f4 f2 - nt consulting engineers · 2018. 9. 13. · s02 6 b18-7912 0 oc mc june 2018 hoj38520 mc...

7
2m 0 SCALE: 1:100 1 0 SCALE: 1:100 CUPOLEX: 260 DOME SCALE 1:10 285 20 55 55 55 55 55 260 560 cover 260 Cupolex Dome 260 Benton Stop 260 Stop End 20 (Benton Stop) (Cupolex Dome) Stop End LEGEND 260 CUPOLEX DOMES 200 CUPOLEX DOMES FOOTING SCHEDULE 320 DEEP x 300 WIDE RAFT FOOTING F2 F4 +260 F2 F2 F2 F1 800 SQ x 100 thk CONCRETE SLAB on 0.2 WPM/50 thk sand bed compacted to 95% MMDD Provide SL72 mesh, 30 top cover SLAB & FOOTING PLAN SCALE 1:100 200 PART PLAN +260 320 DEEP x 300 WIDE RAFT FOOTING F1 260 260 Benton Stop +320 A N12 STARTER BARS AS SCHEDULED 3-N12 RE-ENTRANT BARS x 800 LONG TIE TO MESH (100 GAUGE) A3 SIZE SHEET AMENDMENT NTG DRAWING No. OF SHEET No. NTG ASSET No. NTG PROJECT No. CHECKED DATE CHECKED DATE DATE NTG PROJECT MANAGER DRAWN DATE DESIGNED DATE DATE DESIGN PROJECT LEADER Norhern Territory INIT. DATE DESCRIPTION AMENDMENTS No. DEPT/COMPANY. Government NORTHERN REGION (CYCLONIC) 2 BED MASONRY DUPLEX (STANDARD DESIGN) STRUCTURAL SLAB & FOOTING PLAN S02 6 B18-7912 0 OC JUNE 2018 MC JUNE 2018 HOJ38520 MC JUNE 2018 OC JUNE 2018 DH JUNE 2018 PK JUNE 2018 F4 260 DEEP x 300 WIDE RAFT FOOTING F5 200 +260 F4 F4 200 F4 F4 F5 500 DEEP x 300 WIDE STRIP FOOTING: refer detail 2 2520 = = = = = = Fall 10 mm Fall 25 mm Fall 25 mm Fall 10 mm 1200 SQ x 100 thk CONCRETE SLAB on 0.2 WPM/50 thk sand bed compacted to 95% MMDD Provide SL72 mesh, 30 top cover 300 x 75 thk CONC MOWING STRIP: 3-SL8TM CENTRALLY PROVIDE TOOL JOINT @ CORNERS & 2400 CRS (COMPACT SUBGRADE 95% MMDD) DANLEY 250mm KEY JOINT w/ SILCOSEAL BOND BREAKER Fall 10 mm Fall 10 mm 60 step 60 step Note: Core fill all cores to Party Wall FUTURE DOOR: PROVIDE LINTEL, BUT NO VERT REINF FUTURE DOOR: PROVIDE LINTEL, BUT NO VERT REINF 320 DEEP x 550 WIDE RAFT FOOTING F3 F2 F2 F2 F1 F3 F3 F3 F3 N12 x 600 'L' BAR @ CORNERS & JUNCTIONS TIE TO U/S OF CAGE (typ) 6012 3745 Footing Centerline Note: The ground adjacent to the building must be graded to a uniform fall of 50mm for a 1m wide perimeter Note: Provide cage to all footings 3-N12 bot reinf & 2 N12 top reinf F5 2 Note: 60 thk Verandah slab w/ SL82 mesh on cupolex domes Note: 60 thk Slab w/ SL82 mesh on cupolex domes PROVIDE 2 LAYERS OF MESH TO BATH 120/105 thk Bathroom slab w/ bot SL82 mesh on cupolex domes & SL82 top mesh (40 top cover) SITE PREPERATION BENCH SLAB 50 BELOW NGL PROVIDE 50 SAND BED COMPACTED TO 95% MMDD PROVIDE 0.2 WPM UNDERLAY ON SAND BED CUPOLEX SHALL BE INSTALLED AS SCHEDULED & IN ACCORDANCE WITH THE MANUFACTURERS SPECIFICATION CUPOLEX Note: The ground adjacent to the building must be graded to a uniform fall of 50mm for a 1m wide perimeter

