FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the grant has only been announced, and the totals are preliminary estimates, subject to change prior to award State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary AK Anchorage Merrill Field MRI 3-02-0015-071-2019 Municipality of Anchorage 6/5/2019 9/24/2019 $ 1,125,000 $ - $ 1,125,000 Install Taxiway Lighting AK Anchorage Merrill Field MRI 3-02-0015-074-2019 Municipality of Anchorage 7/29/2019 9/10/2019 $ 287,767 $ - $ 287,767 Conduct Miscellaneous Study AK Anchorage Merrill Field MRI 3-02-0015-078-2019 Municipality of Anchorage 9/20/2019 9/24/2019 $ 720,000 $ - $ 720,000 Reconstruct Access Road AK Anchorage Ted Stevens Anchorage International ANC 3-02-0016-193-2019 State of Alaska/Department of Transportation & Public Facilities 6/5/2019 6/25/2019 $ 13,606,211 $ 16,000,000 $ 29,606,211 Reconstruct Runway - 15/33 AK Anchorage Ted Stevens Anchorage International ANC 3-02-0016-194-2019 State of Alaska/Department of Transportation & Public Facilities 7/9/2019 8/22/2019 $ - $ 886,242 $ 886,242 Reconstruct Perimeter Fencing required by 49 CFR 1542 AK Anchorage Ted Stevens Anchorage International ANC 3-02-0016-195-2019 State of Alaska/Department of Transportation & Public Facilities 9/20/2019 9/23/2019 $ 919,924 $ 7,168,963 $ 8,088,887 Install Apron Flood Lighting, Reconstruct Taxiway [Taxiway F Lighting], Reconstruct Taxiway [Taxiway F Pavement] AK Atqasuk Atqasuk Edward Burnell Sr Memorial ATK 3-02-0023-007-2019 North Slope Borough 6/24/2019 8/8/2019 $ 11,450,000 $ 3,723,000 $ 15,173,000 Rehabilitate Apron, Rehabilitate Runway - 06/24, Rehabilitate Taxiway AK Barrow Wiley Post-Will Rogers Memorial BRW 3-02-0026-018-2019 State of Alaska/Department of Transportation & Public Facilities 9/27/2019 $ 11,224,953 $ 7,702,108 $ 18,927,061 Construct Aircraft Rescue & Fire Fighting Building, Construct Building, Construct Sand and Chemical Storage Building, Construct Snow Removal Equipment Building AK Barrow Wiley Post-Will Rogers Memorial BRW 3-02-0026-019-2019 State of Alaska/Department of Transportation & Public Facilities 6/24/2019 9/11/2019 $ 1,000,000 $ 7,000,000 $ 8,000,000 Reconstruct Taxiway, Rehabilitate Runway - 07/25, Rehabilitate Runway Lighting - 07/25, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting AK Bethel Bethel BET 3-02-0029-026-2019 State of Alaska/Department of Transportation & Public Facilities 6/24/2019 8/9/2019 $ 2,414,725 $ 6,625,000 $ 9,039,725 Reconstruct Runway - 01R/19L AK Cordova Merle K (Mudhole) Smith CDV 3-02-0067-015-2019 State of Alaska/Department of Transportation & Public Facilities 6/5/2019 9/23/2019 $ 313,500 $ - $ 313,500 Update Airport Master Plan Study AK Crooked Creek Crooked Creek CJX 3-02-0073-004-2019 State of Alaska/Department of Transportation & Public Facilities 9/27/2019 $ 376,184 $ 15,678,525 $ 16,054,709 Construct Access Road, Construct Apron, Construct Snow Removal Equipment Building [Service Road], Construct Snow Removal Equipment Building, Construct Taxiway, Install Miscellaneous NAVAIDS, Reconstruct Runway [Land Acquisition] - 13/31, Reconstruct Runway [Lighting] - 13/31, Reconstruct Runway [Reconstruction] - 13/31 AK Fairbanks Fairbanks International FAI 3-02-0096-054-2019 State of Alaska/Department of Transportation & Public Facilities 6/24/2019 9/23/2019 $ 1,488,437 $ - $ 1,488,437 Install Airfield Guidance Signs AK Fairbanks Fairbanks International FAI 3-02-0096-056-2019 State of Alaska/Department of Transportation & Public Facilities 6/5/2019 7/31/2019 $ 1,335,872 $ - $ 1,335,872 Acquire Snow Removal Equipment AK Fairbanks Fairbanks International FAI 3-02-0096-057-2019 State of Alaska/Department of Transportation & Public Facilities 7/9/2019 9/9/2019 $ 82,875 $ - $ 82,875 Conduct Ground Transportation Study AK Juneau Juneau International JNU 3-02-0133-080-2019 City and Borough of Juneau 9/27/2019 $ 2,975,783 $ 22,427,120 $ 25,402,903 Acquire Emergency Generator, Construct Taxiway, Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway E] AK Juneau Various Locations in Alaska *AKV 3-02-0200-123-2019 State of Alaska/Department of Transportation & Public Facilities 9/20/2019 9/23/2019 $ 613,235 $ - $ 613,235 Install Miscellaneous NAVAIDS (Kalskag; Stebbins; Wiley Post-Will Rogers Memorial) AK Juneau Various Locations in Alaska *AKV 3-02-0200-124-2019 State of Alaska/Department of Transportation & Public Facilities 9/20/2019 9/23/2019 $ 760,560 $ - $ 760,560 Remove Obstructions [Non-Hazard] (Birchwood; Chalkyitsik; Kodiak) AK Juneau Various Locations in Alaska *AKV 3-02-0200-125-2019 State of Alaska/Department of Transportation & Public Facilities 9/27/2019 $ 2,522,716 $ - $ 2,522,716 Rehabilitate Runway (Adak - 05/23; Bethel - 01L/19R; Bethel - 01R/19L; Bethel - 12/30; Cold Bay - 08/26; Cold Bay - 15/33; Deadhorse - 06/24; Dillingham - 01/19; Haines - 08/26; Homer - 04/22; Hoonah - 06/24; Iliamna - 08/26; Iliamna - 18/36; Ketchikan International - 11/29; King Salmon - 12/30; King Salmon - 18/36; Klawock - 02/20; Kodiak - 01/19; Kodiak - 08/26; Nome - 03/21; Nome - 10/28; Northway - 05/23; Ralph Wien Memorial - 09/27; Sand Point - 14/32; Sitka Rocky Gutierrez - 11/29; Skagway - 02/20; Unalaska - 13/31; Valdez Pioneer Field - 06/24; Wiley Post- Will Rogers Memorial - 07/25) AK Juneau Various Locations in Alaska *AKV 3-02-0200-126-2019 State of Alaska/Department of Transportation & Public Facilities 9/20/2019 9/23/2019 $ 2,855,261 $ - $ 2,855,261 Acquire Snow Removal Equipment (Merle K (Mudhole) Smith; Yakutat), Install Miscellaneous NAVAIDS (Gulkana; Yakutat), Rehabilitate Runway (Gustavus - 02/20; Gustavus - 11/29; Kake - NW/SE; Merle K (Mudhole) Smith - 09/27; Petersburg James A Johnson - 05/23; Wrangell - 10/28; Yakutat - 02/20; Yakutat - 11/29), Rehabilitate Runway (Gustavus - 02/20; Gustavus - 11/29; Kake - NW/SE; Merle K (Mudhole) Smith - 09/27; Petersburg James A Johnson - 05/23; Wrangell - 10/28; Yakutat - 02/20; Yakutat - 11/29) AK Juneau Various Locations in Alaska *AKV 3-02-0200-127-2019 State of Alaska/Department of Transportation & Public Facilities 9/20/2019 9/24/2019 $ 3,495,568 $ - $ 3,495,568 Acquire Snow Removal Equipment (Chenega Bay; Kasigluk; King Salmon; Kobuk; Pilot Station; Ralph Wien Memorial; Togiak) AK Kenai Kenai Municipal ENA 3-02-0142-058-2019 City of Kenai 6/24/2019 7/10/2019 $ 782,943 $ - $ 782,943 Rehabilitate Apron, Rehabilitate Runway - 02L/20R, Rehabilitate Taxiway 9/30/2019 Page 1 of 40 FAA AIP Grant Detail Report

Upload: others

Post on 19-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

FAA Airport Improvement Program Grant Detail Report As of 9/30/2019

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

AK Anchorage Merrill Field MRI 3-02-0015-071-2019 Municipality of Anchorage 6/5/2019 9/24/2019 $ 1,125,000 $ - $ 1,125,000 Install Taxiway Lighting

AK Anchorage Merrill Field MRI 3-02-0015-074-2019 Municipality of Anchorage 7/29/2019 9/10/2019 $ 287,767 $ - $ 287,767 Conduct Miscellaneous Study

AK Anchorage Merrill Field MRI 3-02-0015-078-2019 Municipality of Anchorage 9/20/2019 9/24/2019 $ 720,000 $ - $ 720,000 Reconstruct Access Road

AK Anchorage Ted Stevens Anchorage International ANC 3-02-0016-193-2019

State of Alaska/Department of Transportation & Public Facilities 6/5/2019 6/25/2019 $ 13,606,211 $ 16,000,000 $ 29,606,211 Reconstruct Runway - 15/33

AK Anchorage Ted Stevens Anchorage International ANC 3-02-0016-194-2019

State of Alaska/Department of Transportation & Public Facilities 7/9/2019 8/22/2019 $ - $ 886,242 $ 886,242 Reconstruct Perimeter Fencing required by 49 CFR 1542

AK Anchorage Ted Stevens Anchorage International ANC 3-02-0016-195-2019

State of Alaska/Department of Transportation & Public Facilities 9/20/2019 9/23/2019 $ 919,924 $ 7,168,963 $ 8,088,887

Install Apron Flood Lighting, Reconstruct Taxiway [Taxiway F Lighting], Reconstruct Taxiway [Taxiway F Pavement]

AK Atqasuk Atqasuk Edward Burnell Sr Memorial ATK 3-02-0023-007-2019 North Slope Borough 6/24/2019 8/8/2019 $ 11,450,000 $ 3,723,000 $ 15,173,000 Rehabilitate Apron, Rehabilitate Runway - 06/24, Rehabilitate Taxiway

AK Barrow Wiley Post-Will Rogers Memorial BRW 3-02-0026-018-2019 State of Alaska/Department of Transportation & Public Facilities 9/27/2019 $ 11,224,953 $ 7,702,108 $ 18,927,061

Construct Aircraft Rescue & Fire Fighting Building, Construct Building, Construct Sand and Chemical Storage Building, Construct Snow Removal Equipment Building

AK Barrow Wiley Post-Will Rogers Memorial BRW 3-02-0026-019-2019 State of Alaska/Department of Transportation & Public Facilities 6/24/2019 9/11/2019 $ 1,000,000 $ 7,000,000 $ 8,000,000

Reconstruct Taxiway, Rehabilitate Runway - 07/25, Rehabilitate Runway Lighting - 07/25, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

AK Bethel Bethel BET 3-02-0029-026-2019 State of Alaska/Department of Transportation & Public Facilities 6/24/2019 8/9/2019 $ 2,414,725 $ 6,625,000 $ 9,039,725 Reconstruct Runway - 01R/19L

AK Cordova Merle K (Mudhole) Smith CDV 3-02-0067-015-2019 State of Alaska/Department of Transportation & Public Facilities 6/5/2019 9/23/2019 $ 313,500 $ - $ 313,500 Update Airport Master Plan Study

AK Crooked Creek Crooked Creek CJX 3-02-0073-004-2019 State of Alaska/Department of Transportation & Public Facilities 9/27/2019 $ 376,184 $ 15,678,525 $ 16,054,709

Construct Access Road, Construct Apron, Construct Snow Removal Equipment Building [Service Road], Construct Snow Removal Equipment Building, Construct Taxiway, Install Miscellaneous NAVAIDS, Reconstruct Runway [Land Acquisition] - 13/31, Reconstruct Runway [Lighting] - 13/31, Reconstruct Runway [Reconstruction] - 13/31

AK Fairbanks Fairbanks International FAI 3-02-0096-054-2019 State of Alaska/Department of Transportation & Public Facilities 6/24/2019 9/23/2019 $ 1,488,437 $ - $ 1,488,437 Install Airfield Guidance Signs

AK Fairbanks Fairbanks International FAI 3-02-0096-056-2019 State of Alaska/Department of Transportation & Public Facilities 6/5/2019 7/31/2019 $ 1,335,872 $ - $ 1,335,872 Acquire Snow Removal Equipment

AK Fairbanks Fairbanks International FAI 3-02-0096-057-2019 State of Alaska/Department of Transportation & Public Facilities 7/9/2019 9/9/2019 $ 82,875 $ - $ 82,875 Conduct Ground Transportation Study

AK Juneau Juneau International JNU 3-02-0133-080-2019 City and Borough of Juneau 9/27/2019 $ 2,975,783 $ 22,427,120 $ 25,402,903 Acquire Emergency Generator, Construct Taxiway, Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway E]

AK Juneau Various Locations in Alaska *AKV 3-02-0200-123-2019 State of Alaska/Department of Transportation & Public Facilities 9/20/2019 9/23/2019 $ 613,235 $ - $ 613,235

Install Miscellaneous NAVAIDS (Kalskag; Stebbins; Wiley Post-Will Rogers Memorial)

AK Juneau Various Locations in Alaska *AKV 3-02-0200-124-2019 State of Alaska/Department of Transportation & Public Facilities 9/20/2019 9/23/2019 $ 760,560 $ - $ 760,560 Remove Obstructions [Non-Hazard] (Birchwood; Chalkyitsik; Kodiak)

AK Juneau Various Locations in Alaska *AKV 3-02-0200-125-2019 State of Alaska/Department of Transportation & Public Facilities 9/27/2019 $ 2,522,716 $ - $ 2,522,716

Rehabilitate Runway (Adak - 05/23; Bethel - 01L/19R; Bethel - 01R/19L; Bethel - 12/30; Cold Bay - 08/26; Cold Bay - 15/33; Deadhorse - 06/24; Dillingham - 01/19; Haines - 08/26; Homer - 04/22; Hoonah - 06/24; Iliamna - 08/26; Iliamna - 18/36; Ketchikan International - 11/29; King Salmon - 12/30; King Salmon - 18/36; Klawock - 02/20; Kodiak - 01/19; Kodiak - 08/26; Nome - 03/21; Nome - 10/28; Northway - 05/23; Ralph Wien Memorial - 09/27; Sand Point - 14/32; Sitka Rocky Gutierrez - 11/29; Skagway - 02/20; Unalaska - 13/31; Valdez Pioneer Field - 06/24; Wiley Post-Will Rogers Memorial - 07/25)

AK Juneau Various Locations in Alaska *AKV 3-02-0200-126-2019 State of Alaska/Department of Transportation & Public Facilities 9/20/2019 9/23/2019 $ 2,855,261 $ - $ 2,855,261

Acquire Snow Removal Equipment (Merle K (Mudhole) Smith; Yakutat), Install Miscellaneous NAVAIDS (Gulkana; Yakutat), Rehabilitate Runway (Gustavus - 02/20; Gustavus - 11/29; Kake - NW/SE; Merle K (Mudhole) Smith - 09/27; Petersburg James A Johnson - 05/23; Wrangell - 10/28; Yakutat - 02/20; Yakutat - 11/29), Rehabilitate Runway (Gustavus - 02/20; Gustavus - 11/29; Kake - NW/SE; Merle K (Mudhole) Smith - 09/27; Petersburg James A Johnson - 05/23; Wrangell - 10/28; Yakutat - 02/20; Yakutat - 11/29)

AK Juneau Various Locations in Alaska *AKV 3-02-0200-127-2019 State of Alaska/Department of Transportation & Public Facilities 9/20/2019 9/24/2019 $ 3,495,568 $ - $ 3,495,568

Acquire Snow Removal Equipment (Chenega Bay; Kasigluk; King Salmon; Kobuk; Pilot Station; Ralph Wien Memorial; Togiak)

AK Kenai Kenai Municipal ENA 3-02-0142-058-2019 City of Kenai 6/24/2019 7/10/2019 $ 782,943 $ - $ 782,943 Rehabilitate Apron, Rehabilitate Runway - 02L/20R, Rehabilitate Taxiway

9/30/2019 Page 1 of 40 FAA AIP Grant Detail Report

Page 2: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

AK Kenai Kenai Municipal ENA 3-02-0142-059-2019 City of Kenai 9/20/2019 9/23/2019 $ 471,020 $ 5,300,000 $ 5,771,020 Construct Aircraft Rescue & Fire Fighting Training Facility, Construct Aircraft Rescue & Fire Fighting Training Facility

AK Ketchikan Ketchikan International KTN 3-02-0144-026-2019 State of Alaska/Department of Transportation & Public Facilities 9/20/2019 9/23/2019 $ 2,712,715 $ - $ 2,712,715 Install Perimeter Fencing required by 49 CFR 1542

AK Kiana Bob Baker Memorial IAN 3-02-0146-005-2019 State of Alaska/Department of Transportation & Public Facilities 6/5/2019 8/9/2019 $ 230,896 $ - $ 230,896 Acquire Land For Approaches

AK Kotlik Kotlik 2A9 3-02-0159-004-2019 State of Alaska/Department of Transportation & Public Facilities 7/29/2019 8/9/2019 $ 7,000,000 $ 13,714,593 $ 20,714,593

Expand Service Road, Install Miscellaneous NAVAIDS, Reconstruct Runway Lighting - 02/20, Reconstruct Taxiway Lighting, Rehabilitate Apron, Rehabilitate Runway - 02/20, Rehabilitate Taxiway

AK Nome Nome OME 3-02-0199-028-2019 State of Alaska/Department of Transportation & Public Facilities 6/24/2019 7/23/2019 $ 1,406,250 $ - $ 1,406,250 Reconstruct Runway - 10/28

AK Palmer Warren "Bud" Woods Palmer Municipal PAQ 3-02-0211-024-2019 City of Palmer 6/24/2019 8/13/2019 $ 937,980 $ - $ 937,980

Install Airfield Guidance Signs, Install Apron Lighting, Install Runway Distance-To-Go Signs - 16/34, Reconstruct Perimeter Fencing not Required by 49 CFR 1542, Remove Obstructions [Non-Hazard]

AK Petersburg Petersburg James A Johnson PSG 3-02-0219-017-2019 State of Alaska/Department of Transportation & Public Facilities 9/20/2019 9/23/2019 $ 3,020,783 $ - $ 3,020,783 Install Perimeter Fencing required by 49 CFR 1542

AK Sand Point Sand Point SDP 3-02-0253-013-2019 State of Alaska/Department of Transportation & Public Facilities 7/9/2019 9/9/2019 $ 590,957 $ - $ 590,957 Acquire Aircraft Rescue & Fire Fighting Vehicle

AK Sitka New +09Q 3-02-0488-001-2019 City of Sitka 7/29/2019 8/28/2019 $ 842,629 $ - $ 842,629 Conduct Environmental Study

AK South Naknek South Naknek Nr 2 WSN 3-02-0186-002-2019 State of Alaska/Department of Transportation & Public Facilities 9/20/2019 9/23/2019 $ 10,525,879 $ - $ 10,525,879

Install Airport Beacons, Install Miscellaneous NAVAIDS, Reconstruct Runway Lighting - 05/23, Reconstruct Runway Lighting - 13/31, Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate Runway - 13/31, Rehabilitate Taxiway

AK Unalaska Unalaska DUT 3-02-0082-016-2019 State of Alaska/Department of Transportation & Public Facilities 6/24/2019 9/9/2019 $ 999,255 $ - $ 999,255 Acquire Aircraft Rescue & Fire Fighting Vehicle

AK Wade Hampton (Census Area) Toksook Bay OOK 3-02-0441-002-2019

State of Alaska/Department of Transportation & Public Facilities 6/24/2019 7/17/2019 $ 16,859,195 $ 5,000,000 $ 21,859,195

Construct Snow Removal Equipment Building, Install Miscellaneous NAVAIDS, Reconstruct Runway Lighting - 16/34, Reconstruct Taxiway Lighting, Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate Taxiway

AK Wasilla Wasilla IYS 3-02-0417-022-2019 City of Wasilla 9/20/2019 9/24/2019 $ 362,110 $ - $ 362,110 Install Perimeter Fencing not Required by 49 CFR 1542

AL Abbeville Abbeville Municipal 0J0 3-01-0112-009-2019 City of Abbeville 6/5/2019 7/8/2019 $ 150,000 $ - $ 150,000 Rehabilitate Runway - 17/35

AL Alabaster Shelby County EET 3-01-0003-022-2019 County of Shelby 6/5/2019 6/11/2019 $ 150,000 $ - $ 150,000 Construct Building

AL Albertville Albertville Regional-Thomas J Brumlik Field 8A0 3-01-0004-028-2019 City of Albertville 7/9/2019 7/18/2019 $ 493,906 $ - $ 493,906 Construct Taxiway, Rehabilitate Runway - 05/23, Rehabilitate Taxiway

AL Andalusia South Alabama Regional at Bill Benton Field 79J 3-01-0007-023-2019 Andalusia-Opp Airport Authority 6/24/2019 7/25/2019 $ 515,141 $ - $ 515,141 Rehabilitate Runway Lighting - 11/29

AL Anniston Anniston Regional ANB 3-01-0008-034-2019 City of Anniston 6/5/2019 6/17/2019 $ 87,702 $ - $ 87,702 Conduct Miscellaneous Study

AL Ashland Ashland/Lineville 26A 3-01-0105-013-2019 County of Clay 6/5/2019 6/10/2019 $ 497,488 $ - $ 497,488 Construct Apron, Construct Taxiway

AL Auburn Auburn University Regional AUO 3-01-0011-032-2019 Auburn University 6/24/2019 8/7/2019 $ 147,007 $ - $ 147,007 Rehabilitate Runway - 18/36

AL Bay Minette Bay Minette Municipal 1R8 3-01-0012-016-2019 City of Bay Minette 9/20/2019 9/23/2019 $ 344,057 $ - $ 344,057 Install Weather Reporting Equipment AL Bessemer Bessemer EKY 3-01-0013-018-2019 City of Bessemer 6/5/2019 8/13/2019 $ 177,393 $ 2,260,479 $ 2,437,872 Rehabilitate Runway - 05/23, Rehabilitate Runway Lighting - 05/23

AL Birmingham Birmingham-Shuttlesworth International BHM 3-01-0014-102-2019 Birmingham Airport Authority 6/5/2019 8/8/2019 $ 10,427,740 $ - $ 10,427,740

Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Aircraft Rescue & Fire Fighting Building

AL Birmingham Birmingham-Shuttlesworth International BHM 3-01-0014-103-2019 Birmingham Airport Authority 6/5/2019 7/31/2019 $ 284,154 $ - $ 284,154 Improve Airport Drainage

AL Camden Camden Municipal 61A 3-01-0106-013-2019 City of Camden 6/5/2019 7/15/2019 $ 166,104 $ - $ 166,104 Install Runway Vertical/Visual Guidance System - 18/36, Remove Obstructions [Hazard]

AL Centreville Bibb County 0A8 3-01-0018-013-2019 County of Bibb 6/5/2019 7/30/2019 $ 395,168 $ - $ 395,168 Rehabilitate Apron, Rehabilitate Runway - 10/28

AL Clanton Chilton County 02A 3-01-0020-016-2019 County of Chilton 7/29/2019 8/6/2019 $ 155,492 $ 1,693,976 $ 1,849,468 Extend Runway - 08/26

AL Clayton Clayton Municipal 11A 3-01-0111-006-2019 Town of Clayton 6/5/2019 7/17/2019 $ 150,000 $ - $ 150,000 Rehabilitate Runway - 09/27

AL Cullman Cullman Regional-Folsom Field CMD 3-01-0022-026-2019 City and County of Cullman 6/5/2019 6/17/2019 $ 150,000 $ 1,136,716 $ 1,286,716 Reconstruct Taxiway

AL Decatur Pryor Field Regional DCU 3-01-0024-028-2019 Counties of Morgan and Limestone 6/5/2019 8/20/2019 $ 150,000 $ 435,699 $ 585,699 Rehabilitate Runway - 18/36

AL Dothan Dothan Regional DHN 3-01-0026-042-2019 Dothan-Houston County Airport Authority 6/24/2019 7/16/2019 $ 610,026 $ - $ 610,026 Acquire Equipment, Acquire Safety and/or Security Equipment, Reconstruct Apron, Rehabilitate Runway - 14/32

AL Enterprise Enterprise Municipal EDN 3-01-0027-021-2019 City of Enterprise 7/29/2019 8/2/2019 $ 233,522 $ 960,000 $ 1,193,522 Construct Taxiway, Reconstruct Apron

AL Eufaula Weedon Field EUF 3-01-0028-022-2019 City of Eufaula 7/9/2019 8/12/2019 $ 190,943 $ - $ 190,943 Construct Building, Install Miscellaneous NAVAIDS, Update Airport Master Plan Study

AL Eufaula Weedon Field EUF 3-01-0028-023-2019 City of Eufaula 9/20/2019 9/23/2019 $ 318,236 $ - $ 318,236 Construct Taxiway, Rehabilitate Apron, Widen Taxiway

9/30/2019 Page 2 of 40 FAA AIP Grant Detail Report

Page 3: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

AL Fairhope H. L. (Sonny) Callahan CQF 3-01-0029-020-2019 City of Fairhope 6/5/2019 6/21/2019 $ 320,454 $ - $ 320,454 Expand Access Road

AL Florala Florala Municipal 0J4 3-01-0094-007-2019 City of Florala 7/29/2019 8/29/2019 $ 59,276 $ - $ 59,276 Rehabilitate Runway - 04/22, Update Airport Master Plan Study

AL Foley Foley Municipal 5R4 3-01-0031-017-2019 City of Foley 6/24/2019 8/22/2019 $ 528,889 $ - $ 528,889 Reconstruct Taxiway

AL Gadsden Northeast Alabama Regional GAD 3-01-0033-019-2019 City of Gadsden 6/5/2019 8/14/2019 $ 300,000 $ 744,172 $ 1,044,172 Improve Airport Drainage, Rehabilitate Taxiway

AL Geneva Geneva Municipal 33J 3-01-0034-014-2019 Town of Geneva 6/5/2019 7/16/2019 $ 304,467 $ - $ 304,467 Rehabilitate Runway - 11/29

AL Greensboro Greensboro Municipal 7A0 3-01-0035-007-2019 City of Greensboro 6/24/2019 7/24/2019 $ 204,590 $ - $ 204,590 Construct Fuel Farm, Update Airport Master Plan Study

AL Gulf Shores Jack Edwards National JKA 3-01-0090-032-2019 City of Gulf Shores 7/29/2019 8/26/2019 $ 171,404 $ 232,066 $ 403,470 Rehabilitate Taxiway Lighting [Taxiway C], Rehabilitate Taxiway Lighting [Taxiway E], Rehabilitate Taxiway Lighting [Taxiway F]

AL Guntersville Guntersville Municipal - Joe Starnes Field 8A1 3-01-0038-023-2019 City of Guntersville 6/24/2019 7/16/2019 $ 153,277 $ - $ 153,277 Construct Runway - 07/25, Construct Taxiway

AL Haleyville Posey Field 1M4 3-01-0039-011-2019 City of Haleyville 6/24/2019 8/5/2019 $ 85,520 $ - $ 85,520 Install Perimeter Fencing not Required by 49 CFR 1542

AL Hamilton Marion County-Rankin Fite HAB 3-01-0040-016-2019 County of Marion 6/24/2019 8/14/2019 $ 471,600 $ - $ 471,600 Construct Taxiway

AL Huntsville Huntsville Executive Tom Sharp Jr Field MDQ 3-01-0087-029-2019 Madison County Executive Airport Authority 7/9/2019 7/23/2019 $ 1,040,449 $ - $ 1,040,449

Acquire Land for Development, Install Runway Vertical/Visual Guidance System - 18/36

AL Huntsville Huntsville International-Carl T Jones Field HSV 3-01-0042-084-2019 Huntsville-Madison County Airport Authority 7/29/2019 8/13/2019 $ 4,752,222 $ 4,263,414 $ 9,015,636

Construct Taxiway, Reconstruct Airfield Guidance Signs, Reconstruct Taxiway Lighting, Rehabilitate Apron, Rehabilitate Runway - 18L/36R, Rehabilitate Taxiway [Multi-Year Funding - Taxiway E], Rehabilitate Taxiway [Taxiway F], Rehabilitate Taxiway [Taxiway L], Rehabilitate Taxiway [Taxiways C4 and C5]

AL Jackson Jackson Municipal 4R3 3-01-0043-012-2019 City of Jackson 6/24/2019 7/15/2019 $ 450,000 $ - $ 450,000 Rehabilitate Runway - 01/19

AL Jasper Walker County-Bevill Field JFX 3-01-0096-021-2019 Walker County, Alabama 6/5/2019 8/29/2019 $ 178,500 $ 789,900 $ 968,400 Rehabilitate Runway Lighting - 09/27

AL Lanett Lanett Municipal 7A3 3-01-0046-017-2019 City of Lanett, Alabama 7/29/2019 8/26/2019 $ 89,798 $ - $ 89,798 Update Airport Master Plan Study

AL Marion Vaiden Field A08 3-01-0104-010-2019 Perry County Airport and Industrial Authority 6/24/2019 7/22/2019 $ 583,531 $ - $ 583,531 Construct Building, Construct Fuel Farm, Rehabilitate Runway - 16/34

AL Mobile Mobile Downtown BFM 3-01-0050-035-2019 Mobile Airport Authority 6/24/2019 8/8/2019 $ 1,257,926 $ - $ 1,257,926 Update Airport Master Plan Study

AL Mobile Mobile Downtown BFM 3-01-0050-036-2019 Mobile Airport Authority 6/24/2019 8/8/2019 $ 768,542 $ - $ 768,542 Acquire Equipment, Rehabilitate Runway - 14/32

AL Mobile Mobile Downtown BFM 3-01-0050-037-2019 Mobile Airport Authority 9/20/2019 9/24/2019 $ - $ 1,080,000 $ 1,080,000 Rehabilitate Apron

AL Mobile Mobile Downtown BFM 3-01-0050-038-2019 Mobile Airport Authority 9/27/2019 $ - $ 2,000,000 $ 2,000,000 Rehabilitate Apron

AL Mobile Mobile Regional MOB 3-01-0051-057-2019 Mobile Airport Authority 6/5/2019 8/8/2019 $ 462,828 $ 1,902,249 $ 2,365,077 Rehabilitate Taxiway

AL Montgomery Montgomery Regional (Dannelly Field) MGM 3-01-0053-049-2019 Montgomery Airport Authority 6/24/2019 8/29/2019 $ 1,091,349 $ - $ 1,091,349 Rehabilitate Taxiway

AL Montgomery State of Alabama *ALS 3-01-0000-006-2019 State of Alabama 9/20/2019 9/24/2019 $ - $ 442,337 $ 442,337 Conduct State System Plan Study

AL Muscle Shoals Northwest Alabama Regional MSL 3-01-0054-040-2019 Counties of Colbert and Lauderdale 6/24/2019 6/27/2019 $ 338,390 $ - $ 338,390 Reconstruct Airfield Guidance Signs

AL Oneonta Robbins Field 20A 3-01-0055-013-2019 City of Oneonta and County of Blount 7/9/2019 8/1/2019 $ 188,678 $ - $ 188,678 Rehabilitate Apron, Rehabilitate Taxiway, Remove Obstructions [Non-Hazard] AL Ozark Ozark-Blackwell Field 71J 3-01-0056-020-2019 City of Ozark 6/24/2019 7/1/2019 $ 303,276 $ - $ 303,276 Construct Fuel Farm

AL Pell City St Clair County PLR 3-01-0057-019-2019 St Clair County Airport Authority 6/24/2019 6/27/2019 $ 109,690 $ - $ 109,690 Construct Taxiway

AL Prattville Prattville - Grouby Field 1A9 3-01-0060-021-2019 Prattville Airport Authority 6/24/2019 8/9/2019 $ 293,946 $ - $ 293,946 Acquire Land For Approaches [Runway 27], Acquire Land For Approaches [Runway 9]

AL Scottsboro Scottsboro Municipal-Word Field 4A6 3-01-0109-022-2019 City of Scottsboro 6/24/2019 8/20/2019 $ 339,480 $ 56,326 $ 395,806 Reconstruct Airfield Guidance Signs, Reconstruct Runway Lighting - 04/22, Reconstruct Taxiway Lighting

AL Selma Craig Field SEM 3-01-0100-020-2019 Craig Field Airport & Industrial Authority 6/24/2019 7/9/2019 $ 150,000 $ 471,576 $ 621,576 Rehabilitate Runway - 15/33

AL Sylacauga Merkel Field Sylacauga Municipal SCD 3-01-0068-022-2019 City of Sylacauga 6/5/2019 8/13/2019 $ 385,219 $ 1,932,136 $ 2,317,355 Rehabilitate Runway - 09/27, Rehabilitate Runway Lighting - 09/27

AL Troy Troy Municipal at N Kenneth Campbell Field TOI 3-01-0071-019-2019 City of Troy 6/24/2019 7/3/2019 $ 608,166 $ - $ 608,166 Rehabilitate Runway Lighting - 07/25, Rehabilitate Taxiway Lighting

AL Tuscaloosa Tuscaloosa Regional TCL 3-01-0072-033-2019 City of Tuscaloosa 9/20/2019 9/24/2019 $ 150,000 $ - $ 150,000 Rehabilitate Runway - 04/22

AR Almyra Almyra Municipal M73 3-05-0001-009-2019 City of Almyra 9/20/2019 9/24/2019 $ 393,110 $ - $ 393,110 Construct Taxiway

AR Arkadelphia Dexter B Florence Memorial Field ADF 3-05-0002-018-2019 City of Arkadelphia 6/5/2019 6/11/2019 $ 427,391 $ 1,814,863 $ 2,242,254 Rehabilitate Runway - 04/22

AR Augusta Woodruff County M60 3-05-0003-008-2019 County of Woodruff 9/20/2019 9/23/2019 $ 150,000 $ - $ 150,000 Improve Runway Safety Area [Multi-Year Funding], Reconstruct Runway Lighting [Multi-Year Funding] - 09/27, Rehabilitate Runway [Multi-Year Funding] - 09/27

AR Batesville Batesville Regional BVX 3-05-0004-015-2019 City of Batesville 9/20/2019 9/23/2019 $ 179,145 $ - $ 179,145 Rehabilitate Apron, Rehabilitate Taxiway

AR Bentonville Bentonville Municipal/Louise M Thaden Field VBT 3-05-0006-014-2019 City of Bentonville 6/24/2019 8/19/2019 $ 144,450 $ - $ 144,450 Construct Taxiway, Install Taxiway Lighting

AR Bentonville Northwest Arkansas Regional XNA 3-05-0021-056-2019 Northwest Arkansas Regional Airport Authority 7/9/2019 8/19/2019 $ 3,125,267 $ - $ 3,125,267 Improve Terminal Building, Rehabilitate Taxiway

AR Berryville Carroll County 4M1 3-05-0007-018-2019 County of Carroll 7/9/2019 8/19/2019 $ 220,409 $ - $ 220,409 Update Airport Master Plan Study

AR Blytheville Arkansas International BYH 3-05-0086-007-2019 Blytheville-Gosnell Regional Airport Authority 6/24/2019 8/21/2019 $ 206,302 $ - $ 206,302 Rehabilitate Apron, Rehabilitate Taxiway

AR Blytheville Blytheville Municipal HKA 3-05-0008-017-2019 City of Blytheville 6/5/2019 9/6/2019 $ 1,446,482 $ - $ 1,446,482 Rehabilitate Runway - 18/36

9/30/2019 Page 3 of 40 FAA AIP Grant Detail Report

Page 4: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

AR Brinkley Frank Federer Memorial M36 3-05-0009-012-2019 City of Brinkley 9/20/2019 9/23/2019 $ 152,647 $ - $ 152,647 Install Runway Vertical/Visual Guidance System - 02/20, Rehabilitate Runway Lighting [Multi-Year Funding] - 02/20

AR Calico Rock Calico Rock-Izard County 37T 3-05-0085-011-2019 County of Izard 9/20/2019 9/24/2019 $ 149,892 $ - $ 149,892 Rehabilitate Apron, Rehabilitate Runway - 15/33, Rehabilitate Taxiway

AR Camden Harrell Field CDH 3-05-0010-018-2019 City of Camden 9/20/2019 9/24/2019 $ 251,739 $ - $ 251,739 Expand Apron, Install Perimeter Fencing not Required by 49 CFR 1542

AR Clarendon Clarendon Municipal 4M8 3-05-0012-012-2019 City of Clarendon 7/9/2019 9/18/2019 $ 170,529 $ - $ 170,529 Improve Runway Safety Area - 18/36, Install Airport Beacons

AR Clinton Clinton Municipal CCA 3-05-0077-016-2019 City of Clinton 7/29/2019 8/29/2019 $ 149,958 $ - $ 149,958 Update Airport Master Plan Study

AR Conway Cantrell Field CXW 3-05-0089-008-2019 City of Conway 9/20/2019 9/25/2019 $ 623,737 $ 844,879 $ 1,468,616 Construct Apron [Multi-year Funding], Construct Taxiway

AR Corning Corning Municipal 4M9 3-05-0068-022-2019 City of Corning 6/24/2019 7/29/2019 $ 610,458 $ - $ 610,458 Rehabilitate Runway - 18/36

AR Danville Danville Municipal 32A 3-05-0088-006-2019 City of Danville 7/9/2019 8/13/2019 $ 296,540 $ - $ 296,540 Rehabilitate Runway [Multi-Year Funding] - 11/29

AR De Queen J Lynn Helms Sevier County DEQ 3-05-0016-015-2019 County of Sevier 9/20/2019 9/23/2019 $ 150,000 $ 446,094 $ 596,094 Rehabilitate Runway - 08/26

AR Fordyce Fordyce Municipal 5M4 3-05-0070-011-2019 City of Fordyce 9/20/2019 9/23/2019 $ 150,000 $ - $ 150,000 Install Airport Beacons [Multi-Year Funding], Install Miscellaneous NAVAIDS [Multi-Year Funding], Rehabilitate Runway [Multi-Year Funding] - 05/23

AR Fort Smith Fort Smith Regional FSM 3-05-0024-048-2019 Fort Smith Airport Commission 6/24/2019 7/23/2019 $ 445,500 $ - $ 445,500 Rehabilitate Runway - 07/25

AR Fort Smith Fort Smith Regional FSM 3-05-0024-049-2019 Fort Smith Airport Commission 6/24/2019 8/22/2019 $ 685,170 $ - $ 685,170 Reconstruct Taxiway Lighting

AR Harrison Boone County HRO 3-05-0026-027-2019 County of Boone 6/24/2019 7/29/2019 $ 462,967 $ - $ 462,967 Rehabilitate Apron, Rehabilitate Taxiway

AR Heber Springs Heber Springs Municipal HBZ 3-05-0028-015-2019 City of Heber Springs 9/20/2019 9/23/2019 $ 145,611 $ - $ 145,611 Install Airport Beacons, Remove Obstructions [Non-Hazard] AR Hot Springs Memorial Field HOT 3-05-0031-027-2019 City of Hot Springs 6/5/2019 8/23/2019 $ 219,136 $ - $ 219,136 Rehabilitate Taxiway

AR Lake Village Lake Village Municipal M32 3-05-0034-013-2019 City of Lake Village 6/24/2019 8/14/2019 $ 622,004 $ - $ 622,004 Rehabilitate Runway - 01/19

AR Little Rock Bill and Hillary Clinton National/Adams Field LIT 3-05-0035-093-2019

City of Little Rock-Little Rock Municipal Airport Commission 9/20/2019 9/23/2019 $ 2,368,602 $ - $ 2,368,602 Expand Apron

AR Little Rock Bill and Hillary Clinton National/Adams Field LIT 3-05-0035-094-2019

City of Little Rock-Little Rock Municipal Airport Commission 9/20/2019 9/23/2019 $ 1,739,908 $ 2,266,768 $ 4,006,676 Expand Apron

AR Manila Manila Municipal MXA 3-05-0038-014-2019 City of Manila 6/24/2019 8/28/2019 $ 199,421 $ - $ 199,421 Rehabilitate Runway - 18/36

AR Marianna Marianna/Lee County-Steve Edwards Field 6M7 3-05-0071-008-2019 City of Marianna 7/9/2019 8/30/2019 $ 379,879 $ - $ 379,879

Install Airfield Guidance Signs, Install Runway Vertical/Visual Guidance System - 18/36, Install Taxiway Lighting

AR Marshall Searcy County 4A5 3-05-0084-014-2019 County of Searcy 9/20/2019 9/23/2019 $ 150,000 $ - $ 150,000 Rehabilitate Apron [Multi-Year Funding], Rehabilitate Runway [Multi-Year Funding], Rehabilitate Taxiway [Multi-Year Funding]

AR Melbourne Melbourne Municipal - John E Miller Field 42A 3-05-0079-019-2019 City of Melbourne 7/9/2019 8/26/2019 $ 177,300 $ - $ 177,300 Update Airport Master Plan Study

AR Mena Mena Intermountain Municipal MEZ 3-05-0041-022-2019 City of Mena 6/24/2019 8/14/2019 $ 149,400 $ - $ 149,400 Rehabilitate Runway - 17/35

AR Monticello Monticello Municipal/Ellis Field LLQ 3-05-0042-016-2019 City of Monticello 7/29/2019 8/28/2019 $ 300,000 $ 982,676 $ 1,282,676 Rehabilitate Runway - 03/21

AR Mount Ida Bearce 7M3 3-05-0045-015-2019 City of Mount Ida 7/9/2019 8/28/2019 $ 254,017 $ - $ 254,017 Remove Obstructions [Non-Hazard] AR Mountain Home Baxter County BPK 3-05-0046-020-2019 County of Baxter 6/24/2019 7/29/2019 $ 149,729 $ - $ 149,729 Rehabilitate Runway - 05/23

AR Nashville Howard County M77 3-05-0048-009-2019 County of Howard 9/20/2019 9/24/2019 $ 150,000 $ - $ 150,000 Reconstruct Runway Lighting [Multi-Year Funding] AR Newport Newport Regional M19 3-05-0049-011-2019 City of Newport 7/29/2019 9/18/2019 $ 500,413 $ - $ 500,413 Rehabilitate Taxiway Lighting

AR North Little Rock North Little Rock Municipal ORK 3-05-0047-026-2019 City of North Little Rock 9/20/2019 9/24/2019 $ 266,391 $ - $ 266,391 Install Weather Reporting Equipment AR Osceola Osceola Municipal 7M4 3-05-0050-009-2019 City of Osceola 7/9/2019 9/12/2019 $ 522,073 $ - $ 522,073 Rehabilitate Runway - 01/19, Rehabilitate Runway Lighting - 01/19

AR Ozark Ozark-Franklin County 7M5 3-05-0072-009-2019 County of Franklin 6/24/2019 7/10/2019 $ 194,833 $ - $ 194,833 Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate Taxiway

AR Paris Paris Municipal 7M6 3-05-0087-005-2019 City of Paris 9/20/2019 9/23/2019 $ 150,000 $ - $ 150,000 Install Runway Vertical/Visual Guidance System - 03/21, Rehabilitate Apron, Rehabilitate Runway [Multi-Year Funding] - 03/21

AR Pocahontas Pocahontas Municipal M70 3-05-0053-010-2019 City of Pocahontas 6/5/2019 6/28/2019 $ 609,810 $ - $ 609,810 Extend Taxiway

AR Rogers Rogers Executive - Carter Field ROG 3-05-0055-037-2019 City of Rogers 6/24/2019 9/3/2019 $ 64,405 $ - $ 64,405 Reconstruct Taxiway

AR Russellville Russellville Regional RUE 3-05-0056-016-2019 City of Russellville 9/20/2019 9/23/2019 $ 449,279 $ 1,125,933 $ 1,575,212 Reconstruct Runway Lighting - 07/25, Rehabilitate Runway - 07/25

AR Searcy Searcy Municipal SRC 3-05-0057-023-2019 City of Searcy 6/24/2019 7/29/2019 $ 600,000 $ - $ 600,000 Construct Building

AR Sheridan Sheridan Municipal 9M8 3-05-0060-010-2019 County of Grant 9/20/2019 9/23/2019 $ 662,424 $ 673,582 $ 1,336,006 Construct Taxiway

AR Texarkana Texarkana Regional-Webb Field TXK 3-05-0062-044-2019 Texarkana Airport Authority 7/29/2019 9/19/2019 $ 2,297,096 $ 4,557,223 $ 6,854,319 Construct Taxiway

AR Ulm Stuttgart Municipal Carl Humphrey Field SGT 3-05-0061-026-2019 City of Stuttgart 9/20/2019 9/23/2019 $ 520,284 $ - $ 520,284 Reconstruct Taxiway Lighting, Rehabilitate Taxiway [Taxiway A]

AR Waldron Waldron Municipal M27 3-05-0074-011-2019 City of Waldron 9/20/2019 9/24/2019 $ 150,000 $ - $ 150,000 Reconstruct Runway Lighting [Multi-Year Funding] - 09/27, Rehabilitate Runway [Multi-Year Funding] - 09/27

AR Walnut Ridge Walnut Ridge Regional ARG 3-05-0063-015-2019 City of Walnut Ridge 6/5/2019 7/2/2019 $ 448,311 $ - $ 448,311 Rehabilitate Runway - 04/22

AR Warren Warren Municipal 3M9 3-05-0064-007-2019 City of Warren 9/20/2019 9/24/2019 $ 367,250 $ - $ 367,250 Reconstruct Apron [Multi-Year Funding] AR West Helena Thompson-Robbins HEE 3-05-0029-012-2019 City of Helena-West Helena 7/29/2019 8/19/2019 $ 1,211,685 $ 3,268,691 $ 4,480,376 Reconstruct Runway - 17/35

AS Fitiuta Fitiuta FAQ 3-60-0003-032-2019 American Samoa State Insular 7/29/2019 9/6/2019 $ 994,086 $ - $ 994,086 Reconstruct Runway Lighting - 12/30

AZ Ajo Eric Marcus Municipal P01 3-04-0001-003-2019 County of Pima 6/5/2019 8/12/2019 $ 555,776 $ - $ 555,776 Install Perimeter Fencing not Required by 49 CFR 1542

9/30/2019 Page 4 of 40 FAA AIP Grant Detail Report

Page 5: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

AZ Bagdad Bagdad E51 3-04-0002-008-2019 County of Yavapai 6/5/2019 7/25/2019 $ 237,513 $ - $ 237,513 Reconstruct Runway - 05/23

AZ Benson Benson Municipal E95 3-04-0077-019-2019 City of Benson 6/5/2019 8/12/2019 $ 303,814 $ - $ 303,814 Install Perimeter Fencing not Required by 49 CFR 1542

AZ Buckeye Buckeye Municipal BXK 3-04-0005-021-2019 Town of Buckeye 6/5/2019 8/13/2019 $ 1,690,907 $ - $ 1,690,907 Rehabilitate Taxiway

AZ Bullhead City Laughlin/Bullhead International IFP 3-04-0006-050-2019 County of Mohave 7/9/2019 8/21/2019 $ 180,134 $ - $ 180,134 Rehabilitate Access Road

AZ Bullhead City Laughlin/Bullhead International IFP 3-04-0006-051-2019 County of Mohave 6/24/2019 7/9/2019 $ 609,600 $ - $ 609,600 Update Airport Master Plan Study

AZ Bullhead City Laughlin/Bullhead International IFP 3-04-0006-052-2019 County of Mohave 6/24/2019 8/13/2019 $ 2,014,538 $ - $ 2,014,538 Acquire Land for Development AZ Chandler Chandler Municipal CHD 3-04-0008-027-2019 City of Chandler 6/5/2019 7/10/2019 $ 546,360 $ - $ 546,360 Update Airport Master Plan Study

AZ Colorado City Colorado City Municipal AZC 3-04-0076-022-2019 Town of Colorado City 7/29/2019 8/26/2019 $ 156,226 $ - $ 156,226 Reconstruct Access Road

AZ Coolidge Coolidge Municipal P08 3-04-0011-012-2019 City of Coolidge 6/24/2019 8/26/2019 $ 377,876 $ - $ 377,876 Install Runway Vertical/Visual Guidance System - 05/23, Reconstruct Runway - 05/23, Reconstruct Runway Lighting - 05/23

AZ Cottonwood Cottonwood P52 3-04-0012-019-2019 City of Cottonwood 6/5/2019 8/6/2019 $ 364,054 $ - $ 364,054 Update Airport Master Plan Study

AZ Douglas Bisbee Douglas International DUG 3-04-0013-013-2019 County of Cochise 6/5/2019 6/24/2019 $ 468,637 $ - $ 468,637 Reconstruct Runway Lighting - 17/35

AZ Eloy Eloy Municipal E60 3-04-0014-015-2019 City of Eloy 6/24/2019 7/11/2019 $ 429,360 $ - $ 429,360 Reconstruct Taxiway

AZ Flagstaff Flagstaff Pulliam FLG 3-04-0015-043-2019 City of Flagstaff 6/24/2019 8/29/2019 $ 1,465,664 $ - $ 1,465,664 Acquire Snow Removal Equipment AZ Glendale Glendale Municipal GEU 3-04-0064-028-2019 City of Glendale 9/20/2019 9/23/2019 $ 150,000 $ 8,844,102 $ 8,994,102 Acquire Land For Approaches

AZ Kayenta Kayenta 0V7 3-04-0067-011-2019 Kayenta Township Commission 6/5/2019 8/15/2019 $ 203,705 $ - $ 203,705 Rehabilitate Apron

AZ Lake Havasu City Lake Havasu City HII 3-04-0071-028-2019 City of Lake Havasu City 6/24/2019 7/22/2019 $ 369,956 $ - $ 369,956 Reconstruct Taxiway, Reconstruct Taxiway Lighting

AZ Mesa Falcon Field FFZ 3-04-0023-029-2019 City of Mesa 6/24/2019 7/16/2019 $ 1,247,522 $ - $ 1,247,522 Construct Taxiway

AZ Mesa Phoenix-Mesa Gateway IWA 3-04-0078-042-2019 Phoenix-Mesa Gateway Airport Authority 9/20/2019 9/23/2019 $ 1,274,840 $ - $ 1,274,840 Construct Building

AZ Mesa Phoenix-Mesa Gateway IWA 3-04-0078-043-2019 Phoenix-Mesa Gateway Airport Authority 9/20/2019 9/23/2019 $ 2,735,468 $ 5,318,814 $ 8,054,282 Reconstruct Taxiway

