Application + Construction of Offshore Wind Farms (OWFs) – Installation of Jacket Foundations EXTERNAL JACKET LIFTING TOOL (EJ-LT) Lifting jacket foundations with external lugs The tool, which can be operated remotely, engages with the external lugs on offshore jacket foundations. It negates the need for human intervention, thus increasing safety and speed of jacket installation.

Upload: duongquynh

Post on 04-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ExtErnAl JAckEt lifting tool (EJ-lt) - Houlder Ltd · ExtErnAl JAckEt lifting tool ... , General Guidelines for Marine Projects • 0027/ND rev.6 2015, Guidelines for Marine Lifting

Application

+ Construction of Offshore Wind Farms (OWFs) – Installation of Jacket Foundations

ExtErnAl JAckEt lifting tool (EJ-lt) Lifting jacket foundations with external lugs

The tool, which can be operated remotely, engages with the external lugs on offshore jacket foundations. It negates the need for human intervention, thus increasing safety and speed of jacket installation.

Page 2: ExtErnAl JAckEt lifting tool (EJ-lt) - Houlder Ltd · ExtErnAl JAckEt lifting tool ... , General Guidelines for Marine Projects • 0027/ND rev.6 2015, Guidelines for Marine Lifting

• Thetooldesignandoperationshouldnotrequiremodificationtothejacketdesign

• Capableofliftinga2000tJackets

• Thedesignalsoaimstominimisetheheightandweightofthetooltomaximiseoperationalflexibilitywithregardstohookheight

• TheHoulderdesignconceptforthisequipmentallowsfortheremoteengagementanddisengagementofthetool,thusremovingtherequirementforpersonnelworkingatheighttoinstallthetoolpriortolifting

• Noumbilicalrequired

bEnEfits rElEvAnt codEs, stAndArds & lEgislAtion

2 /

Thetoolwillcomplywiththefollowingcodes&standards:

• DNVGL-SE-0080ed.2015-12,NobleDentonmarineservices–marinewarrantysurvey

• DNVGL-CG-0127ed.2015-10,FiniteElementAnalysis

• 0001/NDrev.12015,GeneralGuidelinesforMarineProjects

• 0027/NDrev.62015,GuidelinesforMarineLiftingandLoweringOperations

• 0030/NDrev.62015,GuidelinesforMarineTransportations

Page 3: ExtErnAl JAckEt lifting tool (EJ-lt) - Houlder Ltd · ExtErnAl JAckEt lifting tool ... , General Guidelines for Marine Projects • 0027/ND rev.6 2015, Guidelines for Marine Lifting

systEm spEcificAtion

• Toolengages/interfaceswiththeexternallugsonajacket

• Capableofliftingjacketswithamaximumweightof2000t(takingintoaccounttheappropriateliftingfactors)

• Weightoftoolisapproximately40t,notincludingrigging.Thetotalweightoftheentireliftingassemblyisestimatedat50t

• Isdesignedtoensurethatthejacketisnotoverstressedforanytemporaryloadcasesthroughoutitsoperation(i.e.engagement,liftingetc.)–thisistobeconfirmedviaFEAmodellingoftheliftingprocess

• Designedsuchthatitcanberemotelyoperated(wirelesselectroniccontrolsystem)forengagement/disengagementto/fromthejacket

• Willprovidetheremoteoperatorwithconfirmationthatthetoolisengagedandthattheliftingoperationissafetocommence

• Toolwilluse3mountedcamerastoenabletheoperatortopositiontheliftingtoolintojacketlugs

• Guidesandfinsenabletehsystemtofinditsfitonthelugsforengagementofthelockingpins,withoutneedingworkingatheight

• Automaticallyreleasesatseaafterinstallation

• Noumbilicalrequired

• Designedsuchthatitisinherentlysafeinasmuchthatitwouldnotlosetheloadshouldpowerbeterminatedfromthetoolorwhilstthereisanyloadbornbythetool

• Integratedpowersupplyandcontainsasecondarymeansofoperationshouldtheprimarycontrolsandorpowersystemfail

• Providessufficientprotectiononareasthatphysicallyinterfacewiththejacketsuchthatthetoolwillnotcauseanyformofdamagewhichmayaffecttheperformanceofthejacket

/ 3

Page 4: ExtErnAl JAckEt lifting tool (EJ-lt) - Houlder Ltd · ExtErnAl JAckEt lifting tool ... , General Guidelines for Marine Projects • 0027/ND rev.6 2015, Guidelines for Marine Lifting

/ 4

HOulder lImITed22 Witney WayBoldon Business ParkTyne & WearNE35 9PEUKT: +44 (0)191 536 2777

[email protected]

contAct us

Houlder is an independent, innovative offshore engineering company. We build on 30 years’ offshore expertise and work closely with clients to design solutions for their technical challenges. We provide complete EPCI services with special equipment, consultancy, project management and engineering solutions for the offshore wind and wider energy sector.