extracting sustainable productivity improvements - · pdf fileextracting sustainable...

8
Extracting sustainable productivity improvements

Upload: dinhtu

Post on 11-Mar-2018

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Extracting sustainable productivity improvements - · PDF fileExtracting sustainable productivity improvements. ... The project identified over twenty engineering changes that would

Extracting sustainable productivity improvements

Page 2: Extracting sustainable productivity improvements - · PDF fileExtracting sustainable productivity improvements. ... The project identified over twenty engineering changes that would

Increasing costs, threats of international substitutes, lack of available capital - all of these current market pressures are requiring key players in the mining industry to refocus efforts to extract additional value from their existing assets. The big question is ‘How?’ Deloitte has demonstrated that by applying its continuous improvement framework it can, without capital expenditure, deliver a step change in productivity in excess of 30 per cent while setting up a platform for sustainable long term improvement. Deloitte is also supporting the industry to get the most out of its technology budget by applying its expertise in operations, information management and digital design.

Figure 1: Continuous Improvement framework

For sustainable continuous improvement to be achieved, all three elements of the CI framework need to be executed in parallel. This will then embed productivity improvements by addressing the right initiatives that are tied to the economics of the business including: management operating systems across core business processes, IT/OT, data and appropriate mix of leading and lagging KPIs. This approach has the added benefit of de-cluttering business operations and increasing transparency throughout the business.

Deloitte’s deep industry knowledge combined with its breadth of service has enabled it to deliver projects across the continuous improvement framework including:

Business improvement:

• Automated value driver trees to enable live monitoring and optimisation of the value chain

• Completing cost benefit analysis of new mining technologies including underground cutting equipment.

Management operating systems:

• Embedding robust management disciplines including root cause analysis, variance control and accountability management

• Developing automated planning, scheduling and reporting tools and procedures.

Building capability:

• Delivering sustainable business tools that provide decision making support to managers

• Coaching front line managers and leaders to improve management effectiveness.

Busin

ess I

mprov

emen

tCa

pabi

lity

Build

ing

Managem

ent Operating System

ContinuousImprovement

The systematic identification, quantification and elimination of operating problems

The formal structures andprocesses used to managebusiness performance

The skills and behaviours of the workforce both as individuals and collectively

Page 3: Extracting sustainable productivity improvements - · PDF fileExtracting sustainable productivity improvements. ... The project identified over twenty engineering changes that would

Deloitte approaches BI initiatives on a case by case basis. Applying its in depth industry knowledge paired with broad capability Deloitte is able to develop custom solutions at all points in the BI process. Firstly, Deloitte uses its Value Driver methodology to quantify the benefits of opportunities against key indicators (eg cost per tonne or throughput). Initiatives are then prioritised and their implementation managed through a stringent gated system building on a quantum of program management experience.

Deloitte has demonstrated that this approach is successful in delivering sustainable benefits. One example included the development of a scale model to evaluate the cost and benefit of implementing new underground cutting technology.

Deloitte’s client faced a challenge in the successful implementation of a new piece of equipment - the equipment had been purchased, however an implementation plan to was yet to be developed. If successful, the implementation could deliver continuous coal haulage and a monorail ventilation system. Using its deep industry knowledge Deloitte constructed a scale model of the gate road and mapped each process required for the equipment to be implemented and production levels maintained.

Figure 2: Business Improvement process

Figure 3: Scale model

The project identified over twenty engineering changes that would be required for the equipment to work effectively. This project was critical in supporting the business to avoid an unsuccessful implementation which would have cost hundreds of hours of lost time and potentially shut down the longwall.

1. Business Improvement

Manufactures  drawings  

Component  modeling  

VDT to test scenarios and measure benefits

Determine priorities

Value Ease and Pareto Analysis

Create budgets and performance charts

Value Driver TreeAll Weather Roads

IPCC Downtime

IPCC Material

Shift and Crib Change

IPCC Work Management

In Cycle Shift Change -NEW

IPCC Truck Spot and Queue

Truck Assignment and Modular (SIC)