AZ Nogales Nogales International OLS 3-04-0024-019-2019 County of Santa Cruz 6/5/2019 8/7/2019 $ 1,232,344 $ - $ 1,232,344 Reconstruct Taxiway, Rehabilitate Runway - 03/21

AZ Page Page Municipal PGA 3-04-0025-033-2019 City of Page 6/24/2019 8/14/2019 $ 3,787,415 $ 333,974 $ 4,121,389 Reconstruct Apron

AZ Parker Avi Suquilla P20 3-04-0026-020-2019 Colorado River Indian Tribe 6/24/2019 9/11/2019 $ 150,000 $ - $ 150,000 Rehabilitate Runway - 01/19, Rehabilitate Taxiway

AZ Payson Payson PAN 3-04-0027-023-2019 Town of Payson 6/24/2019 8/9/2019 $ 75,944 $ - $ 75,944 Install Runway Vertical/Visual Guidance System - 06/24, Rehabilitate Taxiway Lighting

AZ Peach Springs Grand Canyon West 1G4 3-04-0068-022-2019 Hualapai Tribe 7/9/2019 9/10/2019 $ 910,600 $ - $ 910,600 Acquire Aircraft Rescue & Fire Fighting Vehicle

AZ Phoenix Phoenix Deer Valley DVT 3-04-0028-039-2019 City of Phoenix 7/29/2019 8/9/2019 $ - $ 14,640,400 $ 14,640,400 Construct Taxiway

AZ Phoenix Phoenix Deer Valley DVT 3-04-0028-040-2019 City of Phoenix 6/24/2019 7/9/2019 $ 300,000 $ 2,341,700 $ 2,641,700 Reconstruct Taxiway

AZ Phoenix Phoenix Sky Harbor International PHX 3-04-0029-088-2019 City of Phoenix 6/5/2019 6/21/2019 $ 3,699,500 $ - $ 3,699,500 Reconstruct Apron

AZ Phoenix Phoenix Sky Harbor International PHX 3-04-0029-089-2019 City of Phoenix 9/20/2019 9/23/2019 $ 4,080,628 $ 17,294,372 $ 21,375,000 Reconstruct Apron

AZ Phoenix Phoenix Sky Harbor International PHX 3-04-0029-090-2019 City of Phoenix 9/20/2019 9/23/2019 $ - $ 542,300 $ 542,300 VALE Infrastructure

AZ Polacca Polacca P10 3-04-0081-005-2019 The Hopi Tribe 6/5/2019 7/18/2019 $ 394,289 $ - $ 394,289 Reconstruct Runway - 04/22

AZ Prescott Ernest A Love Field PRC 3-04-0030-040-2019 City of Prescott 6/5/2019 7/12/2019 $ 150,000 $ 657,500 $ 807,500 Reconstruct Taxiway [Taxiway C], Reconstruct Taxiway [Taxiways A and B4] AZ Safford Safford Regional SAD 3-04-0031-026-2019 City of Safford 7/9/2019 7/17/2019 $ 250,754 $ - $ 250,754 Acquire Equipment AZ Safford Safford Regional SAD 3-04-0031-027-2019 City of Safford 6/24/2019 7/9/2019 $ 225,095 $ - $ 225,095 Update Airport Master Plan Study

AZ Scottsdale Scottsdale SDL 3-04-0032-037-2019 City of Scottsdale 6/5/2019 6/18/2019 $ 549,845 $ - $ 549,845 Rehabilitate Runway Lighting - 03/21

AZ Sedona Sedona SEZ 3-04-0033-025-2019 County of Yavapai 6/5/2019 7/25/2019 $ 210,360 $ - $ 210,360 Reconstruct Apron

AZ Show Low Show Low Regional SOW 3-04-0035-028-2019 City of Show Low 6/24/2019 8/19/2019 $ 126,040 $ - $ 126,040 Reconstruct Apron

AZ Taylor Taylor TYL 3-04-0065-022-2019 Town of Taylor 9/20/2019 9/23/2019 $ 637,377 $ - $ 637,377 Install Perimeter Fencing not Required by 49 CFR 1542, Reconstruct Parking Lot AZ Tucson Tucson International TUS 3-04-0045-077-2019 Tucson Airport Authority 7/29/2019 9/18/2019 $ 7,897,543 $ 3,000,000 $ 10,897,543 Reconstruct Taxiway, Rehabilitate Taxiway

AZ Tucson Tucson International TUS 3-04-0045-078-2019 Tucson Airport Authority 7/29/2019 8/28/2019 $ - $ 2,149,124 $ 2,149,124 Reconstruct Runway - 11R/29L

AZ Tucson Tucson International TUS 3-04-0045-079-2019 Tucson Airport Authority 9/20/2019 9/23/2019 $ 1,650,133 $ 7,400,000 $ 9,050,133 Reconstruct Runway - 11R/29L

AZ Whiteriver Whiteriver E24 3-04-0047-014-2019 White Mountain Apache Tribe 7/9/2019 8/27/2019 $ 104,536 $ - $ 104,536 Install Runway Vertical/Visual Guidance System - 01/19

AZ Williams H A Clark Memorial Field CMR 3-04-0050-026-2019 City of Williams 7/9/2019 8/28/2019 $ 957,777 $ - $ 957,777 Rehabilitate Apron [Hangar Apron], Rehabilitate Apron [Terminal Apron], Rehabilitate Runway - 18/36, Rehabilitate Taxiway

AZ Window Rock Window Rock RQE 3-04-0051-017-2019 The Navajo Nation 6/5/2019 8/20/2019 $ 3,127,911 $ - $ 3,127,911 Reconstruct Runway - 02/20

AZ Yuma Yuma MCAS/Yuma International NYL 3-04-0053-038-2019 Yuma County Airport Authority 6/24/2019 7/19/2019 $ 644,041 $ - $ 644,041 Update Airport Master Plan Study

CA Alturas Tulelake Municipal O81 3-06-0264-014-2019 County of Modoc 7/29/2019 8/13/2019 $ 347,166 $ - $ 347,166 Conduct Environmental Study

CA Bakersfield Bakersfield Municipal L45 3-06-0323-022-2019 City of Bakersfield 6/24/2019 8/19/2019 $ 99,000 $ - $ 99,000 Rehabilitate Apron

CA Beckwourth Nervino O02 3-06-0020-011-2019 County of Plumas 7/29/2019 8/9/2019 $ 97,294 $ - $ 97,294 Acquire Snow Removal Equipment CA Beckwourth Nervino O02 3-06-0020-012-2019 County of Plumas 9/20/2019 9/23/2019 $ 460,000 $ - $ 460,000 Improve Fuel Farm

9/30/2019 Page 5 of 40 FAA AIP Grant Detail Report

Page 6: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

CA Bishop Bishop BIH 3-06-0024-021-2019 County of Inyo 9/20/2019 9/23/2019 $ 150,000 $ 5,072,952 $ 5,222,952

Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway C], Rehabilitate Taxiway [Taxiway D], Rehabilitate Taxiway [Taxiway E], Rehabilitate Taxiway [Taxiways B and G], Rehabilitate Taxiway [Taxiways J, H and F]

CA Burbank Bob Hope BUR 3-06-0031-065-2019 Burbank-Glendale-Pasadena Airport Authority 6/5/2019 6/26/2019 $ 1,358,027 $ 838,014 $ 2,196,041 Rehabilitate Taxiway

CA Camarillo Camarillo CMA 3-06-0339-037-2019 County of Ventura 6/24/2019 8/26/2019 $ 318,195 $ - $ 318,195 Rehabilitate Taxiway

CA Chester Rogers Field O05 3-06-0040-018-2019 County of Plumas 7/29/2019 8/19/2019 $ 341,389 $ - $ 341,389 Acquire Snow Removal Equipment, Acquire Snow Removal Equipment CA Cloverdale Cloverdale Municipal O60 3-06-0045-013-2019 City of Cloverdale 6/24/2019 7/23/2019 $ 900,692 $ - $ 900,692 Rehabilitate Taxiway

CA Concord Buchanan Field CCR 3-06-0050-025-2019 County of Contra Costa 9/20/2019 9/24/2019 $ 1,000,000 $ 4,316,232 $ 5,316,232 Rehabilitate Runway - 14L/32R, Rehabilitate Runway Lighting - 14L/32R

CA Covelo Round Valley O09 3-06-0056-007-2019 County of Mendocino 6/24/2019 7/15/2019 $ 61,020 $ - $ 61,020 Rehabilitate Runway - 10/28

CA Crescent City Jack McNamara Field CEC 3-06-0057-038-2019 Border Coast Regional Airport Authority 9/20/2019 9/23/2019 $ 715,007 $ - $ 715,007 Construct Terminal Building, Improve Runway Safety Area - 18/36

CA Crescent City Jack McNamara Field CEC 3-06-0057-039-2019 Border Coast Regional Airport Authority 7/29/2019 8/26/2019 $ 690,391 $ - $ 690,391

Remove Obstructions [Non-Hazard] [Environmental Analysis Reimbursement], Remove Obstructions [Non-Hazard] [Permits], Remove Obstructions [Non-Hazard] [Project Design]

CA Davis University EDU 3-06-0059-006-2019 Regents of the University of California, Davis 9/20/2019 9/23/2019 $ 530,826 $ - $ 530,826 Install Runway Vertical/Visual Guidance System - 17/35, Widen Runway - 17/35

CA Davis Yolo County DWA 3-06-0342-019-2019 County of Yolo 9/20/2019 9/23/2019 $ 998,576 $ - $ 998,576 Improve Airport Drainage

CA Fall River Mills Fall River Mills O89 3-06-0077-016-2019 County of Shasta 9/20/2019 9/23/2019 $ 422,356 $ - $ 422,356 Rehabilitate Access Road, Rehabilitate Runway - 02/20, Rehabilitate Taxiway

CA Firebaugh Firebaugh F34 3-06-0346-007-2019 City of Firebaugh 6/24/2019 7/15/2019 $ 66,758 $ - $ 66,758 Install Perimeter Fencing not Required by 49 CFR 1542

CA Fresno Fresno Yosemite International FAT 3-06-0087-083-2019 City of Fresno 6/24/2019 7/24/2019 $ 461,854 $ - $ 461,854 Rehabilitate Runway Lighting - 11L/29R

CA Fresno Fresno Yosemite International FAT 3-06-0087-084-2019 City of Fresno 6/24/2019 7/24/2019 $ 2,369,624 $ - $ 2,369,624 Modify Terminal Building

CA Gustine Gustine 3O1 3-06-0096-014-2019 City of Gustine 7/9/2019 7/19/2019 $ 339,390 $ - $ 339,390 Improve Airport Drainage

CA Hanford Hanford Municipal HJO 3-06-0098-027-2019 City of Hanford 6/24/2019 7/17/2019 $ 370,721 $ - $ 370,721 Rehabilitate Runway - 14/32

CA Havasu Lake Chemehuevi Valley 49X 3-06-0348-013-2019 Chemehuevi Indian Tribe 9/20/2019 9/23/2019 $ 2,230,000 $ - $ 2,230,000 Rehabilitate Runway - 16/34

CA Hawthorne Jack Northrop Field/Hawthorne Municipal HHR 3-06-0101-017-2019 City of Hawthorne 6/24/2019 7/25/2019 $ 349,406 $ - $ 349,406 Rehabilitate Runway - 07/25

CA Hawthorne Jack Northrop Field/Hawthorne Municipal HHR 3-06-0101-018-2019 City of Hawthorne 7/29/2019 8/28/2019 $ 307,125 $ - $ 307,125 Conduct Noise Compatibility Plan Study

CA Healdsburg Healdsburg Municipal HES 3-06-0305-014-2019 City of Healdsburg 6/24/2019 7/18/2019 $ 67,500 $ - $ 67,500 Rehabilitate Apron, Rehabilitate Taxiway

CA Hollister Hollister Municipal CVH 3-06-0105-021-2019 City of Hollister 9/20/2019 9/23/2019 $ 150,000 $ 5,058,345 $ 5,208,345 Construct Taxiway [Taxiway A], Construct Taxiway [Taxiway B], Construct Taxiway [Taxiway K: RIM]

CA Imperial Imperial County IPL 3-06-0109-037-2019 County of Imperial 6/24/2019 8/26/2019 $ 277,994 $ - $ 277,994 Rehabilitate Apron, Rehabilitate Taxiway

CA Inyokern Inyokern IYK 3-06-0110-032-2019 Indian Wells Valley Airport District 6/24/2019 8/13/2019 $ 111,600 $ - $ 111,600 Rehabilitate Taxiway

CA La Verne Brackett Field POC 3-06-0116-019-2019 County of Los Angeles 9/20/2019 9/23/2019 $ 920,274 $ 12,000,000 $ 12,920,274 Reconstruct Apron [North Apron], Reconstruct Apron [South Apron] CA Lakeport Lampson Field 1O2 3-06-0117-019-2019 County of Lake 6/24/2019 7/25/2019 $ 1,024,677 $ - $ 1,024,677 Rehabilitate Runway - 10/28, Rehabilitate Taxiway

CA Livermore Livermore Municipal LVK 3-06-0123-027-2019 City of Livermore 7/9/2019 7/26/2019 $ 291,397 $ - $ 291,397 Reconstruct Taxiway

CA Lone Pine Lone Pine/Death Valley O26 3-06-0126-014-2019 County of Inyo 9/20/2019 9/23/2019 $ 1,756,710 $ - $ 1,756,710 Rehabilitate Runway - 16/34

CA Long Beach Long Beach /Daugherty Field/ LGB 3-06-0127-045-2019 City of Long Beach 9/20/2019 9/24/2019 $ 9,504,607 $ 14,563,995 $ 24,068,602 Reconstruct Taxiway

CA Los Angeles Los Angeles International LAX 3-06-0139-098-2019 City of Los Angeles 9/20/2019 9/24/2019 $ 11,340,512 $ 24,284,172 $ 35,624,684 Construct Taxiway, Improve Airport Miscellaneous Improvements

CA Los Angeles Los Angeles International LAX 3-06-0139-099-2019 City of Inglewood 9/20/2019 9/23/2019 $ - $ 4,428,903 $ 4,428,903 Noise Mitigation Measures for Residences within 65-69 DNL

CA Los Angeles Los Angeles International LAX 3-06-0139-100-2019 County of Los Angeles Community Development Commission 7/29/2019 9/9/2019 $ - $ 2,400,000 $ 2,400,000 Noise Mitigation Measures for Residences within 65-69 DNL

CA Madera Madera Municipal MAE 3-06-0144-029-2019 City of Madera 7/29/2019 $ 135,900 $ - $ 135,900 No projects assigned. CA Mammoth Lakes Mammoth Yosemite MMH 3-06-0146-038-2019 Town of Mammoth Lakes 7/9/2019 7/22/2019 $ 504,505 $ - $ 504,505 Install Miscellaneous NAVAIDS

CA Mammoth Lakes Mammoth Yosemite MMH 3-06-0146-040-2019 Town of Mammoth Lakes 6/24/2019 7/12/2019 $ 208,518 $ - $ 208,518 Update Airport Master Plan Study

CA Marina Marina Municipal OAR 3-06-0367-015-2019 City of Marina 7/9/2019 7/30/2019 $ 2,087,734 $ 251,109 $ 2,338,843 Extend Taxiway

CA Mariposa Mariposa-Yosemite MPI 3-06-0147-014-2019 County of Mariposa 6/24/2019 7/30/2019 $ 522,000 $ - $ 522,000 Rehabilitate Apron

CA Monterey Monterey Regional MRY 3-06-0159-069-2019 Monterey Peninsula Airport District 6/5/2019 6/21/2019 $ 2,549,628 $ 4,261,562 $ 6,811,190 Acquire Land for Development CA Monterey Monterey Regional MRY 3-06-0159-070-2019 Monterey Peninsula Airport District 9/20/2019 9/23/2019 $ - $ 7,824,490 $ 7,824,490 Improve Runway Safety Area - 10R/28L

CA Napa Napa County APC 3-06-0162-041-2019 County of Napa 7/29/2019 8/15/2019 $ 267,338 $ - $ 267,338 Reconstruct Taxiway

CA Novato Gnoss Field DVO 3-06-0167-024-2019 County of Marin 6/24/2019 7/15/2019 $ 300,000 $ - $ 300,000 Rehabilitate Runway - 13/31

CA Oakland Metropolitan Oakland International OAK 3-06-0170-080-2019 Port of Oakland 7/9/2019 7/18/2019 $ 2,951,206 $ - $ 2,951,206 Rehabilitate Apron, Rehabilitate Service Road, Rehabilitate Taxiway

CA Oceanside Bob Maxwell Memorial Airfield OKB 3-06-0173-014-2019 City of Oceanside 6/24/2019 7/22/2019 $ 1,206,034 $ - $ 1,206,034 Rehabilitate Runway - 06/24, Rehabilitate Taxiway

CA Ontario Ontario International ONT 3-06-0175-045-2019 Ontario International Airport Authority 9/20/2019 9/23/2019 $ 7,937,951 $ - $ 7,937,951 Install Runway Lighting - 08L/26R, Rehabilitate Taxiway

9/30/2019 Page 6 of 40 FAA AIP Grant Detail Report

Page 7: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

CA Ontario Ontario International ONT 3-06-0175-046-2019 Ontario International Airport Authority 6/24/2019 8/9/2019 $ 900,210 $ - $ 900,210 Update Airport Master Plan Study

CA Palm Springs Palm Springs International PSP 3-06-0181-056-2019 City of Palm Springs 7/29/2019 8/8/2019 $ 9,392,856 $ - $ 9,392,856 Acquire Aircraft Rescue & Fire Fighting Vehicle, Improve Terminal Building, Modify Terminal Building

CA Palm Springs Palm Springs International PSP 3-06-0181-057-2019 City of Palm Springs 7/29/2019 8/8/2019 $ 81,692 $ - $ 81,692 Conduct Miscellaneous Study

CA Petaluma Petaluma Municipal O69 3-06-0186-028-2019 City of Petaluma 6/24/2019 8/5/2019 $ 632,797 $ - $ 632,797 Rehabilitate Runway Lighting - 11/29

CA Porterville Porterville Municipal PTV 3-06-0190-015-2019 City of Porterville 7/29/2019 8/13/2019 $ 983,392 $ - $ 983,392 Rehabilitate Apron

CA Quincy Gansner Field 2O1 3-06-0191-015-2019 County of Plumas 7/29/2019 8/9/2019 $ 98,048 $ - $ 98,048 Acquire Snow Removal Equipment CA Riverside (County) French Valley F70 3-06-0338-030-2019 County of Riverside 9/20/2019 9/24/2019 $ 2,248,194 $ - $ 2,248,194 Rehabilitate Runway - 18/36, Rehabilitate Taxiway

CA Sacramento Sacramento International SMF 3-06-0204-058-2019 County of Sacramento 6/5/2019 6/20/2019 $ 6,724,779 $ 20,676,221 $ 27,401,000 Rehabilitate Runway - 16R/34L

CA Salinas Salinas Municipal SNS 3-06-0206-028-2019 City of Salinas 6/24/2019 7/22/2019 $ 495,540 $ - $ 495,540 Rehabilitate Runway - 08/26

CA San Bernardino San Bernardino International SBD 3-06-0358-028-2019 San Bernardino International Airport Authority 6/24/2019 7/2/2019 $ 600,000 $ - $ 600,000 Rehabilitate Apron

CA San Diego Gillespie Field SEE 3-06-0212-031-2019 County of San Diego 9/20/2019 9/24/2019 $ 4,181,139 $ - $ 4,181,139 Improve Airport Drainage

CA San Diego San Diego International SAN 3-06-0214-083-2019 San Diego County Regional Airport Authority 6/24/2019 7/12/2019 $ 3,969,661 $ 4,925,559 $ 8,895,220 Rehabilitate Taxiway

CA San Diego San Diego International SAN 3-06-0214-084-2019 San Diego County Regional Airport Authority 9/20/2019 9/25/2019 $ - $ 14,588,375 $ 14,588,375 Noise Mitigation Measures for Residences within 65-69 DNL

CA San Diego San Diego International SAN 3-06-0214-085-2019 San Diego County Regional Airport Authority 9/20/2019 9/25/2019 $ - $ 1,363,098 $ 1,363,098 Zero Emissions Vehicle/Infrastructure

CA San Francisco International Airport San Francisco International SFO 3-06-0221-069-2019 City and County of San Francisco 7/9/2019 7/19/2019 $ 10,217,575 $ - $ 10,217,575 Reconstruct Runway - 10R/28L

CA San Francisco International Airport San Francisco International SFO 3-06-0221-070-2019 City and County of San Francisco 9/20/2019 9/23/2019 $ 4,886,562 $ 1,500,000 $ 6,386,562 Noise Mitigation Measures for Residences within 65-69 DNL

CA San Francisco International Airport San Francisco International SFO 3-06-0221-071-2019 City and County of San Francisco 9/20/2019 9/23/2019 $ 7,109,477 $ - $ 7,109,477 Improve Airport Miscellaneous Improvements

CA Santa Ana John Wayne Airport-Orange County SNA 3-06-0233-047-2019 County of Orange 6/24/2019 8/15/2019 $ 886,490 $ - $ 886,490 Update Airport Master Plan Study

CA Santa Ana John Wayne Airport-Orange County SNA 3-06-0233-048-2019 County of Orange 9/20/2019 9/23/2019 $ - $ 2,139,935 $ 2,139,935 Zero Emissions Vehicle/Infrastructure

CA Santa Barbara Santa Barbara Municipal SBA 3-06-0235-056-2019 City of Santa Barbara 6/24/2019 8/27/2019 $ 2,334,655 $ - $ 2,334,655 Security Enhancements

CA Santa Barbara Santa Barbara Municipal SBA 3-06-0235-057-2019 City of Santa Barbara 6/24/2019 8/13/2019 $ 162,070 $ - $ 162,070 Conduct Environmental Study

CA Santa Rosa Charles M Schulz - Sonoma County STS 3-06-0241-056-2019 County of Sonoma 6/24/2019 7/15/2019 $ 1,221,047 $ - $ 1,221,047 Reconstruct Apron

CA Santa Ynez Santa Ynez IZA 3-06-0243-017-2019 County of Santa Barbara 7/29/2019 9/10/2019 $ 154,800 $ - $ 154,800 Install Perimeter Fencing not Required by 49 CFR 1542, Reconstruct Apron

CA Shafter Shafter-Minter Field MIT 3-06-0247-025-2019 Minter Field Airport District 7/29/2019 8/27/2019 $ 2,102,490 $ 175,573 $ 2,278,063 Install Runway Lighting - 12/30

CA South Lake Tahoe Lake Tahoe TVL 3-06-0249-042-2019 City of South Lake Tahoe 7/9/2019 8/6/2019 $ 1,768,083 $ - $ 1,768,083 Reconstruct Apron

CA Stockton Stockton Metropolitan SCK 3-06-0250-041-2019 County of San Joaquin 9/20/2019 9/23/2019 $ 1,129,302 $ - $ 1,129,302 Rehabilitate Runway - 11L/29R, Rehabilitate Runway - 11R/29L, Rehabilitate Taxiway [Taxiway D], Rehabilitate Taxiway [Taxiway F]

CA Tehachapi Tehachapi Municipal TSP 3-06-0253-016-2019 City of Tehachapi 7/29/2019 9/3/2019 $ 189,000 $ - $ 189,000 Reconstruct Taxiway

CA Tracy Tracy Municipal TCY 3-06-0259-021-2019 City of Tracy 7/29/2019 9/6/2019 $ 217,080 $ - $ 217,080 Update Airport Master Plan Study

CA Truckee Truckee-Tahoe TRK 3-06-0262-038-2019 Truckee-Tahoe Airport District 7/29/2019 8/9/2019 $ 1,115,627 $ - $ 1,115,627 Construct Apron, Construct Wash Rack, Rehabilitate Runway - 11/29

CA Truckee Truckee-Tahoe TRK 3-06-0262-039-2019 Truckee-Tahoe Airport District 7/29/2019 8/9/2019 $ 107,334 $ - $ 107,334 Rehabilitate Taxiway

CA Ukiah Ukiah Municipal UKI 3-06-0268-015-2019 City of Ukiah 9/20/2019 9/23/2019 $ 3,416,962 $ - $ 3,416,962 Reconstruct Runway - 15/33

CA Ukiah Ukiah Municipal UKI 3-06-0268-016-2019 City of Ukiah 9/20/2019 9/23/2019 $ 290,941 $ - $ 290,941 Reconstruct Runway - 15/33

CA Upland Cable CCB 3-06-0269-015-2019 Robert Cable 6/24/2019 7/24/2019 $ 1,431,769 $ - $ 1,431,769 Rehabilitate Apron

CA Vacaville Nut Tree VCB 3-06-0270-023-2019 County of Solano 9/20/2019 9/23/2019 $ 65,000 $ - $ 65,000 Rehabilitate Taxiway

CA Van Nuys Van Nuys VNY 3-06-0131-016-2019 City of Los Angeles 9/20/2019 9/24/2019 $ 150,000 $ 9,833,233 $ 9,983,233 Reconstruct Taxiway

CA Victorville Southern California Logistics VCV 3-06-0359-025-2019 Southern California Int'l Airport Authority(City of Victorville) 9/20/2019 9/24/2019 $ 315,000 $ - $ 315,000 Install Weather Reporting Equipment

CA Visalia Visalia Municipal VIS 3-06-0271-031-2019 City of Visalia 7/29/2019 8/15/2019 $ 340,414 $ - $ 340,414 Install Airfield Guidance Signs, Rehabilitate Runway - 12/30

CA Wasco Wasco-Kern County L19 3-06-0333-010-2019 County of Kern 9/20/2019 9/23/2019 $ 300,000 $ - $ 300,000 Rehabilitate Apron, Rehabilitate Runway - 12/30, Rehabilitate Taxiway

CA Watsonville Watsonville Municipal WVI 3-06-0272-018-2019 City of Watsonville 7/29/2019 8/20/2019 $ 397,753 $ - $ 397,753 Rehabilitate Runway - 09/27, Rehabilitate Taxiway

CA Willows Willows-Glenn County WLW 3-06-0279-007-2019 County of Glenn 6/24/2019 7/23/2019 $ 144,000 $ - $ 144,000 Rehabilitate Apron

CA Willows Willows-Glenn County WLW 3-06-0279-009-2019 County of Glenn 7/29/2019 9/4/2019 $ 103,599 $ - $ 103,599 Update Airport Master Plan Study

CO Akron Colorado Plains Regional AKO 3-08-0001-020-2019 Town of Akron 6/24/2019 7/1/2019 $ 151,666 $ - $ 151,666 Install Weather Reporting Equipment

CO Alamosa San Luis Valley Regional/Bergman Field ALS 3-08-0002-024-2019 City and County of Alamosa 6/5/2019 8/28/2019 $ 352,470 $ - $ 352,470 Conduct Airport Master Plan Study

CO Broomfield Rocky Mountain Metropolitan BJC 3-08-0006-060-2019 County of Jefferson 6/5/2019 9/11/2019 $ 662,107 $ - $ 662,107 Acquire Aircraft Rescue & Fire Fighting Vehicle

CO Burlington Kit Carson County ITR 3-08-0057-015-2019 City of Burlington 6/5/2019 8/12/2019 $ 810,000 $ - $ 810,000 Construct Taxiway [A4 and A5]

9/30/2019 Page 7 of 40 FAA AIP Grant Detail Report

Page 8: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

CO Canon City Fremont County 1V6 3-08-0009-017-2019 County of Fremont 6/5/2019 6/25/2019 $ 87,435 $ - $ 87,435 Rehabilitate Taxiway [A/A1 and A2]

CO Colorado Springs City of Colorado Springs Municipal COS 3-08-0010-065-2019 City of Colorado Springs 7/9/2019 8/1/2019 $ 2,050,000 $ - $ 2,050,000 Construct Deicing Pad with Associated Facilities, Reconstruct Runway - 17R/35L

CO Cortez Cortez Municipal CEZ 3-08-0011-032-2019 City of Cortez 6/5/2019 7/19/2019 $ 1,314,867 $ - $ 1,314,867 Improve Airport Drainage, Improve Airport Miscellaneous Improvements

CO Denver Denver International DEN 3-08-0086-096-2019 County and City of Denver 6/5/2019 6/19/2019 $ 4,273,719 $ 11,460,195 $ 15,733,914 Rehabilitate Runway - 17R/35L, Rehabilitate Runway Lighting - 17R/35L

CO Denver Denver International DEN 3-08-0086-097-2019 County and City of Denver 6/24/2019 8/16/2019 $ 3,162,360 $ - $ 3,162,360 Rehabilitate Taxiway

CO Denver Denver International DEN 3-08-0086-098-2019 County and City of Denver 9/20/2019 9/23/2019 $ - $ 1,054,416 $ 1,054,416 VALE Infrastructure

CO Denver Denver International DEN 3-08-0086-099-2019 County and City of Denver 9/20/2019 9/23/2019 $ - $ 268,652 $ 268,652 VALE Infrastructure

CO Durango Durango-La Plata County DRO 3-08-0019-052-2019 City of Durango and County of La Plata 6/5/2019 6/25/2019 $ 4,015,595 $ 2,848,787 $ 6,864,382 Reconstruct Taxiway

CO Durango Durango-La Plata County DRO 3-08-0019-053-2019 City of Durango and County of La Plata 9/20/2019 9/24/2019 $ 1,822,905 $ - $ 1,822,905 Rehabilitate Apron

CO Eagle Eagle County Regional EGE 3-08-0020-061-2019 County of Eagle 6/24/2019 8/13/2019 $ 2,541,891 $ 3,100,000 $ 5,641,891 Construct Deicing Pad with Associated Facilities

CO Fort Morgan Fort Morgan Municipal FMM 3-08-0024-014-2019 City of Fort Morgan 6/5/2019 7/8/2019 $ 959,182 $ - $ 959,182 Expand Apron, Reconstruct Apron

CO Grand Junction Grand Junction Regional GJT 3-08-0027-062-2019 City Gr.Junc./Co.Mesa/Walker Fld.Pub.AirportAuth. 6/5/2019 7/10/2019 $ 1,941,950 $ 2,968,050 $ 4,910,000 Construct Runway - 11/29

CO Grand Junction Grand Junction Regional GJT 3-08-0027-063-2019 City Gr.Junc./Co.Mesa/Walker Fld.Pub.AirportAuth. 7/29/2019 8/26/2019 $ - $ 3,500,000 $ 3,500,000 Construct Runway - 11/29

CO Gunnison Gunnison-Crested Butte Regional GUC 3-08-0030-055-2019 County of Gunnison 7/29/2019 8/20/2019 $ 504,171 $ - $ 504,171 Expand Terminal Building

CO Hayden Yampa Valley HDN 3-08-0031-045-2019 County of Routt 6/5/2019 7/26/2019 $ 381,600 $ - $ 381,600 Acquire Snow Removal Equipment CO Hayden Yampa Valley HDN 3-08-0031-046-2019 County of Routt 6/5/2019 7/22/2019 $ 225,000 $ - $ 225,000 Rehabilitate Apron, Rehabilitate Taxiway [A and B] CO Hayden Yampa Valley HDN 3-08-0031-047-2019 County of Routt 7/9/2019 8/13/2019 $ 1,968,940 $ - $ 1,968,940 Expand Terminal Building

CO Kremmling Mc Elroy Airfield 20V 3-08-0034-015-2019 County of Grand 6/5/2019 6/25/2019 $ 270,585 $ - $ 270,585 Rehabilitate Runway - 09/27, Rehabilitate Runway Lighting - 09/27

CO Leadville Lake County LXV 3-08-0038-014-2019 County of Lake 9/20/2019 9/23/2019 $ 600,000 $ - $ 600,000 Construct Parking Lot, Rehabilitate Apron

CO Loveland Northern Colorado Regional FNL 3-08-0023-037-2019 Cities of Fort Collins and Loveland 6/24/2019 7/16/2019 $ 165,000 $ - $ 165,000 Conduct Airport Master Plan Study

CO Montrose Montrose Regional MTJ 3-08-0043-051-2019 County of Montrose 7/9/2019 9/10/2019 $ 682,199 $ - $ 682,199 Expand Terminal Building

CO Pagosa Springs Stevens Field PSO 3-08-0066-024-2019 County of Archuleta 6/5/2019 7/2/2019 $ 300,000 $ - $ 300,000 Conduct Airport Master Plan Study

CO Peyton Meadow Lake FLY 3-08-0063-023-2019 Meadow Lake Airport Association 6/5/2019 7/10/2019 $ 688,176 $ - $ 688,176 Reconstruct Runway - 15/33

CO Pueblo Pueblo Memorial PUB 3-08-0046-037-2019 City of Pueblo 6/5/2019 8/26/2019 $ 532,741 $ - $ 532,741 Conduct Airport Master Plan Study

CO Pueblo Pueblo Memorial PUB 3-08-0046-038-2019 City of Pueblo 9/20/2019 9/24/2019 $ 3,745,842 $ - $ 3,745,842 Install Perimeter Fencing not Required by 49 CFR 1542

CO Rangely Rangely 4V0 3-08-0047-013-2019 County of Rio Blanco 7/9/2019 8/13/2019 $ 88,200 $ - $ 88,200 Install Airfield Guidance Signs, Rehabilitate Runway - 07/25

CO Sterling Sterling Municipal STK 3-08-0052-016-2019 City of Sterling and County of Logan 6/5/2019 8/27/2019 $ 294,686 $ - $ 294,686 Conduct Airport Master Plan Study

CO Telluride Telluride Regional TEX 3-08-0088-035-2019 County of San Miguel/Telluride Regional Airport Authority 6/5/2019 7/23/2019 $ 176,543 $ - $ 176,543 Improve Airport Miscellaneous Improvements

CO Trinidad Perry Stokes TAD 3-08-0053-011-2019 County of Las Animas 6/5/2019 8/15/2019 $ 179,912 $ - $ 179,912 Rehabilitate Runway - 03/21

CO Watkins Front Range FTG 3-08-0016-042-2019 County of Adams and Front Range Airport Authority 6/5/2019 8/27/2019 $ 1,200,688 $ - $ 1,200,688 Rehabilitate Apron

CO Wray Wray Municipal 2V5 3-08-0055-018-2019 City of Wray 9/20/2019 9/23/2019 $ 889,789 $ - $ 889,789 Construct Taxiway, Install Runway Vertical/Visual Guidance System - 17/35

CT Bridgeport Igor I Sikorsky Memorial BDR 3-09-0002-035-2019 City of Bridgeport 6/5/2019 8/13/2019 $ 696,773 $ - $ 696,773 Acquire Aircraft Rescue & Fire Fighting Vehicle

CT Danbury Danbury Municipal DXR 3-09-0006-045-2019 City of Danbury 7/29/2019 8/6/2019 $ 1,008,699 $ 325,191 $ 1,333,890 Rehabilitate Runway - 08/26

CT Groton Groton-New London GON 3-09-0009-031-2019 Connecticut Airport Authority 6/24/2019 7/18/2019 $ 862,339 $ - $ 862,339 Install Perimeter Fencing

CT Meriden Meriden Markham Municipal MMK 3-09-0012-022-2019 City of Meriden 6/24/2019 7/12/2019 $ 1,090,548 $ - $ 1,090,548 Rehabilitate Apron

CT New Haven Tweed-New Haven HVN 3-09-0013-047-2019 Tweed-New Haven Airport Authority 6/24/2019 8/16/2019 $ 782,405 $ - $ 782,405 Update Airport Master Plan Study

CT New Haven Tweed-New Haven HVN 3-09-0013-049-2019 Tweed-New Haven Airport Authority 7/9/2019 8/16/2019 $ - $ 2,735,612 $ 2,735,612 Noise Mitigation Measures for Residences within 65-69 DNL

CT Oxford Waterbury-Oxford OXC 3-09-0017-028-2019 Connecticut Airport Authority 6/24/2019 7/8/2019 $ 386,428 $ - $ 386,428 Update Airport Master Plan Study

CT Plainville Robertson Field 4B8 3-09-0018-010-2019 Town of Plainville 6/5/2019 8/2/2019 $ 169,200 $ - $ 169,200 Rehabilitate Taxiway

CT Windsor Locks Bradley International BDL 3-09-0022-066-2019 Connecticut Airport Authority 6/24/2019 7/8/2019 $ 77,334 $ - $ 77,334 Conduct Miscellaneous Study

DC Washington Washington Metropolitan Area @008 3-11-8840-016-2019 Washington Metro Council of Governments 7/9/2019 8/30/2019 $ 274,950 $ - $ 274,950 Conduct Metropolitan System Plan Study

DE Dover Delaware Airpark 33N 3-10-0001-022-2019 Delaware River and Bay Authority 6/24/2019 8/26/2019 $ 213,517 $ - $ 213,517 Construct Runway - 09/27, Expand Apron, Reconstruct Apron

DE Dover State of Delaware *DES 3-10-0000-015-2019 Delaware Department of Transportation, Office of Aeronautics 6/5/2019 7/24/2019 $ 148,500 $ - $ 148,500 Update State System Plan Study

DE Georgetown Delaware Coastal GED 3-10-0007-035-2019 Sussex County, Delaware 6/24/2019 7/23/2019 $ 150,000 $ 366,727 $ 516,727 Update Airport Master Plan Study

DE Wilmington New Castle ILG 3-10-0006-047-2019 Delaware River and Bay Authority 6/24/2019 7/25/2019 $ 351,874 $ 338,426 $ 690,300 Rehabilitate Runway - 01/19, Rehabilitate Runway Lighting - 01/19, Remove Obstructions

9/30/2019 Page 8 of 40 FAA AIP Grant Detail Report

Page 9: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

FL Arcadia Arcadia Municipal X06 3-12-0093-007-2019 City of Arcadia 7/9/2019 9/11/2019 $ 229,074 $ - $ 229,074 Construct Taxiway

FL Avon Park Avon Park Executive AVO 3-12-0004-019-2019 City of Avon Park 9/20/2019 9/23/2019 $ 600,000 $ 829,029 $ 1,429,029 Install Taxiway Lighting, Rehabilitate Taxiway

FL Brooksville Brooksville-Tampa Bay Regional BKV 3-12-0008-022-2019 Hernando County Board of Commissioners 7/9/2019 8/30/2019 $ 150,000 $ 4,487,469 $ 4,637,469 Reconstruct Taxiway

FL Clearwater St Pete-Clearwater International PIE 3-12-0075-045-2019 Pinellas County Board of Commissioners 9/20/2019 9/24/2019 $ 4,161,816 $ 11,584,528 $ 15,746,344 Rehabilitate Runway [Multi-Year] - 18/36

FL Crestview Bob Sikes CEW 3-12-0014-025-2019 Okaloosa County 6/24/2019 8/20/2019 $ 414,774 $ - $ 414,774 Rehabilitate Runway - 17/35

FL Cross City Cross City CTY 3-12-0015-013-2019 Dixie County Board of County Commissioners 6/24/2019 7/18/2019 $ 450,000 $ - $ 450,000 Rehabilitate Apron

FL Crystal River Crystal River-Captain Tom Davis Field CGC 3-12-0156-009-2019 Citrus County, Florida 6/5/2019 7/15/2019 $ 164,719 $ - $ 164,719 Install Airport Beacons

FL Daytona Beach Daytona Beach International DAB 3-12-0017-079-2019 County of Volusia 6/5/2019 7/1/2019 $ 2,581,644 $ - $ 2,581,644 Improve Terminal Building

FL DeLand DeLand Municipal-Sidney H Taylor Field DED 3-12-0019-023-2019 City of DeLand 6/5/2019 7/15/2019 $ 150,000 $ - $ 150,000

Rehabilitate Apron [East Apron], Rehabilitate Apron [West Apron], Rehabilitate Runway Lighting - 05/23

FL Dunnellon Marion County X35 3-12-0147-004-2019 County of Marion 6/5/2019 8/26/2019 $ 254,259 $ - $ 254,259 Update Airport Master Plan Study

FL Fernandina Beach Fernandina Beach Municipal FHB 3-12-0022-028-2019 City of Fernandina Beach 6/24/2019 8/8/2019 $ 148,500 $ - $ 148,500 Improve Airport Drainage, Install Runway Lighting - 04/22, Rehabilitate Runway - 04/22

FL Fort Lauderdale Fort Lauderdale Executive FXE 3-12-0024-032-2019 City of Fort Lauderdale 9/20/2019 9/25/2019 $ 150,000 $ 5,055,625 $ 5,205,625 Construct Taxiway

FL Fort Lauderdale Fort Lauderdale/Hollywood International FLL 3-12-0025-087-2019 Broward County 6/5/2019 6/19/2019 $ - $ 20,000,000 $ 20,000,000 Extend Runway [Letter of Intent] - 10R/28L

FL Fort Lauderdale Fort Lauderdale/Hollywood International FLL 3-12-0025-088-2019 Broward County 6/5/2019 7/8/2019 $ 5,019,490 $ 19,696,823 $ 24,716,313 Rehabilitate Runway - 10L/28R

FL Gainesville Gainesville Regional GNV 3-12-0028-042-2019 City of Gainesville 9/20/2019 9/24/2019 $ 4,806,496 $ 5,440,150 $ 10,246,646 Expand Terminal Building

FL Hilliard Hilliard Airpark 01J 3-12-0099-011-2019 Town of Hilliard 7/29/2019 8/29/2019 $ 150,000 $ - $ 150,000 Acquire Land For Approaches, Install Perimeter Fencing not Required by 49 CFR 1542, Remove Obstructions [Non-Hazard]

FL Immokalee Immokalee Regional IMM 3-12-0031-012-2019 Collier County Airport Authority 9/20/2019 9/25/2019 $ 210,209 $ - $ 210,209 Extend Taxiway

FL Inverness Inverness INF 3-12-0157-006-2019 Citrus County, Florida 7/29/2019 8/21/2019 $ 236,043 $ - $ 236,043 Conduct Aeronautical Survey for RNAV Approach, Rehabilitate Taxiway [Taxiway A2], Rehabilitate Taxiway [Taxiway B], Rehabilitate Taxiway [Taxiway C]

FL Jacksonville Cecil VQQ 3-12-0032-021-2019 Jacksonville Aviation Authority 7/9/2019 7/18/2019 $ 1,254,614 $ - $ 1,254,614 Install Airfield Guidance Signs, Rehabilitate Runway - 18L/36R

FL Jacksonville Jacksonville International JAX 3-12-0035-057-2019 Jacksonville Aviation Authority 6/24/2019 7/18/2019 $ 1,354,351 $ - $ 1,354,351 Improve Service Road, Rehabilitate Taxiway

FL Key West Key West International EYW 3-12-0037-059-2019 Monroe County Board of County Commissioners 9/27/2019 $ - $ 7,016,974 $ 7,016,974 Noise Mitigation Measures for Residences within 65-69 DNL

FL Key West Key West International EYW 3-12-0037-060-2019 Monroe County Board of County Commissioners 7/29/2019 8/19/2019 $ 3,292,913 $ 3,240,042 $ 6,532,955 Rehabilitate Taxiway, Rehabilitate Taxiway Lighting [Multi-Year Funding] FL Kissimmee Kissimmee Gateway ISM 3-12-0038-036-2019 City of Kissimmee 6/5/2019 8/6/2019 $ 47,619 $ - $ 47,619 Wildlife Hazard Assessments

FL La Belle La Belle Municipal X14 3-12-0125-011-2019 Hendry County Board of County Commissioners 7/29/2019 8/12/2019 $ 113,818 $ - $ 113,818 Rehabilitate Taxiway [South East to North Ramp], Rehabilitate Taxiway [Taxilanes to North West Apron]

FL Lakeland Lakeland Linder International LAL 3-12-0041-042-2019 City of Lakeland 9/20/2019 9/25/2019 $ 150,000 $ 10,150,000 $ 10,300,000 Reconstruct Runway Lighting - 09/27, Strengthen Runway - 09/27

FL Leesburg Leesburg International LEE 3-12-0042-024-2019 City of Leesburg 7/9/2019 8/12/2019 $ 238,050 $ - $ 238,050 Rehabilitate Runway - 13/31

FL Marco Island Marco Island Executive MKY 3-12-0142-013-2019 Collier County Airport Authority 9/20/2019 9/25/2019 $ 195,513 $ - $ 195,513 Construct Apron

FL Melbourne Melbourne International MLB 3-12-0046-047-2019 Melbourne Airport Authority 6/5/2019 8/8/2019 $ 3,255,466 $ - $ 3,255,466 Improve Terminal Building, Remove Obstructions [Non-Hazard] FL Merritt Island Merritt Island COI 3-12-0013-021-2019 Titusville-Cocoa Airport Authority 9/20/2019 9/24/2019 $ 2,821,828 $ - $ 2,821,828 Reconstruct Apron, Rehabilitate Runway - 11/29

FL Milton Peter Prince Field 2R4 3-12-0052-014-2019 County of Santa Rosa 6/24/2019 8/22/2019 $ 410,643 $ - $ 410,643 Update Airport Master Plan Study

FL Naples Naples Municipal APF 3-12-0053-037-2019 City of Naples Airport Authority 7/29/2019 8/22/2019 $ 300,000 $ - $ 300,000 Conduct Noise Compatibility Plan Study

FL Ocala Ocala International-Jim Taylor Field OCF 3-12-0055-027-2019 City of Ocala 6/5/2019 9/17/2019 $ 300,000 $ 4,957,859 $ 5,257,859 Rehabilitate Taxiway

FL Orlando Executive ORL 3-12-0058-032-2019 City of Orlando 7/29/2019 8/14/2019 $ 150,000 $ 4,088,885 $ 4,238,885 Rehabilitate Taxiway [Runway Incursion Mitigation] FL Orlando Orlando International MCO 3-12-0057-119-2019 City of Orlando 9/20/2019 9/23/2019 $ 6,815,416 $ 9,680,680 $ 16,496,096 Rehabilitate Runway - 18L/36R

FL Ormond Beach Ormond Beach Municipal OMN 3-12-0059-022-2019 City of Ormond Beach 9/20/2019 9/24/2019 $ 150,000 $ 3,173,422 $ 3,323,422 Extend Runway - 08/26, Extend Taxiway, Install Runway Lighting - 08/26, Install Taxiway Lighting

FL Palatka Palatka Municipal - Lt Kay Larkin Field 28J 3-12-0061-029-2019 City of Palatka 7/29/2019 8/5/2019 $ 453,736 $ - $ 453,736 Construct Taxiway, Install Taxiway Lighting

FL Panama City Northwest Florida Beaches International ECP 3-12-0159-014-2019 Panama City Airport and Industrial District 7/9/2019 8/21/2019 $ 129,308 $ - $ 129,308 Environmental Mitigation

FL Panama City Northwest Florida Beaches International ECP 3-12-0159-015-2019 Panama City Airport and Industrial District 9/20/2019 9/25/2019 $ 8,995,277 $ - $ 8,995,277

Construct Apron, Construct Taxiway, Expand Terminal Building [Multi-year Funding, Yr 1], Expand Terminal Building [Multi-year Funding, Yr 2]

FL Pensacola Pensacola International PNS 3-12-0063-043-2019 City of Pensacola 7/9/2019 8/16/2019 $ 2,072,525 $ - $ 2,072,525 Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Land for Development, Construct Building, Improve Airport Drainage

FL Plant City Plant City PCM 3-12-0065-010-2019 Hillsborough County Aviation Authority 7/9/2019 8/15/2019 $ 2,900,000 $ - $ 2,900,000 Rehabilitate Runway - 10/28, Rehabilitate Runway Lighting - 10/28, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

9/30/2019 Page 9 of 40 FAA AIP Grant Detail Report

Page 10: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

FL Punta Gorda Punta Gorda PGD 3-12-0067-037-2019 Charlotte County Airport Authority 7/29/2019 8/26/2019 $ 6,354,839 $ - $ 6,354,839 Rehabilitate Runway - 15/33, Wildlife Hazard Assessments

FL Saint Augustine Northeast Florida Regional SGJ 3-12-0073-042-2019 St Augustine - St Johns County Airport Authority 6/5/2019 7/8/2019 $ 225,000 $ - $ 225,000 Improve Airport Drainage, Install Taxiway Lighting, Rehabilitate Taxiway

FL Sanford Orlando Sanford International SFB 3-12-0069-080-2019 Sanford Airport Authority 6/24/2019 7/11/2019 $ 4,464,990 $ - $ 4,464,990

Construct Apron, Install Airfield Guidance Signs, Rehabilitate Taxiway [Taxiway B], Rehabilitate Taxiway [Taxiway C], Rehabilitate Taxiway Lighting [Taxiway B Lighting], Rehabilitate Taxiway Lighting [Taxiway C Lighting], Security Enhancements

FL Sarasota Sarasota/Bradenton International SRQ 3-12-0071-055-2019 Sarasota-Manatee Airport Authority 6/24/2019 7/31/2019 $ 1,480,253 $ - $ 1,480,253 Rehabilitate Aircraft Rescue & Fire Fighting Building, Rehabilitate Taxiway

FL Sarasota Sarasota/Bradenton International SRQ 3-12-0071-056-2019 Sarasota-Manatee Airport Authority 6/24/2019 7/31/2019 $ 873,443 $ - $ 873,443 Update Airport Master Plan Study [Federal Funds are being provided to this multi-year grant for Updating the Airport Master Plan]

FL Sarasota Sarasota/Bradenton International SRQ 3-12-0071-057-2019 Sarasota-Manatee Airport Authority 6/24/2019 7/31/2019 $ 3,168,782 $ 3,634,572 $ 6,803,354 Improve Airport Drainage [Federal Funds are being provided to this multi-year grant for Updating the Airport Master Plan]

FL Stuart Witham Field SUA 3-12-0076-022-2019 County of Martin 6/24/2019 8/27/2019 $ 570,135 $ - $ 570,135 Update Airport Master Plan Study

FL Tallahassee State of Florida *FLS 3-12-0000-015-2019 State of Florida 7/9/2019 8/9/2019 $ 1,700,000 $ - $ 1,700,000 Conduct State System Plan Study

FL Tallahassee Tallahassee International TLH 3-12-0077-043-2019 City of Tallahassee 9/20/2019 9/24/2019 $ 1,776,111 $ - $ 1,776,111 Expand Terminal Building

FL Tampa Peter O Knight TPF 3-12-0079-004-2019 Hillsborough County Aviation Authority 6/24/2019 7/29/2019 $ 150,000 $ - $ 150,000 Extend Taxiway

