excavations for foundations and all reinforcing must be ......minimum concrete cover: bases 75mm...
TRANSCRIPT
DN
DN
DUCT
SE
RV
ICE
DU
CT
S
INFORMATION COUNTER
SE
RV
ICE
DU
CT
SE
RV
ICE
D
UC
T
KITCHEN
ELECTRICALWATER
PARA
PARA
LIFT
SE
RV
ICE
DU
CT
FIRE EXISTFIRE EXIST
LIFT
Wellness area
ElectricStairs
REGISTRATION CUBICLES
REGISTRATION CUBICLES
12
PHASE 2
PHASE 1
Remove existing carpet and pour self levelling screed to match with top of existing tiles
Use self levelling screed on top of existing floor tiles to even out grout joints
Remove existing cubicles & retain timber longer than 2m
Demolish 220mm brick wall
Remove bathroom fittings
Remove suspended ceilings
Keep existing drywall
Remove existing kitchen fittings
Build temporary drywall
Remove existing cubicles & retain timber longer than 2m
Demolish existing curtain walling
Demolish existing 220mm brick wall
Remove suspended ceilings
For Bathrooms - remove existing:floor finishesceilingswall tilesvanitiesall sanitary fixturesall sanitary fittings
Add temporary drywall in front of existing doors
Keep existing door
1070
C
WD002
ELECTRICAL DATA
DUCT
SE
RV
ICE
DU
CT
ELECTRICALWATER
LIFT
SE
RV
ICE
DU
CT
LIFT
27 m²BOARD ROOM 1
Carpet B
27 m²BOARD ROOM 2
Carpet B
28 m²BOARD ROOM 4
Carpet B
15 m²Hot Desking 1
Carpet B
15 m²Hot Desking 2
Carpet B
49 m²MECHANICAL STORE
?20 m²
Director's office
Carpet B
20 m²VP's office
Carpet B
43 m²CONFRENCE ROOM
Carpet finish
37 m²Breakaway room
Carpet B
54 m
²C
OU
RIE
R/ S
TOR
E R
OO
M
?
62 m²STORE 4
Vinyl tiles
81 m²
MANAGERS & Working Stations 7(8)
Carpet A
16 m²STORE 2
Vinyl Tiles
8 m²STORE 3
Vinyl Tiles
83 m²Supervisor desks
Carpet A
6 m²KITCHENETTE 1
Tiles
Red
unda
nt R
oom
GO
OD
SLI
FT
?
10 m²security
Existing flooring
Undercover Exterior outside area
cupb
oard
Extractor fans
PRE PHASE 1 : Erect temporary dry walls in PH1Erect temporary drywalls in PH2
PHASE 1b: Installation of 1. Board room 1-7 2. Managers desks 3. Store room 1-4 4. Secretary 5. Directors office 6. Conference room 7. Waiting room 8. Reception
PHASE 2a: Removal of existing temporary dry walls in PH2Removal of existing cublicles Removal of Wellness centre.
PHASE 2: Installation of 1. Store room 5
2. Break away room 3. Cutting room
4. Working stations5. Supervision desks
PHASE 1a : Removal of existing cublicles
PH1 PH2
Temporary dry walls
Temporary storage spaceduring PH1
90mm Aluminium stud dry walling
110/220mm brick wall
A
WD002
B
WD002
Floor finish Legend
Tiles
Vinyl
Vinyl tiles
Carpet A
Carpet B
Fea
ture
wal
l : w
ood
chip
fin
ish
with
pow
der
coat
ed a
lum
inum
ang
les
arou
nd c
orne
rs
3 m²STORE 1
Vinyl tiles
19 m²Room
Carpet A
90 m²Managers
Carpet A
43 m²Work stations 1 (8)
Carpet A
93 m²Work Stations 2 (20)
Carpet A
113 m²Work Stations 3 (24)
Carpet A
110 m²Work Stations 4 (24)
Carpet A
106 m²Working Stations 5 (20)
Carpet A
34 m²Working Stations 6 (8)
Carpet A
388 m²Walkways
Vinyl tiles
138 m²Sorting Station 1 (54)
Carpet A
96 m²Sorting Station 2 (40)
Carpet A
49 m²CUTTING ROOM
Vinyl Tiles
244 m²Walkways
Vinyl Tiles
27 m²BOARD ROOM 3
Carpet B
55 m²Reception & Waiting rm1
Vinyl
2770 2200