Commuting Strategy -NEW

Accommodation and TravelMine Services: Tools and

Process

Mine PlanningDrill and Blast

Mega Ramp

IPCC Metrics

Truck Payload Management - NEW

IPCC Track Shift - NEWDig Unit Servicing - NEW

Contractor Management -NEW

Coal Gap Reduction -NEW

Overburden Real Estate Footprint - NEW

0

1

2

3

4

5

6

7

0 1 2 3 4 5 6 7 8 9 10

BCM

and

Ena

blin

g Va

lue

Ease

CM3212 Delay Code Analysis: Aug-Oct 2011

0100020003000400050006000700080009000

10000

Min

e S

eque

nce

1R

oadw

orks

Mee

ting

/ PA

SS

/ Tr

aini

ngS

ched

uled

Mai

nten

ance

Ele

phan

t Tru

ck o

r Ven

t Tub

e…Tr

avel

Min

e S

eque

nce

2P

rimar

y S

uppo

rtM

echa

nica

lC

ribB

reak

Off

Flitt

ing

Loss

of P

anel

Bel

tE

lect

rical

Loss

of P

ower

/ V

entil

atio

nS

uppl

y M

iner

/ S

tone

Dus

tE

lect

rical

Dew

ater

ing

Oth

erH

ydra

ulic

Add

ition

al S

tone

Cut

ting

Sec

onda

ry S

uppo

rtP

roce

ss S

heet

s / P

re S

tarts

Mec

hani

cal

Loss

of T

runk

bel

tLo

ss o

f Equ

ipm

ent

Pan

el M

ove

/ Tra

nsfo

rmer…

Life

of M

ine

Floo

r Ins

talla

tion

Shu

ttle

Car

Cab

leA

dditi

onal

Coa

l Cut

ting

Min

e S

eque

nce

3M

ine

Seq

uenc

e 4

Wai

ting

for S

urve

yors

Pre

pare

for M

aint

enan

ceH

oses

Wat

er /

Air

Wai

ting

for M

an T

rans

port

Bog

ged

Equ

ipm

ent

Min

er C

able

Pan

el in

Sta

ndby

Gas

Mon

itorin

gH

ydra

ulic

Lase

r / B

rack

etC

able

Dam

age

Ele

ctric

alR

ewor

kA

udits

Pip

e R

ange

Pro

blem

Cab

le d

amag

eM

aint

enan

ce O

verr

un

Tim

e (m

ins)

Top ten delay codes account for 66% of total operating delay

What are the delays that are most critical to manage in the longer term?

© 2011 Deloitte Touche Tohmatsu

The purpose of a structured idea generation and management process is to drive progress in the business improvement pipeline and to optimally manage the potential value contained in it

Identified projects are entered into a pipeline of value adding projects for further development and implementation

Ideas Value Propositions Business Cases Projects

Higher Priority Project

Lower Priority Project

Valu

e Pr

opos

ition

s

Com

plet

ed B

usin

ess

Cas

es

Impl

emen

tatio

n

Suppliers

Leadership Skills

Other low priority Initiatives

Pulverising Technology

Shift Patterns

Maintenance Strategy E-learning

Water Consumption

Maintenance Crews

Safety ProgrammeIn-bound Logistics

Sensors

Labour Scheduling

Critical Spares

Illustrative

10

Importantly we prioritise around value:ease dimensions and focus implementation on the precious

few

0

2

4

6

8

10

Jan Apr Oct AprJan

Asset Maintenance Downtime

Uni

t pe

r m

onth

Jan

Page 4: Extracting sustainable productivity improvements - · PDF fileExtracting sustainable productivity improvements. ... The project identified over twenty engineering changes that would

Regardless of the tools and technology, sustained productivity gains must be coupled by sustainable behavioural change. Deloitte deploys front line coaches to design and implement effective management operating systems that drive the right behaviour and sustainable improvements in safety, operating times and rate. Based on the foundations of forecast, plan, execute, review and report, an effective management operating system forms a transparent closed circuit of actions that drives performance through accountability, active management and competitive spirit.

Figure 4: Management operating system

It is only by completing detailed, shift production plans and schedules that consistent performance to plan can be achieved. E.g.

Once detailed planning is implemented it is the identification and management of variances between planned and actual results that has the greatest impact on sustaining behavioural change. Deloitte works with Supervisors, Superintendents and Managers, to conduct root cause analysis of variances and set appropriate actions to minimize the risk that these variances will occur again. In a paper environment managers can only assess variances at the end of a shift, which often can be too late to address the cause of the issue.

Technology is now available to provide managers with real time information to support decision making and improve productivity early in the project lifecycle/shift/etc - resulting in upfront savings and sustainable change. Deloitte has developed Ultimine, a SQL server based database that that enables mine management to complete the entire planning, execution and reporting process in one application. A supervisor can instantly report on panel conditions, hourly production, task completion, hourly delays and work completed during a delay. Waiting until the end of a shift is a thing of the past.

2. Management operating systems

A simple touch screen interface allows front line supervisors to make better decisions at the coal face.

Real-time data provides mine Management with live updates, production progress reports and cascading decision making.

