EVALUASI DAN PERANCANGAN PERKUATAN STRUKTUR ATAS GEDUNG PERKANTORAN DI JAKARTA SELATAN
EVALUATION AND UPPER STRUCTURE STRENGTHENING DESIGN OF OFFICE BUILDING IN SOUTH JAKARTA
TUGAS AKHIR
Laporan ini disusun untuk memenuhi salah satu syarat menyelesaikan pendidikan Diploma Empat Program Studi Teknik Perawatan dan Perbaikan Gedung di
Jurusan Teknik Sipil
OLEH
MUHAMMAD FAUZI NOVRIZALDY NIM: 141144022
SITI HAPSARI KUSUMOWARDANI NIM: 141144031
POLITEKNIK NEGERI BANDUNG
2018
Submission author:Assignment t it le:Submission tit le:
File name:File size:
Page count:Word count:
Character count:Submission date:
Submission ID:
Digital ReceiptThis receipt acknowledges that Turnit in received your paper. Below you will f ind the receiptinf ormation regarding your submission.
The f irst page of your submissions is displayed below.
Fauzi SariD4-TPPG TA tahun 2018EVALUASI DAN PERANCANGAN PE…1._LAPORAN_TA_-_141144022_1…4.91M20348,761248,78909-Aug-2018 02:25PM (UTC+0700)988668553
Copyright 2018 Turnitin. All rights reserved.
PERNYATAAN PENULIS
Dengan ini menyatakan bahwa laporan Tugas Akhir dengan judul Evaluasi
dan Perancangan Perkuatan Struktur Atas Gedung Perkantoran di Jakarta Selatan
adalah karya ilmiah yang bebas dari unsur tindakan plagiarisme, dan sesuai dengan
ketentuan tata tulis yang berlaku.
Apabila dikemudian hari ditemukan adanya unsur plagiarisme, maka hasil
penilaian dari Tugas Akhir ini dicabut dan bersedia menerima sanksi dengan
ketentuan yang berlaku.
Demikian pernyataan ini dibuat dengan sesungguhnya dalam keadaan sadar
sepenuhnya.
Bandung, Agustus 2018
M. Fauzi Novrizaldy Siti Hapsari K. NIM: 141144022 NIM: 141144031
i
ABSTRAK
Bangunan gedung yang menjadi objek Tugas Akhir adalah Gedung Kantor milik PT Sepatu Bata. Bangunan ini dibangun pada tahun 1998 dan memiliki 1 Lantai Dasar dan 6 Lantai di atasnya. Pemilik bangunan PT Sepatu Bata menemukan indikasi kerusakan struktur pada Lantai 1. Kerusakan struktur pada balok berupa retak dan pelat lantai (AS 8-9/B-C) berupa retak & kebocoran, sehingga pada tanggal 12 – 16 Juli 2017 dilaksanakan pemeriksaan/investigasi bangunan oleh Konsultan. Pemeriksaan dilakukan dengan metoda nondestruktif dan destruktif pada elemen struktur atas Gedung PT Sepatu Bata.
Pengujian nondestruktif diantaranya adalah uji keseragaman dan kedalaman retak beton dengan UPV dan pemeriksaan tulangan beton dengan R-Bar. Sementara itu, pengujian destruktif adalah uji karbonasi dan uji kuat tekan beton hasil pemboran dengan core drill. Pada Lantai 1, pengambilan sampel balok dan pelat lantai dengan UPV dan R-Bar dilakukan pada 4 titik, core drill 6 titik, uji karbonasi sebanyak 2 titik. Kemudian, data hasil pengujian diolah dan menjadi input untuk perhitungan struktur. Dalam menganalisis struktur, digunakan software ETABS ver. 9 untuk pemodelan struktur gedung dan SAP 2000 ver. 14 untuk tangga. Di Indonesia, analisis pembebanan sampai kapasitas elemen struktur beton bertulang mengacu pada suatu standar, yaitu SNI. Selanjutnya, dalam analisis perkuatan dengan FRP digunakan ACI Committee 440 2R-08 sebagai acuan.
Hasil yang diperoleh dari pengujian struktur balok dan pelat Lantai 1 adalah: UPV, kategori nilai homogenitas struktur kurang – cukup dengan rata-rata kedalaman retak pelat 30 – 63 mm; R-Bar, tulangan balok induk 6D16 & Ø10-100 – 150 dan pelat lantai Ø10-140; karbonasi, seluruhnya sudah terkarbonasi dan core drill, nilai kuat tekan beton dan standar deviasi untuk balok (10,26 & 2,78 MPa) dan pelat (19,86 & 5,78 MPa). Hasil analisis struktur diperoleh seluruh kapasitas ØMn struktur balok dan pelat Lantai 1 tidak memenuhi Mu. Sementara itu, ØVn dari kedua struktur tersebut masih memenuhi Vu. Metoda perkuatan yang dipilih adalah perkuatan eksternal dengan CFRP. Hasil yang diperoleh adalah untuk pelat lantai daerah lapangan digunakan CFRP 1 lapis dengan tf =0,167 mm; wf =100 – 200 mm; dan rasio peningkatan perkuatan 37 – 73% dan daerah tumpuan 1 lapis dengan tf =0,167 mm; wf =300 mm; 24 – 57%. Balok induk daerah lapangan: 1 lapis; tf =0,167; wf =200 – 250 mm; 21 – 44% dan daerah tumpuan: 2 – 5 lapis; 0,293 mm; 300 mm; 81%. Khusus untuk area Tempat Wudhu pada pelat Lantai 1 (AS 8-9/B-C) , metoda perkuatan dan perbaikan yang dipilih adalah CFRP 1 lapis dengan tf =0,167 mm; wf =100 & 300 mm; rasio peningkatan perkuatan 37% dan penambahan lapisan waterproofing jenis membrane bakar.
Kata Kunci: CFRP, Evaluasi Struktur, Gedung Kantor, Pemeriksaan Bangunan, dan Perkuatan dan Perbaikan Struktur.
ii
ABSTRACT
Building that become the object of Final Task is PT Sepatu Bata Office Building. This building built in 1998 and has 1 Ground Floor and 6 floors above it. The owner of this building found any structural damages in 1st floor. Structural damages such as cracks and leakage in beam and slab structures (Axis 8-9/B-C), until in 12 – 16 July 2017 theres been a building investigation by Consultant. The inspection was done by DT and NDT methods on upper structure part of PT Sepatu Bata Office Building.
NDT tests are: homogeneity and cracks depth of concrete using UPV and reinforcement inspection using R-Bar. Meanwhile, DT tests are carbonation test and compressive strength test of core drill sample. In 1st floor, the number UPV and R-Bar of beams and slabs structure samples was taken in 4 spots, core drill in 6 spots, carbonation in 2 spots. Then, the data from all those tests become inputs for structural analysis. In structrual analysis, ETABS ver. 9 is used for building structural modelling and SAP 2000 ver. 14 for staircase modelling. In Indonesia, load analysis until the capacity of concrete reinforcement referred to SNI. Afterwards, in strengthening analysis using FRP, ACI Committee 440 2R-08 become reference.
The results of tests on beam and slab structure in 1st floor are: UPV. the category of homogeneity are less – enough with the average of slabs crack depth are 30 – 63 mm; R-Bar, primary beam reinforcement 6D16 & & Ø10-100 – 150 and slab Ø10-140; carbonation, all structure were carbonated and core drill, compressive strength and standard deviation for beam (10,26 & 2,78 MPa) and slab (19,86 & 5,78 MPa). The results of structural analysis are almost ØMn of all beams and slabs in 1st floor are not comply Mu. Meanwhile, its ØVn of both structures are comply Vu. The chosen strengthening method is external strengthening by using CFRP. The results are for field area of slab structure, it used 1 layer of CFRP with tf=0,167 mm; wf=100 – 200 mm; and strengthening escalation ratio of 37 – 73% and for support area 1 layer with tf=0,167 mm; wf=300 mm; 24 – 57% . Field area of primary beam, 1 layer of CFRP with tf=0,167 mm; wf=200 – 250 mm; and strengthening escalation ratio of 21 – 44% and support area, 2 – 5 layers with tf=0,293 mm; wf=300 mm; and strengthening escalation ratio of 81%. Spesifically for Wudhu Place area of 1st floor slab structure (Axis 8-9/B-C), the chosen strengthening and repairing methods are CFRP with tf=0,167 mm; wf=100 & 300 mm; strengthening ratio of 37% and addition of torch-on waterproofing membrane system.
