Page 1: Example Plumbing, Sewage & Fire Calculation

TABLE OF CONTENTS DESCRIPTION

1. POTABLE WATER DEMAND CALCULATION 01- 06

2. SEWAGE FLOW CALCULATION0 07- 09

3. FIRE FIGHTING WATER DEMAND CALC. 10-11

Page 2: Example Plumbing, Sewage & Fire Calculation

1. POTABLE WATER BRANCH MAINS CALCULATION:

1A.) WATER FIXTURE UNIT VALUES (WFUV): WATER FIXTURE UNIT VALUES (WFUV) WERE BASED ON 2012 UNIFORM PLUMBING CODE (UPC); APPENDIX A, TABLE A-2, WATER FIXTURE UNIT VALUES,

DESCRIPTION

NO.

WFU VALUE

SUB-TOTAL

WC-1 (Staff/ Public use)

2

Refer attachment for Flush Valve

70

LAV-1 (Staff/ Public use)

2

1

2

LAV-2 (Staff/ Public use)

2

1

2

SK-1 (Commercial use)

1

1.5

1.5

TOTAL WFUV = 75.5

Page 3: Example Plumbing, Sewage & Fire Calculation

1B.) POTABLE WATER DEMAND / BRANCH MAIN SIZE: FROM DEMAND LOAD CHART, FOR SYSTEM PREDOMINANTLY FLUSH VALVE; (2009 INTERNATIONAL PLUMBING CODE (IPC), TABLE E103.3(3), TABLE FOR ESTIMATING DEMAND)

@ TOTAL WFUV = 75.5 FU WATER DEMAND = 60 Gpm

USING HAZEN WILLIAMS FORMULA (Pipe Friction Formula);

USE (pipe size) ; 50 mm VELOCITY = 5.74 fps FRICTION LOSS = 5.6 ft/100ft. = 2.43 psi/100ft.

1C.) REFERENCE ATTACHMENT:

Page 4: Example Plumbing, Sewage & Fire Calculation
Page 5: Example Plumbing, Sewage & Fire Calculation
Page 6: Example Plumbing, Sewage & Fire Calculation
Page 7: Example Plumbing, Sewage & Fire Calculation
Willis
Rectangle
Page 8: Example Plumbing, Sewage & Fire Calculation

2. SEWAGE FLOW CALCULATION:

2A.) TOTAL DRAINAGE FIXTURE UNIT VALUES (DFUV): DRAINAGE FIXTURE UNIT VALUES (DFUV) WERE BASED ON 2012 UNIFORM PLUMBING CODE (UPC); TABLE 702.1, DRAINAGE FIXTURE UNITS

DESCRIPTION

NO.

WFU VALUE

SUB-TOTAL

WC-1 (Staff/ Public use)

2

4

8

LAV-1 (Staff/ Public use)

2

1

2

LAV-2 (Staff/ Public use)

2

1

2

SK-1 (Commercial use)

1

2

2

FD-1

4

2

8

TOTAL DFUV = 22

2B.) TOTAL SEWAGE FLOW: FROM NBS NOMOGRAM;

@ TOTAL DFUV = 22 FU DRAINAGE FLOW = 37 GPM

2C.) REFERENCE ATTACHMENT:

Page 9: Example Plumbing, Sewage & Fire Calculation
Page 10: Example Plumbing, Sewage & Fire Calculation
Page 11: Example Plumbing, Sewage & Fire Calculation

3. FIRE FIGHTING:

3A.) TOTAL WATER DEMAND: ADDITIONAL FLOOR AREA = 2206 Ft² HAZARD CLASSIFICATION = ORDINARY HAZARD (due to additional floor only) Note : Area of Operation (AOP) = 2206 ft² Density (DD) = .15 gpm/ft² Overall Factor (OVF) = 1.1 The sprinkler water demand = AOP X DD X OVF = 2206 x .15 x 1.1 = 365 gpm From Table 11.2.3.1.1, for a ordinary hazard, the HSD (Combined) = 250 GPM. Thus, TOTAL WATER DEMAND = 365 + 250 GPM = 615 GPM TOTAL WATER DEMAND IN 60 MINUTES = 615 x 60 min = 36900 Gallons. 3B.) REFERENCE ATTACHMENT:

Page 12: Example Plumbing, Sewage & Fire Calculation
Willis
Typewritten Text
Pipe sizing ordinary & Light Hazard: NFPA 13 SPRINKLER SYSTEM 2002: PAGE 381
Willis
Typewritten Text
Willis
Typewritten Text
Willis
Typewritten Text