� Vision and objectives
� Timeline
� Implementation
� Permanent operation
� Investments
� Membership development
� INFRADEV-3 Transnational access programme
Content
www.eccsel.org
HORIZON
20203
Reduce global warming
Reduce CO2 emissions
Close the knowledge gaps
Nuclear 8% (8%)
Power gen. efficiency and
fuel switching 3% (1%)
Renewables 21% (23%)
End-use fuel switching 12% (12%)
CCS 17%
End-use fuel and electricity
efficiency 42% (39%)
Reduction needed to keep global warming within 1,5 °C ??
IEA 2 degrees low carbon path
www.eccsel.org
Vision and Objectives
HORIZON
20204
ECCSEL vision:
Enabling low to zero CO2 emissions from industry and power generation
Main objectives
� Establish and operate a world class distributed CCS research
infrastructure in Europe
� Integrate and upgrade existing research facilities and supplement with
new ones
� Enhance European science, technology development, innovation and
education in the field of CCS
� Enable spin-off activities and generation of new business
Vision and Objectives
www.eccsel.org
HORIZON
2020
ECCSEL timeline
5
2008 20202009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Implementation
FP7 pre-project granted
Preparatory phase
INFRADEV-3 (H2020)PP1 (FP7) PP2 (FP7)
H2020 Infradev-3 project granted
ECCSEL to be converted into a legal entity (ERIC)
Permanent Operation
Upgrades and new builds (200 Mill Euro until 2030)
European RI legal entity
www.eccsel.org
HORIZON
2020
ECCSEL INFRADEV-3 Partners
6
14 partners are part of this project:
• NTNU (Norway) – Project Leader
• BGS (United Kingdom)
• BRGM (France)
• CERTH (Greece)
• CIUDEN (Spain)
• ETH Zurich (Switzerland)
• GIG (Poland)
• OGS (Italy)
• PGI-NRI (Poland)
• SINTEF Energy (Norway)
• SINTEF Materials and Chemistry
(Norway)
• SINTEF Petroleum (Norway)
• SOTACARBO (Italy)
• TNO (The Netherlands)
Implementation
www.eccsel.org
HORIZON
20207
� Final application sent to EC December 2016
� Expected EC approval by May 2017
� Planned ECCSEL ERIC Inauguration June 12th
2017 in Trondheim
� Fully operative from September 1st 2017
Permanent Operation
Conversion into ECCSEL ERIC (European Research Infrastructure Consortium) legal entity
www.eccsel.org
HORIZON
20208
General assembly
Researchfacilities
1 2 …5
Operations Centre (OC)Director / Management
User Entry point
FACILITY
OPERATORS/
OWNERS
Peer review
ADVISORY COMMITEES/
BOARDS
Scientific
Industry
Infrastructure Coordination Committee
National node B
Binding access rules, HSE, IPR
Binding accessAgreements and
operational follow up
3Ethics &
Environment
National node C
National node….
National node A
4 6 n
ECCSEL ERIC Functional Organisation
Permanent Operation
HORIZON
2020
Lean organization:
� 4-6 employees
� Annual budget ≈ 850.000 EUR
Including in-kind contributions
9
Location: NTNU/SINTEF Campus
Trondheim, Norway
www.eccsel.org
ECCSEL ERIC
Permanent Operation
HORIZON
202010
Gap analysis – main conclusions
� Capture and transport: Need for up-scaling promising
solutions and testing at more
severe experimental
conditions (pressure,
temperature, gas
compositions, ..)
� Storage: Need for a variety of test/pilot sites throughout Europe
Investments
www.eccsel.org
HORIZON
2020
New Capture Facilities (Extract)
Item Description Priority CategoryBudgeted investment
cost in million €
13 Mobile unit (container size) for testing of CO2 capture from flue gases by absorption/desorption (≈1000 m3/h) High New 3-5
14Facility for testing (pilot scale, 1-10 m2) of inorganic membranes and modules for oxy- and Pre-combustion
applicationsHigh New 3-4
15
Experimental facility (small pilot) suitable for CO2 purification of gas mixtures originating from oxy-
combustion processes as well as CO2 / H2 separation, for pressures up to 110 bar and temperatures -70 ℃ -
+50℃. The test rig should be highly instrumented to monitor the operation of heat exchangers and non-equilibria
operations, and be built to handle the HSE requirements of H2.