Key Words: Building Inspection, CFRP, Office Building, Strengthening and Repair of Structure, and Structure Evaluation.
iii
KATA PENGANTAR
Puji syukur penulis panjatkan kehadirat Tuhan Yang Maha Esa, karena atas
berkat rahmat dan karunia-Nya, penulis dapat menyelesaikan penyusunan Laporan
Tugas Akhir dengan judul “EVALUASI DAN PERANCANGAN PERKUATAN
STRUKTUR ATAS GEDUNG PERKANTORAN DI JAKARTA SELATAN”.
Laporan Tugas Akhir ini disusun sebagai salah satu syarat kelulusan mata
kuliah pada semester VIII, yang diwajibkan kepada mahasiswa Program Studi D-
IV Teknik Perawatan dan Perbaikan Gedung Jurusan Teknik Sipil Politeknik
Negeri Bandung, serta sebagai dasar evaluasi yang didasarkan atas hasil-hasil
kegiatan perkuliahan yang telah dijalani dan sebagai tambahan pengetahuan bagi
penulis sendiri.
Penyusunan laporan Tugas Akhir ini dapat diselesaikan tidak lepas dari
bimbingan, arahan, dan dukungan dari berbagai pihak. Oleh karena itu, dalam
kesempatan kali ini, penulis mengucapkan terima kasih dan penghargaan kepada
semua pihak yang terkait dalam penyusunan Laporan Studi Kasus ini, yaitu kepada:
1. Orang tua yang selalu memotivasi penulis dari mulai pelaksanaan Tugas
Akhir hingga saat penyusunan laporan ini berlangsung.
2. Bapak Krish Madyono H., Dipl.Ing., HTL., MT selaku dosen pembimbing
dan anggota penguji II yang telah memberikan arahan dan masukan kepada
penulis pada saat penyusunan laporan Tugas Akhir.
3. Bapak Susilahadi, Ir., MT dan Bapak Antonius Siswanto, SST., MT. selaku
Ketua Penguji dan anggota penguji I pada seminar proposal sampai sidang
Tugas Akhir atas saran dan masukannya.
4. Bapak Hendry, Dipl.Ing., HTL., MT selaku Ketua Jurusan Teknik Sipil
Politeknik Negeri Bandung.
5. Bapak Ahmad Solieh, ST., MT selaku Ketua Program Studi Teknik
Perawatan dan Perbaikan Gedung.
6. Pihak-pihak Konsultan PT. Binanusa Pracetak & Rekayasa khususnya kepada
Ibu Ika Widya A., A.Md dan Bapak Ir. Sjafei Amri, Dipl.E.Eng yang sudah
iv
membantu kami dalam memberikan data-data sekunder yang dibutuhkan
terkait Tugas Akhir ini.
7. Rekan-rekan kelas D4-Teknik Perawatan dan Perbaikan Gedung angkatan
2014 atas semangat dan motivasinya.
8. Pihak-pihak lain yang telah banyak membantu, yang tidak dapat penulis
sebutkan satu persatu, atas segala kebaikan dan bantuannya selama ini.
Akhir kata penulis berharap agar laporan ini dapat bermanfaat. Penulis
mengharapkan kritik dan saran demi perbaikan di masa yang akan datang. Atas
segala perhatiannya, penulis mengucapkan terima kasih.
Bandung, Agustus 2018
Penulis
v
DAFTAR ISI
ABSTRAK ............................................................................................................. i
ABSTRACT ......................................................................................................... ii
KATA PENGANTAR ......................................................................................... iii
DAFTAR ISI ......................................................................................................... v
DAFTAR LAMPIRAN ....................................................................................... ix
DAFTAR GAMBAR ............................................................................................. x
DAFTAR TABEL ............................................................................................. xiii
DAFTAR ISTILAH ........................................................................................... xvi
DAFTAR SINGKATAN ..................................................................................... xx
DAFTAR RUMUS ........................................................................................... xxii
I. BAB I PENDAHULUAN .......................................................................... 1
I.1 Latar Belakang .................................................................................... 1
I.2 Rumusan Masalah ............................................................................... 4
I.3 Tujuan ................................................................................................. 4
I.4 Ruang Lingkup .................................................................................... 5
I.5 Sistematika Penulisan.......................................................................... 5
II. BAB II TINJAUAN PUSTAKA ................................................................ 7
II.1 Karya Ilmiah Sejenis Sebelumnya ...................................................... 7
II.2 Kegagalan dan Kerusakan pada Bangunan ......................................... 8
II.2.1 Kegagalan Bangunan ..................................................................... 8
II.2.2 Kerusakan Bangunan ..................................................................... 9
II.3 Pemeriksaan Bangunan Eksisting ..................................................... 10
II.4 Evaluasi Kekuatan dan Pengujian Beton Eksisting .......................... 10
II.4.1 Metoda Tidak Merusak (Nondestruktif) ...................................... 10
II.4.2 Metoda Merusak (Destruktif) ...................................................... 11
II.5 Analisis Struktur dengan Software ETABS ver. 9 ............................ 12
vi
II.6 Pembebanan ...................................................................................... 12
II.7 Kombinasi Pembebanan .................................................................... 12
II.8 Faktor Reduksi Kekuatan .................................................................. 13
II.9 Analisis Beban Gempa ...................................................................... 13
II.10 Analisis Kapasitas Penampang Elemen Struktur Atas ...................... 15
II.10.1 Analisis Kapasitas Lentur Balok dengan Tulangan Ganda ..... 16
II.10.2 Analisis Kapasitas Geser Balok ............................................... 22
II.10.3 Analisis Struktur Pelat Lantai .................................................. 25
II.11 Perkuatan Elemen Struktur Beton ..................................................... 28
II.11.1 FRP (Fibre Reinforced Polymer) ............................................. 29
II.11.1.1 Keunggulan dan Kekurangan FRP ...................................... 30
II.11.1.2 Perkuatan Lentur dengan FRP ............................................. 31
III. BAB III METODOLOGI ..................................................................... 38
III.1 Identifikasi Masalah .......................................................................... 38
III.2 Pengumpulan Data Sekunder ............................................................ 38
III.3 Evaluasi Hasil Investigasi dan Klasifikasi Kerusakan ...................... 39
III.4 Pemodelan Struktur Gedung Kantor PT Sepatu Bata ....................... 40
III.5 Analisis Kapasitas Eksisting Elemen Struktur Atas Gedung. ........... 40
III.6 Penentuan Tindakan Retrofitting....................................................... 41
III.7 Analisis dan Perancangan Perbaikan Struktur .................................. 41
III.8 Analisis dan Perancangan Perkuatan Struktur .................................. 41
III.8.1 Perencanaan Metoda dan Perhitungan Perkuatan Struktur Atas
41
III.8.2 Perencanaan DED (Detail Engineering Design) Perkuatan .... 42
IV. BAB IV HASIL EVALUASI DAN PEMBAHASAN ........................ 43
IV.1 Data Umum Bangunan ...................................................................... 44
vii
IV.2 Evaluasi Hasil Investigasi ................................................................. 44
IV.2.1 Hasil Pemeriksaan Visual ........................................................ 45
IV.2.2 Hasil Pengujian Tidak Merusak (Nondestruktif) ..................... 48
IV.2.2.1 Uji Kepadatan dan Kedalaman Retak Beton dengan UPV .. 48