3030
8909
4650
9 m²Kitchenette 2
Tiles
4 m²Kitchenette 3
Tiles
6 m²Ext. Bath F
Tiles
6 m²Ext Bath M
Tiles
17 m²Int Bath F
Tiles
3 m²Para
Tiles
1110
1762
1762
11805 2603 6397 2559
4154
2247
1285
8133
Kerestar
Floorworx: Tempo
Floorworx: Forbo
Belgotex: Fringe
Belgotex: Atlantis
Materiality Range
Concrete fuse
Washed Elm
Traditional brushed oak
Belgotex: Fringe
Clear Bubble
Colour
D01D01
D01
D02D02
D02
D02D02
D02
D02
D02
D02
SF
06SF
06
SF
01
SF
06SF
06
D02
D02
D03
D04
SF
02
SF
03 SF
04
SF
01
SF
05
SF
07
22 m²Int Bath M
Tiles
3 m²Para
Tiles
D05
D05
D05
D06
D06
D05
D05
D05
D05
D05
D05
D05
D05
D05
D05
D08
W01W01W01W01
3
WD001
90 m²Waiting rm2, passage
Vinyl
11 m²Secretary
Vinyl
cupboard
cupboard 13 m²Secretary
Vinyl
D02
D03
D08
D08
SF
08 SF
09
102 m²Foyer
Vinyl Tiles
D07
cupboard cupboard cupboard cupboard
cupboard
0mm
2400mm2700mm3000mm Project Address :
Project Description:
Drawing Name:
Project Number:
Drawing Number: Rev. Number:
Scale:
Drawn by:
Checked by:
Date:
Route 21 Corporate Park, Block D63 Regency Drive Irene,
Centurion, 0157 South AfricaTel: (+27)12 345 6694, Fax: (+27)12 345 6813
E-mail: [email protected],Web: www.phunga.co.za
Project Name:
Building Name:
NOTES:Excavations for foundations and all reinforcing must be approved by the engineer before any concrete is cast.All bases are symmetrical about the center lines unless otherwise shown.Specifications:Reinforced concrete work SABS 1200gStructural steel work SABS 1200hPointwork on steel SABS 1200hConcrete work: all brickwork are load bearing and must be completed before commencing with the construction of the concrete slab.Minimum concrete cover:Bases 75mmColumns 40mmBeams 25mmSlabs 12mm or dia.Concrete: all ready mixed concrete will only be approved if a mix design and cement grading by SABS is submitted to the engineer.Test cubes minimum must be tested by an independant soil laboratory.All imported cement approved by SABS must be approved by the engineer on the bases of;All cement must be bought in one batch and treated to SABS 1200g.A mix design must be submitted.4 sets of 3 test cubes must be submitted with age of testing as follows:
3 cubes @ 7days3 cubes @ 14days3 cubes @ 21days3 cubes @ 28days
Concrete cube strength at 28 days:Blinding 15MPaFoundations 20MPaColumns 25MPaBeams 25MPaSlabs 25MPa
1.
2.
3.
4.
5.
6.
7.
8.
9.
GENERAL NOTES:
FIGURED DIMENSIONS ONLY TO BE USED.
COORDINATES BASED ON MSL DATUM.
DISCREPANCIES. ERRORS AND OMISSIONS ARE TO BE REPORTED TO ENGINEERS IMMEDIATELY THEY BECOME EVIDENT.
SHOP DRAWINGS TO BE SUBMITTED FOR APPROVAL PRIOR TO MANUFACTURE OR INSTALLATION.
COPYRIGHT AND RIGHT OF REPRODUCTION OF THIS DRAWING OR ANY PORTION THEREOF IS RESERVED.
Revision Date Issued for Approved
Client:
Discipline Signature Pr. Number Date
Architecture
Engineering
Client
Preliminary
Information
Tender Contract
Measurement
Construction
Approval
Signature of Approval: Date:
1 : 200
UNISA Interior
Floorplan
19/04/18
WD001
M Brand
P du Plessis
Additions and Alterations
UNISA ( Cas van Vuuren Building)
1 : 200001 Demolision drawing
1 : 200002 Phase 1&2 Alterations
1 : 200Section001
05