High New 3-4
16
Aerosol counter measure development facility: demonstration of suitable countermeasures for aerosol formation
during post-combustion capture at different scales. Lab pilot: special demisters, wet electrostatic precipitator
(WESP), impactor. Pilot scale (real flue gas): wet electrostatic precipitator.
High New 2-3
17
Experimental facility for adsorption techniques capturing CO2 from flue gases at atmospheric pressure. The
facility should preferably be located to an industrial site where a realistic gas mixture can be provided. A mobile
unit serving various purposes is preferred.
High
MediumNew 2-3
18
Facility for testing (pilot scale, 1-10 m2) of inorganic high-temperature CO2/H2-separating membranes and
modules (pre-combustion power plant and industrial type applications). This facility should allow testing of
high-temperature H2S removal.
Medium
To HighNew 5-7
19
Experimental facility for testing of CO2/H2-separation at pressures up to 110 bar with auxiliary refrigeration at
temperatures down to at least -60ºC. Test rigs are further needed to be built to handle the HSE requirements of
H2.
Medium New 2-3
20 Experimental facility to investigate heat transfer and pressure loss in heat exchanger channels for CO2 mixtures. Medium New 1-2
21
Experimental facility for efficient laboratory screening and characterisation of absorption solvents at higher
pressures. (Low CO2 partial pressure and higher total pressure equilibrium measurements and high-pressure
kinetics.)
Medium
New or
upgrade
existing
2-3
22Experimental facility for membrane technology capturing CO2 from flue gases at atmospheric pressure. The
facility should preferably be located to an industrial site where a realistic gas mixture can be provided.Medium New 4-6
23 Experimental facility (pilot >3 MW thermal) for Chemical Looping Combustion (CLC) for solid fuels. Medium New 10-15
Investments
11www.eccsel.org
HORIZON
2020
New Storage Facilities (Extract)
Item Description Priority Category
Budgeted
investment cost
in million €
25
A pilot scale research facility for injection into a fracture to study
migration and attenuation processes during migration through the
overburden. Challenges could be site identification and permitting.
�Hontomin and Svalbard may be possible candidates.
High
New or
upgrade
existing
3-8
26
A large (i.e. metres-scale) true tri-axial cell to enable cap
rocks. Such a cell will give us the realistic stress testing for
reservoir and opportunity to investigate more realistic stress
distributions. For example, we could run fracture
propagation tests which are not possible in existing
equipment due to boundary effects.
Medium New 2-3
27
Well scale testing facility at well (with realistic diameter) for evaluating
in-situ a range of in-situ potentially damaging processes specific to
CCS wells (temperature changes, pressure changes, low pH
conditions...). This implies: cement-rock bonding, casing-cement
bonding, casing boundaries, remediation technologies, borehole
monitoring.
Medium New 3-5
28
Engineering facility to develop new low-cost, advanced, drilling
techniques for site characterisation and monitoring.
�Svelvik may be a potential candidate
Medium New 2-4
29
Facility to simulate leakage for developing models and integrated
monitoring technologies for offshore storage.
�No storage site needed.