IV.2.2.2 Pemeriksaan Susunan & Dimensi Tulangan dengan R-Bar . 53
IV.2.3 Hasil Pengujian Merusak (Destruktif) ..................................... 54
IV.2.3.1 Pengambilan Sampel Core Drill dan Uji Kuat Tekan.......... 55
IV.2.3.2 Uji Tingkat Karbonasi .......................................................... 62
IV.2.4 Evaluasi Nilai Kuat Tekan Beton ............................................ 63
IV.2.5 Resume Hasil Investigasi ......................................................... 65
IV.3 Evaluasi Struktur ............................................................................... 68
IV.3.1 Pemodelan Struktur.................................................................. 68
IV.3.2 Perhitungan Pembebanan ......................................................... 71
IV.3.2.1 Beban Mati (Dead Load)...................................................... 71
IV.3.2.2 Beban Hidup (Live Load) ..................................................... 74
IV.3.2.3 Beban Tangga ....................................................................... 75
IV.3.2.4 Beban Gempa ....................................................................... 81
IV.3.3 Kombinasi Pembebanan .......................................................... 88
IV.3.4 Analisis Kapasitas Penampang Pelat Lantai ............................ 91
IV.3.5 Analisis Kapasitas Balok ....................................................... 100
IV.3.5.1 Analisis Kapasitas Lentur Balok ........................................ 102
IV.3.5.2 Analisis Kapasitas Geser Balok ......................................... 115
IV.4 Evaluasi Kapasitas dan Kondisi Eksisting Struktur ........................ 124
IV.5 Perancangan Perkuatan Struktur ..................................................... 141
IV.5.1 Perkuatan Lentur Struktur Pelat Lantai ................................. 142
IV.5.2 Perkuatan Lentur Struktur Balok ........................................... 150
viii
IV.6 Metoda Pelaksanaan Waterproofing ............................................... 159
IV.7 Metoda Pelaksanaan Pekerjaan Perkuatan CFRP ........................... 163
V. BAB V SIMPULAN DAN SARAN ...................................................... 168
V.1 Simpulan ......................................................................................... 168
V.2 Saran ................................................................................................ 171
DAFTAR PUSTAKA ........................................................................................ 173
ix
DAFTAR LAMPIRAN
Lampiran I Data Administratif Tugas Akhir:
1. Lembar Persetujuan Pembimbing dan Topik Tugas Akhir
2. Lembar Persetujuan untuk Seminar Laporan Tugas Akhir
3. Lembar Asistensi Laporan Tugas Akhir
Lampiran II Data Pendukung Tugas Akhir:
1) Gambar As Built:
a. Denah Arsitektural
b. Tampak dan Potongan Bangunan
c. Denah dan Detail Struktur Kolom, Balok dan Pelat Lantai
Eksisting
2) Hasil Pengujian Merusak/DT dan Tidak Merusak/NDT:
a. Denah Pengujian
b. Uji Kepadatan dan Kedalaman Retak Beton dengan Kecepatan
Pulsa Ultrasonik
c. Pemeriksaan Susunan, Dimensi Tulangan, dan Tebal Selimut
Beton dengan Alat R-Bar Meter/Profometer
d. Uji Korosi Tulangan dalam Beton
e. Uji Laju dan Kedalaman Karbonasi
f. Pemboran/Core Drill dan Uji Kuat Tekan Beton Inti
3) Langkah Kerja/SOP Pengujian Merusak/DT dan Tidak Merusak/NDT:
a. Uji Kepadatan dan Kedalaman Retak Beton dengan Kecepatan
Pulsa Ultrasonik
b. Pemeriksaan Susunan, Dimensi Tulangan, dan Tebal Selimut
Beton dengan Alat R-Bar Meter/Profometer
c. Uji Korosi Tulangan dalam Beton
d. Uji Laju dan Kedalaman Karbonasi
e. Pemboran/Core Drill dan Uji Kuat Tekan Beton Inti
Lampiran III Data Hasil Analisis dan Pendukung Tugas Akhir
x
DAFTAR GAMBAR
Gambar I-1. Gedung Kantor PT Sepatu Bata. ....................................................... 1
Gambar I-2. Lokasi Gedung PT Sepatu Bata. ....................................................... 2
Gambar II-1. Diagram Faktor Reduksi Kekuatan. ............................................... 13
Gambar II-2 Blok Analisis Penampang Balok dengan Tulangan Ganda ............ 17
Gambar II-3. Tipe-Tipe Tulangan Sengkang; (a) Sengkang Tegak, dan (b) Sengkang Miring. ................................................................................................ 23
Gambar II-4. Mpr pada Struktur Balok ................................................................ 24
Gambar II-5. Gaya Geser Desain, Ve................................................................... 24
Gambar II-6. Blok Tegangan Persegi Ekivalen. .................................................. 26
Gambar II-7. Blok Tegangan Ekivalen. ............................................................... 26
Gambar II-8. Perkuatan FRP Jenis Wrap pada Struktur Balok dan Pelat Lantai. ............................................................................................................................. 29
Gambar II-9. Distribusi Tegangan dan Regangan Pada Penampang Struktur Persegi Panjang Tulangan Tunggal dengan FRP Jenis Wrap. ............................. 31
Gambar IV-1. Kebocoran pada Pelat Lantai 1. .................................................... 46
Gambar IV-2. Lubang Shaft Plambing Hasil Bobokan Baru di Pelat Lantai 1. .. 46
Gambar IV-3. Retak pada Balok Lantai 1. .......................................................... 46
Gambar IV-4. Pengukuran Retak pada Balok Lantai 1. ...................................... 47
Gambar IV-5. Pengukuran Dimensi Kolom Lantai 1. ......................................... 47
Gambar IV-6. Pengujian Homogenitas Beton Pelat Lantai 1 AS 8-9/B-C. ......... 48
Gambar IV-7. Pengujian Homogenitas Beton Balok Lantai Dasar/Basement AS 2-3/C. ................................................................................................................... 49
Gambar IV-8. Ilustrasi Metoda Pengujian Homogenitas dengan UPV. .............. 49
Gambar IV-9. Ilustrasi Pengujian Kedalaman Retak Pelat dengan UPV. ........... 52
Gambar IV-10. Pengambilan Sampel Core Drill pada Pelat Lantai 1 AS 6-7/B-C. ............................................................................................................................. 55
Gambar IV-11. Pengambilan Sampel Core Drill pada Balok Lantai 1 AS D/7-8. ............................................................................................................................. 55
Gambar IV-12. Pengambilan Sampel Core Drill pada Kolom Lantai 1 AS 2/A. ............................................................................................................................. 56
Gambar IV-13. Uji Kuat Tekan Sampel dari Pelat Lantai 1 AS 6-7/B-C. .......... 56
xi
Gambar IV-14. Benda Uji Pelat Lantai 1 AS 6-7/B-C Setelah Uji Karbonasi. ... 63
Gambar IV-15. Gambar 3D Pemodelan Struktur dengan Software ETABS ....... 69
Gambar IV-16. Plan View Lantai Dasar .............................................................. 69
Gambar IV-17. Plan View Lantai 2 ..................................................................... 69
Gambar IV-18. Plan View Lantai 3 ..................................................................... 70
Gambar IV-19. Plan View Lantai 4 ..................................................................... 70
Gambar IV-20. Plan View Lantai 5 ..................................................................... 70
Gambar IV-21. Plan View Lantai 6 ..................................................................... 71
Gambar IV-22. Pemodelan Tangga pada Software SAP 2000. ........................... 75
Gambar IV-23. Elevasi Pada Pemodelan Tangga. ............................................... 76
Gambar IV-24. Asumsi Dimensi Optrede dan Aantrede Anak Tangga. ............. 77
