177,418.00 $ - Rehabilitate Apron

NM DEN WY LAR Laramie Regional P 33 $ 1,842,210.00 $ 1,842,210.00 $ - Rehabilitate Apron

NM DEN WY RKS Rock Springs-Sweetwater County P 35 $ 4,183,000.00 $ 1,257,500.00 $ 2,925,500.00

Rehabilitate Runway - 09/27, Rehabilitate Runway Lighting -

09/27

NM DEN WY CYS Cheyenne Regional/Jerry Olson Field CS 52 $ 4,613,878.00 $ 2,227,427.00 $ 2,386,451.00 Construct Apron

NM DEN WY JAC Jackson Hole P 55 $ 273,552.00 $ 273,552.00 $ - Rehabilitate Taxiway

NM HLN ID U76 Mountain Home Municipal GA 14 $ 126,122.00 $ 126,122.00 $ - Rehabilitate Apron

NM HLN ID BOI Boise Air Terminal/Gowen Field P 63 $ 1,280,379.00 $ 1,280,379.00 $ - Update Airport Master Plan Study

NM HLN ID 1U7 Bear Lake County GA 14 $ 175,905.00 $ 175,905.00 $ -

Install Runway Vertical/Visual Guidance System - 10/28, Install

Weather Reporting Equipment

NM HLN ID EUL Caldwell Industrial R 29 $ 165,753.00 $ 165,753.00 $ - Rehabilitate Runway - 12/30, Rehabilitate Taxiway

NM HLN ID U02 McCarley Field GA 13 $ 277,110.00 $ 277,110.00 $ - Acquire Land For Approaches

NM HLN ID U02 McCarley Field GA 14 $ 225,000.00 $ 225,000.00 $ - Rehabilitate Taxiway

NM HLN ID U36 Aberdeen Municipal GA 7 $ 53,250.00 $ 53,250.00 $ - Rehabilitate Apron

NM HLN ID S83 Shoshone County GA 11 $ 246,697.00 $ 246,697.00 $ - Conduct Environmental Study

NM HLN ID BOI Boise Air Terminal/Gowen Field P 64 $ 715,745.00 $ 715,745.00 $ -

Improve Runway Safety Area - 10L/28R, Rehabilitate Aircraft

Rescue & Fire Fighting Building, Rehabilitate Taxiway

NM HLN ID IDA Idaho Falls Regional P 42 $ 583,424.00 $ 583,424.00 $ - Acquire Land For Approaches

NM HLN ID MYL McCall Municipal GA 22 $ 401,864.00 $ 401,864.00 $ - Acquire Snow Removal Equipment

NM HLN ID LWS Lewiston-Nez Perce County P 39 $ 703,446.00 $ 703,446.00 $ -

Acquire Snow Removal Equipment, Conduct Miscellaneous

Study

NM HLN ID 65S Boundary County GA 14 $ 238,930.00 $ 238,930.00 $ - Update Airport Master Plan Study

NM HLN ID JER Jerome County GA 18 $ 233,699.00 $ 233,699.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

NM HLN ID DIJ Driggs-Reed Memorial GA 15 $ 295,353.00 $ 295,353.00 $ - Acquire Land For Approaches

NM HLN ID COE Coeur D'Alene - Pappy Boyington Field GA 43 $ 461,927.00 $ 461,927.00 $ - Rehabilitate Taxiway, Rehabilitate Taxiway

NM HLN ID GIC Idaho County GA 16 $ 1,348,636.00 $ 613,733.00 $ 734,903.00 Rehabilitate Taxiway

NM HLN ID *IDS State of Idaho 11 $ 313,486.00 $ 313,486.00 $ - Update State System Plan Study

NM HLN ID 1U7 Bear Lake County GA 13 $ 1,282,550.00 $ 1,282,550.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 10/28, Rehabilitate

Runway - 16/34, Rehabilitate Runway Lighting - 10/28,

Rehabilitate Taxiway

NM HLN ID S87 Weiser Municipal GA 12 $ 170,192.00 $ 170,192.00 $ - Install Miscellaneous NAVAIDS, Install Perimeter Fencing

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 26 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

NM HLN ID COE Coeur D'Alene - Pappy Boyington Field GA 44 $ 559,312.00 $ 559,312.00 $ - Acquire Land For Approaches

NM HLN ID BOI Boise Air Terminal/Gowen Field P 65 $ 186,656.00 $ - $ 186,656.00 VALE Infrastructure

NM HLN ID TWF Joslin Field - Magic Valley Regional P 38 $ 1,855,648.00 $ 1,000,000.00 $ 855,648.00 Expand Terminal Building

NM HLN ID RXE Rexburg-Madison County GA 15 $ 154,800.00 $ 154,800.00 $ - Rehabilitate Runway - 17/35, Rehabilitate Taxiway

NM HLN ID U36 Aberdeen Municipal GA 8 $ 209,829.00 $ 209,829.00 $ - Conduct Environmental Study

NM HLN ID SZT Sandpoint GA 16 $ 89,909.00 $ 89,909.00 $ - Remove Obstructions

NM HLN ID U70 Cascade GA 14 $ 154,642.00 $ 154,642.00 $ - Update Airport Master Plan Study

NM HLN ID IDA Idaho Falls Regional P 41 $ 1,064,269.00 $ 1,064,269.00 $ -

Expand Terminal Building, Rehabilitate Runway - 02/20,

Rehabilitate Taxiway

NM HLN ID LLJ Challis GA 9 $ 261,220.00 $ 261,220.00 $ -

Construct Heliport/Helipad, Rehabilitate Apron, Rehabilitate

Runway - 16/34, Rehabilitate Taxiway

NM HLN ID SUN Friedman Memorial P 42 $ 178,125.00 $ 178,125.00 $ - Expand Apron

NM HLN ID MAN Nampa Municipal GA 27 $ 58,883.00 $ 58,883.00 $ - Conduct Environmental Study

NM HLN ID PIH Pocatello Regional P 39 $ 3,454,579.00 $ 865,000.00 $ 2,589,579.00 Rehabilitate Taxiway

NM HLN MT EKS Ennis - Big Sky GA 16 $ 238,930.00 $ 238,930.00 $ -

Acquire Land for Development, Install Weather Reporting

Equipment

NM HLN MT 00F Broadus GA 6 $ 128,338.00 $ 128,338.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 10/28, Rehabilitate

Taxiway

NM HLN MT BZN Bozeman Yellowstone International P 45 $ 3,565,062.00 $ - $ 3,565,062.00 Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

NM HLN MT GPI Glacier Park International P 50 $ 1,632,488.00 $ 1,632,488.00 $ -

Acquire Interactive Training System, Acquire Land For

Approaches, Acquire Snow Removal Equipment, Improve

Aircraft Rescue & Fire Fighting Building, Improve Terminal

Building, Modify Access Road, Rehabilitate Apron, Security

Enhancements

NM HLN MT BZN Bozeman Yellowstone International P 46 $ 3,009,952.00 $ 3,009,952.00 $ - Construct Runway - 11/29

NM HLN MT M75 Malta GA 13 $ 161,100.00 $ 161,100.00 $ - Install Weather Reporting Equipment

NM HLN MT RPX Roundup GA 13 $ 141,511.00 $ 141,511.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 07/25, Rehabilitate

Taxiway

NM HLN MT 4U6 Circle Town County GA 6 $ 428,850.00 $ 428,850.00 $ - Construct Building

NM HLN MT MSO Missoula International P 60 $ 1,860,804.00 $ 1,860,804.00 $ - Construct Taxiway, Install Guidance Signs

NM HLN MT BTM Bert Mooney P 52 $ 4,683,903.00 $ 1,186,903.00 $ 3,497,000.00 Security Enhancements

NM HLN MT GPI Glacier Park International P 51 $ 302,993.00 $ 302,993.00 $ - Update Airport Master Plan Study

NM HLN MT S71 Edgar G Obie GA 15 $ 756,658.00 $ 756,658.00 $ - Rehabilitate Apron

NM HLN MT WYS Yellowstone CS 17 $ 225,000.00 $ 225,000.00 $ - Conduct Airport Master Plan Study

NM HLN MT BIL Billings Logan International P 51 $ 346,767.00 $ 346,767.00 $ - Extend Taxiway

NM HLN MT HLN Helena Regional P 49 $ 1,512,889.00 $ 1,277,219.00 $ 235,670.00

Acquire Safety Equipment and/or Fencing, Rehabilitate Taxiway,

Rehabilitate Taxiway Lighting

NM HLN MT DLN Dillon GA 12 $ 320,000.00 $ 320,000.00 $ - Acquire Snow Removal Equipment, Install Apron Lighting

NM HLN MT 6S8 Laurel Municipal GA 17 $ 336,420.00 $ 336,420.00 $ - Acquire Land for Development, Construct Runway - 14/32

NM HLN MT GTF Great Falls International P 62 $ 8,934,570.00 $ 1,759,131.00 $ 7,175,439.00

Construct Taxiway, Extend Runway - 16/34, Improve Runway

Safety Area - 16/34, Install Guidance Signs, Install Miscellaneous

NAVAIDS, Install Runway Sensors - 16/34, Rehabilitate Runway -

16/34, Remove Obstructions

NM HLN MT HVR Havre City-County GA 18 $ 144,405.00 $ 144,405.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

NM HLN MT S34 Plains GA 9 $ 133,000.00 $ 133,000.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate

Taxiway

NM HLN MT THM Thompson Falls GA 9 $ 344,021.00 $ 344,021.00 $ -

Construct Fuel Farm, Install Runway Vertical/Visual Guidance

System - 08/26

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 27 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

NM HLN MT 1S3 Tillitt Field GA 11 $ 2,558,765.00 $ 2,558,765.00 $ -

Construct Access Road, Construct Taxiway, Rehabilitate Apron,

Rehabilitate Taxiway, Rehabilitate Taxiway

NM HLN MT LVM Mission Field GA 9 $ 155,000.00 $ 155,000.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate

Taxiway

NM HLN MT 3U3 Bowman Field GA 17 $ 671,211.00 $ 671,211.00 $ - Acquire Land for Development, Install Perimeter Fencing

NM HLN MT 88M Eureka GA 14 $ 144,000.00 $ 144,000.00 $ - Update Airport Master Plan Study

NM HLN MT 9S2 Scobey GA 9 $ 197,550.00 $ 197,550.00 $ -

Rehabilitate Runway - 12/30, Rehabilitate Runway Lighting -

12/30

NM HLN MT OLF L M Clayton CS 12 $ 80,752.00 $ 80,752.00 $ -

Construct Building, Install Runway Vertical/Visual Guidance

System - 11/29

NM HLN MT SBX Shelby GA 12 $ 226,000.00 $ 226,000.00 $ -

Install Runway Lighting - 05/23, Rehabilitate Apron, Rehabilitate

Runway - 05/23, Rehabilitate Runway - 11/29, Rehabilitate

Runway Lighting - 05/23, Rehabilitate Taxiway

NM HLN MT BIL Billings Logan International P 54 $ 1,264,194.00 $ 1,264,194.00 $ - Construct Taxiway, Expand Apron, Expand Service Road

NM HLN MT BIL Billings Logan International P 53 $ 1,362,586.00 $ 1,362,586.00 $ - Modify Terminal Building

NM HLN MT BIL Billings Logan International P 52 $ 1,772,971.00 $ 1,772,971.00 $ - Improve Airport Drainage

NM HLN MT 8S1 Polson GA 8 $ 207,244.00 $ 207,244.00 $ - Acquire Snow Removal Equipment

NM HLN MT 32S Stevensville GA 13 $ 2,057,842.00 $ 2,057,842.00 $ -

Conduct Environmental Study, Construct Taxiway, Install

Guidance Signs, Install Miscellaneous NAVAIDS, Install Weather

Reporting Equipment, Rehabilitate Runway Lighting - 12/30,

Remove Obstructions, Widen Runway - 12/30

NM HLN MT EKS Ennis - Big Sky GA 17 $ 117,000.00 $ 117,000.00 $ - Update Airport Master Plan Study

NM HLN MT WYS Yellowstone CS 18 $ 5,503,537.00 $ 715,050.00 $ 4,788,487.00

Acquire Safety Equipment and/or Fencing, Construct

Heliport/Helipad, Install Apron Edge Lights, Install Miscellaneous

NAVAIDS, Rehabilitate Apron, Rehabilitate Taxiway, Remove

Obstructions

NM HLN MT 7S0 Ronan GA 11 $ 346,500.00 $ 346,500.00 $ - Update Airport Master Plan Study

NM HLN MT S85 Big Sky Field GA 10 $ 154,732.00 $ 154,732.00 $ - Acquire Land For Approaches

NM HLN MT 6S8 Laurel Municipal GA 16 $ 199,440.00 $ 199,440.00 $ - Install Weather Reporting Equipment

NM HLN MT 00U Big Horn County GA 10 $ 259,573.00 $ 259,573.00 $ - Construct Fuel Farm

NM HLN MT 9S5 Three Forks GA 11 $ 66,355.00 $ 66,355.00 $ -

Install Runway Vertical/Visual Guidance System - 02/20,

Rehabilitate Runway - 02/20, Rehabilitate Runway Lighting -

02/20

NM HLN MT GTF Great Falls International P 63 $ 460,336.00 $ 460,336.00 $ -Install Taxiway Lighting, Rehabilitate Runway Lighting - 16/34

NM SEA OR 3S9 Condon State Pauling Field GA 4 $ 240,371.00 $ 240,371.00 $ -

Improve Airport Drainage, Improve Runway Safety Area - 07/25,

Rehabilitate Taxiway

NM SEA OR PDX Portland International P 78 $ 450,000.00 $ - $ 450,000.00 Acquire Equipment

NM SEA OR SPB Scappoose Industrial Airpark GA 22 $ 194,500.00 $ 194,500.00 $ - Rehabilitate Taxiway

NM SEA OR S12 Albany Municipal GA 14 $ 405,007.00 $ 405,007.00 $ - Extend Runway - 16/34, Rehabilitate Apron

NM SEA OR ONP Newport Municipal GA 24 $ 400,000.00 $ 400,000.00 $ - Acquire Land For Approaches

NM SEA OR MMV McMinnville Municipal GA 17 $ 6,952,866.00 $ 828,526.00 $ 6,124,340.00 Rehabilitate Runway - 04/22

NM SEA OR DLS Columbia Gorge Regional/The Dalles Municipal GA 13 $ 1,473,300.00 $ 1,473,300.00 $ - Rehabilitate Taxiway

NM SEA OR TMK Tillamook GA 15 $ 56,934.00 $ 56,934.00 $ - Rehabilitate Apron

NM SEA OR 4S2 Ken Jernstedt Airfield GA 10 $ 237,510.00 $ 237,510.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

NM SEA OR S39 Prineville GA 13 $ 1,248,799.00 $ 1,248,799.00 $ - Construct Apron

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 28 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

NM SEA OR LMT Klamath Falls CS 36 $ 211,872.00 $ 211,872.00 $ - Environmental Mitigation

NM SEA OR LMT Crater Lake-Klamath Regional CS 37 $ 7,291,667.00 $ 1,938,128.00 $ 5,353,539.00 Construct Taxiway

NM SEA OR CVO Corvallis Municipal GA 19 $ 150,000.00 $ 150,000.00 $ - Conduct Environmental Study

NM SEA OR RDM Roberts Field P 41 $ 749,979.00 $ 749,979.00 $ - Update Airport Master Plan Study

NM SEA OR UAO Aurora State GA 19 $ 639,502.00 $ 639,502.00 $ - Rehabilitate Taxiway

NM SEA OR BOK Brookings GA 15 $ 144,000.00 $ 144,000.00 $ - Install Perimeter Fencing

NM SEA OR RDM Roberts Field P 40 $ 3,898,349.00 $ 1,359,422.00 $ 2,538,927.00 Rehabilitate Runway - 11/29, Rehabilitate Taxiway

NM SEA OR 26U McDermitt State GA 2 $ 267,411.00 $ 267,411.00 $ - Rehabilitate Runway - 16/34, Rehabilitate Taxiway

NM SEA OR BKE Baker City Municipal GA 14 $ 1,480,777.00 $ 1,480,777.00 $ - Rehabilitate Apron

NM SEA OR BDN Bend Municipal GA 25 $ 5,674,997.00 $ 150,000.00 $ 5,524,997.00 Expand Heliport/Helipad

NM SEA OR *ORS State of Oregon 15 $ 709,783.00 $ 709,783.00 $ - Update State System Plan Study

NM SEA OR PDX Portland International P 76 $ 5,700,600.00 $ - $ 5,700,600.00 VALE Infrastructure

NM SEA OR 3S4 Illinois Valley GA 7 $ 394,200.00 $ 394,200.00 $ -

Install Runway Vertical/Visual Guidance System - 18/36,

Rehabilitate Apron, Rehabilitate Runway Lighting - 18/36

NM SEA OR HIO Portland-Hillsboro R 26 $ 1,300,000.00 $ 1,300,000.00 $ - Update Airport Master Plan Study

NM SEA OR *ORV Various Locations in Oregon 32 $ 101,886.00 $ 101,886.00 $ -

Rehabilitate Apron (Aurora State; Mulino State; Portland-

Hillsboro; Portland-Troutdale; Scappoose Industrial Airpark;

Tillamook), Rehabilitate Runway (Aurora State - 17/35; Mulino

State - 14/32; Scappoose Industrial Airpark - 15/33; Seaside

Municipal - 16

NM SEA OR M50 Boardman GA 8 $ 143,546.00 $ 143,546.00 $ - Improve Runway Safety Area - 04/22

