Step 1) Calculate the pressure derivative functions of the well-test data (tabulated in table 4.11)h= 78 ft
= 1 cp t (hrs) pws (psi)
q= 600 STB/D 0 250
pwf= 250 psia 0.0001 254.09
= 0.2 0.0002 258.16
B= 1.1 RB/STB 0.0005 270.3
p bar= 2447 psia 0.0008 282.33
rw= 0.365 ft 0.0010 290.29
ct= 1.61E-05 psi^-1 0.0030 367.39
tp= 1400 hrs 0.0050 440.4
0.0080 542.99
0.0100 607.11
0.0160 780.68
0.0255 1005.1
0.0406 1263.2
0.0649 1515.6
0.1040 1714
0.1650 1837
0.2640 1907.4
0.4210 1950
0.6720 1983.21.0700 2013.5
1.7100 2043.1
2.7300 2072.1
4.3600 2100.7
6.5000 2124.9
10.5000 2153.7
15.1000 2175.4
20.0000 2192
25.0000 2205.2
30.0000 2215.9
35.0000 2225
40.0000 2232.8
45.0000 2239.6
50.0000 2245.7
55.0000 2251.2
60.0000 2256.2
65.0000 2260.8
70.0000 2265
72.0000 2266.6
Table 4.10- Pressure Buildup Test Data
-
8/12/2019 ex 4.4 and 4.5
2/13
80.0000 2272.6
Step 2) Plot tep' and p as functions of te on log-log graph
Step 3) We align the horizontal portion of the later-time derivative data for te>0.672 hour with (tD/CD)pD'=
1
10
100
1000
10000
0.1
1
10
100
1000
10000
0.0100 0.1000 1.0000 10.0000 100.0000
pressure change vs equivalent
time
pressure derivative vs.
equivalent time
-
8/12/2019 ex 4.4 and 4.5
3/13
Step 4) We then align the data points exhibiting a unit slope, te
-
8/12/2019 ex 4.4 and 4.5
4/13
te (hrs)= t/(1+t/tp) p (psi) tep' = te* dPws/d(te)
0.0000 0 0
0.0001 4.09 5.8718
0.0002 8.16 9.049
0.0005 20.3 21.41
0.0008 32.33 35.762
0.0010 40.29 44.832
0.0030 117.39 119.84
0.0050 190.4 182.17
0.0080 292.99 268.64
0.0100 357.11 317.26
0.0160 530.68 425.64
0.0255 755.1 518.27
0.0406 1013.2 546.56
0.0649 1265.6 479.59
0.1040 1464 342.82
0.1650 1587 208.69
0.2640 1657.4 120.45
0.4209 1700 81.174
0.6717 1733.2 68.0941.0692 1763.5 64.192
1.7079 1793.1 62.642
2.7247 1822.1 61.664
4.3465 1850.7 61.021
6.4700 1874.9 60.641
10.4218 1903.7 60.329
14.9389 1925.4 60.127
19.7183 1942 60.014
24.5614 1955.2 60.031
29.3706 1965.9 59.989
34.1463 1975 59.941
38.8889 1982.8 59.858
43.5986 1989.6 59.94
48.2759 1995.7 59.787
52.9210 2001.2 59.774
57.5342 2006.2 59.799
62.1160 2010.8 59.808
66.6667 2015 59.914
68.4783 2016.6 59.98
Table 4.11-Pressure and Derivative Plotting Functions
-
8/12/2019 ex 4.4 and 4.5
5/13
75.6757 2022.6 59.834
.5 on the derivative type curve.