Gambar IV-25. Tampak Atas Tangga. ................................................................ 77
Gambar IV-26. Potongan (A-A)/Samping Tangga. ............................................. 77
Gambar IV-27. Potongan (B-B)/ Railing Beton Anak Tangga. .......................... 79
Gambar IV-28. Grafik Respons Spektrum pada Titik Koordinat Gedung Bata Cilandak Barat ..................................................................................................... 83
Gambar IV-29. Nilai Perhitungan Respons Spektrum pada Titik Koordinat Gedung Bata Cilandak Barat ............................................................................... 83
Gambar IV-30. Denah Struktur Pelat Lantai 1 AS 8-9/B-C. ............................... 91
Gambar IV-31. Potongan A-A pada Gambar IV-30. ........................................... 92
Gambar IV-32. Denah Penomoran Pelat Lantai .................................................. 93
Gambar IV-33. Denah Penomoran Pelat Lantai ................................................ 101
Gambar IV-34. Penampang tumpuan balok B7 akibat Mn- ............................... 102
Gambar IV-35. Penampang tumpuan balok B7 akibat Mn+ .............................. 105
Gambar IV-36. Bidang Momen Hasil Running Akibat Beban Envelope pada B7. ........................................................................................................................... 108
Gambar IV-37. Bidang Gaya Geser BI 300x600 (B54). ................................... 118
Gambar IV-38. Bidang Gaya Geser Hasil Running Akibat Beban Envelope pada B37. .................................................................................................................... 119
Gambar IV-39. Denah Struktur Pelat Lantai 1 yang ØMn Lapangannya Tidak Memenuhi Mu. ................................................................................................... 137
Gambar IV-40. Denah Struktur Pelat Lantai 1 yang ØMn Tumpuannya Tidak Memenuhi Mu.Lantai ......................................................................................... 138
xii
Gambar IV-41. Denah Struktur Balok Lantai 1 yang ØMn Lapangannya Tidak Memenuhi Mu. ................................................................................................... 139
Gambar IV-42. Denah Struktur Balok Lantai 1 yang ØMn Tumpuannya Tidak Memenuhi Mu.antai............................................................................................ 140
Gambar IV-43. Denah Struktur Pelat Lantai 1 AS 8-9/B-C yang Mengalami Kebocoran dan Retak. ........................................................................................ 142
Gambar IV-44. Ilustrasi Pembersihan Area yang Akan dilapis Waterproofing Membrane. ......................................................................................................... 160
Gambar IV-45. Ilustrasi Pemasangan Lapisan Primer. ..................................... 160
Gambar IV-46. Ilustrasi Pemasangan Waterproofing Membrane pada Dinding & Lantai. ................................................................................................................ 161
Gambar IV-47. Ilustrasi Overlap pada Sambungan Waterproofing Membrane. ........................................................................................................................... 162
Gambar IV-48. Ilustrasi Pelaksanaan Tes Rendam pada Waterproofing Membrane. ........................................................................................................................... 162
Gambar IV-49. Pemasangan CFRP pada Struktur Balok dan Pelat Lantai 1 AS 2-3/B-C Bagian Atas (Kiri) dan Bagian Bawah (Kanan). .................................... 165
Gambar IV-50. Potongan A-A pada Gambar IV-49. ......................................... 165
Gambar IV-51. Potongan B-B pada Gambar IV-49. ......................................... 166
Gambar IV-52. Detail A pada Gambar IV-50. .................................................. 166
xiii
DAFTAR TABEL
Tabel II-1. Karya Ilmiah Sejenis Sebelumnya. ...................................................... 7
Tabel II-2. Spesifikasi FRP Jenis Wrap Produksi SIKA dan Fosroc. ................. 30
Tabel II-3. Kelebihan dan Kekurangan Metoda FRP. ......................................... 30
Tabel II-4. Faktor Reduksi Tegangan Efektif FRP. ............................................. 32
Tabel IV-1. Jenis dan Volume Pengujian. ........................................................... 45
Tabel IV-2. Merek dan Model Peralatan Pengujian. ........................................... 45
Tabel IV-3. Dimensi Struktur Hasil Pengukuran. ............................................... 47
Tabel IV-4. Kecepatan Pulsa Pelat Lantai 1 AS 8-9/B-C. ................................... 50
Tabel IV-5. Kualitas Homogenitas Beton Berdasarkan Nilai Kecepatan Pulsa UPV. .................................................................................................................... 51
Tabel IV-6. Kecepatan Pulsa dan Kategori Homogenitas Struktur Balok dan Pelat Lantai. .................................................................................................................. 51
Tabel IV-7. Rata-Rata Kedalaman Retak Pelat Lantai 1 AS 2-3/A-B. ............... 53
Tabel IV-8. Nilai Perkiraan Kedalaman Retak Struktur Balok dan Pelat Lantai. ............................................................................................................................. 53
Tabel IV-9. Rekapitulasi Hasil Pengujian R-Bar Meter pada Kolom dan Balok. ............................................................................................................................. 54
Tabel IV-10. Rekapitulasi Hasil Pengujian R-Bar Meter pada Pelat Lantai. ...... 54
Tabel IV-11. Faktor Pengali Berdasarkan Arah Pengeboran. ............................. 58
Tabel IV-12. Faktor Pengali Berdasarkan Rasio Panjang & Diameter . ............. 58
Tabel IV-13. Evaluasi Pelaksanaan Pengambilan Benda Uji Hasil Core Drill. .. 60
Tabel IV-14. Nilai Kuat Tekan Beton Inti Sebelum dan Sesudah Koreksi. ........ 60
Tabel IV-15. Nilai Standar Deviasi dan Koefisien Koreksi Hasil Uji Kuat Tekan Beton Inti. ............................................................................................................ 61
Tabel IV-16. Hasil Pengujian Karbonasi. ............................................................ 63
Tabel IV-18. Pembebanan SDL pada Pelat Lantai. ............................................. 72
Tabel IV-19. Beban SDL pada Struktur Pelat Kantilever Akibat Dinding Pasangan Batu Bata. ............................................................................................................ 72
Tabel IV-20. Beban SDL Balok Akibat Curtain Wall. ....................................... 73
Tabel IV-21. Beban SDL pada Balok AS 5/B-C Akibat Tangga. ....................... 74
Tabel IV-22. Beban Hidup pada Struktur Pelat Lantai 1 – 6. .............................. 75
xiv
Tabel IV-23. Joint Reactions dari Pemodelan Tangga. ....................................... 80
Tabel IV-33. Perhitungan Distribusi Vertikal dan Horizontal Gaya Gempa Arah X .......................................................................................................................... 88
Tabel IV-34. Perhitungan Distribusi Vertikal dan Horizontal Gaya Gempa Arah Y .......................................................................................................................... 88
Tabel IV-35. Kombinasi Pembebanan. ................................................................ 90
Tabel IV-36. Evaluasi Kapasitas Lentur Pelat Lantai 1. ..................................... 99
Tabel IV-37. Nilai Momen (Mu) Akibat Beban Envelope pada B7. .................. 109
Tabel IV-38. Evaluasi Kapasitas Lentur Balok 300 x 600 di Lantai 1. ............. 112