NM SEA OR S30 Lebanon State GA 6 $ 387,372.00 $ 387,372.00 $ - Acquire Land For Approaches

NM SEA OR AST Astoria Regional GA 22 $ 150,000.00 $ 150,000.00 $ - Extend Taxiway

NM SEA OR MFR Rogue Valley International - Medford P 42 $ 11,973,839.00 $ 2,462,528.00 $ 9,511,311.00 Rehabilitate Apron, Rehabilitate Taxiway

NM SEA OR PDX Portland International P 77 $ 11,621,538.00 $ 3,621,538.00 $ 8,000,000.00 Rehabilitate Taxiway

NM SEA OR EUG Mahlon Sweet Field P 53 $ 375,554.00 $ 375,554.00 $ - Rehabilitate Taxiway

NM SEA WA ALW Walla Walla Regional P 33 $ 6,329,350.00 $ 829,350.00 $ 5,500,000.00 Rehabilitate Taxiway

NM SEA WA PUW Pullman/Moscow Regional P 42 $ 14,100,000.00 $ 791,700.00 $ 13,308,300.00 Construct Runway - 06/24

NM SEA WA VUO Pearson Field GA 10 $ 298,675.00 $ 298,675.00 $ - Conduct Environmental Study

NM SEA WA CLM William R Fairchild International CS 36 $ 450,000.00 $ 450,000.00 $ - Construct Apron

NM SEA WA PUW Pullman/Moscow Regional P 43 $ 11,900,000.00 $ 208,300.00 $ 11,691,700.00 Construct Runway - 06/24

NM SEA WA SEA Seattle-Tacoma International P 139 $ 6,479,683.00 $ 6,479,683.00 $ - Rehabilitate Runway - 16C/34C

NM SEA WA S70 Othello Municipal GA 9 $ 834,360.00 $ 834,360.00 $ - Construct Apron, Rehabilitate Taxiway

NM SEA WA GEG Spokane International P 54 $ 5,118,049.00 $ 5,118,049.00 $ - Rehabilitate Apron

NM SEA WA EAT Pangborn Memorial P 38 $ 669,008.00 $ 669,008.00 $ - Update Airport Master Plan Study

NM SEA WA CLS Chehalis-Centralia GA 17 $ 818,100.00 $ 818,100.00 $ - Rehabilitate Apron

NM SEA WA S93 Cle Elum Municipal GA 5 $ 352,885.00 $ 352,885.00 $ - Construct Apron

NM SEA WA BVS Skagit Regional GA 23 $ 368,757.00 $ 368,757.00 $ - Rehabilitate Taxiway

NM SEA WA YKM Yakima Air Terminal/McAllister Field P 38 $ 1,242,672.00 $ 1,242,672.00 $ -

Acquire Safety Equipment and/or Fencing, Acquire Snow

Removal Equipment

NM SEA WA BLI Bellingham International P 54 $ 418,500.00 $ 418,500.00 $ - Update Airport Master Plan Study

NM SEA WA ORS Orcas Island CS 13 $ 2,004,465.00 $ 2,004,465.00 $ -

Improve Access Road, Improve Airport Drainage, Install Weather

Reporting Equipment, Rehabilitate Runway - 16/34

NM SEA WA EPH Ephrata Municipal GA 17 $ 400,730.00 $ 400,730.00 $ - Update Airport Master Plan Study

NM SEA WA S10 Lake Chelan GA 10 $ 171,186.00 $ 171,186.00 $ - Rehabilitate Runway - 02/20, Rehabilitate Taxiway

NM SEA WA ALW Walla Walla Regional P 32 $ 677,021.00 $ 677,021.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 29 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

NM SEA WA 72S Rosalia Municipal GA 10 $ 600,000.00 $ 600,000.00 $ -

Construct Taxiway, Improve Access Road, Install Airport

Beacons, Install Perimeter Fencing, Install Runway Lighting -

02/20

NM SEA WA DEW Deer Park GA 22 $ 288,365.00 $ 288,365.00 $ -

Acquire Snow Removal Equipment, Construct Apron, Construct

Taxiway

NM SEA WA SHN Sanderson Field GA 14 $ 412,179.00 $ 412,179.00 $ - Construct Apron

NM SEA WA BLI Bellingham International P 53 $ 1,761,192.00 $ 1,761,192.00 $ - Rehabilitate Apron

NM SEA WA 1S5 Sunnyside Municipal GA 8 $ 3,300,000.00 $ - $ 3,300,000.00 Rehabilitate Runway - 07/25, Rehabilitate Taxiway

NM SEA WA KLS Southwest Washington Regional GA 16 $ 528,420.00 $ 528,420.00 $ - Install Perimeter Fencing, Remove Obstructions

NM SEA WA S31 Lopez Island GA 13 $ 94,019.00 $ 94,019.00 $ -

Install Runway Vertical/Visual Guidance System - 16/34,

Rehabilitate Runway Lighting - 16/34

NM SEA WA 0S7 Dorothy Scott GA 4 $ 157,725.00 $ 157,725.00 $ - Conduct Environmental Study

NM SEA WA 74S Anacortes GA 20 $ 1,204,470.00 $ 1,204,470.00 $ - Install Perimeter Fencing, Remove Obstructions

NM SEA WA S97 Anderson Field GA 4 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway Lighting - 07/25

NM SEA WA AWO Arlington Municipal GA 25 $ 118,826.00 $ 118,826.00 $ - Install Taxiway Lighting

NM SEA WA 3W7 Grand Coulee Dam GA 7 $ 89,910.00 $ 89,910.00 $ - Update Airport Master Plan Study

NM SEA WA RLD Richland GA 28 $ 2,339,393.00 $ 1,238,554.00 $ 1,100,839.00

Construct Taxiway, Rehabilitate Apron, Rehabilitate Runway -

01/19, Rehabilitate Taxiway

NM SEA WA 55S Packwood GA 7 $ 1,516,873.00 $ 1,516,873.00 $ - Rehabilitate Runway - 01/19

SO ATL GA CSG Columbus P 40 $ 864,380.00 $ 864,380.00 $ -Conduct Miscellaneous Study, Rehabilitate Runway - 06/24

SO ATL GA *GAB Georgia State Block Grant Program 18 $ 18,321,106.00 $ 18,321,106.00 $ -Non primary development projects in state block grant program

SO ATL GA ABY Southwest Georgia Regional P 45 $ 603,639.00 $ 603,639.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate

Taxiway

SO ATL GA SAV Savannah/Hilton Head International P 57 $ 3,942,141.00 $ 3,942,141.00 $ -

Expand Apron, Groove Runway - 01/19, Install Airfield Guidance

Signs, Rehabilitate Apron, Rehabilitate Runway - 10/28,

Rehabilitate Runway Lighting - 10/28, Rehabilitate Taxiway

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 116 $ 15,260,516.00 $ 8,460,516.00 $ 6,800,000.00 Rehabilitate Taxiway

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 117 $ 29,730,979.00 $ - $ 29,730,979.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

SO ATL GA AGS Augusta Regional at Bush Field P 39 $ 14,782,155.00 $ 7,761,927.00 $ 7,020,228.00 Extend Taxiway, Rehabilitate Taxiway

SO ATL GA BQK Brunswick Golden Isles P 38 $ 2,307,633.00 $ 2,307,633.00 $ - Expand Apron

SO ATL GA *GAB Georgia State Block Grant Program 19 $ 8,489,492.00 $ 150,000.00 $ 8,339,492.00 Non primary development projects in state block grant program

SO ATL PR BQN Rafael Hernandez P 27 $ 1,132,413.00 $ 1,132,413.00 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire

Equipment

SO ATL PR ABO Antonio/Nery/Juarbe Pol GA 11 $ 80,235.00 $ 80,235.00 $ - Remove Obstructions

SO ATL PR PSE Mercedita P 23 $ 260,920.00 $ 260,920.00 $ - Install Weather Reporting Equipment

SO ATL PR RVR Jose Aponte De La Torre P 10 $ 229,405.00 $ 229,405.00 $ - Acquire Equipment

SO ATL PR SJU Luis Munoz Marin International P 54 $ 6,884,466.00 $ 2,479,548.00 $ 4,404,918.00 Rehabilitate Taxiway

SO ATL SC HYW Conway-Horry County GA 19 $ 645,216.00 $ 150,000.00 $ 495,216.00

Install Miscellaneous NAVAIDS, Rehabilitate Runway Lighting -

04/22, Rehabilitate Taxiway Lighting

SO ATL SC CUB Jim Hamilton L B Owens R 22 $ 75,600.00 $ 75,600.00 $ - Install Airfield Guidance Signs

SO ATL SC MKS Berkeley County GA 23 $ 2,047,806.00 $ 150,000.00 $ 1,897,806.00 Remove Obstructions

SO ATL SC HXD Hilton Head P 39 $ 18,912,922.00 $ - $ 18,912,922.00 Extend Runway - 03/21

SO ATL SC MYR Myrtle Beach International P 54 $ 3,591,993.00 $ 3,134,980.00 $ 457,013.00 Rehabilitate Apron

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 30 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SO ATL SC LRO Mt Pleasant Regional-Faison Field GA 19 $ 1,772,982.00 $ 1,772,982.00 $ - Expand Apron, Rehabilitate Apron, Rehabilitate Taxiway

SO ATL SC GMU Greenville Downtown GA 25 $ 375,512.00 $ 375,512.00 $ - Acquire Land for Development

SO ATL SC SMS Sumter GA 21 $ 89,536.00 $ 89,536.00 $ -

Rehabilitate Runway Lighting - 05/23, Rehabilitate Taxiway

Lighting

SO ATL SC CEU Oconee County Regional GA 23 $ 28,797.00 $ 28,797.00 $ - Update Airport Master Plan Study

SO ATL SC CHS Charleston AFB/International P 39 $ 3,043,344.00 $ 3,043,344.00 $ - Rehabilitate Taxiway

SO ATL SC FLO Florence Regional P 34 $ 639,555.00 $ 639,555.00 $ - Construct Aircraft Rescue & Fire Fighting Building

SO ATL SC GGE Georgetown County GA 18 $ 135,000.00 $ 135,000.00 $ - Conduct Airport Master Plan Study

SO ATL SC DYB Summerville GA 16 $ 166,117.00 $ 166,117.00 $ - Acquire Land For Approaches

SO ATL SC GYH Donaldson Field GA 21 $ 733,125.00 $ 733,125.00 $ - Rehabilitate Runway - 05/23, Rehabilitate Taxiway

SO ATL SC BBP Marlboro County Jetport - H E Avent Field GA 14 $ 248,483.00 $ 248,483.00 $ - Construct Taxiway

SO ATL SC UZA Rock Hill/York County/Bryant Field R 27 $ 3,332,168.00 $ 639,089.00 $ 2,693,079.00 Rehabilitate Taxiway

SO ATL SC FDW Fairfield County GA 15 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway Lighting - 04/22

SO ATL SC CAE Columbia Metropolitan P 47 $ 2,824,066.00 $ 2,824,066.00 $ -

Improve Terminal Building [Boarding Bridges], Improve Terminal

Building [Passenger Circulation Area Updates], Improve Terminal

Building [Utilites], Rehabilitate Taxiway

SO ATL SC CAE Columbia Metropolitan P 46 $ 5,540,170.00 $ 1,540,170.00 $ 4,000,000.00 Rehabilitate Taxiway

SO ATL SC HXD Hilton Head P 38 $ 1,000,000.00 $ 1,000,000.00 $ - Improve Runway Safety Area - 03/21

SO ATL SC RBW Lowcountry Regional GA 15 $ 979,444.00 $ 979,444.00 $ -

Improve Airport Drainage [Construction], Improve Airport

Drainage [Design]

SO ATL SC FLO Florence Regional P 35 $ 4,726,894.00 $ 1,747,155.00 $ 2,979,739.00 Improve Airport Drainage

SO ATL SC CDN Woodward Field GA 23 $ 171,000.00 $ 171,000.00 $ - Improve Airport Drainage

SO ATL SC 3J1 Ridgeland GA 10 $ 11,650,000.00 $ 150,000.00 $ 11,500,000.00

Construct Runway [Runway 18/36 - Acquire Land and

Easements] - Plan-1, Construct Runway [Runway 18/36 - Paving

and Lighting] - Plan-1, Construct Runway [Runway 18/36 - Site

Preparation, Grading and Drainage] - Plan-1, Rehabilitate

Taxiway

SO ATL SC MYR Myrtle Beach International P 55 $ 710,794.00 $ 710,794.00 $ - Conduct Miscellaneous Study, Rehabilitate Taxiway

SO ATL SC *SCV Various Locations in South Carolina 22 $ 803,633.00 $ 803,633.00 $ -

Install Perimeter Fencing (Hartsville Regional), Install Runway

Vertical/Visual Guidance System (Cheraw Municipal/Lynch

Bellinger Field - 08/26), Rehabilitate Apron (Hartsville Regional;

Santee Cooper Regional), Rehabilitate Runway (Hartsville

Regional -

SO ATL SC SPA Spartanburg Downtown Memorial GA 21 $ 336,602.00 $ 336,602.00 $ -

Extend Runway [Approach Land Acquisition] - 05/23, Extend

Runway [NAVAIDS Relocation] - 05/23

SO ATL SC GSP Greenville Spartanburg International P 52 $ 10,149,762.00 $ 4,149,762.00 $ 6,000,000.00 Rehabilitate Apron, Rehabilitate Terminal Building

SO ATL SC AND Anderson Regional GA 20 $ 662,747.00 $ 662,747.00 $ - Acquire Easement For Approaches

SO ATL SC LUX Laurens County GA 13 $ 918,054.00 $ 918,054.00 $ - Rehabilitate Taxiway

SO ATL SC GRD Greenwood County GA 17 $ 51,689.00 $ 51,689.00 $ - Rehabilitate Parking Lot

SO ATL VI STX Henry E Rohlsen P 36 $ 3,549,671.00 $ 3,549,671.00 $ - Rehabilitate Runway - 10/28, Rehabilitate Taxiway

SO ATL VI STT Cyril E King P 36 $ 7,296,252.00 $ 1,817,402.00 $ 5,478,850.00

Rehabilitate Runway Lighting, Rehabilitate Taxiway, Security

Enhancements

SO JAN AL SCD Merkel Field Sylacauga Municipal GA 20 $ 179,124.00 $ 179,124.00 $ - Rehabilitate Apron

SO JAN AL 61A Camden Municipal GA 11 $ 464,451.00 $ 464,451.00 $ - Improve Airport Drainage, Remove Obstructions

SO JAN AL 7A5 Roanoke Municipal GA 11 $ 190,800.00 $ 190,800.00 $ - Rehabilitate Runway - 11/29

SO JAN AL 1M4 Posey Field GA 10 $ 422,687.00 $ 422,687.00 $ - Construct Building

SO JAN AL MVC Monroe County GA 13 $ 165,474.00 $ 165,474.00 $ - Install Perimeter Fencing

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 31 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SO JAN AL 12J Brewton Municipal GA 14 $ 715,598.00 $ 715,598.00 $ - Construct Taxiway

SO JAN AL 4A9 Isbell Field GA 22 $ 480,256.00 $ 480,256.00 $ - Rehabilitate Taxiway

SO JAN AL ASN Talladega Municipal GA 28 $ 150,000.00 $ 150,000.00 $ - Conduct Airport Master Plan Study, Rehabilitate Apron

SO JAN AL HSV Huntsville International-Carl T Jones Field P 79 $ 1,572,123.00 $ - $ 1,572,123.00 Conduct Airport Master Plan Study

SO JAN AL GZH Middleton Field GA 13 $ 568,584.00 $ 568,584.00 $ - Extend Taxiway

SO JAN AL HAB Marion County-Rankin Fite GA 14 $ 90,000.00 $ 90,000.00 $ - Install Perimeter Fencing

SO JAN AL HSV Huntsville International-Carl T Jones Field P 78 $ 9,647,996.00 $ - $ 9,647,996.00 Construct Taxiway

SO JAN AL 2R5 St Elmo GA 9 $ 950,548.00 $ 600,000.00 $ 350,548.00

Rehabilitate Runway - 06/24, Rehabilitate Runway Lighting -

06/24

SO JAN AL 4R3 Jackson Municipal GA 11 $ 105,522.00 $ 105,522.00 $ - Rehabilitate Runway - 01/19

SO JAN AL 79J South Alabama Regional at Bill Benton Field GA 21 $ 139,948.00 $ 139,948.00 $ - Install Perimeter Fencing

SO JAN AL EUF Weedon Field GA 20 $ 135,653.00 $ 135,653.00 $ -Rehabilitate Runway - 18/36, Update Airport Master Plan Study

SO JAN AL MDQ Huntsville Executive Airport Tom Sharp Jr Field GA 26 $ 241,280.00 $ 241,280.00 $ -

Rehabilitate Runway - 18/36, Rehabilitate Taxiway, Update

Airport Master Plan Study

SO JAN AL AUO Auburn University Regional GA 29 $ 1,089,900.00 $ 150,000.00 $ 939,900.00 Rehabilitate Runway Lighting - 18/36

SO JAN AL DHN Dothan Regional P 39 $ 320,654.00 $ 320,654.00 $ - Improve Airport Drainage, Rehabilitate Apron

SO JAN AL BFM Mobile Downtown GA 32 $ 455,271.00 $ 455,271.00 $ - Rehabilitate Apron

