evaluation of energy storage as a transmission asset · esa_charge mwh esa_discharge mwh esb_charge...

13
PRESENTED BY Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525. EVALUATION OF ENERGY STORAGE AS A TRANSMISSION ASSET Tu A. Nguyen and Raymond H. Byrne 2020 DOE OE Energy Storage Peer Review

Upload: others

Post on 18-Jan-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EVALUATION OF ENERGY STORAGE AS A TRANSMISSION ASSET · ESA_charge MWh ESA_discharge MWh ESB_charge MWh ... 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1

P R E S E N T E D B Y

Sandia National Laboratories is a multimission

laboratory managed and operated by National

Technology & Engineering Solutions of Sandia,

LLC, a wholly owned subsidiary of Honeywell

International Inc., for the U.S. Department of

Energy’s National Nuclear Security

Administration under contract DE-NA0003525.

EVALUATION OF ENERGY STORAGE AS A

TRANSMISSION ASSET

Tu A . Nguyen and Raymond H. Byr ne

2020 DOE OE Energ y S to rage Peer Rev iew

Page 2: EVALUATION OF ENERGY STORAGE AS A TRANSMISSION ASSET · ESA_charge MWh ESA_discharge MWh ESB_charge MWh ... 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1

PROJECT OBJECTIVE2

Objective: this task is to evaluate the benefits of energy storageproviding virtual transmission capacity to relieve congestion inwholesale market settings.Methodology: the task is performed by developing an optimization tomaximize the monetized benefits of energy storage providing virtualtransmission together with market-based services.

Outlines:• Overview of transmission congestion cost• Virtual transmission by energy storage• Virtual transmission vs. upgrade deferral• Virtual transmission vs. transmission upgrade• Case study in ISO-NE

Page 3: EVALUATION OF ENERGY STORAGE AS A TRANSMISSION ASSET · ESA_charge MWh ESA_discharge MWh ESB_charge MWh ... 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1

OVERVIEW OF TRANSMISSION CONGESTION COST3

• Congestion occurs when there is insufficient transmissioncapacity to deliver cheaper generation to loads, requiring theuse of more expensive generators closer to loads.

• In vertically integrated utilities, congestion leads to highertotal production cost.

• In ISO/RTO whole sale markets, congestion creates differencesin LMPs at different locations.

MISO Real time LMP on 09/14/2020 -12pm

Source: PJM

Page 4: EVALUATION OF ENERGY STORAGE AS A TRANSMISSION ASSET · ESA_charge MWh ESA_discharge MWh ESB_charge MWh ... 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1

OVERVIEW OF TRANSMISSION CONGESTION COST4

Reference: Lesieutre, Bernard C, and Eto, Joseph H.Electricity transmission congestion costs: A review ofrecent reports. United States: N. p., 2003. Web.doi:10.2172/821764.

Unconstrained Case 100MW constrained line

Increased

production

cost

Vertically Integrated

Utilities

Wholesale Markets

Paid to BPaid to APaid to A

Paid to B

Congestion

revenue LMPA=LMPB=25

LMPA=23 LMPB=30

• In VTU:• congestion cost is the increase in

production cost due to congestedtransmission.

• congestion cost is passed to theloads.

• In markets:• congestion cost can be the system

redispatch cost, the congestionrevenue or combination of the two.

• congestion cost is returned to theloads through Auction RevenueRights (ARR) and FinancialTransmission Rights (FTR).

Page 5: EVALUATION OF ENERGY STORAGE AS A TRANSMISSION ASSET · ESA_charge MWh ESA_discharge MWh ESB_charge MWh ... 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1

OVERVIEW OF TRANSMISSION CONGESTION COST5

• Congestion costs in ISO/RTO markets tend to increase over the last few years• This indicates the need for upgrading transmission lines or putting cheaper

generators in congested areas.• This also creates opportunity for non-wire alternatives for transmission congestion

relief.

