FIGURE anderson perry associates, i nc. & Job# 986-22-207 Dec. 7, 2015 lbauer 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION LOCATION AND VICINITY MAPS T. 8 S., R. 46 E., W.M. 0 2000 2000 SCALE IN FEET OREGON HWY. 86 To Oxbow OREGON HWY. 86 HALFWAY To Richland and Baker City PINE To Cornucopia VICINITY MAP PROJECT LOCATION Halfway URBAN GROWTH BOUNDARY CITY LIMITS EXISTING WASTEWATER TREATMENT FACILITY PROPOSED EFFLUENT FORCEMAIN TO IRRIGATION STORAGE POND PROPOSED WASTEWATER TREATMENT FACILITY IMPROVEMENTS COMPENSATORY WETLAND MITIGATION SITE PROPOSED IRRIGATION STORAGE POND AND EFFLUENT IRRIGATION SITE

Upload: others

Post on 09-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

FIGUREandersonperry

associates, inc.&

Job#

986

-22-

207

Dec

. 7, 2

015

lbau

er

1

CITY OFHALFWAY, OREGON

WASTEWATER SYSTEM IMPROVEMENTSJOINT PERMIT APPLICATION

LOCATION AND VICINITY MAPS

T. 8 S., R. 46 E., W.M.

0 2000 2000 SCALE IN FEET

OR

EG

ON

HW

Y. 8

6

To OxbowOREGON HWY. 86

HALFWAY

To Richland and Baker City

PINE

To Cornucopia

VICINITY MAP

PROJECTLOCATION

Halfway

URBAN GROWTH BOUNDARY

CITY LIMITS

EXISTING WASTEWATER TREATMENT FACILITY

PROPOSED EFFLUENT FORCEMAIN TO IRRIGATION STORAGE POND

PROPOSED WASTEWATER TREATMENT FACILITY IMPROVEMENTS

COMPENSATORY WETLAND MITIGATION SITE

PROPOSED IRRIGATION STORAGE POND AND EFFLUENT IRRIGATION SITE

g2odgpdo
Typewritten Text
NWP-2015-432 (17 pgs)
Page 2: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

FIGUREandersonperry

associates, inc.&

Job# 986-22-207 Dec. 8, 2015 lbauer

2A

CITY OFHALFWAY, OREGON

WASTEWATER SYSTEM IMPROVEMENTSJOINT PERMIT APPLICATION

PROPOSED IMPROVEMENTS

T. 8 S., R. 46 E., W.M.

0 1000 1000 SCALE IN FEET

HALFWAY

To Cornucopia

To

Ox

bow

OR

EG

ON

H

WY.

