REPAIR OF PRECAST PRE-TENSIONED GIRDERS
USING EXTERNAL POST-TENSIONING
ASIT N. BAXI – BAXI ENGINEERING MIGUEL FORERO – SUNCOAST POST-TENSION
![Page 2: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/2.jpg)
PROJECT INFORMATION
Project name: Laketown Wharf Retrofit Location: Panama City Beach, Florida Owner: Laketown Wharf Marketing, LLC Retrofit designer & contractor: Suncoast Post-Tension, Ltd. Grouting subcontractor: Florida Lemark Corporation
2
![Page 3: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/3.jpg)
KEY POINTS
Project background Existing structure Analysis and design Structural details Retrofit pictures
3
![Page 4: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/4.jpg)
PROJECT BACKGROUND
LAKETOWN WHARF RETROFIT
4
![Page 5: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/5.jpg)
PROJECT BACKGROUND
Owner observed cracks in the bottom face of two precast pretensioned girders supporting the pool deck
The owner’s structural engineer reviewed the original design and found that the girders were not adequately reinforced to prevent cracking under full service loads
Owner requested a retrofit proposal with a minimum effect on the building’s architectural design
5
![Page 6: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/6.jpg)
PROJECT BACKGROUND
Suncoast Post-Tension (SCPT) submitted a retrofit proposal using external post-tensioning with ½-in. strands
SCPT designed and executed the retrofit The design and the executed work were reviewed by
the owner’s structural engineer
6
![Page 7: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/7.jpg)
EXISTING STRUCTURE
LAKETOWN WHARF RETROFIT
7
![Page 8: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/8.jpg)
EXISTING STRUCTURE
8
GIRDER 7-8 GIRDER 6-7 GIRDER 5-6
![Page 9: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/9.jpg)
EXISTING STRUCTURE
9
![Page 10: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/10.jpg)
ANALYSIS AND DESIGN
LAKETOWN WHARF RETROFIT
10
![Page 11: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/11.jpg)
ANALYSIS AND DESIGN
11
A load analysis was performed to determine the flexural moment and the shear along each girder
A sectional analysis (M-φ) program was used to determine the strain and stress profile at critical locations along the girders (before and after the external post-tensioning)
The program used was based on a layered model and accounted for the force due to the external post-tensioning
![Page 12: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/12.jpg)
ANALYSIS AND DESIGN
12
εt
REFERENCE ELEVATION
εci
εb
εck
εcj
fci Ai
fpk
fsj Apk
Asj
MODEL STRAIN STRESS
CONCRETE
PRESTRESSING STEEL
CONVENTIONAL REBAR
SECTIONAL ANALYSIS (M-φ) USING LAYERS NET AXIAL
FORCE
![Page 13: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/13.jpg)
ANALYSIS AND DESIGN
13
Based on the analysis results, six external tendons were used for girders 5-6 and 6-7, while three external tendons were used for girder 7-8
The external tendons were placed below the girders, at a constant elevation, instead of the side faces to minimize the impact on the architectural design
The tendons were placed continuously between two bracket assemblies instead of staggering the tendons and using additional bracket assemblies
![Page 14: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/14.jpg)
ANALYSIS AND DESIGN
14
-4000
-3000
-2000
-1000
0
1000
2000
3000
4000
5000
6000
7000
-80 -60 -40 -20 0 20 40 60 80
Mom
ent (
ft*k
ip)
Curvature (10-6 rad/in)
Girders 5-6 & 6-7: Moment-Curvature ResponseLong-Term Behavior
Original Section Section with external post-tensioning (P = 168 kips)
MMAX 5-6 = 4300 ft*kip
MMAX 6-7 = 4130 ft*kip
![Page 15: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/15.jpg)
ANALYSIS AND DESIGN
Summary of Stress Analysis – Girder 5-6
Loading Condition Location Moment (ft*kip)
Concrete Stress (psi) Stress Limit (psi) Status / Comment
Top Bottom Top Bottom
Original section prior to external post-tensioning Joist 5 4298 -2534 - -3600 581 Concrete cracked on bottom face
Immediately after external post-tensioning Joist 5 4298 -1063 253 -3600 581 OK
Long-term response after external post-tensioning Joist 5 4298 -1007 286 -3600 581 OK
15
![Page 16: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/16.jpg)
ANALYSIS AND DESIGN
Summary of Stress Analysis – Girder 6-7
Loading Condition Location Moment (ft*kip)
Concrete Stress (psi) Stress Limit (psi) Status / Comment
Top Bottom Top Bottom
Original section prior to external post-tensioning Joist 5 4134 -2111 - -3600 581 Concrete cracked on bottom face
Immediately after external post-tensioning Joist 5 4134 -877 132 -3600 581 OK
Long-term response after external post-tensioning Joist 5 4134 -874 194 -3600 581 OK
16
![Page 17: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/17.jpg)
ANALYSIS AND DESIGN
17
-4000
-3000
-2000
-1000
0
1000
2000
3000
4000
5000
6000
7000
-80 -60 -40 -20 0 20 40 60 80
Mom
ent (
ft*k
ip)
Curvature (10-6 rad/in)
Girder 7-8: Moment-Curvature ResponseLong-Term Behavior
Original Section Section with external post-tensioning (P = 81 kips)
MMAX 7-8 = 2560 ft*kip
![Page 18: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/18.jpg)
ANALYSIS AND DESIGN
Summary of Stress Analysis – Girder 7-8
Loading Condition Location Moment (ft*kip)
Concrete Stress (psi) Stress Limit (psi) Status / Comment
Top Bottom Top Bottom
Original section prior to external post-tensioning Joist 4 2557 -630 133 -3600 581 Bottom face in tension
Immediately after external post-tensioning Joist 4 2557 -537 -115 -3600 -3600 Bottom face in compression
Long-term response after external post-tensioning Joist 4 2557 -537 -53 -3600 -3600 Bottom face in compression
18
![Page 19: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/19.jpg)
DESIGN DETAILS
LAKETOWN WHARF RETROFIT
19
![Page 20: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/20.jpg)
DESIGN DETAILS
20
![Page 21: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/21.jpg)
DESIGN DETAILS
21
![Page 22: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/22.jpg)
DESIGN DETAILS
22
The bracket assemblies were located away from the end of the girders to avoid disturbing the transfer zone of the pretensioned strands
The bolts used in the brackets were located to avoid interference with the conventional reinforcement and the pretensioned strands
Barrel anchors were used and located as close as possible to the girder soffit to minimize the eccentricity
![Page 23: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/23.jpg)
DESIGN DETAILS
23
![Page 24: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/24.jpg)
DESIGN DETAILS
24
![Page 25: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/25.jpg)
RETROFIT PICTURES
LAKETOWN WHARF RETROFIT
25
![Page 26: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/26.jpg)
RETROFIT PICTURES
26
![Page 27: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/27.jpg)
RETROFIT PICTURES
27
![Page 28: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/28.jpg)
RETROFIT PICTURES
28
![Page 29: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/29.jpg)
RETROFIT PICTURES
29
![Page 30: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/30.jpg)
RETROFIT PICTURES
30
![Page 31: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/31.jpg)
RETROFIT PICTURES
31
![Page 32: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/32.jpg)
RETROFIT PICTURES
32
![Page 33: External Post Tension](https://reader034.vdocuments.site/reader034/viewer/2022042508/577c82251a28abe054afa1be/html5/thumbnails/33.jpg)
THANK YOU
ASIT N. BAXI – BAXI ENGINEERING MIGUEL FORERO – SUNCOAST POST-TENSION
33