Upload: others

Post on 08-Mar-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: F4 F2 - NT Consulting Engineers · 2018. 9. 13. · S02 6 B18-7912 0 OC MC JUNE 2018 HOJ38520 MC JUNE 2018 OC JUNE 2018 DH JUNE 2018 PK JUNE 2018 F4 260 DEEP x 300 WIDE RAFT FOOTING

2m0

SCALE: 1:100

10

SCALE: 1:100

± 0.00

± 0.00

± 0.00

CUPOLEX: 260 DOME

SCALE 1:10

285 20

55 55 55 55 55

26

0

560 cover

260 Cupolex Dome

260 Benton Stop

260 Stop End

20

(Benton Stop)

(Cupolex Dome)

Stop End

LEGEND

260 CUPOLEX DOMES

200 CUPOLEX DOMES

FOOTING SCHEDULE

320 DEEP x 300 WIDE RAFT FOOTINGF2

F4

+260

F2

F2

F2

F1

800 SQ x 100 thk CONCRETE SLAB on

0.2 WPM/50 thk sand bed compacted to 95% MMDD

Provide SL72 mesh, 30 top cover

SLAB & FOOTING PLANSCALE 1:100

200

PART PLAN

+260

320 DEEP x 300 WIDE RAFT FOOTINGF1

260

260 Benton Stop

+320

A

N12 STARTER BARS AS SCHEDULED

3-N12 RE-ENTRANT

BARS x 800 LONG

TIE TO MESH

(100 GAUGE)

A3

SIZE

SHEET

AMENDMENTNTG DRAWING No.

OF

SHEET No.NTG ASSET No.NTG PROJECT No.

CHECKED

DATE

CHECKED

DATE

DATE

NTG PROJECT MANAGER

DRAWN

DATE

DESIGNED

DATE

DATE

DESIGN PROJECT LEADER

Norhern Territory

INIT.DATEDESCRIPTION

AMENDMENTS

No. DEPT/COMPANY.

Government

NORTHERN REGION (CYCLONIC) 2 BED

MASONRY DUPLEX (STANDARD DESIGN)

STRUCTURAL

SLAB & FOOTING PLAN

S02 6 B18-7912 0

OC

JUNE 2018

MC

JUNE 2018

HOJ38520

MC

JUNE 2018

OC

JUNE 2018

DH

JUNE 2018

PK

JUNE 2018

F4

260 DEEP x 300 WIDE RAFT FOOTING

F5

200

+260 F4F4

200

F4 F4

F5 500 DEEP x 300 WIDE STRIP FOOTING: refer detail 2

± 0.00

25

20

======

Fall

10 m

m

Fa

ll

25

m

m

Fa

ll

25

m

m

Fa

ll

10

m

m

1200 SQ x 100 thk CONCRETE SLAB on

0.2 WPM/50 thk sand bed compacted to 95% MMDD

Provide SL72 mesh, 30 top cover

300 x 75 thk CONC MOWING

STRIP: 3-SL8TM CENTRALLY

PROVIDE TOOL JOINT @

CORNERS & 2400 CRS

(COMPACT SUBGRADE 95% MMDD)

DANLEY 250mm KEY JOINT w/

SILCOSEAL BOND BREAKER

Fa

ll

10

m

m

Fall

10 m

m

60 step

60 step

Note:

Core fill all cores to

Party Wall

FUTURE DOOR: PROVIDE

LINTEL, BUT NO VERT REINF

FUTURE DOOR: PROVIDE

LINTEL, BUT NO VERT REINF

320 DEEP x 550 WIDE RAFT FOOTINGF3

F2

F2

F2

F1

F3 F3

F3F3

N12 x 600 'L' BAR @ CORNERS

& JUNCTIONS TIE TO U/S OF CAGE

(typ)

6012 3745

Footing Centerline

Note:

The ground adjacent to the building

must be graded to a uniform fall of

50mm for a 1m wide perimeter

Note:

Provide cage to all footings 3-N12 bot reinf &

2 N12 top reinf

F5

2

Note:

60 thk Verandah slab w/ SL82

mesh on cupolex domes

Note:

60 thk Slab w/ SL82

mesh on cupolex domes

PROVIDE 2 LAYERS OF MESH TO BATH

120/105 thk Bathroom slab w/ bot SL82

mesh on cupolex domes & SL82 top mesh

(40 top cover)

SITE PREPERATION

BENCH SLAB 50 BELOW NGL

PROVIDE 50 SAND BED COMPACTED

TO 95% MMDD PROVIDE 0.2 WPM

UNDERLAY ON SAND BED

CUPOLEX SHALL BE INSTALLED AS SCHEDULED

& IN ACCORDANCE WITH THE MANUFACTURERS

SPECIFICATION

CUPOLEX

Note:

The ground adjacent to the building

must be graded to a uniform fall of

50mm for a 1m wide perimeter

Page 2: F4 F2 - NT Consulting Engineers · 2018. 9. 13. · S02 6 B18-7912 0 OC MC JUNE 2018 HOJ38520 MC JUNE 2018 OC JUNE 2018 DH JUNE 2018 PK JUNE 2018 F4 260 DEEP x 300 WIDE RAFT FOOTING

2m0

SCALE: 1:100

10

SCALE: 1:100

LEGEND

ROOF FRAMING PLANSCALE 1:100

PART PLAN

RT RTRT RT

= = =

Bondor E

PS

F

R (0.6/0.6) ceiling panel

A

Reflected Ceiling Plan

B1-RING BEAM

B1-RING BEAM

100 x 50 x 2 RHS PURLINS

@ 900 CRS MAX

COMPOSITE 100 thk

SOLARSPAN EPS FR

VERANDAH ROOF PANEL

(O.42/0.6)

Note:

Fix truss top & bot. chord

to Party Wall w/ M12 c/a

to reinforced core @ ea

crossing:Hilti Hit RE 500 c/a

(110 embed)

ROOF FRAMING SCHEDULE

ROOF TRUSS AS SCHEDULED: REFER SECTION ART

125 x 75 x 4 RHS RING BEAMB1

B2 125 x 75 x 4 RHS VERANDAH BEAM

CAST IN PLATE: REFER DETAIL BELOW

A3

SIZE

SHEET

AMENDMENTNTG DRAWING No.

OF

SHEET No.NTG ASSET No.NTG PROJECT No.

CHECKED

DATE

CHECKED

DATE

DATE

NTG PROJECT MANAGER

DRAWN

DATE

DESIGNED

DATE

DATE

DESIGN PROJECT LEADER

Northern Territory

INIT.DATEDESCRIPTION

AMENDMENTS

No. DEPT/COMPANY.

Government

NORTHERN REGION (CYCLONIC) 2 BED

MASONRY DUPLEX (STANDARD DESIGN)

STRUCTURAL

ROOF FRAMING PLAN

S03 6 B18-7913 0

OC

JUNE 2018

MC

JUNE 2018

HOJ38520

MC

JUNE 2018

OC

JUNE 2018

DH

JUNE 2018

PK

JUNE 2018

C1C1C1C1C1C1C1

B2-VERANDAH BEAM

75 x 4 SHS COLUMNC1

24

84

93

8

o/h

======

Bondor E

PS

F

R (0.6/0.6) ceiling panel

Bondor E

PS

F

R (0.6/0.6) ceiling panel

Bondor E

PS

F

R (0.6/0.6) ceiling panel

Bondor E

PS

F

R (0.6/0.6) ceiling panel

Bondor E

PS

F

R (0.6/0.6) ceiling panel

Bondor E

PS

F

R (0.6/0.6) ceiling panel

Bondor E

PS

F

R (0.6/0.6) ceiling panel

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

So

la

rsp

an

E

PS

F

R (0

.4

2/0

.6

) p

an

el

SOLARSPAN SHALL BE INSTALLED AS SCHEDULED

& IN ACCORDANCE WITH THE MANUFACTURERS

SPECIFICATION & AS NOTED ON THESE Dwgs

SOLARSPAN PANELS

B1-RING BEAM

Page 3: F4 F2 - NT Consulting Engineers · 2018. 9. 13. · S02 6 B18-7912 0 OC MC JUNE 2018 HOJ38520 MC JUNE 2018 OC JUNE 2018 DH JUNE 2018 PK JUNE 2018 F4 260 DEEP x 300 WIDE RAFT FOOTING