SO JAN AL 71J Blackwell Field GA 17 $ 955,312.00 $ 955,312.00 $ -Construct Access Road, Construct Apron, Construct Parking Lot

SO JAN AL 8A1 Guntersville Municipal - Joe Starnes Field GA 20 $ 677,894.00 $ 677,894.00 $ -

Construct Runway - 07/25, Install Runway Vertical/Visual

Guidance System - 07/25

SO JAN AL DCU Pryor Field Regional GA 25 $ 122,400.00 $ 122,400.00 $ - Rehabilitate Runway Lighting - 18/36

SO JAN AL 8A0 Albertville Regional-Thomas J Brumlik Field GA 26 $ 139,752.00 $ 139,752.00 $ - Rehabilitate Runway - 05/23, Rehabilitate Taxiway

SO JAN AL HSV Huntsville International-Carl T Jones Field P 77 $ 9,159,642.00 $ 3,736,586.00 $ 5,423,056.00

Acquire Snow Removal Equipment, Rehabilitate Terminal

Building, Security Enhancements

SO JAN AL 5R4 Foley Municipal GA 14 $ 318,438.00 $ 318,438.00 $ - Improve Airport Drainage

SO JAN AL CQF H. L. (Sonny) Callahan GA 17 $ 2,839,388.00 $ 574,811.00 $ 2,264,577.00 Construct Taxiway

SO JAN AL 33J Geneva Municipal GA 13 $ 214,022.00 $ 214,022.00 $ - Construct Fuel Farm

SO JAN AL CMD Cullman Regional-Folsom Field GA 23 $ 363,129.00 $ 363,129.00 $ - Rehabilitate Taxiway

SO JAN AL 4A6 Scottsboro Municipal-Word Field GA 20 $ 148,754.00 $ 148,754.00 $ -Rehabilitate Apron, Rehabilitate Taxiway, Remove Obstructions

SO JAN AL ANB Anniston Regional GA 32 $ 49,500.00 $ 49,500.00 $ - Conduct Miscellaneous Study

SO JAN AL 7A3 Lanett Municipal GA 13 $ 371,671.00 $ 150,000.00 $ 221,671.00 Construct Runway - 08/26

SO JAN AL EKY Bessemer R 15 $ 121,298.00 $ 121,298.00 $ - Rehabilitate Runway - 05/23

SO JAN AL 0R1 Atmore Municipal GA 13 $ 31,757.00 $ 31,757.00 $ - Construct Fuel Farm

SO JAN AL GAD Northeast Alabama Regional GA 17 $ 377,069.00 $ 377,069.00 $ - Rehabilitate Taxiway

SO JAN AL AIV George Downer GA 14 $ 77,363.00 $ 77,363.00 $ - Rehabilitate Apron

SO JAN AL 26A Ashland/Lineville GA 10 $ 85,500.00 $ 85,500.00 $ - Construct Apron, Construct Taxiway

SO JAN AL 0J4 Florala Municipal GA 5 $ 89,865.00 $ 89,865.00 $ - Expand Apron

SO JAN AL 08A Wetumpka Municipal GA 17 $ 350,100.00 $ 350,100.00 $ -

Rehabilitate Runway Lighting - 09/27, Rehabilitate Taxiway

Lighting

SO JAN AL BHM Birmingham-Shuttlesworth International P 99 $ 4,050,000.00 $ 4,050,000.00 $ - Expand Terminal Building

SO JAN AL SEM Craig Field GA 17 $ 221,327.00 $ 221,327.00 $ - Improve Airport Drainage

SO JAN AL TOI Troy Municipal Airport at N Kenneth Campbell Field GA 17 $ 480,098.00 $ 480,098.00 $ - Improve Airport Drainage

SO JAN AL 06A Moton Field Municipal GA 18 $ 57,945.00 $ 57,945.00 $ - Construct Terminal Building

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 32 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SO JAN AL MOB Mobile Regional P 54 $ 2,212,040.00 $ 2,212,040.00 $ -

Acquire Land for Development, Improve Terminal Building,

Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate

Runway - 15/33, Rehabilitate Terminal Building

SO JAN AL EET Shelby County GA 19 $ 147,152.00 $ 147,152.00 $ - Construct Building

SO JAN AL DYA Demopolis Regional GA 14 $ 351,900.00 $ 152,571.00 $ 199,329.00 Install Taxiway Lighting

SO JAN AL M95 Richard Arthur Field GA 8 $ 108,000.00 $ 108,000.00 $ - Rehabilitate Runway - 18/36

SO JAN AL 1R8 Bay Minette Municipal GA 12 $ 260,346.00 $ 260,346.00 $ - Improve Airport Drainage

SO JAN AL 4R9 Jeremiah Denton Airport GA 13 $ 204,629.00 $ 204,629.00 $ - Rehabilitate Runway - 12/30

SO JAN AL 07A Franklin Field GA 6 $ 437,400.00 $ 437,400.00 $ - Acquire Land for Development, Extend Runway - 14/32

SO JAN AL TCL Tuscaloosa Regional GA 30 $ 1,929,000.00 $ 429,976.00 $ 1,499,024.00 Improve Airport Drainage

SO JAN AL 1A9 Prattville - Grouby Field GA 18 $ 98,786.00 $ 98,786.00 $ - Update Airport Master Plan Study

SO JAN AL MSL Northwest Alabama Regional GA 36 $ 274,000.00 $ 274,000.00 $ -

Rehabilitate Runway - 11/29, Rehabilitate Runway - 18/36,

Rehabilitate Terminal Building

SO JAN AL JFX Walker County-Bevill Field GA 18 $ 43,200.00 $ 43,200.00 $ - Install Perimeter Fencing

SO JAN MS 25M Ripley GA 10 $ 710,950.00 $ 467,318.00 $ 243,632.00 Rehabilitate Runway - 03/21

SO JAN MS 87I Yazoo County GA 15 $ 80,000.00 $ 80,000.00 $ - Install Airfield Guidance Signs, Rehabilitate Taxiway

SO JAN MS 5A4 Okolona Municipal-Richard Stovall Field GA 18 $ 132,300.00 $ 132,300.00 $ - Construct Terminal Building

SO JAN MS HSA Stennis International GA 30 $ 1,072,041.00 $ 1,072,041.00 $ - Expand Apron

SO JAN MS GWO Greenwood-Leflore GA 17 $ 888,983.00 $ 888,983.00 $ - Widen Taxiway

SO JAN MS UOX University-Oxford GA 30 $ 121,811.00 $ 121,811.00 $ - Update Airport Master Plan Study

SO JAN MS GPT Gulfport-Biloxi International P 88 $ 3,420,000.00 $ - $ 3,420,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

SO JAN MS GPT Gulfport-Biloxi International P 87 $ 1,693,212.00 $ 1,693,212.00 $ -

Improve Airport Drainage, Rehabilitate Terminal Building, Widen

Taxiway

SO JAN MS MBO Bruce Campbell Field GA 24 $ 872,331.00 $ 872,331.00 $ - Construct Terminal Building

SO JAN MS 8M1 Booneville/Baldwyn GA 17 $ 179,379.00 $ 179,379.00 $ - Construct Taxiway

SO JAN MS IDL Indianola Municipal GA 18 $ 211,514.00 $ 211,514.00 $ - Construct Building

SO JAN MS M40 Monroe County GA 15 $ 270,000.00 $ 270,000.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate

Taxiway, Update Airport Master Plan Study

SO JAN MS HEZ Hardy-Anders Field Natchez-Adams County GA 26 $ 198,193.00 $ 198,193.00 $ - Rehabilitate Runway - 13/31, Rehabilitate Taxiway

SO JAN MS UBS Columbus-Lowndes County GA 18 $ 258,555.00 $ 258,555.00 $ - Rehabilitate Apron

SO JAN MS 2M4 G V Montgomery GA 12 $ 214,419.00 $ 214,419.00 $ - Rehabilitate Runway, Rehabilitate Taxiway

SO JAN MS 17M Magee Municipal GA 10 $ 94,653.00 $ 94,653.00 $ - Improve Airport Drainage, Install Perimeter Fencing

SO JAN MS M41 Holly Springs-Marshall County GA 17 $ 841,773.00 $ 841,773.00 $ - Rehabilitate Runway - 18/36

SO JAN MS GTR Golden Triangle Regional P 54 $ 2,060,230.00 $ 996,745.00 $ 1,063,485.00 Rehabilitate Apron

SO JAN MS M11 Copiah County GA 13 $ 67,500.00 $ 67,500.00 $ - Conduct Aeronautical Survey for RNAV Approach

SO JAN MS M83 McCharen Field GA 13 $ 150,000.00 $ 150,000.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate

Taxiway, Update Airport Master Plan Study

SO JAN MS CRX Roscoe Turner GA 25 $ 386,698.00 $ 386,698.00 $ - Install Perimeter Fencing

SO JAN MS 9M4 Ackerman Choctaw County GA 10 $ 437,933.00 $ 437,933.00 $ -Construct Access Road, Construct Building, Construct Taxiway

SO JAN MS 5A6 Winona-Montgomery County GA 15 $ 149,984.00 $ 149,984.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 03/21, Rehabilitate

Taxiway

SO JAN MS M24 Dean Griffin Memorial GA 16 $ 163,391.00 $ 163,391.00 $ - Construct Parking Lot, Remove Obstructions

SO JAN MS JVW John Bell Williams GA 21 $ 390,753.00 $ 390,753.00 $ - Expand Apron

SO JAN MS MPE Philadelphia Municipal GA 16 $ 691,020.00 $ 691,020.00 $ - Construct Terminal Building

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 33 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SO JAN MS JAN Jackson-Medgar Wiley Evers International P 51 $ 17,216,361.00 $ 6,933,903.00 $ 10,282,458.00

Rehabilitate Runway - 16R/34L, Rehabilitate Runway Lighting -

16R/34L, Rehabilitate Taxiway [Section 1 Paving], Rehabilitate

Taxiway [Section 3 Paving], Rehabilitate Taxiway Lighting

[Section 1 Lighting], Rehabilitate Taxiway Lighting [Section 3

Lighting]

SO JAN MS PQL Trent Lott International GA 32 $ 210,542.00 $ 210,542.00 $ - Rehabilitate Taxiway

SO JAN MS OSX Kosciusko-Attala County GA 15 $ 144,346.00 $ 144,346.00 $ - Acquire Land For Approaches

SO JAN MS 0R0 Columbia-Marion County GA 13 $ 128,250.00 $ 128,250.00 $ - Conduct Environmental Study

SO JAN MS GPT Gulfport-Biloxi International P 86 $ 5,834,308.00 $ 779,060.00 $ 5,055,248.00 Rehabilitate Runway - 14/32

SO JAN MS M44 Houston Municipal GA 15 $ 443,286.00 $ 443,286.00 $ - Construct Building, Construct Taxiway

SO JAN MS 19M C A Moore GA 17 $ 150,600.00 $ 150,600.00 $ - Improve Airport Drainage

SO JAN MS M13 Poplarville-Pearl River County GA 11 $ 204,838.00 $ 204,838.00 $ - Improve Airport Drainage, Install Perimeter Fencing

SO JAN MS 1R7 Brookhaven-Lincoln County GA 13 $ 115,432.00 $ 115,432.00 $ - Rehabilitate Runway - 04/22

SO JAN MS GNF Grenada Municipal GA 13 $ 149,999.00 $ 149,999.00 $ - Rehabilitate Runway - 13/31

SO JAN MS HKS Hawkins Field GA 16 $ 320,161.00 $ 320,161.00 $ - Rehabilitate Apron

SO JAN MS PIB Hattiesburg-Laurel Regional CS 37 $ 147,764.00 $ 147,764.00 $ -

Rehabilitate Access Road, Rehabilitate Parking Lot, Rehabilitate

Taxiway, Remove Obstructions, Security Enhancements

SO JAN MS GLH Greenville Mid-Delta GA 33 $ 165,709.00 $ 165,709.00 $ - Improve Airport Drainage, Install Airport Beacons

SO JAN MS TUP Tupelo Regional CS 41 $ 979,468.00 $ 150,289.00 $ 829,179.00 Rehabilitate Runway - 18/36, Rehabilitate Taxiway

SO JAN MS HBG Hattiesburg Bobby L Chain Municipal GA 23 $ 161,623.00 $ 161,623.00 $ - Extend Taxiway

SO JAN MS 1M2 Belzoni Municipal GA 16 $ 69,984.00 $ 69,984.00 $ - Install Taxiway Lighting

SO JAN MS CKM Fletcher Field GA 23 $ 2,621,079.00 $ 150,000.00 $ 2,471,079.00 Rehabilitate Runway - 18/36

SO JAN MS UTA Tunica Municipal GA 22 $ 467,381.00 $ 467,381.00 $ -

Install Runway Vertical/Visual Guidance System - 17/35,

Rehabilitate Runway - 17/35, Rehabilitate Taxiway

SO MEM KY CVG Cincinnati/Northern Kentucky International P 87 $ 450,000.00 $ - $ 450,000.00 Acquire Equipment

SO MEM KY I35 Tucker-Guthrie Memorial GA 14 $ 340,897.00 $ 340,897.00 $ - Acquire Land For Approaches

SO MEM KY BYL Williamsburg-Whitley County GA 17 $ 125,320.00 $ 125,320.00 $ - Update Airport Master Plan Study

SO MEM KY M20 Grayson County GA 12 $ 232,318.00 $ 232,318.00 $ - Rehabilitate Runway - 02/20, Update Miscellaneous Study

SO MEM KY DWU Ashland Regional GA 19 $ 3,389,437.00 $ 1,303,909.00 $ 2,085,528.00 Construct Taxiway

SO MEM KY FFT Capital City GA 17 $ 1,579,620.00 $ 1,579,620.00 $ -

Install Miscellaneous NAVAIDS, Install Runway Lighting - 07/25,

Install Taxiway Lighting

SO MEM KY EKQ Wayne County GA 11 $ 841,900.00 $ 841,900.00 $ - Construct Building

SO MEM KY TZV Tompkinsville-Monroe County GA 13 $ 171,399.00 $ 171,399.00 $ - Construct Building, Remove Obstructions

SO MEM KY GLW Glasgow Municipal GA 26 $ 129,502.00 $ 129,502.00 $ - Improve Runway Safety Area - 08/26

SO MEM KY KY8 Hancock Co-Ron Lewis Field GA 11 $ 143,707.00 $ 143,707.00 $ - Conduct Environmental Study

SO MEM KY CVG Cincinnati/Northern Kentucky International P 86 $ 3,944,951.00 $ 3,944,951.00 $ -

Extend Runway - 09/27, Improve Terminal Building, Rehabilitate

Terminal Building

SO MEM KY IOB Mount Sterling-Montgomery County GA 18 $ 170,000.00 $ 170,000.00 $ - Rehabilitate Runway - 03/21

SO MEM KY PAH Barkley Regional P 46 $ 823,949.00 $ 823,949.00 $ -

Improve Airport Drainage, Rehabilitate Access Road,

Rehabilitate Parking Lot, Rehabilitate Taxiway

SO MEM KY SDF Louisville International-Standiford Field P 101 $ 4,098,976.00 $ 4,098,976.00 $ -

Acquire Safety Equipment and/or Fencing, Acquire Snow

Removal Equipment, Conduct Miscellaneous Study, Rehabilitate

Runway - 17R/35L, Rehabilitate Runway Lighting - 11/29,

Rehabilitate Taxiway, Rehabilitate Taxiway Lighting, Runway

Incursion Markings

SO MEM KY OWB Owensboro-Daviess County P 51 $ 598,687.00 $ 598,687.00 $ -

Construct Aircraft Rescue & Fire Fighting Building, Rehabilitate

Runway - 18/36

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 34 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SO MEM KY BRY Samuels Field GA 18 $ 804,332.00 $ 804,332.00 $ -

Improve Runway Safety Area - 02/20, Rehabilitate Runway

Lighting - 02/20

SO MEM KY LOZ London-Corbin Airport-Magee Field GA 24 $ 779,040.00 $ 779,040.00 $ - Construct Building

SO MEM KY EHR Henderson City-County GA 29 $ 1,084,881.00 $ 1,084,881.00 $ - Extend Runway - 09/27

SO MEM KY EKX Addington Field GA 19 $ 149,878.00 $ 149,878.00 $ - Construct Apron

SO MEM KY JQD Ohio County GA 17 $ 56,070.00 $ 56,070.00 $ - Construct Building

SO MEM KY LEX Blue Grass P 68 $ 12,398,193.00 $ 3,503,608.00 $ 8,894,585.00 Construct Taxiway

SO MEM KY SDF Louisville International-Standiford Field P 102 $ 8,600,000.00 $ 8,600,000.00 $ -Conduct Miscellaneous Study, Expand Apron, Rehabilitate Apron

SO MEM KY 1M7 Fulton GA 14 $ 74,871.00 $ 74,871.00 $ - Conduct Miscellaneous Study

SO MEM KY 4M7 Russellville-Logan County GA 18 $ 33,884.00 $ 33,884.00 $ - Expand Apron, Install Perimeter Fencing

SO MEM KY LOU Bowman Field R 25 $ 1,279,634.00 $ 1,279,634.00 $ - Construct Taxiway, Rehabilitate Taxiway

SO MEM KY 6I2 Lebanon Springfield-George Hoerter Field GA 16 $ 243,000.00 $ 243,000.00 $ - Acquire Land For Approaches

SO MEM KY 1A6 Middlesboro-Bell County GA 19 $ 49,050.00 $ 49,050.00 $ - Conduct Environmental Study