Plan Do

Act

MOS

Time

Perf

orm

ance

PeopleProcessesSystems

Check

Shift Plan Production Report

Page 5: Extracting sustainable productivity improvements - · PDF fileExtracting sustainable productivity improvements. ... The project identified over twenty engineering changes that would

The transfer of knowledge and improving decision capability of managers has become a hallmark of Deloitte success. It has been achieved by applying its dedicated human capital team with its skills in operations, information management and digital.

Deloitte deploys front line operational coaches to work with managers at all levels of the business. Working together to improve management disciplines including effective meetings, delegation and time and performance management have led to an uplift in the capability on site and a step change in the organisational culture. Coaching is delivered on the job and in formal group training sessions. The greatest improvement is realised when mine employees are embedded into the project team, and once upskilled become key change agents. Once the project is complete these individual often taken leadership roles within the business.

Deloitte is also supporting managers by designing user friendly, automated reporting systems and dashboards that access information from a range of sources, in a timely manner and enable businesses to react faster and reduce downtime. These tools remain with the business after the project has finished. Examples include:

• Automated dashboards for reporting end-to-end metrics across the mining operations, built on leading business intelligence and data warehouse technologies. Dashboards provide managers with a single source of accurate data displayed in a timely, intuitive and visual manner

• Visual performance tracking of each component in the value chain in real time. The user can see the impact underperformance has on the entire value chain, identify problems quickly and allocate resources with confidence and in a timely manner.

3. Capability Building

Page 6: Extracting sustainable productivity improvements - · PDF fileExtracting sustainable productivity improvements. ... The project identified over twenty engineering changes that would

“Come and visit ‘The Core’ – a space to discuss, develop and tailor a solution to your operational challenges”

To understand how Deloitte has supported other organisations to improve their productivity we suggest you book a time to tour The Core. The Core is an interactive space in which Deloitte demonstrates its extensive experience in supporting step change productivity improvements across mining operations.

The Core is a interactive room which is used to communicate approaches, methodologies and outcomes from past projects. Visual displays and the presence of a range of subject matter experts provide you with an opportunity to understand improvement initiatives, and what is required to deliver sustainable productivity improvements through real examples.

The Core enables managers to identify approaches that will suit their environment. Alternatively participants can work through a particular issue and custom design an approach that will meet the needs of their organisation.

Who do I contact for more information?

Keith Buckley Partner, Consulting, Tel: +61 8 9365 [email protected]

Steve Dyson Partner, Consulting,+61 7 3308 [email protected]

Julian Dolby Partner, Consulting,+61 7 3308 [email protected]

Page 7: Extracting sustainable productivity improvements - · PDF fileExtracting sustainable productivity improvements. ... The project identified over twenty engineering changes that would
Page 8: Extracting sustainable productivity improvements - · PDF fileExtracting sustainable productivity improvements. ... The project identified over twenty engineering changes that would

This publication contains general information only, and none of Deloitte Touche Tohmatsu Limited, its member firms, or their related entities (collectively the “Deloitte Network”) is, by means of this publication, rendering professional advice or services.

Before making any decision or taking any action that may affect your finances or your business, you should consult a qualified professional adviser. No entity in the Deloitte Network shall be responsible for any loss whatsoever sustained by any person who relies on this publication.

About Deloitte

Deloitte refers to one or more of Deloitte Touche Tohmatsu Limited, a UK private company limited by guarantee, and its network of member firms, each of which is a legally separate and independent entity. Please see www.deloitte.com/au/about for a detailed description of the legal structure of Deloitte Touche Tohmatsu Limited and its member firms.

Deloitte provides audit, tax, consulting, and financial advisory services to public and private clients spanning multiple industries. With a globally connected network of member firms in more than 150 countries, Deloitte brings world-class capabilities and high-quality service to clients, delivering the insights they need to address their most complex business challenges. Deloitte has in the region of 200,000 professionals, all committed to becoming the standard of excellence.

About Deloitte Australia

In Australia, the member firm is the Australian partnership of Deloitte Touche Tohmatsu. As one of Australia’s leading professional services firms, Deloitte Touche Tohmatsu and its affiliates provide audit, tax, consulting, and financial advisory services through approximately 6,000 people across the country. Focused on the creation of value and growth, and known as an employer of choice for innovative human resources programs, we are dedicated to helping our clients and our people excel. For more information, please visit Deloitte’s web site at www.deloitte.com.au.

Liability limited by a scheme approved under Professional Standards Legislation.

Member of Deloitte Touche Tohmatsu Limited

© 2014 Deloitte Touche Tohmatsu.

MCBD_Hyd_07/14_1714