Tabel IV-38.a. Evaluasi Kapasitas Lentur Balok 300 x 600 di Lantai 1. .......... 113
Tabel IV-39. Evaluasi Kapasitas Lentur Balok 250 x 600 di Lantai 1. ............. 114
Tabel IV-40. Evaluasi Kapasitas Lentur Balok 200 x 400 di Lantai 1. ............. 114
Tabel IV-41. Gaya Geser Nominal Balok di Lantai 1. ...................................... 116
Tabel IV-43. Gaya Geser Desain Balok Lantai 1. ............................................. 118
Tabel IV-45. Gaya Geser Ultimit (Vu) Akibat Tipe Kombinasi Beban Envelope. ........................................................................................................................... 119
Tabel IV-46. Evaluasi Kapasitas Geser Balok Daerah Tumpuan di Lantai 1. .. 120
Tabel IV-47. Evaluasi Kapasitas Geser Balok Daerah Lapangan di Lantai 1. .. 120
Tabel IV-48. Evaluasi Kapasitas Geser Balok 300 x 600 di Lantai 1. .............. 121
Tabel IV-48a. Evaluasi Kapasitas Geser Balok 300 x 600 di Lantai 1. ............ 122
Tabel IV-49. Evaluasi Kapasitas Geser Balok 250 x 600 di Lantai 1. .............. 123
Tabel IV-50. Evaluasi Kapasitas Geser Balok 200 x 400 di Lantai 1. .............. 123
Tabel IV-51. Evaluasi Kapasitas Lentur & Kondisi Struktur Pelat Lantai 1 ..... 125
Tabel IV-51a. Evaluasi Kapasitas Lentur & Kondisi Struktur Pelat Lantai 1 ... 126
Tabel IV-52. Evaluasi Kapasitas Lentur & Kondisi Balok 300 x 600 di Lantai 1. ........................................................................................................................... 127
Tabel IV-52b. Evaluasi Kapasitas Lentur & Kondisi Balok 300 x 600 di Lantai 1. ........................................................................................................................... 129
Tabel IV-52c. Evaluasi Kapasitas Lentur & Kondisi Balok 300 x 600 di Lantai 1. ........................................................................................................................... 130
Tabel IV-52d. Evaluasi Kapasitas Lentur & Kondisi Balok 300 x 600 di Lantai 1. ........................................................................................................................... 131
xv
Tabel IV-53. Evaluasi Kapasitas Lentur dan Kondisi Balok 250 x 600 di Lantai 1. ........................................................................................................................... 132
Tabel IV-54. Evaluasi Kapasitas Lentur dan Kondisi Balok 200 x 400 di Lantai 1. ........................................................................................................................... 133
Tabel IV-55. Evaluasi Kapasitas Geser & Kondisi Balok 300 x 600 di Lantai 1. ........................................................................................................................... 134
Tabel IV-55a. Evaluasi Kapasitas Geser & Kondisi Balok 300 x 600 di Lantai 1. ........................................................................................................................... 135
Tabel IV-56. Evaluasi Kapasitas Geser & Kondisi Balok 250 x 600 di Lantai 1. ........................................................................................................................... 136
Tabel IV-57. Evaluasi Kapasitas Geser & Kondisi Balok 200 x 400 di Lantai 1. ........................................................................................................................... 136
Tabel IV-58. Rekapitulasi Perkuatan FRP pada Pelat Lantai 1 (Lapangan). .... 148
Tabel IV-59. Rekapitulasi Perkuatan FRP pada Pelat Lantai 1 (Tumpuan). ..... 149
Tabel IV-60. Rekapitulasi Perkuatan FRP pada Balok 300x600 (Lapangan). .. 155
Tabel IV-61. Rekapitulasi Perkuatan FRP pada Balok 250x600 (Lapangan). .. 155
Tabel IV-62. Rekapitulasi Perkuatan FRP pada Balok 300x600 (Tumpuan Akibat Mu
-). ................................................................................................................... 156
Tabel IV-62a. Rekapitulasi Perkuatan FRP pada Balok 300x600 (Tumpuan Akibat Mu+). ...................................................................................................... 157
Tabel IV-63. Rekapitulasi Perkuatan FRP pada Balok 250x600 (Tumpuan Akibat Mu
-). ................................................................................................................... 158
Tabel IV-63a. Rekapitulasi Perkuatan FRP pada Balok 250x600 (Tumpuan Akibat Mu
+). ....................................................................................................... 158
xvi
DAFTAR ISTILAH
A
Aantrede : Sisi horizontal dari anak tangga.
Analyzing Program : Analisis yang dijalankan sendiri oleh program.
As Built Drawing : Gambar realisasi dari suatu pekerjaan yang telah
dilaksanakan.
Assigning in Program : Menempatkan dan menggunakan parameter-
parameter yang telah ditentukan pada proses
defining di program, seperti elemen struktur dan
jenis beban.
B
Brittle Material : Material yang bersifat rapuh atau getas, contohnya
seperti beton.
C
Capping : Digunakan sebagai media untuk menyalurkan
beban secara merata ke permukaan beton yang
akan diuji kuat tekan.
Confinement : Tulangan pengekang; tulangan geser/sengkang.
Curtain Wall : Pelapis atau penutup dinding gedung bagian luar
untuk melindungi area gedung bagian dalam.
D
Debonding : Peristiwa lepasnya ikatan FRP dengan permukaan
beton.
Defining in Program : Mendefinisikan seluruh parameter yang
digunakan dalam pemodelan struktur di program.
Delta Momen : Selisih antara nilai momen ultimit dan momen
nominal penampang struktur.
Demolishing : Membongkar; melumpuhkan; menghancurkan.
Density : Massa jenis suatu zat.
xvii
Destruktif : Bersifat destruksi (merusak, memusnahkan, atau
menghancurkan.
Deteriorasi : Kemunduran; penurunan mutu.
Direct Method : Metoda pengujian UPV, dimana transducer dan
reducer diletakkan bersebrangan.
E
Eksisting : Sudah ada; sudah terbentuk/dibangun.
Envelope Load : Tipe beban yang mengeluarkan nilai maksimum
dan minimum dari berbagai kombinasi
pembebanan.
F
Fundamental : Bersifat pokok atau mendasar.
G
Gaya Aksial : Gaya yang bekerja pada pusat aksis dari elemen
struktur.
Gaya Lateral : Gaya horisontal.
Gaya Transversal : Gaya geser; tulangan transversal atau tulangan
geser.
Grouting Method : Metoda perbaikan beton yang retak atau berlubang
dengan menyuntikkan pasta semen yang
bertekanan.
H
Hardener Material : Material tambahan pada beton yang berfungsi
membuat permukaan beton lebih keras, rata, dan
mudah dibersihkan.
Homogenitas : Keseragaman dari berbagai sampel.
I
Indirect Method : Metoda pengujian UPV, dimana transducer dan
reducer diletakkan sejajar.
Integritas Struktural : Konsep berkaitan dengan konsistensi struktur.
xviii
Investigasi : Upaya penyelidikan dengan mencatat atau
merekam fakta melakukan peninjauan, percobaan,
dan sebagainya.
J
Joint Kolom dan Balok : Bagian struktur berupa sambungan/hubungan
antara struktur kolom dan balok.
K
Karbonasi : Proses yang terjadi ketika karbon dioksida di
atmosfer dengan kelembaban tertentu bereaksi
dengan mineral semen terhidrasi dan
menghasilkan karbonat.
L
Longitudinal : Sejajar sumbu batang.
M
Modelling in Program : Membuat gambar model struktur sesuai bangunan
eksisting pada program.
O
Optrede : Sisi tegak/vertikal dari anak tangga.
P
Phenolphthalein : Zat kimia (pewarna) yang berperan sebagai
indikator pH.
Plastic Region : Kondisi plastis dari sebuah material.
R
Repair : Tindakan memperbaiki kerusakan.
Resin : Campuran pada bahan perekat FRP yang
berfungsi mempercepat proses rekatan.
Resistence : Tahanan; faktor ketahanan.
Retrofitting : Tindakan yang bertujuan untuk menyesuaikan
kondisi atau keperluan baru terhadap bangunan
seperti memperbaiki bangunan yang rusak,
memperkuat bangunan, menambah ruangan dan
xix
lain sebagainya, tanpa harus membongkar total
bangunan yang sudah ada.
