expanded community advisory panel (xcap) meeting #4 · 2019. 9. 5. · breakout tables for deep...

20
Expanded Community Advisory Panel (XCAP) Meeting #4 09.05.19 ……..

Upload: others

Post on 24-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Expanded Community Advisory Panel (XCAP) Meeting #4 09.05.19

……..

Page 2: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Agenda

Welcome and Introductions Community Conversations Status of City Council Considerations Outline for Design Workshop Design Workshop Questions Embarcadero/Alma Renderings Churchill Viaduct Summary of Action Items / Next Meeting Adjourn

Page 3: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

XCAP Upcoming Meetings and Work Plan

3

September 25, 2019 – XCAP Meeting #5 – Summary of Churchill Alternatives, Review South Palo Alto tunnel animations, plan for community meeting

September 27, 2019 – Design Workshop – thorough discussion of current alternatives (geometrics, etc.); detailed questions and answers

October 16, 2019 – XCAP Meeting #6 – debrief design workshop, plan for community meeting, discuss alternatives, and consensus

October 30, 2019 – XCAP Meeting #7 – review materials and exhibits for community meeting

November 7, 2019 – Citywide Community Meeting

Page 4: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Community Conversations

4

Page 5: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Status of City Council Considerations

Rail Blue Ribbon Committee (RBRC)

5

Page 6: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Outline for Design Workshop

Introductions Agenda Overview and Goals Project Overview Engineering Basics Alternative Overview Breakout Tables for Deep Dive

• Churchill (Closure, Viaduct)• Charleston-Meadows (Trench, Hybrid,

Viaduct)• South Tunnel (with and without freight)• Alternatives no longer considered• No build

Report Out Adjourn

Mitchell Park Community CenterEl Palo Alto Room

September 27, 201910:00am – 2:00pm

Page 7: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Design Workshop Questions

7

See handout for list of questions

Page 8: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

8

Alternatives Still Under Consideration

Meadow / Charleston Trench o Lower the railroad below the roadways at

Meadow and Charleston

Meadow / Charleston Hybrid o Partially lower the roads and partially elevate

the tracks at Meadow and Charleston

Meadow / Charleston Viaduct o Raise the railroad above the roadways at

Meadow and Charleston on structure

South Palo Alto Tunnel – Passenger & Freighto Tunnel south of Oregon Expressway under

Meadow and Charleston

South Palo Alto Tunnel with At-Grade Freight o Tunnel south of Oregon Expressway under

Meadow and Charleston with at grade freight

Churchill Ave. Closureo At-grade crossing to be fully closed at Churchill

Ave. with a grade separation for Bike/Ped connectivity. Will also consider all street mitigation options including Embarcadero.

Churchill Ave. Vicinity Viaduct o Raise the railroad above the roadways in the

vicinity of Churchill on structure

Page 9: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Embarcadero/Alma – Option 3 with High St Connection

9

Page 10: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Embarcadero/Alma – Option 3 without High St Connection

10

Page 11: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Embarcadero/Alma (Existing Condition, Looking West)

Palo AltoHigh School

Town & Country

Page 12: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Embarcadero/Alma (3D Rendering. Looking West)

Palo AltoHigh School

Town & Country

Left Turn Pocket from SB Alma St

Signalized Intersection

Alma St BridgeWidening

Connection Eliminated

Rt Turn Pocket from EB

Embarcadero No Left Turns Allowed

Ped/Bike Bridge over

Embarcadero

Page 13: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Churchill Viaduct

Churchill Viaduct can be built without the Meadow/Charleston Viaduct and vice versa

Page 14: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Churchill Viaduct – Option 1, Retained Fill

Page 15: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Churchill Viaduct – Option 1, Aerial Guideway

Page 16: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Churchill Viaduct – Option 2, Retained Fill

Page 17: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Churchill Viaduct – Option 2, Aerial Guideway

Page 18: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Churchill Viaduct Animation https://we.tl/t-jKXF4DpuSA

18

Page 19: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

All meeting materials will be posted onto www.cityofpaloalto.org/connectingpaloalto

At-Grade CrossingChurchill Ave. and Caltrain Tracks

Summary of Action Items/Next Meeting

September 25, 20194:00 – 6:00pm

Page 20: Expanded Community Advisory Panel (XCAP) Meeting #4 · 2019. 9. 5. · Breakout Tables for Deep Dive • Churchill (Closure, Viaduct) • Charleston-Meadows (Trench, Hybrid, Viaduct)

Thank you