FL Tampa Tampa International TPA 3-12-0078-065-2019 Hillsborough County Aviation Authority 7/9/2019 9/5/2019 $ 6,305,125 $ - $ 6,305,125 Install Security Equipment FL Tampa Tampa International TPA 3-12-0078-066-2019 Hillsborough County Aviation Authority 7/9/2019 7/29/2019 $ - $ 502,014 $ 502,014 Conduct Noise Compatibility Plan Study

FL Titusville Arthur Dunn Air Park X21 3-12-0101-014-2019 Titusville-Cocoa Airport Authority 6/5/2019 8/27/2019 $ 329,778 $ - $ 329,778 Install Runway Vertical/Visual Guidance System - 15/33, Rehabilitate Runway - 15/33

FL Titusville Space Coast Regional TIX 3-12-0080-029-2019 Titusville-Cocoa Airport Authority 6/24/2019 7/22/2019 $ 274,815 $ - $ 274,815 Install Airfield Guidance Signs [Runway 18/36], Install Airfield Guidance Signs [Runway 9/27]

FL Umatilla Umatilla Municipal X23 3-12-0026-011-2019 City of Umatilla 6/24/2019 8/6/2019 $ 181,771 $ - $ 181,771 Update Airport Master Plan Study

FL Valkaria Valkaria X59 3-12-0144-011-2019 Brevard County Board of County Commissioners 6/5/2019 8/6/2019 $ 133,722 $ - $ 133,722 Widen Taxiway

FL Valparaiso Eglin AFB/Destin-Ft Walton Beach VPS 3-12-0081-030-2019 Okaloosa County 6/24/2019 8/20/2019 $ 6,200,000 $ - $ 6,200,000 Expand Apron

FL Venice Venice Municipal VNC 3-12-0082-018-2019 City of Venice 6/24/2019 8/14/2019 $ 1,964,029 $ - $ 1,964,029 Extend Taxiway

FL Vero Beach Vero Beach Regional VRB 3-12-0083-041-2019 City of Vero Beach 6/5/2019 8/20/2019 $ 168,996 $ - $ 168,996 Rehabilitate Apron

FL West Palm Beach North Palm Beach County General Aviation F45 3-12-0113-018-2019 Palm Beach Board of County Commissioners 9/20/2019 9/24/2019 $ 743,198 $ - $ 743,198 Conduct Environmental Study

FL West Palm Beach Palm Beach County Park LNA 3-12-0086-017-2019 Palm Beach Board of County Commissioners 9/20/2019 9/24/2019 $ 709,056 $ - $ 709,056 Conduct Noise Compatibility Plan Study

FL West Palm Beach Palm Beach International PBI 3-12-0085-061-2019 Palm Beach Board of County Commissioners 9/20/2019 9/24/2019 $ 2,148,704 $ - $ 2,148,704 Expand Service Road, Modify Terminal Building, Rehabilitate Terminal Building

FL West Palm Beach Palm Beach International PBI 3-12-0085-062-2019 Palm Beach Board of County Commissioners 9/20/2019 9/24/2019 $ 451,296 $ - $ 451,296 Sustainable Management Plan

FL Winter Haven Winter Haven Regional GIF 3-12-0088-028-2019 City of Winter Haven 6/5/2019 9/10/2019 $ 136,560 $ - $ 136,560 Remove Obstructions [Non-Hazard] FL Winter Haven Winter Haven Regional GIF 3-12-0088-029-2019 City of Winter Haven 7/29/2019 9/10/2019 $ 72,000 $ - $ 72,000 Extend Taxiway

FM Colonia Yap International T11 3-64-0004-016-2019 Federated States of Micronesia 9/20/2019 9/25/2019 $ - $ 4,248,000 $ 4,248,000 Improve Airport Miscellaneous Improvements

FM Iras Chuuk International TKK 3-64-0003-021-2019 Federated States of Micronesia 6/24/2019 9/4/2019 $ - $ 600,000 $ 600,000 Conduct Aeronautical Survey for RNAV Approach

FM Kosrae Kosrae TTK 3-64-0001-017-2019 Federated States of Micronesia 9/20/2019 9/25/2019 $ - $ 3,807,000 $ 3,807,000 Improve Airport Miscellaneous Improvements

GA Albany Southwest Georgia Regional ABY 3-13-0002-049-2019 City of Albany 7/9/2019 8/16/2019 $ 1,107,580 $ 1,470,136 $ 2,577,716 Rehabilitate Apron, Rehabilitate Taxiway

GA Atlanta Georgia State Block Grant Program *GAB 3-13-SBGP-025-2019 State of Georgia 7/9/2019 7/11/2019 $ 18,960,909 $ - $ 18,960,909 Non primary development projects in state block grant program

GA Atlanta Georgia State Block Grant Program *GAB 3-13-SBGP-026-2019 State of Georgia 6/5/2019 6/11/2019 $ - $ 10,100,000 $ 10,100,000 Non primary development projects in state block grant program

GA Augusta Augusta Regional at Bush Field AGS 3-13-0011-043-2019 City of Augusta 7/9/2019 8/26/2019 $ 927,767 $ - $ 927,767 Improve Terminal Building, Rehabilitate Apron, Rehabilitate Taxiway

GA Brunswick Brunswick Golden Isles BQK 3-13-0018-041-2019 County of Glynn 7/9/2019 8/1/2019 $ 264,554 $ - $ 264,554 Construct Apron, Construct Parking Lot GA Columbus Columbus CSG 3-13-0035-044-2019 Columbus Consolidated Government 9/20/2019 9/24/2019 $ 1,659,350 $ 8,000,000 $ 9,659,350 Modify Terminal Building

GA Savannah Savannah/Hilton Head International SAV 3-13-0100-062-2019 City of Savannah and Savannah Airport Commission 7/9/2019 7/22/2019 $ 4,222,340 $ - $ 4,222,340 Improve Terminal Building

GA Valdosta Valdosta Regional VLD 3-13-0115-035-2019 City of Valdosta 7/9/2019 7/26/2019 $ 1,089,067 $ - $ 1,089,067 Improve Airport Drainage, Rehabilitate Taxiway, Rehabilitate Taxiway

GA Valdosta Valdosta Regional VLD 3-13-0115-036-2019 City of Valdosta 7/29/2019 8/23/2019 $ 200,939 $ - $ 200,939 Acquire Land For Approaches

GU Tamuning Guam International GUM 3-66-0001-106-2019 Guam Airport Authority 7/9/2019 8/29/2019 $ 4,596,429 $ - $ 4,596,429 Modify Terminal Building [Multi-year Funding] HI Hilo Hilo International ITO 3-15-0004-053-2019 State of Hawaii 6/24/2019 7/25/2019 $ 875,319 $ - $ 875,319 Acquire Aircraft Rescue & Fire Fighting Vehicle

HI Honolulu Daniel K Inouye International HNL 3-15-0005-134-2019 State of Hawaii 6/24/2019 8/28/2019 $ 1,385,775 $ - $ 1,385,775 Install Runway Lighting - 04L/22R

HI Honolulu State of Hawaii *HIS 3-15-0000-009-2019 State of Hawaii 6/24/2019 8/29/2019 $ 2,700,000 $ - $ 2,700,000 Update Miscellaneous Study

HI Kahului Kahului OGG 3-15-0006-056-2019 State of Hawaii 6/24/2019 8/8/2019 $ 727,540 $ - $ 727,540 Acquire Aircraft Rescue & Fire Fighting Vehicle

HI Kahului Kahului OGG 3-15-0006-057-2019 State of Hawaii 6/24/2019 8/27/2019 $ 3,216,075 $ - $ 3,216,075 Reconstruct Taxiway

9/30/2019 Page 10 of 40 FAA AIP Grant Detail Report

Page 11: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

HI Kailua Kona Ellison Onizuka Kona International at Keahole KOA 3-15-0008-042-2019 State of Hawaii 6/24/2019 8/27/2019 $ 877,471 $ - $ 877,471 Acquire Aircraft Rescue & Fire Fighting Vehicle

HI Kailua Kona Ellison Onizuka Kona International at Keahole KOA 3-15-0008-043-2019 State of Hawaii 7/29/2019 8/26/2019 $ 7,477,830 $ - $ 7,477,830 Extend Taxiway

HI Lanai City Lanai LNY 3-15-0012-023-2019 State of Hawaii 9/20/2019 9/24/2019 $ 11,303,303 $ - $ 11,303,303 Rehabilitate Apron, Rehabilitate Runway - 03/21, Rehabilitate Taxiway

IA Algona Algona Municipal AXA 3-19-0002-011-2019 City of Algona 7/29/2019 8/22/2019 $ 245,700 $ - $ 245,700 Reconstruct Runway - 12/30

IA Ames State of Iowa *IAS 3-19-0000-025-2019 State of Iowa DOT 9/20/2019 9/23/2019 $ - $ 504,064 $ 504,064 Update State System Plan Study

IA Ames State of Iowa *IAS 3-19-0000-026-2019 State of Iowa DOT 9/20/2019 9/23/2019 $ - $ 227,180 $ 227,180 Conduct State System Plan Study

IA Ankeny Ankeny Regional IKV 3-19-0132-026-2019 Polk County Aviation Authority 6/5/2019 7/11/2019 $ 570,492 $ - $ 570,492 Rehabilitate Runway - 18/36

IA Bloomfield Bloomfield Municipal 4K6 3-19-0008-010-2019 City of Bloomfield 7/29/2019 8/7/2019 $ 223,358 $ - $ 223,358 Improve Airport Drainage

IA Burlington Southeast Iowa Regional BRL 3-19-0010-039-2019 Southeast Iowa Regional Airport Authority 9/27/2019 $ - $ 10,954,454 $ 10,954,454 Reconstruct Runway - 18/36

IA Burlington Southeast Iowa Regional BRL 3-19-0010-040-2019 Southeast Iowa Regional Airport Authority 9/20/2019 9/23/2019 $ 135,267 $ - $ 135,267 Reconstruct Runway - 18/36

IA Cedar Rapids The Eastern Iowa CID 3-19-0012-054-2019 The Cedar Rapids Airport Commission 6/24/2019 7/22/2019 $ 3,592,258 $ 4,519,537 $ 8,111,795 Reconstruct Runway - 13/31, Rehabilitate Runway - 09/27, Rehabilitate Taxiway

IA Cedar Rapids The Eastern Iowa CID 3-19-0012-056-2019 The Cedar Rapids Airport Commission 9/20/2019 9/23/2019 $ 85,593 $ - $ 85,593 Reconstruct Runway - 13/31

IA Cedar Rapids The Eastern Iowa CID 3-19-0012-057-2019 The Cedar Rapids Airport Commission 7/29/2019 8/15/2019 $ - $ 105,930 $ 105,930 Update Miscellaneous Study

IA Chariton Chariton Municipal CNC 3-19-0014-011-2019 City of Chariton 6/5/2019 7/1/2019 $ 249,787 $ - $ 249,787 Rehabilitate Runway - 17/35, Rehabilitate Taxiway

IA Charles City Northeast Iowa Regional CCY 3-19-0015-014-2019 North Cedar Aviation Authority 6/5/2019 6/25/2019 $ 90,000 $ - $ 90,000 Reconstruct Taxiway

IA Cherokee Cherokee County Regional CKP 3-19-0099-015-2019 Cherokee, Iowa, Aviation Authority 6/24/2019 7/24/2019 $ 773,796 $ - $ 773,796 Construct Taxiway

IA Clarion Clarion Municipal CAV 3-19-0018-014-2019 City of Clarion 7/9/2019 7/16/2019 $ 511,793 $ - $ 511,793 Rehabilitate Runway - 14/32

IA Des Moines Des Moines International DSM 3-19-0027-072-2019 Des Moines Airport Authority 7/29/2019 8/1/2019 $ 4,452,618 $ 6,805,469 $ 11,258,087 Reconstruct Runway - 05/23

IA Des Moines Des Moines International DSM 3-19-0027-074-2019 Des Moines Airport Authority 6/5/2019 6/21/2019 $ 76,267 $ - $ 76,267 Reconstruct Runway - 05/23

IA Des Moines Des Moines International DSM 3-19-0027-075-2019 Des Moines Airport Authority 7/9/2019 7/12/2019 $ 13,733 $ 5,033,078 $ 5,046,811 Reconstruct Apron, Reconstruct Taxiway

IA Dubuque Dubuque Regional DBQ 3-19-0028-065-2019 Dubuque Regional Airport Commission 6/5/2019 6/24/2019 $ 537,237 $ - $ 537,237 Update Airport Master Plan Study

IA Estherville Estherville Municipal EST 3-19-0032-012-2019 City of Estherville 6/5/2019 7/1/2019 $ 72,360 $ - $ 72,360 Construct Taxiway

IA Fairfield Fairfield Municipal FFL 3-19-0033-017-2019 City of Fairfield 6/5/2019 6/25/2019 $ 461,474 $ - $ 461,474 Reconstruct Taxiway

IA Fort Dodge Fort Dodge Regional FOD 3-19-0035-034-2019 Fort Dodge Airport Commission 6/5/2019 8/12/2019 $ 386,793 $ - $ 386,793 Acquire Snow Removal Equipment

IA Greenfield Greenfield Municipal GFZ 3-19-0038-009-2019 City of Greenfield 6/5/2019 7/16/2019 $ 391,500 $ - $ 391,500 Rehabilitate Apron, Rehabilitate Runway - 07/25, Rehabilitate Runway - 14/32, Rehabilitate Taxiway

IA Guthrie Center Guthrie County Regional GCT 3-19-0103-011-2019 Guthrie County Airport Authority 7/29/2019 8/15/2019 $ 486,266 $ 2,660,622 $ 3,146,888 Reconstruct Runway - 18/36

IA Harlan Harlan Municipal HNR 3-19-0042-010-2019 City of Harlan 6/5/2019 7/15/2019 $ 183,951 $ - $ 183,951 Acquire Land for Development IA Humboldt Humboldt Municipal 0K7 3-19-0043-012-2019 City of Humboldt 6/5/2019 7/1/2019 $ 435,000 $ - $ 435,000 Construct Snow Removal Equipment Building

IA Independence Independence Municipal IIB 3-19-0045-016-2019 City of Independence 6/5/2019 7/8/2019 $ 312,917 $ - $ 312,917 Construct Taxiway

IA Iowa City Iowa City Municipal IOW 3-19-0047-025-2019 City of Iowa City 6/5/2019 7/19/2019 $ 150,480 $ - $ 150,480 Remove Obstructions [Hazard] IA Iowa City Iowa City Municipal IOW 3-19-0047-026-2019 City of Iowa City 7/29/2019 8/15/2019 $ 87,731 $ - $ 87,731 Rehabilitate Runway - 07/25

IA Knoxville Knoxville Municipal OXV 3-19-0051-016-2019 Knoxville Airport Commission 9/20/2019 9/23/2019 $ 2,308,087 $ 1,282,694 $ 3,590,781 Reconstruct Runway - 15/33, Reconstruct Runway Lighting - 15/33

IA Lamoni Lamoni Municipal LWD 3-19-0122-012-2019 City of Lamoni, Iowa 7/29/2019 8/6/2019 $ 331,252 $ - $ 331,252 Extend Runway - 18/36

IA Leighton New Regional Airport +09K 3-19-0136-002-2019 South Central Regional Airport Agency 9/20/2019 9/24/2019 $ 150,000 $ 1,009,761 $ 1,159,761 Construct New Airport IA Manchester Manchester Municipal C27 3-19-0137-002-2019 City of Manchester 6/5/2019 7/22/2019 $ 173,612 $ - $ 173,612 Rehabilitate Runway - 18/36

IA Maquoketa Maquoketa Municipal OQW 3-19-0055-010-2019 City of Maquoketa 6/5/2019 7/15/2019 $ 516,757 $ - $ 516,757 Reconstruct Runway Lighting - 15/33

IA Marshalltown Marshalltown Municipal MIW 3-19-0058-016-2019 City of Marshalltown 6/5/2019 7/24/2019 $ 55,800 $ - $ 55,800 Construct Building

IA Mason City Mason City Municipal MCW 3-19-0059-044-2019 Mason City Airport Commission 6/5/2019 7/1/2019 $ 300,000 $ - $ 300,000 Acquire Snow Removal Equipment IA Mount Pleasant Mount Pleasant Municipal MPZ 3-19-0062-016-2019 City of Mount Pleasant 9/20/2019 9/24/2019 $ 600,000 $ 3,525,724 $ 4,125,724 Reconstruct Runway - 15/33

IA Newton Newton Municipal-Earl Johnson Field TNU 3-19-0065-016-2019 City of Newton 6/5/2019 8/7/2019 $ 549,000 $ - $ 549,000 Expand Apron

IA Osceola Osceola Municipal I75 3-19-0108-014-2019 City of Osceola 7/29/2019 8/21/2019 $ 309,586 $ - $ 309,586 Construct Taxiway

IA Oskaloosa Oskaloosa Municipal OOA 3-19-0072-012-2019 City of Oskaloosa 6/5/2019 7/2/2019 $ 354,132 $ - $ 354,132 Rehabilitate Runway - 04/22

IA Perry Perry Municipal PRO 3-19-0075-010-2019 City of Perry, Iowa 7/9/2019 8/6/2019 $ 978,583 $ - $ 978,583 Reconstruct Runway - 14/32

IA Red Oak Red Oak Municipal RDK 3-19-0077-016-2019 City of Red Oak 6/5/2019 7/1/2019 $ 220,348 $ - $ 220,348 Rehabilitate Runway - 05/23

IA Shenandoah Shenandoah Municipal SDA 3-19-0082-014-2019 City of Shenandoah 6/5/2019 8/19/2019 $ 503,943 $ - $ 503,943 Rehabilitate Runway - 04/22, Rehabilitate Runway - 12/30

IA Sioux City Sioux Gateway/Brig Gen Bud Day Field SUX 3-19-0085-056-2019 City of Sioux City 9/20/2019 9/23/2019 $ 1,000,000 $ 2,496,949 $ 3,496,949 Reconstruct Taxiway

IA Spencer Spencer Municipal SPW 3-19-0086-025-2019 City of Spencer 6/5/2019 8/8/2019 $ 295,150 $ - $ 295,150 Update Airport Master Plan Study

IA Vinton Vinton Veterans Memorial Airpark VTI 3-19-0092-012-2019 City of Vinton 6/5/2019 6/25/2019 $ 324,000 $ - $ 324,000 Acquire Snow Removal Equipment

9/30/2019 Page 11 of 40 FAA AIP Grant Detail Report

Page 12: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

IA Washington Washington Municipal AWG 3-19-0093-011-2019 City of Washington 6/5/2019 7/5/2019 $ 444,733 $ - $ 444,733 Expand Apron

IA Waverly Waverly Municipal C25 3-19-0096-010-2019 City of Waverly 6/24/2019 7/15/2019 $ 186,887 $ 1,170,143 $ 1,357,030 Extend Runway - 11/29

IA Waverly Waverly Municipal C25 3-19-0096-011-2019 City of Waverly 6/24/2019 7/15/2019 $ - $ 361,912 $ 361,912 Extend Runway - 11/29

IA Winterset Winterset Municipal 3Y3 3-19-0098-011-2019 Winterset-Madison County Airport Authority 6/5/2019 8/13/2019 $ 518,040 $ - $ 518,040 Remove Obstructions

IA Winterset Winterset Municipal 3Y3 3-19-0098-012-2019 Winterset-Madison County Airport Authority 6/5/2019 6/26/2019 $ 184,500 $ - $ 184,500 Conduct Environmental Study

ID Arbon Valley Pocatello Regional PIH 3-16-0028-043-2019 City of Pocatello 6/24/2019 7/26/2019 $ 1,017,955 $ 2,886,643 $ 3,904,598 Install Airport Beacons, Rehabilitate Apron, Rehabilitate Runway Lighting - 03/21, Rehabilitate Taxiway, Rehabilitate Taxiway

ID Blackfoot McCarley Field U02 3-16-0002-017-2019 City of Blackfoot 9/20/2019 9/24/2019 $ 270,000 $ - $ 270,000 Acquire Land For Approaches

ID Boise Boise Air Terminal/Gowen Field BOI 3-16-0003-070-2019 City of Boise 7/9/2019 7/25/2019 $ 5,358,454 $ - $ 5,358,454 Construct Taxiway, Expand Apron, Rehabilitate Apron

ID Boise State of Idaho *IDS 3-16-0000-014-2019 Idaho State Division of Aeronautics 7/9/2019 8/23/2019 $ 415,000 $ - $ 415,000 Update State System Plan Study

ID Bonners Ferry Boundary County 65S 3-16-0004-016-2019 County of Boundary 6/24/2019 8/5/2019 $ 354,455 $ - $ 354,455 Acquire Snow Removal Equipment, Conduct Environmental Study, Construct Snow Removal Equipment Building

ID Buhl Buhl Municipal U03 3-16-0005-014-2019 City of Buhl 6/5/2019 6/6/2019 $ 100,566 $ - $ 100,566 Construct Taxiway [Taxiway D], Rehabilitate Taxiway [Taxiway C] ID Caldwell Caldwell Industrial EUL 3-16-0045-031-2019 City of Caldwell 9/20/2019 9/24/2019 $ 630,000 $ - $ 630,000 Update Airport Master Plan Study

ID Driggs Driggs-Reed Memorial DIJ 3-16-0012-019-2019 City of Driggs 6/24/2019 8/2/2019 $ 213,662 $ - $ 213,662 Install Perimeter Fencing not Required by 49 CFR 1542

ID Driggs Driggs-Reed Memorial DIJ 3-16-0012-020-2019 City of Driggs 9/20/2019 9/23/2019 $ 282,924 $ 433,819 $ 716,743 Acquire Land for Development ID Gooding Gooding Municipal GNG 3-16-0014-013-2019 City of Gooding 6/5/2019 8/5/2019 $ 1,478,312 $ - $ 1,478,312 Extend Runway - 07/25, Extend Runway - 07/25, Extend Taxiway

ID Hailey Friedman Memorial SUN 3-16-0016-047-2019 City of Hailey and County of Blaine 6/24/2019 7/23/2019 $ 1,259,144 $ - $ 1,259,144 Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow Removal Equipment, Remove Obstructions [Hazard]

ID Hailey Friedman Memorial SUN 3-16-0016-048-2019 City of Hailey and County of Blaine 9/20/2019 9/23/2019 $ - $ 2,335,000 $ 2,335,000 Acquire Land For Approaches

ID Hayden Lake Coeur D'Alene - Pappy Boyington Field COE 3-16-0010-047-2019 County of Kootenai 7/9/2019 8/6/2019 $ 227,214 $ - $ 227,214 Construct Taxiway

ID Idaho Falls Idaho Falls Regional IDA 3-16-0018-045-2019 City of Idaho Falls 9/20/2019 9/24/2019 $ 1,637,945 $ - $ 1,637,945 Acquire Snow Removal Equipment, Modify Terminal Building

ID Idaho Falls Idaho Falls Regional IDA 3-16-0018-046-2019 City of Idaho Falls 9/20/2019 9/24/2019 $ - $ 1,938,822 $ 1,938,822 Construct Taxiway, Reconstruct Runway - 17/35

ID Lewiston Lewiston-Nez Perce County LWS 3-16-0022-043-2019 Lewiston-Nez Perce County Regional Airport Authority 7/29/2019 8/13/2019 $ 1,057,982 $ 6,150,944 $ 7,208,926

Construct Taxiway, Improve Airport Drainage, Install Airfield Guidance Signs, Install Runway Lighting - 12/30, Install Runway Vertical/Visual Guidance System - 12/30, Reconstruct Runway - 12/30, Reconstruct Taxiway

ID McCall McCall Municipal MYL 3-16-0023-026-2019 City of McCall 7/9/2019 7/25/2019 $ 60,300 $ - $ 60,300 Conduct Miscellaneous Study

ID Mountain Home Mountain Home Municipal U76 3-16-0025-017-2019 City of Mountain Home 6/5/2019 7/29/2019 $ 193,130 $ - $ 193,130 Install Runway Vertical/Visual Guidance System - 10/28

ID Nampa Nampa Municipal MAN 3-16-0043-031-2019 City of Nampa 6/5/2019 7/15/2019 $ 646,850 $ - $ 646,850 Construct Taxiway

ID Orofino Orofino Municipal S68 3-16-0026-008-2019 City of Orofino 7/9/2019 7/23/2019 $ 164,584 $ - $ 164,584 Rehabilitate Runway - 09/27

ID Preston Preston U10 3-16-0030-005-2019 City of Preston & County of Franklin 9/20/2019 9/24/2019 $ 300,000 $ - $ 300,000 Construct Taxiway, Extend Runway - 03/21, Install Runway Lighting - 03/21, Reconstruct Runway - 03/21

ID Priest River Priest River Municipal 1S6 3-16-0058-008-2019 County of Bonner 9/20/2019 9/23/2019 $ 394,829 $ - $ 394,829 Acquire Easement For Approaches, Remove Obstructions [Non-Hazard]

ID Saint Maries St Maries Municipal S72 3-16-0035-011-2019 County of Benewah 6/5/2019 7/8/2019 $ 337,985 $ - $ 337,985 Install Miscellaneous NAVAIDS, Install Perimeter Fencing not Required by 49 CFR 1542

ID Sandpoint Sandpoint SZT 3-16-0033-017-2019 County of Bonner 9/20/2019 9/23/2019 $ 731,378 $ - $ 731,378 Acquire Easement For Approaches, Acquire Land For Approaches, Acquire Land for Development

ID Twin Falls Joslin Field - Magic Valley Regional TWF 3-16-0036-042-2019 County and City of Twin Falls 9/20/2019 9/23/2019 $ 748,525 $ - $ 748,525 Extend Taxiway

ID Weiser Weiser Municipal S87 3-16-0037-015-2019 City of Weiser 6/5/2019 6/18/2019 $ 83,880 $ - $ 83,880 Install Airfield Guidance Signs, Install Runway Vertical/Visual Guidance System - 12/30, Rehabilitate Runway Lighting - 12/30

IL Belleville Scott AFB/Midamerica BLV 3-17-0146-035-2019 County of St. Clair 9/20/2019 9/25/2019 $ 2,218,884 $ - $ 2,218,884 Expand Terminal Building

IL Chicago Chicago Midway International MDW 3-17-0025-096-2019 City of Chicago 6/24/2019 9/16/2019 $ - $ 276,900 $ 276,900 Conduct Noise Compatibility Plan Study

IL Chicago Chicago O'Hare International ORD 3-17-0022-170-2019 City of Chicago 6/24/2019 7/15/2019 $ - $ 20,000,000 $ 20,000,000 Construct Runway [Letter of Intent] - 10C/28C

IL Chicago Chicago O'Hare International ORD 3-17-0022-171-2019 City of Chicago 6/24/2019 7/15/2019 $ - $ 45,000,000 $ 45,000,000 Construct Runway [Letter of Intent] - Plan-2

IL Chicago Chicago O'Hare International ORD 3-17-0022-172-2019 City of Chicago 9/20/2019 9/25/2019 $ 13,476,080 $ - $ 13,476,080 Construct Taxiway

IL Decatur Decatur DEC 3-17-0033-040-2019 Decatur Park District 7/29/2019 9/25/2019 $ 600,000 $ 1,731,338 $ 2,331,338 Rehabilitate Runway - 06/24

IL Marion Veterans Airport of Southern Illinois MWA 3-17-0065-036-2019 Williamson County Airport Authority 7/29/2019 8/21/2019 $ 673,000 $ - $ 673,000 Construct Terminal Building

IL Moline Quad City International MLI 3-17-0068-089-2019 Metropolitan Airport Authority of Rock Island County 7/29/2019 9/5/2019 $ 2,526,888 $ 2,908,552 $ 5,435,440 Improve Airport Drainage

IL Peoria General Downing - Peoria International PIA 3-17-0080-066-2019 Greater Peoria Airport Authority 9/20/2019 9/25/2019 $ 1,487,607 $ - $ 1,487,607 Expand Apron, Strengthen Apron

IL Quincy Quincy Regional-Baldwin Field UIN 3-17-0085-040-2019 City of Quincy 9/20/2019 9/25/2019 $ 1,028,336 $ - $ 1,028,336 Acquire Aircraft Rescue & Fire Fighting Vehicle, Reconstruct Runway - 04/22

IL Rockford Chicago/Rockford International RFD 3-17-0088-083-2019 Greater Rockford Airport Authority 7/9/2019 8/28/2019 $ 2,296,026 $ 6,292,934 $ 8,588,960 Rehabilitate Runway - 07/25, Rehabilitate Taxiway

9/30/2019 Page 12 of 40 FAA AIP Grant Detail Report

Page 13: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

IL Savoy University of Illinois-Willard CMI 3-17-0016-034-2019 Board of Trustees University of Illinois 9/20/2019 9/25/2019 $ 1,219,746 $ - $ 1,219,746 Rehabilitate Taxiway Lighting [Taxiway A and C], Rehabilitate Taxiway Lighting [Taxiway B and D]

IL Springfield Abraham Lincoln Capital SPI 3-17-0096-073-2019 Springfield Airport Authority 6/5/2019 9/25/2019 $ 1,390,744 $ 2,674,739 $ 4,065,483 Install Perimeter Fencing not Required by 49 CFR 1542, Rehabilitate Runway - 04/22

IL Springfield Illinois State Block Grant Program *ILB 3-17-SBGP-156-2019 State of Illinois 9/20/2019 9/25/2019 $ 15,788,753 $ - $ 15,788,753 Non primary development projects in state block grant program

IL Springfield Illinois State Block Grant Program *ILB 3-17-SBGP-157-2019 State of Illinois 6/5/2019 9/25/2019 $ - $ 1,865,841 $ 1,865,841 Non primary development projects in state block grant program

IL Springfield Illinois State Block Grant Program *ILB 3-17-SBGP-158-2019 State of Illinois 6/5/2019 9/25/2019 $ - $ 2,598,958 $ 2,598,958 Non primary development projects in state block grant program

IL Springfield Illinois State Block Grant Program *ILB 3-17-SBGP-159-2019 State of Illinois 6/5/2019 9/25/2019 $ - $ 2,174,257 $ 2,174,257 Non primary development projects in state block grant program

IL Springfield Illinois State Block Grant Program *ILB 3-17-SBGP-160-2019 State of Illinois 7/9/2019 9/25/2019 $ - $ 1,960,373 $ 1,960,373 Non primary development projects in state block grant program

IL Springfield Illinois State Block Grant Program *ILB 3-17-SBGP-161-2019 State of Illinois 9/20/2019 9/25/2019 $ - $ 717,642 $ 717,642 Non primary development projects in state block grant program

IL Springfield State of Illinois *ILS 3-17-0000-010-2019 State of Illinois 6/5/2019 9/12/2019 $ - $ 500,000 $ 500,000 Update State System Plan Study

IN Anderson Anderson Municipal-Darlington Field AID 3-18-0001-033-2019 City of Anderson 9/20/2019 9/25/2019 $ 89,550 $ - $ 89,550 Update Airport Master Plan Study

IN Angola Tri-State Steuben County ANQ 3-18-0002-019-2019 County of Steuben 9/20/2019 9/25/2019 $ 296,000 $ - $ 296,000 Remove Obstructions [Non-Hazard] IN Auburn De Kalb County GWB 3-18-0004-026-2019 DeKalb County Airport Authority 6/24/2019 7/19/2019 $ 518,220 $ - $ 518,220 Extend Runway - 09/27

IN Bloomington Monroe County BMG 3-18-0006-035-2019 County of Monroe 7/29/2019 8/12/2019 $ 344,680 $ 771,320 $ 1,116,000 Rehabilitate Taxiway

IN Columbus Columbus Municipal BAK 3-18-0012-031-2019 Columbus Board of Aviation Commissions 7/29/2019 8/30/2019 $ 360,000 $ - $ 360,000 Update Airport Master Plan Study [Multi-Year Funding] IN Connersville Mettel Field CEV 3-18-0013-026-2019 Connersville Board of Aviation Commissioners 7/29/2019 8/12/2019 $ 150,000 $ 832,300 $ 982,300 Rehabilitate Runway - 18/36

IN Crawfordsville Crawfordsville Regional CFJ 3-18-0015-018-2019 Crawfordsville Board of Aviation Commissioners 7/9/2019 7/22/2019 $ 150,000 $ - $ 150,000 Construct Terminal Building

IN Delphi Delphi Municipal 1I9 3-18-0117-016-2019 Delphi Board of Aviation Commissioners 7/29/2019 8/8/2019 $ 150,000 $ - $ 150,000 Construct Building [Multi-Year Funding] IN Elkhart Elkhart Municipal EKM 3-18-0018-032-2019 Elkhart Board of Aviation Commissioners 7/9/2019 8/16/2019 $ 150,000 $ 1,431,414 $ 1,581,414 Install Perimeter Fencing not Required by 49 CFR 1542

IN Evansville Evansville Regional EVV 3-18-0020-063-2019 Evansville-Vanderburgh Airport Authority 9/20/2019 9/23/2019 $ 1,980,480 $ - $ 1,980,480 Improve Terminal Building, Rehabilitate Taxiway

IN Fishers Indianapolis Metropolitan UMP 3-18-0040-026-2019 Indianapolis Airport Authority 7/29/2019 8/30/2019 $ 300,000 $ - $ 300,000 Install Perimeter Fencing not Required by 49 CFR 1542 [Multi-Year Funding] IN Fort Wayne Fort Wayne International FWA 3-18-0022-071-2019 Fort Wayne-Allen County Airport Authority 9/20/2019 9/23/2019 $ 2,779,650 $ - $ 2,779,650 Reconstruct Apron

IN Gary Gary/Chicago International GYY 3-18-0028-039-2019 Gary/Chicago Airport Authority 9/20/2019 9/25/2019 $ 150,000 $ 437,628 $ 587,628 Rehabilitate Taxiway

IN Goshen Goshen Municipal GSH 3-18-0029-019-2019 Goshen Board of Aviation Commissioners 7/29/2019 8/21/2019 $ 540,000 $ - $ 540,000 Rehabilitate Taxiway [Multi-Year Funding] IN Greencastle Putnam County Regional GPC 3-18-0030-019-2019 Putnam County Regional Airport Authority 7/29/2019 8/7/2019 $ 385,553 $ - $ 385,553 Install Perimeter Fencing not Required by 49 CFR 1542

IN Greenwood Indy South Greenwood HFY 3-18-0097-032-2019 Greenwood Board of Aviation Commissioners 9/20/2019 9/24/2019 $ 118,513 $ - $ 118,513 Conduct Environmental Study

IN Huntingburg Huntingburg HNB 3-18-0035-017-2019 Dubois County Airport Authority 9/20/2019 9/24/2019 $ 957,088 $ 5,970,000 $ 6,927,088 Extend Runway - 09/27

IN Indianapolis Eagle Creek Airpark EYE 3-18-0039-025-2019 Indianapolis Airport Authority 7/29/2019 8/30/2019 $ 150,000 $ - $ 150,000 Install Perimeter Fencing not Required by 49 CFR 1542

IN Indianapolis Indianapolis Downtown 8A4 3-18-0118-017-2019 Indianapolis Airport Authority 6/24/2019 8/23/2019 $ 77,966 $ - $ 77,966 Construct Fuel Farm

IN Indianapolis Indianapolis International IND 3-18-0038-159-2019 Indianapolis Airport Authority 7/9/2019 8/23/2019 $ 464,427 $ - $ 464,427 Rehabilitate Taxiway Lighting [Taxiway G], Rehabilitate Taxiway Lighting [Taxiway N] IN Indianapolis Indianapolis International IND 3-18-0038-160-2019 Indianapolis Airport Authority 7/29/2019 8/23/2019 $ 934,779 $ - $ 934,779 Security Enhancements

IN Indianapolis Indianapolis International IND 3-18-0038-161-2019 Indianapolis Airport Authority 7/29/2019 8/23/2019 $ 1,082,685 $ - $ 1,082,685 Rehabilitate Taxiway

IN Indianapolis Indianapolis International IND 3-18-0038-162-2019 Indianapolis Airport Authority 7/29/2019 8/23/2019 $ 2,725,894 $ - $ 2,725,894 Rehabilitate Apron

IN Indianapolis Indianapolis International IND 3-18-0038-163-2019 Indianapolis Airport Authority 9/20/2019 9/24/2019 $ - $ 300,000 $ 300,000 Conduct Miscellaneous Study

IN Indianapolis Indianapolis International IND 3-18-0038-164-2019 Indianapolis Airport Authority 9/20/2019 9/24/2019 $ 91,219 $ 2,000,000 $ 2,091,219 Construct Taxiway

IN Indianapolis Indianapolis International IND 3-18-0038-165-2019 Indianapolis Airport Authority 9/27/2019 $ - $ 9,654,846 $ 9,654,846 Construct Snow Removal Equipment Building

IN Indianapolis State of Indiana *INS 3-18-0000-017-2019 Indiana State Department of Transportation 7/9/2019 8/21/2019 $ 697,536 $ - $ 697,536 Update State System Plan Study

IN Jeffersonville Clark Regional JVY 3-18-0041-032-2019 South Central Regional Airport Authority 6/5/2019 8/28/2019 $ 150,000 $ 379,759 $ 529,759 Extend Runway - 18/36

IN Kendallville Kendallville Municipal C62 3-18-0042-022-2019 Kendallville Board of Aviation Commissioners 7/9/2019 8/26/2019 $ 150,000 $ - $ 150,000 Construct Building

IN Knox Starke County OXI 3-18-0043-016-2019 Starke County Airport Authority 6/24/2019 7/16/2019 $ 150,000 $ 426,288 $ 576,288 Extend Runway - 18/36

IN Kokomo Kokomo Municipal OKK 3-18-0044-028-2019 Kokomo Board of Aviation Commissioners 9/20/2019 9/24/2019 $ 83,700 $ - $ 83,700 Rehabilitate Runway - 14/32

IN La Porte La Porte Municipal PPO 3-18-0047-026-2019 La Porte Municipal Airport Authority 7/29/2019 8/21/2019 $ 200,100 $ 686,400 $ 886,500 Rehabilitate Apron, Rehabilitate Taxiway

IN Logansport Logansport/Cass County GGP 3-18-0051-024-2019 Logansport-Cass County Airport Authority 7/29/2019 8/22/2019 $ 150,000 $ 404,041 $ 554,041 Install Runway Lighting - 09/27, Rehabilitate Runway Lighting - 09/27

IN Madison Madison Municipal IMS 3-18-0052-023-2019 Madison Board of Aviation Commissioners 6/24/2019 8/12/2019 $ 246,900 $ 1,012,889 $ 1,259,789 Install Perimeter Fencing [Fence], Install Perimeter Fencing [Land] IN Marion Marion Municipal MZZ 3-18-0053-028-2019 Marion Board of Aviation Commissioners 7/9/2019 7/15/2019 $ 750,000 $ - $ 750,000 Construct Taxiway

IN McCordsville Indianapolis Regional MQJ 3-18-0037-020-2019 Indianapolis Airport Authority 7/29/2019 9/9/2019 $ 150,000 $ 210,000 $ 360,000 Update Airport Master Plan Study

IN Monticello White County MCX 3-18-0057-019-2019 White County Board of Aviation Commissioners 9/20/2019 9/24/2019 $ 211,320 $ - $ 211,320 Extend Runway - 18/36

IN North Vernon North Vernon OVO 3-18-0063-022-2019 City of North Vernon 7/9/2019 8/19/2019 $ 144,090 $ - $ 144,090 Construct Taxiway

IN Paoli Paoli Municipal I42 3-18-0064-016-2019 City of Paoli 6/5/2019 6/27/2019 $ 150,000 $ 2,771,400 $ 2,921,400 Extend Runway - 02/20

IN Peru Peru Municipal I76 3-18-0066-022-2019 Peru Board of Aviation Commissioners 6/24/2019 8/6/2019 $ 35,550 $ - $ 35,550 Rehabilitate Runway Lighting - 01/19

9/30/2019 Page 13 of 40 FAA AIP Grant Detail Report

Page 14: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

IN Rensselaer Jasper County RZL 3-18-0070-012-2019 Jasper County Board of Aviation Commissioners 9/20/2019 9/23/2019 $ 454,360 $ - $ 454,360 Acquire Land For Approaches [Multi-Year Funding] IN Salem Salem Municipal I83 3-18-0075-020-2019 Salem Board of Aviation Commissioners 6/24/2019 8/6/2019 $ 150,000 $ - $ 150,000 Construct Runway [Design] - Plan-1, Construct Runway [Land] - Plan-1

IN Seymour Freeman Municipal SER 3-18-0076-018-2019 Seymour Municipal Airport Authority 7/29/2019 8/14/2019 $ 311,441 $ 144,276 $ 455,717 Rehabilitate Taxiway

IN Shelbyville Shelbyville Municipal GEZ 3-18-0077-027-2019 City of Shelbyville 7/9/2019 8/16/2019 $ 469,500 $ 1,000,000 $ 1,469,500 Rehabilitate Runway - 01/19

IN South Bend South Bend International SBN 3-18-0079-053-2019 St Joseph County Airport Authority 9/20/2019 9/24/2019 $ 2,870,269 $ - $ 2,870,269 Conduct Airport Master Plan Study, Reconstruct Taxiway

IN Tell City Perry County Municipal TEL 3-18-0081-013-2019 Perry County Airport Authority 7/29/2019 8/14/2019 $ 71,820 $ - $ 71,820 Rehabilitate Runway Lighting - 13/31

IN Terre Haute Terre Haute Regional HUF 3-18-0082-047-2019 Terre Haute International Airport Authority 9/20/2019 9/24/2019 $ 705,000 $ - $ 705,000 Construct Taxiway [Multi-Year Funding]

IN Winamac Arens Field RWN 3-18-0087-011-2019 Winamac-Pulaski County Board of Aviation Commissioners 7/29/2019 9/4/2019 $ 63,000 $ - $ 63,000 Rehabilitate Runway Lighting - 09/27

IN Zionsville Indianapolis Executive TYQ 3-18-0103-030-2019 Hamilton County Airport Authority 9/20/2019 9/23/2019 $ 150,060 $ 1,303,440 $ 1,453,500 Extend Runway - 18/36

KS Atwood Atwood-Rawlins County City-County ADT 3-20-0005-014-2019 City of Atwood & County of Rawlins 6/5/2019 7/31/2019 $ 243,000 $ - $ 243,000 Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate Taxiway

KS Burlington Coffey County UKL 3-20-0510-013-2019 Coffey County Airport Authority 7/29/2019 8/9/2019 $ 877,756 $ 2,788,844 $ 3,666,600 Reconstruct Runway - 18/36, Reconstruct Runway Lighting - 18/36

KS Chanute Chanute Martin Johnson CNU 3-20-0009-014-2019 City of Chanute 6/5/2019 8/12/2019 $ 411,300 $ - $ 411,300 Reconstruct Taxiway

KS Clay Center Clay Center Municipal CYW 3-20-0010-013-2019 City of Clay Center 6/5/2019 8/8/2019 $ 275,012 $ - $ 275,012 Rehabilitate Apron, Rehabilitate Taxiway

KS Colby Shalz Field CBK 3-20-0012-019-2019 City of Colby 6/5/2019 8/6/2019 $ 3,443,670 $ - $ 3,443,670 Reconstruct Runway Lighting - 17/35, Rehabilitate Runway - 17/35

KS El Dorado El Dorado/Captain Jack Thomas Memorial EQA 3-20-0018-012-2019 City of El Dorado 6/5/2019 7/29/2019 $ 324,900 $ - $ 324,900 Rehabilitate Runway - 04/22

KS Ellsworth Ellsworth Municipal 9K7 3-20-0117-012-2019 City of Ellsworth 6/5/2019 7/29/2019 $ 335,711 $ - $ 335,711 Reconstruct Taxiway

KS Emporia Emporia Municipal EMP 3-20-0020-012-2019 City of Emporia 6/5/2019 8/21/2019 $ 492,329 $ - $ 492,329 Acquire Land For Approaches

KS Eureka Lt William M Milliken 13K 3-20-0021-005-2019 City of Eureka 6/5/2019 8/12/2019 $ 204,300 $ - $ 204,300 Conduct Airport Master Plan Study

KS Fort Scott Fort Scott Municipal FSK 3-20-0022-018-2019 City of Fort Scott 6/5/2019 8/6/2019 $ 360,000 $ - $ 360,000 Improve Airport Miscellaneous Improvements

KS Garden City Garden City Regional GCK 3-20-0024-042-2019 City of Garden City 6/5/2019 8/6/2019 $ 110,423 $ - $ 110,423 Reconstruct Airport Beacon

KS Hays Hays Regional HYS 3-20-0028-037-2019 City of Hays 6/5/2019 7/3/2019 $ 261,989 $ - $ 261,989 Acquire Snow Removal Equipment KS Hugoton Hugoton Municipal HQG 3-20-0034-012-2019 County of Stevens 6/5/2019 8/12/2019 $ 206,677 $ - $ 206,677 Update Airport Master Plan Study

KS Junction City Freeman Field 3JC 3-20-0039-013-2019 City of Junction City 6/5/2019 7/2/2019 $ 89,181 $ - $ 89,181 Conduct Environmental Study

KS Larned Larned-Pawnee County LQR 3-20-0046-016-2019 City of Larned and County of Pawnee 6/24/2019 8/5/2019 $ 328,230 $ - $ 328,230 Rehabilitate Building

KS Liberal Liberal Mid-America Regional LBL 3-20-0050-025-2019 City of Liberal 7/9/2019 7/30/2019 $ 1,406,285 $ - $ 1,406,285 Install Perimeter Fencing not Required by 49 CFR 1542

KS Norton Norton Municipal NRN 3-20-0091-008-2019 Norton City/County Airport 6/5/2019 6/27/2019 $ 665,610 $ - $ 665,610 Rehabilitate Runway - 16/34

KS Oberlin Oberlin Municipal OIN 3-20-0061-011-2019 City of Oberlin 6/5/2019 7/23/2019 $ 796,664 $ - $ 796,664 Construct Taxiway, Expand Apron

KS Paola Miami County K81 3-20-0063-019-2019 County of Miami 6/5/2019 7/11/2019 $ 947,700 $ - $ 947,700 Construct Taxiway

KS Pratt Pratt Regional PTT 3-20-0070-019-2019 Pratt Airport Authority 6/5/2019 6/26/2019 $ 495,585 $ - $ 495,585 Rehabilitate Runway - 17/35, Rehabilitate Taxiway

KS Salina Salina Regional SLN 3-20-0072-040-2019 Salina Airport Authority 6/5/2019 8/7/2019 $ 196,189 $ - $ 196,189 Conduct Airport Master Plan Study

KS Scott City Scott City Municipal TQK 3-20-0073-017-2019 City of Scott City 6/5/2019 9/3/2019 $ 177,975 $ - $ 177,975 Update Airport Master Plan Study

KS Smith Center Smith Center Municipal K82 3-20-0076-016-2019 City of Smith Center 6/5/2019 7/22/2019 $ 508,050 $ - $ 508,050 Construct Taxiway, Install Airfield Guidance Signs

KS Stockton (Township of) Rooks County Regional RCP 3-20-0100-009-2019 Rooks County Airport Commission 6/5/2019 7/30/2019 $ 344,700 $ - $ 344,700 Construct Snow Removal Equipment Building

KS Topeka Philip Billard Municipal TOP 3-20-0082-021-2019 Metropolitan Topeka Airport Authority 7/29/2019 8/13/2019 $ 300,000 $ 2,711,185 $ 3,011,185 Reconstruct Taxiway, Reconstruct Taxiway Lighting

KS Wichita Wichita Dwight D Eisenhower National ICT 3-20-0088-078-2019 Wichita Airport Authority 6/5/2019 9/16/2019 $ 4,319,388 $ 8,537,838 $ 12,857,226

Reconstruct Runway Lighting - 01L/19R, Reconstruct Runway Lighting - 01R/19L, Rehabilitate Runway - 01L/19R, Rehabilitate Runway - 01R/19L

KY Bowling Green Bowling Green-Warren County Regional BWG 3-21-0006-030-2019 Bowling Green-Warren County Airport Board 7/29/2019 9/9/2019 $ 150,000 $ 7,461,704 $ 7,611,704 Rehabilitate Taxiway

KY Cadiz Lake Barkley State Park 1M9 3-21-0086-005-2019 State of Kentucky 9/20/2019 9/23/2019 $ 155,998 $ - $ 155,998 Improve Runway Safety Area - 02/20

KY Campbellsville Taylor County AAS 3-21-0008-020-2019 Taylor County Airport Board 7/9/2019 9/6/2019 $ 260,000 $ - $ 260,000 Acquire Land for Development, Construct Taxiway

KY Cynthiana Cynthiana-Harrison County 0I8 3-21-0011-016-2019 Cynthiana-Harrison Airport Board 6/24/2019 8/6/2019 $ 50,000 $ - $ 50,000 Remove Obstructions [Non-Hazard] KY Debord Big Sandy Regional SJS 3-21-0072-019-2019 Big Sandy Regional Airport Board 6/24/2019 8/23/2019 $ 65,700 $ - $ 65,700 Conduct Environmental Study

KY Elizabethtown Addington Field EKX 3-21-0074-022-2019 Elizabethtown Airport Board 6/24/2019 7/24/2019 $ 110,000 $ - $ 110,000 Install Runway Vertical/Visual Guidance System - 05/23

KY Falls of Rough Rough River State Park 2I3 3-21-0090-003-2019 State of Kentucky 9/20/2019 9/23/2019 $ 150,000 $ - $ 150,000 Rehabilitate Apron

KY Falmouth Gene Snyder K62 3-21-0064-017-2019 County of Falmouth-Pendleton 7/9/2019 8/13/2019 $ 90,000 $ - $ 90,000 Conduct Environmental Study

KY Fulton Fulton 1M7 3-21-0062-017-2019 Fulton Airport Board 9/20/2019 $ 339,787 $ - $ 339,787 Remove Obstructions

KY Greater Cincinnati International Airport

Cincinnati/Northern Kentucky International CVG 3-21-0010-091-2019 County of Kenton and Kenton County Airport Board 9/20/2019 9/24/2019 $ 5,538,862 $ - $ 5,538,862 Rehabilitate Taxiway [Taxiway N], Rehabilitate Taxiway [Taxiway S]

KY Greenville Muhlenberg County M21 3-21-0020-019-2019 County of Muhlenberg 7/9/2019 7/25/2019 $ 221,000 $ - $ 221,000 Improve Airport Drainage, Remove Obstructions