S
Seismik : Pengaruh gempa bumi.
Serviceability : Kondisi batas layanan.
Settlement : Penurunan elevasi tanah dasar.
Shaft : Lubang pada pelat lantai yang biasa
diperuntukkan un
Standar Deviasi : Penyimpangan dari berbagai data/sampel.
Strength : Kekuatan.
Strengthening : Metoda perkuatan untuk meningkatkan kapasitas
nominal dari suatu elemen struktur.
W
Waterproofing Method : Metoda pencegahan/perbaikan untuk melindungi
struktur dari penetrasi air.
xx
DAFTAR SINGKATAN
SINGKATAN Nama Pemakaian Pertama
Kali di Halaman ACI American Concrete Institute 3
AHS Analisis Harga Satuan 39
ASTM American Standard Testing and
Material
48
BA Balok Anak 100
BI Balok Induk 100
BJ Berat Jenis 73
BS British Standard 48
Canin Corrosion Analysist Instrument 10
CQC Complete Quadratic Combination 88
CW Curtain Wall 73
DED Detail Engineering Design 3
DL Dead Load 12
DT Destructive Test 2
ETABS Extended Three Dimensional
Analysis of Building Systems
4
FFL Finished Floor Level 167
FRP Fibre Reinforce Polymer 5
HAKI Hak, Kekayaaan, dan Intelektual 8
ISO International Standard Organization 3
LL Live Load 12
ls Lump sum 45
LT Lantai 76
NDT Non-Destructive Test 2
PT Perseroan Terbatas 1
Pundit Portable Ultrasonic Non-Destructive
Digital Indicating Tester
10
xxi
Puskim PU Pusat Penelitian dan Pengembangan
Pemukiman – Kementrian Pekerjaan
Umum
83
R-Bar Reinforcement-Bar 2
SAP Structure Analysis Program 40
SDL Super Imposed Dead Load 71
SFL Structural Floor Level 76
SNI Standar Nasional Indonesia 3
SOP Standar Operasional Prosedur 6
SRPMK Sistem Rangka Pemikul Momen
Khusus
21
SRSS Square Root of The Sum of The
Squares
88
UPV Ultrasonic Pulse Velocity 2
UU Undang-Undang 3
xxii
DAFTAR RUMUS
Rumus Halaman
Perhitungan Gaya Geser Dasar Seismik 15
Perhitungan Faktor Koreksi Hasil Respon Spektra 15
Persyaratan Kapasitas Lentur 16
Perhitungan Regangan Tulangan Tekan 17
Perhitungan Regangan Tulangan Tekan dengan Subtitusi c 17
Perhitungan Batas Tulangan Tekan akan Leleh 17
Perhitungan Kapasitas Momen Nominal Balok I 18
Perhitungan Gaya Tekan pada Beton 18
Perhitungan c Asumsi 19
Perhitungan Kapasitas Momen Nominal Balok II 19
Perhitungan Momen Nominal Total Penampang Beton Bertulang
Ganda
19
Pemeriksaan Tegangan Tarik Baja Tulangan = Tegangan Leleh 20
Perhitungan Gaya Tarik Baja Tulangan 20
Perhitungan Gaya Tekan Beton 20
Perhitungan Gaya Tekan Baja Tulangan Tarik 20
Perhitungan Tegangan Baja Tulangan Tekan 20
Perhitungan Regangan Baja Tulangan Tekan 20
Persamaan Kesetimbangan Gaya Aksial pada Penampang Beton 21
Persamaan Kuadratik dalam Tinggi Blok Tegangan Ekivalen 21
Perhitungan Momen Nominal Beton 21
Persyaratan Momen Tumpuan pada SRPMK 21
Persyaratan Momen Sepanjang Bentang pada SRPMK 22
Persyaratan Gaya Geser untuk Desain Balok Beton Bertulang 22
Perhitungan Kuat Geser Nominal Beton Bertulang 22
Perhitungan Gaya Geser Beton 23
Simplifikasi Perhitungan Gaya Geser Beton 23
xxiii
Perhitungan Gaya Geser yang Dipikul oleh Sengkang Saat Semua
Sengkang Leleh
24
Perhitungan Gaya Geser Desain Pada Tumpuan Kiri 25
Perhitungan Gaya Geser Desain Pada Tumpuan Kanan 25
Perhitungan Gaya Geser Desain Pada Tumpuan Kanan 25
Perhitungan Gaya Tekan Beton Berdasarkan Distribusi Tegangan 27
Perhitungan Gaya Tarik Beton Berdasarkan Distribusi Tegangan 27
Perhitungan Nilai Tinggi Blok Tegangan Ekivalen pada Syarat
Kesetimbangan
27
Perhitungan Momen Nominal yang Dimomenka pada Titik Berat
Gaya Tekan Beton
27
Perhitungan Rasio Tulangan Tarik Aktual 27
Perhitungan Rasio Tulangan Tarik Minimum 27
Perhitungan Rasio Tulangan Tarik Maksimum 27
Perhitungan Rasio Tulangan Tarik Balance 28
Perhitungan Tegangan Tarik Ultimit untuk Perencanaan 31
Perhitungan Regangan Ultimit untuk Perencanaan 31
Perhitungan Tingkat Regangan Beton pada Ikatan FRP 32
Perhitungan Faktor Modifikasi 33
Perhitungan Rasio FRP pada Beton 33
Perhitungan Momen Inersia Crack Section Transformed to Concrete 33
Perhitungan Regangan Desain/Debonding FRP 34
Perhitungan Regangan Efektif FRP 34
Perhitungan Tegangan Efektif FRP 35
Perhitungan Regangan dan Tegangan Baja Tulangan 35
Perhitungan Kontrol Asumsi Nilai c 36
Perhitungan Momen Nominal dari Struktur dengan FRP 36
Perhitungan Rasio Peningkatan Perkuatan dengan FRP 36
Perhitungan Persentase Peningkatan Perkuatan dengan FRP 37
Perhitungan Kecepatan Pulsa Ultrasonik 49
Perhitungan Kedalaman Retak Hasil Pengujian UPV 52
xxiv
Perhitungan Kuat Tekan Beton Inti Hasil Core Drill 57
Perhitungan Kuat Tekan Beton Inti Terkoreksi Hasil Core Drill 58
Perhitungan Faktor Pengali Akibat Adanya Baja Tulangan pada
Sampel Core Drill
58
Perhitungan Standar Deviasi dari Sampel Uji Kuat Tekan Hasil Core
Drill
61
Perhitungan Koefisien Variasi 61
Persyaratan Hasil Pengecekan Kuat Tekan Beton dengan Nilai Rata-
Rata
64
Persyaratan Hasil Pengecekan Kuat Tekan Beton dengan Nilai
Minimum
64
Perhitungan Modulus Elastisitas Beton 65
Perhitungan Beban Anak Tangga 76
Perhitungan Perioda Fundamental Pendekatan 85
Perhitungan Gaya Geser Statik 87
D4 TEKNIK SIPIL POLITEKNIK NEGERI BANDUNG
M. Fauzi Novrizaldy, Siti Hapsari K., Evaluasi dan Perancangan.....173
DAFTAR PUSTAKA
__________. (2017). Product Data Sheet SikaWrap – 231 C. PT Sika Indonesia.
__________. (2017). Product Data Sheet SikaWrap – 301 C. PT Sika Indonesia.
__________. (2017). Product Data Sheet Nitowrap FRC. Fosroc.
Abuhuroyroh, KM & Medi Triyantono. Modul Pelatihan Teknologi Informasi:
Fundamental Structural Analyst (FSA). Comblabs USDI-ITB. Bandung.
ACI Committee 440 (2002). Guide for The Design and Construction of Externally
Bounded FRP Systems for Strengthening Concrete Structures. American
Concrete Institute. Farmington Hills, Michigan.
