excavation and shoring design
TRANSCRIPT
EXCAVATION AND SHORING DESIGN
Since 2001 our firm has designed over 500 excavation systems for shallow, deep and drop-shaft
designs. We routinely work with the Board of Underground.
Our Services Include:
Excavation Certification
Board of Underground Designs
Braced Sheet Piling Design
Soldier Pile Design
Tie-Back Systems
Mechanically Stabilized Earth
Retention Systems
Construction Observation Services
"Peer" Engineering Review
Services
Excavation Cost Estimates
Typical braced sheeting system to achieve an
excavation depth less than 12'-0" depth. Chicago, IL
Above - Basement level wall bracing design for The Park in Rosemont. Thrust resistance from
wall was designed using helical anchors grouping diagonally embedded in the soil.
Left – Bracing for 4 story condominium on
N. Fremont Avenue in Chicago.
Above Left - Wall bracing to create resistance for lateral soil pressure at The Park in Rosemont. Diagonals
shown resist tension forces. Above Right - Overview of wall bracing installed to resist forces from soil backfill
at The Park in Rosemont.
Left - Structural engineering design for a
two level below grade double-braced
shoring system along Broadway Ave. in
Chicago. Excavation depth exceeded
22’-0” to accommodate a below grade
garage.
Left - Cary, IL - Earth retention
system for Fienburg Court
Roadway.
Grade differential varied to a
maximum of 16'-0".
Retention system designed to
meet all IDOT live load criteria.
Left - Construction begins on
excavation site.
J. V. Henik, Inc. - Structural
Engineering Services provides
construction phase services.
Construction services should
begin early on before excavation
begins to document site
conditions.
Above - Mechanically Stabilized Earth Wall with 14'- 0" Grade Differential - Glencoe, IL
Left – Example of structural
documents provided for
residential shoring design for a
new 20’-0’ wall opening on
Mohawk Avenue Chicago IL
Below and Right - Glen Ellyn Residential
Renovation – Shoring Design and installation of new
flitch beam design in 16’-0” masonry facade.
Left – Northbrook, IL
– Soldier Pier and
wood lagging system
designed for Ancient
Tree Condominiums.
Above Left- North Milwaukee Avenue – Chicago. Earth retention system with an excavation depth
greater than 12’-0” required Board of Underground review. Above Right – Chicago - Design based
on Board of Underground criteria for a mat foundation. Included structural design for condominium
and retail facility. Excavation depth was also greater than 12'-0" Board of Underground was required.
Left – Cantilever sheeting design and
installation for retention of soil at pond at
the Ancient Tree Condominium Complex
in Northbrook, IL