SO MEM KY PBX Pike County-Hatcher Field GA 16 $ 343,415.00 $ 343,415.00 $ - Rehabilitate Runway Lighting - 09/27

SO MEM KY 0I8 Cynthiana-Harrison County GA 15 $ 150,000.00 $ 150,000.00 $ - Conduct Environmental Study

SO MEM KY CEY Kyle-Oakley Field GA 27 $ 2,163,367.00 $ 463,367.00 $ 1,700,000.00

Rehabilitate Runway - 05/23, Rehabilitate Runway Lighting -

05/23, Remove Obstructions

SO MEM NC PGV Pitt-Greenville P 43 $ 2,568,956.00 $ - $ 2,568,956.00 Rehabilitate Runway Lighting - 02/20

SO MEM NC PGV Pitt-Greenville P 42 $ 1,000,000.00 $ 1,000,000.00 $ -

Acquire Easement For Approaches [Runway 2], Acquire

Easement For Approaches [Runway 20], Rehabilitate Runway -

02/20

SO MEM NC EWN Coastal Carolina Regional P 39 $ 1,106,036.00 $ 1,106,036.00 $ -

Improve Airport Drainage, Rehabilitate Apron, Rehabilitate

Taxiway [Taxiway B], Rehabilitate Taxiway [Taxiway E], Remove

Obstructions, Update Airport Master Plan Study

SO MEM NC AVL Asheville Regional P 46 $ 12,260,258.00 $ 1,360,258.00 $ 10,900,000.00

Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate

Runway - 16/34

SO MEM NC FAY Fayetteville Regional/Grannis Field P 44 $ 11,978,267.00 $ 1,978,267.00 $ 10,000,000.00 Expand Terminal Building

SO MEM NC RDU Raleigh-Durham International P 47 $ 1,306,945.00 $ 1,306,945.00 $ -

Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway

F]

SO MEM NC JQF Concord Regional P 2 $ 1,000,000.00 $ 1,000,000.00 $ - Install Perimeter Fencing required by 49 CFR 1542

SO MEM NC CLT Charlotte/Douglas International P 75 $ 3,750,000.00 $ 3,750,000.00 $ - Conduct Environmental Study

SO MEM NC CLT Charlotte/Douglas International P 76 $ 11,564,438.00 $ 11,564,438.00 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Conduct

Miscellaneous Study, Rehabilitate Apron, Rehabilitate Taxiway

SO MEM NC *NCB North Carolina State Block Grant Program 51 $ 14,914,755.00 $ 14,914,755.00 $ -Non primary development projects in state block grant program

SO MEM NC GSO Piedmont Triad International P 74 $ 9,120,903.00 $ 6,285,803.00 $ 2,835,100.00

Improve Airport Miscellaneous Improvements, Rehabilitate

Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway M]

SO MEM NC AVL Asheville Regional P 47 $ 1,409,189.00 $ 1,409,189.00 $ - Rehabilitate Runway - 16/34

SO MEM NC OAJ Albert J Ellis P 38 $ 169,249.00 $ 169,249.00 $ - Update Airport Master Plan Study

SO MEM NC ILM Wilmington International P 52 $ 2,276,656.00 $ 2,276,656.00 $ - Rehabilitate Apron

SO MEM TN MEM Memphis International P 93 $ 2,446,731.00 $ - $ 2,446,731.00 VALE Infrastructure

SO MEM TN TYS McGhee Tyson P 69 $ 27,967,334.00 $ 4,055,498.00 $ 23,911,836.00 Rehabilitate Runway - 05L/23R

SO MEM TN BNA Nashville International P 100 $ 2,343,466.00 $ 2,343,466.00 $ - Conduct Miscellaneous Study, Rehabilitate Taxiway

SO MEM TN CHA Lovell Field P 62 $ 2,083,438.00 $ 2,083,438.00 $ - Rehabilitate Apron

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 35 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SO MEM TN CHA Lovell Field P 63 $ 548,162.00 $ 548,162.00 $ - Rehabilitate Apron

SO MEM TN *TNB Tennessee State Block Grant Program 51 $ 6,000,000.00 $ - $ 6,000,000.00 Non primary development projects in state block grant program

SO MEM TN MEM Memphis International P 92 $ 12,395,583.00 $ 12,395,583.00 $ -

Improve Access Road, Improve Terminal Building, Security

Enhancements, Update Airport Master Plan Study

SO MEM TN *TNB Tennessee State Block Grant Program 50 $ 13,316,579.00 $ 13,316,579.00 $ -Non primary development projects in state block grant program

SO MEM TN TRI Tri-Cities Regional TN/VA P 68 $ 1,246,184.00 $ 1,246,184.00 $ - Expand Apron

SO ORL FL SEF Sebring Regional GA 23 $ 300,600.00 $ 300,600.00 $ - Update Airport Master Plan Study

SO ORL FL IMM Immokalee Regional GA 9 $ 152,078.00 $ 152,078.00 $ - Conduct Airport Master Plan Study

SO ORL FL LEE Leesburg International GA 23 $ 355,903.00 $ 355,903.00 $ - Conduct Airport Master Plan Study

SO ORL FL X59 Valkaria GA 8 $ 225,000.00 $ 225,000.00 $ - Rehabilitate Runway - 14/32

SO ORL FL MIA Miami International P 71 $ 2,764,125.00 $ 2,764,125.00 $ - Rehabilitate Apron

SO ORL FL X26 Sebastian Municipal GA 12 $ 193,500.00 $ 193,500.00 $ - Update Airport Master Plan Study

SO ORL FL FIN Flagler Executive GA 18 $ 9,334,377.00 $ 2,034,778.00 $ 7,299,599.00 Construct Runway - 11/29

SO ORL FL PBI Palm Beach International P 60 $ 3,416,639.00 $ 3,416,639.00 $ - Construct Taxiway, Extend Taxiway, Rehabilitate Taxiway

SO ORL FL FHB Fernandina Beach Municipal GA 25 $ 93,645.00 $ 93,645.00 $ - Install Runway Vertical/Visual Guidance System - 04/22

SO ORL FL OCF Ocala International-Jim Taylor Field GA 25 $ 377,098.00 $ 377,098.00 $ - Rehabilitate Taxiway

SO ORL FL BKV Brooksville-Tampa Bay Regional GA 19 $ 272,567.00 $ 272,567.00 $ - Install Airfield Guidance Signs

SO ORL FL DAB Daytona Beach International P 73 $ 1,669,514.00 $ - $ 1,669,514.00 Update Airport Master Plan Study

SO ORL FL CHN Wauchula Municipal GA 13 $ 203,175.00 $ 203,175.00 $ -

Install Runway Vertical/Visual Guidance System - 18/36, Light

Obstructions, Rehabilitate Runway - 18/36, Rehabilitate Runway

Lighting - 18/36

SO ORL FL TMB Miami Executive R 11 $ 229,926.00 $ 229,926.00 $ - Construct Taxiway

SO ORL FL MKY Marco Island GA 11 $ 508,747.00 $ 508,747.00 $ - Construct Apron

SO ORL FL FXE Fort Lauderdale Executive R 29 $ 663,180.00 $ 663,180.00 $ - Rehabilitate Taxiway, Runway Incursion Markings

SO ORL FL X26 Sebastian Municipal GA 11 $ 235,980.00 $ 235,980.00 $ - Construct Taxiway

SO ORL FL MLB Melbourne International P 43 $ 4,209,047.00 $ 4,209,047.00 $ - Improve Terminal Building

SO ORL FL TLH Tallahassee International P 40 $ 3,993,190.00 $ 3,993,190.00 $ -

Rehabilitate Apron, Rehabilitate Terminal Building, Security

Enhancements

SO ORL FL SUA Witham Field GA 20 $ 32,175.00 $ 32,175.00 $ - Wildlife Hazard Assessments

SO ORL FL X07 Lake Wales Municipal GA 17 $ 1,160,193.00 $ 192,179.00 $ 968,014.00 Rehabilitate Runway - 06/24

SO ORL FL SFB Orlando Sanford International P 76 $ 2,555,340.00 $ 2,555,340.00 $ -

Construct Apron, Rehabilitate Runway [Runway Incursion

Mitigation] - 09R/27L, Widen Taxiway

SO ORL FL FLL Fort Lauderdale/Hollywood International P 79 $ 1,574,657.00 $ 1,574,657.00 $ - Conduct Airport Master Plan Study

SO ORL FL PGD Punta Gorda P 35 $ 1,304,226.00 $ 1,304,226.00 $ -Conduct Environmental Study, Update Airport Master Plan Study

SO ORL FL MIA Miami International P 70 $ 13,867,182.00 $ 13,867,182.00 $ -

Rehabilitate Taxiway [Taxiway M5], Rehabilitate Terminal

Building

SO ORL FL 28J Palatka Municipal - Lt Kay Larkin Field GA 26 $ 371,817.00 $ 273,093.00 $ 98,724.00 Remove Obstructions

SO ORL FL *FLS State of Florida 12 $ 2,145,000.00 $ 2,145,000.00 $ - Conduct State System Plan Study

SO ORL FL EVB New Smyrna Beach Municipal R 20 $ 366,300.00 $ 366,300.00 $ - Construct Taxiway

SO ORL FL BCT Boca Raton R 21 $ 4,586,469.00 $ 150,000.00 $ 4,436,469.00 Improve Runway Safety Area - 05/23

SO ORL FL TPA Tampa International P 63 $ 8,653,391.00 $ 3,204,269.00 $ 5,449,122.00 Rehabilitate Apron, Rehabilitate Taxiway

SO ORL FL SGJ Northeast Florida Regional P 39 $ 768,253.00 $ 768,253.00 $ - Conduct Airport Master Plan Study

SO ORL FL SGJ Northeast Florida Regional P 38 $ 180,000.00 $ 180,000.00 $ - Rehabilitate Apron

SO ORL FL F45 North Palm Beach County General Aviation R 17 $ 319,948.00 $ 319,948.00 $ - Update Airport Master Plan Study

SO ORL FL X14 La Belle Municipal GA 9 $ 283,131.00 $ 283,131.00 $ - Update Airport Master Plan Study

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 36 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SO ORL FL LCQ Lake City Gateway GA 22 $ 4,597,401.00 $ 219,000.00 $ 4,378,401.00 Rehabilitate Taxiway

SO ORL FL OMN Ormond Beach Municipal R 19 $ 166,200.00 $ 166,200.00 $ - Wildlife Hazard Assessments

SO ORL FL MTH The Florida Keys Marathon International GA 35 $ 1,089,453.00 $ 1,089,453.00 $ -

Conduct Airport Master Plan Study, Conduct Environmental

Study

SO ORL FL LAL Lakeland Linder Regional R 38 $ 6,835,898.00 $ 6,835,898.00 $ -

Construct Taxiway [Taxiway G], Construct Taxiway [Taxiway M],

Rehabilitate Taxiway

SO ORL FL OPF Opa-Locka Executive R 18 $ 83,160.00 $ 83,160.00 $ - Construct Service Road

SO ORL FL PHK Palm Beach County Glades GA 5 $ 234,739.00 $ 234,739.00 $ - Update Airport Master Plan Study

SO ORL FL 01J Hilliard Airpark GA 9 $ 131,478.00 $ 131,478.00 $ - Conduct Environmental Study

SO ORL FL LNA Palm Beach County Park R 15 $ 296,094.00 $ 296,094.00 $ - Update Airport Master Plan Study

SO ORL FL HWO North Perry R 10 $ 300,000.00 $ 300,000.00 $ - Conduct Airport Master Plan Study

SO ORL FL GNV Gainesville Regional P 39 $ 4,253,212.00 $ 2,082,274.00 $ 2,170,938.00

Construct Aircraft Rescue & Fire Fighting Building, Expand

Terminal Building

SO ORL FL APF Naples Municipal GA 35 $ 1,580,993.00 $ 1,580,993.00 $ - Construct Taxiway

SO ORL FL 24J Suwannee County GA 11 $ 108,946.00 $ 108,946.00 $ - Conduct Environmental Study

SO ORL FL FMY Page Field R 20 $ 17,654,727.00 $ 4,242,256.00 $ 13,412,471.00

Rehabilitate Runway - 05/23, Rehabilitate Runway Lighting -

05/23, Rehabilitate Taxiway

SO ORL FL ECP Northwest Florida Beaches International P 8 $ 2,963,903.00 $ 2,963,903.00 $ -

Environmental Mitigation, Improve Terminal Building, Security

Enhancements

SO ORL FL MCO Orlando International P 116 $ 10,983,997.00 $ 10,983,997.00 $ -

Rehabilitate Runway - 17R/35L, Rehabilitate Taxiway [Taxiway

C], Rehabilitate Taxiway [Taxiway J], Rehabilitate Taxiway,

Security Enhancements

SO ORL FL VRB Vero Beach Municipal GA 40 $ 4,058,859.00 $ 205,860.00 $ 3,852,999.00 Rehabilitate Taxiway

SO ORL FL IMM Immokalee Regional GA 10 $ 67,950.00 $ 67,950.00 $ - Rehabilitate Taxiway

SO ORL FL MTH The Florida Keys Marathon International GA 34 $ 144,055.00 $ 144,055.00 $ - Remove Obstructions

SO ORL FL SPG Albert Whitted R 24 $ 43,090.00 $ 43,090.00 $ - Rehabilitate Taxiway

SO ORL FL EYW Key West International P 52 $ 1,284,751.00 $ - $ 1,284,751.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

SO ORL FL PIE St Pete-Clearwater International P 42 $ 7,648,298.00 $ 3,650,690.00 $ 3,997,608.00

Rehabilitate Taxiway [Rehabilitate Taxiway A7], Rehabilitate

Taxiway [Rehabilitate Taxiway B and T], Rehabilitate Taxiway

[Rehabilitate Taxiway M]

SO ORL FL FLL Fort Lauderdale/Hollywood International P 78 $ 1,857,101.00 $ 1,857,101.00 $ - Conduct Noise Compatibility Plan Study

SO ORL FL SFB Orlando Sanford International P 75 $ 1,088,703.00 $ 1,088,703.00 $ - Rehabilitate Apron

SO ORL FL GIF Winter Haven's Gilbert GA 25 $ 4,184,544.00 $ 597,493.00 $ 3,587,051.00

Construct Taxiway [Construct Taxiway E], Construct Taxiway

[Construct Taxiway F]

SO ORL FL VQQ Cecil GA 20 $ 496,167.00 $ 496,167.00 $ -

Install Runway Vertical/Visual Guidance System - 09R/27L, Install

Runway Vertical/Visual Guidance System - 18L/36R

SO ORL FL BOW Bartow Municipal GA 34 $ 181,446.00 $ 181,446.00 $ - Improve Airport Drainage

SO ORL FL FPR Treasure Coast International GA 35 $ 387,000.00 $ 387,000.00 $ - Conduct Airport Master Plan Study

SO ORL FL 2R4 Peter Prince Field GA 13 $ 1,149,411.00 $ 1,149,411.00 $ - Rehabilitate Runway - 18/36

SO ORL FL MAI Marianna Municipal GA 18 $ 254,889.00 $ 254,889.00 $ - Conduct Airport Master Plan Study

SO ORL FL EYW Key West International P 53 $ 11,528,734.00 $ 4,018,353.00 $ 7,510,381.00

Improve Airport Drainage, Rehabilitate Apron, Rehabilitate

Runway - 09/27, Rehabilitate Runway Lighting - 09/27

SO ORL FL VNC Venice Municipal R 15 $ 187,144.00 $ 187,144.00 $ - Rehabilitate Apron

SO ORL FL ZPH Zephyrhills Municipal GA 15 $ 147,162.00 $ 147,162.00 $ - Rehabilitate Taxiway

SO ORL FL DAB Daytona Beach International P 74 $ 1,924,308.00 $ - $ 1,924,308.00 Construct Taxiway, Rehabilitate Taxiway

SO ORL FL FLL Fort Lauderdale/Hollywood International P 77 $ 20,000,000.00 $ - $ 20,000,000.00 Extend Runway - 10R/28L

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 37 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SO ORL FL SRQ Sarasota/Bradenton International P 52 $ 726,853.00 $ 726,853.00 $ -

Construct Taxiway, Improve Terminal Building, Rehabilitate

Runway - 14/32, Wildlife Hazard Assessments

SO ORL FL DAB Daytona Beach International P 72 $ 2,374,018.00 $ 2,374,018.00 $ - Improve Terminal Building

SW AROK AR BPK Baxter County GA 17 $ 130,534.00 $ 130,534.00 $ - Install Runway Lighting - 05/23

SW AROK AR 4M9 Corning Municipal GA 20 $ 98,814.00 $ 98,814.00 $ - Rehabilitate Taxiway

SW AROK AR XNA Northwest Arkansas Regional P 52 $ 468,000.00 $ 468,000.00 $ - Rehabilitate Taxiway

SW AROK AR XNA Northwest Arkansas Regional P 51 $ 2,639,152.00 $ 2,639,152.00 $ - Acquire Snow Removal Equipment

SW AROK AR BDQ Morrilton Municipal GA 9 $ 76,320.00 $ 76,320.00 $ - Rehabilitate Runway - 09/27

SW AROK AR AGO Magnolia Municipal GA 12 $ 48,388.00 $ 48,388.00 $ -

Install Runway Lighting - 18/36, Install Runway Vertical/Visual

Guidance System - 18/36

SW AROK AR BYH Arkansas International GA 6 $ 321,965.00 $ 321,965.00 $ -

Install Miscellaneous NAVAIDS, Rehabilitate Runway Lighting -

18/36

SW AROK AR RUE Russellville Regional GA 15 $ 417,844.00 $ 417,844.00 $ - Extend Taxiway