KY Harlan Tucker-Guthrie Memorial I35 3-21-0022-018-2019 County of Harlan 6/24/2019 8/15/2019 $ 216,725 $ - $ 216,725 Update Airport Master Plan Study

9/30/2019 Page 14 of 40 FAA AIP Grant Detail Report

Page 15: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

KY Hartford Ohio County JQD 3-21-0063-018-2019 County of Ohio 6/24/2019 8/13/2019 $ 268,412 $ - $ 268,412 Rehabilitate Runway Lighting - 03/21, Rehabilitate Taxiway Lighting, Update Airport Master Plan Study

KY Hazard Wendell H Ford CPF 3-21-0024-021-2019 Hazard-Perry County Airport Board 6/24/2019 8/12/2019 $ 184,423 $ - $ 184,423 Update Airport Master Plan Study

KY Henderson Henderson City-County EHR 3-21-0025-031-2019 Henderson City-County Airport Board 7/29/2019 8/27/2019 $ 683,596 $ - $ 683,596 Extend Runway - 09/27

KY Lewisport Hancock Co-Ron Lewis Field KY8 3-21-0023-014-2019 Hancock County Airport Board 6/24/2019 8/12/2019 $ 2,257,512 $ - $ 2,257,512 Extend Runway - 05/23, Rehabilitate Runway Lighting, Rehabilitate Taxiway Lighting

KY Lexington Blue Grass LEX 3-21-0028-074-2019 Lexington-Fayette Urban County Airport Board 6/5/2019 6/20/2019 $ 3,596,616 $ 7,498,584 $ 11,095,200 Construct Taxiway

KY London London-Corbin Airport-Magee Field LOZ 3-21-0029-026-2019 London-Corbin Airport Board 9/20/2019 9/23/2019 $ 594,602 $ 2,659,332 $ 3,253,934 Rehabilitate Runway - 06/24

KY Louisville Bowman Field LOU 3-21-0032-027-2019 Louisville Regional Airport Authority 9/20/2019 9/24/2019 $ 562,500 $ - $ 562,500 Install Airfield Guidance Signs

KY Louisville Louisville International-Standiford Field SDF 3-21-0031-107-2019 Louisville Regional Airport Authority 6/5/2019 9/24/2019 $ 1,215,000 $ - $ 1,215,000 Conduct Miscellaneous Study, Update Airport Master Plan Study

KY Louisville Louisville Muhammad Ali International SDF 3-21-0031-108-2019 Louisville Regional Airport Authority 9/20/2019 9/24/2019 $ - $ 2,925,000 $ 2,925,000

Acquire Land for Noise Compatibility within 65 - 69 DNL, Noise Mitigation Measures for Public Buildings, Noise Mitigation Measures for Residences within 65-69 DNL

KY Louisville Louisville Muhammad Ali International SDF 3-21-0031-109-2019 Louisville Regional Airport Authority 9/20/2019 9/24/2019 $ 12,101,036 $ - $ 12,101,036

Reconstruct Taxiway [Taxiway G], Rehabilitate Runway - 17R/35L, Rehabilitate Runway Lighting - 17L/35R, Rehabilitate Runway Lighting - 17R/35L, Rehabilitate Taxiway [Taxiway B], Rehabilitate Taxiway [Taxiway C]

KY Marion Marion-Crittenden County 5M9 3-21-0071-014-2019 Marion-Crittenden County Airport Board 6/24/2019 8/2/2019 $ 679,733 $ - $ 679,733 Construct Building

KY Morehead Morehead-Rowan County Clyde A Thomas Regional SYM 3-21-0087-009-2019 Morehead-Rowan County Airport Authority 6/24/2019 7/23/2019 $ 70,000 $ - $ 70,000 Rehabilitate Runway - 02/20

KY Mount Sterling Mount Sterling-Montgomery County IOB 3-21-0038-020-2019 City of Mount Sterling and County of Montgomery 6/24/2019 7/15/2019 $ 400,000 $ - $ 400,000 Construct Taxiway

KY Murray Kyle-Oakley Field CEY 3-21-0040-030-2019 Murray-Calloway County Airport Board 9/20/2019 9/24/2019 $ 359,500 $ - $ 359,500 Acquire Land For Approaches

KY Owensboro Owensboro-Daviess County Regional OWB 3-21-0042-054-2019 Owensboro-Daviess County Airport Board 9/20/2019 9/23/2019 $ 1,000,000 $ 890,000 $ 1,890,000

Rehabilitate Apron, Rehabilitate Runway - 06/24, Rehabilitate Runway - 18/36, Rehabilitate Taxiway

KY Paducah Barkley Regional PAH 3-21-0043-049-2019 Barkley Regional Airport Authority 7/29/2019 9/13/2019 $ 239,845 $ - $ 239,845 Acquire Aircraft Rescue & Fire Fighting Vehicle [AFFF Equipment], Rehabilitate Runway - 04/22, Rehabilitate Runway Lighting - 04/22

KY Paducah Barkley Regional PAH 3-21-0043-050-2019 Barkley Regional Airport Authority 9/20/2019 9/24/2019 $ 2,400,385 $ - $ 2,400,385 Construct Terminal Building

KY Russellville Russellville-Logan County 4M7 3-21-0047-020-2019 Russellville-Logan County Airport Board 7/29/2019 8/27/2019 $ 820,511 $ - $ 820,511 Construct Building

KY Somerset Lake Cumberland Regional SME 3-21-0048-024-2019 Somerset-Pulaski County Airport Board 9/20/2019 9/24/2019 $ 212,000 $ - $ 212,000 Acquire Snow Removal Equipment KY Sparta New 71 3-21-0009-004-2019 County of Gallatin, Kentucky 7/9/2019 8/15/2019 $ - $ 9,000,000 $ 9,000,000 Construct New Airport

KY Springfield Lebanon Springfield-George Hoerter Field 6I2 3-21-0049-018-2019 Marion-Washington County Airport Board 6/24/2019 7/26/2019 $ 140,000 $ - $ 140,000 Conduct Environmental Study

KY Williamsburg Williamsburg-Whitley County BYL 3-21-0077-019-2019 County of Williamsburg-Whitley 9/20/2019 9/25/2019 $ 63,869 $ - $ 63,869 Improve Airport Drainage

LA Bastrop Morehouse Memorial BQP 3-22-0004-016-2019 City of Bastrop 6/24/2019 7/31/2019 $ 72,000 $ - $ 72,000 Remove Obstructions to support RNAV Approach

LA Baton Rouge Baton Rouge Metropolitan, Ryan Field BTR 3-22-0006-113-2019 Parish of East Baton Rouge/City of Baton Rouge 7/29/2019 8/21/2019 $ 2,663,418 $ 4,500,000 $ 7,163,418 Improve Runway Safety Area - 13/31

LA DeQuincy DeQuincy Industrial Airpark 5R8 3-22-0014-019-2019 City of DeQuincy 6/24/2019 8/12/2019 $ 147,324 $ - $ 147,324 Reconstruct Perimeter Fencing not Required by 49 CFR 1542

LA DeRidder Beauregard Regional DRI 3-22-0015-018-2019 Beauregard Parish Airport District No. 1 6/5/2019 8/13/2019 $ 600,000 $ - $ 600,000 Rehabilitate Apron

LA DeRidder Beauregard Regional DRI 3-22-0015-019-2019 Beauregard Parish Airport District No. 1 9/27/2019 9/27/2019 $ 226,507 $ - $ 226,507 Rehabilitate Apron

LA Eunice Eunice 4R7 3-22-0016-014-2019 City of Eunice 6/5/2019 7/29/2019 $ 247,176 $ - $ 247,176 Rehabilitate Apron

LA Farmerville Union Parish F87 3-22-0017-015-2019 Union Parish Police Jury 7/9/2019 7/22/2019 $ 36,437 $ - $ 36,437 Remove Obstructions [Non-Hazard] LA Galliano South Lafourche Leonard Miller Jr GAO 3-22-0067-018-2019 Greater Lafourche Port Commission 6/5/2019 8/29/2019 $ 322,801 $ - $ 322,801 Improve Airport Drainage

LA Gonzales Louisiana Regional REG 3-22-0058-016-2019 Ascension-St. James Airport and Transportation Authority 9/20/2019 9/24/2019 $ 484,536 $ 691,838 $ 1,176,374 Rehabilitate Runway - 17/35

LA Homer Homer Municipal 5F4 3-22-0019-008-2019 City of Homer 7/29/2019 8/13/2019 $ 82,188 $ - $ 82,188 Improve Runway Safety Area - 12/30

LA Jena Jena 1R1 3-22-0059-008-2019 LaSalle Economic Development District 6/24/2019 8/22/2019 $ 72,000 $ - $ 72,000 Remove Obstructions [Non-Hazard]

LA Lafayette Lafayette Regional/Paul Fournet Field LFT 3-22-0025-053-2019 Lafayette Airport Commission 6/5/2019 9/12/2019 $ 1,908,471 $ 4,540,879 $ 6,449,350 Reconstruct Apron

LA Lafayette Lafayette Regional/Paul Fournet Field LFT 3-22-0025-054-2019 Lafayette Airport Commission 7/29/2019 9/12/2019 $ - $ 5,459,121 $ 5,459,121 Construct Terminal Building

LA Lake Charles Chennault International CWF 3-22-0086-018-2019 Chennault Industrial Airport Authority 7/9/2019 8/5/2019 $ 67,478 $ - $ 67,478 Reconstruct Taxiway

LA Lake Charles Chennault International CWF 3-22-0086-019-2019 Chennault Industrial Airport Authority 9/27/2019 $ 202,000 $ - $ 202,000 Reconstruct Taxiway

LA Leesville Leesville L39 3-22-0057-012-2019 City of Leesville 6/5/2019 7/22/2019 $ 51,863 $ - $ 51,863 Improve Runway Safety Area - 18/36

LA Leesville Leesville L39 3-22-0057-013-2019 City of Leesville 9/27/2019 $ 73,482 $ - $ 73,482 Construct Taxiway

LA Marksville Marksville Municipal MKV 3-22-0031-017-2019 Avoyelles Parish Airport Authority 6/24/2019 7/15/2019 $ 170,100 $ - $ 170,100 Update Airport Master Plan Study

9/30/2019 Page 15 of 40 FAA AIP Grant Detail Report

Page 16: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

LA Metairie Louis Armstrong New Orleans International MSY 3-22-0037-104-2019

City of New Orleans and New Orleans Aviation Board 7/9/2019 9/4/2019 $ 2,503,219 $ - $ 2,503,219 Expand Apron

LA Minden Minden MNE 3-22-0032-012-2019 City of Minden 6/5/2019 7/10/2019 $ 108,950 $ - $ 108,950 Rehabilitate Runway - 01/19

LA Monroe Monroe Regional MLU 3-22-0033-038-2019 City of Monroe 9/20/2019 9/23/2019 $ 1,318,444 $ 6,962,350 $ 8,280,794 Extend Runway - 14/32

LA Natchitoches Natchitoches Regional IER 3-22-0034-022-2019 City of Natchitoches 6/24/2019 7/23/2019 $ 101,401 $ - $ 101,401 Acquire Land For Approaches

LA New Orleans Lakefront NEW 3-22-0038-032-2019 Non-Flood Protection Asset Management Authority 6/5/2019 8/13/2019 $ 1,505,000 $ 5,055,000 $ 6,560,000 Rehabilitate Runway - 18R/36L

LA Oakdale Allen Parish ACP 3-22-0042-013-2019 Parish of Allen 6/5/2019 8/6/2019 $ 218,408 $ - $ 218,408 Update Airport Master Plan Study

LA Patterson Harry P Williams Memorial PTN 3-22-0044-018-2019 St. Mary's Parish Council 6/5/2019 9/9/2019 $ 423,180 $ - $ 423,180 Reconstruct Perimeter Fencing not Required by 49 CFR 1542

LA Pineville Esler Regional ESF 3-22-0002-028-2019 Rapides Parish Police Jury 7/29/2019 8/23/2019 $ 1,333,817 $ - $ 1,333,817 Rehabilitate Runway - 09/27

LA Reserve Port of South Louisiana Executive Regional APS 3-22-0064-018-2019 Port of South Louisiana 6/24/2019 9/9/2019 $ 1,049,919 $ - $ 1,049,919 Rehabilitate Runway - 17/35

LA Shreveport Shreveport Downtown DTN 3-22-0047-029-2019 Shreveport Airport Authority 9/20/2019 9/23/2019 $ 99,270 $ - $ 99,270 Rehabilitate Runway - 14/32

LA Shreveport Shreveport Regional SHV 3-22-0048-066-2019 Shreveport Airport Authority 9/27/2019 9/27/2019 $ 459,034 $ - $ 459,034 Security Enhancements

LA Shreveport Shreveport Regional SHV 3-22-0048-067-2019 Shreveport Airport Authority 9/27/2019 9/27/2019 $ 96,651 $ - $ 96,651 Rehabilitate Taxiway, Rehabilitate Taxiway

LA Sulphur Southland Field UXL 3-22-0080-020-2019 West Calcasieu Parish Airport 7/9/2019 8/6/2019 $ 132,885 $ - $ 132,885 Rehabilitate Apron, Rehabilitate Taxiway

LA Tallulah Vicksburg Tallulah Regional TVR 3-22-0084-017-2019 Vicksburg-Tallulah District Airport Board 6/24/2019 7/11/2019 $ 93,600 $ - $ 93,600 Construct Building, Construct Taxiway

LA Vidalia Concordia Parish 0R4 3-22-0061-014-2019 Concordia Parish Airport Authority 7/9/2019 9/9/2019 $ 374,874 $ - $ 374,874 Construct Taxiway

LA Vivian Vivian 3F4 3-22-0070-010-2019 Town of Vivian 9/20/2019 9/24/2019 $ 132,261 $ - $ 132,261 Remove Obstructions [Non-Hazard] LA Winnsboro Winnsboro Municipal F89 3-22-0053-012-2019 City of Winnsboro 6/24/2019 8/28/2019 $ 322,747 $ - $ 322,747 Reconstruct Apron, Rehabilitate Apron, Rehabilitate Taxiway

MA Bedford Laurence G Hanscom Field BED 3-25-0003-042-2019 Massachusetts Port Authority 6/5/2019 7/17/2019 $ 1,000,000 $ - $ 1,000,000 Rehabilitate Apron

MA Beverly Beverly Regional BVY 3-25-0006-038-2019 City of Beverly 6/24/2019 7/25/2019 $ 484,830 $ - $ 484,830 Update Airport Master Plan Study

MA Beverly Beverly Regional BVY 3-25-0006-039-2019 City of Beverly 7/9/2019 7/25/2019 $ - $ 1,318,403 $ 1,318,403 Rehabilitate Runway - 16/34

MA Boston General Edward Lawrence Logan International BOS 3-25-0010-130-2019 Massachusetts Port Authority 6/5/2019 7/16/2019 $ 4,367,773 $ - $ 4,367,773 Rehabilitate Apron

MA Boston General Edward Lawrence Logan International BOS 3-25-0010-131-2019 Massachusetts Port Authority 9/20/2019 9/24/2019 $ - $ 3,051,925 $ 3,051,925 VALE Infrastructure

MA Chatham Chatham Municipal CQX 3-25-0015-024-2019 Town of Chatham 9/20/2019 9/23/2019 $ 150,000 $ 2,857,521 $ 3,007,521 Reconstruct Taxiway [Taxilanes], Reconstruct Taxiway [Taxiway A]

MA Fitchburg Fitchburg Municipal FIT 3-25-0018-028-2019 City of Fitchburg 6/5/2019 6/24/2019 $ 1,541,788 $ 12,290,312 $ 13,832,100

Extend Runway [Phase I] - 14/32, Extend Runway [Phase II] - 14/32, Reconstruct Runway [Phase II] - 14/32, Reconstruct Runway [Phase III] - 14/32, Rehabilitate Taxiway

MA Hyannis Barnstable Municipal-Boardman/Polando Field HYA 3-25-0025-066-2019 Town of Barnstable 6/24/2019 7/1/2019 $ 904,015 $ - $ 904,015 Update Airport Master Plan Study

MA Nantucket Nantucket Memorial ACK 3-25-0033-070-2019 Nantucket Airport Commission 9/20/2019 9/23/2019 $ 194,363 $ - $ 194,363 Security Enhancements

MA New Bedford New Bedford Regional EWB 3-25-0034-060-2019 City of New Bedford 6/24/2019 7/17/2019 $ 106,290 $ - $ 106,290 Install Perimeter Fencing not Required by 49 CFR 1542

MA North Adams Harriman-And-West AQW 3-25-0036-030-2019 City of North Adams 6/5/2019 7/8/2019 $ 131,855 $ - $ 131,855 Install Perimeter Fencing not Required by 49 CFR 1542, Wildlife Hazard Assessments

MA Orange Orange Municipal ORE 3-25-0039-028-2019 Town of Orange 6/5/2019 6/11/2019 $ 53,550 $ - $ 53,550 Light Obstructions

MA Plymouth Plymouth Municipal PYM 3-25-0042-049-2019 Town of Plymouth 6/5/2019 7/14/2019 $ 152,292 $ - $ 152,292 Remove Obstructions [Non-Hazard] MA Provincetown Provincetown Municipal PVC 3-25-0043-046-2019 Town of Provincetown 6/5/2019 6/27/2019 $ 329,670 $ - $ 329,670 Install Perimeter Fencing not Required by 49 CFR 1542

MA Provincetown Provincetown Municipal PVC 3-25-0043-047-2019 Town of Provincetown 6/24/2019 7/26/2019 $ 2,032,650 $ - $ 2,032,650 Construct Taxiway, Environmental Mitigation

MA Provincetown Provincetown Municipal PVC 3-25-0043-048-2019 Town of Provincetown 6/24/2019 7/1/2019 $ 62,302 $ - $ 62,302 Construct Taxiway

MA Vineyard Haven Martha's Vineyard MVY 3-25-0031-046-2019 County of Dukes 6/5/2019 7/11/2019 $ 655,444 $ - $ 655,444 Acquire Aircraft Rescue & Fire Fighting Vehicle

MA Vineyard Haven Martha's Vineyard MVY 3-25-0031-047-2019 County of Dukes 7/29/2019 8/1/2019 $ 344,556 $ - $ 344,556 Conduct Environmental Study, Conduct Miscellaneous Study

MA Westfield Westfield-Barnes Regional BAF 3-25-0052-056-2019 City of Westfield 7/29/2019 8/26/2019 $ 1,269,533 $ 5,503,519 $ 6,773,052 Reconstruct Runway - 15/33

MA Westfield Westfield-Barnes Regional BAF 3-25-0052-057-2019 City of Westfield 7/29/2019 8/26/2019 $ 41,940 $ - $ 41,940 Reconstruct Runway - 15/33

MA Westfield Westfield-Barnes Regional BAF 3-25-0052-058-2019 City of Westfield 7/29/2019 8/26/2019 $ 74,696 $ - $ 74,696 Reconstruct Runway - 15/33

MA Worcester Worcester Regional ORH 3-25-0053-057-2019 Massachusetts Port Authority 6/5/2019 7/22/2019 $ 964,822 $ - $ 964,822 Improve Airport Miscellaneous Improvements, Install Miscellaneous NAVAIDS

MD Cambridge Cambridge-Dorchester Regional CGE 3-24-0007-030-2019 County of Dorchester 7/29/2019 9/3/2019 $ 315,355 $ - $ 315,355 Remove Obstructions [Non-Hazard] [Design], Remove Obstructions [Non-Hazard] [Wetland Mitigation]

MD Crisfield Crisfield-Somerset County W41 3-24-0012-015-2019 County of Somerset and City of Crisfield 9/20/2019 9/24/2019 $ 670,074 $ - $ 670,074 Remove Obstructions

MD Easton Easton/Newnam Field ESN 3-24-0014-045-2019 County Council of Talbot County 6/5/2019 8/28/2019 $ 430,554 $ 5,124,156 $ 5,554,710 Extend Runway - 04/22

MD Frederick Frederick Municipal FDK 3-24-0017-046-2019 City of Frederick 9/20/2019 9/24/2019 $ 2,474,425 $ 2,489,075 $ 4,963,500 Extend Runway - 05/23

MD Glen Burnie Baltimore/Washington International Thurgood Marshall BWI 3-24-0005-099-2019 Maryland DOT and Maryland Aviation Administration 7/29/2019 8/19/2019 $ 4,938,705 $ 5,000,000 $ 9,938,705 Reconstruct Taxiway

9/30/2019 Page 16 of 40 FAA AIP Grant Detail Report

Page 17: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

MD Hagerstown Hagerstown Regional-Richard A Henson Field HGR 3-24-0019-060-2019 County of Washington 7/9/2019 9/18/2019 $ 1,000,000 $ - $ 1,000,000 Acquire Land For Approaches, Expand Terminal Building

MD Leonardtown St Mary's County Regional 2W6 3-24-0022-027-2019 County of St Mary's 6/5/2019 9/5/2019 $ 150,000 $ 3,231,839 $ 3,381,839 Extend Runway - 11/29

MD Ocean City Ocean City Municipal OXB 3-24-0024-025-2019 Town of Ocean City 7/29/2019 8/21/2019 $ 173,578 $ - $ 173,578 Remove Obstructions

MD Salisbury Salisbury-Ocean City Wicomico Regional SBY 3-24-0025-055-2019 County of Wicomico 9/20/2019 9/23/2019 $ 2,308,452 $ 750,448 $ 3,058,900 Rehabilitate Apron, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

MD Stevensville Bay Bridge W29 3-24-0036-027-2019 County of Queen Anne's 7/9/2019 9/3/2019 $ 108,388 $ - $ 108,388 Conduct Environmental Study

MD Westminster Carroll County Regional/Jack B Poage Field DMW 3-24-0028-031-2019 County of Carroll 9/20/2019 9/24/2019 $ 206,800 $ - $ 206,800 Reconstruct Runway - 16/34

MD Wiley Ford Greater Cumberland Regional CBE 3-24-0013-025-2019 Potomac Highlands Airport Authority 6/5/2019 7/16/2019 $ 150,000 $ 4,850,000 $ 5,000,000 Rehabilitate Runway - 05/23

ME Auburn Auburn/Lewiston Municipal LEW 3-23-0002-026-2019 Cities of Auburn & Lewiston 9/20/2019 9/23/2019 $ 540,388 $ 3,548,574 $ 4,088,962 Rehabilitate Runway - 04/22

ME Auburn Auburn/Lewiston Municipal LEW 3-23-0002-027-2019 Cities of Auburn & Lewiston 9/20/2019 9/23/2019 $ 417,454 $ - $ 417,454 Rehabilitate Runway - 04/22

ME Auburn Auburn/Lewiston Municipal LEW 3-23-0002-028-2019 Cities of Auburn & Lewiston 9/27/2019 $ - $ 3,212,756 $ 3,212,756 Reconstruct Runway - 17/35

ME Augusta Augusta State AUG 3-23-0003-031-2019 State of Maine 6/24/2019 7/31/2019 $ 269,982 $ - $ 269,982 Acquire Snow Removal Equipment ME Augusta State of Maine *MES 3-23-0000-011-2019 State of Maine 6/24/2019 7/31/2019 $ 602,336 $ - $ 602,336 Update State System Plan Study

ME Bangor Bangor International BGR 3-23-0005-073-2019 City of Bangor 6/24/2019 7/9/2019 $ 1,381,279 $ - $ 1,381,279 Rehabilitate Taxiway

ME Bar Harbor Hancock County-Bar Harbor BHB 3-23-0006-046-2019 County of Hancock 6/5/2019 7/2/2019 $ 231,476 $ - $ 231,476 Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate Runway - 17/35, Rehabilitate Taxiway

ME Bar Harbor Hancock County-Bar Harbor BHB 3-23-0006-047-2019 County of Hancock 6/5/2019 7/2/2019 $ 110,229 $ - $ 110,229 Conduct Environmental Study

ME Bethel Bethel Regional 0B1 3-23-0008-016-2019 Town of Bethel 6/5/2019 6/11/2019 $ 236,322 $ - $ 236,322 Rehabilitate Apron, Rehabilitate Runway - 14/32

ME Brunswick Brunswick Executive BXM 3-23-0056-034-2019 Midcoast Regional Redevelopment Authority (MRRA) 7/29/2019 8/19/2019 $ 150,000 $ - $ 150,000 Rehabilitate Taxiway

ME Brunswick Brunswick Executive BXM 3-23-0056-035-2019 Midcoast Regional Redevelopment Authority (MRRA) 9/20/2019 9/23/2019 $ - $ 1,624,770 $ 1,624,770 Rehabilitate Apron [MAP]

ME Brunswick Brunswick Executive BXM 3-23-0056-036-2019 Midcoast Regional Redevelopment Authority (MRRA) 9/20/2019 9/23/2019 $ - $ 422,718 $ 422,718 Rehabilitate Parking Lot [MAP]

ME Frenchville Northern Aroostook Regional FVE 3-23-0021-022-2019 Northern Aroostook Regional Airport Authority 6/24/2019 7/8/2019 $ 228,516 $ - $ 228,516 Construct Taxiway, Rehabilitate Apron

ME Fryeburg Eastern Slopes Regional IZG 3-23-0022-019-2019 Eastern Slope Regional Airport Authority 6/5/2019 6/28/2019 $ 320,310 $ - $ 320,310 Construct Building

ME Greenville Greenville Municipal 3B1 3-23-0023-021-2019 Town of Greenville 6/5/2019 7/18/2019 $ 100,800 $ - $ 100,800 Conduct Aeronautical Survey for RNAV Approach

ME Greenville Greenville Municipal 3B1 3-23-0023-022-2019 Town of Greenville 6/24/2019 7/18/2019 $ 72,000 $ - $ 72,000 Conduct Miscellaneous Study

ME Jackman Newton Field 59B 3-23-0026-017-2019 Town of Jackman 7/9/2019 7/15/2019 $ 86,400 $ - $ 86,400 Remove Obstructions

ME Jackman Newton Field 59B 3-23-0026-018-2019 Town of Jackman 7/29/2019 7/31/2019 $ 68,400 $ - $ 68,400 Extend Runway - 13/31

ME Lincoln Lincoln Regional LRG 3-23-0027-014-2019 Town of Lincoln 6/5/2019 7/15/2019 $ 304,380 $ - $ 304,380 Reconstruct Runway - 17/35

ME Millinocket Millinocket Municipal MLT 3-23-0030-020-2019 Town of Millinocket 6/5/2019 8/5/2019 $ 488,700 $ - $ 488,700 Acquire Snow Removal Equipment, Wildlife Hazard Assessments

ME Old Town Dewitt Field, Old Town Municipal OLD 3-23-0034-016-2019 City of Old Town 7/29/2019 8/5/2019 $ 668,884 $ - $ 668,884 Construct Building

ME Pittsfield Pittsfield Municipal 2B7 3-23-0036-017-2019 Town of Pittsfield 7/29/2019 8/8/2019 $ 129,600 $ - $ 129,600 Construct Building

ME Portland Portland International Jetport PWM 3-23-0038-087-2019 City of Portland 7/29/2019 7/31/2019 $ 4,338,374 $ 2,447,131 $ 6,785,505 Expand Apron [Construction], Expand Apron [Environmental Mitigation]

ME Presque Isle Northern Maine Regional Airport at Presque Isle PQI 3-23-0039-050-2019 City of Presque Isle 6/5/2019 6/18/2019 $ 950,950 $ - $ 950,950 Acquire Snow Removal Equipment

ME Presque Isle Presque Isle International PQI 3-23-0039-051-2019 City of Presque Isle 9/20/2019 9/23/2019 $ 74,815 $ 1,000,001 $ 1,074,816 Acquire Snow Removal Equipment ME Presque Isle Presque Isle International PQI 3-23-0039-052-2019 City of Presque Isle 9/27/2019 $ - $ 5,775,999 $ 5,775,999 Rehabilitate Apron [Multi-year Funding]

ME Princeton Princeton Municipal PNN 3-23-0040-010-2019 Town of Princeton 7/29/2019 8/2/2019 $ 450,000 $ - $ 450,000 Construct Terminal Building [Multi-Year Funding], Install Perimeter Fencing not Required by 49 CFR 1542

ME Rockland Knox County Regional RKD 3-23-0042-056-2019 County of Knox 7/29/2019 8/2/2019 $ 841,826 $ - $ 841,826 Rehabilitate Apron [Multiyear Funding] ME Wiscasset Wiscasset IWI 3-23-0049-021-2019 Town of Wiscasset 6/5/2019 6/17/2019 $ 369,000 $ - $ 369,000 Remove Obstructions

MH Majuro Marshall Islands International MAJ 3-68-0001-020-2019 Republic of the Marshall Islands 7/9/2019 9/5/2019 $ - $ 1,000,000 $ 1,000,000 Improve Airport Miscellaneous Improvements

MI Alpena Alpena County Regional APN 3-26-0004-024-2019 County of Alpena 7/29/2019 8/26/2019 $ 532,784 $ - $ 532,784 Acquire Snow Removal Equipment

MI Detroit Detroit Metropolitan Wayne County DTW 3-26-0026-114-2019 Wayne County Airport Authority 7/29/2019 8/15/2019 $ 12,991,520 $ 8,452,645 $ 21,444,165 Reconstruct Runway - 03L/21R

MI Detroit Detroit Metropolitan Wayne County DTW 3-26-0026-115-2019 Wayne County Airport Authority 9/20/2019 9/24/2019 $ - $ 12,381,551 $ 12,381,551 Reconstruct Taxiway

MI Detroit Willow Run YIP 3-26-0024-042-2019 Wayne County Airport Authority 9/20/2019 9/24/2019 $ 403,157 $ - $ 403,157 Acquire Snow Removal Equipment

MI Escanaba Delta County ESC 3-26-0031-042-2019 County of Delta 9/20/2019 9/24/2019 $ 862,272 $ - $ 862,272 Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Emergency Generator, Reconstruct Taxiway Lighting, Rehabilitate Taxiway

MI Flint Bishop International FNT 3-26-0032-059-2019 Bishop International Airport Authority 6/24/2019 8/19/2019 $ 649,131 $ - $ 649,131 Construct Taxiway

9/30/2019 Page 17 of 40 FAA AIP Grant Detail Report

Page 18: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

MI Flint Bishop International FNT 3-26-0032-060-2019 Bishop International Airport Authority 6/5/2019 8/12/2019 $ 2,056,505 $ 6,068,820 $ 8,125,325 Reconstruct Runway Lighting - 09/27, Rehabilitate Runway - 09/27

MI Grand Rapids Gerald R Ford International GRR 3-26-0039-057-2019 Gerald R Ford International Airport Authority 7/29/2019 8/12/2019 $ 4,594,943 $ 6,460,119 $ 11,055,062 Rehabilitate Apron

MI Gwinn Sawyer International SAW 3-26-0153-043-2019 County of Marquette 7/9/2019 8/20/2019 $ 467,217 $ - $ 467,217 Acquire Snow Removal Equipment MI Gwinn Sawyer International SAW 3-26-0153-044-2019 County of Marquette 9/20/2019 9/25/2019 $ - $ 1,099,199 $ 1,099,199 Construct Utilities [MAP], Expand Building [MAP]

MI Kalamazoo Kalamazoo/Battle Creek International AZO 3-26-0052-046-2019 County of Kalamazoo 7/29/2019 8/27/2019 $ 1,540,833 $ - $ 1,540,833 Conduct Environmental Study

MI Lansing Michigan State Block Grant Program *MIB 3-26-SBGP-107-2019 State of Michigan 9/20/2019 9/24/2019 $ 17,506,791 $ - $ 17,506,791 Non primary development projects in state block grant program

MI Lansing Michigan State Block Grant Program *MIB 3-26-SBGP-108-2019 State of Michigan 7/9/2019 8/14/2019 $ - $ 1,073,480 $ 1,073,480 Non primary development projects in state block grant program

MI Lansing Michigan State Block Grant Program *MIB 3-26-SBGP-110-2019 State of Michigan 9/20/2019 9/24/2019 $ - $ 4,424,050 $ 4,424,050 Non primary development projects in state block grant program

MI Lansing Michigan State Block Grant Program *MIB 3-26-SBGP-111-2019 State of Michigan 9/20/2019 9/24/2019 $ - $ 2,604,960 $ 2,604,960 Non primary development projects in state block grant program

MI Muskegon Muskegon County MKG 3-26-0071-043-2019 County of Muskegon 9/20/2019 9/24/2019 $ 125,193 $ - $ 125,193 Conduct Miscellaneous Study, Install Emergency Generator

MI Pellston Pellston Regional Airport of Emmet County PLN 3-26-0076-037-2019 County of Emmet 9/20/2019 9/24/2019 $ 43,980 $ - $ 43,980 Remove Obstructions [Non-Hazard]

MI Saginaw MBS International MBS 3-26-0083-054-2019 Cities of Midland, Saginaw and County of Bay 7/9/2019 8/23/2019 $ 1,357,013 $ 3,292,960 $ 4,649,973 Construct Taxiway

MI Sault Ste. Marie Chippewa County International CIU 3-26-0139-040-2019 Economic Development Corporation of Chippewa County 6/24/2019 8/14/2019 $ 93,508 $ - $ 93,508

Install Airport Beacons, Rehabilitate Runway [Runway 10/28] - 10/28, Rehabilitate Runway [Runway 16/34] - 16/34

MI Traverse City Cherry Capital TVC 3-26-0094-044-2019 Northwestern Regional Airport Commission 7/9/2019 8/26/2019 $ 1,597,789 $ - $ 1,597,789 Conduct Airport Energy Efficiency Assessment, Install Airfield Guidance Signs, Reconstruct Apron, Reconstruct Taxiway, Update Miscellaneous Study

MN Albert Lea Albert Lea Municipal AEL 3-27-0003-019-2019 City of Albert Lea 7/29/2019 8/27/2019 $ 272,160 $ - $ 272,160 Update Airport Master Plan Study

MN Baudette Baudette International BDE 3-27-0009-017-2019 Baudette-Lake of the Woods Airport Commission 9/20/2019 9/25/2019 $ 65,648 $ - $ 65,648 Rehabilitate Apron

MN Bemidji Bemidji Regional BJI 3-27-0010-035-2019 Bemidji Regional Airport Authority Commission 7/9/2019 7/22/2019 $ 1,355,000 $ - $ 1,355,000 Acquire Snow Removal Equipment, Construct Apron [Multi-year Funding], Remove Obstructions [Non-Hazard]

MN Benson Benson Municipal BBB 3-27-0011-011-2019 City of Benson 6/24/2019 9/17/2019 $ 568,906 $ - $ 568,906 Construct Terminal Building

MN Blaine Anoka County-Blaine (Janes Field) ANE 3-27-0062-016-2019 Minneapolis-St. Paul Metropolitan Airports Commission 6/24/2019 8/14/2019 $ 196,728 $ 187,734 $ 384,462 Rehabilitate Service Road

MN Blue Earth Blue Earth Municipal SBU 3-27-0013-015-2019 City of Blue Earth 7/29/2019 8/13/2019 $ 152,910 $ - $ 152,910 Acquire Snow Removal Equipment MN Buffalo Buffalo Municipal CFE 3-27-0015-014-2019 City of Buffalo 9/20/2019 9/24/2019 $ 337,561 $ - $ 337,561 Extend Taxiway [Multi-Year Funding], Reconstruct Apron [Multi-Year Funding] MN Cambridge Cambridge Municipal CBG 3-27-0017-012-2019 City of Cambridge 7/29/2019 8/19/2019 $ 48,690 $ - $ 48,690 Conduct Environmental Study

MN Canby Myers Field CNB 3-27-0144-013-2019 City of Canby 6/24/2019 9/6/2019 $ 41,400 $ - $ 41,400 Construct Taxiway

MN Cloquet Cloquet Carlton County COQ 3-27-0018-015-2019 County of Carlton 7/9/2019 7/22/2019 $ 150,827 $ 1,132,116 $ 1,282,943 Rehabilitate Runway - 07/25

MN Crookston Crookston Municipal Kirkwood Field CKN 3-27-0019-014-2019 City of Crookston 6/24/2019 7/22/2019 $ 199,274 $ - $ 199,274 Update Airport Master Plan Study [Multi-year Funding] MN Duluth Duluth International DLH 3-27-0024-063-2019 City of Duluth 6/24/2019 8/14/2019 $ - $ 645,920 $ 645,920 Conduct Noise Compatibility Plan Study

MN Duluth Duluth International DLH 3-27-0024-064-2019 City of Duluth 7/9/2019 8/14/2019 $ 1,063,175 $ - $ 1,063,175 Update Airport Master Plan Study

MN Duluth Sky Harbor DYT 3-27-0025-014-2019 City of Duluth 9/20/2019 9/24/2019 $ 150,000 $ 3,206,946 $ 3,356,946 Construct Runway - 14/32

MN Elbow Lake Elbow Lake Municipal - Pride of the Prairie Y63 3-27-0026-009-2019 City of Elbow Lake 7/9/2019 8/5/2019 $ 143,234 $ - $ 143,234 Install Perimeter Fencing not Required by 49 CFR 1542, Rehabilitate Runway - 14/32

MN Ely Ely Municipal ELO 3-27-0027-019-2019 City of Ely 6/24/2019 7/29/2019 $ 148,590 $ - $ 148,590 Construct Taxiway, Rehabilitate Taxiway

MN Eveleth Eveleth-Virginia Municipal EVM 3-27-0028-015-2019 Eveleth-Virginia Airport Authority 7/9/2019 8/14/2019 $ 1,113,862 $ - $ 1,113,862 Rehabilitate Apron

MN Fairmont Fairmont Municipal FRM 3-27-0029-017-2019 City of Fairmont 7/29/2019 8/13/2019 $ 883,800 $ - $ 883,800 Construct Building

MN Fergus Falls Fergus Falls Municipal-Einar Mickelson Field FFM 3-27-0031-014-2019 City of Fergus Falls 9/20/2019 9/23/2019 $ 493,125 $ - $ 493,125 Reconstruct Taxiway [Multi-Year Funding]

MN Glencoe Glencoe Municipal GYL 3-27-0158-006-2019 City of Glencoe 7/29/2019 8/20/2019 $ 36,000 $ - $ 36,000 Extend Taxiway, Rehabilitate Taxiway

MN Grand Marais Grand Marais/Cook County CKC 3-27-0036-019-2019 County of Cook 6/24/2019 8/20/2019 $ 217,628 $ - $ 217,628 Extend Runway - 10/28

MN Grand Rapids Grand Rapids/Itasca County Airport-Gordon Newstrom Field GPZ 3-27-0037-022-2019 County of Itasca and City of Grand Rapids 6/24/2019 8/14/2019 $ 202,064 $ - $ 202,064 Acquire Snow Removal Equipment

MN Hibbing Range Regional HIB 3-27-0041-040-2019 Chisholm-Hibbing Airport Authority 6/24/2019 7/15/2019 $ 1,010,792 $ - $ 1,010,792 Reconstruct Parking Lot

MN International Falls Falls International-Einarson Field INL 3-27-0043-032-2019 International Falls/Koochiching County Airport Commission 9/20/2019 9/24/2019 $ 1,000,000 $ 14,845,208 $ 15,845,208 Conduct Environmental Study, Expand Apron, Reconstruct Runway - 13/31

MN Lake Elmo Lake Elmo 21D 3-27-0097-012-2019 Minneapolis-St. Paul Metropolitan Airports Commission 9/20/2019 9/23/2019 $ 450,000 $ 2,908,548 $ 3,358,548 Reconstruct Runway - 14/32, Reconstruct Taxiway

9/30/2019 Page 18 of 40 FAA AIP Grant Detail Report

Page 19: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

MN Lakeville Airlake LVN 3-27-0140-011-2019 Minneapolis-St. Paul Metropolitan Airports Commission 9/20/2019 9/23/2019 $ 468,737 $ - $ 468,737 Construct Access Road, Construct Taxiway

MN Little Falls Little Falls/Morrison County-Lindbergh Field LXL 3-27-0048-020-2019 Morrison County & City of Little Falls 7/9/2019 8/20/2019 $ 371,724 $ - $ 371,724 Construct Taxiway

MN Mankato Mankato Regional MKT 3-27-0055-026-2019 City of Mankato 9/20/2019 9/23/2019 $ 337,770 $ - $ 337,770

Construct Taxiway [Holding Bays], Construct Taxiway [Taxiway B2], Construct Taxiway [Taxiway C], Construct Taxiway [Taxiway D3], Rehabilitate Runway - 15/33, Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway B]

MN Minneapolis Crystal MIC 3-27-0064-011-2019 Minneapolis-St. Paul Metropolitan Airports Commission 7/29/2019 8/14/2019 $ 308,853 $ - $ 308,853

Reconstruct Taxiway [Taxiway B], Reconstruct Taxiway [Taxiway C], Rehabilitate Taxiway

MN Minneapolis Flying Cloud FCM 3-27-0061-021-2019 Minneapolis-St. Paul Metropolitan Airports Commission 6/5/2019 7/24/2019 $ 170,974 $ 561,426 $ 732,400 Reconstruct Taxiway [Taxiway D], Reconstruct Taxiway [Taxiway E]

MN Minneapolis Minneapolis-St Paul International/Wold-Chamberlain MSP 3-27-0059-116-2019

Minneapolis-St. Paul Metropolitan Airports Commission 7/9/2019 8/26/2019 $ 8,066,057 $ - $ 8,066,057

Construct Taxiway, Improve Runway Safety Area - 04/22, Install Runway Incursion Marking (14 CFR Part 139), Install Taxiway Lighting [Runway 4/22], Install Taxiway Lighting [Taxiway B], Install Taxiway Lighting [Taxiway Q]

MN Montevideo Montevideo-Chippewa County MVE 3-27-0065-018-2019 City of Montevideo 7/29/2019 8/19/2019 $ 634,797 $ - $ 634,797 Construct Building [Multi-Year Funding] MN Moorhead Moorhead Municipal JKJ 3-27-0147-014-2019 City of Moorhead 9/20/2019 9/24/2019 $ 480,141 $ 1,182,087 $ 1,662,228 Rehabilitate Runway - 12/30, Rehabilitate Runway Lighting - 12/30

MN Mora Mora Municipal JMR 3-27-0068-013-2019 City of Mora 7/9/2019 8/20/2019 $ 50,485 $ - $ 50,485 Rehabilitate Runway - 17/35

MN Morris Morris Municipal - Charlie Schmidt Field MOX 3-27-0069-010-2019 City of Morris 7/9/2019 7/23/2019 $ 58,178 $ - $ 58,178 Rehabilitate Taxiway

MN New Ulm New Ulm Municipal ULM 3-27-0070-015-2019 City of New Ulm 7/29/2019 8/20/2019 $ 31,516 $ - $ 31,516 Reconstruct Taxiway, Wildlife Hazard Assessments

MN Ortonville Ortonville Municipal-Martinson Field VVV 3-27-0073-013-2019 City of Ortonville 9/20/2019 9/23/2019 $ 38,817 $ - $ 38,817 Rehabilitate Apron, Rehabilitate Taxiway

MN Owatonna Owatonna Degner Regional OWA 3-27-0074-020-2019 City of Owatonna 7/29/2019 9/3/2019 $ 333,607 $ - $ 333,607 Acquire Snow Removal Equipment MN Paynesville Paynesville Municipal PEX 3-27-0152-013-2019 City of Paynesville 7/29/2019 8/26/2019 $ 1,072,308 $ - $ 1,072,308 Construct Building, Construct Taxiway

MN Pine River Pine River Regional PWC 3-27-0149-011-2019 City of Pine River 7/9/2019 8/19/2019 $ 320,670 $ - $ 320,670 Conduct Airport Master Plan Study

MN Pipestone Pipestone Municipal PQN 3-27-0079-011-2019 City of Pipestone 7/29/2019 8/19/2019 $ 120,310 $ - $ 120,310 Rehabilitate Apron, Rehabilitate Taxiway

MN Princeton Princeton Municipal PNM 3-27-0081-015-2019 City of Princeton 9/20/2019 9/23/2019 $ 1,669,922 $ - $ 1,669,922 Reconstruct Runway - 15/33, Reconstruct Runway Lighting - 15/33, Reconstruct Taxiway, Reconstruct Taxiway Lighting

MN Rochester Rochester International RST 3-27-0084-038-2019 City of Rochester 7/29/2019 8/23/2019 $ 3,303,556 $ - $ 3,303,556 Improve Terminal Building, Reconstruct Runway - 02/20

MN Roseau Roseau Municipal/Rudy Billberg Field ROX 3-27-0085-012-2019 City of Roseau 7/29/2019 8/19/2019 $ 2,535,209 $ - $ 2,535,209

Construct Taxiway [Taxilane B], Construct Taxiway [Taxiway D], Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Install Runway Lighting - 16/34, Install Runway Vertical/Visual Guidance System [Precision Approach Path Indicators] - 16/34, Install Runway Vertical/Visual Guidance System [Runway End Identifier Lights] - 16/34, Reconstruct Access Road, Reconstruct Apron, Rehabilitate Runway - 16/34, Rehabilitate Taxiway [Hangar Taxilane A], Rehabilitate Taxiway [Taxiway A], Remove Obstructions [Non-Hazard]

MN South St. Paul South St Paul Municipal-Richard E Fleming Field SGS 3-27-0093-019-2019 City of South St. Paul 7/9/2019 8/5/2019 $ 205,020 $ - $ 205,020 Rehabilitate Runway - 16/34

MN Springfield Springfield Municipal D42 3-27-0119-012-2019 City of Springfield 9/20/2019 9/24/2019 $ 150,000 $ - $ 150,000 Expand Apron

MN St. Cloud St. Cloud Regional STC 3-27-0095-031-2019 City of St. Cloud 6/24/2019 7/18/2019 $ 1,352,757 $ - $ 1,352,757 Construct Taxiway

MN Staples Staples Municipal SAZ 3-27-0145-013-2019 City of Staples 7/9/2019 7/24/2019 $ 550,488 $ - $ 550,488 Construct Building

MN Thief River Falls Thief River Falls Regional TVF 3-27-0100-023-2019 Thief River Falls Regional Airport Authority 7/9/2019 8/21/2019 $ 436,770 $ - $ 436,770 Update Airport Master Plan Study

MN Tower Tower Municipal 12D 3-27-0148-013-2019 City of Tower 7/9/2019 7/24/2019 $ 84,303 $ - $ 84,303 Construct Snow Removal Equipment Building, Rehabilitate Runway - 08/26

MN Tracy Tracy Municipal TKC 3-27-0102-010-2019 City of Tracy 7/29/2019 9/6/2019 $ 392,685 $ - $ 392,685 Reconstruct Apron

MN Two Harbors Richard B Helgeson TWM 3-27-0103-011-2019 City of Two Harbors 7/29/2019 8/12/2019 $ 1,100,002 $ - $ 1,100,002 Construct Building [Multi-Year Funding] MN Walker Walker Municipal Y49 3-27-0151-012-2019 City of Walker 7/9/2019 8/6/2019 $ 163,350 $ - $ 163,350 Rehabilitate Access Road, Rehabilitate Parking Lot

MN Willmar Willmar Municipal-John L Rice Field BDH 3-27-0115-012-2019 City of Willmar 9/20/2019 9/24/2019 $ 366,471 $ 540,958 $ 907,429 Rehabilitate Runway - 13/31, Rehabilitate Taxiway

MN Windom Windom Municipal MWM 3-27-0113-013-2019 City of Windom 6/24/2019 8/6/2019 $ 453,210 $ - $ 453,210 Construct Building

MN Winona Winona Municipal-Max Conrad Field ONA 3-27-0114-011-2019 City of Winona 7/29/2019 8/19/2019 $ 668,462 $ - $ 668,462

Construct Sand and Chemical Storage Building [Sand and Chemical Storage Building - Multi-year Funding], Construct Snow Removal Equipment Building [Snow Removal Equipment Building - Multi-year Funding]

MN Winsted Winsted Municipal 10D 3-27-0139-009-2019 City of Winsted 9/20/2019 9/23/2019 $ 150,000 $ 1,839,533 $ 1,989,533 Reconstruct Runway - 09/27

MO Columbia Columbia Regional COU 3-29-0022-047-2019 City of Columbia 6/5/2019 6/28/2019 $ 1,181,960 $ 550,144 $ 1,732,104 Extend Runway - 02/20

MO Columbia Columbia Regional COU 3-29-0022-048-2019 City of Columbia 6/5/2019 6/17/2019 $ - $ 574,875 $ 574,875 Extend Runway - 02/20

MO Jefferson City Missouri State Block Grant Program *MOB 3-29-SBGP-097-2019 State of Missouri DOT 6/24/2019 7/22/2019 $ 9,750,000 $ - $ 9,750,000 Non primary development projects in state block grant program

9/30/2019 Page 19 of 40 FAA AIP Grant Detail Report

Page 20: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

MO Jefferson City Missouri State Block Grant Program *MOB 3-29-SBGP-098-2019 State of Missouri DOT 6/5/2019 8/1/2019 $ 3,824,855 $ - $ 3,824,855 Non primary development projects in state block grant program

MO Jefferson City Missouri State Block Grant Program *MOB 3-29-SBGP-099-2019 State of Missouri DOT 9/20/2019 9/24/2019 $ - $ 3,016,253 $ 3,016,253 Non primary development projects in state block grant program

MO Jefferson City Missouri State Block Grant Program *MOB 3-29-SBGP-100-2019 State of Missouri DOT 6/5/2019 7/29/2019 $ - $ 4,621,806 $ 4,621,806 Non primary development projects in state block grant program

MO Jefferson City Missouri State Block Grant Program *MOB 3-29-SBGP-101-2019 State of Missouri DOT 9/20/2019 9/24/2019 $ - $ 72,000 $ 72,000 Non primary development projects in state block grant program

MO Jefferson City Missouri State Block Grant Program *MOB 3-29-SBGP-102-2019 State of Missouri DOT 9/20/2019 9/24/2019 $ - $ 961,494 $ 961,494 Non primary development projects in state block grant program

MO Jefferson City Missouri State Block Grant Program *MOB 3-29-SBGP-103-2019 State of Missouri DOT 6/24/2019 7/22/2019 $ 150,000 $ - $ 150,000 Non primary development projects in state block grant program

MO Jefferson City Missouri State Block Grant Program *MOB 3-29-SBGP-104-2019 State of Missouri DOT 9/20/2019 9/24/2019 $ 600,000 $ - $ 600,000 Non primary development projects in state block grant program

MO Jefferson City State of Missouri *MOS 3-29-0000-016-2019 State of Missouri DOT 9/20/2019 9/24/2019 $ - $ 233,305 $ 233,305 Update State System Plan Study

