exhibit a the transportation system a-1 overview

13
1 EXHIBIT A The Transportation System A-1 Overview Gorm "E" Platform FILSØ BOOSTER STATION The Terminal and The Stabilisation Plant Nybro Gas Treatment Plant 16 BLOCK VALVE INSTALLATIONS JETTY 1 + 2 Note: Hydrocarbon liquid: Hydrocarbon gas (LP): Hydrocarbon gas (HP): Water liquid: Battery limit: Metering (Fiscal) Sampling (Fiscal) Metering & Sampling (Fiscal) M,S M S

Upload: others

Post on 12-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

1

EXHIBIT A The Transportation System A-1 Overview

Gorm "E" Platform

FILSØ

BOOSTER

STATION

The Terminal and The Stabilisation Plant

Nybro Gas

Treatment Plant

16 BLOCK VALVE

INSTALLATIONS

JETTY

1 + 2

Note:

Hydrocarbon liquid:

Hydrocarbon gas (LP):

Hydrocarbon gas (HP):

Water liquid:

Battery limit:

Metering (Fiscal)

Sampling (Fiscal)

Metering & Sampling (Fiscal) M,S

M

S

TY

RA

EA

ST

Notes:

1. Main allocation Meters.

2. Common Master- and Spare Meter for both streams.

3. The Tyra by-pass of Gorm "E" platform is not in use and is permanently closed.

4. Automatic sampling done via fast loop.

220 km 20” Pipeline (offshore)

GORM "E" Platform

2

EXHIBIT A The Transportation System A-2 GORM "E" Platform

P-117B/C/D/E/F

P-117A/G

WATER

LP FLARE

GO

RM

C

SKJOLD

DAGMAR

SV

EN

D

TY

RA

WE

ST

TR

YM

GO

RM

A

GO

RM

B

GO

RM

F

HA

RA

LD

DAN F

HALFDAN

M

37131

FT 37141

37151

MM

M

FAST

LOOP

Note 1

Note 2

V-3601 Note 1

FAST

LOOP

Note 3

FT 37111

FT 37121

FAST

LOOP

SPARE

OWNERSHIP OF THE

TRANSPORTER

Hejre

SAMPLE POINTS

OWNERSHIP of the

Sole Concession

OWNERSHIP of

the Hejre License

LIMIT OF OWNERSHIP

ROLF

Note 4

3

EXHIBIT A The Transportation System A-3 GORM E Fast Loop Setup (each stream + Spare)

DE

NS

ITY

W

AT

ER

CU

T

TT

PT

0,5

L R

EC

EIV

ER

0,5

L R

EC

EIV

ER

0,5

L R

EC

EIV

ER

0,5

L R

EC

EIV

ER

FT

10

L R

EC

EIV

ER

Pressurised Receivers

(Pressurised samples for Allocation)

Non-Pressurised

Receiver

(Dead Sample for

Value Adjustment) DE

NS

ITY

RVP

PI

P-117 Off-Shore Pipeline

20” Pipeline (onshore) 20” Pipeline (onshore)

FILSØ BOOSTER STATION

4

EXHIBIT A The Transportation System A-4 Filsø Booster Station

P-304-A/B/C/D/E

M

PC

FIC

5

EXHIBIT A The Transportation System A-5 Condensat injection line

NORTH FENCE

of Nybro Gas Treatment Plant

Transporter

4" CONDENSATE

INJECTION LINE

N2 PRESERVED

M

20" Pipeline (onshore) TO TERMINAL

LINE VALVE STATION

HELTOFT

(1)

PUMP

Notes:

1. Delivery Point from Nybro Gas Treatment Plant.

2. Condensate injection Line is decommissioned and filled with N2.

3. Pumps and Meter Runs are decommissioned but stored at Nybro Gas Treatment Plant.

(3)

(2)

Nybro Gas

Treatment Plant

BATTERY LIMIT

6

EXHIBIT A The Transportation System A-6 Line Valve Stations (except Heltoft)

PT PDT

SIG

7

EXHIBIT A The Transportation System A-7 Line Valve Station Heltoft

PT PDT

CO

ND

EN

SA

TE

FR

OM

Nybro

Ga

s T

reatm

ent P

lant

PT

8

EXHIBIT A The Transportation System A-8 Terminal and Stabilisation Plant

DEWATER V-9501/2

STORAGE TANKS

T-9801-6

T-53/67/71

98LIT001-6/24/25

34L553/567/571

CRUDE OIL LOADING

P-9801A/B/C/D

ESD

SLOPS

T-9901/2

BUFFER

T-9929

WATER

TREATMENT

(LURGI)

TO SEWER TO LILLEBÆLT

TO JETTY

TO REFINERY

RECYCLE

P-9802

M,S

95FT002/012 99FT136A/B

95FT019/020

M,S M,S

P-9616A

P-9615A

NC

96FT059

COMPRESSOR

K-9601-1A/B

99FQ015

DEGASSER V-9601

SEPARATOR V-9606/8A/B

Fuel Gas EXPORT (LP )