SW AROK AR 3M9 Warren Municipal GA 5 $ 593,303.00 $ 593,303.00 $ - Rehabilitate Runway - 03/21

SW AROK AR M60 Woodruff County GA 7 $ 209,004.00 $ 209,004.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 09/27, Rehabilitate

Taxiway

SW AROK AR ADF Dexter B Florence Memorial Field GA 15 $ 199,533.00 $ 199,533.00 $ - Rehabilitate Runway - 04/22

SW AROK AR 6M7 Marianna/Lee County-Steve Edwards Field GA 6 $ 278,052.00 $ 278,052.00 $ - Install Runway Lighting - 18/36

SW AROK AR FYV Drake Field GA 43 $ 251,982.00 $ 251,982.00 $ - Install Taxiway Lighting, Wildlife Hazard Assessments

SW AROK AR CRT Z M Jack Stell Field GA 11 $ 462,762.00 $ 462,762.00 $ - Rehabilitate Runway

SW AROK AR 6M2 Horseshoe Bend GA 7 $ 218,543.00 $ 218,543.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate

Taxiway

SW AROK AR SUZ Saline County Regional GA 10 $ 298,817.00 $ 298,817.00 $ - Update Airport Master Plan Study

SW AROK AR MEZ Mena Intermountain Municipal GA 19 $ 253,175.00 $ 253,175.00 $ - Rehabilitate Taxiway

SW AROK AR FSM Fort Smith Regional P 44 $ 728,829.00 $ 728,829.00 $ - Modify Service Road

SW AROK AR HOT Memorial Field GA 24 $ 239,676.00 $ 239,676.00 $ - Update Airport Master Plan Study

SW AROK AR ROG Rogers Executive - Carter Field GA 35 $ 5,951,990.00 $ 150,000.00 $ 5,801,990.00 Strengthen Runway - 02/20

SW AROK AR LIT Bill and Hillary Clinton National/Adams Field P 86 $ 5,904,333.00 $ 2,294,333.00 $ 3,610,000.00 Rehabilitate Taxiway

SW AROK AR CDH Harrell Field GA 16 $ 1,479,814.00 $ 1,479,814.00 $ - Rehabilitate Runway - 01/19, Rehabilitate Taxiway

SW AROK AR 42A Melbourne Municipal - John E Miller Field GA 16 $ 397,871.00 $ 397,871.00 $ - Construct Taxiway

SW AROK AR FSM Fort Smith Regional P 45 $ 297,770.00 $ 297,770.00 $ - Construct Aircraft Rescue & Fire Fighting Building

SW AROK AR VBT Bentonville Municipal/Louise M Thaden Field GA 12 $ 189,198.00 $ 189,198.00 $ - Construct Taxiway

SW AROK AR M70 Pocahontas Municipal GA 8 $ 132,814.00 $ 132,814.00 $ - Update Airport Master Plan Study

SW AROK AR LIT Bill and Hillary Clinton National/Adams Field P 85 $ 1,685,790.00 $ 1,685,790.00 $ -

Rehabilitate Runway - 04R/22L, Rehabilitate Runway Lighting -

04R/22L

SW AROK AR JBR Jonesboro Municipal CS 21 $ 369,457.00 $ 369,457.00 $ - Update Airport Master Plan Study

SW AROK AR 0M0 Billy Free Municipal GA 10 $ 81,630.00 $ 81,630.00 $ - Construct Taxiway

SW AROK AR M78 Malvern Municipal GA 7 $ 534,166.00 $ 534,166.00 $ - Construct Taxiway

SW AROK AR MPJ Petit Jean Park GA 3 $ 274,235.00 $ 274,235.00 $ - Rehabilitate Runway - 03/21

SW AROK AR HRO Boone County CS 25 $ 2,583,945.00 $ 2,583,945.00 $ -

Rehabilitate Runway - 18/36, Rehabilitate Runway Lighting -

18/36

SW AROK AR M70 Pocahontas Municipal GA 7 $ 387,982.00 $ 387,982.00 $ -

Improve Runway Safety Area - 18/36, Rehabilitate Runway,

Rehabilitate Taxiway

SW AROK AR SGT Stuttgart Municipal GA 23 $ 133,227.00 $ 133,227.00 $ - Rehabilitate Runway Lighting - 18/36

SW AROK AR 7M3 Bearce GA 13 $ 111,903.00 $ 111,903.00 $ - Install Perimeter Fencing

SW AROK OK DUA Durant Regional - Eaker Field GA 11 $ 310,000.00 $ 310,000.00 $ - Rehabilitate Runway - 17/35

SW AROK OK 1K5 Waynoka Municipal GA 6 $ 265,882.00 $ 265,882.00 $ - Rehabilitate Runway - 17/35

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 38 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SW AROK OK PNC Ponca City Regional GA 17 $ 262,003.00 $ 262,003.00 $ - Install Miscellaneous NAVAIDS

SW AROK OK DUA Durant Regional - Eaker Field GA 12 $ 70,041.00 $ 70,041.00 $ - Conduct Environmental Study

SW AROK OK 1K8 South Grand Lake Regional GA 5 $ 123,885.00 $ 123,885.00 $ - Expand Apron

SW AROK OK CQB Chandler Regional GA 11 $ 132,278.00 $ 132,278.00 $ - Install Weather Reporting Equipment

SW AROK OK GUY Guymon Municipal GA 16 $ 1,029,121.00 $ 1,029,121.00 $ - Rehabilitate Apron

SW AROK OK 17K Boise City GA 6 $ 355,316.00 $ 355,316.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

SW AROK OK 95F Cleveland Municipal GA 9 $ 201,432.00 $ 201,432.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate

Taxiway

SW AROK OK AQR Atoka Municipal GA 11 $ 717,498.00 $ 717,498.00 $ - Widen Runway - 18/36

SW AROK OK MLC McAlester Regional GA 14 $ 83,790.00 $ 83,790.00 $ - Install Miscellaneous NAVAIDS

SW AROK OK H68 Hefner-Easley GA 5 $ 72,450.00 $ 72,450.00 $ - Construct Parking Lot, Construct Service Road

SW AROK OK 4O5 Cherokee Municipal GA 8 $ 54,000.00 $ 54,000.00 $ - Rehabilitate Runway - 17/35

SW AROK OK 86F Carnegie Municipal GA 5 $ 247,569.00 $ 247,569.00 $ - Expand Apron, Install Miscellaneous NAVAIDS

SW AROK OK TUL Tulsa International P 90 $ 1,172,700.00 $ 1,172,700.00 $ -

Rehabilitate Taxiway [Taxiway J], Rehabilitate Taxiway [Taxiway

K]

SW AROK OK F30 Sulphur Municipal GA 9 $ 51,210.00 $ 51,210.00 $ - Rehabilitate Runway - 17/35

SW AROK OK JWG Watonga Regional GA 10 $ 396,581.00 $ 396,581.00 $ - Construct Taxiway

SW AROK OK SRE Seminole Municipal GA 16 $ 282,753.00 $ 282,753.00 $ - Install Weather Reporting Equipment

SW AROK OK BVO Bartlesville Municipal GA 11 $ 479,639.00 $ 479,639.00 $ - Rehabilitate Apron

SW AROK OK 3O4 Sayre Municipal GA 8 $ 244,422.00 $ 244,422.00 $ -

Install Runway Vertical/Visual Guidance System - 17/35,

Rehabilitate Apron

SW AROK OK 6F1 Talihina Municipal GA 1 $ 300,000.00 $ 300,000.00 $ - Rehabilitate Runway - 01/19

SW AROK OK 1F0 Ardmore Downtown Executive GA 15 $ 172,774.00 $ 172,774.00 $ - Acquire Land For Approaches

SW AROK OK TQH Tahlequah Municipal GA 12 $ 78,795.00 $ 78,795.00 $ - Install Runway Vertical/Visual Guidance System - 17/35

SW AROK OK GOK Guthrie-Edmond Regional GA 16 $ 48,510.00 $ 48,510.00 $ - Rehabilitate Runway Lighting - 16/34

SW AROK OK WDG Enid Woodring Regional GA 27 $ 300,000.00 $ 300,000.00 $ - Construct Apron

SW AROK OK RVS Richard Lloyd Jones Jr R 30 $ 1,144,679.00 $ - $ 1,144,679.00 Install Airfield Guidance Signs

SW AROK OK WWR West Woodward GA 13 $ 79,402.00 $ 79,402.00 $ - Rehabilitate Taxiway Lighting

SW AROK OK BKN Blackwell-Tonkawa Municipal GA 12 $ 105,456.00 $ 105,456.00 $ - Install Perimeter Fencing

SW AROK OK 80F Antlers Municipal GA 6 $ 128,845.00 $ 128,845.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 17/35, Rehabilitate

Taxiway

SW AROK OK H04 Vinita Municipal GA 10 $ 298,260.00 $ 298,260.00 $ - Install Perimeter Fencing

SW AROK OK 2F6 Skiatook Municipal GA 10 $ 421,052.00 $ 421,052.00 $ - Rehabilitate Apron

SW AROK OK O53 Medford Municipal GA 8 $ 74,911.00 $ 74,911.00 $ - Rehabilitate Runway - 17/35, Rehabilitate Taxiway

SW AROK OK OKM Okmulgee Regional GA 22 $ 163,305.00 $ 163,305.00 $ - Improve Airport Drainage

SW AROK OK MIO Miami Regional GA 18 $ 173,880.00 $ 173,880.00 $ -

Install Airport Beacons, Install Miscellaneous NAVAIDS, Install

Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542,

Install Runway Vertical/Visual Guidance System - 17/35,

Rehabilitate Runway Lighting - 17/35

SW AROK OK 3O3 Purcell Municipal - Steven E Shephard Field GA 9 $ 231,722.00 $ 231,722.00 $ - Construct Taxiway

SW AROK OK FDR Frederick Regional GA 9 $ 48,870.00 $ 48,870.00 $ - Install Taxiway Lighting

SW AROK OK LAW Lawton-Fort Sill Regional P 34 $ 900,431.00 $ 900,431.00 $ - Improve Snow Removal Equipment Building

SW AROK OK 1O4 Thomas Municipal GA 12 $ 140,423.00 $ 140,423.00 $ - Rehabilitate Runway - 17/35

SW AROK OK OWP William R Pogue Municipal GA 19 $ 131,490.00 $ 131,490.00 $ -

Conduct Aeronautical Survey for RNAV Approach, Improve

Airport Miscellaneous Improvements, Install Runway

Vertical/Visual Guidance System - 17/35

SW AROK OK SWO Stillwater Regional GA 24 $ 150,000.00 $ 150,000.00 $ - Construct Taxiway

SW AROK OK TUL Tulsa International P 88 $ 3,620,840.00 $ 3,620,840.00 $ - Install Perimeter Fencing required by 14 CFR 139

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 39 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SW AROK OK PWA Wiley Post R 23 $ 2,955,690.00 $ 1,111,373.00 $ 1,844,317.00 Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

SW AROK OK DUC Halliburton Field GA 15 $ 148,050.00 $ 148,050.00 $ - Rehabilitate Runway - 17/35, Rehabilitate Taxiway

SW AROK OK HHW Stan Stamper Municipal GA 12 $ 247,950.00 $ 247,950.00 $ -

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual

Guidance System - 17/35, Remove Obstructions

SW AROK OK O45 Hooker Municipal GA 7 $ 136,563.00 $ 136,563.00 $ - Install Runway Vertical/Visual Guidance System - 17/35

SW AROK OK GCM Claremore Regional GA 19 $ 80,370.00 $ 80,370.00 $ - Rehabilitate Runway - 17/35, Rehabilitate Taxiway

SW AROK OK *OKV Various Locations in Oklahoma 6 $ 245,353.00 $ 245,353.00 $ -

Extend Runway (Durant Regional - Eaker Field - 17/35),

Rehabilitate Runway (McAlester Regional - 02/20; Ponca City

Regional - 17/35; Stillwater Regional - 04/22), Rehabilitate

Taxiway (Stillwater Regional)

SW AROK OK 3F7 Jones Memorial GA 10 $ 3,974,374.00 $ 574,374.00 $ 3,400,000.00 Construct Runway - 18/36

SW AROK OK ADH Ada Municipal GA 15 $ 345,000.00 $ 345,000.00 $ - Construct Apron

SW AROK OK 0F9 Tishomingo Airpark GA 4 $ 257,935.00 $ 257,935.00 $ - Rehabilitate Apron

SW AROK OK RVS Richard Lloyd Jones Jr R 29 $ 1,917,713.00 $ 1,452,844.00 $ 464,869.00 Rehabilitate Runway - 01L/19R

SW AROK OK F22 Perry Municipal GA 12 $ 317,027.00 $ 317,027.00 $ - Rehabilitate Taxiway

SW AROK OK OJA Thomas P Stafford GA 11 $ 324,381.00 $ 324,381.00 $ - Rehabilitate Runway Lighting - 17/35

SW AROK OK SWO Stillwater Regional GA 23 $ 831,331.00 $ 831,331.00 $ - Construct Taxiway

SW AROK OK 1O1 Grandfield Municipal GA 10 $ 32,400.00 $ 32,400.00 $ - Rehabilitate Runway Lighting - 17/35

SW AROK OK ADM Ardmore Municipal GA 16 $ 5,443,650.00 $ 1,250,200.00 $ 4,193,450.00 Rehabilitate Taxiway

SW AROK OK 4O4 McCurtain County Regional GA 11 $ 326,114.00 $ 326,114.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 02/20, Rehabilitate

Taxiway

SW AROK OK CUH Cushing Municipal GA 16 $ 207,000.00 $ 207,000.00 $ - Rehabilitate Runway Lighting - 18/36

SW AROK OK OKC Will Rogers World P 68 $ 2,183,174.00 $ 2,183,174.00 $ - Expand Terminal Building

SW AROK OK CHK Chickasha Municipal GA 14 $ 416,262.00 $ 416,262.00 $ - Rehabilitate Access Road

SW AROK OK ELK Elk City Regional Business GA 17 $ 47,610.00 $ 47,610.00 $ - Conduct Miscellaneous Study

SW AROK OK GZL Stigler Regional GA 11 $ 89,820.00 $ 89,820.00 $ - Construct Taxiway

SW LANM LA HUM Houma-Terrebonne GA 28 $ 434,444.00 $ 434,444.00 $ - Construct Taxiway

SW LANM LA F87 Union Parish GA 14 $ 412,198.00 $ 412,198.00 $ - Construct Taxiway

SW LANM LA L32 Jonesville GA 7 $ 363,425.00 $ 363,425.00 $ - Remove Obstructions

SW LANM LA HZR False River Regional GA 18 $ 204,484.00 $ 204,484.00 $ - Update Airport Master Plan Study

SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 106 $ 7,571,262.00 $ 2,366,596.00 $ 5,204,666.00 Construct Taxiway

SW LANM LA DTN Shreveport Downtown R 26 $ 800,000.00 $ - $ 800,000.00 Extend Taxiway

SW LANM LA AEX Alexandria International P 72 $ 10,000,000.00 $ - $ 10,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

SW LANM LA OPL St Landry Parish-Ahart Field GA 13 $ 821,993.00 $ 821,993.00 $ - Rehabilitate Runway - 18/36

SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 105 $ 430,676.00 $ 430,676.00 $ - Rehabilitate Runway - 04L/22R

SW LANM LA LCH Lake Charles Regional P 46 $ 1,659,792.00 $ 1,515,160.00 $ 144,632.00 Rehabilitate Taxiway Lighting

SW LANM LA CWF Chennault International GA 16 $ 1,500,725.00 $ 118,755.00 $ 1,381,970.00 Rehabilitate Runway - 15/33

SW LANM LA MSY Louis Armstrong New Orleans International P 101 $ 19,090,925.00 $ 2,210,925.00 $ 16,880,000.00 Construct Apron

SW LANM LA LFT Lafayette Regional/Paul Fournet Field P 48 $ 2,235,985.00 $ - $ 2,235,985.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

SW LANM LA MLU Monroe Regional P 34 $ 1,822,753.00 $ 1,822,753.00 $ - Improve Airport Drainage

SW LANM LA DTN Shreveport Downtown R 25 $ 1,847,884.00 $ 1,847,884.00 $ -

Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway

D], Rehabilitate Taxiway [Taxiway J], Rehabilitate Taxiway

[Taxiway Q]

SW LANM LA 3R7 Jennings GA 16 $ 76,500.00 $ 76,500.00 $ - Rehabilitate Runway - 13/31

SW LANM LA BXA George R Carr Memorial Air Field GA 19 $ 539,809.00 $ 539,809.00 $ - Remove Obstructions

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 40 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SW LANM LA F88 Jonesboro GA 8 $ 67,586.00 $ 67,586.00 $ - Update Airport Master Plan Study

SW LANM LA HDC Hammond Northshore Regional GA 19 $ 3,877,659.00 $ 1,877,659.00 $ 2,000,000.00 Rehabilitate Runway - 13/31

SW LANM LA ARA Acadiana Regional GA 19 $ 90,000.00 $ 90,000.00 $ - Widen Taxiway

SW LANM LA *LAS State of Louisiana 4 $ 300,000.00 $ 300,000.00 $ - Conduct State System Plan Study