pressure change vs equivalent time
pressure derivative vs. equivalent time
-
8/12/2019 ex 4.4 and 4.5
6/13
-
8/12/2019 ex 4.4 and 4.5
7/13
Step 1) Calculate Pressure Derivative Functions. Tabulated in Table 4.13
h= 21 ft Table 4.12-Pressure Buildup Test D
tp= 2000 hrs t (hrs)
g= 0.03274 cp 0
pi= 9000 psia 0.01
rw= 0.365 ft 0.0149
qg= 100 Mscf/D 0.0221
ct= 4.54E-05 psia^-1 0.0329
pa,i= 7366.1 psia 0.0489
= 0.1 0.0728
T= 670 R 0.108
g= 0.6 0.161
z= 1.31 0.24
Bg= 0.491 RB/Mscf 0.356
0.53
0.788
1.17
1.74
2.59
3.86
5.748.53
12.7
18.9
28.1
41.8
62.1
92.4
137
204
304
452
672
1000
Step 2) Plot adjusted pressure change (pa) and adjusted pressure derivative (taepa') vs. ad
10000
-
8/12/2019 ex 4.4 and 4.5
8/13
Step 3) Using the Bourdet et al. type curves, match both pa and taepa' in the vertical direc
1
10
100
1000
0.001 0.01 0.1 1 10 100 1000
adjusted
equivalen
adjusted
adjusted
1
10
100
1000
10000
100000
0.1 1 10 100
-
8/12/2019 ex 4.4 and 4.5
9/13
Step 4) We can calculate CDusing a point (tae,pa)USL from the unit-slope line of the pressu
We choose (tae=.01528 hours and pa=21.010psi) and calculate:
CD= 1.05E+02
Step 5) A good match of the curves is characterized by the correlating parameter CDe2s
=10^2
Step 6) From the match shown in the graph, we obtain a pressure match point of pa=3800ps
Step 7) From the pressure match point, the permability is :
k= 0.028444 md
Step 8) Calculate the dimensionless wellbore storage coefficient, CD from the time match poin
CD= 1.08E+02
This agrees with the value calculated from the USL.
Step 9) Estimate the skin factor with the value of CDand the correlating parameter:
s= -3.78E-02
-
8/12/2019 ex 4.4 and 4.5
10/13
ata, Example 4.5 Table 4.13
pws (psia) pa=pa,ws-pa,wf te (hrs)= t/(1+t/tp)
6287.1 0 0
6296.6 9.6426 0.00999995
6301.1 14.21 0.014899889
6307.8 21.01 0.022099756
6317.7 31.059 0.032899459
6332.1 45.675 0.048898804
6353.1 66.99 0.07279735
6383.5 97.85 0.107994168
6427.1 142.12 0.160987041
6488.6 204.56 0.239971203
6573.6 290.87 0.355936643
6687.9 406.93 0.529859587
6834.7 556.02 0.78768965
7011.8 736 1.16931595
7208.3 935.76 1.738487516
7405.9 1136.6 2.586650288
7586 1319.6 3.85256455
7738.7 1474.6 5.7235733457864.9 1602.5 8.493774054
7971.4 1710.5 12.61986386
8065.6 1805.8 18.72306702
8153.2 1894.3 27.71066515
8234.4 1976.5 40.94426486
8313.4 2056.3 60.22986276
8389.8 2133.4 88.31963296
8463.7 2207.9 128.2171268
8534.9 2279.6 185.1179673
8602.9 2348 263.8888889
8666.6 2412 368.6786297
8725.3 2498.1 502.994012
8777.6 2523.5 666.6666667
justed equivalent time (tae) on log-log paper
-
8/12/2019 ex 4.4 and 4.5
11/13
tion.
ressure change vs. adjusted
t time
ressure derivative vs.
quivalent time
1000 10000
adjusted pressure change vs. adjusted
equivalent time
adjusted pressure derivative vs. adjusted
equivalent time
-
8/12/2019 ex 4.4 and 4.5
12/13
e-change data.
i and pD=10 and a time match point of tae=0.27 hr and tD/CD=0.1
t:
-
8/12/2019 ex 4.4 and 4.5
13/13
tae=ta/(1+ta/tp) taepa'
0
0.0069 11.442
0.0103 14.35
0.0153 21.194
0.0228 30.993
0.0339 45.022
0.0505 65.568
0.0751 93.656
0.1125 132.03
0.1685 184.69
0.2519 249.29
0.3789 323.68
0.5711 399.43
0.8631 456.53
1.3114 476.88
1.9993 454.02
3.0545 400.08
4.6507 337.577.0594 282.93
10.704 245.2
16.167 224.2
24.31 209.96
36.439 201.32
54.31 197.48
80.629 194.43
118.42 191.57
172.93 188.26
249.23 186.43
351.85 228.46
484.97 173.32
648.68 182.19