experiences and further plans in mobility development in

24
István Nagy projects manager Miskolc Holding Plc. [email protected] Experiences and further plans in mobility development in Miskolc 08 March, 2017 1st ITW in Karlskrona Nikolett Szalai planning engineer Közlekedés Ltd. [email protected]

Upload: others

Post on 02-Mar-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Experiences and further plans in mobility development in

István Nagyprojects managerMiskolc Holding [email protected]

Experiences and further plans in mobilitydevelopment in Miskolc

08 March, 20171st ITW in Karlskrona

Nikolett Szalaiplanning engineerKözlekedés [email protected]

Page 2: Experiences and further plans in mobility development in

2

Miskolc in a nutshell

Page 3: Experiences and further plans in mobility development in

3

Miskolc in a nutshellOverview

The administrative, economic, scientific, intellectual and cultural centre of the region

Hungary’s fourth largest city (160k inhabitants) App. 360,000 residents within the agglomeration Very long history in steel and machinery industry

dating The University of Miskolc is the educational and

research centre of the region The city currently is a hotspot for industrial and

commercial investments Pilot city in Modern Cities Programme (national) Notable city development in the past 3-5 years

Miskolc Borsod-Abaúj-Zemplén County

North Hungarian Region Hungary

Area ~ 236,7 km2 7,247 km2 13,428 km2 93,036 km2

Population ~160,000persons

668,000 persons

1 165,000persons

9 849,000 persons

Unemployment rate 7 % 8.5 % 10.8% 6.4%

Average monthly gross wages

188,468 HUF598 EUR

242,975 HUF771 EUR

Page 4: Experiences and further plans in mobility development in

4

The Green Arrow project

Page 5: Experiences and further plans in mobility development in

5

The Green Arrow project

Page 6: Experiences and further plans in mobility development in

6

The Green Arrow project

Page 7: Experiences and further plans in mobility development in

7

The Green Arrow projectChallenges to address

Decreasing share of PT in modal split Air and noise pollution Unattractive vehicles, lack of comfort Outdated rail infrastucture Long duration of trips Low satisfaction rate of passengers Congestions along the tram line Security issues Uncovered residential areas in the end-western

district

Page 8: Experiences and further plans in mobility development in

8

The Green Arrow projectMain elements

Renovation and extension of tramline New, accessible tram stops 31 new trams Real-Time passenger information On-board Wi-Fi Citizen engagement activities

Main Stakeholders Municiaplity of Miskolc City of County Rank MVK Zrt. (municipal provider of public

transportation services) Miskolc Holding Zrt.

Budget 120 M EUR (own contribution 10%)

Duration 9 years (from planning) / 3 years (implementation)

Page 9: Experiences and further plans in mobility development in

9

The Green Arrow project

Page 10: Experiences and further plans in mobility development in

10

The Green Arrow project

Page 11: Experiences and further plans in mobility development in

11

The Green Arrow project

Page 12: Experiences and further plans in mobility development in

12

The Green Arrow project

Page 13: Experiences and further plans in mobility development in

13

The Green Arrow project

Page 14: Experiences and further plans in mobility development in

14

The Green Arrow project

Page 15: Experiences and further plans in mobility development in

15

Main results Modernized rail track (9,6 km) Extended tram line (1,4 km) 31 Skoda vehicles procured Accessible (barrier-free) tram stops GPS-based real time information for passangers

/touch-info screens, digital displays, smart phone app/ Shorter duration of trips

The Green Arrow project

Additional results More attractive PT (trams), improved quality of service (incl. on-

board Wi-Fi) Improved passangers safety (cameras, emergency calls) Energy savings Decreased noise and vibration Improved passanger comfort (on-board and in stops)

Page 16: Experiences and further plans in mobility development in

16

CNG buses + gas station

Page 17: Experiences and further plans in mobility development in

17

FURTHER PLANS FOR SUSTAINABLE DEVELOPMENT IN MISKOLC

Chapter 2 – About the future

Nikolett Szalaiplanning engineerKözlekedés [email protected]

Page 18: Experiences and further plans in mobility development in

18

PreludeIntroduction;Previous development practices and plans in Miskolc: SUMP (2013) Tram Project; CNG buses; Intermodal hub will be built til 2019 Plans: Expansion of tramway networks; Intermodal hub; Tram-train (Kazincbarcika – Miskolc); Bypass road network.

Page 19: Experiences and further plans in mobility development in

19

SUMP Development planSUMP How is the city we

would like to live in? Research –previous plans; Meetings; Project ideas – 80 projects; Scheduling (3 terms); Cost estimates(rough).

Development plan What do we have to do

to reach our aims? SUMP and otherprevious plans; Cooperations; Explanation of project ideas; Scheduling (annuallevel); Cost estimates and financial resources.

Page 20: Experiences and further plans in mobility development in

20

Short overview of suggested projectsSoft projects Education Communication campaign Events

Short-term projects Intermodal hub; Developments in the inner city; Development of elements of road network and bycicle

paths network

Long-term projects (Vision) Tram-train; Development of tramway network; Cargo Tram.

Page 21: Experiences and further plans in mobility development in

21

Development of road network

Page 22: Experiences and further plans in mobility development in

22

Development of bicycle road network

Page 23: Experiences and further plans in mobility development in

23

Inner city - Limitations

Page 24: Experiences and further plans in mobility development in

Project smedia

Thank you!

Questions welcome