SW LANM LA L83 Thibodaux Municipal GA 5 $ 63,000.00 $ 63,000.00 $ - Remove Obstructions

SW LANM LA GAO South Lafourche Leonard Miller Jr GA 15 $ 90,450.00 $ 90,450.00 $ - Install Taxiway Lighting

SW LANM LA 0R4 Concordia Parish GA 12 $ 71,100.00 $ 71,100.00 $ - Rehabilitate Runway - 14/32

SW LANM LA 9M6 Kelly-Dumas GA 15 $ 116,100.00 $ 116,100.00 $ - Rehabilitate Runway - 18/36

SW LANM LA AEX Alexandria International P 69 $ 1,692,735.00 $ 1,692,735.00 $ -

Improve Airport Drainage, Rehabilitate Apron, Rehabilitate

Taxiway [Taxiway B], Rehabilitate Taxiway [Taxiway E],

Rehabilitate Taxiway Lighting [Taxiway A], Rehabilitate Taxiway

Lighting [Taxiway B], Rehabilitate Taxiway Lighting [Taxiway E]

SW LANM LA M79 John H Hooks Jr Memorial GA 15 $ 474,107.00 $ 474,107.00 $ - Rehabilitate Runway - 18/36

SW LANM LA TVR Vicksburg Tallulah Regional GA 15 $ 299,764.00 $ 299,764.00 $ - Install Perimeter Fencing

SW LANM LA AEX Alexandria International P 71 $ 4,132,332.00 $ - $ 4,132,332.00 Construct Access Road

SW LANM LA MKV Marksville Municipal GA 15 $ 117,000.00 $ 117,000.00 $ - Rehabilitate Runway - 04/22

SW LANM LA *LAV Various Locations in Louisiana 5 $ 720,000.00 $ - $ 720,000.00

Wildlife Hazard Assessments (Abbeville Chris Crusta Memorial;

Hammond Northshore Regional; Harry P Williams Memorial;

Houma-Terrebonne; Louisiana Regional; Ruston Regional;

Shreveport Downtown; Slidell)

SW LANM LA SHV Shreveport Regional P 62 $ 457,600.00 $ 107,600.00 $ 350,000.00 Sustainable Management Plan

SW LANM LA NEW Lakefront R 29 $ 237,510.00 $ 237,510.00 $ - Rehabilitate Runway - 18L/36R

SW LANM LA SHV Shreveport Regional P 61 $ 68,400.00 $ 68,400.00 $ - Acquire Safety Equipment and/or Fencing

SW LANM LA LFT Lafayette Regional/Paul Fournet Field P 47 $ 13,026,644.00 $ 2,154,274.00 $ 10,872,370.00 Improve Runway Safety Area - 11/29

SW LANM LA AEX Alexandria International P 70 $ 2,025,000.00 $ - $ 2,025,000.00 Rehabilitate Apron

SW LANM NM 5V5 Shiprock Airstrip GA 3 $ 360,058.00 $ 360,058.00 $ - Rehabilitate Runway - 02/20

SW LANM NM SVC Grant County GA 17 $ 2,490,128.00 $ 340,128.00 $ 2,150,000.00 Rehabilitate Runway - 08/26

SW LANM NM SAF Santa Fe Municipal P 45 $ 262,955.00 $ 262,955.00 $ - Rehabilitate Runway - 02/20

SW LANM NM GNT Grants-Milan Municipal GA 15 $ 261,196.00 $ 261,196.00 $ - Rehabilitate Runway - 13/31

SW LANM NM TCS Truth Or Consequences Municipal GA 16 $ 627,514.00 $ 627,514.00 $ - Construct Fuel Farm

SW LANM NM SRR Sierra Blanca Regional GA 25 $ 91,590.00 $ 91,590.00 $ - Rehabilitate Runway - 06/24

SW LANM NM E26 Lea County/Jal/ GA 8 $ 79,061.00 $ 79,061.00 $ - Install Perimeter Fencing

SW LANM NM DMN Deming Municipal GA 17 $ 509,899.00 $ 509,899.00 $ - Rehabilitate Runway - 08/26

SW LANM NM GUP Gallup Municipal GA 25 $ 3,474,689.00 $ 3,474,689.00 $ - Rehabilitate Runway - 06/24

SW LANM NM TCC Tucumcari Municipal GA 17 $ 442,394.00 $ 442,394.00 $ - Rehabilitate Parking Lot

SW LANM NM N19 Aztec Municipal GA 4 $ 600,000.00 $ 600,000.00 $ - Rehabilitate Apron

SW LANM NM TCC Tucumcari Municipal GA 18 $ 77,729.00 $ 77,729.00 $ - Acquire Emergency Generator

SW LANM NM E14 Ohkay Owingeh GA 13 $ 297,653.00 $ 297,653.00 $ - Construct Snow Removal Equipment Building

SW LANM NM HOB Lea County Regional P 25 $ 5,675,205.00 $ 2,319,629.00 $ 3,355,576.00 Rehabilitate Runway - 12/30

SW LANM NM SAF Santa Fe Municipal P 43 $ 937,500.00 $ 937,500.00 $ -

Acquire Friction Measuring Equipment, Acquire Snow Removal

Equipment

SW LANM NM LSB Lordsburg Municipal GA 16 $ 59,327.00 $ 59,327.00 $ - Construct Taxiway

SW LANM NM LAM Los Alamos CS 13 $ 534,316.00 $ 534,316.00 $ - Rehabilitate Runway - 09/27

SW LANM NM F37 Carrizozo Municipal GA 7 $ 201,654.00 $ 201,654.00 $ - Rehabilitate Runway - 06/24

SW LANM NM ABQ Albuquerque International Sunport P 49 $ 299,363.00 $ 299,363.00 $ - Rehabilitate Runway - 12/30

SW LANM NM ONM Socorro Municipal GA 15 $ 135,347.00 $ 135,347.00 $ - Install Runway Vertical/Visual Guidance System - 15/33

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 41 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SW LANM NM HOB Lea County Regional P 24 $ 818,066.00 $ 818,066.00 $ - Install Perimeter Fencing

SW LANM NM ONM Socorro Municipal GA 16 $ 277,911.00 $ 277,911.00 $ - Rehabilitate Runway - 06/24, Rehabilitate Taxiway

SW LANM NM ROW Roswell International Air Center P 30 $ 2,140,000.00 $ 790,000.00 $ 1,350,000.00 Rehabilitate Runway - 03/21

SW LANM NM E89 Conchas Lake GA 6 $ 339,348.00 $ 339,348.00 $ - Rehabilitate Runway - 09/27

SW LANM NM ATS Artesia Municipal GA 15 $ 3,787,986.00 $ 1,967,272.00 $ 1,820,714.00 Rehabilitate Runway - 12/30

SW LANM NM SAF Santa Fe Municipal P 46 $ 180,541.00 $ 180,541.00 $ - Conduct Miscellaneous Study

SW LANM NM ABQ Albuquerque International Sunport P 50 $ 87,016.00 $ 87,016.00 $ - Rehabilitate Runway - 08/26

SW LANM NM FSU Fort Sumner Municipal GA 11 $ 281,528.00 $ 281,528.00 $ -

Rehabilitate Runway - 03/21, Rehabilitate Runway - 08/26,

Rehabilitate Taxiway

SW LANM NM SXU Santa Rosa Route 66 GA 15 $ 113,016.00 $ 113,016.00 $ - Install Perimeter Fencing

SW LANM NM CAO Clayton Municipal Airpark GA 17 $ 402,413.00 $ 402,413.00 $ - Rehabilitate Runway - 02/20

SW LANM NM CNM Cavern City Air Terminal GA 25 $ 228,915.00 $ 228,915.00 $ - Rehabilitate Runway - 08/26

SW LANM NM T16 Reserve GA 6 $ 408,686.00 $ 408,686.00 $ - Rehabilitate Runway - 06/24

SW LANM NM FMN Four Corners Regional CS 40 $ 236,643.00 $ 236,643.00 $ - Improve Airport Erosion Control

SW LANM NM 5V5 Shiprock Airstrip GA 4 $ 158,174.00 $ 158,174.00 $ - Conduct Aeronautical Survey for RNAV Approach

SW LANM NM E06 Lea County-Zip Franklin Memorial GA 8 $ 143,481.00 $ 143,481.00 $ - Install Perimeter Fencing

SW LANM NM SAF Santa Fe Municipal P 44 $ 171,478.00 $ 171,478.00 $ - Rehabilitate Taxiway

SW TEX TX CLL Easterwood Field P 38 $ 3,338,477.00 $ 3,338,477.00 $ - Expand Terminal Building

SW TEX TX IAH George Bush Intercontinental/Houston P 106 $ 9,285,287.00 $ 9,285,287.00 $ - Rehabilitate Taxiway

SW TEX TX ABI Abilene Regional P 46 $ 1,234,022.00 $ 1,234,022.00 $ -

Rehabilitate Taxiway [Taxiways C, C1, C2, C3, S and T],

Rehabilitate Taxiway [Taxiways D, D1, D2 and D3], Rehabilitate

Taxiway [Taxiways M, N and P], Security Enhancements, Update

Airport Master Plan Study

SW TEX TX SAT San Antonio International P 86 $ 1,769,214.00 $ 1,769,214.00 $ - Rehabilitate Runway Lighting

SW TEX TX SJT San Angelo Regional/Mathis Field P 34 $ 348,910.00 $ 348,910.00 $ -

Conduct Miscellaneous Study, Rehabilitate Taxiway, Wildlife

Hazard Assessments

SW TEX TX *TXB Texas State Block Grant Program 97 $ 20,062,871.00 $ 20,062,871.00 $ -Non primary development projects in state block grant program

SW TEX TX DFW Dallas-Fort Worth International P 113 $ 8,000,000.00 $ - $ 8,000,000.00 Strengthen Taxiway

SW TEX TX DFW Dallas-Fort Worth International P 116 $ 8,993,598.00 $ 8,993,598.00 $ - Rehabilitate Runway - 18R/36L, Rehabilitate Taxiway

SW TEX TX AUS Austin-Bergstrom International P 59 $ 14,518,190.00 $ 7,018,190.00 $ 7,500,000.00 Expand Apron

SW TEX TX MAF Midland International P 56 $ 3,365,404.00 $ 3,365,404.00 $ -

Construct Taxiway, Improve Terminal Building, Rehabilitate

Apron, Rehabilitate Runway - 10/28, Rehabilitate Runway -

16L/34R, Rehabilitate Runway - 16R/34L, Rehabilitate Taxiway

[Taxiways A and E], Rehabilitate Taxiway [Taxiways B, C, D, F, H,

L, M, P and

SW TEX TX TYR Tyler Pounds Regional P 37 $ 8,987,959.00 $ 1,101,298.00 $ 7,886,661.00 Rehabilitate Runway - 04/22

SW TEX TX SPS Sheppard AFB/Wichita Falls Municipal P 18 $ 1,000,000.00 $ 1,000,000.00 $ - Construct Terminal Building

SW TEX TX ELP El Paso International P 36 $ 704,476.00 $ 704,476.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

SW TEX TX SAT San Antonio International P 84 $ 2,790,525.00 $ - $ 2,790,525.00 Rehabilitate Taxiway

SW TEX TX SAT San Antonio International P 87 $ 592,849.00 $ 592,849.00 $ - Rehabilitate Service Road

SW TEX TX *TXB Texas State Block Grant Program 100 $ 2,080,980.00 $ 2,080,980.00 $ -Non primary development projects in state block grant program

SW TEX TX BRO Brownsville/South Padre Island International P 44 $ 837,000.00 $ 837,000.00 $ -Conduct Airport Master Plan Study, Install Airport Beacons

SW TEX TX IAH George Bush Intercontinental/Houston P 108 $ 1,500,469.00 $ - $ 1,500,469.00 VALE Infrastructure

SW TEX TX DFW Dallas-Fort Worth International P 115 $ 3,065,946.00 $ - $ 3,065,946.00 VALE Infrastructure

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 42 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SW TEX TX LBB Lubbock Preston Smith International P 41 $ 2,314,971.00 $ 2,314,971.00 $ -

Construct Aircraft Rescue & Fire Fighting Building, Modify

Terminal Building

SW TEX TX GRK Robert Gray AAF P 26 $ 540,000.00 $ 540,000.00 $ - Improve Terminal Building

SW TEX TX AMA Rick Husband Amarillo International P 40 $ 1,849,994.00 $ 1,849,994.00 $ -

Acquire Snow Removal Equipment, Improve Airport

Miscellaneous Improvements, Rehabilitate Apron, Rehabilitate

Runway - 13/31, Rehabilitate Snow Removal Equipment Building

SW TEX TX HRL Valley International P 58 $ 4,043,113.00 $ 4,043,113.00 $ -

Construct Aircraft Rescue & Fire Fighting Building, Rehabilitate

Taxiway

SW TEX TX *TXB Texas State Block Grant Program 99 $ 4,136,780.00 $ 4,136,780.00 $ -Non primary development projects in state block grant program

SW TEX TX *TXB Texas State Block Grant Program 95 $ 15,715,060.00 $ 15,715,060.00 $ -Non primary development projects in state block grant program

SW TEX TX SAT San Antonio International P 83 $ 3,684,640.00 $ - $ 3,684,640.00 Rehabilitate Taxiway

SW TEX TX LRD Laredo International P 81 $ 5,000,000.00 $ - $ 5,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

SW TEX TX LRD Laredo International P 82 $ 7,819,990.00 $ 2,085,795.00 $ 5,734,195.00

Extend Taxiway, Install Guidance Signs, Rehabilitate Apron,

Rehabilitate Taxiway

SW TEX TX DAL Dallas Love Field P 51 $ 988,086.00 $ 988,086.00 $ -

Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway

B]

SW TEX TX AMA Rick Husband Amarillo International P 41 $ 269,460.00 $ 269,460.00 $ - Prepare SMS Manual and Implementation Plan

SW TEX TX *TXB Texas State Block Grant Program 96 $ 7,909,322.00 $ 7,909,322.00 $ -Non primary development projects in state block grant program

SW TEX TX DFW Dallas-Fort Worth International P 114 $ 20,200,648.00 $ - $ 20,200,648.00 Rehabilitate Apron

SW TEX TX GGG East Texas Regional P 42 $ 1,563,286.00 $ 1,000,000.00 $ 563,286.00 Rehabilitate Taxiway Lighting

SW TEX TX CRP Corpus Christi International P 53 $ 2,300,000.00 $ - $ 2,300,000.00 Rehabilitate Apron

SW TEX TX CRP Corpus Christi International P 54 $ 6,637,856.00 $ 1,589,817.00 $ 5,048,039.00 Install Perimeter Fencing required by 49 CFR 1542

SW TEX TX AFW Fort Worth Alliance R 57 $ 10,680,318.00 $ 680,318.00 $ 10,000,000.00 Extend Runway - 16L/34R

SW TEX TX *TXB Texas State Block Grant Program 101 $ 5,278,637.00 $ 5,278,637.00 $ -Non primary development projects in state block grant program

SW TEX TX *TXB Texas State Block Grant Program 98 $ 12,000,000.00 $ - $ 12,000,000.00 Non primary development projects in state block grant program

SW TEX TX GGG East Texas Regional P 43 $ 2,194,195.00 $ - $ 2,194,195.00 Improve Airport Drainage

SW TEX TX SAT San Antonio International P 85 $ 11,040,000.00 $ - $ 11,040,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

SW TEX TX BPT Jack Brooks Regional P 32 $ 2,233,096.00 $ 1,000,000.00 $ 1,233,096.00 Rehabilitate Taxiway

SW TEX TX IAH George Bush Intercontinental/Houston P 107 $ 15,000,000.00 $ - $ 15,000,000.00 Rehabilitate Taxiway

SW TEX TX DAL Dallas Love Field P 50 $ 7,900,000.00 $ 900,000.00 $ 7,000,000.00 Rehabilitate Apron

WP HNL AS Z08 Ofu GA 14 $ 100,000.00 $ 100,000.00 $ - Prepare SMS Manual and Implementation Plan

WP HNL AS FAQ Fitiuta GA 28 $ 100,000.00 $ 100,000.00 $ - Prepare SMS Manual and Implementation Plan

WP HNL AS FAQ Fitiuta GA 29 $ 900,000.00 $ 900,000.00 $ - Conduct Airport Master Plan Study

WP HNL AS PPG Pago Pago International P 60 $ 6,200,000.00 $ - $ 6,200,000.00 Construct Parking Lot

WP HNL AS Z08 Ofu GA 13 $ 900,000.00 $ 900,000.00 $ - Update Airport Master Plan Study

WP HNL AS PPG Pago Pago International P 59 $ 7,348,875.00 $ - $ 7,348,875.00 Rehabilitate Apron, Rehabilitate Runway - 05/23

WP HNL AS PPG Pago Pago International P 55 $ 150,000.00 $ - $ 150,000.00 Prepare SMS Manual and Implementation Plan

WP HNL AS PPG Pago Pago International P 58 $ 5,400,000.00 $ - $ 5,400,000.00

Rehabilitate Runway Lighting - 08/26, Rehabilitate Taxiway

Lighting

WP HNL AS PPG Pago Pago International P 56 $ 300,000.00 $ 300,000.00 $ - Update Airport Master Plan Study

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 43 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

WP HNL AS PPG Pago Pago International P 57 $ 700,000.00 $ 700,000.00 $ - Improve Runway Safety Area - 08/26

WP HNL FM T11 Yap International GA 13 $ 300,000.00 $ - $ 300,000.00 Improve Airport Miscellaneous Improvements