High New 3-8
www.eccsel.org
Investments
12
HORIZON
2020
Research Facilities
CaptureM€
TransportM€
StorageM€
SUMM€
Upgrade 29-35 0,25 5-8 34-43
New 11-16 5-8 6-16 22-40
SUM 40-51 5-8 11-24 56-83
Cost of identified high priority facilities only
Over the first 5 -10 years a total investment in the range €80-120
million is expected
Investments
HORIZON
202014
Preparatory Phase(2011 – 2014)
Norway (host)• NTNU, SINTEF,
RCNFrance • IFPEN, BRGMThe Netherlands • TNOGermany • Universität StuttgartUnited Kingdom • BGSSwitzerland • ETH ZürichSpain • CIUDENItaly • OGS, ENEAGreece • CERTH, ISFTAPoland• PGI-NRI
ECCSEL ERIC(2017 – )
• Norway (Operations Centre)
• The Netherlands• Italy• France• United Kingdom• Poland• Greece• Spain• Switzerland (ERIC
observer)
Signed up final commitment to become founding members of ECCSEL ERIC
Signed Letter of Intent (LoI) to join ECCSEL ERIC
Expansion (2017 – )
• Germany• Czech Republic • Other member states• Bilateral agreements
with oversea states,institutions, industry
www.eccsel.org
Membership Development and Expansion
Implementation Phase (2015 – 2017)
Norway (host)• NTNU, SINTEFFrance • BRGMThe Netherlands • TNOUnited Kingdom • BGSSwitzerland • ETH ZürichSpain • CIUDENItaly • OGS, SotacarboGreece • CERTHPoland• PGI-NRI, GIG
HORIZON
2020
Capture Labs Transport Labs Storage Labs
Absorption Labs
Membrane Labs
Cryogenics Labs
Combustion Labs
CO2 characterization Labs
Material integrity Labs
Rock characterization Labs
Field Labs
Solid Sorbent Labs
Sorted by category/science area
Transnational Access (TA) Programme
www.eccsel.org
HORIZON
2020
ECCSEL INFRADEV-3 Implementation Partners
16
14 partners are part of this project:
• NTNU (Norway) – Project Leader
• BGS (United Kingdom)
• BRGM (France)
• CERTH (Greece)
• CIUDEN (Spain)
• ETH Zurich (Switzerland)
• GIG (Poland)
• OGS (Italy)
• PGI-NRI (Poland)
• SINTEF Energy (Norway)
• SINTEF Materials and Chemistry
(Norway)
• SINTEF Petroleum (Norway)
• SOTACARBO (Italy)
• TNO (The Netherlands)
Transnational Access (TA) Programme
www.eccsel.org
HORIZON
2020
TA to 44 ECCSEL facilities -funded by H2020
17
3 TA open calls
• March 2016 – closed
(11 successful applications)
• June 2016 – closed
(5 successful applications)
• December 2016 (Open until June 2017)
Published
• ECCSEL - www.eccsel.org
• EU - http://www.rich2020.eu/tas_calls
• Direct e-mail
• Quarterly Greenhouse News newsletter
• IEAGHG Weekly News email (worldwide)
• CLIMIT newsletter (next call)
• EERA
• BigCCS website
• UKCCS Research Centre website
• ESFRI_EU Twitter
• NTNU intranet
• Info-days & training courses …
HORIZON
2020
Fact sheets (web) for all 44 TA facilities
� Organisation name
� Installation name
� Location
� Category, Science area
� Short description
� Pictures
� Calendar
Transnational Access
www.eccsel.org
HORIZON
2020
Third TA call overview
19
� 28 ECCSEL Infradev-3 facilities included
� Call opened December 2016
� Continuous open call until we have used up TA funds for this project (monthly reviews).
� First for facilities which have not had TA access
� Early this year will we try to reallocate some funds (subject to ECCSEL consortium and EU approval).
