Drawing Identifier BS1192 CompliantProject - Originator - Zone - Level - File Type - Role - Number revision
Capita Property and infrastructure Ltd.Print
Date
: 18/12
/2017
16:29
:08
St David's House, Pascal Close, St Mellons, Cardiff, CF3 0LW029 2080 3500www.capitaproperty.co.uk
Project
Client
Drawing
Scale @ A1 Drawn Checked Approved
Project No. Date
Purpose of Issue
Classification
M:\PROJECTS\ED3251 Bow Street Interchange\03 - Drawings\Received\Current\Platform GA BSS_CAP_00_XX_DR_S_000001 - P03.dwg
Rev Description DateDrwn
Chk'd
App'd
CEREDIGION COUNTY COUNCIL
BOW STREET STATION
STATION PLATFORMGENERAL ARRANGEMENT
P03
Rail
PAKAS SHOWN KH -
CS083886 25-10-2016
F001 APPROVAL IN PRINCIPLE
Commercial in Confidence
BSS-CAP-00-XX-DR-S-000001
SAFETY, HEALTH ANDENVIRONMENTAL INFORMATION
IN ADDITION TO THE HAZARDS/RISKS NORMALLY ASSOCIATED WITH THETYPES OF WORK DETAILED ON THIS DRAWING, NOTE THE FOLLOWING
IT IS ASSUMED THAT ALL WORKS WILL BE CARRIED OUT BY ACOMPETENT CONTRACTOR WORKING, WHERE APPROPRIATE,
TO AN APPROVED METHOD STATEMENT
CONSTRUCTIONSERVICES AT TRACK LEVEL: S&T CABLE TROUGH ROUTEPRESENT IN CESS.PRESENCE OF JAPANESE KNOTWEED IN VARIOUS LOCATIONSTHROUGHOUT THE CONSTRUCTION SITE.WELSH WATER SEWER DEPTH TO BE CONFIRMEDOPERATIONSNO EXTRAORDINARY RISKS OR HAZARDS.MAINTENANCEWORK ADJACENT TO RAILWAY.
DISMANTLING/DEMOLITION (FUTURE)WORK ADJACENT TO RAILWAYSERVICES AT TRACK LEVEL: S&T CABLE TROUGH ROUTEPRESENT IN CESS.
0 20m4 8 12 16
SCALE 1:200
0 25m205 10 15
SCALE 1:250
0 2500mm500 1000 1500 2000
SCALE 1:25
AutoCAD SHX Text
EXISTING NETWORK RAIL CONTROL ROOM (ACCESS REQUIRED FOR MAINTENANCE)
AutoCAD SHX Text
EXISTING RAILWAY TRACK
AutoCAD SHX Text
EXISTING NETWORK RAIL GSM-R MAST
AutoCAD SHX Text
FUTURE PLATFORM EXTENSION
AutoCAD SHX Text
FENCE WITH ACCESS GATE TO EXISTING NETWORK RAIL CONTROL ROOM
AutoCAD SHX Text
PROPOSED RAILWAY TRACK
AutoCAD SHX Text
FENCING TO TIE INTO NEW CAR PARK
AutoCAD SHX Text
P L A T F O R M S E C T I O N A - A S C A L E 1 : 2 5
AutoCAD SHX Text
SETTING OUT POINTS AND TOP OF PLATFORM LEVELS ARE GIVEN AT THIS LOCATION
AutoCAD SHX Text
FOUNDATION IS LAID ON STONE COLUMNS. FALL TO SUIT PLATFORM CONSTRUCTION
AutoCAD SHX Text
POWER, LIGHTING & SIS DUCTS
AutoCAD SHX Text
5O THK. DENSE BITUMEN MACADAM BASE COURSE
AutoCAD SHX Text
25 THK. BITUMEN MACADAM WEARING COURSE
AutoCAD SHX Text
1160 WIDE 100 DEEP COMBINED COPING & TACTILE UNIT ON 25 MORTAR BED
AutoCAD SHX Text
100 SUB BASE COURSE
AutoCAD SHX Text
130 WIDE x 200 DEEP (NOMINAL) CHANNEL DRAIN WITH HEELGUARD GRATING