WP HNL FM TTK Kosrae GA 15 $ 300,000.00 $ - $ 300,000.00 Improve Airport Miscellaneous Improvements

WP HNL GU GUM Guam International P 96 $ 150,000.00 $ - $ 150,000.00 Prepare SMS Manual and Implementation Plan

WP HNL GU GUM Guam International P 94 $ 706,077.00 $ 706,077.00 $ - Install Perimeter Fencing required by 14 CFR 139

WP HNL GU GUM Guam International P 95 $ 100,000.00 $ - $ 100,000.00 Wildlife Hazard Assessments

WP HNL GU GUM Guam International P 98 $ 1,000,000.00 $ - $ 1,000,000.00 Construct Aircraft Rescue & Fire Fighting Building

WP HNL GU GUM Guam International P 99 $ 810,000.00 $ - $ 810,000.00 Rehabilitate Apron

WP HNL GU GUM Guam International P 97 $ 3,760,649.00 $ 3,760,649.00 $ - Modify Terminal Building

WP HNL HI LIH Lihue P 47 $ 126,200.00 $ 126,200.00 $ - Wildlife Hazard Assessments

WP HNL HI KOA Kona International at Keahole P 38 $ 128,000.00 $ 128,000.00 $ - Wildlife Hazard Assessments

WP HNL HI ITO Hilo International P 50 $ 3,305,490.00 $ 3,305,490.00 $ - Improve Airport Drainage

WP HNL HI JRF Kalaeloa (John Rodgers Field) R 20 $ 3,150,000.00 $ - $ 3,150,000.00 Modify Building [Military Airport Program]

WP HNL HI OGG Kahului P 51 $ 106,500.00 $ 106,500.00 $ - Wildlife Hazard Assessments

WP HNL HI HNL Honolulu International P 128 $ 408,000.00 $ - $ 408,000.00 Acquire Equipment

WP HNL HI HNL Honolulu International P 125 $ 105,000.00 $ 105,000.00 $ - Wildlife Hazard Assessments

WP HNL HI LIH Lihue P 49 $ 12,755,131.00 $ 12,755,131.00 $ - Rehabilitate Runway - 03/21

WP HNL HI MKK Molokai P 22 $ 128,000.00 $ 128,000.00 $ - Wildlife Hazard Assessments

WP HNL HI JRF Kalaeloa (John Rodgers Field) R 19 $ 4,000,000.00 $ 150,000.00 $ 3,850,000.00 Construct Building [Military Airport Program]

WP HNL HI LNY Lanai P 20 $ 127,800.00 $ 127,800.00 $ - Wildlife Hazard Assessments

WP HNL HI HNL Honolulu International P 127 $ 3,111,026.00 $ 3,111,026.00 $ - Widen Runway - 08L/26R

WP HNL MH MAJ Marshall Islands International GA 17 $ 300,000.00 $ - $ 300,000.00 Improve Airport Miscellaneous Improvements

WP HNL MP TNI Tinian International P 27 $ 104,981.00 $ 104,981.00 $ - Runway Incursion Markings

WP HNL MP GRO Benjamin Taisacan Manglona International P 27 $ 275,392.00 $ 275,392.00 $ - Install Perimeter Fencing required by 14 CFR 139

WP HNL MP GRO Benjamin Taisacan Manglona International P 28 $ 2,424,072.00 $ 2,424,072.00 $ - Improve Aircraft Rescue & Fire Fighting Building

WP HNL MP GSN Francisco C Ada/Saipan International P 88 $ 4,095,018.00 $ 1,595,018.00 $ 2,500,000.00 Rehabilitate Taxiway

WP HNL MP GRO Benjamin Taisacan Manglona International P 26 $ 123,000.00 $ 123,000.00 $ - Runway Incursion Markings

WP HNL MP GSN Francisco C Ada/Saipan International P 87 $ 323,193.00 $ 323,193.00 $ - Improve Terminal Building

WP LAX CA L35 Big Bear City GA 22 $ 1,291,517.00 $ 1,291,517.00 $ -

Install Miscellaneous NAVAIDS, Rehabilitate Runway Lighting -

08/26, Rehabilitate Taxiway Lighting

WP LAX CA F70 French Valley GA 28 $ 1,635,168.00 $ 1,635,168.00 $ - Rehabilitate Apron

WP LAX CA BLH Blythe GA 10 $ 546,919.00 $ 546,919.00 $ - Rehabilitate Apron

WP LAX CA O26 Lone Pine GA 12 $ 300,000.00 $ 300,000.00 $ -

Rehabilitate Runway Lighting - 16/34, Rehabilitate Taxiway

Lighting

WP LAX CA REI Redlands Municipal GA 15 $ 827,437.00 $ 827,437.00 $ -

Install Airfield Guidance Signs, Rehabilitate Runway Lighting -

08/26, Rehabilitate Taxiway Lighting

WP LAX CA OKB Oceanside Municipal GA 12 $ 95,848.00 $ 95,848.00 $ - Conduct Miscellaneous Study

WP LAX CA SEE Gillespie Field R 26 $ 4,782,450.00 $ 4,782,450.00 $ - Improve Airport Drainage

WP LAX CA IZA Santa Ynez GA 15 $ 982,320.00 $ 982,320.00 $ -

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual

Guidance System - 08/26, Rehabilitate Runway Lighting - 08/26,

Rehabilitate Taxiway Lighting

WP LAX CA LAX Los Angeles International P 88 $ 4,024,844.00 $ - $ 4,024,844.00 VALE Infrastructure

WP LAX CA BUR Bob Hope P 61 $ 9,670,800.00 $ - $ 9,670,800.00 Rehabilitate Runway - 15/33

WP LAX CA LPC Lompoc GA 17 $ 1,054,007.00 $ 1,054,007.00 $ - Rehabilitate Apron

WP LAX CA SDM Brown Field Municipal R 18 $ 500,000.00 $ 500,000.00 $ - Update Airport Master Plan Study

WP LAX CA HHR Jack Northrop Field/Hawthorne Municipal R 16 $ 281,000.00 $ 281,000.00 $ - Update Airport Master Plan Study

WP LAX CA HMT Hemet-Ryan GA 16 $ 213,706.00 $ 213,706.00 $ - Update Airport Master Plan Study

WP LAX CA L71 California City Municipal GA 17 $ 132,750.00 $ 132,750.00 $ - Rehabilitate Taxiway

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 44 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

WP LAX CA LAX Los Angeles International P 86 $ 11,000,000.00 $ - $ 11,000,000.00 Construct Apron

WP LAX CA LAX Los Angeles International P 87 $ 36,201,092.00 $ 9,201,092.00 $ 27,000,000.00 Improve Runway Safety Area - 07L/25R

WP LAX CA CNO Chino R 33 $ 3,914,100.00 $ 3,914,100.00 $ - Rehabilitate Apron

WP LAX CA L05 Kern Valley GA 7 $ 242,506.00 $ 242,506.00 $ - Update Airport Master Plan Study

WP LAX CA SEE Gillespie Field R 27 $ 108,840.00 $ 108,840.00 $ - Install Weather Reporting Equipment

WP LAX CA 49X Chemehuevi Valley GA 11 $ 94,368.00 $ 94,368.00 $ - Install Apron Lighting

WP LAX CA CCB Cable R 14 $ 207,643.00 $ 207,643.00 $ - Install Weather Reporting Equipment

WP LAX CA BWC Brawley Municipal GA 18 $ 140,708.00 $ 140,708.00 $ - Rehabilitate Runway Lighting - 08/26

WP LAX CA BIH Bishop GA 18 $ 252,483.00 $ 252,483.00 $ - Rehabilitate Runway - 17/35

WP LAX CA RAL Riverside Municipal R 28 $ 105,852.00 $ 105,852.00 $ - Rehabilitate Apron, Rehabilitate Runway - 09/27

WP LAX CA LAX Los Angeles International P 89 $ 14,684,378.00 $ 7,884,378.00 $ 6,800,000.00 Rehabilitate Runway - 07L/25R

WP LAX CA SBA Santa Barbara Municipal P 50 $ 353,878.00 $ 353,878.00 $ - Rehabilitate Runway - 07/25

WP LAX CA FUL Fullerton Municipal R 24 $ 720,000.00 $ 720,000.00 $ - Improve Airport Erosion Control

WP LAX CA IPL Imperial County GA 35 $ 500,350.00 $ 500,350.00 $ - Rehabilitate Apron

WP LAX CA BFL Meadows Field P 43 $ 13,990,212.00 $ 1,508,036.00 $ 12,482,176.00 Rehabilitate Runway - 12L/30R

WP LAX CA SAN San Diego International P 76 $ 500,000.00 $ - $ 500,000.00 Sustainable Management Plan

WP LAX CA SMX Santa Maria Public/Capt G Allan Hancock Field P 35 $ 3,521,316.00 $ 3,521,316.00 $ - Rehabilitate Apron

WP LAX CA MYF Montgomery Field R 17 $ 500,000.00 $ 500,000.00 $ - Update Airport Master Plan Study

WP LAX CA BUR Bob Hope P 60 $ 12,088,500.00 $ 1,561,309.00 $ 10,527,191.00 Rehabilitate Runway - 08/26

WP LAX CA IPL Imperial County GA 34 $ 80,752.00 $ 80,752.00 $ - Rehabilitate Runway - 14/32

WP LAX CA RIV March ARB R 12 $ 172,000.00 $ 172,000.00 $ - Construct Taxiway

WP LAX CA PSP Palm Springs International P 54 $ 2,554,344.00 $ 2,554,344.00 $ -

Improve Terminal Building, Install Apron Lighting, Rehabilitate

Runway Lighting - 13L/31R, Rehabilitate Taxiway, Security

Enhancements

WP PHX AZ SEZ Sedona GA 23 $ 594,234.00 $ 594,234.00 $ - Rehabilitate Access Road, Rehabilitate Parking Lot

WP PHX AZ P33 Cochise County GA 5 $ 270,258.00 $ 270,258.00 $ -

Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS,

Install Taxiway Lighting

WP PHX AZ PGA Page Municipal P 30 $ 241,542.00 $ 241,542.00 $ - Construct Taxiway, Rehabilitate Apron

WP PHX AZ TUS Tucson International P 74 $ 1,932,560.00 $ 1,932,560.00 $ - Energy Efficiency Equipment/Infrastructure

WP PHX AZ P10 Polacca GA 4 $ 90,449.00 $ 90,449.00 $ - Update Airport Master Plan Study

WP PHX AZ P08 Coolidge Municipal GA 11 $ 1,366,920.00 $ 1,366,920.00 $ - Rehabilitate Taxiway

WP PHX AZ BXK Buckeye Municipal GA 18 $ 155,591.00 $ 155,591.00 $ - Construct Building

WP PHX AZ RYN Ryan Field R 28 $ 1,530,485.00 $ 1,530,485.00 $ - Rehabilitate Apron

WP PHX AZ IWA Phoenix-Mesa Gateway P 38 $ 9,126,306.00 $ 4,337,375.00 $ 4,788,931.00 Rehabilitate Apron

WP PHX AZ *AZS State of Arizona 9 $ 926,991.00 $ 30,875.00 $ 896,116.00 Update State System Plan Study

WP PHX AZ PHX Phoenix Sky Harbor International P 82 $ 6,939,000.00 $ 6,939,000.00 $ - Rehabilitate Runway - 08/26

WP PHX AZ P52 Cottonwood GA 17 $ 962,954.00 $ 962,954.00 $ - Rehabilitate Apron

WP PHX AZ RQE Window Rock GA 14 $ 1,159,119.00 $ 1,159,119.00 $ - Rehabilitate Runway Lighting

WP PHX AZ HII Lake Havasu City GA 25 $ 40,000.00 $ 40,000.00 $ -

Acquire Emergency Generator, Improve Airport Miscellaneous

Improvements

WP PHX AZ FLG Flagstaff Pulliam P 40 $ 150,000.00 $ 150,000.00 $ - Wildlife Hazard Assessments

WP PHX AZ GEU Glendale Municipal R 25 $ 865,070.00 $ 865,070.00 $ - Rehabilitate Apron

WP PHX AZ SAD Safford Regional GA 25 $ 494,521.00 $ 494,521.00 $ - Install Perimeter Fencing

WP PHX AZ TUS Tucson International P 75 $ 3,556,776.00 $ 2,698,233.00 $ 858,543.00 Conduct Environmental Study

WP PHX AZ GYR Phoenix Goodyear R 21 $ 587,275.00 $ 587,275.00 $ - Update Airport Master Plan Study

WP PHX AZ FFZ Falcon Field R 26 $ 1,984,926.00 $ 150,000.00 $ 1,834,926.00

Construct Taxiway [Construct Taxiway C], Construct Taxiway

[Contruct Taxiway D]

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 45 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

WP PHX AZ SDL Scottsdale R 33 $ 768,546.00 $ 768,546.00 $ -

Improve Airport Miscellaneous Improvements, Install Airport

Beacons

WP PHX AZ PRC Ernest A Love Field CS 37 $ 950,000.00 $ 150,000.00 $ 800,000.00 Update Airport Master Plan Study

WP PHX AZ IFP Laughlin/Bullhead International P 47 $ 8,866,038.00 $ 1,326,939.00 $ 7,539,099.00

Extend Runway - 16/34, Rehabilitate Runway - 16/34, Runway

Incursion Markings

WP PHX AZ DUG Bisbee Douglas International GA 10 $ 77,233.00 $ 77,233.00 $ - Rehabilitate Taxiway

WP PHX AZ AZC Colorado City Municipal GA 20 $ 102,034.00 $ 102,034.00 $ - Rehabilitate Taxiway

WP PHX AZ AVQ Marana Regional R 21 $ 374,206.00 $ 374,206.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

WP PHX AZ INW Winslow-Lindbergh Regional GA 20 $ 1,796,836.00 $ 1,796,836.00 $ - Rehabilitate Runway - 04/22

WP PHX AZ *AZS State of Arizona 8 $ 745,000.00 $ 730,800.00 $ 14,200.00 Update State System Plan Study

WP PHX AZ PHX Phoenix Sky Harbor International P 83 $ 4,252,350.00 $ 45,567.00 $ 4,206,783.00 Update Airport Master Plan Study

WP PHX AZ P14 Holbrook Municipal GA 16 $ 636,020.00 $ 636,020.00 $ - Rehabilitate Runway - 03/21

WP PHX AZ CMR H A Clark Memorial Field GA 24 $ 105,471.00 $ 105,471.00 $ - Rehabilitate Apron

WP PHX AZ FHU Sierra Vista Municipal-Libby AAF GA 30 $ 1,756,657.00 $ 1,756,657.00 $ - Strengthen Taxiway

WP PHX AZ DVT Phoenix Deer Valley R 36 $ 4,074,280.00 $ 150,000.00 $ 3,924,280.00 Rehabilitate Apron

WP PHX NV TPH Tonopah GA 14 $ 2,364,900.00 $ 448,013.00 $ 1,916,887.00 Rehabilitate Runway - 15/33

WP PHX NV CXP Carson R 30 $ 2,573,438.00 $ 150,000.00 $ 2,423,438.00 Rehabilitate Apron

WP PHX NV RTS Reno/Stead R 35 $ 258,750.00 $ 258,750.00 $ - Rehabilitate Apron

WP PHX NV 67L Mesquite GA 15 $ 153,750.00 $ 153,750.00 $ - Install Perimeter Fencing

WP PHX NV BAM Battle Mountain GA 25 $ 924,046.00 $ 307,179.00 $ 616,867.00

Rehabilitate Apron, Rehabilitate Runway - 03/21, Rehabilitate

Runway - 12/30, Rehabilitate Taxiway

WP PHX NV LAS McCarran International P 84 $ 1,500,000.00 $ 1,500,000.00 $ - Conduct Miscellaneous Study

WP PHX NV LAS McCarran International P 83 $ 4,000,000.00 $ 4,000,000.00 $ - Rehabilitate Apron

WP PHX NV MEV Minden-Tahoe GA 29 $ 4,457,028.00 $ 3,622,930.00 $ 834,098.00 Install Perimeter Fencing

WP PHX NV HTH Hawthorne Industrial GA 13 $ 113,213.00 $ 113,213.00 $ -

Install Miscellaneous NAVAIDS, Install Weather Reporting

Equipment

WP PHX NV VGT North Las Vegas P 34 $ 1,406,250.00 $ 1,406,250.00 $ - Conduct Miscellaneous Study

WP PHX NV HND Henderson Executive R 26 $ 973,125.00 $ 973,125.00 $ - Rehabilitate Apron, Rehabilitate Apron

WP PHX NV SPZ Silver Springs GA 18 $ 166,998.00 $ 166,998.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

WP PHX NV 10U Owyhee GA 10 $ 339,329.00 $ 339,329.00 $ - Install Weather Reporting Equipment

WP PHX NV EKO Elko Regional P 46 $ 474,953.00 $ 474,953.00 $ - Update Airport Master Plan Study

WP PHX NV O43 Yerington Municipal GA 16 $ 213,750.00 $ 213,750.00 $ - Rehabilitate Runway - 01/19, Rehabilitate Taxiway

WP PHX NV LOL Derby Field GA 15 $ 67,171.00 $ 67,171.00 $ - Install Airport Beacons

WP PHX NV WMC Winnemucca Municipal GA 23 $ 1,211,207.00 $ 1,211,207.00 $ - Construct Taxiway

WP PHX NV FLX Fallon Municipal GA 18 $ 588,750.00 $ 588,750.00 $ - Rehabilitate Runway - 13/31