MO Joplin Joplin Regional JLN 3-29-0037-042-2019 City of Joplin 6/5/2019 8/6/2019 $ 709,692 $ - $ 709,692 Acquire Safety and/or Security Equipment, Reconstruct Runway - 18/36

MO Kansas City Charles B Wheeler Downtown MKC 3-29-0041-028-2019 City of Kansas City 6/5/2019 6/26/2019 $ 650,920 $ - $ 650,920 Acquire Aircraft Rescue & Fire Fighting Vehicle

MO Springfield Springfield-Branson National SGF 3-29-0077-055-2019 City of Springfield 6/5/2019 6/28/2019 $ 3,256,483 $ - $ 3,256,483 Construct Apron, Construct Terminal Building

MO Springfield Springfield-Branson National SGF 3-29-0077-056-2019 City of Springfield 6/5/2019 6/28/2019 $ 169,097 $ - $ 169,097 Update Miscellaneous Study

MO St. Louis St Louis Lambert International STL 3-29-0085-160-2019 City of St. Louis 7/29/2019 8/22/2019 $ 2,205,916 $ 3,020,147 $ 5,226,063 Rehabilitate Taxiway

MO St. Louis St Louis Lambert International STL 3-29-0085-161-2019 City of St. Louis 6/5/2019 8/8/2019 $ - $ 415,062 $ 415,062 Reconstruct Taxiway

MO St. Louis St Louis Lambert International STL 3-29-0085-162-2019 City of St. Louis 9/20/2019 9/24/2019 $ - $ 3,112,500 $ 3,112,500 Update Airport Master Plan Study

MO St. Louis St Louis Lambert International STL 3-29-0085-163-2019 City of St. Louis 6/5/2019 8/16/2019 $ 583,785 $ - $ 583,785 Acquire Aircraft Rescue & Fire Fighting Vehicle

MO St. Louis St Louis Lambert International STL 3-29-0085-164-2019 City of St. Louis 9/20/2019 9/24/2019 $ - $ 1,149,533 $ 1,149,533 VALE Infrastructure

MP Northern Islands (Municipality)

Benjamin Taisacan Manglona International GRO 3-69-0003-032-2019 Commonwealth Ports Authority 6/24/2019 8/23/2019 $ 2,842,450 $ - $ 2,842,450 Install Perimeter Fencing not Required by 49 CFR 1542

MP Tinian (Municipality) Tinian International TNI 3-69-0011-031-2019 Commonwealth Ports Authority 7/29/2019 8/23/2019 $ 2,778,885 $ - $ 2,778,885 Install Perimeter Fencing not Required by 49 CFR 1542 [Multi-year Funding] MS Aberdeen Monroe County M40 3-28-0001-018-2019 County of Monroe 6/24/2019 8/23/2019 $ 70,200 $ - $ 70,200 Expand Apron

MS Batesville Panola County PMU 3-28-0003-012-2019 County of Panola 6/5/2019 8/20/2019 $ 547,899 $ 845,632 $ 1,393,531 Rehabilitate Runway - 01/19

MS Bay Springs Thigpen Field 00M 3-28-0004-012-2019 City of Bay Springs 6/24/2019 9/4/2019 $ 150,000 $ - $ 150,000 Rehabilitate Runway - 16/34

MS Bay St. Louis Stennis International HSA 3-28-0005-033-2019 County of Hancock 6/5/2019 8/22/2019 $ 882,404 $ - $ 882,404 Rehabilitate Taxiway

MS Belzoni Belzoni Municipal 1M2 3-28-0007-019-2019 City of Belzoni 6/24/2019 8/20/2019 $ 118,125 $ - $ 118,125 Rehabilitate Runway - 03/21, Rehabilitate Taxiway

MS Brookhaven Brookhaven-Lincoln County 1R7 3-28-0009-015-2019 City of Brookhaven 7/9/2019 8/26/2019 $ 208,911 $ - $ 208,911 Extend Taxiway

MS Carroll (County) Greenwood-Leflore GWO 3-28-0028-019-2019 City of Greenwood and County of Leflore 6/24/2019 8/15/2019 $ 254,315 $ - $ 254,315 Rehabilitate Apron

MS Clarksdale Fletcher Field CKM 3-28-0014-026-2019 Clarksdale-Coahoma County Airport Board 7/29/2019 8/30/2019 $ 150,000 $ 117,138 $ 267,138 Reconstruct Taxiway Lighting

MS Cleveland Cleveland Municipal RNV 3-28-0015-022-2019 City of Cleveland 6/24/2019 9/5/2019 $ 478,938 $ - $ 478,938 Expand Apron

MS Columbia Columbia-Marion County 0R0 3-28-0018-016-2019 County of Columbia & Marion 6/24/2019 8/8/2019 $ 300,000 $ - $ 300,000 Reconstruct Taxiway

MS Columbus Columbus-Lowndes County UBS 3-28-0019-020-2019 City of Columbus 6/5/2019 7/2/2019 $ 118,396 $ - $ 118,396 Rehabilitate Runway - 18/36

MS Columbus Golden Triangle Regional GTR 3-28-0020-057-2019 Golden Triangle Regional Airport Authority 7/9/2019 7/23/2019 $ 1,000,000 $ - $ 1,000,000 Acquire Equipment, Acquire Safety and/or Security Equipment, Expand Building, Improve Airport Miscellaneous Improvements, Improve Terminal Building

MS Corinth Roscoe Turner CRX 3-28-0021-028-2019 City of Corinth/County of Alcorn 7/9/2019 8/6/2019 $ 485,920 $ - $ 485,920 Improve Airport Drainage, Remove Obstructions [Non-Hazard] MS Greenville Greenville Mid-Delta GLH 3-28-0027-036-2019 City of Greenville 9/20/2019 9/23/2019 $ 150,000 $ 1,550,306 $ 1,700,306 Acquire Equipment, Improve Runway Safety Area - 18L/36R

MS Greenville Greenville Mid-Delta GLH 3-28-0027-037-2019 City of Greenville 9/20/2019 9/24/2019 $ - $ 675,000 $ 675,000 Acquire Aircraft Rescue & Fire Fighting Vehicle

MS Gulfport Gulfport-Biloxi International GPT 3-28-0030-093-2019 Gulfport Biloxi Regional Airport Authority 7/29/2019 8/7/2019 $ 2,278,389 $ - $ 2,278,389

Acquire Equipment, Conduct Miscellaneous Study [Airfield Drainage], Conduct Miscellaneous Study [Pavement Management Program], Construct Access Road, Expand Terminal Building, Install Perimeter Fencing not Required by 49 CFR 1542, Security Enhancements, Widen Taxiway

MS Gulfport Gulfport-Biloxi International GPT 3-28-0030-094-2019 Gulfport Biloxi Regional Airport Authority 6/24/2019 7/17/2019 $ 450,878 $ - $ 450,878 Update Airport Master Plan Study

MS Hattiesburg Hattiesburg Bobby L Chain Municipal HBG 3-28-0031-026-2019 City of Hattiesburg 7/9/2019 8/13/2019 $ 574,200 $ - $ 574,200 Improve Airport Drainage

MS Holly Springs Holly Springs-Marshall County M41 3-28-0033-020-2019 Holly Springs-Marshall County Airport Board 6/24/2019 8/28/2019 $ 57,748 $ - $ 57,748 Install Miscellaneous NAVAIDS

MS Indianola Indianola Municipal IDL 3-28-0035-021-2019 City of Indianola 6/5/2019 8/13/2019 $ 255,627 $ - $ 255,627 Rehabilitate Runway - 18/36

MS Iuka Iuka 15M 3-28-0036-014-2019 Tishomingo Dist 1,2,3 6/5/2019 8/1/2019 $ 142,889 $ - $ 142,889 Remove Obstructions [Non-Hazard]

MS Jackson Hawkins Field HKS 3-28-0038-019-2019 Jackson Municipal Airport Authority and City of Jackson 7/9/2019 8/28/2019 $ 150,000 $ 4,682,470 $ 4,832,470 Rehabilitate Runway - 16/34, Rehabilitate Runway Lighting - 16/34

9/30/2019 Page 20 of 40 FAA AIP Grant Detail Report

Page 21: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

MS Jackson Jackson-Medgar Wiley Evers International JAN 3-28-0037-054-2019

Jackson Municipal Airport Authority and City of Jackson 7/9/2019 9/4/2019 $ 3,431,963 $ - $ 3,431,963 Improve Service Road, Rehabilitate Access Road

MS Lexington C A Moore 19M 3-28-0042-020-2019 City of Lexington 6/5/2019 6/19/2019 $ 299,255 $ - $ 299,255 Rehabilitate Apron, Rehabilitate Runway - 01/19, Rehabilitate Taxiway

MS Louisville Louisville Winston County LMS 3-28-0043-018-2019 City of Louisville 7/9/2019 8/27/2019 $ 162,540 $ - $ 162,540 Acquire Land For Approaches

MS Madison Bruce Campbell Field MBO 3-28-0046-026-2019 City of Madison 7/29/2019 8/2/2019 $ 150,000 $ 737,071 $ 887,071 Rehabilitate Taxiway

MS Magee Magee Municipal 17M 3-28-0047-013-2019 City of Magee 6/24/2019 8/29/2019 $ 595,000 $ 331,589 $ 926,589 Rehabilitate Runway - 18/36

MS McComb McComb/Pike County/John E Lewis Field MCB 3-28-0049-026-2019 City of McComb 7/29/2019 8/22/2019 $ 300,000 $ 260,084 $ 560,084 Improve Airport Drainage

MS Meridian Key Field MEI 3-28-0050-039-2019 Meridian Airport Authority 9/20/2019 9/23/2019 $ 1,043,822 $ 3,471,211 $ 4,515,033

Acquire Equipment, Conduct Miscellaneous Study, Improve Airport Drainage, Install Perimeter Fencing not Required by 49 CFR 1542, Reconstruct Taxiway [Taxiway A], Rehabilitate Access Road, Rehabilitate Runway - 01/19, Rehabilitate Taxiway [Taxiway B], Rehabilitate Taxiway [Taxiway D], Rehabilitate Taxiway Lighting

MS Moselle Hattiesburg-Laurel Regional PIB 3-28-0041-040-2019 Hattiesburg-Laurel Regional Airport Authority 7/9/2019 8/19/2019 $ 1,277,289 $ - $ 1,277,289 Rehabilitate Apron, Rehabilitate Parking Lot, Rehabilitate Runway - 18/36, Rehabilitate Taxiway

MS New Albany New Albany-Union County M72 3-28-0053-020-2019 City of New Albany and County of Union 6/24/2019 9/3/2019 $ 151,920 $ 181,692 $ 333,612 Rehabilitate Runway Lighting - 18/36

MS Okolona Okolona Municipal-Richard Stovall Field 5A4 3-28-0093-021-2019 City of Okolona 6/24/2019 8/21/2019 $ 103,693 $ - $ 103,693 Improve Airport Drainage

MS Olive Branch Olive Branch OLV 3-28-0056-020-2019 City of Olive Branch 6/5/2019 7/17/2019 $ 157,689 $ - $ 157,689 Update Airport Master Plan Study

MS Oxford University-Oxford UOX 3-28-0057-033-2019 University of Mississippi 7/29/2019 8/20/2019 $ 265,612 $ 411,790 $ 677,402 Rehabilitate Apron

MS Pascagoula Trent Lott International PQL 3-28-0101-033-2019 County of Jackson 6/24/2019 9/6/2019 $ 136,018 $ - $ 136,018 Rehabilitate Runway - 17/35

MS Philadelphia Philadelphia Municipal MPE 3-28-0059-019-2019 City of Philadelphia 6/24/2019 7/16/2019 $ 243,014 $ - $ 243,014 Install Perimeter Fencing not Required by 49 CFR 1542

MS Poplarville Poplarville-Pearl River County M13 3-28-0096-013-2019 City of Poplarville 6/24/2019 8/5/2019 $ 82,831 $ - $ 82,831 Improve Access Road, Improve Airport Drainage

MS Prentiss Prentiss-Jefferson Davis County M43 3-28-0062-013-2019 City of Prentiss, Mississippi 6/5/2019 7/1/2019 $ 95,361 $ - $ 95,361 Rehabilitate Access Road, Rehabilitate Apron

MS Raymond John Bell Williams JVW 3-28-0064-024-2019 County of Hinds 7/29/2019 8/16/2019 $ 220,860 $ 983,584 $ 1,204,444 Construct Taxiway

MS Tunica Tunica Municipal UTA 3-28-0069-025-2019 County of Tunica & Tunica County Airport Commission 6/24/2019 8/5/2019 $ 159,606 $ - $ 159,606 Acquire Land For Approaches

MS Tupelo Tupelo Regional TUP 3-28-0070-044-2019 Tupelo Airport Authority 9/20/2019 9/24/2019 $ 685,074 $ - $ 685,074 Acquire Aircraft Rescue & Fire Fighting Vehicle

MS Vicksburg Vicksburg Municipal VKS 3-28-0073-011-2019 City of Vicksburg 6/24/2019 7/25/2019 $ 130,460 $ - $ 130,460 Expand Apron

MS Wiggins Dean Griffin Memorial M24 3-28-0078-019-2019 Wiggins-Stone County Airport Board 6/5/2019 8/19/2019 $ 1,119,274 $ - $ 1,119,274 Rehabilitate Apron, Rehabilitate Runway - 17/35, Rehabilitate Taxiway

MS Yazoo City Yazoo County 87I 3-28-0102-018-2019 County of Yazoo 6/24/2019 8/29/2019 $ 150,000 $ - $ 150,000 Construct Apron

MT Anaconda Bowman Field 3U3 3-30-0002-018-2019 County of Deerlodge and City of Anaconda 7/9/2019 9/4/2019 $ 220,580 $ - $ 220,580 Rehabilitate Runway - 04/22, Rehabilitate Runway - 17/35, Rehabilitate Taxiway

MT Baker Baker Municipal BHK 3-30-0004-020-2019 City of Baker and County of Fallon 6/24/2019 8/8/2019 $ 2,227,434 $ - $ 2,227,434 Construct Taxiway, Expand Apron, Reconstruct Apron, Reconstruct Taxiway

MT Big Timber Big Timber 6S0 3-30-0007-012-2019 City of Big Timber and County of Sweet Grass 6/24/2019 8/16/2019 $ 269,609 $ - $ 269,609 Reconstruct Perimeter Fencing not Required by 49 CFR 1542, Rehabilitate Apron, Rehabilitate Runway - 06/24, Rehabilitate Taxiway

MT Billings Billings Logan International BIL 3-30-0008-060-2019 City of Billings 7/29/2019 8/19/2019 $ 2,097,856 $ 1,100,000 $ 3,197,856 Reconstruct Apron

MT Billings Billings Logan International BIL 3-30-0008-061-2019 City of Billings 7/9/2019 8/7/2019 $ 916,347 $ - $ 916,347 Acquire Aircraft Rescue & Fire Fighting Vehicle, Expand Terminal Building

MT Billings Billings Logan International BIL 3-30-0008-062-2019 City of Billings 9/20/2019 9/23/2019 $ 442,526 $ - $ 442,526 Expand Terminal Building

MT Billings Billings Logan International BIL 3-30-0008-063-2019 City of Billings 9/27/2019 $ - $ 2,000,000 $ 2,000,000 Expand Terminal Building

MT Bozeman Bozeman Yellowstone International BZN 3-30-0010-051-2019 Gallatin Airport Authority 7/9/2019 7/26/2019 $ 2,949,307 $ - $ 2,949,307 Acquire Snow Removal Equipment, Improve Terminal Building, Rehabilitate Apron

MT Butte Bert Mooney BTM 3-30-0012-057-2019 Bert Mooney Airport Authority 6/24/2019 6/27/2019 $ - $ 188,617 $ 188,617 Rehabilitate Runway Lighting - 12/30

MT Butte Bert Mooney BTM 3-30-0012-058-2019 Bert Mooney Airport Authority 7/9/2019 8/12/2019 $ 725,000 $ - $ 725,000 Rehabilitate Apron, Rehabilitate Runway - 12/30, Rehabilitate Runway - 15/33, Rehabilitate Taxiway

MT Choteau Choteau CII 3-30-0015-010-2019 City of Choteau and County of Teton 6/24/2019 8/8/2019 $ 397,980 $ - $ 397,980 Construct Building, Construct Snow Removal Equipment Building

MT Conrad Conrad S01 3-30-0018-007-2019 County of Pondera 6/24/2019 8/1/2019 $ 243,000 $ - $ 243,000 Construct Fuel Farm

MT Conrad Conrad S01 3-30-0018-008-2019 County of Pondera 9/20/2019 9/24/2019 $ 40,500 $ - $ 40,500 Construct Fuel Farm

MT Deer Lodge Deer Lodge-City-County 38S 3-30-0021-016-2019 City of Deer Lodge and County of Powell 7/9/2019 8/26/2019 $ 196,464 $ - $ 196,464 Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate Taxiway

MT Dillon Dillon DLN 3-30-0022-013-2019 County of Beaverhead 6/24/2019 7/22/2019 $ 312,000 $ - $ 312,000 Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate Runway - 17/35, Rehabilitate Taxiway

MT Fort Benton Fort Benton 79S 3-30-0030-013-2019 City of Fort Benton and County of Chouteau 6/5/2019 7/8/2019 $ 1,192,500 $ - $ 1,192,500 Construct Apron, Construct Taxiway

MT Geraldine Geraldine 5U8 3-30-0102-003-2019 Town of Geraldine and County of Chouteau 9/20/2019 9/23/2019 $ 134,797 $ - $ 134,797 Reconstruct Runway - 07/25

MT Glendive Dawson Community GDV 3-30-0035-017-2019 County of Dawson 9/20/2019 9/23/2019 $ 762,919 $ - $ 762,919

Rehabilitate Apron [A-1 Apron], Rehabilitate Apron [A-2 Apron], Rehabilitate Runway - 02/20, Rehabilitate Runway - 12/30, Rehabilitate Taxiway [Taxiway T2], Rehabilitate Taxiway [Taxiways T-1, T-5, T-6, and T-7]

9/30/2019 Page 21 of 40 FAA AIP Grant Detail Report

Page 22: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

MT Great Falls Great Falls International GTF 3-30-0036-066-2019 Great Falls International Airport Authority 7/9/2019 7/18/2019 $ 1,640,877 $ - $ 1,640,877 Expand Snow Removal Equipment Building, Improve Runway Safety Area - 03/21, Install Runway Sensors - 17/35, Rehabilitate Runway - 03/21

MT Hamilton Ravalli County 6S5 3-30-0037-017-2019 County of Ravalli 9/20/2019 9/24/2019 $ 532,686 $ - $ 532,686 Construct Runway - 16/34

MT Hardin Big Horn County 00U 3-30-0038-011-2019 County of Big Horn 7/9/2019 8/21/2019 $ 36,000 $ - $ 36,000 Acquire Snow Removal Equipment MT Hardin Big Horn County 00U 3-30-0038-012-2019 County of Big Horn 9/20/2019 9/24/2019 $ 235,072 $ - $ 235,072 Install Weather Reporting Equipment

MT Helena Helena Regional HLN 3-30-0042-053-2019 Helena Regional Airport Authority 6/24/2019 6/27/2019 $ 711,220 $ 1,728,688 $ 2,439,908 Rehabilitate Aircraft Rescue & Fire Fighting Building, Rehabilitate Apron, Rehabilitate Taxiway

MT Helena Helena Regional HLN 3-30-0042-054-2019 Helena Regional Airport Authority 6/24/2019 6/27/2019 $ 608,400 $ - $ 608,400 Rehabilitate Runway - 09/27

MT Jordan Jordan JDN 3-30-0045-006-2019 County of Garfield 7/9/2019 8/5/2019 $ 158,000 $ - $ 158,000 Rehabilitate Apron, Rehabilitate Runway - 11/29, Rehabilitate Taxiway

MT Kalispell Glacier Park International GPI 3-30-0046-055-2019 Flathead Municipal Airport Authority 7/9/2019 8/20/2019 $ 1,105,812 $ 3,500,000 $ 4,605,812 Acquire Aircraft Rescue & Fire Fighting Vehicle, Expand Apron, Improve Terminal Building

MT Kalispell Glacier Park International GPI 3-30-0046-056-2019 Flathead Municipal Airport Authority 7/9/2019 8/20/2019 $ 1,164,927 $ - $ 1,164,927 Expand Terminal Building

MT Lewistown Lewistown Municipal LWT 3-30-0048-023-2019 City of Lewistown and County of Fergus 9/20/2019 9/24/2019 $ 325,641 $ - $ 325,641 Rehabilitate Runway - 08/26

MT Lincoln Lincoln S69 3-30-0050-007-2019 Montana State of (Montana Aeronautics Division) 6/24/2019 8/9/2019 $ 853,475 $ - $ 853,475 Construct Taxiway, Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate Taxiway

MT Livingston Mission Field LVM 3-30-0051-011-2019 County of Park and City of Livingston 7/9/2019 8/13/2019 $ 472,000 $ - $ 472,000 Widen Taxiway

MT Miles City Frank Wiley Field MLS 3-30-0055-018-2019 City of Miles City 7/29/2019 8/27/2019 $ 359,190 $ - $ 359,190 Construct Taxiway, Reconstruct Runway - 04/22, Rehabilitate Taxiway

MT Missoula Missoula International MSO 3-30-0056-065-2019 Missoula County Airport Authority 7/9/2019 7/31/2019 $ 2,924,915 $ 6,283,353 $ 9,208,268 Construct Terminal Building

MT Missoula Missoula International MSO 3-30-0056-066-2019 Missoula County Airport Authority 9/20/2019 9/23/2019 $ 1,000,000 $ - $ 1,000,000 Expand Access Road, Reconstruct Access Road

MT Plentywood Sher-Wood PWD 3-30-0060-011-2019 City of Plentywood and County of Sheridan 7/9/2019 8/7/2019 $ 418,644 $ - $ 418,644 Acquire Snow Removal Equipment, Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 12/30

MT Plentywood Sher-Wood PWD 3-30-0060-012-2019 City of Plentywood and County of Sheridan 9/20/2019 9/25/2019 $ 129,204 $ - $ 129,204 Install Weather Reporting Equipment MT Ronan Ronan 7S0 3-30-0065-013-2019 City of Ronan and County of Lake 6/24/2019 7/29/2019 $ 214,892 $ - $ 214,892 Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate Taxiway

MT Roundup Roundup RPX 3-30-0066-014-2019 City of Roundup/County of Musselshell 7/9/2019 8/5/2019 $ 225,000 $ - $ 225,000 Construct Taxiway, Install Miscellaneous NAVAIDS, Rehabilitate Apron, Rehabilitate Runway - 07/25, Rehabilitate Taxiway

MT Sidney Sidney-Richland Regional SDY 3-30-0070-025-2019 Sidney-Richland Airport Authority 7/9/2019 8/28/2019 $ 670,510 $ - $ 670,510

Install Perimeter Fencing not Required by 49 CFR 1542, Install Runway Vertical/Visual Guidance System - 01/19, Install Runway Vertical/Visual Guidance System - 11/29, Rehabilitate Apron, Rehabilitate Runway - 01/19, Rehabilitate Runway - 11/29, Rehabilitate Taxiway, Remove Obstructions [Non-Hazard]

MT Stanford Stanford/Biggerstaff Field S64 3-30-0072-009-2019 County of Judith Basin 6/24/2019 7/31/2019 $ 128,655 $ - $ 128,655 Reconstruct Apron, Reconstruct Runway - 11/29, Reconstruct Taxiway

MT Stevensville Stevensville 32S 3-30-0044-015-2019 Town of Stevensville 9/20/2019 9/24/2019 $ 910,071 $ - $ 910,071 Construct Taxiway, Reconstruct Apron, Reconstruct Taxiway

MT Terry Terry 8U6 3-30-0075-008-2019 Prairie County Airport Authority 7/9/2019 7/25/2019 $ 154,530 $ - $ 154,530 Rehabilitate Apron, Rehabilitate Runway - 08/26, Rehabilitate Taxiway

MT Thompson Falls Thompson Falls THM 3-30-0076-010-2019 County of Sanders 6/24/2019 7/25/2019 $ 147,136 $ - $ 147,136 Reconstruct Apron, Reconstruct Runway - 08/26, Reconstruct Taxiway, Rehabilitate Taxiway

MT Three Forks Three Forks 9S5 3-30-0077-013-2019 County of Gallatin 6/24/2019 8/27/2019 $ 112,157 $ - $ 112,157 Rehabilitate Apron, Rehabilitate Runway - 03/21, Rehabilitate Taxiway

MT Twin Bridges Twin Bridges 7S1 3-30-0080-014-2019 County of Madison 9/20/2019 9/23/2019 $ 228,000 $ - $ 228,000 Install Weather Reporting Equipment

MT West Yellowstone Yellowstone WYS 3-30-0082-020-2019 Montana State of (Montana Aeronautics Division) 6/5/2019 7/22/2019 $ 320,701 $ - $ 320,701 Rehabilitate Runway - 01/19

MT West Yellowstone Yellowstone WYS 3-30-0082-021-2019 Montana State of (Montana Aeronautics Division) 6/24/2019 9/3/2019 $ 329,299 $ - $ 329,299 Conduct Environmental Study

NC Asheville Asheville Regional AVL 3-37-0005-052-2019 Greater Asheville Regional Airport Authority 9/20/2019 9/23/2019 $ 5,319,909 $ - $ 5,319,909 Acquire Snow Removal Equipment, Expand Apron, Security Enhancements

NC Charlotte Charlotte/Douglas International CLT 3-37-0012-081-2019 City of Charlotte 6/5/2019 7/26/2019 $ 12,927,017 $ - $ 12,927,017 Expand Apron

NC Charlotte Charlotte/Douglas International CLT 3-37-0012-082-2019 City of Charlotte 6/5/2019 7/26/2019 $ - $ 1,500,000 $ 1,500,000 Improve Runway Safety Area - 18L/36R

NC Concord Concord-Padgett Regional JQF 3-37-0015-007-2019 City of Concord 6/5/2019 7/16/2019 $ 589,019 $ - $ 589,019 Acquire Aircraft Rescue & Fire Fighting Vehicle

NC Concord Concord-Padgett Regional JQF 3-37-0015-008-2019 City of Concord 9/20/2019 9/24/2019 $ 861,958 $ 4,300,000 $ 5,161,958 Strengthen Apron

NC Fayetteville Fayetteville Regional/Grannis Field FAY 3-37-0021-046-2019 City of Fayetteville 9/27/2019 $ 3,968,167 $ 7,531,833 $ 11,500,000 Expand Terminal Building [Multi-year Funding] NC Greensboro Piedmont Triad International GSO 3-37-0026-078-2019 Piedmont Triad Airport Authority 6/5/2019 8/28/2019 $ 3,783,587 $ 5,500,000 $ 9,283,587 Rehabilitate Runway - 05R/23L

NC Greensboro Piedmont Triad International GSO 3-37-0026-079-2019 Piedmont Triad Airport Authority 9/20/2019 9/24/2019 $ 500,000 $ - $ 500,000 Update Airport Master Plan Study

NC Greenville Pitt-Greenville PGV 3-37-0028-047-2019 Pitt County-City of Greenville Airport Authority 6/5/2019 9/23/2019 $ 664,844 $ - $ 664,844 Acquire Aircraft Rescue & Fire Fighting Vehicle

NC Greenville Pitt-Greenville PGV 3-37-0028-049-2019 Pitt County-City of Greenville Airport Authority 9/20/2019 9/23/2019 $ 354,445 $ 3,016,896 $ 3,371,341 Expand Apron, Rehabilitate Apron

NC New Bern Coastal Carolina Regional EWN 3-37-0050-043-2019 Craven County Regional Airport Authority 7/9/2019 9/3/2019 $ 1,357,964 $ - $ 1,357,964 Construct Aircraft Rescue & Fire Fighting Building, Expand Terminal Building, Rehabilitate Terminal Building

NC Raleigh North Carolina State Block Grant Program *NCB 3-37-SBGP-057-2019 State of North Carolina 6/24/2019 8/20/2019 $ 13,193,990 $ - $ 13,193,990 Non primary development projects in state block grant program

9/30/2019 Page 22 of 40 FAA AIP Grant Detail Report

Page 23: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

NC Raleigh North Carolina State Block Grant Program *NCB 3-37-SBGP-058-2019 State of North Carolina 9/20/2019 9/23/2019 $ - $ 2,400,000 $ 2,400,000 Non primary development projects in state block grant program

NC Wilmington Wilmington International ILM 3-37-0084-057-2019 New Hanover County Airport Authority 9/27/2019 $ 3,164,455 $ - $ 3,164,455 Expand Terminal Building

ND Ashley Ashley Municipal ASY 3-38-0085-002-2019 ASHLEY MUNICIPAL AIRPORT 6/24/2019 8/28/2019 $ 67,500 $ - $ 67,500

Install Airfield Guidance Signs, Install Airport Beacons, Install Runway Vertical/Visual Guidance System - 14/32, Reconstruct Runway Lighting - 14/32, Reconstruct Taxiway Lighting

ND Bismarck Bismarck Municipal BIS 3-38-0003-061-2019 City of Bismarck 9/20/2019 9/24/2019 $ 766,800 $ - $ 766,800 Improve Airport Miscellaneous Improvements

ND Cando Cando Municipal 9D7 3-38-0073-013-2019 Cando Municipal Airport Authority 7/9/2019 8/27/2019 $ 1,163,790 $ - $ 1,163,790 Reconstruct Apron, Rehabilitate Runway - 16/34, Rehabilitate Taxiway

ND Cavalier Cavalier Municipal 2C8 3-38-0008-016-2019 Cavalier Municipal Airport Authority 7/9/2019 8/8/2019 $ 112,826 $ - $ 112,826

Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 16/34, Reconstruct Airport Beacon, Reconstruct Runway Lighting - 16/34, Reconstruct Taxiway Lighting

ND Cooperstown Cooperstown Municipal S32 3-38-0010-012-2019 Cooperstown ND City of DBA Cooperstown Municipal Airport Authori 7/29/2019 9/10/2019 $ 193,234 $ - $ 193,234 Acquire Land For Approaches

ND Devils Lake Devils Lake Regional DVL 3-38-0012-038-2019 Devils Lake Airport Authority 7/9/2019 7/31/2019 $ 150,000 $ - $ 150,000 Install Taxiway Lighting

ND Dickinson Dickinson - Theodore Roosevelt Regional DIK 3-38-0013-040-2019 Dickinson Municipal Airport Authority 9/20/2019 9/25/2019 $ 1,000,000 $ 11,978,000 $ 12,978,000 Extend Runway - 14/32

ND Ellendale Ellendale Municipal 40000000 3-38-0016-011-2019 Ellendale Airport 9/20/2019 9/23/2019 $ 75,600 $ - $ 75,600 Construct Taxiway

ND Glen Ullin Glen Ullin Regional D57 3-38-0020-015-2019 Glen Ullin Municipal Airport Authority 7/9/2019 9/10/2019 $ 450,000 $ - $ 450,000 Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Install Taxiway Lighting, Reconstruct Runway Lighting - 11/29

ND Grafton Hutson Field GAF 3-38-0021-011-2019 Grafton Municipal Airport Authority 7/9/2019 8/15/2019 $ 384,198 $ - $ 384,198 Improve Runway Safety Area - 08/26, Rehabilitate Apron, Rehabilitate Runway - 17/35, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

ND Grand Forks Grand Forks International GFK 3-38-0022-053-2019 Grand Forks Regional Airport Authority 7/29/2019 8/23/2019 $ 789,202 $ - $ 789,202 Reconstruct Apron, Rehabilitate Apron

ND Gwinner Gwinner-Roger Melroe Field GWR 3-38-0023-017-2019 Gwinner Municipal Airport Authority 6/24/2019 8/12/2019 $ 371,700 $ - $ 371,700 Construct Taxiway

ND Harvey Harvey Municipal 5H4 3-38-0071-014-2019 Harvey Municipal Airport Authority 7/9/2019 8/27/2019 $ 434,729 $ - $ 434,729 Rehabilitate Apron, Rehabilitate Runway - 11/29, Rehabilitate Taxiway

ND Hazen Mercer County Regional HZE 3-38-0075-015-2019 Mercer County Regional Airport Authority 7/9/2019 8/30/2019 $ 138,457 $ - $ 138,457 Rehabilitate Apron, Rehabilitate Runway - 14/32, Rehabilitate Taxiway

ND Hettinger Hettinger Municipal HEI 3-38-0026-015-2019 Adams County Airport Authority 7/9/2019 8/23/2019 $ 1,584,000 $ - $ 1,584,000 Construct Taxiway, Reconstruct Taxiway

ND Jamestown Jamestown Regional JMS 3-38-0028-046-2019 Jamestown Airport Authority 9/20/2019 9/23/2019 $ 970,200 $ - $ 970,200 Acquire Snow Removal Equipment, Reconstruct Apron

ND Kindred Robert Odegaard Field K74 3-38-0068-017-2019 Kindred-Davenport Regional Airport Authority 7/9/2019 9/11/2019 $ 1,060,046 $ - $ 1,060,046 Improve Airport Drainage, Install Miscellaneous NAVAIDS

ND Lakota Lakota Municipal 5L0 3-38-0080-009-2019 Lakota Airport Authority 7/9/2019 8/15/2019 $ 378,322 $ - $ 378,322 Construct Fuel Farm, Construct Service Road

ND Linton Linton Municipal 7L2 3-38-0033-016-2019 Linton Municipal Airport Authority 7/9/2019 9/9/2019 $ 504,000 $ - $ 504,000 Install Airfield Guidance Signs, Install Airport Beacons, Install Miscellaneous NAVAIDS, Install Taxiway Lighting, Rehabilitate Runway Lighting - 09/27

ND Lisbon Lisbon Municipal 6L3 3-38-0081-014-2019 Lisbon Municipal Airport Authority 7/9/2019 9/10/2019 $ 256,500 $ - $ 256,500 Update Airport Master Plan Study

ND Mandan Mandan Municipal Y19 3-38-0035-024-2019 Mandan Airport Authority 9/20/2019 9/23/2019 $ 1,300,459 $ - $ 1,300,459 Reconstruct Taxiway

ND Minot Minot International MOT 3-38-0037-055-2019 City of Minot 7/9/2019 7/22/2019 $ 2,164,051 $ - $ 2,164,051 Construct Taxiway, Expand Apron, Reconstruct Apron [Cargo], Reconstruct Apron [General Aviation], Reconstruct Taxiway

ND Mohall Mohall Municipal HBC 3-38-0038-013-2019 City of Mohall 9/20/2019 9/25/2019 $ 747,684 $ - $ 747,684 Extend Runway [Design] - 13/31, Extend Runway [Land Acquisition] - 13/31, Widen Runway - 13/31

ND Mott Mott Municipal 3P3 3-38-0039-016-2019 Mott Municipal Airport Authority 7/29/2019 8/29/2019 $ 202,500 $ - $ 202,500 Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate Runway - 10/28, Rehabilitate Taxiway

ND Park River Park River - W C Skjerven Field Y37 3-38-0045-012-2019 Park River Municipal Airport Authority 9/20/2019 9/23/2019 $ 209,021 $ - $ 209,021 Construct Parking Lot, Reconstruct Access Road

ND Parshall Parshall-Hankins Y74 3-38-0046-012-2019 Parshall Municipal Airport Authority 6/24/2019 8/28/2019 $ 300,265 $ - $ 300,265 Conduct Airport Master Plan Study

ND Stanley Stanley Municipal 08D 3-38-0050-016-2019 Stanley Airport Authority 9/20/2019 9/24/2019 $ 144,478 $ - $ 144,478 Conduct Aeronautical Survey for RNAV Approach

ND Tioga Tioga Municipal D60 3-38-0051-010-2019 Tioga Municipal Airport Authority 7/9/2019 9/11/2019 $ 63,000 $ - $ 63,000 Reconstruct Taxiway, Rehabilitate Apron

ND Valley City Barnes County Municipal BAC 3-38-0053-019-2019 Barnes County Municipal Airport Authority 7/9/2019 8/12/2019 $ 120,600 $ - $ 120,600 Install Airport Beacons, Install Runway Vertical/Visual Guidance System - 13/31

ND Walhalla Walhalla Municipal 96D 3-38-0063-009-2019 Walhalla Airport Authority 7/9/2019 8/19/2019 $ 149,360 $ - $ 149,360 Rehabilitate Runway - 15/33

ND Washburn Washburn Municipal 5C8 3-38-0055-016-2019 Washburn Municipal Airport 7/9/2019 8/29/2019 $ 62,272 $ - $ 62,272 Construct Fuel Farm

ND Watford City Watford City Municipal S25 3-38-0056-019-2019 Watford City Airport Authority 9/20/2019 9/24/2019 $ 246,012 $ 3,000,000 $ 3,246,012 Reconstruct Runway - 12/30, Reconstruct Runway - 12/30

ND Williston New +09N 3-38-0084-007-2019 City of Williston 6/5/2019 6/19/2019 $ 1,000,000 $ 7,000,000 $ 8,000,000 Construct New Airport ND Williston New +09N 3-38-0084-008-2019 City of Williston 9/27/2019 $ - $ 6,301,568 $ 6,301,568 Construct New Airport NE Ainsworth Ainsworth Regional ANW 3-31-0001-012-2019 Ainsworth Airport Authority 6/5/2019 6/11/2019 $ 283,700 $ - $ 283,700 Rehabilitate Apron, Rehabilitate Taxiway

NE Alma Alma Municipal 4D9 3-31-0004-008-2019 Alma Airport Authority 6/5/2019 6/17/2019 $ 189,200 $ - $ 189,200 Construct Taxiway

NE Atkinson Stuart-Atkinson Municipal 8V2 3-31-0079-008-2019 Stuart Atkinson Airport Authority 6/5/2019 6/14/2019 $ 385,000 $ - $ 385,000 Construct Taxiway

NE Auburn Farington Field K01 3-31-0006-008-2019 Auburn Airport Authority 6/5/2019 6/13/2019 $ 344,000 $ - $ 344,000 Construct Fuel Farm

NE Columbus Columbus Municipal OLU 3-31-0019-013-2019 City of Columbus, Nebraksa 6/5/2019 8/5/2019 $ 600,000 $ - $ 600,000 Construct Snow Removal Equipment Building

NE Cozad Cozad Municipal CZD 3-31-0020-010-2019 Cozad Airport Authority 6/5/2019 7/11/2019 $ 161,000 $ - $ 161,000 Rehabilitate Apron

9/30/2019 Page 23 of 40 FAA AIP Grant Detail Report

Page 24: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

NE Falls City Brenner Field FNB 3-31-0028-013-2019 Falls City Airport Authority 6/5/2019 6/10/2019 $ 426,000 $ - $ 426,000 Improve Access Road

NE Fremont Fremont Municipal FET 3-31-0029-012-2019 City of Fremont 7/9/2019 7/30/2019 $ 2,045,500 $ - $ 2,045,500 Construct Apron [Multi-year Funding]

NE Gordon Gordon Municipal GRN 3-31-0031-009-2019 Gordon Airport Authority 7/9/2019 7/19/2019 $ 362,700 $ - $ 362,700 Reconstruct Apron, Reconstruct Taxiway [Parallel], Reconstruct Taxiway [Taxilane], Rehabilitate Runway - 04/22

NE Grand Island Central Nebraska Regional GRI 3-31-0034-041-2019 Hall County Airport Authority 6/5/2019 8/6/2019 $ 783,252 $ - $ 783,252 Acquire Aircraft Rescue & Fire Fighting Vehicle

NE Grand Island Central Nebraska Regional GRI 3-31-0034-042-2019 Hall County Airport Authority 9/20/2019 9/23/2019 $ 574,612 $ 2,785,889 $ 3,360,501 Construct Aircraft Rescue & Fire Fighting Building

NE Imperial Imperial Municipal IML 3-31-0044-014-2019 Imperial Airport Authority 6/5/2019 6/12/2019 $ 489,000 $ - $ 489,000 Rehabilitate Runway - 13/31

NE Lincoln Lincoln LNK 3-31-0050-054-2019 Lincoln Airport Authority 6/5/2019 7/24/2019 $ 87,075 $ - $ 87,075 Acquire Friction Measuring Equipment NE Lincoln Lincoln LNK 3-31-0050-057-2019 Lincoln Airport Authority 6/5/2019 6/13/2019 $ 206,900 $ - $ 206,900 Install Runway Vertical/Visual Guidance System - 17/35

NE Lincoln State of Nebraska *NES 3-31-0000-027-2019 Nebraska Department of Transportation 9/20/2019 9/23/2019 $ - $ 67,500 $ 67,500 Update State System Plan Study

NE McCook McCook Ben Nelson Regional MCK 3-31-0052-015-2019 City of McCook 6/5/2019 7/1/2019 $ 901,742 $ 562,158 $ 1,463,900 Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate Runway - 12/30, Rehabilitate Taxiway [Taxiway C], Rehabilitate Taxiway [Taxiwy A and Taxiway B]

NE Neligh Antelope County 4V9 3-31-0057-007-2019 Antelope County Airport Authority 7/29/2019 8/7/2019 $ 1,241,200 $ - $ 1,241,200 Reconstruct Apron, Reconstruct Taxiway

NE Norfolk Norfolk Regional/Karl Stefan Memorial Field OFK 3-31-0058-023-2019 Norfolk Airport Authority 6/5/2019 6/20/2019 $ 1,937,004 $ 843,996 $ 2,781,000

Rehabilitate Runway - 01/19, Rehabilitate Runway - 14/32, Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway B and Taxiway C]

NE North Platte North Platte Regional Airport Lee Bird Field LBF 3-31-0059-036-2019 North Platte Airport Authority 7/29/2019 8/14/2019 $ 2,388,553 $ 2,075,147 $ 4,463,700

Reconstruct Airfield Guidance Signs, Reconstruct Airport Beacon, Reconstruct Taxiway, Rehabilitate Taxiway Lighting

NE North Platte North Platte Regional Airport Lee Bird Field LBF 3-31-0059-037-2019 North Platte Airport Authority 6/5/2019 7/1/2019 $ 147,700 $ - $ 147,700 Acquire Safety and/or Security Equipment

NE Omaha Eppley Airfield OMA 3-31-0062-070-2019 Omaha Airport Authority 6/5/2019 6/10/2019 $ 8,187,719 $ 2,806,281 $ 10,994,000 Rehabilitate Taxiway

NE Omaha Millard MLE 3-31-0053-011-2019 Omaha Airport Authority 6/5/2019 6/21/2019 $ 176,400 $ - $ 176,400 Rehabilitate Runway - 12/30

NE Red Cloud Red Cloud Municipal 7V7 3-31-0105-008-2019 Red Cloud Airport Authority 7/29/2019 8/19/2019 $ 513,000 $ - $ 513,000 Reconstruct Runway - 16/34, Rehabilitate Apron, Rehabilitate Taxiway

NE Scottsbluff Western Nebraska Regional/William B Heilig Field BFF 3-31-0072-042-2019

Airport Authority of the County of Scotts Bluff, Nebraska 6/24/2019 7/12/2019 $ 862,000 $ - $ 862,000

Rehabilitate Runway - 12/30, Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway B]

NE Seward Seward Municipal SWT 3-31-0074-012-2019 Seward Airport Authority 6/5/2019 7/30/2019 $ 1,121,000 $ - $ 1,121,000 Construct Building

NE Sidney Sidney Municipal/Lloyd W Carr Field SNY 3-31-0075-007-2019 Sidney Airport Authority 6/5/2019 6/28/2019 $ 230,800 $ - $ 230,800 Install Airfield Guidance Signs, Install Airport Beacons, Install Miscellaneous NAVAIDS

NE Tekamah Tekamah Municipal TQE 3-31-0082-009-2019 Tekamah Airport Authority 6/5/2019 7/11/2019 $ 599,594 $ - $ 599,594 Construct Apron

NE Wayne Wayne Municipal/ Stan Morris Field LCG 3-31-0086-015-2019 Wayne Airport Authority 6/24/2019 6/28/2019 $ 151,800 $ - $ 151,800 Construct Taxiway, Install Taxiway Lighting

NH Concord New Hampshire State Block Grant Program *NHB 3-33-SBGP-030-2019 State of New Hampshire 6/5/2019 6/19/2019 $ 2,105,194 $ - $ 2,105,194 Non primary development projects in state block grant program

NH Lebanon Lebanon Municipal LEB 3-33-0010-059-2019 City of Lebanon 6/24/2019 7/8/2019 $ 123,300 $ - $ 123,300 Update Airport Master Plan Study

NH Lebanon Lebanon Municipal LEB 3-33-0010-060-2019 City of Lebanon 6/24/2019 7/22/2019 $ 1,107,000 $ - $ 1,107,000 Construct Snow Removal Equipment Building

NH Manchester Manchester MHT 3-33-0011-116-2019 City of Manchester 6/5/2019 6/21/2019 $ 693,531 $ - $ 693,531 Rehabilitate Taxiway

NH Manchester Manchester MHT 3-33-0011-117-2019 City of Manchester 6/5/2019 6/21/2019 $ 134,928 $ - $ 134,928 Acquire Safety and/or Security Equipment NH Manchester Manchester MHT 3-33-0011-118-2019 City of Manchester 6/5/2019 6/21/2019 $ 1,414,175 $ - $ 1,414,175 Rehabilitate Taxiway

NH Manchester Manchester MHT 3-33-0011-119-2019 City of Manchester 6/5/2019 6/21/2019 $ 2,313,899 $ - $ 2,313,899 Acquire Snow Removal Equipment NH Portsmouth Portsmouth International at Pease PSM 3-33-0016-064-2019 Pease Development Authority 7/9/2019 7/16/2019 $ 1,205,198 $ 12,171,348 $ 13,376,546 Reconstruct Runway - 16/34

NH Portsmouth Portsmouth International at Pease PSM 3-33-0016-065-2019 Pease Development Authority 7/9/2019 7/16/2019 $ 129,987 $ - $ 129,987 Reconstruct Runway - 16/34

NJ Atlantic City Atlantic City International ACY 3-34-0002-102-2019 South Jersey Transportation Authority 7/9/2019 8/27/2019 $ 9,049,608 $ 1,420,047 $ 10,469,655 Construct Deicing Containment Facility

NJ Caldwell Essex County CDW 3-34-0011-042-2019 Essex County Improvement Authority 6/5/2019 7/15/2019 $ 144,900 $ - $ 144,900 Remove Obstructions

NJ Hammonton Hammonton Municipal N81 3-34-0017-025-2019 Town of Hammonton 6/5/2019 8/22/2019 $ 87,300 $ - $ 87,300 Install Perimeter Fencing not Required by 49 CFR 1542

NJ Lakewood Lakewood N12 3-34-0076-020-2019 Township of Lakewood 6/24/2019 9/10/2019 $ 298,246 $ - $ 298,246 Construct Apron

NJ Millville Millville Municipal MIV 3-34-0022-046-2019 Delaware River and Bay Authority 9/20/2019 9/23/2019 $ 695,484 $ - $ 695,484 Rehabilitate Apron

NJ Morristown Morristown Municipal MMU 3-34-0023-055-2019 Town of Morristown 6/5/2019 8/26/2019 $ 939,888 $ 6,524,450 $ 7,464,338 Improve Runway Safety Area - 05/23

NJ Morristown Morristown Municipal MMU 3-34-0023-056-2019 Town of Morristown 6/24/2019 8/26/2019 $ - $ 188,448 $ 188,448 Improve Runway Safety Area - 05/23

NJ Mount Holly South Jersey Regional VAY 3-34-0054-016-2019 New Jersey State Department of Transportation 6/24/2019 8/28/2019 $ 482,377 $ - $ 482,377 Remove Obstructions

NJ Mount Holly South Jersey Regional VAY 3-34-0054-017-2019 New Jersey State Department of Transportation 6/24/2019 8/28/2019 $ 944,730 $ - $ 944,730 Construct Taxiway, Widen Runway - 08/26

NJ Newark Newark Liberty International EWR 3-34-0027-142-2019 Port Authority of New York and New Jersey 9/20/2019 9/23/2019 $ 5,791,440 $ - $ 5,791,440 Rehabilitate Runway - 11/29

NJ Newark Newark Liberty International EWR 3-34-0027-143-2019 Port Authority of New York and New Jersey 9/20/2019 9/23/2019 $ 918,133 $ - $ 918,133 Rehabilitate Taxiway

NJ Newark Newark Liberty International EWR 3-34-0027-144-2019 Port Authority of New York and New Jersey 9/20/2019 9/23/2019 $ 1,570,545 $ - $ 1,570,545 Rehabilitate Taxiway

NJ Ocean City Ocean City Municipal 26N 3-34-0029-020-2019 City of Ocean City 6/5/2019 8/27/2019 $ 316,391 $ - $ 316,391 Light Obstructions [Non-Hazard] NJ Ocean City Ocean City Municipal 26N 3-34-0029-021-2019 City of Ocean City 6/24/2019 8/27/2019 $ 618,764 $ - $ 618,764 Improve Airport Erosion Control

9/30/2019 Page 24 of 40 FAA AIP Grant Detail Report

Page 25: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

NJ Teterboro Teterboro TEB 3-34-0039-056-2019 Port Authority of New York and New Jersey 9/20/2019 9/23/2019 $ 1,300,000 $ - $ 1,300,000 Construct Taxiway

NJ Toms River Ocean County MJX 3-34-0041-030-2019 Ocean County 6/5/2019 7/24/2019 $ 25,015 $ - $ 25,015 Wildlife Hazard Assessments

NJ Toms River Ocean County MJX 3-34-0041-031-2019 Ocean County 6/5/2019 7/24/2019 $ 1,131,552 $ - $ 1,131,552 Expand Apron

NJ Trenton Trenton Mercer TTN 3-34-0042-053-2019 County of Mercer 6/24/2019 8/8/2019 $ 4,002,174 $ - $ 4,002,174 Reconstruct Taxiway, Reconstruct Taxiway Lighting

NJ West Milford Greenwood Lake 4N1 3-34-0044-011-2019 New Jersey Department of Transportation 6/24/2019 8/28/2019 $ 135,459 $ - $ 135,459 Rehabilitate Apron

NJ Wildwood Cape May County WWD 3-34-0045-043-2019 Delaware River and Bay Authority 9/27/2019 $ - $ 2,429,131 $ 2,429,131 Rehabilitate Apron

NJ Wildwood Cape May County WWD 3-34-0045-044-2019 Delaware River and Bay Authority 7/29/2019 8/6/2019 $ 150,000 $ 235,650 $ 385,650 Rehabilitate Runway - 10/28, Rehabilitate Runway Lighting - 10/28

