EXHIBIT A The Transportation System A-1 Overview
Gorm "E" Platform
FILSØ
BOOSTER
STATION
The Terminal and The Stabilisation Plant
Nybro Gas
Treatment Plant
16 BLOCK VALVE
INSTALLATIONS
JETTY
1 + 2
Note:
Hydrocarbon liquid:
Hydrocarbon gas (LP):
Hydrocarbon gas (HP):
Water liquid:
Battery limit:
Metering (Fiscal)
Sampling (Fiscal)
Metering & Sampling (Fiscal) M,S
M
S
TY
RA
EA
ST
Notes:
1. Main allocation Meters.
2. Common Master- and Spare Meter for both streams.
3. The Tyra by-pass of Gorm "E" platform is not in use and is permanently closed.
4. Automatic sampling done via fast loop.
220 km 20” Pipeline (offshore)
GORM "E" Platform
2
EXHIBIT A The Transportation System A-2 GORM "E" Platform
P-117B/C/D/E/F
P-117A/G
WATER
LP FLARE
GO
RM
C
SKJOLD
DAGMAR
SV
EN
D
TY
RA
WE
ST
TR
YM
GO
RM
A
GO
RM
B
GO
RM
F
HA
RA
LD
DAN F
HALFDAN
M
37131
FT 37141
37151
MM
M
FAST
LOOP
Note 1
Note 2
V-3601 Note 1
FAST
LOOP
Note 3
FT 37111
FT 37121
FAST
LOOP
SPARE
OWNERSHIP OF THE
TRANSPORTER
Hejre
SAMPLE POINTS
OWNERSHIP of the
Sole Concession
OWNERSHIP of
the Hejre License
LIMIT OF OWNERSHIP
ROLF
Note 4
3
EXHIBIT A The Transportation System A-3 GORM E Fast Loop Setup (each stream + Spare)
DE
NS
ITY
W
AT
ER
CU
T
TT
PT
0,5
L R
EC
EIV
ER
0,5
L R
EC
EIV
ER
0,5
L R
EC
EIV
ER
0,5
L R
EC
EIV
ER
FT
10
L R
EC
EIV
ER
Pressurised Receivers
(Pressurised samples for Allocation)
Non-Pressurised
Receiver
(Dead Sample for
Value Adjustment) DE
NS
ITY
RVP
PI
P-117 Off-Shore Pipeline
20” Pipeline (onshore) 20” Pipeline (onshore)
FILSØ BOOSTER STATION
4
EXHIBIT A The Transportation System A-4 Filsø Booster Station
P-304-A/B/C/D/E
M
PC
FIC
5
EXHIBIT A The Transportation System A-5 Condensat injection line
NORTH FENCE
of Nybro Gas Treatment Plant
Transporter
4" CONDENSATE
INJECTION LINE
N2 PRESERVED
M
20" Pipeline (onshore) TO TERMINAL
LINE VALVE STATION
HELTOFT
(1)
PUMP
Notes:
1. Delivery Point from Nybro Gas Treatment Plant.
2. Condensate injection Line is decommissioned and filled with N2.
3. Pumps and Meter Runs are decommissioned but stored at Nybro Gas Treatment Plant.
(3)
(2)
Nybro Gas
Treatment Plant
BATTERY LIMIT
7
EXHIBIT A The Transportation System A-7 Line Valve Station Heltoft
PT PDT
CO
ND
EN
SA
TE
FR
OM
Nybro
Ga
s T
reatm
ent P
lant
PT
8
EXHIBIT A The Transportation System A-8 Terminal and Stabilisation Plant
DEWATER V-9501/2
STORAGE TANKS
T-9801-6
T-53/67/71
98LIT001-6/24/25
34L553/567/571
CRUDE OIL LOADING
P-9801A/B/C/D
ESD
SLOPS
T-9901/2
BUFFER
T-9929
WATER
TREATMENT
(LURGI)
TO SEWER TO LILLEBÆLT
TO JETTY
TO REFINERY
RECYCLE
P-9802
M,S
95FT002/012 99FT136A/B
95FT019/020
M,S M,S
P-9616A
P-9615A
NC
96FT059
COMPRESSOR
K-9601-1A/B
99FQ015
DEGASSER V-9601
SEPARATOR V-9606/8A/B
Fuel Gas EXPORT (LP )
P-9617/8A/B
ST
AB
ILIS
ER
C
-9401
DE
ET
HA
NIS
ER
C
-9402
DE
PR
OP
AN
ISE
R
C-9
403
M,S
M,S
Fuel Gas IMPORT (LP)
V-9301A-F
V-9302A-F
V-9205-7 LPG C3 STORAGE
V-9208 LPG OFF SPEC
V-9201-4 LPG C4 STORAGE
C5+
M,S M,S
M,S Fuel Gas EXPORT (HP)
LPG EXPORT JETTY
M,S
M,S
92FQI080A/B
92FQI070A/B
99FT053A/B
99FT052A/B
54FT145A/B
M
96FT086A/B HOT OIL
FURNACE
F-9601
The Stabilisation Plant The Pipeline
M,S
92LISA021-8
S
S
S
S
Note:
All water from separators
and columns return to
degassers (not shown).