NGL

SECTION

SCALE: 1:50

TYPICAL

GENERAL ARRANGEMENT

A

0.42 BMT CUSTOM ORB

SOFFIT CLADDING PAN

FIX AS PER DTC M/309/1

TO 75 x 50 x 2 RHS BATTENS

@ 1000 CRS MAX

TRUSS MEMEBER SCHEDULE

75 x 2 SHSTop Chord

75 x 2 SHSBottom Chord

75 x 2 SHSWeb Members

1

75 X 4 SHS STRUT

@

1

3

POINT

75 X 4 SHS STRUT

@

1

3

POINT

20°

CONTINUOUS 65 X 2.5 CA. FIX TO CEILING PANEL

w/ 14g-25-50 TEKS @ 300 CRS

STITCH WELD TO CA: HIT 30, MISS 300

A3

SIZE

SHEET

AMENDMENTNTG DRAWING No.

OF

SHEET No.NTG ASSET No.NTG PROJECT No.

CHECKED

DATE

CHECKED

DATE

DATE

NTG PROJECT MANAGER

DRAWN

DATE

DESIGNED

DATE

DATE

DESIGN PROJECT LEADER

Northern Territory

INIT.DATEDESCRIPTION

AMENDMENTS

No. DEPT/COMPANY.

Government

NORTHERN REGION (CYCLONIC) 2 BED

MASONRY DUPLEX (STANDARD DESIGN)

STRUCTURAL

SECTION A

S04 6 B18-7914 0

OC

JUNE 2018

MC

JUNE 2018

HOJ38520

MC

JUNE 2018

OC

JUNE 2018

DH

JUNE 2018

PK

JUNE 2018

Note:

CONTINUOUS 65 X 2.5 CA

FIX TO CEILING PANEL w/

14g-25-50 TEKS @ 300 CRS

STITCH WELD TO B1:

(HIT 30, MISS 300)

5

0

5

0

100 x 4 SHS PLATE

10°

150 SQ x 10 CIP

N12 TAG x 200, COG 65

PLUG & FW TO CIP

(GRIND FLUSH)

HOT DIP GALVANISE

ASSEMBLY (500 gsm)

FALL VERANDAH

SUBGRADE 25mm

300 x 75 thk CONC MOWING

STRIP: 3-SL8TM CENTRALLY

PROVIDE TOOL JOINT @

2400 CRS MAX

(COMPACT SUBGRADE 95% MMDD)

GABLE CLADDING

PROVIDE 0.42 BMT VERTICAL CUSTOM ORB

GABLE CLADDING PAN FIX AS PER DTC M/309/1

TO HORIZ 40 TH BATTENS @ 900 CRS MAX AS

PER DTC M/630/1A

Note:

Provide raking batten to truss top chord

Note:

PROVIDE 150 LAYERS MAX OF SELECT FILL

COMPACTED TO 95% MMDD. CLASS 'M' SITE

CLASSIFICATION AS PER AS2870

±0.00 FFL

+2700 Top of Wall

+2100 Lintel

-320 NGL

== = = =

Truss bot chord nodes

=

=

=

T

r

u

s

s

t

o

p

c

h

o

r

d

n

o

d

e

s

Page 4: F4 F2 - NT Consulting Engineers · 2018. 9. 13. · S02 6 B18-7912 0 OC MC JUNE 2018 HOJ38520 MC JUNE 2018 OC JUNE 2018 DH JUNE 2018 PK JUNE 2018 F4 260 DEEP x 300 WIDE RAFT FOOTING

A3

SIZE

SHEET

AMENDMENTNTG DRAWING No.

OF

SHEET No.NTG ASSET No.NTG PROJECT No.

CHECKED

DATE

CHECKED

DATE

DATE

NTG PROJECT MANAGER

DRAWN

DATE

DESIGNED

DATE

DATE

DESIGN PROJECT LEADER

Northern Territory

INIT.DATEDESCRIPTION

AMENDMENTS

No. DEPT/COMPANY.

