Page 1: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Excavation Below Subgrade (EBS)

Topic G

Topic G

Page 2: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

EBS• QC/QV personnel do not

determine/direct EBS operations.

• Engineer ultimately determines the need for EBS.

Topic G

Page 3: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

EBS• Remove objectionable materials.

• Resulting excavation is then back filled with soil.

• Figure 3.1

Topic G

Page 4: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.1: Intercepting Embankment

Topic G

Page 5: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Predicting EBS Areas

• Groundwater levels = 3 feet or less.• Silty “B” horizon.• Topsoil depths exceed 12 inches.• Moisture levels above plastic limit.• Depositional characteristics (alluvial,

lacustrine).

Topic G

Page 6: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Predicting EBS Areas

• Roadway constructed prior to 1940.• Extensive filling.• Roadway is distressed.• Highly variable soil conditions exist.• Subgrade is within 2 ft. of original

surface.

Topic G

Page 7: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.2: Detail of EBS

Topic G

Page 8: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

EBS

• Remove uncertain soil.• Note the diagonal rutting= unstable silt.• In addition to excavation.

Topic G

Page 9: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.3: EBS

Topic G

Page 10: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Topic I

Page 11: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Rutting of Unstable Material

• Transition from cut to fill are important.• Inspect before the subbase or base.• Rutting of unstable material shown.

Topic G

Page 12: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.4: Rutting of Unstable Material

Topic G

Page 13: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

EBS

• Yielding water-bearing silt.• Rock truck-hauling material away.• Backhoe-Loading EBS material out.• Dozer-Pushing material to backhoe.

Topic G

Page 14: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.5: EBS

Topic G

Page 15: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Backfilling EBS

• EBS has to be measured.• Original section is template in the cross.• Final section–How much was excavated.

Topic G

Page 16: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.6: Backfilling EBS

Topic G

Page 17: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

EBS

• Do not do EBS when rain is imminent.

• Do not leave EBS excavation open over night.

Topic G

Page 18: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Topic I

Page 19: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.7: EBS

Topic G

Page 20: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.8: Loading Unstable Material

Topic G

Page 21: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Backfilling EBS

• Careful placement and compact backfill.

• Use similar materials in area.

Topic G

Page 22: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.9: Backfilling EBS

Topic G

Page 23: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Organic & Silty Soils

• Have foundation support for equipment.

Topic G

Page 24: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.10: Organic & Silty Soils

Topic G

Page 25: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Seepage in a Cut

• Must correct area like this.• Ditches may work.–Riprapping–Underdrains

• Vegetation will not grow.

Topic G

Page 26: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.11: Seepage in a Cut

Topic G

Page 27: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Dust Abatement

• Required to minimize dust. • Use water or dust control materials.

Topic G

Page 28: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.12: Dust Abatement

Topic G

Page 29: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Stone Piles & Fences

• Large rocks outside the shoulder point.

Topic G

Page 30: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.13: Stone Piles & Fences

Topic G

Page 31: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Marsh Excavation

• Picture 2:–Excavated marsh either cast out or

loaded into marsh.–Used for deeper marshes.

• Dragline works slower then backhoe.

Topic G

Page 32: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.14: Marsh Excavation 1

Topic G

Page 33: Excavation Below Subgrade (EBS) Topic G. EBS QC/QV personnel do not determine/direct EBS operations. Engineer ultimately determines the need for EBS

Figure 3.15: Marsh Excavation 2

Topic G