86

URBAN GROWTH BOUNDARY

CITY LIMITS

EXISTING WASTEWATER TREATMENT FACILITY

EXISTING SUMMER EFFLUENT IRRIGATION SITE

EXISTING WINTER SURFACE WATER DISCHARGE

PROPOSED LAGOON CELLS IMPROVEMENT

PROPOSED COLLECTION SYSTEM REHABILITATION

PROPOSED EFFLUENT PUMP STATION

PROPOSED INFLUENT METER STATION IMPROVEMENTS

PROPOSED DITCH CROSSING 1 (C1)SEE FIGURE 6

WETLAND 4 - SEE FIGURE 6

WETLAND 1 SEE FIGURE 4

WETLAND 3 - SEE FIGURE 5

COMPENSATORY WETLAND MITIGATION SITE - WETLANDS 12, 13, AND 14 - SEE FIGURE 8

SEE FIGURE 2B FOR CONTINUATION

PROPOSED EFFLUENT FORCEMAIN TO IRRIGATION STORAGE POND

Page 3: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

FIGUREandersonperry

associates, inc.&

Job# 986-22-207 Dec. 8, 2015 lbauer

2B

CITY OFHALFWAY, OREGON

WASTEWATER SYSTEM IMPROVEMENTSJOINT PERMIT APPLICATION

PROPOSED IMPROVEMENTS

T. 8 S., R. 46 E., W.M.

0 1000 1000 SCALE IN FEET

OR

EG

ON

HW

Y. 8

6

To Richland and Baker City

To Halfway To OxbowSEE FIGURE 2A FOR CONTINUATION

PROPOSED EFFLUENT IRRIGATION SITE

WETLAND 6, 7, AND 8SEE FIGURE 7

PROPOSED IRRIGATION PIPING

PROPOSED TOPSOIL DISPOSAL AREASEE FIGURE 7

PROPOSED STAGING AREASEE FIGURE 7

WETLAND 9SEE FIGURE 7

EXISTING IRRIGATION PIVOT

PROPOSED IRRIGATION STORAGE POND

PROPOSED IRRIGATION PUMP STATION

PROPOSED EFFLUENT FORCEMAIN TO IRRIGATION STORAGE POND

Page 4: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

FIGUREandersonperry

associates, inc.&

Job# 986-22-207 Dec. 8, 2015 lbauer

3A

CITY OFHALFWAY, OREGON

WASTEWATER SYSTEM IMPROVEMENTSJOINT PERMIT APPLICATION

TAX LOT MAP

T. 8 S., R. 46 E., W.M.

0 1000 1000 SCALE IN FEET

HALFWAY

To Cornucopia

To

Ox

bow

OR

EG

ON

HW

Y. 8

6

To Richland and Baker City

Lee CreekPine

Creek

URBAN GROWTH BOUNDARY

CITY LIMITS

EXISTING WASTEWATER TREATMENT FACILITY

PROPOSED WASTEWATER TREATMENT FACILITY IMPROVEMENTS

COMPENSATORY WETLAND MITIGATION SITE

SEE FIGURE 3B FOR CONTINUATION

PROPOSED EFFLUENT FORCEMAIN TO IRRIGATION STORAGE POND 08S46E17 1600

Buchanan, Greg

08S46E17 140045 Ranch, LLC

08S46E17 1501Dyke, Dana A.

08S46E16 400City of Halfway

08S46E16 501Becker, Michael A.

08S46E16 500Kuwahara, Charles W. and Brenda E.

08S46E16 600Becker, Michael A.

08S46E17AA 600Ralls, Ronda I.

08S46E17AA 100Pine Valley Cemetery Assoc.

08S46E17 1500Traw, Dustin and Kristin

08S46E17 1700Votaw, Steven et al

08S46E16 700Pine Valley Fair Assoc.

Page 5: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

FIGUREandersonperry

associates, inc.&

Job# 986-22-207 Dec. 8, 2015 lbauer

3B

CITY OFHALFWAY, OREGON

WASTEWATER SYSTEM IMPROVEMENTSJOINT PERMIT APPLICATION

TAX LOT MAP

T. 8 S., R. 46 E., W.M.

0 1000 1000 SCALE IN FEET

OR

EG

ON

HW

Y. 8

6

To Richland and Baker City

To Halfway To Oxbow

ValleyD

itch

Posey

SEE FIGURE 3A FOR CONTINUATION

PROPOSED EFFLUENT IRRIGATION SITE

PROPOSED IRRIGATION STORAGE POND

PROPOSED EFFLUENT FORCEMAIN TO IRRIGATION STORAGE POND

08S46E17 1800Gover Family Trust

08S46E17 1600Buchanan, Greg

08S46E 3200Gover, George L. and Marcia M.

08S46E17 1100Gover, George L. and Marcia M.

Page 6: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

5

TRENCH EXCAVATION AND

RESTORATION FOR WETLAND AREAS

WASTEWATER SYSTEM IMPROVEMENTS

HALFWAY, OREGON

CITY OF

JOINT PERMIT APPLICATION

perry

anderson

associates, inc.&

FIGURE

Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Plans.dwg

TRENCH EXCAVATION AND RESTORATION FOR WETLAND AREAS, TYP.