Ahadi. (2011). Metode Cara Pemasangan Waterproofing Membrane.
http://www.ilmusipil.com/metode-cara-pemasangan-waterproofing-
membrane (Diakses pada 9 Juli 2018).
ASTM C597-16 (2016). Standard Test Method for Pulse Velocity Through
Concrete. American Standard Testing and Material. West Conshohocken,
Pennsylvania.
Badan Standarisasi Nasional (1994). SNI 03-3403-1994 tentang Metoda Pengujian
Kuat Tekan Beton Inti Pemboran. Jakarta. Badan Standarisasi Nasional.
Badan Standarisasi Nasional (2000). SNI 03-6468-2000 tentang Perencanaan
Campuran Tinggi dengan Semen Portland dan Abu Terbang. Jakarta. Badan
Standarisasi Nasional.
Badan Standarisasi Nasional (2012). SNI 03-1726-2012 tentang Tata Cara
Perencanaan Ketahanan Gempa untuk Struktur Bangunan Gedung dan Non
Gedung. Jakarta. Badan Standarisasi Nasional.
Badan Standarisasi Nasional (2013). SNI 1727:2013 tentang Beban Minimum untuk
Perancangan Bangunan Gedung dan Struktur Lain. Jakarta. Badan
Standarisasi Nasional.
Badan Standarisasi Nasional (2013). SNI 2847:2013 tentang Persyaratan Beton
Struktural untuk Bangunan Gedung. Jakarta. Badan Standarisasi Nasional.
Bambang Budiono, Prof., Ir., M.E., PhD. & Lucky Supriatna, S (2011). Studi
Komparasi Desain Bangunan Tahan Gempa. Penerbit: ITB. Bandung.
D4 TEKNIK SIPIL POLITEKNIK NEGERI BANDUNG
M. Fauzi Novrizaldy, Siti Hapsari K., Evaluasi dan Perancangan.....174
BS 4408: Part 5 (1974). Recommendations for Non-destructive Methods of Test for
Concrete. Part 5. Measurement of The Velocity of Ultrasonic Pulses In
Concrete British Standard. London.
Dewan Perwakilan Rakyat RI (2017). Undang-Undang No. 2 Tahun 2017 tentang
Jasa Konstruksi. Jakarta. Dewan Perwakilan Rakyat RI.
Dewan Perwakilan Rakyat RI (2002). Undang-Undang No. 28 Tahun 2002 tentang
Bangunan Gedung. Jakarta. DPR RI
Ditjen Cipta Karya Kementrian PUPR (2006). Pedoman Teknis Bangunan Gedung
Tahan Gempa. Ditjen Cipta Karya Kementrian PUPR. Jakarta.
Endawati, Jul (2017). Modul Mata Kuliah Perawatan Bangunan. Tidak Diterbitkan.
Bandung.
Hartono dan Santosa, H., (2003). Perkuatan Struktur Beton dengan FRP. Yayasan
John Hi-Tech Idetama. Jakarta.
Heri Khoeri, Ir., MT. (2016). Perkiraan Umur Bangunan dengan Uji Karbonasi.
https://hesa.co.id/perkiraan-umur-bangunan-dengan-uji-karbonasi-
carbonation-test-2/ (Diakses pada 11 Juni 2018).
Ignatius, Andreas, dan Hary (2008). Evaluasi Kinerja dan Perkuatan Struktur
Gedung Guna Alih Fungsi Bangunan. Forum Teknik Sipil No. XVIVI/1-
Januari-2008.
Imran, Iswandi & Ediansyah Zulkifli (2014). Perencanaan Dasar Struktur Beton
Bertulang. Penerbit: ITB. Bandung.
Imran, Iswandi & Fajar Hendrik (2009). Perencanaan Struktur Gedung Beton
Bertulang Tahan Gempa. Penerbit: ITB. Bandung.
Imran, Iswandi & Fajar Hendrik (2014). Perencanaan Lanjut Struktur Beton
Bertulang. Penerbit: ITB. Bandung.
Litvinov, Artem (2010). Applying Carbon Fibre in Building Structures. Thesis.
Tidak Diterbitkan. Laapenrata, Finlandia.
Majelis Permusyarawatan Rakyat RI (2000). Peraturan Presiden No. 29 Tahun
2000 tentang Penyelenggaraan Jasa Konstruksi. Jakarta. Majelis
Permusyarawatan Rakyat RI.
Mudjisantosa (2013). Kegagalan Konstruksi atau Kegagalan Bangunan.
http://kliping.co/cara-menulis-daftar-pustaka/ (Diakses pada 11 Juni 2018).
D4 TEKNIK SIPIL POLITEKNIK NEGERI BANDUNG
M. Fauzi Novrizaldy, Siti Hapsari K., Evaluasi dan Perancangan.....175
Pamungkas, Anugrah & Erny Harianti (2009). Gedung Beton Bertulang Tahan
Gempa. Penerbit: ITSPress. Surabaya.
Putri, Yulia Eka (2013). Perencanaan Perkuatan Struktur Atas Rusunawa Brigif
Kabupaten Tegal Menggunakan FRP Berdasarkan Metoda, Biaya, dan Jadwal.
Tugas Akhir Politeknik Negeri Bandung. Tidak Diterbitkan. Bandung.
Setjo R., (2012). Perkiraan Kekuatan Beton Pasca Gempa denga Metoda Uji Tak
Merusak. Prosiding Seminar BPPT. Yogyakarta.
Sulistya, Shona (2014). Modul Pelatihan Tata Cara Pengujian Hammer Test dan
Ultrasonic Pulse Velocity. Tidak Diterbitkan. Bandung.
Triwiyono, A., (1998). Perbaikan dan Perkuatan Struktur Beton. Bahan Ajar Topik
Spesial. Universitas Gadjah Mada. Yogyakarta.
Triwiyono, A., (2006). Perbaikan dan Perkuatan Struktur Beton Pasca Gempa
dengan FRP. Makalah Seminar Perkembangan Standar dan Metodologi
Konstruksi Tahan Gempa. Himpunan Ahli Konstruksi Indonesia. Medan.
Wuryanti, Wahyu (2013). Penilaian Keandalan Struktur Bangunan Gedung
Eksisting: Peraturan dan Implementasinya. Konferensi Nasional Teknik Sipil
7. Volume 5: Halaman 69 – 75.
Yahya, Edward (2010). Studi Perkuatan Balok Beton Di Daerah Tumpuan Dengan
Menggunakan Lembaran Serat Karbon. Skripsi Universitas Indonesia. Tidak
Diterbitkan. Depok.