Image Credit: Monitoring Analytics – 2019 PJM Market Annual Report

Congestion Cost in ISO/RTO Markets

(Millions $)

Page 6: EVALUATION OF ENERGY STORAGE AS A TRANSMISSION ASSET · ESA_charge MWh ESA_discharge MWh ESB_charge MWh ... 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1

VIRTUAL TRANSMISSION BY ENERGY STORAGE6

ESSA ESSB

100MW

100M

W

100M

W

• ESSs are placed at both ends of a line, providing both cost-based transmission andmarket-based services:• when the line is congested, ESSs simultaneously charge and discharge mimicking line flow and

support voltage stability to further increase line dynamic rating.• when the line is not congested, ESSs provide other market services

• In line with FERC’s 2017 policy statement “Utilization of Electric Storage Resourcesfor Multiple Services When Receiving Cost-Based Rate Recovery” (PL17-2).

• ISO/RTOs in the US are investigating the opportunities under Storage asTransmission Assets Frameworks.

200MW 200MW

Page 7: EVALUATION OF ENERGY STORAGE AS A TRANSMISSION ASSET · ESA_charge MWh ESA_discharge MWh ESB_charge MWh ... 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1

EVALUATION OF STORAGE AS VIRTUAL TRANSMISSION7

• Maximize the benefits from cost-base services together with market-basedservices:• Congestions relief: maximize opportunity for upstream generators to sell more energy at

higher prices; minimize overall congestion cost• Market activities: energy arbitrage, ancillary services

• Evaluate the impact of virtual transmission in transmission planning: reduce theamount of transmission to meet N-1 security requirement.

Image Credit: FLUENCE- Storage as Transmission White Paper

Page 8: EVALUATION OF ENERGY STORAGE AS A TRANSMISSION ASSET · ESA_charge MWh ESA_discharge MWh ESB_charge MWh ... 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1

VIRTUAL TRANSMISSION VS.TRANSMISSON UPGRADE8

• Faster to deploy• Smaller foot print• More flexible and relocatable• Providing multiple services• Shorter life (10-15 years)

• Longer to get permitted andbuild.

• Need much more land• Fixed assets• Longer life (~50-60 years)

Page 9: EVALUATION OF ENERGY STORAGE AS A TRANSMISSION ASSET · ESA_charge MWh ESA_discharge MWh ESB_charge MWh ... 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1

A CASE STUDY in ISO-NE9

Congested

Line

• Congestions make the marginal wind plant in region A curtail its output.• Congestion component of LMP are negative indicating that if the congestions are

relieved, more wind energy in region A can be sold to region B at higher LMPs• In this case study:

• Maximize the revenue for generators in region A by using storage as virtual transmission.• Compare with arbitrage benefit from wind curtailment.

0

5

10

15

20

25

30

35

40

45

1

382

763

1144

1525

1906

2287

2668

3049

3430

3811

4192

4573

4954

5335

5716

6097

6478

6859

7240

7621

8002

8383

2019 Wind Curtailment MW

Page 10: EVALUATION OF ENERGY STORAGE AS A TRANSMISSION ASSET · ESA_charge MWh ESA_discharge MWh ESB_charge MWh ... 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1

0

5

10

15

20

25

30

35

40

45

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

10MW/20Wh Case - Charge/discharge 24h Profile Example

ESA_charge MWh ESA_discharge MWh ESB_charge MWh

ESB_discharge MWh Curtail After MWh Curtail Before MWh

CASE STUDY – RESULTS10

LMPA increases $5/MWh

at hour 18 due to 10MW

congestion Relief

-40.00

-20.00

0.00

20.00

40.00

60.00

80.00

100.00

1

252

503

754

1005

1256

1507

1758

2009

2260

2511

2762

3013

3264

3515

3766

4017

4268

4519

4770

5021

5272

5523

5774

6025

6276

6527

6778

7029

7280

7531

7782

8033

8284

8535

10MW/20Wh Case- LMP Improvement in $/MWh

-10000

-5000

0

5000

10000

15000

20000

25000

30000

35000

1245

489

733

977

1221

1465

1709

1953

2197

2441

2685

2929

3173

3417

3661

3905

4149

4393

4637

4881

5125

5369

5613

5857

6101

6345

6589

6833

7077

7321

7565

7809

8053

8297

8541

10MW/20MWh Case - Region A Revenue Increase ($)

Total Revenue Increase = $850K vs.