NJ Woodbine Woodbine Municipal OBI 3-34-0046-025-2019 Borough of Woodbine NJ 6/24/2019 8/19/2019 $ 186,029 $ - $ 186,029 Rehabilitate Taxiway

NM Angel Fire Angel Fire AXX 3-35-0058-023-2019 County of Colfax 6/5/2019 9/9/2019 $ 287,949 $ - $ 287,949 Rehabilitate Taxiway

NM Belen Belen Regional BRG 3-35-0006-014-2019 City of Belen 7/9/2019 8/5/2019 $ 149,681 $ - $ 149,681 Reconstruct Runway - 03/21

NM Carlsbad Cavern City Air Terminal CNM 3-35-0007-027-2019 City of Carlsbad 6/5/2019 8/28/2019 $ 798,000 $ - $ 798,000 Reconstruct Taxiway

NM Carrizozo Carrizozo Municipal F37 3-35-0008-010-2019 Town of Carrizozo 6/5/2019 8/19/2019 $ 51,456 $ - $ 51,456 Reconstruct Apron

NM Clayton Clayton Municipal Airpark CAO 3-35-0010-019-2019 Town of Clayton 6/5/2019 6/28/2019 $ 132,108 $ - $ 132,108 Rehabilitate Taxiway

NM Deming Deming Municipal DMN 3-35-0013-018-2019 City of Deming 6/5/2019 8/12/2019 $ 226,717 $ - $ 226,717 Rehabilitate Runway - 04/22

NM Farmington Four Corners Regional FMN 3-35-0016-042-2019 City of Farmington 6/5/2019 9/6/2019 $ 1,450,000 $ 2,000,000 $ 3,450,000 Improve Runway Safety Area - 05/23, Improve Runway Safety Area - 07/25

NM Grants Grants-Milan Municipal GNT 3-35-0020-018-2019 City of Grants 6/5/2019 7/26/2019 $ 106,546 $ - $ 106,546 Reconstruct Taxiway

NM Hobbs Lea County Regional HOB 3-35-0022-030-2019 County of Lea 7/9/2019 9/6/2019 $ 1,325,096 $ - $ 1,325,096 Reconstruct Apron

NM Jal Lea County/Jal/ E26 3-35-0023-012-2019 County of Lea 6/24/2019 8/28/2019 $ 165,437 $ - $ 165,437 Install Runway Vertical/Visual Guidance System - 01/19

NM Las Cruces Las Cruces International LRU 3-35-0024-032-2019 City of Las Cruces 9/27/2019 $ 1,000,000 $ 1,808,344 $ 2,808,344 Rehabilitate Apron

NM Lovington Lea County-Zip Franklin Memorial E06 3-35-0027-011-2019 County of Lea 7/9/2019 8/28/2019 $ 177,620 $ - $ 177,620 Improve Airport Miscellaneous Improvements

NM Moriarty Moriarty Municipal 0 3-35-0029-017-2019 City of Moriarty 6/24/2019 8/29/2019 $ 121,013 $ - $ 121,013 Rehabilitate Taxiway

NM Portales Portales Municipal PRZ 3-35-0061-021-2019 City of Portales 9/27/2019 9/27/2019 $ 2,972,597 $ - $ 2,972,597 Reconstruct Runway - 01/19, Reconstruct Runway - 08/26

NM Questa Questa Municipal Nr 2 N24 3-35-0063-012-2019 Village of Questa 7/9/2019 9/10/2019 $ 150,000 $ - $ 150,000 Rehabilitate Runway [Multi-year Funding] - 17/35

NM Reserve Reserve T16 3-35-0034-007-2019 County of Catron 7/9/2019 9/12/2019 $ 60,684 $ - $ 60,684 Reconstruct Runway Lighting - 07/25

NM Roswell Roswell International Air Center ROW 3-35-0035-033-2019 City of Roswell 6/24/2019 7/30/2019 $ 148,439 $ - $ 148,439 Rehabilitate Taxiway

NM Roswell Roswell International Air Center ROW 3-35-0035-034-2019 City of Roswell 6/24/2019 8/1/2019 $ 316,663 $ - $ 316,663 Rehabilitate Taxiway

NM Roswell Roswell International Air Center ROW 3-35-0035-035-2019 City of Roswell 9/20/2019 9/20/2019 $ - $ 2,000,000 $ 2,000,000 Construct Parking Lot [MAP] NM Santa Fe Santa Fe Municipal SAF 3-35-0037-049-2019 City of Santa Fe 9/27/2019 $ 2,320,152 $ 66,603 $ 2,386,755 Rehabilitate Taxiway

NM Santa Teresa Dona Ana County International Jetport DNA 3-35-0055-025-2019 County of Dona Ana 6/5/2019 8/12/2019 $ 614,603 $ 4,294,150 $ 4,908,753 Reconstruct Runway - 10/28

NM Silver City Grant County SVC 3-35-0039-020-2019 County of Grant 6/5/2019 6/25/2019 $ 47,429 $ - $ 47,429 Reconstruct Apron

NM Silver City Grant County SVC 3-35-0039-021-2019 County of Grant 9/20/2019 9/20/2019 $ 336,191 $ - $ 336,191 Modify Terminal Building

NM Socorro Socorro Municipal ONM 3-35-0040-018-2019 City of Socorro 6/5/2019 9/5/2019 $ 186,022 $ - $ 186,022 Acquire Equipment NM Springer Springer Municipal S42 3-35-0051-010-2019 City of Springer 6/24/2019 8/7/2019 $ 56,500 $ - $ 56,500 Construct Snow Removal Equipment Building

NM Taos Taos Regional SKX 3-35-0041-037-2019 City of Taos 6/5/2019 8/8/2019 $ 239,686 $ - $ 239,686 Reconstruct Taxiway

NM Tucumcari Tucumcari Municipal TCC 3-35-0043-020-2019 City of Tucumcari 9/20/2019 9/23/2019 $ 100,000 $ - $ 100,000 Rehabilitate Runway - 03/21, Rehabilitate Runway - 08/26, Rehabilitate Taxiway

NM Vaughn Vaughn Municipal N17 3-35-0509-013-2019 Town of Vaughn 6/5/2019 8/16/2019 $ 117,494 $ - $ 117,494 Rehabilitate Apron, Rehabilitate Taxiway

NM Zuni Andrew Othole Memorial XNI 3-35-0064-009-2019 Pueblo of Zuni 6/5/2019 7/1/2019 $ 297,002 $ - $ 297,002 Conduct Airport Master Plan Study

NV Austin Austin TMT 3-32-0026-018-2019 County of Lander 6/5/2019 7/1/2019 $ 108,178 $ - $ 108,178 Rehabilitate Access Road

NV Battle Mountain Battle Mountain BAM 3-32-0001-028-2019 County of Lander 6/5/2019 7/1/2019 $ 142,567 $ - $ 142,567 Reconstruct Apron

NV Beatty Beatty BTY 3-32-0002-017-2019 County of Nye 6/24/2019 8/16/2019 $ 733,594 $ - $ 733,594 Reconstruct Apron, Reconstruct Perimeter Fencing not Required by 49 CFR 1542, Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate Taxiway

NV Elko Elko Regional EKO 3-32-0005-050-2019 City of Elko 6/24/2019 7/25/2019 $ 1,000,000 $ 332,564 $ 1,332,564 Rehabilitate Apron, Rehabilitate Runway - 06/24, Rehabilitate Runway - 12/30, Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway B]

NV Ely Ely /Yelland Field/ ELY 3-32-0006-023-2019 County of White Pine 6/5/2019 7/2/2019 $ 99,727 $ - $ 99,727 Rehabilitate Apron

NV Fallon Fallon Municipal FLX 3-32-0008-021-2019 City of Fallon 6/5/2019 7/8/2019 $ 730,219 $ - $ 730,219 Install Perimeter Fencing not Required by 49 CFR 1542

NV Hawthorne Hawthorne Industrial HTH 3-32-0009-015-2019 County of Mineral 6/5/2019 7/17/2019 $ 34,666 $ - $ 34,666 Install Perimeter Fencing not Required by 49 CFR 1542

NV Las Vegas Henderson Executive HND 3-32-0027-028-2019 County of Clark 6/24/2019 8/13/2019 $ 934,383 $ - $ 934,383 Update Airport Master Plan Study

NV Las Vegas McCarran International LAS 3-32-0012-088-2019 County of Clark 9/20/2019 9/24/2019 $ 9,631,425 $ - $ 9,631,425 Reconstruct Apron [Holding Pad #2 Apron], Reconstruct Apron [South Teardrop Holding Pad]

NV Las Vegas McCarran International LAS 3-32-0012-089-2019 County of Clark 9/20/2019 9/24/2019 $ - $ 4,274,843 $ 4,274,843 VALE Infrastructure

NV Minden Minden-Tahoe MEV 3-32-0013-033-2019 County of Douglas 6/5/2019 8/19/2019 $ 805,080 $ 1,806,643 $ 2,611,723 Construct Taxiway

9/30/2019 Page 25 of 40 FAA AIP Grant Detail Report

Page 26: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

NV Reno Reno/Stead RTS 3-32-0018-038-2019 Reno-Tahoe Airport Authority 6/5/2019 7/30/2019 $ 1,083,053 $ - $ 1,083,053 Reconstruct Apron

NV Reno Reno/Tahoe International RNO 3-32-0017-104-2019 Reno-Tahoe Airport Authority 6/5/2019 6/18/2019 $ 12,846,926 $ 1,767,386 $ 14,614,312 Reconstruct Runway - 16L/34R, Reconstruct Taxiway, Rehabilitate Runway Lighting - 16L/34R

NV Silver Springs Silver Springs SPZ 3-32-0023-020-2019 County of Lyon 6/5/2019 7/31/2019 $ 93,750 $ - $ 93,750 Expand Apron

NV Tonopah Tonopah TPH 3-32-0019-016-2019 County of Nye 6/24/2019 8/6/2019 $ 469,687 $ - $ 469,687 Update Airport Master Plan Study

NV Winnemucca Winnemucca Municipal WMC 3-32-0021-027-2019 City of Winnemucca 6/5/2019 7/16/2019 $ 2,149,449 $ - $ 2,149,449 Expand Apron, Reconstruct Apron

NY Akron Akron/Jesson Field 9G3 3-36-0206-024-2019 Christian Airmen Inc. 9/20/2019 9/24/2019 $ 153,201 $ - $ 153,201 Conduct Environmental Study

NY Albany Albany International ALB 3-36-0001-138-2019 Albany County Airport Authority 6/5/2019 7/22/2019 $ 2,603,546 $ - $ 2,603,546 Reconstruct Runway Lighting - 10/28, Reconstruct Taxiway Lighting

NY Albany Albany International ALB 3-36-0001-139-2019 Albany County Airport Authority 6/24/2019 9/10/2019 $ 1,247,214 $ - $ 1,247,214

Acquire Snow Removal Equipment [Vehicle M-24], Acquire Snow Removal Equipment [Vehicle M-35], Acquire Snow Removal Equipment [Vehicle M-61], Acquire Snow Removal Equipment [Vehicle M-63]

NY Albany Albany International ALB 3-36-0001-140-2019 Albany County Airport Authority 9/20/2019 9/23/2019 $ 717,900 $ 920,240 $ 1,638,140 Improve Airport Drainage

NY Batavia Genesee County GVQ 3-36-0006-042-2019 County of Genesee 7/9/2019 8/19/2019 $ 124,767 $ - $ 124,767 Reconstruct Apron, Remove Obstructions [Non-Hazard]

NY Binghamton Greater Binghamton/Edwin A Link Field BGM 3-36-0008-075-2019 County of Broome 6/5/2019 7/22/2019 $ 1,220,869 $ 3,126,599 $ 4,347,468

Reconstruct Airfield Guidance Signs, Reconstruct Runway Lighting, Rehabilitate Runway - 10/28

NY Buffalo Buffalo Niagara International BUF 3-36-0009-100-2019 Niagara Frontier Transportation Authority 6/5/2019 7/22/2019 $ 189,712 $ - $ 189,712 Acquire Snow Removal Equipment

NY Buffalo Buffalo Niagara International BUF 3-36-0009-101-2019 Niagara Frontier Transportation Authority 6/5/2019 7/8/2019 $ 1,171,488 $ - $ 1,171,488 Acquire Snow Removal Equipment [Vehicle 1], Acquire Snow Removal Equipment [Vehicle 2]

NY Buffalo Buffalo Niagara International BUF 3-36-0009-102-2019 Niagara Frontier Transportation Authority 6/5/2019 7/17/2019 $ 83,133 $ - $ 83,133 Remove Obstructions

NY Corning Corning-Painted Post 7N1 3-36-0193-024-2019 Town of Erwin Industrial Development Agency 6/24/2019 7/15/2019 $ 317,308 $ - $ 317,308

Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 13/31, Reconstruct Airport Beacon, Rehabilitate Runway Lighting - 13/31

NY Corning Corning-Painted Post 7N1 3-36-0193-025-2019 Town of Erwin Industrial Development Agency 6/5/2019 7/3/2019 $ 45,824 $ - $ 45,824 Construct Taxiway

NY Corning Corning-Painted Post 7N1 3-36-0193-026-2019 Town of Erwin Industrial Development Agency 6/5/2019 8/8/2019 $ 123,910 $ - $ 123,910 Conduct Environmental Study

NY Cortland Cortland County-Chase Field N03 3-36-0017-027-2019 County of Cortland 7/9/2019 9/4/2019 $ 229,023 $ - $ 229,023 Reconstruct Airfield Guidance Signs, Reconstruct Runway Lighting - 06/24, Rehabilitate Runway - 06/24

NY Elmira Elmira/Corning Regional ELM 3-36-0026-071-2019 County of Chemung 6/5/2019 8/5/2019 $ 1,104,057 $ - $ 1,104,057 Construct Taxiway

NY Elmira Elmira/Corning Regional ELM 3-36-0026-072-2019 County of Chemung 9/20/2019 9/24/2019 $ 344,789 $ 3,650,311 $ 3,995,100 Reconstruct Deicing Pad with Associated Facilities

NY Endicott Tri-Cities CZG 3-36-0027-026-2019 Village of Endicott 6/24/2019 9/11/2019 $ 91,327 $ - $ 91,327 Remove Obstructions

NY Fishers Island Elizabeth Field 0B8 3-36-0029-024-2019 Town of Southold 6/5/2019 7/19/2019 $ 79,650 $ - $ 79,650 Rehabilitate Runway - 12/30

NY Fishers Island Elizabeth Field 0B8 3-36-0029-025-2019 Town of Southold 6/5/2019 7/19/2019 $ 293,400 $ - $ 293,400 Improve Airport Miscellaneous Improvements

NY Fulton Oswego County FZY 3-36-0031-049-2019 County of Oswego 6/5/2019 7/19/2019 $ 1,155,780 $ - $ 1,155,780 Rehabilitate Apron

NY Glens Falls Floyd Bennett Memorial GFL 3-36-0033-063-2019 County of Warren 6/24/2019 7/26/2019 $ 135,000 $ - $ 135,000 Construct Snow Removal Equipment Building

NY Glens Falls Floyd Bennett Memorial GFL 3-36-0033-064-2019 County of Warren 6/24/2019 9/11/2019 $ 373,500 $ - $ 373,500 Acquire Snow Removal Equipment [Vehicle #413], Acquire Snow Removal Equipment [Vehicle #414]

NY Hamilton Hamilton Municipal VGC 3-36-0192-024-2019 Village of Hamilton 6/5/2019 8/13/2019 $ 53,883 $ - $ 53,883 Conduct Miscellaneous Study

NY Hudson Columbia County 1B1 3-36-0042-037-2019 County of Columbia 6/5/2019 7/19/2019 $ 91,639 $ - $ 91,639 Reconstruct Apron

NY Hudson Columbia County 1B1 3-36-0042-038-2019 County of Columbia 6/24/2019 8/21/2019 $ 59,266 $ - $ 59,266

Install Airport Beacons, Install Miscellaneous NAVAIDS, Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542, Install Perimeter Fencing not Required by 49 CFR 1542, Install Runway Vertical/Visual Guidance System - 03/21, Reconstruct Perimeter Fencing not Required by 49 CFR 1542

NY Islip Long Island MacArthur ISP 3-36-0046-101-2019 Town of Islip 6/5/2019 7/25/2019 $ 326,997 $ - $ 326,997 Reconstruct Apron

NY Islip Long Island MacArthur ISP 3-36-0046-102-2019 Town of Islip 6/5/2019 7/25/2019 $ 732,675 $ - $ 732,675 Rehabilitate Terminal Building

NY Islip Long Island MacArthur ISP 3-36-0046-103-2019 Town of Islip 7/9/2019 7/25/2019 $ 477,765 $ - $ 477,765 Conduct Miscellaneous Study

NY Ithaca Ithaca Tompkins Regional ITH 3-36-0047-086-2019 County of Tompkins 6/5/2019 7/16/2019 $ 808,548 $ - $ 808,548 Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway C] NY Ithaca Ithaca Tompkins Regional ITH 3-36-0047-087-2019 County of Tompkins 7/29/2019 8/13/2019 $ 720,447 $ - $ 720,447 Acquire Snow Removal Equipment NY Jamestown Chautauqua County/Jamestown JHW 3-36-0048-050-2019 County of Chautauqua 6/24/2019 8/23/2019 $ 165,150 $ - $ 165,150 Install Perimeter Fencing not Required by 49 CFR 1542

NY Jamestown Chautauqua County/Jamestown JHW 3-36-0048-051-2019 County of Chautauqua 6/24/2019 8/23/2019 $ 25,000 $ - $ 25,000 Install Miscellaneous NAVAIDS

NY Jamestown Chautauqua County/Jamestown JHW 3-36-0048-052-2019 County of Chautauqua 6/24/2019 8/23/2019 $ 363,600 $ - $ 363,600 Rehabilitate Runway - 07/25, Rehabilitate Runway Lighting - 07/25

NY Johnstown Fulton County NY0 3-36-0049-023-2019 County of Fulton 6/5/2019 7/10/2019 $ 945,919 $ - $ 945,919 Construct Taxiway, Rehabilitate Runway - 10/28

NY Johnstown Fulton County NY0 3-36-0049-024-2019 County of Fulton 6/5/2019 7/9/2019 $ 90,000 $ - $ 90,000 Reconstruct Apron

NY Kingston Kingston-Ulster 20N 3-36-0222-025-2019 Kingston-Ulster Airport, Inc. 6/24/2019 8/1/2019 $ 47,586 $ - $ 47,586 Light Obstructions, Remove Obstructions

NY Lake Placid Lake Placid LKP 3-36-0051-045-2019 Town of North Elba 6/24/2019 9/10/2019 $ 913,932 $ - $ 913,932 Remove Obstructions

NY Lake Placid Lake Placid LKP 3-36-0051-046-2019 Town of North Elba 6/24/2019 9/10/2019 $ 118,530 $ - $ 118,530 Rehabilitate Apron

NY Lancaster Buffalo-Lancaster Regional BQR 3-36-0216-026-2019 Lancaster Airport, Inc. 6/24/2019 8/29/2019 $ 128,652 $ - $ 128,652 Conduct Environmental Study

9/30/2019 Page 26 of 40 FAA AIP Grant Detail Report

Page 27: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

NY Le Roy Le Roy 5G0 3-36-0221-029-2019 Leroy Aviation Services, Inc. 6/24/2019 8/1/2019 $ 137,261 $ - $ 137,261 Conduct Environmental Study

NY Malone Malone-Dufort MAL 3-36-0053-037-2019 Town of Malone 6/5/2019 7/24/2019 $ 268,634 $ - $ 268,634 Acquire Snow Removal Equipment

NY Massena Massena International-Richards Field MSS 3-36-0054-079-2019 Town of Massena 6/5/2019 7/17/2019 $ 171,000 $ - $ 171,000 Rehabilitate Apron

NY Massena Massena International-Richards Field MSS 3-36-0054-080-2019 Town of Massena 6/24/2019 8/21/2019 $ 332,500 $ - $ 332,500 Acquire Aircraft Rescue & Fire Fighting Vehicle

NY Massena Massena International-Richards Field MSS 3-36-0054-081-2019 Town of Massena 6/5/2019 7/17/2019 $ 68,400 $ - $ 68,400 Rehabilitate Access Road

NY Massena Massena International-Richards Field MSS 3-36-0054-083-2019 Town of Massena 9/20/2019 9/23/2019 $ 76,000 $ - $ 76,000 Rehabilitate Apron

NY Middletown Randall 06N 3-36-0224-035-2019 Aerodrome Development Corporation 7/29/2019 8/17/2019 $ 50,597 $ - $ 50,597 Reconstruct Runway Lighting - 08/26

NY Montgomery Orange County MGJ 3-36-0059-043-2019 County of Orange 6/5/2019 8/14/2019 $ 83,025 $ - $ 83,025 Construct Snow Removal Equipment Building

NY Montgomery Orange County MGJ 3-36-0059-044-2019 County of Orange 6/5/2019 8/14/2019 $ 121,275 $ - $ 121,275 Expand Apron, Rehabilitate Apron

NY Montgomery Orange County MGJ 3-36-0059-045-2019 County of Orange 6/5/2019 8/14/2019 $ 90,000 $ - $ 90,000 Rehabilitate Apron

NY Monticello Sullivan County International MSV 3-36-0060-041-2019 County of Sullivan 6/5/2019 8/1/2019 $ 208,052 $ - $ 208,052 Rehabilitate Taxiway

NY Monticello Sullivan County International MSV 3-36-0060-042-2019 County of Sullivan 9/20/2019 9/23/2019 $ 2,244,223 $ 1,357,911 $ 3,602,134 Rehabilitate Runway - 15/33

NY New York John F Kennedy International JFK 3-36-0066-189-2019 Port Authority of New York and New Jersey 9/20/2019 9/23/2019 $ 28,795,710 $ - $ 28,795,710 Reconstruct Runway - 13L/31R, Widen Runway - 13L/31R

NY New York Laguardia LGA 3-36-0068-146-2019 Port Authority of New York and New Jersey 9/20/2019 9/23/2019 $ 1,775,936 $ - $ 1,775,936 Rehabilitate Runway - 04/22

NY New York Laguardia LGA 3-36-0068-147-2019 Port Authority of New York and New Jersey 9/20/2019 9/23/2019 $ 4,290,014 $ - $ 4,290,014 Rehabilitate Runway - 04/22, Rehabilitate Runway - 13/31

NY New York Laguardia LGA 3-36-0068-148-2019 Port Authority of New York and New Jersey 9/20/2019 9/23/2019 $ 1,327,011 $ - $ 1,327,011 Rehabilitate Taxiway

NY Newburgh New York Stewart International SWF 3-36-0085-075-2019 Port Authority of New York and New Jersey 9/20/2019 9/23/2019 $ 3,731,271 $ - $ 3,731,271 Rehabilitate Runway [Multi-Year Funding] - 09/27, Rehabilitate Runway [Multi-Year Funding] - 16/34

NY Niagara Falls Niagara Falls International IAG 3-36-0086-050-2019 Niagara Frontier Transportation Authority 6/24/2019 7/24/2019 $ 315,000 $ - $ 315,000 Reconstruct Taxiway, Rehabilitate Taxiway

NY Niagara Falls Niagara Falls International IAG 3-36-0086-051-2019 Niagara Frontier Transportation Authority 6/24/2019 7/24/2019 $ 89,172 $ - $ 89,172 Remove Obstructions

NY Ogdensburg Ogdensburg International OGS 3-36-0089-053-2019 Ogdensburg Bridge and Port Authority 6/24/2019 8/6/2019 $ 242,250 $ - $ 242,250 Conduct Environmental Study

NY Ogdensburg Ogdensburg International OGS 3-36-0089-054-2019 Ogdensburg Bridge and Port Authority 6/24/2019 8/29/2019 $ 1,064,495 $ 522,318 $ 1,586,813 Extend Runway - 09/27

NY Ogdensburg Ogdensburg International OGS 3-36-0089-055-2019 Ogdensburg Bridge and Port Authority 9/20/2019 9/24/2019 $ 38,387 $ 179,800 $ 218,187 Extend Runway - 09/27

NY Olean Cattaraugus County-Olean OLE 3-36-0091-025-2019 City of Olean 6/5/2019 8/20/2019 $ 240,300 $ - $ 240,300 Rehabilitate Runway - 04/22

NY Olean Cattaraugus County-Olean OLE 3-36-0091-026-2019 City of Olean 6/5/2019 8/20/2019 $ 40,500 $ - $ 40,500 Reconstruct Apron

NY Oneonta Oneonta Municipal N66 3-36-0092-021-2019 City of Oneonta 6/5/2019 8/5/2019 $ 92,700 $ - $ 92,700 Conduct Environmental Study

NY Oneonta Oneonta Municipal N66 3-36-0092-022-2019 City of Oneonta 6/24/2019 8/29/2019 $ 118,800 $ - $ 118,800 Install Apron Edge Lights, Reconstruct Airfield Guidance Signs, Reconstruct Apron, Rehabilitate Apron

NY Penn Yan Penn Yan PEO 3-36-0094-037-2019 County of Yates 6/5/2019 7/8/2019 $ 123,654 $ - $ 123,654 Install Miscellaneous NAVAIDS

NY Piseco Piseco K09 3-36-0096-022-2019 Town of Arietta 9/20/2019 9/24/2019 $ - $ 833,778 $ 833,778 Reconstruct Runway Lighting - 04/22

NY Piseco Piseco K09 3-36-0096-023-2019 Town of Arietta 9/20/2019 9/24/2019 $ - $ 84,600 $ 84,600 Remove Obstructions

NY Plattsburgh Plattsburgh International PBG 3-36-0229-064-2019 County of Clinton 6/5/2019 9/9/2019 $ 390,780 $ - $ 390,780 Reconstruct Runway Lighting - 17/35, Rehabilitate Runway - 17/35

NY Plattsburgh Plattsburgh International PBG 3-36-0229-065-2019 County of Clinton 7/9/2019 9/9/2019 $ 228,780 $ - $ 228,780 Rehabilitate Apron, Rehabilitate Taxiway

NY Potsdam Potsdam Municipal/Damon Field/ PTD 3-36-0099-035-2019 Village of Potsdam 7/29/2019 8/29/2019 $ 170,779 $ - $ 170,779 Acquire Land For Approaches

NY Poughkeepsie Hudson Valley Regional POU 3-36-0100-052-2019 County of Dutchess 6/5/2019 7/30/2019 $ 456,750 $ - $ 456,750 Conduct Airport Master Plan Study, Conduct Miscellaneous Study

NY Poughkeepsie Hudson Valley Regional POU 3-36-0100-053-2019 County of Dutchess 6/5/2019 7/22/2019 $ 57,600 $ - $ 57,600 Reconstruct Airfield Guidance Signs

NY Rochester Greater Rochester International ROC 3-36-0102-103-2019 County of Monroe 6/5/2019 8/26/2019 $ 90,000 $ - $ 90,000 Conduct Environmental Study

NY Rochester Greater Rochester International ROC 3-36-0102-104-2019 County of Monroe 6/24/2019 8/5/2019 $ 1,462,818 $ - $ 1,462,818 Remove Obstructions [Hazard]

NY Rochester Greater Rochester International ROC 3-36-0102-105-2019 County of Monroe 7/29/2019 8/28/2019 $ 4,307,713 $ 1,538,332 $ 5,846,045 Install Airfield Guidance Signs, Reconstruct Runway Lighting - 04/22, Rehabilitate Runway - 04/22

NY Rochester Greater Rochester International ROC 3-36-0102-106-2019 County of Monroe 9/20/2019 9/24/2019 $ - $ 2,700,161 $ 2,700,161 Construct Aircraft Rescue & Fire Fighting Training Facility [ARFF Training Vehicles], Construct Aircraft Rescue & Fire Fighting Training Facility [Replace Control Systems]

NY Rome Griffiss International RME 3-36-0119-048-2019 County of Oneida 6/5/2019 7/30/2019 $ - $ 6,949,710 $ 6,949,710 Reconstruct Runway - 15/33, Reconstruct Runway Lighting - 15/33

NY Rome Griffiss International RME 3-36-0119-049-2019 County of Oneida 6/24/2019 8/19/2019 $ 140,400 $ - $ 140,400 Construct Taxiway, Extend Taxiway, Install Taxiway Lighting

NY Rome Griffiss International RME 3-36-0119-050-2019 County of Oneida 7/9/2019 8/26/2019 $ 150,000 $ 82,200 $ 232,200 Reconstruct Runway - 15/33, Reconstruct Runway Lighting - 15/33

NY Saranac Lake Adirondack Regional SLK 3-36-0105-071-2019 Town of Harrietstown 6/5/2019 7/11/2019 $ 43,577 $ - $ 43,577 Rehabilitate Apron

NY Saranac Lake Adirondack Regional SLK 3-36-0105-073-2019 Town of Harrietstown 6/5/2019 7/11/2019 $ 673,196 $ - $ 673,196 Acquire Aircraft Rescue & Fire Fighting Vehicle

NY Saratoga Springs Saratoga County 5B2 3-36-0004-036-2019 County of Saratoga 6/5/2019 7/16/2019 $ 158,400 $ - $ 158,400 Install Perimeter Fencing not Required by 49 CFR 1542

NY Saratoga Springs Saratoga County 5B2 3-36-0004-037-2019 County of Saratoga 6/5/2019 7/16/2019 $ 378,000 $ - $ 378,000 Construct Taxiway

9/30/2019 Page 27 of 40 FAA AIP Grant Detail Report

Page 28: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

NY Schenectady Schenectady County SCH 3-36-0106-057-2019 County of Schenectady 6/5/2019 9/11/2019 $ 118,350 $ - $ 118,350 Conduct Environmental Study

NY Seneca Falls Finger Lakes Regional 0G7 3-36-0133-029-2019 County of Seneca 6/5/2019 8/1/2019 $ 300,000 $ 461,400 $ 761,400 Reconstruct Apron

NY Shirley Brookhaven HWV 3-36-0108-037-2019 Town of Brookhaven 6/24/2019 7/23/2019 $ 89,796 $ - $ 89,796 Reconstruct Airfield Guidance Signs, Reconstruct Runway Lighting - 15/33

NY Sodus Williamson-Sodus SDC 3-36-0215-033-2019 Williamson Flying Club 6/24/2019 8/20/2019 $ 119,075 $ - $ 119,075 Conduct Environmental Study

NY Syracuse Syracuse Hancock International SYR 3-36-0114-152-2019 Syracuse Regional Airport Authority 6/24/2019 8/19/2019 $ 2,824,920 $ - $ 2,824,920 Improve Terminal Building

NY Syracuse Syracuse Hancock International SYR 3-36-0114-153-2019 Syracuse Regional Airport Authority 6/5/2019 9/6/2019 $ 1,355,334 $ 6,075,781 $ 7,431,115 Construct Taxiway, Rehabilitate Taxiway

NY Syracuse Syracuse Hancock International SYR 3-36-0114-154-2019 Syracuse Regional Airport Authority 9/20/2019 9/23/2019 $ 81,244 $ - $ 81,244 Construct Taxiway

NY Watertown Watertown International ART 3-36-0120-054-2019 County of Jefferson 7/29/2019 8/30/2019 $ 848,546 $ 4,481,735 $ 5,330,281 Construct Aircraft Rescue & Fire Fighting Building

NY Watertown Watertown International ART 3-36-0120-055-2019 County of Jefferson 7/29/2019 8/27/2019 $ 155,043 $ - $ 155,043 Conduct Environmental Study

NY Wellsville Wellsville Municipal Airport,Tarantine Field ELZ 3-36-0121-032-2019 Town of Wellsville 6/5/2019 8/14/2019 $ 50,400 $ - $ 50,400 Conduct Environmental Study

NY White Plains Westchester County HPN 3-36-0123-130-2019 County of Westchester 7/9/2019 7/18/2019 $ 11,157,861 $ - $ 11,157,861

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System [Precision Approach Path Indictors] - 16/34, Install Runway Vertical/Visual Guidance System [Runway End Identifier Lights] - 16/34, Reconstruct Taxiway Lighting, Rehabilitate Runway [Multi-year Funding] - 16/34

OH Akron Akron-Canton Regional CAK 3-39-0001-066-2019 Akron Canton Regional Airport Authority 6/5/2019 7/26/2019 $ 402,619 $ - $ 402,619 Acquire Snow Removal Equipment

OH Barnesville Barnesville-Bradfield 6G5 3-39-0007-013-2019 Belmont County Reg'l Airport Auth & Belmont County Commissioners 9/20/2019 9/24/2019 $ 151,096 $ - $ 151,096 Reconstruct Runway - 09/27, Remove Obstructions

OH Bellefontaine Bellefontaine Regional EDJ 3-39-0125-012-2019 City of Bellefontaine 7/9/2019 8/2/2019 $ 346,973 $ - $ 346,973 Rehabilitate Apron

OH Bluffton Bluffton 5G7 3-39-0115-016-2019 Village of Bluffton 7/9/2019 9/13/2019 $ 106,669 $ - $ 106,669 Install Airport Beacons, Rehabilitate Taxiway Lighting

OH Bryan Williams County 0G6 3-39-0100-012-2019 Williams County Regional Airport Authority 7/29/2019 8/14/2019 $ 2,430,000 $ - $ 2,430,000 Construct Taxiway

OH Carrollton Carroll County-Tolson TSO 3-39-0015-013-2019 Carroll County Commissioners & Carroll County Airport Authority 6/5/2019 8/15/2019 $ 401,584 $ - $ 401,584 Install Perimeter Fencing

OH Celina Lakefield CQA 3-39-0016-020-2019 Lakefield Airport Auth. & Mercer County Board of Commissioners 6/5/2019 8/9/2019 $ 65,679 $ - $ 65,679 Rehabilitate Runway - 08/26, Rehabilitate Taxiway

OH Chillicothe Ross County RZT 3-39-0017-019-2019 Board of Commissioners of Ross County 6/5/2019 8/14/2019 $ 346,821 $ - $ 346,821 Reconstruct Taxiway Lighting

OH Circleville Pickaway County Memorial CYO 3-39-0020-016-2019 Pickaway County Airport Authority & Pickaway County Comm. 6/24/2019 8/28/2019 $ 156,994 $ - $ 156,994 Rehabilitate Apron, Rehabilitate Runway - 01/19, Rehabilitate Taxiway

OH Cleveland Cleveland-Hopkins International CLE 3-39-0023-116-2019 City of Cleveland 6/5/2019 7/22/2019 $ - $ 14,931,937 $ 14,931,937 Construct Taxiway

OH Cleveland Cleveland-Hopkins International CLE 3-39-0023-117-2019 City of Cleveland 6/5/2019 7/22/2019 $ 2,125,807 $ - $ 2,125,807 Construct Runway - 06L/24R

OH Cleveland Cleveland-Hopkins International CLE 3-39-0023-118-2019 City of Cleveland 6/5/2019 7/26/2019 $ - $ 3,238,526 $ 3,238,526 Acquire Snow Removal Equipment OH Cleveland Cleveland-Hopkins International CLE 3-39-0023-119-2019 City of Cleveland 6/24/2019 8/15/2019 $ - $ 119,022 $ 119,022 Construct Taxiway

OH Columbus John Glenn Columbus International CMH 3-39-0025-089-2019 Columbus Regional Airport Authority 6/24/2019 8/12/2019 $ 1,584,491 $ - $ 1,584,491 Acquire Snow Removal Equipment

OH Columbus John Glenn Columbus International CMH 3-39-0025-090-2019 Columbus Regional Airport Authority 6/24/2019 8/12/2019 $ - $ 866,637 $ 866,637 Conduct Noise Compatibility Plan Study

OH Columbus Rickenbacker International LCK 3-39-0117-047-2019 Columbus Regional Airport Authority 6/5/2019 9/11/2019 $ 999,288 $ - $ 999,288 Acquire Snow Removal Equipment

OH Coshocton Richard Downing I40 3-39-0028-024-2019 Coshocton County Regional Airport Auth. & County Commissioners 9/20/2019 9/24/2019 $ 154,926 $ 253,845 $ 408,771 Install Perimeter Fencing not Required by 49 CFR 1542

OH Crestline Galion Municipal GQQ 3-39-0037-012-2019 City of Galion 7/9/2019 8/22/2019 $ 606,940 $ - $ 606,940

Install Runway Vertical/Visual Guidance System - 05/23, Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate Runway Lighting - 05/23, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

OH Dayton Dayton-Wright Brothers MGY 3-39-0030-019-2019 City of Dayton 6/5/2019 8/19/2019 $ 367,312 $ - $ 367,312 Reconstruct Perimeter Fencing not Required by 49 CFR 1542

OH Dayton James M Cox Dayton International DAY 3-39-0029-085-2019 City of Dayton 7/9/2019 9/13/2019 $ 4,742,872 $ - $ 4,742,872 Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate Apron

OH Dayton James M Cox Dayton International DAY 3-39-0029-086-2019 City of Dayton 7/9/2019 8/19/2019 $ 1,296,162 $ - $ 1,296,162 Update Airport Master Plan Study

OH Defiance Defiance Memorial DFI 3-39-0031-015-2019 Defiance County Regional Airport Authority & Defiance County Com 6/24/2019 9/10/2019 $ 310,383 $ - $ 310,383 Rehabilitate Runway - 12/30, Remove Obstructions [Non-Hazard]

OH Delaware Delaware Municipal - Jim Moore Field DLZ 3-39-0032-024-2019 City of Delaware 6/5/2019 8/1/2019 $ 73,224 $ - $ 73,224 Reconstruct Taxiway

OH East Liverpool Columbiana County 02G 3-39-0033-019-2019 Columbiana County Airport Authority & County Commissioners 9/20/2019 9/24/2019 $ 200,440 $ - $ 200,440 Acquire Snow Removal Equipment

OH Findlay Findlay FDY 3-39-0034-027-2019 City of Findlay 6/5/2019 8/13/2019 $ 174,764 $ - $ 174,764 Rehabilitate Runway - 07/25, Rehabilitate Taxiway

OH Gallipolis Gallia-Meigs Regional GAS 3-39-0101-014-2019 Gallia County Commissioners 9/20/2019 9/24/2019 $ 127,800 $ - $ 127,800 Conduct Miscellaneous Study

9/30/2019 Page 28 of 40 FAA AIP Grant Detail Report

Page 29: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

OH Jackson James A Rhodes I43 3-39-0041-014-2019 Jackson County Airport Authority & Jackson County Commisssioners 6/24/2019 8/15/2019 $ 73,170 $ - $ 73,170 Install Runway Vertical/Visual Guidance System - 01/19

OH Kelleys Island Kelleys Island Land Field 89D 3-39-0098-013-2019 Village of Kelleys Island 9/20/2019 9/24/2019 $ 101,079 $ - $ 101,079 Improve Airport Drainage

OH Kenton Hardin County I95 3-39-0043-013-2019 Hardin County Commissioners & Hardin County Airport Authority 7/9/2019 9/3/2019 $ 152,779 $ - $ 152,779 Remove Obstructions [Non-Hazard]

OH Lancaster Fairfield County LHQ 3-39-0044-028-2019 Fairfield County Airport Authority & Fairfield Co. Commissioners 6/5/2019 8/1/2019 $ 529,789 $ - $ 529,789 Reconstruct Taxiway

OH Lebanon Warren County/John Lane Field I68 3-39-0045-020-2019 Warren County Airport Authority & Board of Commissioners 6/24/2019 8/20/2019 $ 126,544 $ - $ 126,544 Install Runway Vertical/Visual Guidance System - 01/19

OH Lorain Lorain County Regional LPR 3-39-0048-026-2019 Lorain County Board of Commissioners 7/9/2019 9/4/2019 $ 129,981 $ - $ 129,981 Rehabilitate Access Road

OH Marion Marion Municipal MNN 3-39-0050-026-2019 City of Marion 6/5/2019 8/13/2019 $ 600,000 $ - $ 600,000 Construct Terminal Building

OH Marysville Union County MRT 3-39-0051-024-2019 Union County Airport Authority & Union County Board of Comm 7/29/2019 8/27/2019 $ 283,181 $ - $ 283,181 Update Airport Master Plan Study

OH Medina Medina Municipal 1G5 3-39-0053-015-2019 City of Medina 7/9/2019 9/5/2019 $ 410,720 $ - $ 410,720 Construct Taxiway

OH Mount Vernon Knox County 4I3 3-39-0058-018-2019 Knox County Commissioners & Knox County Airport Authority 9/20/2019 9/24/2019 $ 312,331 $ 2,842,060 $ 3,154,391 Rehabilitate Runway - 10/28

OH New Lexington Perry County I86 3-39-0059-014-2019 Perry County Commissioners 6/5/2019 8/21/2019 $ 194,434 $ - $ 194,434 Install Perimeter Fencing not Required by 49 CFR 1542

OH North Bass Island North Bass Island 3X5 3-39-0123-015-2019 Put-in-Bay Township Port Authority 7/9/2019 8/9/2019 $ 2,087,971 $ - $ 2,087,971 Rehabilitate Apron, Rehabilitate Runway - 01/19

OH Norwalk Norwalk-Huron County 5A1 3-39-0062-012-2019 Huron County Commissioners & Huron County Airport Authority* 6/24/2019 8/20/2019 $ 252,356 $ - $ 252,356 Reconstruct Apron

OH Ottawa Putnam County OWX 3-39-0110-014-2019 Putnam County Board of Commissioners & Putnam Co. Airport Auth 7/9/2019 9/10/2019 $ 174,816 $ - $ 174,816 Install Airport Beacons, Rehabilitate Runway - 09/27

OH Port Clinton Erie-Ottawa International PCW 3-39-0068-036-2019 Erie-Ottawa Regional Airport Authority & Erie County & Ottawa C 9/20/2019 9/24/2019 $ 2,867,228 $ - $ 2,867,228 Construct Taxiway, Expand Apron

OH Sidney Sidney Municipal SCA 3-39-0071-022-2019 City of Sidney 7/9/2019 8/1/2019 $ 138,742 $ - $ 138,742 Construct Apron, Rehabilitate Runway - 05/23

OH Steubenville Jefferson County Airpark 2G2 3-39-0074-019-2019 Jefferson County Commissioners 9/20/2019 9/24/2019 $ 42,210 $ - $ 42,210 Install Weather Reporting Equipment OH Tiffin Seneca County 16G 3-39-0076-013-2019 Seneca County Board of Commissioners 6/24/2019 8/22/2019 $ 386,757 $ - $ 386,757 Rehabilitate Taxiway

OH Toledo Toledo Express TOL 3-39-0077-080-2019 Toledo-Lucas County Port Authority 9/20/2019 9/24/2019 $ 2,819,314 $ - $ 2,819,314 Rehabilitate Taxiway

OH Versailles Darke County VES 3-39-0082-013-2019 Darke County Board of Commissioners 6/5/2019 7/31/2019 $ 225,243 $ - $ 225,243 Construct Access Road, Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway A1]

OH Wadsworth Wadsworth Municipal 3G3 3-39-0083-019-2019 City of Wadsworth 7/29/2019 8/23/2019 $ 314,896 $ - $ 314,896 Update Airport Master Plan Study, Wildlife Hazard Assessments

OH Walbridge Toledo Executive TDZ 3-39-0078-029-2019 Toledo-Lucas County Port Authority 9/20/2019 9/24/2019 $ 366,775 $ - $ 366,775 Extend Taxiway

OH Wapakoneta Neil Armstrong AXV 3-39-0084-020-2019 Auglaize County Board of Commissioners 6/5/2019 8/13/2019 $ 150,000 $ - $ 150,000 Improve Airport Drainage, Improve Terminal Building

OH Washington Court House Fayette County I23 3-39-0086-012-2019 Fayette County Board of Commissioners 9/20/2019 9/24/2019 $ 1,589,470 $ - $ 1,589,470 Conduct Miscellaneous Study, Reconstruct Taxiway

OH Wauseon Fulton County USE 3-39-0087-014-2019 Fulton Co Board of Commissioners 9/20/2019 9/24/2019 $ 448,443 $ - $ 448,443 Construct Snow Removal Equipment Building

OH Waverly Pike County EOP 3-39-0088-014-2019 Pike County Commissioners 9/20/2019 9/25/2019 $ 97,260 $ - $ 97,260 Improve Airport Drainage, Rehabilitate Runway - 07/25, Remove Obstructions [Non-Hazard]

OH Willoughby Willoughby Lost Nation Municipal LNN 3-39-0090-016-2019 Lake County Ohio Port and Economic Development Authority 9/20/2019 9/25/2019 $ 307,512 $ 336,945 $ 644,457 Install Perimeter Fencing not Required by 49 CFR 1542

OH Wilmington Clinton Field I66 3-39-0091-013-2019 Clinton County Board of Commissioners 7/9/2019 9/4/2019 $ 59,065 $ - $ 59,065 Install Runway Lighting - 03/21, Wildlife Hazard Assessments

OH Wooster Wayne County BJJ 3-39-0093-024-2019 Wayne County Commissioners 9/20/2019 9/24/2019 $ 531,799 $ 4,498,311 $ 5,030,110 Construct Taxiway, Reconstruct Taxiway

OH Youngstown Youngstown-Warren Regional YNG 3-39-0096-047-2019 Western Reserve Port Authority 9/20/2019 9/24/2019 $ 1,291,240 $ - $ 1,291,240

Reconstruct Apron, Reconstruct Taxiway, Rehabilitate Runway Lighting - 05/23, Rehabilitate Taxiway Lighting [Taxiway C, G, H, H1], Rehabilitate Taxiway Lighting [Taxiway F, T]

OH Zanesville Zanesville Municipal ZZV 3-39-0097-017-2019 City of Zanesville 6/5/2019 7/27/2019 $ 387,398 $ - $ 387,398 Improve Airport Miscellaneous Improvements

OH Zanesville Zanesville Municipal ZZV 3-39-0097-018-2019 City of Zanesville 6/5/2019 7/27/2019 $ 353,538 $ - $ 353,538 Update Airport Master Plan Study

OK Ada Ada Regional ADH 3-40-0001-016-2019 City of Ada 7/9/2019 8/19/2019 $ 75,704 $ - $ 75,704 Acquire Land For Approaches

OK Antlers Antlers Municipal 80F 3-40-0110-009-2019 City of Antlers 9/20/2019 9/24/2019 $ 238,348 $ - $ 238,348 Improve Airport Drainage, Install Runway Lighting - 17/35, Install Runway Vertical/Visual Guidance System - 17/35, Remove Obstructions [Non-Hazard]

OK Ardmore Ardmore Downtown Executive 1F0 3-40-0006-017-2019 City of Ardmore 6/24/2019 8/1/2019 $ 134,910 $ - $ 134,910 Install Runway Lighting - 17/35, Rehabilitate Runway - 17/35

OK Ardmore Ardmore Municipal ADM 3-40-0005-018-2019 City of Ardmore 7/29/2019 8/13/2019 $ 924,700 $ 2,873,612 $ 3,798,312 Construct Taxiway

OK Atoka Atoka Municipal AQR 3-40-0124-012-2019 City of Atoka 7/9/2019 9/12/2019 $ 312,399 $ - $ 312,399 Rehabilitate Runway - 18/36

OK Bristow Jones Memorial 3F7 3-40-0128-011-2019 City of Bristow 6/24/2019 9/11/2019 $ 194,040 $ - $ 194,040 Reconstruct Taxiway

OK Burns Flat Clinton-Sherman CSM 3-40-0125-007-2019 State of Oklahoma 9/20/2019 9/25/2019 $ 150,000 $ - $ 150,000 Rehabilitate Apron [Multi-Year Funding], Rehabilitate Runway [Multi-Year Funding] - 17R/35L

9/30/2019 Page 29 of 40 FAA AIP Grant Detail Report

Page 30: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

OK Canadian Carlton Landing Field 91F 3-40-0030-005-2019 Oklahoma Aeronautics Commission & Oklahoma Department of Tourism 9/20/2019 9/23/2019 $ 150,000 $ - $ 150,000

Install Runway Lighting [Multi-Year Funding] - 15/33, Rehabilitate Runway [Multi-Year Funding] - 15/33

OK Chandler Chandler Regional CQB 3-40-0015-014-2019 City of Chandler 7/29/2019 8/13/2019 $ 964,917 $ 1,980,774 $ 2,945,691 Construct Taxiway

OK Cherokee Cherokee Municipal 4O5 3-40-0016-010-2019 City of Cherokee 9/20/2019 9/25/2019 $ 537,957 $ - $ 537,957 Rehabilitate Runway - 17/35

OK Cheyenne Mignon Laird Municipal 93F 3-40-0017-008-2019 City of Cheyenne 9/20/2019 9/23/2019 $ 152,000 $ - $ 152,000 Rehabilitate Apron, Rehabilitate Runway [Multi-Year Funding] - 18/36, Rehabilitate Runway Lighting - 18/36

OK Chickasha Chickasha Municipal CHK 3-40-0018-017-2019 City of Chickasha 7/29/2019 9/23/2019 $ 483,231 $ - $ 483,231 Construct Apron, Construct Taxiway

OK Cleveland Cleveland Municipal 95F 3-40-0020-010-2019 Cleveland Airport Authority 9/20/2019 9/24/2019 $ 150,000 $ - $ 150,000 Rehabilitate Apron, Rehabilitate Runway [Multi-Year Funding] - 18/36, Remove Obstructions [Non-Hazard]

OK Cordell Cordell Municipal F36 3-40-0022-008-2019 City of Cordell 9/20/2019 9/23/2019 $ 150,000 $ - $ 150,000 Install Runway Vertical/Visual Guidance System [Multi-Year Funding] - 17/35, Rehabilitate Runway [Multi-Year Funding] - 17/35

OK Cushing Cushing Municipal CUH 3-40-0023-019-2019 City of Cushing 6/24/2019 7/29/2019 $ 48,600 $ - $ 48,600 Rehabilitate Taxiway

OK Duncan Halliburton Field DUC 3-40-0024-018-2019 City of Duncan 7/9/2019 9/5/2019 $ 481,027 $ - $ 481,027 Rehabilitate Taxiway Lighting

OK Eufaula Eufaula Municipal F08 3-40-0029-011-2019 City of Eufaula 6/24/2019 8/23/2019 $ 330,007 $ - $ 330,007 Construct Fuel Farm

OK Eufaula Fountainhead Lodge Airpark 0F7 3-40-0031-006-2019 Oklahoma Aeronautics Commission & Oklahoma Department of Tourism 9/20/2019 9/23/2019 $ 124,737 $ - $ 124,737 Rehabilitate Apron, Rehabilitate Runway [Multi-Year Funding] - 18/36