AutoCAD SHX Text
1:50 FALL (55mm TOTAL)
AutoCAD SHX Text
15 THICK POLYMER MODIFIED BITUMEN BONDING STRIP
AutoCAD SHX Text
1.5m HIGH BLACK BOW TOP FENCE
AutoCAD SHX Text
REINFORCED CONCRETE RETAINING WALL
AutoCAD SHX Text
PROPOSED GROUND LEVEL
AutoCAD SHX Text
75 BLINDING
AutoCAD SHX Text
75 BLINDING
AutoCAD SHX Text
6N FILL
AutoCAD SHX Text
F R O N T E L E V A T I O N F R O M R A I L W A Y L I N E I N D I C A T I N G E X I S T I N G A N D P R O P O S E D T R A C K L E V E L S S C A L E 1 : 2 5 0
AutoCAD SHX Text
NOTE: PROPOSED RAILWAY TRACK PROFILE TO BE AT A CONSTANT FALL OF 1 in 300 (GRADIENT) TO THE SOUTH (ABERYSTWYTH) PLATFORM ALSO TO BE AT 1:300 CONSTANT FALL TO THE SOUTH
AutoCAD SHX Text
NOTE: FOR DETAILS OF 1 in 300 GRADE TRACK DESIGN REFER TO DRAWING No. BSS-CAP-0100-XX-DR-Y-0105
AutoCAD SHX Text
F R O N T E L E V A T I O N F R O M C A R P A R K S C A L E 1 : 2 5 0
AutoCAD SHX Text
SHELTER: PARAGON ANTI VANDAL AV9 (7300 LONG x 1500 DEEP x 2350 HIGH)
AutoCAD SHX Text
SHELTER: PARAGON ANTI VANDAL AV9 (7300 LONG x 1500 DEEP x 2350 HIGH)
AutoCAD SHX Text
1.5m HIGH BLACK BOW TOP FENCE
AutoCAD SHX Text
ACCESS STEPS
AutoCAD SHX Text
CCTV POST
AutoCAD SHX Text
LIGHTING COLUMN
AutoCAD SHX Text
ELECTRICAL FEEDER PILLAR
AutoCAD SHX Text
2 No. ALTRON CABINETS AEC 90-10-65
AutoCAD SHX Text
NOTICE BOARD
AutoCAD SHX Text
TICKET VENDING MACHINE WITH CANOPY
AutoCAD SHX Text
PASSENGER HELP POINT AND PASSENGER INFORMATION DISPLAY
AutoCAD SHX Text
DATUM: 18.000m
AutoCAD SHX Text
TO ABERYSTWYTH
AutoCAD SHX Text
TO BORTH
AutoCAD SHX Text
NORTH END OF PLATFORM 20.086m
AutoCAD SHX Text
SOUTH END OF PLATFORM LEVEL 19.586m
AutoCAD SHX Text
PROPOSED TRACK LEVEL (1 IN 300 CONSTANT GRADIENT)
AutoCAD SHX Text
EXISTING TRACK LEVEL (GRADIENT VARIES)
AutoCAD SHX Text
CONCRETE RETAINING WALL
AutoCAD SHX Text
TO ABERYSTWYTH
AutoCAD SHX Text
TO BORTH
AutoCAD SHX Text
PROPOSED PLATFORM
AutoCAD SHX Text
PROPOSED RAILWAY TRACK
AutoCAD SHX Text
NORTH END OF PLATFORM 20.086m
AutoCAD SHX Text
EXISTING RAIL LEVEL 18.920m
AutoCAD SHX Text
EXISTING RAIL LEVEL 18.470m
AutoCAD SHX Text
PROPOSED RAIL LEVEL 19.171m
AutoCAD SHX Text
STEEL PARAPET WITH DOUBLE HANDRAIL TO RAMP, STAIRCASE & LANDING (PART OMITTED FOR CLARITY)
AutoCAD SHX Text
PROPOSED GROUND LEVEL 18.971m
AutoCAD SHX Text
PROPOSED GROUND LEVEL 18.471
AutoCAD SHX Text
ACCESS STEPS
AutoCAD SHX Text
SOUTH END OF PLATFORM LEVEL 19.586m
AutoCAD SHX Text
19.839m
AutoCAD SHX Text
PROPOSED GROUND LEVEL 18.779m
AutoCAD SHX Text
DATUM: 18.000m
AutoCAD SHX Text
TO BORTH
AutoCAD SHX Text