RIWAYAT HIDUP
A. DATA PRIBADI
1. Nama Lengkap : Muhammad Fauzi Novrizaldy
2. Tempat, Tanggal Lahir : Bandung, 21 November 1995
3. Jenis Kelamin : Laki-Laki
4. Agama : Islam
5. Status : Belum Menikah
6. Tinggi/Berat Badan : 170 cm/58 kg
7. Alamat : Jalan Riung Bagja IIB No. 2, RT/RW
006/009, Kelurahan Cisaranten Kidul, Kecamatan Gedebage, Kotamadya
Bandung, Jawa Barat
8. Telepon : 0856-2452-4821/(022)7509501
9. Email : [email protected]
B. RIWAYAT PENDIDIKAN FORMAL
1. 2001-2002 : TK Gunatria Putra, Bandung
2. 2002-2008 : SDN Cisaranten Kidul I
3. 2008-2011 : SMPN 13 Bandung
4. 2011-2014 : SMAN 11 Bandung
5. 2014-2018 : Politeknik Negeri Bandung
• Jurusan Teknik Sipil
• Program Studi D4-Teknik Perawatan
dan Perbaikan Gedung
C. RIWAYAT PENDIDIKAN NON FORMAL
1. 2016 : EF (English First) Front Runner 6 B.1.1
Book 6
D. RIWAYAT ORGANISASI
1. 2011-2014 : Anggota TLC (Techo Lovers Club) SMAN 11 Bandung
2. 2016-2017 : Anggota Divisi Multimedia Departemen Infokom
Himpunan, HIMAS (Himpunan Mahasiswa Jurusan Teknik
Sipil)
E. KEMAMPUAN
1. Bahasa Indonesia : Sangat Baik
2. Bahasa Inggris : Sangat Baik
3. MS Office (Word, Excell, Visio, dan Power Point) : Baik
4. Familiar Terhadap Internet : Sangat Baik
5. Menghitung BBS (Bar Bending Schedule) : Cukup Baik
6. Pengoperasian AutoCAD : Cukup Baik
7. Menghitung Volume Pekerjaan dan RAB : Baik
8. Pengoperasian SAP : Baik
9. Pengoperasian ETABS : Baik
10. Pengoperasian Sketchup : Cukup Baik
F. PENGALAMAN MENGIKUTI KURSUS/PELATIHAN/SEMINAR
1. 2014 : Peserta Program Pengenalan Kehidupan Kampus (PPKK)
2. 2014 : Peserta Pelatihan Bela Negara dan Kedisiplinan Mahasiswa
Politeknik Negeri Bandung
3. 2014 : Peserta ESQ Leadership Training
4. 2014 : Peserta Seminar Nasional “Membangun Semangat Keilmuan
Pemuda Indonesia yang Cinta Al-Qur’an”
5. 2015 : Peserta Grand Seminar IPWeek (Integrated Petroleum Week)
6. 2016 : Peserta Seminar ICEE (ITB Civil Engineering Expo)
7. 2016 : Peserta Seminar Workshop Indocement Awards
8. 2016 : Peserta Simposium Bidang Infrastruktur Green Road
Construction
9. 2017 : Peserta Seminar Nasional Pembangunan “Optimalisasi peran
Engineers dalam Menghadapi Pembangunan Nasional dan Daerah
10. 2017 : Peserta Seminar Step Up with Astra Daihatsu Motor
11. 2018 : Peserta Pelatihan Jarak Jauh Bidang Konstruksi
G. PRESTASI
1. Penerima Beasiswa Indocement Tahun 2016
H. PENGALAMAN KUNJUNGAN DAN KERJA PRAKTEK
1. 2015 : Kunjungan ke Proyek Sudirman Suites Apartement, Jakarta
2. 2016 : Kunjungan ke Proyek Apartemen RU IV Pertamina, Cilacap
3. 2017 : Pekerja Lapangan PT. Totalindo Eka Persada Proyek El Centro
Apartemen Bogor
4. 2018 : Tim Surveying Kelengkapan Dokumen untuk Pembuatan SLF
Hotel Marriott Bandung
Dengan ini saya menyatakan bahwa semua informasi yang ada dalam
Riwayat Hidup ini adalah benar dan akurat sesuai dengan keadaan yang
sebenarnya.
Dengan Hormat,
Muhammad Fauzi Novrizaldy
RIWAYAT HIDUP
A. DATA PRIBADI
10. Nama Lengkap : Siti Hapsari Kusumowardani
11. Tempat, Tanggal Lahir : Bandung, 27 November 1995
12. Jenis Kelamin : Perempuan
13. Agama : Islam
14. Status : Belum Menikah
15. Tinggi/Berat Badan : 151 cm/55 kg
16. Alamat : Komp. Puri Cipageran Indah 1 Blok F
No.13, RT 05 RW 27, Kecamatan Cimahi
Utara, 40511
17. Telepon : 0857-6587-9538/(022)6650227
18. Email : [email protected]
B. RIWAYAT PENDIDIKAN FORMAL
2. 2001-2002 : TK Melati, Sangkuriang, Cimahi
3. 2002-2008 : SDN Mandiri 1 Cimahi
4. 2008-2011 : SMPN 3 Cimahi
5. 2011-2014 : SMAN 2 Cimahi
6. 2014-2018 : Politeknik Negeri Bandung
• Jurusan Teknik Sipil
• Program Studi D4-Teknik Perawatan
dan Perbaikan Gedung
C. RIWAYAT ORGANISASI
3. 2008-2009 : Bendahara Angkatan Paduan Suara SMPN 3 Cimahi
4. 2008-2009 : Anggota SSB (Sasana Seni Budaya)
5. 2009-2011 : Anggota HKPI (Himpunan Keluarga Pelajar Islam)
6. 2014-2015 : Ketua Divisi Kerohanian Karang Taruna RW 27
7. 2016-2017 : Anggota Divisi Isu Internal Departemen Dalam
Himpunan, HIMAS (Himpunan Mahasiswa Jurusan
Teknik Sipil Politeknik Negeri Bandung)
D. KEMAMPUAN
11. Bahasa Indonesia : Sangat Baik
12. Bahasa Inggris : Cukup Baik
13. MS Office (Word, Excell, Visio, dan Power Point) : Baik
14. Familiar Terhadap Internet : Sangat Baik
15. Menghitung BBS (Bar Ben ding Schedule) : Cukup Baik
16. Pengoperasian AutoCAD : Cukup Baik
17. Menghitung Volume Pekerjaan dan RAB : Baik
18. Pengoperasian SAP : Baik
19. Pengoperasian ETABS : Baik
E. PENGALAMAN MENGIKUTI KURSUS/PELATIHAN/SEMINAR
12. 2010 : Peserta Pelatihan Teknik Menghafal Cepat
13. 2010 : Peserta Program Spiritual Motivation Camp
14. 2014 : Peserta Program Pengenalan Kehidupan Kampus (PPKK)
15. 2014 : Peserta Pelatihan Bela Negara dan Kedisiplinan Mahasiswa
Politeknik Negeri Bandung
16. 2014 : Peserta ESQ Leadership Training
17. 2014 : Peserta Seminar Nasional “Membangun Semangat Keilmuan
Pemuda Indonesia yang Cinta Al-Qur’an”
18. 2016 : Peserta Seminar Kesehatan dan Keselamatan Kerja (K3)
19. 2016 : Peserta Simposium Bidang Infrastruktur Green Road
Construction
20. 2017 : Peserta Seminar Beasiswa sebagai Upaya Peningkatan Kualitas
Sumber Daya Manusia Indonesia
21. 2018 : Peserta Seminar Penerapan Teknologi Konstruksi Ramah
Lingkungan
22. 2018 : Peserta Pelatihan Jarak Jauh Bidang Konstruksi
F. PRESTASI
2. Juara 3 Menggambar Tingkat RW (2004)
3. Juara 1 Drama Musikal Tingkat Sekolah (2012)
4. Juara 2 Vocal Group Tingkat Sekolah (2013)
5. Juara 1 Paduan Suara Tingkat Sekolah (2013)
6. Juara 3 Vocal Group Tingkat Bandung-Raya (2013)
7. Juara 1 Solo Pop Tingkat HIMAS Polban (2015)
G. PENGALAMAN KUNJUNGAN DAN KERJA PRAKTEK
5. 2016 : Kunjungan ke Proyek Apartemen RU IV Pertamina, Cilacap
6. 2017 : Pekerja Lapangan Wika Gedung Proyek Pembangunan Hotel
Sarinah
7. 2018 : Tim Perencana Gedung Dakwah Martanegara Bandung
8. 2018 : Tim Surveying Kelengkapan Dokumen untuk Pembuatan SLF
Hotel Marriott Bandung
9. 2018 : Tim Perencana Gedung Dakwah Tahap II, Martanegara
Bandung
Dengan ini saya menyatakan bahwa semua informasi yang ada dalam
Riwayat Hidup ini adalah benar dan akurat sesuai dengan keadaan yang
sebenarnya.