OK Fairview Fairview Municipal 6K4 3-40-0032-010-2019 City of Fairview 6/24/2019 8/23/2019 $ 227,583 $ - $ 227,583 Rehabilitate Runway Lighting - 17/35

OK Frederick Frederick Regional FDR 3-40-0033-011-2019 City of Frederick 7/29/2019 9/19/2019 $ 564,658 $ - $ 564,658 Rehabilitate Taxiway

OK Gage Gage GAG 3-40-0034-005-2019 City of Gage 9/20/2019 9/23/2019 $ 150,000 $ - $ 150,000 Rehabilitate Runway [Multi-Year Funding] - 17/35

OK Grandfield Grandfield Municipal 1O1 3-40-0114-012-2019 City of Grandfield 9/20/2019 9/24/2019 $ 594,462 $ - $ 594,462 Improve Airport Drainage, Rehabilitate Runway [Multi-Year Funding] - 17/35, Rehabilitate Runway Lighting - 17/35

OK Guthrie Guthrie-Edmond Regional GOK 3-40-0036-018-2019 City of Guthrie 6/24/2019 8/30/2019 $ 60,390 $ - $ 60,390 Rehabilitate Apron

OK Guymon Guymon Municipal GUY 3-40-0037-017-2019 City of Guymon 9/20/2019 9/24/2019 $ 144,277 $ - $ 144,277 Install Runway Lighting - 18/36

OK Healdton Healdton Municipal F32 3-40-0038-006-2019 City of Healdton 9/20/2019 9/24/2019 $ 150,000 $ - $ 150,000 Rehabilitate Apron, Rehabilitate Runway [Multi-Year Funding] - 17/35, Remove Obstructions [Non-Hazard]

OK Hobart Hobart Regional HBR 3-40-0040-005-2019 City of Hobart 7/9/2019 9/10/2019 $ 442,856 $ - $ 442,856 Rehabilitate Taxiway

OK Holdenville Holdenville Municipal F99 3-40-0041-004-2019 City of Holdenville 9/20/2019 9/24/2019 $ 260,626 $ - $ 260,626 Install Runway Lighting - 17/35

OK Hominy Hominy Municipal H92 3-40-0043-009-2019 City of Hominy 9/20/2019 9/23/2019 $ 150,000 $ - $ 150,000 Rehabilitate Apron, Rehabilitate Runway [Multi-Year Funding] - 17/35, Remove Obstructions [Non-Hazard]

OK Hooker Hooker Municipal O45 3-40-0044-009-2019 City of Hooker 7/9/2019 9/23/2019 $ 444,685 $ - $ 444,685 Reconstruct Apron

OK Ketchum South Grand Lake Regional 1K8 3-40-0142-008-2019 City of Ketchum 7/29/2019 8/21/2019 $ 973,270 $ 3,149,302 $ 4,122,572 Rehabilitate Runway - 18/36, Widen Runway - 18/36

OK Latimer (County) Talihina Municipal 6F1 3-40-0109-002-2019 City of Talihina 9/20/2019 9/24/2019 $ 150,000 $ - $ 150,000 Install Airport Beacons, Install Miscellaneous NAVAIDS [Multi-Year Funding], Remove Obstructions [Non-Hazard] [Multi-Year Funding]

OK Lawton Lawton-Fort Sill Regional LAW 3-40-0051-037-2019 Lawton Metropolitan Airport Authority 9/20/2019 9/24/2019 $ 785,511 $ - $ 785,511 Expand Terminal Building, Install Emergency Generator

OK Lindsay Lindsay Municipal 1K2 3-40-0052-009-2019 City of Lindsay 9/20/2019 9/23/2019 $ 150,000 $ - $ 150,000 Install Runway Vertical/Visual Guidance System - 01/19, Rehabilitate Runway Lighting [Multi-Year Funding] - 01/19, Remove Obstructions [Non-Hazard]

OK Madill Madill Municipal 1F4 3-40-0054-008-2019 City of Madill 6/24/2019 9/10/2019 $ 540,103 $ - $ 540,103 Construct Taxiway

OK Mangum Scott Field 2K4 3-40-0055-008-2019 City of Mangum 9/20/2019 9/24/2019 $ 150,000 $ - $ 150,000

Install Runway Vertical/Visual Guidance System - 17/35, Rehabilitate Apron, Rehabilitate Runway [Multi-Year Funding] - 17/35, Rehabilitate Runway Lighting [Multi-Year Funding] - 17/35

OK Medford Medford Municipal O53 3-40-0058-010-2019 City of Medford 9/20/2019 9/23/2019 $ 301,811 $ - $ 301,811 Rehabilitate Taxiway

OK Mooreland Mooreland Municipal MDF 3-40-0061-007-2019 City of Mooreland 7/9/2019 9/25/2019 $ 318,173 $ - $ 318,173 Rehabilitate Runway - 17/35

OK Norman University of Oklahoma Westheimer OUN 3-40-0064-029-2019 University of Oklahoma 9/20/2019 9/24/2019 $ 607,799 $ 4,516,431 $ 5,124,230 Rehabilitate Taxiway

OK Okeene Christman Airfield O65 3-40-0068-010-2019 City of Okeene 9/20/2019 9/24/2019 $ 150,000 $ - $ 150,000 Rehabilitate Runway [Multi-Year Funding] - 17/35, Rehabilitate Runway Lighting [Multi-Year Funding] - 17/35

OK Okemah Okemah Municipal F81 3-40-0069-006-2019 City of Okemah 9/20/2019 9/23/2019 $ 150,000 $ - $ 150,000 Rehabilitate Apron [Multi-Year Funding], Rehabilitate Runway [Multi-Year Funding] - 18/36

OK Oklahoma City Clarence E Page Municipal RCE 3-40-0071-013-2019 Oklahoma City Airport Trust 6/5/2019 7/30/2019 $ 35,728 $ - $ 35,728 Conduct Miscellaneous Study

OK Oklahoma City State of Oklahoma *OKS 3-40-0000-020-2019 Oklahoma Aeronautics Commission 9/20/2019 9/23/2019 $ 400,000 $ - $ 400,000 Update State System Plan Study

OK Oklahoma City Various Locations in Oklahoma *OKV 3-40-4000-009-2019 Oklahoma Aeronautics Commission 6/24/2019 7/18/2019 $ 301,563 $ - $ 301,563

Construct Taxiway (South Grand Lake Regional), Rehabilitate Runway (McCurtain County Regional - 02/20; Watonga Regional - 17/35), Widen Runway (Blackwell-Tonkawa Municipal - 17/35)

OK Oklahoma City Wiley Post PWA 3-40-0073-026-2019 Oklahoma City Airport Trust 6/5/2019 7/25/2019 $ 525,613 $ - $ 525,613 Reconstruct Taxiway Lighting, Rehabilitate Taxiway

OK Oklahoma City Will Rogers World OKC 3-40-0072-075-2019 Oklahoma City Airport Trust 6/5/2019 7/30/2019 $ 902,307 $ - $ 902,307 Acquire Snow Removal Equipment OK Oklahoma City Will Rogers World OKC 3-40-0072-076-2019 Oklahoma City Airport Trust 6/5/2019 7/30/2019 $ 2,729,223 $ - $ 2,729,223 Rehabilitate Access Road

OK Oklahoma City Will Rogers World OKC 3-40-0072-077-2019 Oklahoma City Airport Trust 6/5/2019 9/11/2019 $ 3,467,708 $ - $ 3,467,708 Reconstruct Apron

9/30/2019 Page 30 of 40 FAA AIP Grant Detail Report

Page 31: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

OK Oklahoma City Will Rogers World OKC 3-40-0072-078-2019 Oklahoma City Airport Trust 9/20/2019 9/26/2019 $ 1,842,903 $ - $ 1,842,903 Rehabilitate Access Road

OK Okmulgee Okmulgee Regional OKM 3-40-0074-024-2019 City of Okmulgee 6/24/2019 8/30/2019 $ 77,211 $ - $ 77,211 Rehabilitate Runway - 18/36

OK Perry Perry Municipal F22 3-40-0077-014-2019 City of Perry 7/9/2019 8/28/2019 $ 56,700 $ - $ 56,700 Improve Airport Drainage, Improve Fuel Farm

OK Ponca City Ponca City Regional PNC 3-40-0078-018-2019 City of Ponca City 6/5/2019 7/30/2019 $ 424,456 $ - $ 424,456 Rehabilitate Runway - 17/35

OK Prague Prague Municipal O47 3-40-0081-007-2019 City of Prague 7/9/2019 9/19/2019 $ 420,737 $ - $ 420,737 Construct Taxiway

OK Purcell Purcell Municipal - Steven E Shephard Field 3O3 3-40-0130-011-2019 City of Purcell 6/5/2019 8/6/2019 $ 55,620 $ - $ 55,620 Reconstruct Apron

OK Sand Springs William R Pogue Municipal OWP 3-40-0084-021-2019 City of Sand Springs 6/24/2019 8/5/2019 $ 40,653 $ - $ 40,653 Improve Airport Drainage

OK Sayre Sayre Municipal 3O4 3-40-0086-011-2019 City of Sayre 7/9/2019 8/20/2019 $ 110,499 $ - $ 110,499 Install Runway Vertical/Visual Guidance System - 17/35

OK Skiatook Skiatook Municipal 2F6 3-40-0089-013-2019 Town of Skiatook 6/24/2019 8/15/2019 $ 231,228 $ - $ 231,228 Install Taxiway Lighting

OK Stillwater Stillwater Regional SWO 3-40-0090-028-2019 City of Stillwater 6/5/2019 8/5/2019 $ 1,000,000 $ 4,200,000 $ 5,200,000 Reconstruct Apron

OK Tahlequah Tahlequah Municipal TQH 3-40-0093-014-2019 City of Tahlequah 6/5/2019 7/1/2019 $ 107,100 $ - $ 107,100 Install Taxiway Lighting

OK Tishomingo Tishomingo Airpark 0F9 3-40-0096-005-2019 City of Tishomingo 9/20/2019 9/24/2019 $ 150,000 $ - $ 150,000 Rehabilitate Runway [Multi-Year Funding] - 17/35, Remove Obstructions [Non-Hazard]

OK Tulsa Richard Lloyd Jones Jr RVS 3-40-0098-033-2019 Tulsa Airports Improvement Trust 6/5/2019 8/22/2019 $ 730,818 $ 1,525,767 $ 2,256,585 Rehabilitate Runway - 01R/19L

OK Tulsa Tulsa International TUL 3-40-0099-093-2019 Tulsa Airports Improvement Trust 7/9/2019 7/24/2019 $ 224,190 $ - $ 224,190 Rehabilitate Runway - 18R/36L

OK Wagoner Hefner-Easley H68 3-40-0140-007-2019 City of Wagoner 6/5/2019 7/2/2019 $ 133,893 $ - $ 133,893 Install Runway Vertical/Visual Guidance System - 18/36

OK Waynoka Waynoka Municipal 1K5 3-40-0105-007-2019 Housing Authority of the City of Waynoka 9/20/2019 9/23/2019 $ 150,000 $ - $ 150,000 Rehabilitate Runway [Multi-Year Funding] - 17/35

OK Weatherford Thomas P Stafford OJA 3-40-0106-013-2019 City of Weatherford 7/9/2019 8/19/2019 $ 317,772 $ - $ 317,772 Construct Fuel Farm

OK Wilburton Wilburton Municipal H05 3-40-0107-008-2019 City of Wilburton 7/9/2019 9/12/2019 $ 523,500 $ - $ 523,500 Reconstruct Apron

OR Astoria Astoria Regional AST 3-41-0003-024-2019 Port of Astoria 7/29/2019 8/7/2019 $ 150,000 $ 3,018,232 $ 3,168,232 Extend Taxiway, Install Taxiway Lighting

OR Astoria Astoria Regional AST 3-41-0003-025-2019 Port of Astoria 9/27/2019 $ - $ 900,000 $ 900,000 Reconstruct Apron

OR Brookings Brookings BOK 3-41-0008-016-2019 City of Brookings 9/20/2019 9/23/2019 $ 390,794 $ - $ 390,794 Update Airport Master Plan Study

OR Cave Junction Illinois Valley 3S4 3-41-0011-009-2019 County of Josephine 6/24/2019 7/17/2019 $ 300,000 $ - $ 300,000 Reconstruct Taxiway, Rehabilitate Apron, Rehabilitate Runway - 18/36

OR Chiloquin Chiloquin State 2S7 3-41-0012-007-2019 Oregon Department of Aviation 7/9/2019 7/19/2019 $ 89,261 $ - $ 89,261 Remove Obstructions

OR Condon Condon State Pauling Field 3S9 3-41-0013-006-2019 Oregon Department of Aviation 6/24/2019 7/5/2019 $ 78,017 $ - $ 78,017 Rehabilitate Runway - 07/25, Rehabilitate Taxiway

OR Cottage Grove Cottage Grove State 61S 3-41-0015-010-2019 Oregon Department of Aviation 7/9/2019 7/24/2019 $ 107,667 $ - $ 107,667 Install Perimeter Fencing not Required by 49 CFR 1542

OR Creswell Hobby Field 77S 3-41-0083-013-2019 City of Creswell 6/5/2019 8/29/2019 $ 700,000 $ - $ 700,000 Reconstruct Taxiway

OR Dallesport Columbia Gorge Regional/The Dalles Municipal DLS 3-41-0059-015-2019 City of Dalles and Klickitat County 7/9/2019 9/6/2019 $ 1,745,229 $ - $ 1,745,229 Reconstruct Apron

OR Eugene Mahlon Sweet Field EUG 3-41-0018-058-2019 City of Eugene 6/5/2019 6/27/2019 $ 4,755,253 $ 4,529,124 $ 9,284,377 Reconstruct Taxiway Lighting, Rehabilitate Taxiway

OR Gleneden Beach Siletz Bay State S45 3-41-0020-008-2019 Oregon Department of Aviation 7/9/2019 7/19/2019 $ 173,473 $ - $ 173,473 Improve Airport Drainage, Reconstruct Taxiway, Rehabilitate Runway - 17/35, Rehabilitate Taxiway

OR Hood River Ken Jernstedt Airfield 4S2 3-41-0026-012-2019 Port of Hood River 7/9/2019 8/7/2019 $ 324,660 $ - $ 324,660 Conduct Environmental Study

OR Independence Independence State 7S5 3-41-0027-006-2019 Oregon Department of Aviation 7/9/2019 7/24/2019 $ 116,152 $ - $ 116,152 Install Perimeter Fencing not Required by 49 CFR 1542

OR John Day Grant County Regional/Ogilvie Field GCD 3-41-0028-012-2019 Grant County 9/27/2019 $ - $ 950,000 $ 950,000 Reconstruct Apron

OR Joseph Joseph State JSY 3-41-0092-011-2019 Oregon Department of Aviation 6/24/2019 7/15/2019 $ 397,981 $ - $ 397,981 Update Airport Master Plan Study

OR Klamath Falls Crater Lake-Klamath Regional LMT 3-41-0030-039-2019 City of Klamath Falls 6/5/2019 6/11/2019 $ 1,000,000 $ 5,707,046 $ 6,707,046 Install Miscellaneous NAVAIDS, Reconstruct Taxiway, Rehabilitate Taxiway [Taxiway D], Rehabilitate Taxiway [Taxiway G], Rehabilitate Taxiway Lighting

OR La Grande La Grande/Union County LGD 3-41-0031-024-2019 County of Union 7/9/2019 8/14/2019 $ 394,253 $ - $ 394,253

Construct Apron, Construct Taxiway, Extend Taxiway, Install Airfield Guidance Signs, Install Runway Lighting - 16/34, Install Runway Vertical/Visual Guidance System - 16/34, Reconstruct Runway - 16/34, Rehabilitate Runway - 16/34, Rehabilitate Taxiway

OR Lebanon Lebanon State S30 3-41-0033-007-2019 Oregon Department of Aviation 6/5/2019 8/5/2019 $ 243,596 $ - $ 243,596 Conduct Environmental Study

OR Madras Madras Municipal S33 3-41-0035-012-2019 City of Madras 7/9/2019 9/10/2019 $ 297,547 $ - $ 297,547 Update Airport Master Plan Study

OR Medford Rogue Valley International - Medford MFR 3-41-0037-046-2019 County of Jackson 6/5/2019 7/31/2019 $ 1,124,743 $ - $ 1,124,743 Update Airport Master Plan Study

OR Medford Rogue Valley International - Medford MFR 3-41-0037-047-2019 County of Jackson 7/9/2019 9/12/2019 $ 1,479,910 $ - $ 1,479,910 Improve Terminal Building

OR Medford Rogue Valley International - Medford MFR 3-41-0037-048-2019 County of Jackson 6/24/2019 8/7/2019 $ 56,146 $ - $ 56,146 Wildlife Hazard Assessments

OR Medford Rogue Valley International - Medford MFR 3-41-0037-049-2019 County of Jackson 6/24/2019 8/14/2019 $ 409,832 $ - $ 409,832 Acquire Land For Approaches, Acquire Miscellaneous Land

9/30/2019 Page 31 of 40 FAA AIP Grant Detail Report

Page 32: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

OR North Bend Southwest Oregon Regional OTH 3-41-0041-043-2019 Coos County Airport District 6/24/2019 7/29/2019 $ 3,706,994 $ - $ 3,706,994 Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 04/22, Rehabilitate Runway Lighting - 04/22

OR Ontario Ontario Municipal ONO 3-41-0044-015-2019 City of Ontario 7/9/2019 8/9/2019 $ 83,800 $ - $ 83,800 Construct Apron, Construct Taxiway

OR Pendleton Eastern Oregon Regional at Pendleton PDT 3-41-0046-027-2019 City of Pendleton 7/29/2019 8/20/2019 $ 155,819 $ 6,106,316 $ 6,262,135 Rehabilitate Runway - 07/25, Rehabilitate Runway Lighting - 07/25

OR Portland Portland International PDX 3-41-0048-080-2019 Port of Portland 6/5/2019 6/14/2019 $ 5,007,285 $ 5,999,169 $ 11,006,454 Reconstruct Taxiway

OR Prineville Prineville S39 3-41-0051-015-2019 Crook County 7/9/2019 8/1/2019 $ 360,000 $ - $ 360,000

Install Airfield Guidance Signs, Install Runway Vertical/Visual Guidance System - 10/28, Reconstruct Runway - 10/28, Reconstruct Runway Lighting - 10/28, Reconstruct Taxiway

OR Redmond Roberts Field RDM 3-41-0052-044-2019 City of Redmond 7/9/2019 8/29/2019 $ 2,684,385 $ - $ 2,684,385 Construct Snow Removal Equipment Building

OR Roseburg Roseburg Regional RBG 3-41-0054-026-2019 City of Roseburg 6/5/2019 6/25/2019 $ 642,165 $ - $ 642,165 Install Miscellaneous NAVAIDS, Rehabilitate Runway Lighting - 16/34

OR Salem McNary Field SLE 3-41-0055-023-2019 City of Salem 6/24/2019 7/30/2019 $ 1,059,860 $ - $ 1,059,860 Rehabilitate Apron

OR Salem State of Oregon *ORS 3-41-0000-018-2019 Oregon Department of Aviation 6/5/2019 8/14/2019 $ 197,925 $ - $ 197,925 Update State System Plan Study

OR Salem State of Oregon *ORS 3-41-0000-019-2019 Oregon Department of Aviation 6/24/2019 8/14/2019 $ 904,500 $ - $ 904,500 Conduct Miscellaneous Study

OR Salem Various Locations in Oregon *ORV 3-41-4100-035-2019 Oregon Department of Aviation 7/29/2019 9/24/2019 $ 251,364 $ - $ 251,364

Rehabilitate Apron (Albany Municipal; Aurora State; Corvallis Municipal; Independence State; Lebanon State; McNary Field; Mulino State; Newport Municipal; Portland-Hillsboro; Portland-Troutdale; Scappoose Industrial Airpark; Tillamook), Rehabilitate Runway (Astoria Regional - 08/26; Aurora State - 17/35; Corvallis Municipal - 17/35; Independence State - 16/34; McMinnville Municipal - 17/35; McNary Field - 13/31; Mulino State - 14/32; Newport Municipal - 16/34; Scappoose Industrial Airpark - 15/33; Siletz Bay State - 17/35), Rehabilitate Taxiway (Albany Municipal; Astoria Regional; Aurora State; Corvallis Municipal; Independence State; Lebanon State; McMinnville Municipal; McNary Field; Mulino State; Newport Municipal; Portland-Hillsboro; Portland-Troutdale; Scappoose Industrial Airpark; Siletz Bay State; Tillamook)

OR Tillamook Tillamook TMK 3-41-0060-017-2019 Port of Tillamook Bay 7/9/2019 7/26/2019 $ 150,000 $ - $ 150,000 Expand Apron

PA Allentown Allentown Queen City Municipal XLL 3-42-0002-026-2019 Lehigh-Northampton Airport Authority 7/29/2019 8/15/2019 $ 403,565 $ - $ 403,565 Remove Obstructions

PA Allentown Lehigh Valley International ABE 3-42-0001-106-2019 Lehigh-Northampton Airport Authority 6/5/2019 8/15/2019 $ 2,605,404 $ 8,925,617 $ 11,531,021 Rehabilitate Runway - 06/24, Rehabilitate Taxiway Lighting [Taxiway A], Rehabilitate Taxiway Lighting [Taxiway E]

PA Allentown Lehigh Valley International ABE 3-42-0001-107-2019 Lehigh-Northampton Airport Authority 6/5/2019 8/15/2019 $ 348,295 $ - $ 348,295 Rehabilitate Runway - 06/24

PA Altoona Altoona-Blair County AOO 3-42-0055-044-2019 Blair County Airport Authority 7/9/2019 8/15/2019 $ 379,800 $ - $ 379,800 Install Miscellaneous NAVAIDS, Rehabilitate Runway - 12/30

PA Avoca Wilkes-Barre/Scranton International AVP 3-42-0105-068-2019 Counties of Lackawanna and Luzerne, Pennsylvania 6/5/2019 8/22/2019 $ 165,025 $ - $ 165,025 Rehabilitate Access Road

PA Avoca Wilkes-Barre/Scranton International AVP 3-42-0105-069-2019 Counties of Lackawanna and Luzerne, Pennsylvania 6/5/2019 8/22/2019 $ 2,846,517 $ - $ 2,846,517 Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

PA Bradford Bradford Regional BFD 3-42-0008-049-2019 Bradford Regional Airport Authority 6/5/2019 8/22/2019 $ 147,425 $ - $ 147,425 Remove Obstructions

PA Bradford Bradford Regional BFD 3-42-0008-050-2019 Bradford Regional Airport Authority 6/5/2019 8/22/2019 $ 138,141 $ - $ 138,141 Rehabilitate Taxiway

PA Chambersburg Franklin County Regional N68 3-42-0012-018-2019 Susquehanna Area Regional Airport Authority 7/9/2019 8/6/2019 $ 883,347 $ - $ 883,347 Construct Taxiway, Install Taxiway Lighting

PA Harrisburg Harrisburg International MDT 3-42-0059-084-2019 Susquehanna Area Regional Airport Authority 6/5/2019 8/23/2019 $ 634,265 $ - $ 634,265 Acquire Aircraft Rescue & Fire Fighting Vehicle

PA Harrisburg Harrisburg International MDT 3-42-0059-085-2019 Susquehanna Area Regional Airport Authority 6/5/2019 8/23/2019 $ 1,123,393 $ - $ 1,123,393 Acquire Snow Removal Equipment PA Harrisburg Harrisburg International MDT 3-42-0059-086-2019 Susquehanna Area Regional Airport Authority 6/24/2019 7/16/2019 $ 416,792 $ - $ 416,792 Expand Apron

PA Harrisburg Pennsylvania State Block Grant Program *PAB 3-42-SBGP-093-2019 Commonwealth of Pennsylvania 6/24/2019 7/19/2019 $ 3,658,700 $ - $ 3,658,700 Non primary development projects in state block grant program

PA Harrisburg Pennsylvania State Block Grant Program *PAB 3-42-SBGP-094-2019 Commonwealth of Pennsylvania 6/24/2019 7/15/2019 $ 5,850,000 $ - $ 5,850,000 Non primary development projects in state block grant program

PA Harrisburg Pennsylvania State Block Grant Program *PAB 3-42-SBGP-095-2019 Commonwealth of Pennsylvania 7/29/2019 8/2/2019 $ 150,000 $ 1,826,000 $ 1,976,000 Non primary development projects in state block grant program

PA Harrisburg Pennsylvania State Block Grant Program *PAB 3-42-SBGP-096-2019 Commonwealth of Pennsylvania 7/29/2019 8/2/2019 $ - $ 623,628 $ 623,628 Non primary development projects in state block grant program

PA Johnstown John Murtha Johnstown-Cambria County JST 3-42-0045-053-2019 Johnstown-Cambria County Airport Authority 6/5/2019 7/23/2019 $ 115,743 $ - $ 115,743 Acquire Land For Approaches

PA Latrobe Arnold Palmer Regional LBE 3-42-0050-055-2019 Westmoreland County Airport Authority 9/20/2019 9/23/2019 $ 218,548 $ - $ 218,548 Widen Runway - 06/24

PA Latrobe Arnold Palmer Regional LBE 3-42-0050-056-2019 Westmoreland County Airport Authority 9/27/2019 $ 1,416,341 $ 9,719,276 $ 11,135,617 Widen Runway - 06/24

PA Lititz Lancaster LNS 3-42-0049-041-2019 Lancaster Airport Authority 6/24/2019 8/19/2019 $ 757,800 $ 108,000 $ 865,800 Rehabilitate Runway - 08/26

PA New Cumberland Army Depot Capital City CXY 3-42-0038-037-2019 Susquehanna Area Regional Airport Authority 6/24/2019 8/6/2019 $ 151,704 $ - $ 151,704 Remove Obstructions

9/30/2019 Page 32 of 40 FAA AIP Grant Detail Report

Page 33: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

PA Philadelphia Delaware Valley Region @01N 3-42-0125-020-2019 Delaware Valley Regional Planning Commission 9/20/2019 9/23/2019 $ - $ 99,000 $ 99,000 Conduct Metropolitan System Plan Study

PA Philadelphia Northeast Philadelphia PNE 3-42-0074-022-2019 City of Philadelphia 7/29/2019 8/17/2019 $ 47,283 $ 8,759,370 $ 8,806,653 Reconstruct Runway - 06/24, Reconstruct Runway Lighting - 06/24

PA Philadelphia Northeast Philadelphia PNE 3-42-0074-022-2019 City of Philadelphia 7/29/2019 8/17/2019 $ 47,283 $ 8,759,370 $ 8,806,653 Reconstruct Runway - 06/24, Reconstruct Runway Lighting - 06/24

PA Philadelphia Northeast Philadelphia PNE 3-42-0074-023-2019 City of Philadelphia 9/20/2019 9/23/2019 $ 102,717 $ - $ 102,717 Reconstruct Runway - 06/24

PA Philadelphia Northeast Philadelphia PNE 3-42-0074-023-2019 City of Philadelphia 9/20/2019 9/23/2019 $ 102,717 $ - $ 102,717 Reconstruct Runway - 06/24

PA Philadelphia Philadelphia International PHL 3-42-0076-115-2019 City of Philadelphia 9/20/2019 9/24/2019 $ 5,681,845 $ 7,733,091 $ 13,414,936 Reconstruct Taxiway

PA Pittsburgh Pittsburgh International PIT 3-42-0081-126-2019 Allegheny County Airport Authority 9/20/2019 9/23/2019 $ 2,155,500 $ 443,408 $ 2,598,908 Acquire Snow Removal Equipment

PA Reading Reading Regional/Carl A Spaatz Field RDG 3-42-0088-061-2019 Reading Regional Airport Authority 7/29/2019 8/20/2019 $ 150,000 $ 814,853 $ 964,853 Rehabilitate Apron

PA Reading Reading Regional/Carl A Spaatz Field RDG 3-42-0088-062-2019 Reading Regional Airport Authority 7/29/2019 8/20/2019 $ - $ 1,141,582 $ 1,141,582 Rehabilitate Apron

PA State College University Park UNV 3-42-0096-063-2019 The Pennsylvania State University 7/29/2019 8/26/2019 $ 1,828,832 $ - $ 1,828,832 Acquire Snow Removal Equipment PA West Mifflin Allegheny County AGC 3-42-0082-039-2019 Allegheny County Airport Authority 9/20/2019 9/23/2019 $ 941,137 $ 2,942,587 $ 3,883,724 Reconstruct Apron

PA West Newton Rostraver FWQ 3-42-0061-027-2019 Westmoreland County Airport Authority 6/5/2019 7/30/2019 $ 115,403 $ - $ 115,403 Remove Obstructions

PA Williamsport Williamsport Regional IPT 3-42-0106-054-2019 Williamsport Municipal Airport Authority 7/9/2019 8/22/2019 $ 730,565 $ - $ 730,565 Acquire Snow Removal Equipment PR Arecibo Antonio/Nery/Juarbe Pol ABO 3-72-0002-012-2019 Puerto Rico Ports Authority 9/20/2019 9/23/2019 $ 520,000 $ - $ 520,000 Rehabilitate Runway - 08/26

PR Ceiba Jose Aponte De La Torre RVR 3-72-0023-011-2019 Puerto Rico Ports Authority 9/20/2019 9/23/2019 $ 1,982,603 $ - $ 1,982,603 Rehabilitate Taxiway

PR Culebra Benjamin Rivera Noriega CPX 3-72-0009-015-2019 Puerto Rico Ports Authority 9/20/2019 9/23/2019 $ 135,000 $ - $ 135,000 Reconstruct Perimeter Fencing required by 49 CFR 1542

PR Mayaguez Eugenio Maria De Hostos MAZ 3-72-0010-015-2019 Puerto Rico Ports Authority 9/20/2019 9/23/2019 $ 9,651,283 $ - $ 9,651,283 Reconstruct Runway - 09/27

PR San Juan Luis Munoz Marin International SJU 3-72-0016-058-2019 Aerostar Airport Holdings, LLC 7/29/2019 8/12/2019 $ 1,521,118 $ - $ 1,521,118 Rehabilitate Runway - 10/28

PR San Juan Luis Munoz Marin International SJU 3-72-0016-059-2019 Aerostar Airport Holdings, LLC 9/20/2019 9/25/2019 $ 925,160 $ - $ 925,160 Reconstruct Taxiway

PR San Juan Various Locations in Puerto Rico *PRV 3-72-7200-003-2019 Puerto Rico Ports Authority 9/20/2019 9/23/2019 $ 535,500 $ - $ 535,500

Rehabilitate Runway Lighting (Antonio Rivera Rodriguez - 09/27; Antonio/Nery/Juarbe Pol - 08/26; Benjamin Rivera Noriega - 13/31; Eugenio Maria De Hostos - 09/27; Fernando Luis Ribas Dominicci - 09/27)

PW Koror Babelthuap/Koror ROR 3-70-0001-023-2019 Republic of Palau 6/24/2019 9/4/2019 $ - $ 300,000 $ 300,000 Acquire Equipment RI Providence State of Rhode Island *RIS 3-44-0000-004-2019 Rhode Island Airport Corporation 6/5/2019 6/26/2019 $ 413,010 $ - $ 413,010 Conduct State System Plan Study

RI Providence State of Rhode Island *RIS 3-44-0000-005-2019 Rhode Island Airport Corporation 6/24/2019 7/18/2019 $ 453,413 $ - $ 453,413 Conduct State System Plan Study

RI Warwick Theodore Francis Green State PVD 3-44-0003-128-2019 Rhode Island Airport Corporation 6/5/2019 7/18/2019 $ 616,241 $ - $ 616,241 Acquire Aircraft Rescue & Fire Fighting Vehicle

SC Aiken Aiken Regional AIK 3-45-0002-019-2019 City of Aiken 7/9/2019 8/13/2019 $ 369,396 $ - $ 369,396 Construct Apron

SC Allendale Allendale County AQX 3-45-0003-016-2019 County of Allendale 9/20/2019 9/23/2019 $ 220,635 $ - $ 220,635 Improve Airport Drainage

SC Anderson Anderson Regional AND 3-45-0004-022-2019 County of Anderson 6/24/2019 8/6/2019 $ 300,000 $ 366,896 $ 666,896 Acquire Aircraft Rescue & Fire Fighting Vehicle, Update Airport Master Plan Study

SC Barnwell Barnwell Regional BNL 3-45-0007-014-2019 County of Barnwell 7/9/2019 8/22/2019 $ 121,803 $ - $ 121,803 Rehabilitate Apron

SC Bennettsville Marlboro County Jetport - H E Avent Field BBP 3-45-0009-017-2019 County of Marlboro 7/9/2019 8/12/2019 $ 554,861 $ - $ 554,861 Rehabilitate Apron

SC Charleston Charleston AFB/International CHS 3-45-0012-040-2019 Charleston County Aviation Authority 6/24/2019 7/8/2019 $ 12,513,929 $ - $ 12,513,929 Improve Access Road

SC Charleston Charleston Executive JZI 3-45-0013-023-2019 Charleston County Aviation Authority 6/24/2019 7/24/2019 $ 1,795,996 $ - $ 1,795,996 Rehabilitate Runway Lighting - 09/27, Rehabilitate Taxiway Lighting

SC Chester Chester Catawba Regional DCM 3-45-0015-011-2019 Chester County 9/20/2019 9/24/2019 $ 247,500 $ - $ 247,500 Rehabilitate Runway - 17/35

SC Columbia Columbia Metropolitan CAE 3-45-0018-050-2019 Richland/Lexington Airport Commission 7/9/2019 7/23/2019 $ 3,456,996 $ - $ 3,456,996 Improve Terminal Building

SC Columbia Jim Hamilton L B Owens CUB 3-45-0017-025-2019 County of Richland 7/9/2019 9/6/2019 $ 550,000 $ - $ 550,000 Improve Airport Drainage, Rehabilitate Access Road

SC Darlington Darlington County UDG 3-45-0021-017-2019 County of Darlington 6/5/2019 8/5/2019 $ 381,301 $ 3,748,900 $ 4,130,201 Rehabilitate Runway - 05/23

SC Florence Florence Regional FLO 3-45-0023-038-2019 Pee Dee Regional Airport Authority 7/29/2019 8/22/2019 $ 1,000,000 $ 950,000 $ 1,950,000 Rehabilitate Taxiway Lighting

SC Georgetown Georgetown County GGE 3-45-0025-021-2019 County of Georgetown 9/20/2019 9/23/2019 $ 173,538 $ - $ 173,538 Acquire Easement For Approaches

SC Greenville Greenville Downtown GMU 3-45-0026-028-2019 City of Greenville 9/20/2019 9/24/2019 $ 150,000 $ 2,870,000 $ 3,020,000 Rehabilitate Taxiway

SC Greenville Greenville Downtown GMU 3-45-0026-029-2019 City of Greenville 7/9/2019 9/24/2019 $ 332,301 $ - $ 332,301 Update Airport Master Plan Study

SC Greenwood Greenwood County GRD 3-45-0027-020-2019 County of Greenwood 9/20/2019 9/24/2019 $ 214,275 $ 1,936,097 $ 2,150,372 Rehabilitate Taxiway

SC Greer Greenville Spartanburg International GSP 3-45-0028-056-2019 Greenville-Spartanburg Airport Commission 9/20/2019 9/23/2019 $ 4,312,647 $ 3,500,000 $ 7,812,647 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Aircraft Rescue & Fire Fighting Building

SC Hartsville Hartsville Regional HVS 3-45-0029-015-2019 City of Hartsville 7/29/2019 8/27/2019 $ 149,905 $ - $ 149,905 Construct Terminal Building, Rehabilitate Access Road

SC Hilton Head Island Hilton Head HXD 3-45-0030-043-2019 County of Beaufort 7/29/2019 8/23/2019 $ 260,944 $ - $ 260,944 Conduct Environmental Study

SC Laurens Laurens County LUX 3-45-0036-017-2019 County of Laurens 7/29/2019 8/30/2019 $ 124,197 $ - $ 124,197 Install Runway Vertical/Visual Guidance System - 08/26, Rehabilitate Runway Lighting - 08/26, Rehabilitate Taxiway Lighting

SC Manning Santee Cooper Regional MNI 3-45-0038-011-2019 County of Clarendon 9/20/2019 9/23/2019 $ 336,087 $ - $ 336,087 Install Miscellaneous NAVAIDS, Install Perimeter Fencing not Required by 49 CFR 1542

9/30/2019 Page 33 of 40 FAA AIP Grant Detail Report

Page 34: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

SC Mount Pleasant Mt Pleasant Regional-Faison Field LRO 3-45-0042-020-2019 Charleston County Aviation Authority 6/24/2019 7/8/2019 $ 224,577 $ - $ 224,577 Construct Building

SC Myrtle Beach Myrtle Beach International MYR 3-45-0065-061-2019 County of Horry 9/27/2019 $ 4,161,959 $ 7,955,492 $ 12,117,451 Reconstruct Taxiway

SC North Myrtle Beach Grand Strand CRE 3-45-0044-023-2019 County of Horry 7/9/2019 8/19/2019 $ 685,000 $ 3,350,000 $ 4,035,000 Rehabilitate Taxiway

SC Orangeburg Orangeburg Municipal OGB 3-45-0045-021-2019 City of Orangeburg 9/20/2019 9/25/2019 $ 153,000 $ - $ 153,000 Expand Apron

SC Pageland Pageland PYG 3-45-0046-014-2019 City of Pageland 7/29/2019 8/16/2019 $ 162,000 $ - $ 162,000 Acquire Land for Development SC Pelion Lexington County 6J0 3-45-0067-018-2019 Lexington County 7/29/2019 9/3/2019 $ 196,503 $ 588,668 $ 785,171 Reconstruct Apron

SC Ridgeland Ridgeland-Claude Dean 3J1 3-45-0048-012-2019 County of Jasper 7/29/2019 8/21/2019 $ 432,513 $ 3,070,000 $ 3,502,513 Construct Runway - Plan-1

SC Rock Hill Rock Hill/York County/Bryant Field UZA 3-45-0049-029-2019 City of Rock Hill 7/9/2019 7/23/2019 $ 92,340 $ - $ 92,340 Improve Airport Drainage

SC Saluda Saluda County 6J4 3-45-0050-012-2019 County of Saluda 9/20/2019 9/24/2019 $ 114,084 $ - $ 114,084 Reconstruct Apron, Reconstruct Taxiway

SC Seneca Oconee County Regional CEU 3-45-0016-025-2019 County of Oconee 6/24/2019 9/4/2019 $ 150,000 $ 936,721 $ 1,086,721 Remove Obstructions [Non-Hazard] SC Seneca Oconee County Regional CEU 3-45-0016-026-2019 County of Oconee 7/9/2019 9/4/2019 $ 1,147,784 $ - $ 1,147,784 Expand Apron

SC Summerville Summerville DYB 3-45-0062-017-2019 County of Dorchester 9/20/2019 9/23/2019 $ 229,839 $ - $ 229,839 Acquire Land For Approaches, Expand Apron

SC Sumter Sumter SMS 3-45-0054-024-2019 County of Sumter 9/20/2019 9/24/2019 $ 225,670 $ - $ 225,670 Reconstruct Apron

SC Union Union County, Troy Shelton Field 35A 3-45-0056-011-2019 County of Union 9/20/2019 9/23/2019 $ 291,105 $ - $ 291,105 Acquire Land For Approaches

SC Walterboro Lowcountry Regional RBW 3-45-0057-017-2019 City of Walterboro 9/20/2019 9/23/2019 $ 300,000 $ 3,117,832 $ 3,417,832 Improve Airport Drainage

SC Winnsboro Fairfield County FDW 3-45-0058-018-2019 County of Fairfield 9/20/2019 9/23/2019 $ 302,398 $ - $ 302,398 Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate Taxiway

SD Aberdeen Aberdeen Regional ABR 3-46-0001-040-2019 City of Aberdeen 9/20/2019 9/24/2019 $ 1,027,388 $ 2,301,612 $ 3,329,000 Reconstruct Taxiway, Rehabilitate Taxiway

SD Belle Fourche Belle Fourche Municipal EFC 3-46-0072-012-2019 City of Belle Fourche 6/24/2019 9/3/2019 $ 217,755 $ - $ 217,755 Rehabilitate Access Road, Rehabilitate Parking Lot SD Brookings Brookings Regional BKX 3-46-0005-031-2019 City of Brookings 9/20/2019 9/23/2019 $ 885,412 $ 1,490,588 $ 2,376,000 Expand Apron, Reconstruct Apron, Reconstruct Taxiway

SD Buffalo Harding County 9D2 3-46-0006-008-2019 Harding County 7/29/2019 9/3/2019 $ 426,005 $ - $ 426,005 Construct Snow Removal Equipment Building, Construct Terminal Building

SD Canton Canton Municipal 7G9 3-46-0007-008-2019 City of Canton 7/29/2019 8/19/2019 $ 70,200 $ - $ 70,200 Construct Taxiway

SD De Smet Wilder 600000 3-46-0063-013-2019 City of De Smet 7/9/2019 9/3/2019 $ 45,000 $ - $ 45,000 Construct Taxiway

SD Faith Faith Municipal D07 3-46-0076-010-2019 City of Faith 9/20/2019 9/24/2019 $ 49,500 $ - $ 49,500 Conduct Environmental Study

SD Faulkton Faulkton Municipal 3FU 3-46-0016-011-2019 City of Faulkton 7/29/2019 8/15/2019 $ 678,000 $ - $ 678,000 Reconstruct Apron [Multi-Year Funding], Reconstruct Taxiway [Multi-Year Funding] SD Gettysburg Gettysburg Municipal 0D8 3-46-0017-011-2019 City of Gettysburg 6/24/2019 9/4/2019 $ 312,975 $ - $ 312,975 Reconstruct Taxiway

SD Huron Huron Regional HON 3-46-0022-037-2019 City of Huron 7/29/2019 8/26/2019 $ 637,505 $ - $ 637,505 Install Runway Vertical/Visual Guidance System [Runway End Indentifier Lights] - 17/35, Reconstruct Airfield Guidance Signs, Reconstruct Runway Lighting - 17/35

SD Madison Madison Municipal MDS 3-46-0029-017-2019 City of Madison 7/29/2019 8/20/2019 $ 180,270 $ - $ 180,270 Rehabilitate Runway [Multi-year Funding] - 15/33, Rehabilitate Taxiway

SD McLaughlin Mc Laughlin Municipal 5P2 3-46-0031-009-2019 City of McLaughlin 7/29/2019 8/22/2019 $ 121,500 $ - $ 121,500 Acquire Land For Approaches

SD Milbank Milbank Municipal 1D1 3-46-0034-015-2019 City of Milbank 9/20/2019 9/23/2019 $ 333,000 $ - $ 333,000 Acquire Land For Approaches

SD Miller Miller Municipal MKA 3-46-0035-010-2019 City of Miller 6/24/2019 8/6/2019 $ 202,500 $ - $ 202,500 Acquire Land for Development, Update Airport Master Plan Study

SD Mobridge Mobridge Municipal MBG 3-46-0038-014-2019 City of Mobridge 6/24/2019 8/27/2019 $ 77,814 $ - $ 77,814 Install Runway Vertical/Visual Guidance System - 12/30

SD Murdo Murdo Municipal 8F6 3-46-0039-011-2019 City of Murdo 7/29/2019 9/11/2019 $ 66,000 $ - $ 66,000 Construct Building

SD Onida Onida Municipal 98D 3-46-0041-011-2019 City of Onida 6/24/2019 8/26/2019 $ 198,900 $ - $ 198,900 Extend Taxiway

SD Philip Philip PHP 3-46-0043-012-2019 City of Philip 7/29/2019 8/23/2019 $ 827,762 $ - $ 827,762 Construct Building [Multi-Year Funding], Reconstruct Apron, Reconstruct Taxiway

SD Pierre Pierre Regional PIR 3-46-0044-040-2019 City of Pierre 7/29/2019 9/6/2019 $ 115,000 $ - $ 115,000 Reconstruct Taxiway

SD Pierre Various Locations in South Dakota *SDV 3-46-4600-025-2019 State of South Dakota 9/20/2019 9/23/2019 $ 823,500 $ - $ 823,500

Rehabilitate Apron (Bison Municipal; Britton Municipal; Gregory Municipal - Flynn Field; Mc Laughlin Municipal; Springfield Municipal), Rehabilitate Runway (Bison Municipal - 11/29; Britton Municipal - 13/31; Gregory Municipal - Flynn Field - 13/31; Marv Skie-Lincoln County - 16/34; Mc Laughlin Municipal - 13/31; Springfield Municipal - 15/33), Rehabilitate Taxiway (Bison Municipal; Britton Municipal; Gregory Municipal - Flynn Field; Marv Skie-Lincoln County; Mc Laughlin Municipal; Springfield Municipal)

SD Rapid City Rapid City Regional RAP 3-46-0048-052-2019 City of Rapid City 7/29/2019 8/13/2019 $ 4,351,245 $ - $ 4,351,245

Acquire Snow Removal Equipment, Construct Access Road, Reconstruct Terminal Building [Multi-Year Funding], Rehabilitate Access Road, Rehabilitate Taxiway, Rehabilitate Terminal Building [Passenger Boarding Bridge], Rehabilitate Terminal Building [Ticketing Area]

SD Redfield Redfield Municipal 1D8 3-46-0049-012-2019 City of Redfield 7/9/2019 8/8/2019 $ 31,500 $ - $ 31,500 Install Perimeter Fencing not Required by 49 CFR 1542

SD Rosebud Rosebud Sioux Tribal SUO 3-46-0082-011-2019 Rosebud Sioux Tribe 7/29/2019 9/3/2019 $ 441,000 $ - $ 441,000 Expand Building

SD Sioux Falls Joe Foss Field FSD 3-46-0050-053-2019 Sioux Falls Regional Airport Authority 7/29/2019 8/13/2019 $ 4,121,315 $ - $ 4,121,315 Construct Apron, Expand Apron [Multi-Year Funding], Rehabilitate Apron [Multi-Year Funding]

9/30/2019 Page 34 of 40 FAA AIP Grant Detail Report

Page 35: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

SD Sisseton Sisseton Municipal 8D3 3-46-0051-015-2019 City of Sisseton 9/20/2019 9/24/2019 $ 1,093,530 $ 1,500,000 $ 2,593,530 Reconstruct Runway - 16/34, Reconstruct Runway Lighting - 16/34, Reconstruct Taxiway

SD Spearfish Black Hills-Clyde Ice Field SPF 3-46-0065-025-2019 City of Spearfish 7/9/2019 8/19/2019 $ 228,000 $ - $ 228,000 Conduct Miscellaneous Study

SD Sturgis Sturgis Municipal 49B 3-46-0054-015-2019 City of Sturgis 9/20/2019 9/23/2019 $ 67,500 $ - $ 67,500 Construct Building, Construct Taxiway, Expand Access Road

SD Tea Marv Skie-Lincoln County Y14 3-46-0078-014-2019 County of Lincoln 9/20/2019 9/24/2019 $ 179,390 $ - $ 179,390

Conduct Aeronautical Survey for RNAV Approach, Install Miscellaneous NAVAIDS, Install Runway Lighting - 16/34, Install Runway Vertical/Visual Guidance System - 16/34, Light Obstructions [Non-Hazard], Remove Obstructions [Non-Hazard]

SD Vermillion Harold Davidson Field VMR 3-46-0056-013-2019 City of Vermillion 7/9/2019 8/19/2019 $ 49,500 $ - $ 49,500 Rehabilitate Taxiway

SD Wagner Wagner Municipal AGZ 3-46-0057-014-2019 City of Wagner 7/29/2019 8/23/2019 $ 453,446 $ - $ 453,446 Construct Building [Multi-year Funding] SD Wall Wall Municipal 6V4 3-46-0069-008-2019 City of Wall 7/29/2019 9/10/2019 $ 140,000 $ - $ 140,000 Conduct Environmental Study

SD Watertown Watertown Regional ATY 3-46-0058-034-2019 City of Watertown 9/20/2019 9/23/2019 $ 1,102,000 $ 1,472,000 $ 2,574,000 Reconstruct Apron

SD Webster The Sigurd Anderson 1D7 3-46-0059-010-2019 City of Webster 7/29/2019 8/21/2019 $ 117,000 $ - $ 117,000 Acquire Land for Development, Construct Building

SD Wessington Springs Wessington Springs 4X4 3-46-0080-011-2019 City of Wessington Springs 9/20/2019 9/23/2019 $ 1,948,500 $ - $ 1,948,500 Reconstruct Runway - 12/30, Reconstruct Taxiway

SD Yankton Chan Gurney Municipal YKN 3-46-0062-029-2019 City of Yankton 7/29/2019 8/26/2019 $ 1,514,000 $ - $ 1,514,000 Expand Apron, Remove Obstructions [Non-Hazard] TN Alcoa McGhee Tyson TYS 3-47-0037-074-2019 Metropolitan Knoxville Airport Authority 7/9/2019 7/26/2019 $ 4,167,788 $ 10,652,207 $ 14,819,995 Reconstruct Runway [Multi-Year Funding] - 05L/23R

TN Bristol/Johnson/Kingsport Tri-Cities TRI 3-47-0004-071-2019 Tri-Cities Airport Authority 7/29/2019 8/15/2019 $ 1,895,664 $ - $ 1,895,664 Conduct Miscellaneous Study, Construct Apron, Install Miscellaneous NAVAIDS

TN Chattanooga Lovell Field CHA 3-47-0009-068-2019 Chattanooga Metropolitan Airport Authority 9/20/2019 9/24/2019 $ 2,789,826 $ - $ 2,789,826 Construct Taxiway

TN Memphis Memphis International MEM 3-47-0049-100-2019 Memphis-Shelby County Airport Authority 7/9/2019 9/10/2019 $ 5,083,662 $ - $ 5,083,662 Conduct Miscellaneous Study, Update Airport Master Plan Study

TN Memphis Memphis International MEM 3-47-0049-101-2019 Memphis-Shelby County Airport Authority 7/29/2019 9/10/2019 $ 11,286,390 $ - $ 11,286,390

Construct Taxiway [Taxiway Y], Improve Terminal Building [Electrical Infrastructure Upgrades], Improve Terminal Building [Passenger Boarding Bridges], Reconstruct Taxiway [Taxiway A]