PROPOSED RAIL LEVEL 18.979m18.979m
AutoCAD SHX Text
EXISTING RAIL LEVEL 18.580m
AutoCAD SHX Text
FOUNDATION LEVEL (VARIES)
AutoCAD SHX Text
FOUNDATION LEVEL (VARIES)
AutoCAD SHX Text
NOTE: IN ACCORDANCE WITH GI/RT7016 ISSUE 5 (MARCH 2014) ABSOLUTE MINIMUM CLEAR PLATFORM TO BE 2500mm FROM PLATFORM EDGE NO PLATFORM FURNITURE TO ENCROACH THIS DIMENSION (APPLICABLE FOR TRAIN SPEEDS LESS THAN 100mph)
AutoCAD SHX Text
FUTURE PLATFORM EXTENSION
AutoCAD SHX Text
FUTURE PLATFORM EXTENSION
AutoCAD SHX Text
PASSENGER HELP POINT
AutoCAD SHX Text
PROPOSED RAIL LEVEL 18.671m
AutoCAD SHX Text
**CAR PARK LEVEL TO BE 200mm BELOW PROPOSED RAIL LEVEL (PERPENDICULAR TO TRACK)
AutoCAD SHX Text
STEEL PARAPET WITH DOUBLE HANDRAIL TO RAMP, STAIRCASE & LANDING (PART OMITTED FOR CLARITY)
AutoCAD SHX Text
CCTV POST
AutoCAD SHX Text
LIGHTING COLUMN
AutoCAD SHX Text
CCTV POST
AutoCAD SHX Text
LIGHTING COLUMN
AutoCAD SHX Text
OUTLINE OF NEW RAILWAY PLATFORM
AutoCAD SHX Text
1.5m HIGH BLACK BOW TOP FENCE
AutoCAD SHX Text
1.5m HIGH BLACK BOW TOP FENCE
AutoCAD SHX Text
NOTICE BOARD
AutoCAD SHX Text
PASSENGER HELP POINT & PASSENGER INFORMATION SCREEN (MINIMUM 2500mm HEADROOM)
AutoCAD SHX Text
2 No. ALTRON CABINETS AEC 90-10-65
AutoCAD SHX Text
TICKET VENDING MACHINE WITH CANOPY
AutoCAD SHX Text
4m WIDE ENTRANCE TO PLATFORM
AutoCAD SHX Text
19.753m
AutoCAD SHX Text
20.086m
AutoCAD SHX Text
P L A N P L A N S C A L E 1 : 2 0 0
AutoCAD SHX Text
CAR PARK
AutoCAD SHX Text
TO ABERYSTWYTH
AutoCAD SHX Text
ELECTRICAL FEEDER PILLAR
AutoCAD SHX Text
DRAINAGE OUTFALL TO CAR PARK DRAINAGE SYSTEM
AutoCAD SHX Text
NEW FENCE WITH ACCESS GATE
AutoCAD SHX Text
EXISTING FENCE
AutoCAD SHX Text
150mm DIA. WELSH WATER SEWER (SHOWN INDICATIVELY & SUBJECT TO CONFIRMATION ON SITE)
AutoCAD SHX Text
SP ENERGY NETWORKS OVERHEAD CABLE
AutoCAD SHX Text
CCTV POST
AutoCAD SHX Text
LIGHTING COLUMN CLEARANCE ZONE WHEN LOWERING POST
AutoCAD SHX Text
EXISTING RAILWAY TRACK
AutoCAD SHX Text
CH. 146997.685 TRACK CHAINAGE
AutoCAD SHX Text
PASSENGER SEATING
AutoCAD SHX Text
NOTE: FOR DETAILS OF NETWORK RAIL COMPOUND SOUTH OF PLATFORM REFER TO INSET VIEW
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
20.031m
AutoCAD SHX Text
CH. 147097.685 147097.685 TRACK CHAINAGE
AutoCAD SHX Text
19.339m*
AutoCAD SHX Text
18.779m*
AutoCAD SHX Text
SOP 1: 262061.530 E 284315.878 N
AutoCAD SHX Text
SOP 2: 262099.451 E 284408.409 N
AutoCAD SHX Text
NOTE: BOTH PLATFORM END STEPS AND END FENCE/GATE AND ANTI-TRESPASS MEASURES TO BE IN ACCORDANCE WITH NR/CIV/SD/3018 AND NR/CIV/SD/3019.