Curtailment Utilization = $302K

$-

$500,000.00

$1,000,000.00

$1,500,000.00

$2,000,000.00

$2,500,000.00

$3,000,000.00

$3,500,000.00

0 50 100 150 200 250 300 350 400 450

Congestion Relieve Revenue $ vs. ESS size

10MW 20MW 30MW 40MW

Page 11: EVALUATION OF ENERGY STORAGE AS A TRANSMISSION ASSET · ESA_charge MWh ESA_discharge MWh ESB_charge MWh ... 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1

OUTCOMES AND NEXT STEPS11

Outcomes:• A conference paper for 2021 IEEE PES General Meeting.• A presentation for a panel session at 2021 IEEE ISGT.

Next steps:• Study the stacked benefit of ES providing virtual transmission,

energy arbitrage and ancillary services.• Investigate the voltage stability support from ESS while providing

virtual transmission and the impact on dynamic line rating.• Investigate the large scale impact of storage as virtual

transmission on ISOs/RTOs markets.

Page 12: EVALUATION OF ENERGY STORAGE AS A TRANSMISSION ASSET · ESA_charge MWh ESA_discharge MWh ESB_charge MWh ... 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1

ACKNOWLEDGEMENTS

Funding provided by US DOE Energy Storage Program managed by Dr. Imre Gyuk ofthe DOE Office of Electricity.

Analytics Team:

•David Rosewater

•Rodrigo Trvezan

•Alvaro Furlani Bastos

•Hyungjin Choi

•Ujjwol Tamakar

•Tu Nguyen

•Ray Byrne

Contact: Tu Nguyen, [email protected]

12

Page 13: EVALUATION OF ENERGY STORAGE AS A TRANSMISSION ASSET · ESA_charge MWh ESA_discharge MWh ESB_charge MWh ... 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1 5 9 3 7 1

REFERENCES 13

1. Byrne, R. H., Nguyen, T. A., Copp, D. A., Chalamala, B. R., & Gyuk, I, “Energy Management and Optimization Methods for Grid Energy Storage Systems,” in IEEE Access, vol. 6, pp. 13231-13260, 2018.

2. T. A. Nguyen, D. A. Copp, R. H. Byrne, B. R. Chalamala, “Market Evaluation of Energy Storage Systems Incorporating Technology-specific Nonlinear Models,” in IEEE Transactions on Power Systems, vol.

34, no. 5, pp. 3706 – 3715, April 2019.

3. D. M. Rosewater, D. A. Copp, T. A. Nguyen, R. H. Byrne and S. Santoso, "Battery Energy Storage Models for Optimal Control," in IEEE Access, vol. 7, pp. 178357-178391, Nov 2019.

4. T. A. Nguyen, R. H. Byrne, and R. D. Trevizan, “Utilization of Existing Generation Fleets Using Large-scale Energy Storage Systems,” in the proceeding of the 2020 IEEE Power and Energy Society General

Meeting, Aug 2020, Montreal, Canada.

5. R. H. Byrne, T. A. Nguyen, A. Headley, F. Wilches-Bernal, R. Concepcion and R. D. Trevizan “Opportunities and Trends for Energy Storage Plus Solar in CAISO: 2014-2018,” in the proceeding of the 2020

IEEE Power and Energy Society General Meeting, Aug 2020, Montreal, Canada.

6. R. Trevizan, T. A Nguyen, R. Byrne, “Sizing behind-the-meter energy storage and solar for electric vehicle fast-charging stations,” in the proceeding of the 2020 IEEE SPEEDAM, Jun 2020, Sorento, Italy.

7. R. H. Byrne, T. A. Nguyen, A. Headley, F. Wilches-Bernal, R. Concepcion, R. Trevizan, “Opportunities for storage plus solar in the CAISO real-time market,” in the proceeding of the 2020 IEEE

SPEEDAM, Jun 2020, Sorento, Italy.