Batt
ery
lim
it
JETTY
RE
DE
LIV
ER
Y
AT
FL
AN
GE
CO
NN
EC
TIO
N
FT
9
EXHIBIT A The Transportation System A-9 Terminal and Stabilisation Plant
DEWATER V-9501/2
STORAGE TANKS
T-9801-6
T-53/67/71
98LIT001-6/24/25
34L553/567/571
CRUDE OIL LOADING
P-9801A/B/C/D
ESD
SLOPS
T-9901/2
BUFFER
T-9929
WATER
TREATMENT
(LURGI)
RECYCLE
P-9802
M,S
95FT002/012 99FT136A/B
95FT019/020
M,S M,S
P-9616B
P-9615B
96FT072
COMPRESSOR
K-9601-1A/B
99FQ015
DEGASSER V-9604B
SEPARATOR V-9606/8A/B
P-9617/8A/B
ST
AB
ILIS
ER
C
-9401
DE
ET
HA
NIS
ER
C
-9402
DE
PR
OP
AN
ISE
R
C-9
403
M,S
M,S
V-9301A-F
V-9302A-F
V-9205-7 LPG C3 STORAGE
V-9208 LPG OFF SPEC
V-9201-4 LPG C4 STORAGE
C5+
M,S M,S
M,S
LPG EXPORT JETTY
M,S
M,S
92FQI080A/B
92FQI070A/B
99FT053A/B
99FT052A/B
54FT145A/B
M
96FT086A/B HOT OIL
FURNACE
F-9601
M,S
92LISA021-8
S
S
S
S
Note:
All water from separators
and columns return to
degassers (not shown).
The Stabilisation Plant The Pipeline Fuel Gas EXPORT (LP )
Fuel Gas IMPORT (LP)
Fuel Gas EXPORT (HP)
Batt
ery
lim
it
TO SEWER TO LILLEBÆLT
TO REFINERY
M,S
NC 99FQ015
TO JETTY JETTY
RE
DE
LIV
ER
Y
AT
FL
AN
GE
CO
NN
EC
TIO
N
FT
96FT059
10
EXHIBIT A The Transportation System A-10 Degassing Facilities
DEGASSER
V-9601
DEGASSER
V-9604B
E-9605B/D E-9605F/H
E-9605A/C E-9605E/G
From LDS metering Crude Oil to storage
Off Gas to Stabilisation Plant
P-9616A
P-9615A
P-9616B
P-9615B
Sour water to treatment
M
M
NC
NC
99FT136B
99FT136A
E-9606A
E-9606B
HTF Supply/return
HTF Supply/return
Degassing Facility 1
Th
e P
ipelin
e
Th
e S
tabili
satio
n P
lant
Sour water return
from Stabilisation
Plant
Sour water return
from Stabilisation
Plant
Degassing Facility 2
Notes:
1. Battery limit
2. E = Heat Exchanger
3. V = Vessel
96FT072
11
EXHIBIT A The Transportation System A-11 The Stabilisation Plant (Flare)
M Fuel Gas FROM SHELL REFINERY
PILOT GAS
FROM HP STEAM DISTRIBUTION (IMPORT FROM REFINERY)
FROM KO-DRUM
PURGE GAS
97 FT 052
97 FT
050A
97FT090
Note:
1. 97FT050A High Range
2. 97FT050B Low Range 97 FT
050B
FLARE GAS RELEASE
Used by Shell only The Stabilisation Plant
12
EXHIBIT A The Transportation System A-12 LPG Loading Facilities
SHIPS MANIFOLD
SHIPS MANIFOLD
Z-8406
JETTY 1
Z-8420
JETTY 2
JE
TT
Y A
RE
A
OU
TS
IDE
FE
NC
E
OU
TS
IDE
FE
NC
E
Shell
Refin
ery
FROM LPG Butane STORAGE
FROM LPG Propane STORAGE
P-9202
1)
P-9201
1)
1)
1)
Notes:
1. Redelivery Point(s)
2. Battery limit(s)
Propane/Butane Refinery import/export
Shell Refinery
6" Pipe line
approx. 7 km
DONG Property