AutoCAD SHX Text
CHAMBERS TO BE AN ABSOLUTE MINIMUM OF 1500 FROM THE PLATFORM EDGE FOR MAINTENANCE ACCESS WHILE TRAINS ARE OPERATING
AutoCAD SHX Text
TACTILE PAVING AT TOP & BOTTOM OF STAIRCASE
AutoCAD SHX Text
NOTE: MAX. 1:50 CROSS FALL IN BOTH LANDINGS TO DETER PONDING OF RAINWATER
AutoCAD SHX Text
TO BORTH
AutoCAD SHX Text
HINGED LIGHTING COLUMN WITH 450 x 450 CHAMBERS FOR DUCTS
AutoCAD SHX Text
ABSOLUTE MINIMUM 1500 CLEARANCE FROM THE PLATFORM EDGE TO LOWERED LIGHTING COLUMN (DURING MAINTENANCE WITH TRAINS OPERATING)
AutoCAD SHX Text
19.698m
AutoCAD SHX Text
FUTURE PLATFORM EXTENSION
AutoCAD SHX Text
ACCESS STEPS AT END OF PLATFORM
AutoCAD SHX Text
BOUNDARY LINE SIDE FENCE WITH VEHICULAR BARRIER EG. 'ARMCO'
AutoCAD SHX Text
19.839m
AutoCAD SHX Text
ACCESS FROM A487 & A4159 (VIA. NEW ROUNDABOUT)
AutoCAD SHX Text
RAMP & LANDINGS TO MEET THE REQUIREMENTS OF BS8300: 2009 & DFT DESIGN STANDARDS FOR ACCESSIBLE STATIONS (RAMP GRADIENTS TO BE 1 IN 20)
AutoCAD SHX Text
FENCE WITH ACCESS GATE TO EXISTING NETWORK RAIL CONTROL ROOM
AutoCAD SHX Text
ALL PLATFORM FURNITURE TO BE AN ABSOLUTE MINIMUM OF 2500mm FROM THE PLATFORM EDGE
AutoCAD SHX Text
CCTV POST
AutoCAD SHX Text
10000 LONG PEDESTRIAN RAMPS 1800 BETWEEN HANDRAILS
AutoCAD SHX Text
CCTV POST
AutoCAD SHX Text
TOP OF RETAINING WALL
AutoCAD SHX Text
PROPOSED RAILWAY TRACK
AutoCAD SHX Text
BACK OF PLATFORM DRAIN CHANNEL REFER TO SECTION A-A
AutoCAD SHX Text
SHELTER
AutoCAD SHX Text
RAMPS TO BE FINISHED IN CONTRASTING COLOUR
AutoCAD SHX Text
'HEELSURE' DRAINS CONNECTED TO CARPARK DRAINAGE SYSTEM
AutoCAD SHX Text
NOTE: STEP DIMENSIONS GOING: 6 No. AT 300mm RISERS: 7 No. AT 150mm
AutoCAD SHX Text
CYCLE SHELTER (CAR PARK DESIGN)
AutoCAD SHX Text
CYCLE STAND (CAR PARK DESIGN)
AutoCAD SHX Text
BUS SHELTER (CAR PARK DESIGN)
AutoCAD SHX Text
LIGHTING COLUMN (CAR PARK DESIGN)
AutoCAD SHX Text
FENCING TO TIE INTO NEW CAR PARK
AutoCAD SHX Text
ACCESS STEPS AT END OF PLATFORM
AutoCAD SHX Text
FENCE TO TIE INTO EXISTING
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
REINFORCED CONCRETE CANTILEVER WALL
AutoCAD SHX Text
PLATFORM LEVEL
AutoCAD SHX Text
1.5m HIGH BLACK BOW TOP FENCE
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