Government

NORTHERN REGION (CYCLONIC) 2 BED

MASONRY DUPLEX (STANDARD DESIGN)

STRUCTURAL

DETAILS

S05 6 B18-7915 0

OC

JUNE 2018

MC

JUNE 2018

HOJ38520

MC

JUNE 2018

OC

JUNE 2018

DH

JUNE 2018

PK

JUNE 2018

Note:2-R6 galv. ties to masonry walljunctions at 400 crs(typ)

WALL CORNER

N16 TIE x 600 LEGS

WALL JUNCTION

150/200 SERIES MASONRY WALL

DETAIL

SCALE: 1:10

TYPICAL

B/B REINFORCEMENT LAPS

_

-

N16 TIE x 600 LEGS

Note:

Ligatures & s/b omitted for clarity

Lap footing reinf as shown

xx-xx

xx-xx

DETAIL

SCALE: 1:20

TYPICAL

FOOTING 'F4'

DETAIL

SCALE: 1:10

TYPICAL

FIX CEILING PANEL TO B/B

w/ M12 HILTI HIT 500 C/A

@ 300 CRS (100 EMBED)

Note:

Provide 50 SQ x 2

distribution washer

1

INT WALL CONN TO CEILING PANEL

2

Page 5: F4 F2 - NT Consulting Engineers · 2018. 9. 13. · S02 6 B18-7912 0 OC MC JUNE 2018 HOJ38520 MC JUNE 2018 OC JUNE 2018 DH JUNE 2018 PK JUNE 2018 F4 260 DEEP x 300 WIDE RAFT FOOTING

NORTHERN TERRITORY OF AUSTRALIA BUILDING ACT

SECTION 40 – CERTIFICATE OF COMPLIANCE – STRUCTURAL DESIGN

Revised 31/7/14 No changes to the declaration are permitted Page 1 of 2

All sections must be completed – mark N/A to any question that does not apply

PROPERTY / PROJECT DETAILS

Owner (if known):

Lot/Portion Number: Address:

Location: Wurumiyanga Town / Hundred : Bathurst Island

Description of works : Proposed Duplex

DOCUMENTS ATTACHED

Drawing Nos: NTG Dwg No.’s B18-7911:B18-7916

Other:

DESIGN BASIS (please list relevant Standards used in the design) AS1170, AS4100, AS3600, AS3700, AS4600, AS AS2870, AS1554, AS1312, AS3850

Class of Building (BCA): 1a Type of Construction (BCA volume 1 §C1.1): (eg. Type A fire-resisting construction) n/a

Building Importance Level (BCA Table B1.2a): II Annual Probability of Exceedance for Wind (BCA Table 1.2b): 1 in 500

Region: C Regional ultimate wind speed VR(m/s): 69 Terrain Category: 2.0 Reference height (m): 4.3

Mz,cat : 0.91 Ms : 1.0 Mt : 1.0 Vdesθ Design Wind Speed at reference height (m/s): 63

Internal Pressure Coefficients (Cp,i): To AS 1170.2 Section 5.3 & Table 5.1

External Pressure Coefficients (Cp,e) Walls To AS 1170.2 Section 5.4 & Appendix C

Roof To AS 1170.2 Section 5.4 & Appendix C

Net Pressure Coefficients: (Cp,n) Roof / Walls To AS 1170.2 Appendix D

Imposed Loads, kPa Floor / Roof To AS 1170.1

Earthquake Design Category, EDC (Table 2.1 of AS 1170.4): n/a Annual Probability of Exceedance for Earthquake Actions (BCA Table 1.2b): 1 in n/a Importance Level (BCA): n/a Hazard Factor, Z (Section 3): n/a Class of Sub-Soil (Section 4): n/a

Safe Foundation Bearing Capacity, kPa: 100 Site classification (AS2870): S to be confirmed prior to construction

COMMENTS / EXCLUSIONS (Exclusions to this Certificate must be clearly identified).

The following items are excluded and shall be certified separately:

• Glazed Windows & Doors inc glazing, framing & fixing

Comments:

CERTIFICATION BY STRUCTURAL ENGINEER

Company Name if certification issued on behalf of a corporation

Company NT Registration Number

I certify that reasonable care has been taken to ensure that the structural engineering aspects of the works as described above have been designed in accordance with the requirements of the Building Code of Australia and the Northern Territory Building Regulations.

