StructuralBucao River1) Heightening of existing right dike (l=7.5 km) and construction of new dike downstream from the bridge (l=2.1 km on left bank, l=2.4 km on right bank)2) Reconstruction of Bucao Bridge (321 lm)3) Observation of hydrological/geological data at Maraunot Notch <to be included in the warning system>
Project Cost: 1,678 million pesosEIRR: 15.7%Environment: No particular issuesResettlement: 29 families (as of May 2003)Schedule: 2007-2010 (construction)
Sto. Tomas River (Middle reach, looking downstream)
Future imagePresent
Aeta people
Baquilan Bridge
StructuralSto. Tomas RiverHeightening of existing dike (l=13.4 km),strengthening of existing dike (l=13.9 km) andconstruction of new dike (l=2.0 km) with Gabor Riverdrainage improvement (l=1.7 km)
Project Cost: 1,960 million pesosEIRR: 26.3%Environment: No particular issuesResettlement: 77 families (as of May 2003)Schedule: 2007-2010 (construction)
CDPPCommunity Road RehabilitationCommunity road rehabilitation in Bucao River basinfor route-A1 of 16 km
Project Cost: 189 million pesos (Route-A1)EIRR: 2.1%Environment: Positive impact for forest managementSocial Impact: Positive impact for poverty reduction, and enhancement of social servicesSchedule: 2005-2007
CDPPAgricultural Development on Lahar AreaPilot project for agricultural development on lahar as pilot development scheme for 10 ha in the Bucao downstream and 10 ha for the Sto. Tomas middle reach.
Project Cost: 19 million pesos (pilot)EIRR: 9.8%Environment: No particular issuesSocial Impact: Positive impact for poverty reductionSchedule: 2008-2010 (20 ha)
PresentBucao Bridge (during Flood)
CDPPEstablishment of Aeta Assistance Station (AETAS)Support to NGOs' activities for Aeta Upland Farming school, assistance for registration of ancestral domain land, livelihooddevelopment program and detailed study for establishmentof Aeta Assistance Station.
Project Cost: 15 million pesosEIRR: Not calculatedEnvironment: Positive impact for forest managementSocial Impact: Positive impact for prevention of tradition, culture of Aeta tribeSchedule: 2005-2009 (pilot scheme)
CDPPCommunity-based Forest Management (CBFM)Extension of CBFM with 2,200 ha as pilot development scheme
Project Cost: 76 million pesos (pilot)EIRR: 21.5%Environment: Positive impact for forest conservation/managementSocial Impact: Positive impact for poverty reductionSchedule: 2007-2012 (2,200 ha)
Non-structuralWarning System7 Rainfall/6 water level gauging stations, one monitoringstation, and dissemination/transmission systemwith cellular phone network, radio and sirenEvacuation SystemDesignation of 10 evacuation centers and dissemination of hazard map
Project Cost: 30 million pesos (operation for 10 years) 82 million pesos (GSM)EIRR: Not calculatedEnvironment: No particular issuesSocial Impact: Positive impact to secure human lifeSchedule: 2003-08 (pilot operation) 2007-12 (GSM system)
Priority Development Area of CBFM (green)
Bucao RiverBucao River