(WITH LOCATING WIRE)

Page 7: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

FA

IR

GR

OU

ND

S R

D

NEW 6"

FORCEMAIN

6

WETLAND 1

WASTEWATER SYSTEM IMPROVEMENTS

HALFWAY, OREGON

CITY OF

JOINT PERMIT APPLICATION

WETLAND 1

perry

anderson

associates, inc.&

FIGURE

Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Plans.dwg

Page 8: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

H

I

G

H

W

A

Y

4

1

3

FAIRGROUNDS R

D

WETLAND 3

7

WETLAND 3

WASTEWATER SYSTEM IMPROVEMENTS

HALFWAY, OREGON

CITY OF

JOINT PERMIT APPLICATION

perry

anderson

associates, inc.&

FIGURE

Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Plans.dwg

WETLAND 2

NEW 6"

FORCEMAIN

Page 9: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

6" RJ DI

CROSSING 1 (C1) PROFILE

8B

CROSSING 1 (C1) PROFILE

WASTEWATER SYSTEM IMPROVEMENTS

HALFWAY, OREGON

CITY OF

JOINT PERMIT APPLICATION

perry

anderson

associates, inc.&

FIGURE

Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA- DITCH-XINGS.dwg

Page 10: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

NOTE: DITCH CROSSING WORK SHALL BE COMPLETED

IN ACCORDANCE WITH THE 404 PERMIT. SEE THE

APPENDICES IN THE CONTRACT DOCUMENTS

PLAN

8A

CROSSING 1 (C1), WETLAND 4

CROSSING 1 (C1)

WASTEWATER SYSTEM IMPROVEMENTS

HALFWAY, OREGON

CITY OF

JOINT PERMIT APPLICATION

WETLAND 4

perry

anderson

associates, inc.&

FIGURE

Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA- DITCH-XINGS.dwg

Page 11: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

DAM A

DAM B

IRRIGATION AREA

ACCESS ROAD

TOPSOIL

DISPOSAL

AREA

WETLAND 8

WETLAND 7

WETLAND 6

STAGING AREA

LEGEND

anderson

i i&

perry

assoc ates, nc.

FIGURE

Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Reservoir.dwg

9A

IRRIGATION STORAGE POND-OVERVIEW

WASTEWATER SYSTEM IMPROVEMENTS

HALFWAY, OREGON

CITY OF

JOINT PERMIT APPLICATION

Page 12: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

DAM A

WETLAND 7

WETLAND 6

STAGING AREA

perry

anderson

associates, inc.&

FIGURE

Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Reservoir.dwg

9B

WETLANDS 6 AND 7

WASTEWATER SYSTEM IMPROVEMENTS

HALFWAY, OREGON

CITY OF

JOINT PERMIT APPLICATION

Page 13: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

perry

anderson

associates, inc.&

FIGURE

Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Reservoir.dwg

9C

WETLAND 8

WASTEWATER SYSTEM IMPROVEMENTS

HALFWAY, OREGON

CITY OF

JOINT PERMIT APPLICATION

WETLAND 8

Page 14: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

anderson

i i&

perry

assoc ates, nc.

FIGURE

Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA- Section.dwg

9D

TYPICAL SECTION

WASTEWATER SYSTEM IMPROVEMENTS

HALFWAY, OREGON

CITY OF

JOINT PERMIT APPLICATION

TYPICAL SECTION

GENERAL DAM EMBANKMENT BORROW AREA

Page 15: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

LEGEND

NOTE:

AREA OF IMPACT

anderson

i i&

perry

assoc ates, nc.

FIGURE

Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Mitigation Impacts.dwg

10

COMPENSATORY WETLAND

WASTEWATER SYSTEM IMPROVEMENTS

HALFWAY, OREGON

CITY OF

JOINT PERMIT APPLICATION

Page 16: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

LEGEND

NOTE:

anderson

i i&

perry

assoc ates, nc.

FIGURE

Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Mitigation Impacts.dwg

11

WETLAND MITIGATION SUMMARY -

WASTEWATER SYSTEM IMPROVEMENTS

HALFWAY, OREGON

CITY OF

JOINT PERMIT APPLICATION

Page 17: EXISTING WASTEWATER HALFWAY...anderson perry Job# 986-22-207 Dec. 7, 2015 lbauer & associates, inc. 1 CITY OF HALFWAY, OREGON WASTEWATER SYSTEM IMPROVEMENTS JOINT PERMIT APPLICATION

SECTION A

PLAN

anderson

i i&

perry

assoc ates, nc.

FIGURE

Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Compensatory Wetland Mitigation.dwg

12

COMPENSATORY WETLAND MITIGATION

WASTEWATER SYSTEM IMPROVEMENTS

HALFWAY, OREGON

CITY OF

JOINT PERMIT APPLICATION