WP PHX NV RNO Reno/Tahoe International P 102 $ 1,875,000.00 $ 1,875,000.00 $ - Update Airport Master Plan Study

WP PHX NV TMT Austin GA 16 $ 362,306.00 $ 362,306.00 $ - Update Airport Master Plan Study

WP PHX NV BVU Boulder City Municipal P 24 $ 1,642,928.00 $ 1,642,928.00 $ - Improve Airport Drainage, Rehabilitate Apron

WP PHX NV ELY Ely /Yelland Field/ GA 20 $ 2,849,476.00 $ 151,875.00 $ 2,697,601.00 Rehabilitate Apron, Rehabilitate Runway - 18/36

WP PHX NV RTS Reno/Stead R 36 $ 20,531,250.00 $ - $ 20,531,250.00 Rehabilitate Runway - 08/26

WP PHX NV EKO Elko Regional P 47 $ 466,102.00 $ 466,102.00 $ - Acquire Snow Removal Equipment

WP SFO CA 1O2 Lampson Field GA 18 $ 89,818.00 $ 89,818.00 $ - Rehabilitate Runway - 10/28

WP SFO CA MPI Mariposa-Yosemite GA 12 $ 25,000.00 $ 25,000.00 $ - Conduct Miscellaneous Study

WP SFO CA HWD Hayward Executive R 20 $ 1,162,390.00 $ 600,000.00 $ 562,390.00 Rehabilitate Runway - 10R/28L

WP SFO CA EKA Murray Field GA 13 $ 137,840.00 $ 137,840.00 $ - Rehabilitate Runway - 12/30, Rehabilitate Taxiway

WP SFO CA 1O6 Dunsmuir Municipal-Mott GA 14 $ 216,836.00 $ 216,836.00 $ - Update Airport Master Plan Study

WP SFO CA O86 Trinity Center GA 8 $ 93,632.00 $ 93,632.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

WP SFO CA C80 New Coalinga Municipal GA 7 $ 27,000.00 $ 27,000.00 $ - Conduct Miscellaneous Study

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 46 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

WP SFO CA O42 Woodlake GA 3 $ 25,520.00 $ 25,520.00 $ - Conduct Miscellaneous Study

WP SFO CA UKI Ukiah Municipal GA 14 $ 45,000.00 $ 45,000.00 $ - Conduct Miscellaneous Study

WP SFO CA STS Charles M Schulz - Sonoma County P 50 $ 1,326,824.00 $ 1,326,824.00 $ - Improve Runway Safety Area - 14/32

WP SFO CA O69 Petaluma Municipal R 25 $ 32,670.00 $ 32,670.00 $ - Conduct Miscellaneous Study

WP SFO CA CEC Jack McNamara Field P 32 $ 5,632,574.00 $ 933,299.00 $ 4,699,275.00 Construct Terminal Building

WP SFO CA CIC Chico Municipal P 38 $ 3,385,290.00 $ 1,420,204.00 $ 1,965,086.00 Rehabilitate Apron

WP SFO CA SCK Stockton Metropolitan P 36 $ 2,618,943.00 $ 1,672,172.00 $ 946,771.00 Rehabilitate Apron

WP SFO CA CPU Calaveras County-Maury Rasmussen Field GA 11 $ 150,000.00 $ 150,000.00 $ - Update Airport Master Plan Study

WP SFO CA SFO San Francisco International P 66 $ 4,461,500.00 $ 4,461,500.00 $ - Rehabilitate Runway - 10R/28L

WP SFO CA APC Napa County R 34 $ 836,969.00 $ 836,969.00 $ -Rehabilitate Runway - 06/24, Rehabilitate Runway - 18R/36L

WP SFO CA O22 Columbia GA 16 $ 1,775,001.00 $ 1,775,001.00 $ - Rehabilitate Taxiway [B], Rehabilitate Taxiway [C]

WP SFO CA O60 Cloverdale Municipal GA 10 $ 137,169.00 $ 137,169.00 $ - Conduct Environmental Study

WP SFO CA UKI Ukiah Municipal GA 13 $ 207,311.00 $ 207,311.00 $ - Rehabilitate Runway - 15/33

WP SFO CA O85 Benton Field GA 18 $ 106,086.00 $ 106,086.00 $ -

Install Weather Reporting Equipment, Rehabilitate Apron,

Rehabilitate Taxiway

WP SFO CA SQL San Carlos R 18 $ 433,313.00 $ 433,313.00 $ - Conduct Noise Compatibility Plan Study

WP SFO CA SFO San Francisco International P 68 $ 10,577,500.00 $ - $ 10,577,500.00 VALE Infrastructure

WP SFO CA OAK Metropolitan Oakland International P 73 $ 3,491,015.00 $ 3,491,015.00 $ -

Conduct Miscellaneous Study, Install Taxiway Lighting,

Rehabilitate Taxiway [Taxiway P], Rehabilitate Taxiway [Taxiway

R]

WP SFO CA FAT Fresno Yosemite International P 78 $ 1,087,920.00 $ 1,087,920.00 $ - Rehabilitate Taxiway

WP SFO CA 1O2 Lampson Field GA 17 $ 33,250.00 $ 33,250.00 $ - Conduct Miscellaneous Study

WP SFO CA 3O1 Gustine GA 13 $ 67,500.00 $ 67,500.00 $ - Improve Airport Drainage

WP SFO CA RBL Red Bluff Municipal GA 13 $ 548,804.00 $ 548,804.00 $ - Rehabilitate Runway - 15/33

WP SFO CA MPI Mariposa-Yosemite GA 11 $ 125,000.00 $ 125,000.00 $ - Update Airport Master Plan Study

WP SFO CA LLR Little River GA 12 $ 135,020.00 $ 135,020.00 $ - Rehabilitate Taxiway

WP SFO CA O16 Garberville GA 10 $ 2,143,598.00 $ 2,143,598.00 $ -

Construct Apron, Construct Taxiway, Rehabilitate Runway -

18/36, Rehabilitate Taxiway

WP SFO CA O86 Trinity Center GA 9 $ 225,213.00 $ 225,213.00 $ - Update Airport Master Plan Study

WP SFO CA D83 Boonville GA 6 $ 112,500.00 $ 112,500.00 $ - Update Airport Master Plan Study

WP SFO CA ACV Arcata P 45 $ 51,706.00 $ 51,706.00 $ - Conduct Miscellaneous Study

WP SFO CA LHM Lincoln Regional/Karl Harder Field R 21 $ 135,000.00 $ 135,000.00 $ - Update Airport Master Plan Study

WP SFO CA TCY Tracy Municipal GA 17 $ 2,631,114.00 $ 304,815.00 $ 2,326,299.00 Rehabilitate Apron

WP SFO CA PRB Paso Robles Municipal GA 25 $ 1,784,619.00 $ 1,784,619.00 $ - Rehabilitate Taxiway

WP SFO CA CEC Jack McNamara Field P 33 $ 66,701.00 $ 66,701.00 $ - Conduct Miscellaneous Study

WP SFO CA E36 Georgetown GA 12 $ 63,000.00 $ 63,000.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate

Taxiway

WP SFO CA MHR Sacramento Mather R 19 $ 996,924.00 $ 996,924.00 $ - Install Taxiway Lighting, Rehabilitate Taxiway

WP SFO CA O57 Bryant Field GA 10 $ 455,985.00 $ 455,985.00 $ - Remove Obstructions

WP SFO CA VIS Visalia Municipal GA 30 $ 1,534,758.00 $ 1,393,844.00 $ 140,914.00 Rehabilitate Apron

WP SFO CA JAQ Westover Field Amador County GA 19 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 01/19

WP SFO CA O42 Woodlake GA 2 $ 124,481.00 $ 124,481.00 $ - Update Airport Master Plan Study

WP SFO CA LHM Lincoln Regional/Karl Harder Field R 19 $ 108,698.00 $ 108,698.00 $ - Rehabilitate Runway - 15/33

WP SFO CA LHM Lincoln Regional/Karl Harder Field R 20 $ 29,700.00 $ 29,700.00 $ - Install Perimeter Fencing

WP SFO CA TLR Mefford Field GA 16 $ 137,700.00 $ 137,700.00 $ -

Install Airfield Guidance Signs, Install Runway Vertical/Visual

Guidance System - 13/31

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 47 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

WP SFO CA HAF Half Moon Bay R 15 $ 833,957.00 $ 833,957.00 $ -

Install Miscellaneous NAVAIDS, Install Perimeter Fencing,

Rehabilitate Taxiway

WP SFO CA MMH Mammoth Yosemite P 35 $ 89,753.00 $ 89,753.00 $ - Install Perimeter Fencing required by 14 CFR 139

WP SFO CA MOD Modesto City County-Harry Sham Field CS 40 $ 145,287.00 $ 145,287.00 $ - Conduct Miscellaneous Study

WP SFO CA SJC Norman Y Mineta San Jose International P 89 $ 8,125,303.00 $ 1,408,635.00 $ 6,716,668.00 Install Perimeter Fencing required by 14 CFR 139

WP SFO CA SFO San Francisco International P 65 $ 2,977,500.00 $ 2,977,500.00 $ - Install Guidance Signs

WP SFO CA SJC Norman Y Mineta San Jose International P 88 $ 698,387.00 $ 698,387.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

WP SFO CA O46 Weed GA 10 $ 1,132,070.00 $ 1,132,070.00 $ - Rehabilitate Runway - 14/32

WP SFO CA 2O6 Chowchilla GA 8 $ 84,600.00 $ 84,600.00 $ -Conduct Miscellaneous Study, Update Airport Master Plan Study

WP SFO CA O27 Oakdale GA 15 $ 347,685.00 $ 347,685.00 $ - Install Perimeter Fencing, Rehabilitate Apron

WP SFO CA T42 Ruth GA 5 $ 147,716.00 $ 147,716.00 $ - Update Airport Master Plan Study

WP SFO CA APC Napa County R 33 $ 25,008.00 $ 25,008.00 $ - Conduct Miscellaneous Study

WP SFO CA MYV Yuba County GA 17 $ 31,050.00 $ 31,050.00 $ - Conduct Miscellaneous Study

WP SFO CA AUN Auburn Municipal GA 13 $ 112,151.00 $ 112,151.00 $ - Rehabilitate Taxiway Lighting

WP SFO CA PTV Porterville Municipal GA 14 $ 103,005.00 $ 103,005.00 $ -

Install Perimeter Fencing, Rehabilitate Apron, Update

Miscellaneous Study

WP SFO CA GOO Nevada County Air Park GA 18 $ 969,300.00 $ 969,300.00 $ - Install Perimeter Fencing

WP SFO CA AUN Auburn Municipal GA 14 $ 57,649.00 $ 57,649.00 $ - Install Perimeter Fencing

WP SFO CA RDD Redding Municipal P 48 $ 2,980,019.00 $ 1,757,857.00 $ 1,222,162.00 Rehabilitate Apron

WP SFO CA PVF Placerville GA 18 $ 58,500.00 $ 58,500.00 $ - Rehabilitate Taxiway Lighting

WP SFO CA SFO San Francisco International P 67 $ 1,800,000.00 $ - $ 1,800,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

WP SFO CA PAO Palo Alto R 11 $ 436,481.00 $ 436,481.00 $ - Rehabilitate Apron

WP SFO CA KIC Mesa Del Rey GA 12 $ 162,000.00 $ 162,000.00 $ - Update Airport Master Plan Study

WP SFO CA O37 Haigh Field GA 5 $ 165,240.00 $ 165,240.00 $ - Update Airport Master Plan Study

WP SFO CA CCR Buchanan Field R 21 $ 1,593,205.00 $ 491,664.00 $ 1,101,541.00 Rehabilitate Taxiway

WP SFO CA O81 Tulelake Municipal GA 12 $ 156,527.00 $ 156,527.00 $ - Rehabilitate Runway - 11/29

WP SFO CA MCE Merced Regional/Macready Field GA 25 $ 116,286.00 $ 116,286.00 $ -

Rehabilitate Runway - 12/30, Rehabilitate Taxiway, Wildlife

Hazard Assessments

WP SFO CA CVH Hollister Municipal GA 19 $ 261,888.00 $ 261,888.00 $ - Update Airport Master Plan Study

WP SFO CA OAR Marina Municipal GA 13 $ 150,000.00 $ 150,000.00 $ - Conduct Miscellaneous Study

WP SFO CA STS Charles M Schulz - Sonoma County P 51 $ 1,842,989.00 $ 61,815.00 $ 1,781,174.00 Improve Runway Safety Area - 14/32

WP SFO CA CEC Jack McNamara Field P 34 $ 11,300,000.00 $ - $ 11,300,000.00 Construct Terminal Building

WP SFO CA SNS Salinas Municipal GA 25 $ 824,050.00 $ 824,050.00 $ -

Conduct Miscellaneous Study, Install Airfield Guidance Signs,

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual

Guidance System - 13/31, Rehabilitate Taxiway Lighting

WP SFO CA OVE Oroville Municipal GA 21 $ 390,158.00 $ 390,158.00 $ -

Improve Airport Drainage, Improve Runway Safety Area - 02/20,

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual

Guidance System - 02/20

WP SFO CA EDU University GA 5 $ 288,742.00 $ 288,742.00 $ - Update Airport Master Plan Study

WP SFO CA AAT Alturas Municipal GA 13 $ 1,247,940.00 $ 1,247,940.00 $ - Construct Apron

WP SFO CA SVE Susanville Municipal GA 16 $ 206,303.00 $ 206,303.00 $ - Install Runway Vertical/Visual Guidance System - 11/29

WP SFO CA O88 Rio Vista Municipal GA 16 $ 164,484.00 $ 164,484.00 $ - Conduct Miscellaneous Study, Improve Airport Drainage

WP SFO CA SMF Sacramento International P 56 $ 16,402,259.00 $ 2,371,589.00 $ 14,030,670.00 Rehabilitate Taxiway

WP SFO CA MMH Mammoth Yosemite P 34 $ 45,330.00 $ 45,330.00 $ - Conduct Miscellaneous Study

WP SFO CA TRK Truckee-Tahoe GA 35 $ 1,175,904.00 $ 1,175,904.00 $ - Expand Apron, Rehabilitate Apron

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 48 of 49

FAA - Office of Airports Report Date: 10/6/2016 FY 2016 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

WP SFO CA PAO Palo Alto R 12 $ 1,954,971.00 $ - $ 1,954,971.00 Install Perimeter Fencing

WP SFO CA SJC Norman Y Mineta San Jose International P 90 $ 7,200,614.00 $ - $ 7,200,614.00 Rehabilitate Apron

WP SFO CA OAK Metropolitan Oakland International P 75 $ 3,969,903.00 $ 879,423.00 $ 3,090,480.00 Rehabilitate Runway - 12/30

WP SFO CA FAT Fresno Yosemite International P 79 $ 1,374,069.00 $ 1,374,069.00 $ - Conduct Airport Master Plan Study

WP SFO CA O15 Turlock Municipal GA 11 $ 140,618.00 $ 140,618.00 $ -

Construct Runway Safety Area - 12/30, Rehabilitate Runway

Lighting - 12/30, Widen Runway - 12/30

WP SFO CA 2O1 Gansner Field GA 14 $ 2,276,448.00 $ 2,276,448.00 $ -

Install Runway Lighting - 07/25, Rehabilitate Runway - 07/25,

Rehabilitate Taxiway

WP SFO CA 1O6 Dunsmuir Municipal-Mott GA 13 $ 90,810.00 $ 90,810.00 $ - Conduct Miscellaneous Study

WP SFO CA O08 Colusa County GA 16 $ 79,264.00 $ 79,264.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

WP SFO CA HES Healdsburg Municipal GA 11 $ 40,500.00 $ 40,500.00 $ - Install Perimeter Fencing

WP SFO CA MAE Madera Municipal GA 27 $ 1,370,587.00 $ 1,370,587.00 $ - Rehabilitate Apron

WP SFO CA HJO Hanford Municipal GA 24 $ 1,132,037.00 $ 1,132,037.00 $ - Conduct Miscellaneous Study, Rehabilitate Taxiway

WP SFO CA L52 Oceano County GA 8 $ 359,219.00 $ 359,219.00 $ - Install Weather Reporting Equipment

WP SFO CA PVF Placerville GA 17 $ 166,500.00 $ 166,500.00 $ - Update Airport Master Plan Study

WP SFO CA LVK Livermore Municipal R 25 $ 3,079,962.00 $ 2,479,962.00 $ 600,000.00

Install Runway Lighting - 07R/25L, Rehabilitate Runway -

07R/25L

WP SFO CA MRY Monterey Regional P 64 $ 1,617,061.00 $ 1,617,061.00 $ - Conduct Environmental Study

WP SFO CA MRY Monterey Regional P 63 $ 250,612.00 $ 250,612.00 $ - FOD Detection Equipment

WP SFO CA O69 Petaluma Municipal R 26 $ 150,000.00 $ 150,000.00 $ - Update Airport Master Plan Study

WP SFO CA VCB Nut Tree GA 21 $ 702,968.00 $ 702,968.00 $ - Rehabilitate Runway - 02/20, Rehabilitate Taxiway

WP SFO CA CIC Chico Municipal P 37 $ 363,093.00 $ 363,093.00 $ - Rehabilitate Taxiway, Rehabilitate Taxiway

WP SFO CA DVO Gnoss Field R 21 $ 220,050.00 $ 220,050.00 $ - Rehabilitate Runway - 13/31

Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 49 of 49