TN Memphis Memphis International MEM 3-47-0049-102-2019 Memphis-Shelby County Airport Authority 9/27/2019 $ 5,541,975 $ 9,060,000 $ 14,601,975 Construct Deicing Pad with Associated Facilities

TN Nashville Nashville International BNA 3-47-0055-105-2019 Metropolitan Nashville Airport Authority 7/9/2019 7/22/2019 $ 2,679,858 $ 6,164,233 $ 8,844,091 Reconstruct Taxiway

TN Nashville Tennessee State Block Grant Program *TNB 3-47-SBGP-057-2019 State of Tennessee 7/9/2019 7/23/2019 $ 13,982,472 $ - $ 13,982,472 Non primary development projects in state block grant program

TX Amarillo Rick Husband Amarillo International AMA 3-48-0007-044-2019 City of Amarillo 7/29/2019 9/4/2019 $ 271,063 $ - $ 271,063 Reconstruct Taxiway

TX Austin Austin-Bergstrom International AUS 3-48-0359-062-2019 City of Austin 9/27/2019 9/27/2019 $ 2,829,137 $ 8,290,989 $ 11,120,126 Rehabilitate Runway - 17L/35R

TX Austin Texas State Block Grant Program *TXB 3-48-SBGP-114-2019 Texas Department of Transportation - Aviation 6/5/2019 6/28/2019 $ 27,394,000 $ - $ 27,394,000 Non primary development projects in state block grant program

TX Austin Texas State Block Grant Program *TXB 3-48-SBGP-115-2019 Texas Department of Transportation - Aviation 6/5/2019 6/28/2019 $ 18,120,779 $ - $ 18,120,779 Non primary development projects in state block grant program

TX Austin Texas State Block Grant Program *TXB 3-48-SBGP-116-2019 Texas Department of Transportation - Aviation 9/20/2019 9/23/2019 $ - $ 2,650,000 $ 2,650,000 Non primary development projects in state block grant program

TX Austin Texas State Block Grant Program *TXB 3-48-SBGP-117-2019 Texas Department of Transportation - Aviation 9/20/2019 9/23/2019 $ - $ 1,000,000 $ 1,000,000 Non primary development projects in state block grant program

TX Austin Texas State Block Grant Program *TXB 3-48-SBGP-118-2019 Texas Department of Transportation - Aviation 9/20/2019 9/23/2019 $ - $ 1,300,000 $ 1,300,000 Non primary development projects in state block grant program

TX Austin Texas State Block Grant Program *TXB 3-48-SBGP-119-2019 Texas Department of Transportation - Aviation 9/20/2019 9/23/2019 $ - $ 670,960 $ 670,960 Non primary development projects in state block grant program

TX College Station Easterwood Field CLL 3-48-0047-040-2019 Texas A&M University 7/29/2019 9/23/2019 $ 2,830,695 $ 2,860,112 $ 5,690,807 Rehabilitate Taxiway

TX College Station Easterwood Field CLL 3-48-0047-041-2019 Texas A&M University 9/20/2019 9/23/2019 $ 506,286 $ - $ 506,286 Improve Airport Miscellaneous Improvements, Rehabilitate Taxiway [Multi-Year Funding]

TX Corpus Christi Corpus Christi International CRP 3-48-0051-058-2019 City of Corpus Christi 9/20/2019 9/23/2019 $ 2,445,368 $ 7,000,000 $ 9,445,368

Rehabilitate Apron [General Aviation Apron, Phase 7 Construction], Rehabilitate Apron [General Aviation Apron, Phase 8 Design], Rehabilitate Apron [Terminal Apron, Phase 5 Construction], Rehabilitate Apron [Terminal Apron, Phase 6 Design]

TX Dallas Dallas Love Field DAL 3-48-0062-057-2019 City of Dallas 6/24/2019 8/29/2019 $ 2,655,841 $ - $ 2,655,841 Reconstruct Taxiway, Rehabilitate Taxiway

TX El Paso El Paso International ELP 3-48-0077-039-2019 City of El Paso 6/24/2019 8/20/2019 $ 6,491,522 $ - $ 6,491,522 Reconstruct Taxiway, Rehabilitate Taxiway

TX Fort Worth Dallas-Fort Worth International DFW 3-48-0064-121-2019 Dallas/Fort Worth International Airport 6/5/2019 6/25/2019 $ - $ 15,000,000 $ 15,000,000 Construct Taxiway [Letter of Intent] TX Fort Worth Dallas-Fort Worth International DFW 3-48-0064-122-2019 Dallas/Fort Worth International Airport 6/24/2019 8/9/2019 $ 9,294,426 $ 13,900,000 $ 23,194,426 Rehabilitate Taxiway

TX Fort Worth Fort Worth Alliance AFW 3-48-0296-063-2019 City of Fort Worth 7/9/2019 9/4/2019 $ - $ 8,000,000 $ 8,000,000 Noise Mitigation Measures for Residences within 65-69 DNL

TX Fort Worth Fort Worth Alliance AFW 3-48-0296-064-2019 City of Fort Worth 6/24/2019 9/18/2019 $ - $ 5,500,000 $ 5,500,000 Extend Taxiway

TX Fort Worth Fort Worth Alliance AFW 3-48-0296-065-2019 City of Fort Worth 7/29/2019 9/18/2019 $ 758,516 $ - $ 758,516 Rehabilitate Runway Lighting - 16L/34R, Rehabilitate Taxiway Lighting [Taxiway A]

TX Harlingen Valley International HRL 3-48-0101-062-2019 City of Harlingen 9/20/2019 9/23/2019 $ 1,645,000 $ - $ 1,645,000 Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Rehabilitate Terminal Building

TX Houston George Bush Intercontinental/Houston IAH 3-48-0111-112-2019 City of Houston 9/20/2019 9/24/2019 $ 1,180,261 $ 15,000,000 $ 16,180,261 Reconstruct Taxiway

9/30/2019 Page 35 of 40 FAA AIP Grant Detail Report

Page 36: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

TX Houston George Bush Intercontinental/Houston IAH 3-48-0111-113-2019 City of Houston 7/29/2019 8/23/2019 $ - $ 5,425,470 $ 5,425,470 Noise Mitigation Measures for Residences within 65-69 DNL

TX Houston William P Hobby HOU 3-48-0110-043-2019 City of Houston 9/20/2019 9/24/2019 $ 8,050,677 $ 20,000,000 $ 28,050,677 Reconstruct Taxiway

TX Killeen Robert Gray AAF GRK 3-48-0361-028-2019 City of Killeen 7/29/2019 9/12/2019 $ 45,000 $ - $ 45,000 Rehabilitate Runway - 15/33

TX Killeen Robert Gray AAF GRK 3-48-0361-029-2019 City of Killeen 7/29/2019 9/12/2019 $ 631,260 $ - $ 631,260 Rehabilitate Taxiway

TX Killeen Robert Gray AAF GRK 3-48-0361-030-2019 City of Killeen 7/29/2019 9/12/2019 $ 1,150,000 $ - $ 1,150,000 Rehabilitate Terminal Building

TX Killeen Robert Gray AAF GRK 3-48-0361-031-2019 City of Killeen 9/20/2019 9/24/2019 $ - $ 3,375,000 $ 3,375,000 Construct Building [Military Airport Program] TX Laredo Laredo International LRD 3-48-0136-088-2019 City of Laredo 7/29/2019 8/19/2019 $ - $ 1,000,000 $ 1,000,000 Noise Mitigation Measures for Residences within 65-69 DNL

TX Laredo Laredo International LRD 3-48-0136-089-2019 City of Laredo 9/20/2019 9/20/2019 $ 1,606,303 $ 8,250,000 $ 9,856,303 Rehabilitate Apron

TX Longview East Texas Regional GGG 3-48-0137-047-2019 County of Gregg 6/24/2019 9/9/2019 $ 1,473,413 $ - $ 1,473,413 Construct Taxiway

TX Lubbock Lubbock Preston Smith International LBB 3-48-0138-043-2019 City of Lubbock 7/29/2019 9/10/2019 $ 3,173,227 $ - $ 3,173,227 Modify Terminal Building [Multi-Year Funding]

TX Lubbock Lubbock Preston Smith International LBB 3-48-0138-044-2019 City of Lubbock 6/5/2019 8/13/2019 $ 761,582 $ - $ 761,582 Acquire Snow Removal Equipment TX McAllen McAllen Miller International MFE 3-48-0144-049-2019 City of McAllen 9/20/2019 9/23/2019 $ 6,680,726 $ - $ 6,680,726 Improve Airport Drainage

TX Midland Midland International Air And Space Port MAF 3-48-0150-059-2019 City of Midland 7/29/2019 9/4/2019 $ 4,952,943 $ - $ 4,952,943 Improve Terminal Building

TX San Angelo San Angelo Regional/Mathis Field SJT 3-48-0191-039-2019 City of San Angelo 7/29/2019 9/13/2019 $ 1,100,600 $ - $ 1,100,600 Rehabilitate Apron, Rehabilitate Runway - 18/36

TX San Antonio San Antonio International SAT 3-48-0192-092-2019 City of San Antonio 7/9/2019 9/13/2019 $ - $ 4,627,750 $ 4,627,750 Construct Taxiway

TX San Antonio San Antonio International SAT 3-48-0192-093-2019 City of San Antonio 9/20/2019 9/23/2019 $ 2,421,127 $ - $ 2,421,127 Update Airport Master Plan Study

TX San Antonio San Antonio International SAT 3-48-0192-094-2019 City of San Antonio 9/20/2019 9/23/2019 $ - $ 1,387,500 $ 1,387,500 Install Runway Incursion Lighting

TX San Antonio San Antonio International SAT 3-48-0192-095-2019 City of San Antonio 9/20/2019 9/23/2019 $ - $ 1,493,170 $ 1,493,170 Rehabilitate Taxiway

TX San Antonio San Antonio International SAT 3-48-0192-096-2019 City of San Antonio 9/27/2019 $ - $ 2,330,850 $ 2,330,850 VALE Infrastructure

TX Tyler Tyler Pounds Regional TYR 3-48-0215-042-2019 City of Tyler 6/24/2019 8/28/2019 $ 800,000 $ - $ 800,000 Conduct Miscellaneous Study, Update Airport Master Plan Study

TX Tyler Tyler Pounds Regional TYR 3-48-0215-043-2019 City of Tyler 7/9/2019 8/28/2019 $ 100,000 $ - $ 100,000 Security Enhancements

TX Waco Waco Regional ACT 3-48-0220-042-2019 City of Waco 9/20/2019 9/23/2019 $ 274,500 $ - $ 274,500 Improve Airport Drainage, Improve Terminal Building

TX Waco Waco Regional ACT 3-48-0220-043-2019 City of Waco 9/20/2019 9/23/2019 $ 90,000 $ - $ 90,000 Acquire Emergency Generator TX Waco Waco Regional ACT 3-48-0220-044-2019 City of Waco 9/27/2019 $ 955,836 $ - $ 955,836 Acquire Land For Approaches [Multi-Year Funding]

TX Wichita Falls Sheppard AFB/Wichita Falls Municipal SPS 3-48-0227-020-2019 City of Wichita Falls 6/24/2019 8/20/2019 $ 1,445,189 $ - $ 1,445,189 Construct Access Road

TX Wichita Falls Sheppard AFB/Wichita Falls Municipal SPS 3-48-0227-021-2019 City of Wichita Falls 6/24/2019 9/3/2019 $ 554,811 $ - $ 554,811 Construct Terminal Building

UT Brigham City Brigham City Regional BMC 3-49-0003-028-2019 City of Brigham City 6/5/2019 7/3/2019 $ 415,000 $ - $ 415,000 Rehabilitate Apron

UT Bryce Canyon Bryce Canyon BCE 3-49-0041-018-2019 County of Garfield 9/20/2019 9/23/2019 $ 306,540 $ - $ 306,540 Reconstruct Runway Lighting - 03/21, Rehabilitate Runway - 03/21

UT Cedar City Cedar City Regional CDC 3-49-0005-035-2019 Cedar City Corporation 9/20/2019 9/24/2019 $ 1,000,000 $ 15,323,475 $ 16,323,475 Reconstruct Runway - 02/20

UT Delta Delta Municipal DTA 3-49-0006-016-2019 City of Delta 7/9/2019 7/23/2019 $ 4,160,000 $ - $ 4,160,000 Reconstruct Runway - 17/35, Reconstruct Taxiway, Rehabilitate Runway Lighting - 17/35, Rehabilitate Taxiway Lighting

UT Green River Green River Municipal U34 3-49-0010-012-2019 City of Green River 6/5/2019 7/9/2019 $ 298,820 $ - $ 298,820 Update Airport Master Plan Study

UT Heber City Heber City Municipal - Russ McDonald Field HCR 3-49-0011-030-2019 City of Heber 9/20/2019 9/23/2019 $ 200,000 $ - $ 200,000 Rehabilitate Runway - 04/22

UT Heber City Heber City Municipal - Russ McDonald Field HCR 3-49-0011-031-2019 City of Heber 7/29/2019 9/4/2019 $ 540,030 $ - $ 540,030 Update Airport Master Plan Study

UT Kanab Kanab Municipal KNB 3-49-0013-016-2019 City of Kanab 6/5/2019 7/29/2019 $ 292,937 $ - $ 292,937 Acquire Snow Removal Equipment UT Loa Wayne Wonderland 38U 3-49-0015-010-2019 County of Wayne 9/20/2019 9/23/2019 $ 160,000 $ - $ 160,000 Rehabilitate Runway - 13/31

UT Logan Logan-Cache LGU 3-49-0016-031-2019 County of Cache 6/5/2019 7/9/2019 $ 173,225 $ - $ 173,225 Construct Taxiway

UT Milford Milford Municipal/Ben and Judy Briscoe Field MLF 3-49-0019-014-2019 City of Milford 9/20/2019 9/24/2019 $ 150,000 $ - $ 150,000 Rehabilitate Runway - 16/34

UT Moab Canyonlands Field CNY 3-49-0020-033-2019 County of Grand 9/20/2019 9/23/2019 $ 1,000,000 $ 3,572,999 $ 4,572,999 Reconstruct Apron, Reconstruct Taxiway

UT Ogden Ogden-Hinckley OGD 3-49-0024-049-2019 Ogden City Corporation 6/5/2019 7/29/2019 $ 317,101 $ - $ 317,101 Conduct Miscellaneous Study, Rehabilitate Apron

UT Panguitch Panguitch Municipal U55 3-49-0025-013-2019 City of Panguitch 9/20/2019 9/24/2019 $ 166,272 $ - $ 166,272 Install Weather Reporting Equipment

UT Price Carbon County Regional/Buck Davis Field PUC 3-49-0026-018-2019 County of Carbon 6/5/2019 8/21/2019 $ 363,000 $ - $ 363,000 Rehabilitate Apron, Rehabilitate Runway - 01/19

UT Provo Provo Municipal PVU 3-49-0027-044-2019 City of Provo 9/20/2019 9/23/2019 $ 2,293,003 $ - $ 2,293,003 Construct Apron, Construct Terminal Building

UT Richfield Richfield Municipal RIF 3-49-0028-020-2019 Richfield City Corporation 7/29/2019 8/29/2019 $ 246,600 $ - $ 246,600 Construct Snow Removal Equipment Building, Install Perimeter Fencing not Required by 49 CFR 1542

9/30/2019 Page 36 of 40 FAA AIP Grant Detail Report

Page 37: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

UT Roosevelt Roosevelt Municipal 74V 3-49-0047-015-2019 City of Roosevelt 6/24/2019 7/9/2019 $ 97,880 $ - $ 97,880 Install Runway Vertical/Visual Guidance System - 07/25

UT Salt Lake City Salt Lake City International SLC 3-49-0033-116-2019 Salt Lake City Corporation 6/5/2019 7/15/2019 $ 3,600,000 $ - $ 3,600,000 Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

UT Salt Lake City Salt Lake City International SLC 3-49-0033-117-2019 Salt Lake City Corporation 6/5/2019 7/15/2019 $ 817,141 $ 10,000,000 $ 10,817,141 Construct Apron

UT Salt Lake City Salt Lake City International SLC 3-49-0033-118-2019 Salt Lake City Corporation 9/27/2019 $ - $ 7,664,143 $ 7,664,143 Construct Apron

UT Salt Lake City South Valley Regional U42 3-49-0032-018-2019 Salt Lake City Corporation 6/5/2019 8/22/2019 $ 789,582 $ - $ 789,582 Rehabilitate Taxiway

UT St. George St George Regional SGU 3-49-0060-031-2019 City of St George 6/5/2019 9/5/2019 $ 1,230,245 $ - $ 1,230,245 Construct Snow Removal Equipment Building

UT Vernal Vernal Regional VEL 3-49-0037-035-2019 City of Vernal and County of Uintah 6/5/2019 7/17/2019 $ 300,488 $ - $ 300,488 Update Airport Master Plan Study

UT Vernal Vernal Regional VEL 3-49-0037-036-2019 City of Vernal and County of Uintah 6/24/2019 7/17/2019 $ 64,335 $ - $ 64,335 Acquire Land For Approaches

UT Wendover Wendover ENV 3-49-0046-032-2019 County of Tooele 6/5/2019 7/30/2019 $ 1,415,000 $ - $ 1,415,000 Reconstruct Apron

VA Abingdon Virginia Highlands VJI 3-51-0001-036-2019 Virginia Highlands Airport Commission 9/20/2019 9/23/2019 $ 150,000 $ 4,000,000 $ 4,150,000 Extend Runway - 06/24

VA Arlington Ronald Reagan Washington National DCA 3-51-0082-035-2019 Metropolitan Washington Airports Authority 6/24/2019 7/15/2019 $ 4,921,500 $ - $ 4,921,500 Reconstruct Apron

VA Blacksburg Virginia Tech/Montgomery Executive BCB 3-51-0002-023-2019 Va. Tech/Montgomery Regional Airport Authority 6/5/2019 6/27/2019 $ 300,000 $ 1,021,000 $ 1,321,000 Extend Runway - 12/30

VA Charlottesville-Albemarle Airport Charlottesville-Albemarle CHO 3-51-0004-048-2019 Charlottesville-Albemarle Airport Authority 7/29/2019 8/28/2019 $ 3,690,181 $ - $ 3,690,181 Expand Apron

VA Culpeper Culpeper Regional CJR 3-51-0010-024-2019 County of Culpeper 7/29/2019 9/12/2019 $ 388,039 $ - $ 388,039 Remove Obstructions [Land Acquisition], Remove Obstructions [Road Extension] VA Danville Danville Regional DAN 3-51-0011-030-2019 City of Danville 7/29/2019 8/21/2019 $ 329,123 $ 3,224,421 $ 3,553,544 Rehabilitate Apron

VA Dulles Washington Dulles International IAD 3-51-0083-059-2019 Metropolitan Washington Airports Authority 6/5/2019 7/15/2019 $ 2,534,154 $ 4,177,858 $ 6,712,012 Reconstruct Taxiway

VA Dulles Washington Dulles International IAD 3-51-0083-060-2019 Metropolitan Washington Airports Authority 9/20/2019 9/24/2019 $ - $ 854,786 $ 854,786 VALE Infrastructure

VA Farmville Farmville Regional FVX 3-51-0015-019-2019 Town of Farmville 7/29/2019 8/16/2019 $ 150,000 $ 3,287,861 $ 3,437,861 Reconstruct Runway Lighting - 03/21, Rehabilitate Runway - 03/21

VA Highland Springs Richmond International RIC 3-51-0043-066-2019 Capital Region Airport Commission 9/20/2019 9/23/2019 $ 8,542,101 $ - $ 8,542,101 Construct Taxiway

VA Isle of Wight Franklin Municipal-John Beverly Rose FKN 3-51-0017-022-2019 City of Franklin 9/20/2019 9/23/2019 $ 90,000 $ - $ 90,000 Conduct Miscellaneous Study

VA Leesburg Leesburg Executive JYO 3-51-0027-041-2019 Town of Leesburg 6/24/2019 8/26/2019 $ 743,969 $ - $ 743,969 Rehabilitate Runway Lighting - 17/35, Rehabilitate Taxiway Lighting

VA Leesburg Leesburg Executive JYO 3-51-0027-042-2019 Town of Leesburg 9/20/2019 9/25/2019 $ 205,000 $ - $ 205,000 Construct Apron

VA Luray Luray Caverns LUA 3-51-0067-020-2019 Luray-Page County Airport Authority 9/20/2019 9/23/2019 $ 363,751 $ 927,974 $ 1,291,725 Construct Apron

VA Manassas Manassas Regional/Harry P Davis Field HEF 3-51-0030-045-2019 City of Manassas 9/20/2019 9/24/2019 $ 2,287,505 $ 1,108,301 $ 3,395,806 Construct Taxiway, Improve Runway Safety Area - 16L/34R

VA Manassas Manassas Regional/Harry P Davis Field HEF 3-51-0030-046-2019 City of Manassas 9/20/2019 9/24/2019 $ 297,592 $ - $ 297,592 Rehabilitate Runway - 16R/34L

VA Mattaponi Middle Peninsula Regional FYJ 3-51-0057-013-2019 Middle Peninsula Regional Airport Authority 7/29/2019 8/16/2019 $ 405,750 $ 1,196,250 $ 1,602,000 Rehabilitate Taxiway

VA Melfa Accomack County MFV 3-51-0033-020-2019 County of Accomack 7/29/2019 8/27/2019 $ 94,500 $ - $ 94,500 Rehabilitate Apron

VA Newport News Newport News/Williamsburg International PHF 3-51-0035-051-2019 Peninsula Airport Commission 6/24/2019 7/25/2019 $ 1,930,500 $ - $ 1,930,500 Construct Service Road

VA Newport News Newport News/Williamsburg International PHF 3-51-0035-052-2019 Peninsula Airport Commission 7/9/2019 8/22/2019 $ 310,500 $ - $ 310,500 Construct Taxiway, Reconstruct Taxiway Lighting

VA Norfolk Norfolk International ORF 3-51-0036-070-2019 Norfolk Airport Authority 7/9/2019 8/20/2019 $ 148,500 $ - $ 148,500 Conduct Miscellaneous Study

VA Norfolk Norfolk International ORF 3-51-0036-071-2019 Norfolk Airport Authority 9/20/2019 9/23/2019 $ 3,529,024 $ - $ 3,529,024 Acquire Land For Approaches, Install Airfield Guidance Signs, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

VA Orange Orange County OMH 3-51-0037-019-2019 Orange County Board of Supervisor 7/9/2019 8/13/2019 $ 110,735 $ - $ 110,735 Remove Obstructions

VA Quinton New Kent County W96 3-51-0041-019-2019 County of New Kent 7/29/2019 9/3/2019 $ 324,000 $ - $ 324,000 Conduct Environmental Study

VA Richmond Commonwealth of Virginia *VAS 3-51-0000-012-2019 Commonwealth of Virginia 7/9/2019 9/3/2019 $ 500,000 $ - $ 500,000 Conduct State System Plan Study

VA Roanoke Roanoke-Blacksburg Regional/Woodrum Field ROA 3-51-0045-062-2019 Roanoke Regional Airport Commission 7/29/2019 8/21/2019 $ 229,500 $ - $ 229,500

Reconstruct Airfield Guidance Signs, Reconstruct Runway Lighting - 06/24, Reconstruct Runway Lighting - 16/34, Reconstruct Taxiway Lighting

VA Timberlake Lynchburg Regional/Preston Glenn Field LYH 3-51-0029-042-2019 City of Lynchburg 9/20/2019 9/23/2019 $ 305,147 $ - $ 305,147 Construct Apron, Rehabilitate Apron, Rehabilitate Taxiway

VA Warrenton Warrenton-Fauquier HWY 3-51-0068-025-2019 County of Fauquier 9/20/2019 9/23/2019 $ 150,000 $ - $ 150,000 Rehabilitate Runway - 15/33, Rehabilitate Taxiway

VA Weyers Cave Shenandoah Valley Regional SHD 3-51-0049-043-2019 Shenandoah Valley Regional Airport Commission 9/20/2019 9/23/2019 $ 232,816 $ - $ 232,816 Acquire Safety and/or Security Equipment, Construct Taxiway

VA Winchester Winchester Regional OKV 3-51-0059-038-2019 Winchester Regional Airport Authority 7/9/2019 8/9/2019 $ 436,500 $ - $ 436,500 Reconstruct Apron, Rehabilitate Taxiway

VI Charlotte Amalie Cyril E King STT 3-78-0001-039-2019 Virgin Islands Port Authority 9/27/2019 $ 660,000 $ - $ 660,000 Reconstruct Apron, Update Miscellaneous Study

VI Charlotte Amalie Cyril E King STT 3-78-0001-040-2019 Virgin Islands Port Authority 9/27/2019 $ 1,503,000 $ - $ 1,503,000 Improve Runway Safety Area - 10/28

VI Christiansted Henry E Rohlsen STX 3-78-0002-039-2019 Virgin Islands Port Authority 9/27/2019 $ 639,000 $ - $ 639,000 Reconstruct Apron, Rehabilitate Runway Lighting - 10/28

VT Burlington Burlington International BTV 3-50-0005-117-2019 City of Burlington 6/5/2019 6/26/2019 $ 1,033,840 $ - $ 1,033,840 Rehabilitate Apron

9/30/2019 Page 37 of 40 FAA AIP Grant Detail Report

Page 38: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

VT Burlington Burlington International BTV 3-50-0005-118-2019 City of Burlington 9/20/2019 9/23/2019 $ 2,337,753 $ 13,531,648 $ 15,869,401 Reconstruct Taxiway

VT Burlington Burlington International BTV 3-50-0005-119-2019 City of Burlington 9/20/2019 9/23/2019 $ 109,825 $ - $ 109,825 Reconstruct Taxiway

VT Montpelier Various Locations in Vermont *VTV 3-50-5000-014-2019 State of Vermont 6/5/2019 6/27/2019 $ 207,697 $ - $ 207,697

Rehabilitate Apron (Franklin County State; Rutland - Southern Vermont Regional), Rehabilitate Runway (Caledonia County - 02/20; Franklin County State - 01/19; Hartness State (Springfield) - 05/23; Rutland - Southern Vermont Regional - 01/19; Rutland - Southern Vermont Regional - 13/31), Rehabilitate Taxiway (Caledonia County; Franklin County State)

VT Morrisville Morrisville-Stowe State MVL 3-50-0012-018-2019 State of Vermont 6/24/2019 7/17/2019 $ 53,694 $ - $ 53,694 Acquire Easement For Approaches

VT Morrisville Morrisville-Stowe State MVL 3-50-0012-019-2019 State of Vermont 7/9/2019 7/16/2019 $ 342,159 $ 1,153,833 $ 1,495,992 Extend Runway - 01/19

VT Newport Northeast Kingdom International EFK 3-50-0013-019-2019 State of Vermont 6/5/2019 7/17/2019 $ 117,720 $ - $ 117,720 Conduct Miscellaneous Study

VT Newport Northeast Kingdom International EFK 3-50-0013-020-2019 State of Vermont 6/24/2019 8/2/2019 $ 297,334 $ - $ 297,334 Acquire Easement For Approaches

VT Newport Northeast Kingdom International EFK 3-50-0013-021-2019 State of Vermont 7/9/2019 7/17/2019 $ 212,484 $ - $ 212,484 Environmental Mitigation

VT Swanton Franklin County State FSO 3-50-0007-011-2019 State of Vermont 6/24/2019 7/17/2019 $ 608,051 $ - $ 608,051 Install Perimeter Fencing not Required by 49 CFR 1542

WA Anacortes Anacortes 74S 3-53-0001-021-2019 Port of Anacortes 6/5/2019 7/18/2019 $ 372,823 $ - $ 372,823 Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate Taxiway

WA Auburn Auburn Municipal S50 3-53-0003-025-2019 City of Auburn 9/27/2019 $ 150,000 $ 2,708,343 $ 2,858,343 Extend Runway - 16/34

WA Bellingham Bellingham International BLI 3-53-0005-057-2019 Port of Bellingham 6/5/2019 8/5/2019 $ 711,000 $ - $ 711,000 Improve Runway Safety Area - 16/34

WA Bremerton Bremerton National PWT 3-53-0007-033-2019 Port of Bremerton 6/24/2019 8/27/2019 $ 2,246,728 $ - $ 2,246,728

Install Airfield Guidance Signs, Install Runway Vertical/Visual Guidance System - 02/20, Reconstruct Runway Lighting - 02/20, Reconstruct Taxiway Lighting, Rehabilitate Airport Beacons

WA Colfax Port of Whitman Business Air Center S94 3-53-0015-010-2019 Port of Whitman County 6/5/2019 7/3/2019 $ 497,661 $ - $ 497,661 Construct Access Road

WA Davenport Davenport 68S 3-53-0095-009-2019 City of Davenport 7/29/2019 9/9/2019 $ 294,732 $ - $ 294,732

Extend Runway - 05/23, Install Airfield Guidance Signs, Install Airport Beacons, Install Miscellaneous NAVAIDS, Install Runway Lighting - 05/23, Reconstruct Runway - 05/23

WA Deer Park Deer Park DEW 3-53-0022-025-2019 City of Deer Park 6/5/2019 7/17/2019 $ 352,780 $ - $ 352,780 Rehabilitate Apron, Rehabilitate Runway - 16/34

WA East Wenatchee Pangborn Memorial EAT 3-53-0084-040-2019 Ports of Chelan County and Douglas County 7/9/2019 8/7/2019 $ 749,882 $ - $ 749,882 Conduct Environmental Study

WA East Wenatchee Pangborn Memorial EAT 3-53-0084-041-2019 Ports of Chelan County and Douglas County 7/9/2019 8/30/2019 $ 158,314 $ - $ 158,314 Acquire Safety and/or Security Equipment, Modify Terminal Building

WA Friday Harbor Friday Harbor FHR 3-53-0152-035-2019 Port of Friday Harbor 6/24/2019 8/16/2019 $ 1,125,000 $ - $ 1,125,000 Acquire Snow Removal Equipment, Improve Airport Drainage

WA Kelso Southwest Washington Regional KLS 3-53-0034-019-2019 City of Kelso 6/24/2019 7/24/2019 $ 675,726 $ - $ 675,726 Rehabilitate Runway - 12/30, Rehabilitate Taxiway

WA Lopez Lopez Island S31 3-53-0037-015-2019 Port of Lopez 6/5/2019 8/16/2019 $ 150,743 $ - $ 150,743 Update Airport Master Plan Study

WA Moses Lake Grant County International MWH 3-53-0039-044-2019 Port of Moses Lake 9/20/2019 9/25/2019 $ 233,362 $ 9,916,638 $ 10,150,000 Reconstruct Runway - 14L/32R, Reconstruct Runway Lighting - 14L/32R

WA Omak Omak OMK 3-53-0042-009-2019 City of Omak 7/29/2019 8/29/2019 $ 71,091 $ - $ 71,091 Rehabilitate Apron, Rehabilitate Taxiway

WA Pasco Tri-Cities PSC 3-53-0046-047-2019 Port of Pasco 7/9/2019 9/12/2019 $ 2,735,429 $ - $ 2,735,429 Acquire Aircraft Deicing Equipment, Acquire Snow Removal Equipment WA Port Townsend Jefferson County International 0S9 3-53-0134-016-2019 Port of Port Townsend 9/20/2019 9/23/2019 $ 150,000 $ 300,000 $ 450,000 Install Airfield Guidance Signs, Reconstruct Taxiway

WA Prosser Prosser S40 3-53-0050-019-2019 Port of Benton 6/24/2019 7/25/2019 $ 57,627 $ - $ 57,627 Construct Taxiway

WA Pullman Pullman/Moscow Regional PUW 3-53-0051-051-2019 Cities of Pullman, WA and Moscow, ID 7/9/2019 7/17/2019 $ 76,495 $ - $ 76,495 Construct Runway - 06/24

WA Pullman Pullman/Moscow Regional PUW 3-53-0051-052-2019 Cities of Pullman, WA and Moscow, ID 7/9/2019 7/17/2019 $ 923,505 $ 24,000,000 $ 24,923,505 Construct Runway - 06/24

WA Pullman Pullman/Moscow Regional PUW 3-53-0051-053-2019 Cities of Pullman, WA and Moscow, ID 7/9/2019 7/17/2019 $ 2,493,361 $ - $ 2,493,361 Acquire Emergency Generator, Acquire Snow Removal Equipment, Install Perimeter Fencing required by 49 CFR 1542, Runway Incursion Markings

WA Quillayute Quillayute UIL 3-53-0168-007-2019 City of Forks 7/29/2019 8/30/2019 $ 271,917 $ - $ 271,917 Rehabilitate Runway - 04/22

WA Richland Richland RLD 3-53-0056-031-2019 Port of Benton 6/5/2019 7/18/2019 $ 430,305 $ - $ 430,305 Update Airport Master Plan Study

WA Seattle Boeing Field/King County International BFI 3-53-0058-055-2019 County of King 7/9/2019 9/16/2019 $ 1,725,000 $ - $ 1,725,000

Construct Snow Removal Equipment Building, Rehabilitate Runway Lighting - 14L/32R, Rehabilitate Taxiway Lighting

WA Seattle Boeing Field/King County International BFI 3-53-0058-056-2019 County of King 9/20/2019 9/24/2019 $ 3,157,389 $ - $ 3,157,389 Construct Snow Removal Equipment Building

WA Seattle Seattle-Tacoma International SEA 3-53-0062-142-2019 Port of Seattle 7/9/2019 7/26/2019 $ 3,335,223 $ - $ 3,335,223 Reconstruct Perimeter Fencing required by 49 CFR 1542

WA Seattle Seattle-Tacoma International SEA 3-53-0062-143-2019 Port of Seattle 7/9/2019 8/7/2019 $ 2,373,078 $ - $ 2,373,078 Reconstruct Terminal Building

WA Seattle Seattle-Tacoma International SEA 3-53-0062-144-2019 Port of Seattle 6/24/2019 8/7/2019 $ - $ 3,116,722 $ 3,116,722 Noise Mitigation Measures for Public Buildings

WA Seattle Seattle-Tacoma International SEA 3-53-0062-145-2019 Port of Seattle 6/24/2019 8/7/2019 $ - $ 6,000,000 $ 6,000,000 Noise Mitigation Measures for Public Buildings

WA Shelton Sanderson Field SHN 3-53-0069-016-2019 Port of Shelton 9/20/2019 9/23/2019 $ 1,829,027 $ 1,282,136 $ 3,111,163 Rehabilitate Runway - 05/23

WA Spokane Spokane International GEG 3-53-0072-058-2019 County and City of Spokane 6/5/2019 7/3/2019 $ 678,295 $ - $ 678,295 Acquire Aircraft Rescue & Fire Fighting Vehicle

WA Tacoma Tacoma Narrows TIW 3-53-0076-020-2019 County of Pierce 6/5/2019 8/14/2019 $ 137,661 $ - $ 137,661 Update Airport Master Plan Study

WA Vancouver Pearson Field VUO 3-53-0139-013-2019 City of Vancouver 7/29/2019 8/19/2019 $ 794,121 $ - $ 794,121 Install Runway Vertical/Visual Guidance System - 08/26, Reconstruct Airfield Guidance Signs, Rehabilitate Runway - 08/26

WA Walla Walla Walla Walla Regional ALW 3-53-0083-035-2019 Port of Walla Walla 7/9/2019 8/19/2019 $ 619,351 $ - $ 619,351 Conduct Miscellaneous Study, Rehabilitate Runway - 02/20

9/30/2019 Page 38 of 40 FAA AIP Grant Detail Report

Page 39: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

WA Walla Walla Walla Walla Regional ALW 3-53-0083-036-2019 Port of Walla Walla 7/9/2019 9/16/2019 $ 791,408 $ - $ 791,408 Acquire Snow Removal Equipment WA Winthrop Methow Valley State S52 3-53-0110-010-2019 State of Washington/DOT Aviation Division 7/29/2019 8/15/2019 $ 205,000 $ - $ 205,000 Expand Apron

WA Yakima Yakima Air Terminal/McAllister Field YKM 3-53-0089-043-2019 City of Yakima 7/29/2019 8/28/2019 $ 132,426 $ - $ 132,426 Install Miscellaneous NAVAIDS, Reconstruct Runway Lighting - 09/27, Rehabilitate Runway - 09/27

WA Yakima Yakima Air Terminal/McAllister Field YKM 3-53-0089-044-2019 City of Yakima 9/20/2019 9/23/2019 $ 1,000,000 $ - $ 1,000,000 Acquire Aircraft Rescue & Fire Fighting Vehicle

WI Appleton Appleton International ATW 3-55-0002-056-2019 County of Outagamie 9/20/2019 9/25/2019 $ 2,328,501 $ 2,276,799 $ 4,605,300 Expand Apron

WI Eau Claire Chippewa Valley Regional EAU 3-55-0019-044-2019 County of Eau Claire 9/20/2019 9/25/2019 $ 1,000,000 $ 345,682 $ 1,345,682 Rehabilitate Runway - 04/22, Rehabilitate Taxiway

WI Green Bay Green Bay-Austin Straubel International GRB 3-55-0025-051-2019 County of Brown 7/29/2019 9/6/2019 $ 1,074,600 $ - $ 1,074,600 Improve Terminal Building

WI La Crosse La Crosse Regional LSE 3-55-0030-044-2019 City of La Crosse 9/20/2019 9/25/2019 $ 1,217,939 $ - $ 1,217,939

Expand Apron [Multi-Year Funding], Modify Access Road [Multi-Year Funding], Reconstruct Taxiway [Multi-Year Funding], Rehabilitate Service Road [Multi-Year Funding]

WI Madison Dane County Regional-Truax Field MSN 3-55-0036-063-2019 County of Dane 9/20/2019 9/24/2019 $ 2,991,363 $ - $ 2,991,363 Modify Access Road, Rehabilitate Service Road

WI Madison Wisconsin State Block Grant Program *WIB 3-55-SBGP-104-2019 State of Wisconsin 9/20/2019 9/24/2019 $ 15,555,969 $ - $ 15,555,969 Non primary development projects in state block grant program

WI Madison Wisconsin State Block Grant Program *WIB 3-55-SBGP-105-2019 State of Wisconsin 7/29/2019 8/20/2019 $ - $ 2,160,000 $ 2,160,000 Non primary development projects in state block grant program

WI Madison Wisconsin State Block Grant Program *WIB 3-55-SBGP-106-2019 State of Wisconsin 7/29/2019 9/16/2019 $ - $ 844,375 $ 844,375 Non primary development projects in state block grant program

WI Madison Wisconsin State Block Grant Program *WIB 3-55-SBGP-107-2019 State of Wisconsin 7/29/2019 9/16/2019 $ - $ 584,843 $ 584,843 Non primary development projects in state block grant program

WI Madison Wisconsin State Block Grant Program *WIB 3-55-SBGP-108-2019 State of Wisconsin 9/20/2019 9/24/2019 $ 150,000 $ - $ 150,000 Non primary development projects in state block grant program

WI Madison Wisconsin State Block Grant Program *WIB 3-55-SBGP-109-2019 State of Wisconsin 9/20/2019 9/24/2019 $ - $ 3,600,000 $ 3,600,000 Non primary development projects in state block grant program

WI Madison Wisconsin State Block Grant Program *WIB 3-55-SBGP-110-2019 State of Wisconsin 9/20/2019 9/24/2019 $ - $ 7,521,894 $ 7,521,894 Non primary development projects in state block grant program

WI Milwaukee General Mitchell International MKE 3-55-0045-097-2019 County of Milwaukee 6/5/2019 9/9/2019 $ - $ 1,997,645 $ 1,997,645 Improve Runway Safety Area - 07R/25L

WI Milwaukee General Mitchell International MKE 3-55-0045-098-2019 County of Milwaukee 9/20/2019 9/25/2019 $ 2,016,419 $ 213,373 $ 2,229,792 Rehabilitate Taxiway [Taxiway E], Rehabilitate Taxiway [Taxiway F] WI Mosinee Central Wisconsin CWA 3-55-0052-051-2019 Central Wisconsin Airport 9/20/2019 9/25/2019 $ 2,344,673 $ - $ 2,344,673 Improve Terminal Building

WI Mosinee Central Wisconsin CWA 3-55-0052-052-2019 Central Wisconsin Airport 9/20/2019 9/25/2019 $ 897,841 $ - $ 897,841 Reconstruct Runway - 17/35

WI Rhinelander Rhinelander-Oneida County RHI 3-55-0070-041-2019 County of Oneida and City of Rhinelander 9/20/2019 9/25/2019 $ 3,274,472 $ - $ 3,274,472

Acquire Aircraft Deicing Equipment [Multi-Year Funding], Acquire Equipment, Modify Terminal Building, Reconstruct Apron [Multi-Year Funding], Rehabilitate Apron [Commercial Service Apron, Multi-Year Funding], Rehabilitate Apron [General Aviation Apron, Multi-Year Funding], Rehabilitate Runway [Runway 15/33, Multi-Year Funding] - 15/33, Rehabilitate Runway [Runway 9/27, Multi-Year Funding] - 09/27, Rehabilitate Taxiway [Taxiway A, Multi-Year Funding], Rehabilitate Taxiway [Taxiways B and E, Multi-Year Funding], Rehabilitate Taxiway [Taxiways C and D, Multi-Year Funding], Rehabilitate Terminal Building

WV Beckley Raleigh County Memorial BKW 3-54-0001-038-2019 Raleigh County Airport Authority 6/24/2019 7/23/2019 $ 238,774 $ 1,497,893 $ 1,736,667 Reconstruct Taxiway

WV Bluefield Mercer County BLF 3-54-0002-032-2019 Mercer County Airport Authority 9/20/2019 9/24/2019 $ 828,528 $ - $ 828,528 Install Perimeter Fencing not Required by 49 CFR 1542

WV Buckhannon Upshur County Regional W22 3-54-0039-033-2019 Buckhannon-Upshur Airport Authority 7/29/2019 8/22/2019 $ 152,723 $ - $ 152,723 Construct Building

WV Charleston State of West Virginia *WVS 3-54-0000-002-2019 West Virginia Aeronautics Commission 7/29/2019 8/22/2019 $ 364,500 $ - $ 364,500 Conduct State System Plan Study

WV Charleston Yeager CRW 3-54-0003-066-2019 Central West Virginia Regional Airport Authority 7/9/2019 7/19/2019 $ 518,645 $ - $ 518,645 Rehabilitate Runway - 05/23

WV Charleston Yeager CRW 3-54-0003-067-2019 Central West Virginia Regional Airport Authority 7/9/2019 8/2/2019 $ 1,315,801 $ 1,321,199 $ 2,637,000 Improve Airport Drainage

WV Clarksburg North Central West Virginia CKB 3-54-0005-043-2019 Benedum Airport Authority 7/9/2019 7/26/2019 $ 971,260 $ - $ 971,260 Acquire Snow Removal Equipment, Reconstruct Deicing Containment Facility

WV Fairmont Fairmont Municipal-Frankman Field 4G7 3-54-0008-020-2019 Fairmont-Marion County Regional Airport Authority 7/29/2019 8/14/2019 $ 91,800 $ - $ 91,800 Remove Obstructions [Non-Hazard] WV Huntington Tri-State/Milton J Ferguson Field HTS 3-54-0010-059-2019 Tri State Airport Authority 6/24/2019 8/30/2019 $ - $ 2,435,036 $ 2,435,036 Improve Airport Drainage

WV Huntington Tri-State/Milton J Ferguson Field HTS 3-54-0010-060-2019 Tri State Airport Authority 7/29/2019 8/30/2019 $ 1,319,365 $ 2,096,890 $ 3,416,255 Improve Runway Safety Area - 12/30

WV Lewisburg Greenbrier Valley LWB 3-54-0012-041-2019 Greenbrier County Airport Authority 7/29/2019 8/22/2019 $ 142,500 $ - $ 142,500 Conduct Miscellaneous Study

WV Morgantown Morgantown Municipal-Walter L Bill Hart Field MGW 3-54-0015-041-2019 City of Morgantown 7/29/2019 8/21/2019 $ 1,016,467 $ - $ 1,016,467

Improve Airport Drainage, Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 18/36, Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway C]

WV Petersburg Grant County W99 3-54-0019-022-2019 County of Grant 7/29/2019 8/28/2019 $ 85,000 $ - $ 85,000 Construct Building

9/30/2019 Page 39 of 40 FAA AIP Grant Detail Report

Page 40: FAA Airport Improvement Program Grant Detail Report...FAA Airport Improvement Program Grant Detail Report As of 9/30/2019 Current Grant Totals Note: If there is no award date, the

Current Grant Totals Note: If there is no award date, the grant has only been announced, and the

totals are preliminary estimates, subject to change prior to award

State City Worksite LocID Grant Number Sponsor Release Date Award Date Entitlement Amount Discretionary Amount Total AIP Amount Project Summary

WV Philippi Philippi/Barbour County Regional 79D 3-54-0040-020-2019 City of Philippi/Barbour County Airport Authority 7/29/2019 8/22/2019 $ 88,991 $ - $ 88,991 Construct Building

WV Pineville Kee Field I16 3-54-0020-017-2019 County of Wyoming 7/29/2019 8/13/2019 $ 357,211 $ - $ 357,211 Rehabilitate Runway - 08/26

WV Sutton Braxton County 48I 3-54-0026-020-2019 Braxton County Airport Authority 7/29/2019 8/21/2019 $ 842,026 $ - $ 842,026 Construct Building

WV Williamson Appalachian Regional EBD 3-54-0041-008-2019 Mingo County Airport Authority 9/20/2019 9/24/2019 $ 243,663 $ - $ 243,663 Rehabilitate Apron, Rehabilitate Runway - 08/26, Rehabilitate Taxiway

WY Afton Afton Municipal AFO 3-56-0037-025-2019 Town of Afton 6/5/2019 8/19/2019 $ 92,000 $ - $ 92,000 Construct Taxiway [Taxiway F], Reconstruct Taxiway [Taxiway A5] WY Buffalo Johnson County BYG 3-56-0003-019-2019 County of Johnson 7/9/2019 9/3/2019 $ 429,129 $ - $ 429,129 Acquire Snow Removal Equipment

WY Casper Casper/Natrona County International CPR 3-56-0004-059-2019 County of Natrona Board of Trustees 7/29/2019 8/6/2019 $ 1,267,167 $ 6,093,933 $ 7,361,100 Rehabilitate Apron

WY Cheyenne Cheyenne Regional/Jerry Olson Field CYS 3-56-0005-055-2019 Cheyenne Airport Board 7/29/2019 8/29/2019 $ 245,960 $ - $ 245,960 Reconstruct Runway - 09/27

WY Cheyenne State of Wyoming *WYS 3-56-0000-010-2019 State of Wyoming 6/24/2019 9/5/2019 $ 694,660 $ - $ 694,660 Update State System Plan Study

WY Cowley North Big Horn County U68 3-56-0008-014-2019 County of Big Horn 6/24/2019 7/23/2019 $ 117,000 $ - $ 117,000 Improve Airport Drainage, Install Airport Beacons

WY Dixon Dixon DWX 3-56-0038-017-2019 County of Carbon 6/5/2019 7/15/2019 $ 307,437 $ - $ 307,437 Update Airport Master Plan Study

WY Dixon Dixon DWX 3-56-0038-018-2019 County of Carbon 7/9/2019 9/4/2019 $ 350,000 $ - $ 350,000 Rehabilitate Runway - 06/24

WY Douglas Converse County DGW 3-56-0035-022-2019 County of Converse 7/9/2019 8/6/2019 $ 571,000 $ - $ 571,000 Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 11/29, Reconstruct Runway Lighting - 11/29

WY Gillette Gillette-Campbell County GCC 3-56-0012-045-2019 County of Campbell/Gillette-Campbell Co. Airport Board 6/5/2019 6/18/2019 $ 1,651,712 $ 2,968,288 $ 4,620,000

Construct Taxiway, Install Taxiway Lighting, Reconstruct Taxiway, Reconstruct Taxiway Lighting

WY Jackson Jackson Hole JAC 3-56-0014-060-2019 Jackson Hole Airport Board 6/24/2019 7/16/2019 $ 2,556,642 $ - $ 2,556,642 Rehabilitate Access Road

WY Kemmerer Kemmerer Municipal EMM 3-56-0015-021-2019 Town of Kemmerer 6/5/2019 6/24/2019 $ 150,000 $ - $ 150,000 Construct Fuel Farm

WY Laramie Laramie Regional LAR 3-56-0017-037-2019 Laramie Regional Airport 7/29/2019 8/20/2019 $ 2,000,036 $ - $ 2,000,036 Expand Terminal Building, Rehabilitate Terminal Building

WY Newcastle Mondell Field ECS 3-56-0019-017-2019 County of Weston 6/5/2019 8/9/2019 $ 509,999 $ - $ 509,999 Construct Taxiway, Install Perimeter Fencing not Required by 49 CFR 1542

WY Pinedale Ralph Wenz Field PNA 3-56-0021-022-2019 Town of Pinedale 6/5/2019 8/13/2019 $ 2,371,000 $ - $ 2,371,000 Reconstruct Apron, Reconstruct Taxiway

WY Powell Powell Municipal POY 3-56-0022-016-2019 City of Powell 7/9/2019 7/29/2019 $ 78,000 $ - $ 78,000 Construct Taxiway

WY Rock Springs Southwest Wyoming Regional RKS 3-56-0025-037-2019 City of Rock Springs/County of Sweetwater 6/24/2019 7/2/2019 $ 1,000,000 $ 4,075,000 $ 5,075,000 Install Miscellaneous NAVAIDS, Reconstruct Taxiway, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

WY Saratoga Shively Field SAA 3-56-0026-027-2019 Town of Saratoga 6/5/2019 8/7/2019 $ 189,000 $ - $ 189,000 Acquire Snow Removal Equipment WY Sheridan Sheridan County SHR 3-56-0027-052-2019 County of Sheridan 6/5/2019 7/17/2019 $ 1,954,521 $ - $ 1,954,521 Expand Terminal Building, Install Apron Flood Lighting

WY Thermopolis Hot Springs County HSG 3-56-0043-011-2019 County of Hot Springs 6/5/2019 7/2/2019 $ 187,000 $ - $ 187,000 Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate Taxiway

WY Torrington Torrington Municipal TOR 3-56-0029-018-2019 Town of Torrington 7/9/2019 7/18/2019 $ 540,000 $ - $ 540,000 Rehabilitate Runway - 02/20

WY Worland Worland Municipal WRL 3-56-0031-024-2019 City of Worland 6/5/2019 8/6/2019 $ 225,052 $ - $ 225,052 Widen Taxiway

9/30/2019 Page 40 of 40 FAA AIP Grant Detail Report