8. T. A. Nguyen, D. A. Copp, R. H. Byrne, “Stacking Revenue of Energy Storage System from Resilience, T&D Deferral and Arbitrage,” accepted for the 2019 IEEE Power and Energy Society General

Meeting, Aug 2019, Atlanta, GA.

9. R. Concepcion, F. Wilches-Bernal, R. H. Byrne, “Revenue Opportunities for Electric Storage Resources in the Southwest Power Pool Integrated Marketplace,” accepted for the 2019 IEEE Power and Energy

Society General Meeting, Aug 2019, Atlanta, GA.

10. F. Wilches-Bernal, R. Concepcion, R. H. Byrne, “Participation of Electric Storage Resources in the NYISO Electricity and Frequency Regulation Markets,” accepted for the 2019 IEEE Power and Energy

Society General Meeting, Aug 2019, Atlanta, GA.

11. D. A. Copp, T. A. Nguyen, and R. H. Byrne, “Adaptive Model Predictive Control for Real-time Dispatch of Energy Storage systems,” accepted for the 2019 IEEE American Control Conference, Jul 2019,

Philadelphia, PA.

12. A. Ingalalli, A. Luna, V. Durvasulu, T. Hansen, R. Tonkoski, D. A. Copp, T. A. Nguyen, “Energy Storage Systems in Emerging Electricity Markets: Frequency Regulation and Resiliency,” accepted the 2019

IEEE Power and Energy Society General Meeting, Aug 2019, Atlanta, GA.

13. T. A. Nguyen and R. H. Byrne, “Optimal Time-of-Use Management with Power Factor Correction Using Behind-the-Meter Energy Storage Systems,” in the proceedings of the 2018 IEEE Power and Energy

Society General Meeting, Aug 2018, Portland, OR. (Selected for Best Paper Session in Power System Planning, Operation, and Electricity Markets.)

14. T. A. Nguyen, R. Rigo-Mariani, M. Ortega-Vazquez, D.S. Kirschen, “Voltage Regulation in Distribution Grid Using PV Smart Inverters,” in the proceedings of the 2018 IEEE Power and Energy Society

General Meeting, Aug 2018, Portland, OR.

15. R. H. Byrne and T. A. Nguyen, “Opportunities for Energy Storage in CAISO,” in the proceedings of the 2018 IEEE Power and Energy Society General Meeting, Aug 2018, Portland, OR.

16. D. A. Copp, T. A. Nguyen and R. H. Byrne, “Optimal Sizing of Behind-the-Meter Energy Storage with Stochastic Load and PV Generation for Islanded Operation,” in the proceedings of the 2018 IEEE

Power and Energy Society General Meeting, Aug 2018, Portland, OR.

17. T. A. Nguyen, R. H. Byrne, B. R. Chalamala and I. Gyuk, “Maximizing The Revenue of Energy Storage Systems in Market Areas Considering Nonlinear Storage Efficiencies,” in the proceedings of the 2018

IEEE Symposium on Power Electronics, Electrical Drives, Automation and Motion (SPEEDAM 2018), June 2018, Amalfi, Italy.

18. R. H. Byrne, T. A. Nguyen, D. A. Copp and I. Gyuk, “Opportunities for Energy Storage in CAISO: Day-Ahead and Real-Time Market Arbitrage,” in the proceedings of the 2018 IEEE Symposium on Power

Electronics, Electrical Drives, Automation and Motion (SPEEDAM 2018), June 2018, Amalfi, Italy.

19. T. A. Nguyen, R. H. Byrne, R. Concepcion, and I. Gyuk, “Maximizing Revenue from Electrical Energy Storage in MISO Energy & Frequency Regulation Markets,” in Proceedings of the 2017 IEEE Power

Energy Society General Meeting, Chicago, IL, July 2017, pp. 1–5.

20. T. A. Nguyen and R. H. Byrne, " Maximizing the Cost-savings for Time-of-use and Net-metering Customers Using Behind-the-meter Energy Storage Systems," in Proceedings of the 2017 North American

Power Symposium, Morgan Town, WV, 2017, pp. 1-7.