HORIZON
2020
Third TA call overview
20
� 28 ECCSEL Infradev-3 facilities included initially
� Call still open
Successful Applications so far for:� GIG HPTGA (TA12.1) – from Serbia
� TNO Mini Plant (TA2.1) – from Kazakhstan
� OGS Panarea Natural Laboratory (TA7.4) – from Slovenia
� BGS RMPL (TA3.2) – from Norway
� CIUDEN Transport Rig (TA5.2) – from Belgium
HORIZON
2020
Third TA call overview
21
15 ECCSEL Infradev-3 facilities still available
Capture:Insti
tution
Coun
try
Num
ber
Short NameLong Name
Access
unit
Unit
quan
tity
Pro
jects
CERTH GR TA 9.1 CERTH CLC Chemical Looping Combustion facility week 3 1
ETH Zürich CH TA11.1 ETH-BAL Adsorption Equilibrium Measurement Balance month 1 1
ETH Zürich CH TA11.2 ETH-PSA Two column lab PSA setup month 1 1
GIG PL TA12.2 GIG-FBR Fixed bed reactor week 3 1
GIG PL TA12.3 GIG-MBR Pilot-scale moving bed reactor week 1 1
NTNU NO TA1.5 ABSEQ Thermodynamic studies package week 4 1
NTNU NO TA1.1 MEM-FAB
Facilities to fabricate polymer-based membranes. Those
can be testet on the MEM-PERM facilities to test
membrane gas permeation performance
week 4 1
SINTEF
(MC)NO TA4.3 SINTEF PPLab Powder processing laboratories for CCS day 5 1
SINTEF
(MC)NO TA4.5 SINTEF SDR Solvent Degradation Rig day 30 1
SINTEF
(MC)NO TA4.6
SINTEF Tiller
PilotTiller CO2 Capture Pilot Plant day 20 1
SINTEF ER NO TA 8.1 CLC Hot Rig Chemical Looping Combustion Rig week 2 1
SOTA-
CARBOIT TA 10.1 COHYGEN COHYGEN (Coal to Hydrogen Generation) pilot plant day 20 1
TNO NL TA2.3 CLC CLC fixed bed facility week 4 1
TNO NL TA2.4 High-P abs&des High pressure absorption and desorption pilot week 4 1
TNO NL TA2.2 Qscan QSCAN solvent test street week 4 1
HORIZON
2020
Third TA call overview
22
8 ECCSEL Infradev-3 facilities still available for
Storage:
InstitutionCoun
try
Num
berShort Name Long Name Access unit Unit quantity Projects
BGS / NERC UK TA3.3 HTL Hydrothermal Laboratory month 1 1
BGS / NERC UK TA3.1 TPRL Transport Properties Research Laboratory month 1 1
CERTH GR TA 9.2
CERTH
Storage
facilities
CO2 Storage facilities week 3 1
CIUDEN ES TA5.1 PISCO2 Pilot for Injection of CO2 in Soils week 3 1
ETH Zürich CH TA11.4ETH Conf-
PermHigh pressure hydrostatic flow cell month 1 1
OGS IT TA7.1 DeepLab
DeepLab Sea Floor Landers for
meteooceanographic physical and geochemical
data collection
day 5 1
PGI-NRI PL TA6.2 GEOPH-Lab GEOPH-Lab week 2 1
SINTEF
PETROLEUM
AS
NO TA13.1SINTEF PR –
SCALCore Flood (SCAL) laboratory day 30 1
HORIZON
2020
TA - Application
23
Online Application from EU&non-EU for
� ‘Free of charge' (equal opportunity) access to a facility of the ECCSEL RI,
� to selected researchers or research teams (including from industry),
� working in a country other than the country where the RI is located.
Information
� Personal (and group) information
� Project description and objectives
� Equipment required & preferred facilities
� Own chemicals brought
� Ethical & environmental impact
� Publication plans
HORIZON
202024www.eccsel.org
Transnational Access Application Process
Start/End
“Open” CALL (3x) published in 2016
Application made by Potential Users
Pre-Screening of Applications
Peer Review Committee
Successful Projects/Users access the Infrastructure
HSE and Practical Local Training
Dissemination
HORIZON
2020
EU funding for Access Costs for transnational access
25
Access costs: Costs incurred by the access provider for the provision of access.
They cover: • The running costs of the installation
• Costs for logistical, technological and scientific support to users’
access, including ad-hoc training and preparatory and closing
activities necessary to carry out user’s work
Researcher expenditure:
Covers travel, subsistence
HORIZON
2020
EU funding: How much access is available ?
26
At least one EU funded access to each of the included facilities
• Typical time needed for a research project is listed on fact sheet
• Reasonable Travel and Subsidence funding for one researcher
• Up to € 500 for travel
• Up to € 100 for each day at the facility
• Travel claim with receipts must be submitted
• Access is also available to all those facilities and some additional
which will be listed soon to researchers paying the access costs
HORIZON
202027www.eccsel.org
Thank you for your attention!
www.eccsel.org