Name (see *below) Michael Cooper

Nominee/Individual NT Registration Number 21133ES

Signature

Date 18 June, 2018

* Name and registration number of nominee signing on behalf of the company or if no company, name of individual issuing certification.

Page 6: F4 F2 - NT Consulting Engineers · 2018. 9. 13. · S02 6 B18-7912 0 OC MC JUNE 2018 HOJ38520 MC JUNE 2018 OC JUNE 2018 DH JUNE 2018 PK JUNE 2018 F4 260 DEEP x 300 WIDE RAFT FOOTING

Page 2 of 2

SCHEDULE OF STRUCTURAL INSPECTIONS REQUIRED

Inspection of construction is required at the stages indicated below.

[ X ] 1. Completion of site preparation/site filling/excavations for footings prior to placement of any reinforcement or

concrete.

[ ] 2. Completion of preparations for placing of concrete strip footings including placement of reinforcement.

[ X ] 3. Completion of preparations for placing concrete slabs including compaction of fill and sand blinding, placement

of formwork, reinforcement, starter bars and cast in items.

[ X ] 4. Completion of preparations for placing of concrete pier footings including reinforcement (if any).

[ X ] 5. Starter bars and cast in items after placing of concrete and prior to any covering up work.

[ X ] 6 Reinforcement to walls completed prior to core filling (inspection holes and cleanout cores to be completed).

[ X ] 7. Structural steelwork and cold formed steelwork completed and prior to any covering up work. Floor framing

system completed before floors are laid or underside is lined.

[ ] 8. Suspended concrete floor slabs with formwork, reinforcement and cast in items completed, prior to placing of

concrete.

[ X ] 9. Wall framing or blockwork wall core filling completed (with windows fixed in place) and roof framing with

connections completed and prior to sheeting or lining.

Note: [ ] Prior lodgement of truss manufacturer’s drawings, details and certification required.

[ X ] Prior lodgement of windows manufacturer’s drawings including fixings and certification required.

[ X ] 10. Structural wall linings completed and prior to any covering up work.

[ X ] 11. Final inspection upon completion of all structural work including fixings of external roof and wall claddings,

flashings, barges & vents.

[ X ] 12. Other Inspections as required by the building permit

Important Information:

1) The above inspections are required to be carried out by either the certifying engineer or the building certifier

who issued the Building Permit for the work. (If no inspections are indicated refer to the certifying engineer for

advice).

2) Where works are prescribed building works under the NT Building Act, the building certifier must be provided

with a copy of the inspection record and no further works must be carried out by the builder until the building

certifier issues a release to proceed with further works.

3) Additional non structural inspections may be required during the course of construction before the issue of an

Occupancy Permit (refer to building certifier for requirements).

4) Failure to obtain inspections may prevent the issue of an Occupancy Permit upon completion of the building

works.

Page 7: F4 F2 - NT Consulting Engineers · 2018. 9. 13. · S02 6 B18-7912 0 OC MC JUNE 2018 HOJ38520 MC JUNE 2018 OC JUNE 2018 DH JUNE 2018 PK JUNE 2018 F4 260 DEEP x 300 WIDE RAFT FOOTING

A3

SIZE

SHEET

AMENDMENTNTG DRAWING No.

OF

SHEET No.NTG ASSET No.NTG PROJECT No.

CHECKED

DATE

CHECKED

DATE

DATE

NTG PROJECT MANAGER

DRAWN

DATE

DESIGNED

DATE

DATE

DESIGN PROJECT LEADER

Northern Territory

INIT.DATEDESCRIPTION

AMENDMENTS

No. DEPT/COMPANY.

Government

NORTHERN REGION (CYCLONIC) 2 BED

MASONRY DUPLEX (STANDARD DESIGN)

STRUCTURAL

CUPOLEX SPECIFICATION

S06 6 B18-7916 0

OC

JUNE 2018

MC

JUNE 2018

HOJ38520

MC

JUNE 2018

OC

JUNE 2018

DH

JUNE 2018

PK

JUNE 2018

CUPOLEX DETAILS

GROUND SURFACE 1:20 FALL

PROVIDE VISUAL SPACE

TO COMPLY WITH AS.3660-1

DOWN PIPE

OVER-LAP PIPES

150mm MIN AS SHOWN

ALLOW PIPE WORK TO MOVE VERTICALLY INDEPENDENT OF

FOOTINGS.