PROPOSED GROUND LEVEL
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
RAMPS & LANDINGS: 25 THK. BITUMEN MACADAM WEARING COURSE 5O THK. DENSE BITUMEN MACADAM BASE COURSE 100 THK. SUB BASE COURSE
AutoCAD SHX Text
STEEL PARAPET
AutoCAD SHX Text
FOUNDATION LEVEL TO MATCH PLATFORM FOUNDATION LEVELS
AutoCAD SHX Text
LED ILLUMINATED 48 HANDRAIL
AutoCAD SHX Text
STEEL PARAPET
AutoCAD SHX Text
T Y P I C A L R A M P S E C T I O N B - B S C A L E 1 : 2 5
AutoCAD SHX Text
LED ILLUMINATED 48 HANDRAIL
AutoCAD SHX Text
LED ILLUMINATED 48 HANDRAIL
AutoCAD SHX Text
LED ILLUMINATED 48 HANDRAIL
AutoCAD SHX Text
48 HANDRAIL
AutoCAD SHX Text
48 HANDRAIL
AutoCAD SHX Text
REINFORCED CONCRETE CANTILEVER WALL
AutoCAD SHX Text
6N FILL
AutoCAD SHX Text
6N FILL
AutoCAD SHX Text
NOTES 1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH DRAWING THIS DRAWING SHALL BE READ IN CONJUNCTION WITH DRAWING No. BSS-CAP-00-XX-DR-S-000002. 2. FOR HORIZONTAL AND VERTICAL RAIL ALIGNMENT DESIGN REFER FOR HORIZONTAL AND VERTICAL RAIL ALIGNMENT DESIGN REFER TO DRAWING No. BSS-CAP-0100-XX-DR-Y-0105. BSS-CAP-0100-XX-DR-Y-0105. . 3. ALL DIMENSIONS SHOWN ARE IN MILLIMETRES UNLESS STATED ALL DIMENSIONS SHOWN ARE IN MILLIMETRES UNLESS STATED OTHERWISE. ALL LEVELS AND COORDINATES ARE IN METRES UNLESS NOTED OTHERWISE. 4. COPERS TO BE NON-SLIP IN ACCORDANCE WITH COPERS TO BE NON-SLIP IN ACCORDANCE WITH NR/PS/RES/00030. 5. THE RECESS WIDTH MAY VARY FROM 300 TO 325mm TO ALLOW THE RECESS WIDTH MAY VARY FROM 300 TO 325mm TO ALLOW FOR ALIGNMENT (OR FUTURE MINOR REALIGNMENT) OF COPING UNITS. 6. SLIP RESISTANCE OF RAMPS & LANDINGS TO BE A MINIMUM OF SLIP RESISTANCE OF RAMPS & LANDINGS TO BE A MINIMUM OF 55PTV.
AutoCAD SHX Text
PLANE OF THE RAILS
AutoCAD SHX Text
6. SETTING OUT LINES AND DIMENSIONS 'X' AND 'Y' ARE PARALLEL TO, OR AT RIGHT ANGLES TO THE PLANE OF THE RAIL (SEE FIGURE BELOW). 7. VERTICAL / HORIZONTAL ALIGNMENT OF THE TRACK TO BE MONITORED DURING CONSTRUCTION OF THE WORKS. 8. THE RECESS BENEATH THE COPER SHALL BE KEPT CLEAR OF CABLES AND OTHER OBSTRUCTIONS IN ORDER TO PROVIDE EMERGENCY REFUGE.
AutoCAD SHX Text
N E T W O R K R A I L C O M P O U N D S O U T H O F P L A T F O R M S C A L E 1 : 2 0 0