LESSE PILOT STUDY – DENDRE PILOT STUDYWAMM ACTIVITIES IN BELGIUM
EUROPEAN COMMISSION - DIRECTORATE GENERAL XIII
THE INNOVATION PROGRAMME
Marco Gonella – Bernard Hanquet
-
WAMM
DIGITAL TERRAINMODEL
RAINFALL GAUGES
FLOODEDAREAS LEVEL
METERS
SOILMOISTURE
RAINFALL RADARSATELLITE
WAMM LAY-OUT
Lesse Catchm ent
M euse River
Dendre Catchm ent
-
SOIL MOISTURE ANALYSIS
Lesse Catchment
Rainfall-runoffsim ulations w ithNAM – M IKE 11m odel
-
SUBCATCHMENTS, DTM, TC
-
HYDROLOGICAL PARAMETERS FROM GIS ANALYSIS
-
DETAILED MIKE 11 NETWORK
-
CALIBRATION THROUGH HYDROLOGICALANALYSIS
-
Mean pixel valuefor each sub-basin
6 SAR images from September1992 to April 1993
SOIL MOISTURE EVALUATION FROM SAR
Faculté Universitaire des Sciences Agronomiques de Gembloux - WAMM project - DHI Software Conference - 07/06/1999
Relation SAR/soilmoisture for eachsub-basin
6 simulated soil moisture maps(EPIC-GRID model)
Mean pixel value for each sub-basin
-
SOIL MOISTURE IN NAM
• SM = U (physical meaning of U)
• SM = L (SM is a superficial “sample” of L)
U
L
-
SM (SAR)
SM (SAR) – SM (L,U) ANALYSIS
SM (SAR) CAN BE USED TO VERIFY THE ACTUAL STATE OFTHE SOIL MOISTURE (L,U) IN THE MODEL
SM (L,U,k)
SM (L)
SM (L,U)
-
FLOODED AREAS ANALYSIS
DEM 30X30 m (H 1 m) AVAILABLE FOR THE LESSE RIVER
TOPOGRAPHICAL PROBLEMS
LACK OF GEOMETRICAL DATA
RELIABILITY
-
SIGNIFICANCE PROBLEMS COUPLING HD RESULTS WITHTHE TOPOGRAPHY
ACCURATE DEM (TOPO AND BATHYMETRICAL) ARE NEEDED
-
NEW SURVEYS MADE BY SETHYWITH ADVANCEDTECHNOLOGIES
MULTIBEAMBATHYMETRY
COUPLED WITH
AEROLASERTOPOGRAPHY
GIS DATA MANAGEMENT OFTHE MEUSE RIVER ATDINANT
-
AEROLASERTOPOGRAPHY
MULTIBEAMBATHYMETRY
-
HIGH ACCURACY OF THE DATA
-
CROSS SECTION DATA EXTRACTION FROM THEDEM WITH THE WAMM TOOLBOX IN MIKE 11
-
SIMULATION OF THE 1993FLOOD EVENT
-
Maximum floodextent at first runwith uncalibratedmodel
Zone coveredby the DEM
Traces ofinundationdetected bySAR
COMPARISON WITH SAR IMAGES
HIGH PERFORMANCES OF MIKE 11 GIS FOR FLOODSIMULATIONS STARTING FROM HIGH QUALITY DATA
-
HYDRAULIC SIMULATIONS WITH STRUCTURES
Dendre Catchment
-
HD MODEL
NAM MODEL
CONTROLSTRUCTURES
COMPLETE MODEL SET-UP
-
HYDRODYNAMIC MODEL
MULTI-CHANNELMODEL
-
RAINFALL-RUNOFF MODEL
-
RAINFALL-RUNOFF MODEL
AUTOCALIBRATION
MODULE
-
STRUCTURE OPERATION MODEL
NEW FEATURESIN MIKE 112000: MORECOMPLEXREGULATIONSTRATEGY
NORMALREGULATION:
FIXEDUPSTREAMLEVEL
OVERRIDEREGULATION:
ALL OPEN
-
CONCLUSIONS
Lesse CatchmentRADAR DETECTED SOIL MOISTURE IS A GOOD INFORMATION TOVALIDATE ON REAL TIME THE RAINFALL-RUNOFF MODELS
Meuse RiverHIGH PERFORMANCES OF MIKE 11 GIS FOR FLOODSIMULATIONS CAN BE OBTAINED STARTING FROM HIGHQUALITY TOPO-BATHYMETRICAL DATA
Dendre CatchmentWAMM APPROACH (MIKE 11 HD MODEL) ALLOW THEREPRESENTATION OF REGULATED CHANNEL BOTH IN CASE OFNORMAL AND EXTREME CONDITIONS