P-9617/8A/B

ST

AB

ILIS

ER

C

-9401

DE

ET

HA

NIS

ER

C

-9402

DE

PR

OP

AN

ISE

R

C-9

403

M,S

M,S

Fuel Gas IMPORT (LP)

V-9301A-F

V-9302A-F

V-9205-7 LPG C3 STORAGE

V-9208 LPG OFF SPEC

V-9201-4 LPG C4 STORAGE

C5+

M,S M,S

M,S Fuel Gas EXPORT (HP)

LPG EXPORT JETTY

M,S

M,S

92FQI080A/B

92FQI070A/B

99FT053A/B

99FT052A/B

54FT145A/B

M

96FT086A/B HOT OIL

FURNACE

F-9601

The Stabilisation Plant The Pipeline

M,S

92LISA021-8

S

S

S

S

Note:

All water from separators

and columns return to

degassers (not shown).

Batt

ery

lim

it

JETTY

RE

DE

LIV

ER

Y

AT

FL

AN

GE

CO

NN

EC

TIO

N

FT

9

EXHIBIT A The Transportation System A-9 Terminal and Stabilisation Plant

DEWATER V-9501/2

STORAGE TANKS

T-9801-6

T-53/67/71

98LIT001-6/24/25

34L553/567/571

CRUDE OIL LOADING

P-9801A/B/C/D

ESD

SLOPS

T-9901/2

BUFFER

T-9929

WATER

TREATMENT

(LURGI)

RECYCLE

P-9802

M,S

95FT002/012 99FT136A/B

95FT019/020

M,S M,S

P-9616B

P-9615B

96FT072

COMPRESSOR

K-9601-1A/B

99FQ015

DEGASSER V-9604B

SEPARATOR V-9606/8A/B

P-9617/8A/B

ST

AB

ILIS

ER

C

-9401

DE

ET

HA

NIS

ER

C

-9402

DE

PR

OP

AN

ISE

R

C-9

403

M,S

M,S

V-9301A-F

V-9302A-F

V-9205-7 LPG C3 STORAGE

V-9208 LPG OFF SPEC

V-9201-4 LPG C4 STORAGE

C5+

M,S M,S

M,S

LPG EXPORT JETTY

M,S

M,S

92FQI080A/B

92FQI070A/B

99FT053A/B

99FT052A/B

54FT145A/B

M

96FT086A/B HOT OIL

FURNACE

F-9601

M,S

92LISA021-8

S

S

S

S

Note:

All water from separators

and columns return to

degassers (not shown).

The Stabilisation Plant The Pipeline Fuel Gas EXPORT (LP )

Fuel Gas IMPORT (LP)

Fuel Gas EXPORT (HP)

Batt

ery

lim

it

TO SEWER TO LILLEBÆLT

TO REFINERY

M,S

NC 99FQ015

TO JETTY JETTY

RE

DE

LIV

ER

Y

AT

FL

AN

GE

CO

NN

EC

TIO

N

FT

96FT059

10

EXHIBIT A The Transportation System A-10 Degassing Facilities

DEGASSER

V-9601

DEGASSER

V-9604B

E-9605B/D E-9605F/H

E-9605A/C E-9605E/G

From LDS metering Crude Oil to storage

Off Gas to Stabilisation Plant

P-9616A

P-9615A

P-9616B

P-9615B

Sour water to treatment

M

M

NC

NC

99FT136B

99FT136A

E-9606A

E-9606B

HTF Supply/return

HTF Supply/return

Degassing Facility 1

Th

e P

ipelin

e

Th

e S

tabili

satio

n P

lant

Sour water return

from Stabilisation

Plant

Sour water return

from Stabilisation

Plant

Degassing Facility 2

Notes:

1. Battery limit

2. E = Heat Exchanger

3. V = Vessel

96FT072

11

EXHIBIT A The Transportation System A-11 The Stabilisation Plant (Flare)

M Fuel Gas FROM SHELL REFINERY

PILOT GAS

FROM HP STEAM DISTRIBUTION (IMPORT FROM REFINERY)

FROM KO-DRUM

PURGE GAS

97 FT 052

97 FT

050A

97FT090

Note:

1. 97FT050A High Range

2. 97FT050B Low Range 97 FT

050B

FLARE GAS RELEASE

Used by Shell only The Stabilisation Plant

12

EXHIBIT A The Transportation System A-12 LPG Loading Facilities

SHIPS MANIFOLD

SHIPS MANIFOLD

Z-8406

JETTY 1

Z-8420

JETTY 2

JE

TT

Y A

RE

A

OU

TS

IDE

FE

NC

E

OU

TS

IDE

FE

NC

E

Shell

Refin

ery

FROM LPG Butane STORAGE

FROM LPG Propane STORAGE

P-9202

1)

P-9201

1)

1)

1)

Notes:

1. Redelivery Point(s)

2. Battery limit(s)

Propane/Butane Refinery import/export

Shell Refinery

6" Pipe line

approx. 7 km

DONG Property

13

EXHIBIT A The Transportation System A-13 GORM "E" Platform Riser

THE PIPELINE

PLOT OF GORM "E" Platform

20" RISER BOTTOM RUN

DATE: OCT. 1999

GORM "E" Platform

jacket leg