STORMWATER

DRAINAGE PIPE

TYPICAL STORM WATER

SCALE 1:20

Note:

JOINTS MUST BE SEALED TO PROTECT THEM AGAINST PLANT ROOT

CRIME AND DIRT INTRUSION BY WRAPPING WITH DENSO TAPE OVER

A 50mm LENGTH BEYOND THE JOINT ON EITHER SIDE. THE DENSO

TAPE MUST FIRST BE LAID OUT IN STRAIGHT LENGTHS AND

SPRINKLED WITH COPPER SULPHATE CRYSTALS PRIOR TO

WRAPPING.

TRENCH MESH

PIPE UNDER FOOTING ELEVATION

SCALE 1:20

250 min - 450 max

75

TYPICAL TRENCH DETAIL

SCALE 1:20

BA

CK

FIL

L

DE

PT

H

VA

RIE

S

20

0

min

NATURAL SURFACE

LIGHTLY COMPACTED CLAY

FINES TO FORM IMPERMEABLE LAYER

NOTE:

WHERE PIPE PASES UNDER THE FOOTING SYSTEM, THE TRENCH

SHALL BE BACKFILLED WITH COMPACTED CLAY OR CONCRETE TO

RESTRICT THE INGRESS OF WATER BENEATH THE FOOTING

SYSTEM.

15

0

APRROVED BEDDING SAND

SEE NOTE 2

15

0

min

25mm COMPRESSIVE COLLAR150150

TYPICAL PIPE PENETRATION DETAILS

SCALE 1:20

ACCEPTABLE PIPE PENETRATION ZONE

SCALE 1:20

ACCEPTABLE PIPE PENETRATION ZONE

CUPOLEX DOME

NOTES

1. CONSTRUCTION TO BE IN ACCORDANCE WITH AS/NZS 3500.2: 2003

SECTION 5, CLAUSE 5.6 AND AS 2870 2011, CLAUSES 5.5.3 (b), 5.5.4

(c) AND 6.6 (d).

2. PIPE BEDDING SHALL BE CLEAN SAND AGGREGATE SIZE TO BE

NO GREATER THAN 5mm.

3. BACKFILL TO BE SITE EXCAVATION MATERIAL APPROVED BY

SUPERINTENDENT AND HAVE AN AGGREGATE SIZE NO GREATER

THAN 50mm AND CONTAIN NO BUILDING RUBBISH.

4. BACKFILL TO BE COMPACTED TO 95% MMDD.

5. ALL TRENCHES OVER 1.5m TO BE SHORED OR BATTERED UNLESS

AUTHORISED BY THE SUPERINTENDENT.

6. SWIVEL JOINT TO BE INSTALLED IN ACCORDANCE WITH

MANUFACTURERS RECOMDATIONS. ENSURE JOINT IS SET AT

MID-LENGHT SO AS TO ALLOW FOR MAXIMUM MOVEMENT IN EITHER

DIRECTION.

7. THESE DETAILS ONLY APPLY TO CLASS "E" AND "H1 & H2" SITES

AS DEFINED BY AS 2870.

EXPANDABLE AND SWIVEL JOINT SPECIFICATIONS

SITE CLASSIFICATION

±15° ROTATION

MINIMUM EXPANSIONOF JOINTS SWIVEL JOINT

±15° ROTATION±15° ROTATION±15° ROTATION

CLASS H1CLASS H2CLASS ECLASS P

80mm100mm150mm80mm

REFER TO SPECIFICATIONS TABLE

SWIVEL JOINT SJ10015

OR EQUIVALENT

CLASS 'E' SITE ONLY

ADDITIONAL:

3-SL8TM FIXED

to bot of cage x 1500 long

SINGLE JUNCTION

Note

INTERNAL BEAM BTM TRENCH MESH NOT SHOWN FOR CLARITY

ADDITIONAL:

2-N12 L-BARS fix to top of fabric, 1500 each leg

SCALE 1:20

min

250 min - 450 max

75

15

0

min