Maloma RiverMaloma River
Sto.Tomas RiverSto.Tomas River
Iba
Botolan
Cabangan
San Felipe
San Narciso
San Antonio
San Marcelino
Castillejos
Figure 1.1.1
Priority Projects Location Map
THE GOVERNMENT OF THE PHILIPPINESTHE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
The Study on Sabo and Flood Control forWestern River Basins of Mount Pinatubo
in the Republic of the Philippines
JAPAN INTERNATIONAL COOPERATION AGENCY
XI-F1
THE G
OV
ERN
MEN
T OF TH
E PHILIPPIN
ES TH
E DEPA
RTM
ENT O
F PUB
LIC W
OR
KS A
ND
HIG
HW
AY
S
The Study on Sabo and Flood C
ontrol for W
estern River B
asins of Mount Pinatubo
in the Republic of the Philippines
JAPAN IN
TERNATIO
NAL C
OO
PERATION
AGEN
CY
Figure 2.3.1 L
ocations of the Bucao R
iver Dikes
TO IBA
BOTOLAN
PROPOSED DIVERSION CHANNELFOR THE SWAMP (L=4,240m)
PROPOSED NEW DIKE(L=2,350m)
PROPOSED NEW DIKE(L=1,910m)
TO MANILAPROPOSED BUCAO BRIDGE(L=321m)
PROPOSED NEW DIKE(L=170m) BUCAO RIVER
PROPOSED DIKE HEIGHTENING (L=5,800m)
EXISTING SPUR DIKESTRENGTHENING (L=200m)
PROPOSED DIKE HEIGHTENING (L=1,650m)
BAQUILAN(SWAMPY AREA)
NA
TION
AL R
OA
D N
O. 7
BAQUILAN RIVER
LEGEND DIKE HEIGHTENING DIKE STRENGTHENING NEW DIKE NATIONAL ROAD NO. 7
SCALE
XI-F2
THE G
OV
ERN
MEN
T OF TH
E PHILIPPIN
ES TH
E DEPA
RTM
ENT O
F PUB
LIC W
OR
KS A
ND
HIG
HW
AY
S
The Study on Sabo and Flood C
ontrol for W
estern River B
asins of Mount Pinatubo
in the Republic of the Philippines
JAPAN IN
TERNATIO
NAL C
OO
PERATION
AGEN
CY
Figure 2.3.2 L
ocations of the Sto. Tom
as River D
ikes
PROPOSED DIVERSION CHANNEL FOR GABOR RIVER (L=1,700m)
PROPOSED NEW DIKE(L=1,950m)
TO BOTOLAN
MACULCOL BRIDGE (TO BE RECONSTRUCTED BY DPWH)
NA
TION
AL R
OA
D N
O. 7
PROPOSED DIKE STRENGTHENING (L=3,100m)
STO. TOMAS RIVER
PROPOSED DIKE HEIGHTENING (L=4,300m)
PROPOSED DIKE HEIGHTENING (L=9,000m)
SAN NARCISO
PAETE HILL
PROPOSED DIKE STRENGTHENING
(L=8,000m)
SANTA FE RIVER
MT. BAGANG
SAN MARCELINO
VEGA HILL
TO MANILA
SAN FELIPE
PROPOSED DIKESTRENGTHENING
(L=2,800m)
GABOR RIVER
LEGEND DIKE HEIGHTENING
DIKE STRENGTHENING
NEW DIKE
NATIONAL ROAD NO. 7
XI-F3
THE G
OV
ERN
MEN
T OF TH
E PHILIPPIN
ES TH
E DEPA
RTM
ENT O
F PUB
LIC W
OR
KS A
ND
HIG
HW
AY
S
The Study on Sabo and Flood C
ontrol for W
estern River B
asins of Mount Pinatubo
in the Republic of the Philippines
JAPAN IN
TERNATIO
NAL C
OO
PERATION
AGEN
CY
Figure 3.1.1 T
opographic Map, (Provincial)
XI-F4
THE G
OV
ERN
MEN
T OF TH
E PHILIPPIN
ES TH
E DEPA
RTM
ENT O
F PUB
LIC W
OR
KS A
ND
HIG
HW
AY
S
The Study on Sabo and Flood C
ontrol for W
estern River B
asins of Mount Pinatubo
in the Republic of the Philippines
JAPAN IN
TERNATIO
NAL C
OO
PERATION
AGEN
CY
Figure 3.1.2 Spot Im
ages Map
XI-F5
THE GOVERNMENT OF THE PHILIPPINES THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
The Study on Sabo and Flood Control for Western River Basins of Mount Pinatubo in the
Republic of the Philippines JAPAN INTERNATIONAL COOPERATION AGENCY
Figure 3.1.3
Principal Tectonic Features in the Philippines
XI-F6