TMN Workshop Antwerp, 27 May1998 EURESCOM Project P708 EURESCOM Project P708 TMN X-Interface Studies TMN X-Interface Studies and Experiments for ATM and Experiments for ATM Colin Smith (BT) Donald Ranasinghe (BT) Marina Geymonat (CSELT) Project Participants: Belgacom, BT, CSELT, Deutsche Telekom, Finnet Group, France Telecom, OTE, Sonera, SwissCom, Telefonica I+D

Upload: melyssa-simpson

Post on 14-Mar-2016

25 views

Category:

Documents


0 download

DESCRIPTION

TMN X-Interface Studies and Experiments for ATM. EURESCOM Project P708. Colin Smith (BT) Donald Ranasinghe (BT) Marina Geymonat (CSELT) Project Participants: Belgacom, BT, CSELT, Deutsche Telekom, Finnet Group, France Telecom, OTE, Sonera, SwissCom, Telefonica I+D. Rationale. - PowerPoint PPT Presentation

TRANSCRIPT

TMN WorkshopAntwerp, 27 May1998

EURESCOM Project P708EURESCOM Project P708

TMN X-Interface Studies and TMN X-Interface Studies and Experiments for ATMExperiments for ATM

Colin Smith (BT)Donald Ranasinghe (BT)

Marina Geymonat (CSELT)

Project Participants: Belgacom, BT, CSELT, Deutsche Telekom, Finnet Group, France Telecom, OTE,

Sonera, SwissCom, Telefonica I+D

TMN WorkshopAntwerp, 27 May1998

Need for a global ATM VP service both Need for a global ATM VP service both in Europe and World-widein Europe and World-wide

RationaleRationale

TMN WorkshopAntwerp, 27 May1998

MANAGEMENTMANAGEMENTLAYERLAYER

NETWORKNETWORKLAYER (ATM)LAYER (ATM)

PNO A

PNO B

PNO C

PNO D

MANAGEMENTNETWORK

ATMNetwork

ATMNetwork

ATMNetwork

ATMNetwork

Inter-Domain ConnectionsInter-Domain Connections

TMN WorkshopAntwerp, 27 May1998

PNO A

PNO B

PNO C

PNO D

MANAGEMENTMANAGEMENTNETWORKNETWORK

IssuesIssues at the at the Management Management LayerLayer

• Co-operative Management of Interdomain Connections

• Communications between Management Systems

Need ForNeed For

A Common Protocol

A Standardised Interface

TMN WorkshopAntwerp, 27 May1998

TMN X-Interfaces: Xcoop, XuserTMN X-Interfaces: Xcoop, Xuser

PRIVATEPRIVATE PNO A PNO B

ManagementSystem (NE)

ManagementSystem (NE)

Q3 elQ3 el Q3 elQ3 el

ManagementSystem

(Network Level)

ManagementSystem

(Network Level)

Q3 nwQ3 nw Q3 nwQ3 nw

M3Customer

ManagementSystem

Xuser Xcoop/M5

TMN WorkshopAntwerp, 27 May1998

Xcoop Functional AreasXcoop Functional Areas

FAULT FAULT (ETSI-300 820.2) (ETSI-300 820.2)

CONFIGURATION (ETSI-300 820.1)CONFIGURATION (ETSI-300 820.1)

PROTOCOL

PROTOCOL

Specified in GDMO language

Implemented with CMIP protocol

EXISTING

EXISTING

TMN WorkshopAntwerp, 27 May1998

Objectives of P708Objectives of P708Xcoop validated specification for:• Performance Management• Accounting Management

X.25

Europe-wide infrastructurePET-Lab to test TMN X-

Interfacespecifications (any technology)Implement and Test (EURESCOM P710)

Security Solutions for the X-Interface

TMN WorkshopAntwerp, 27 May1998

Performance ManagementPerformance Management Monitoring of ATM VPs (including

parts over Inter- PNO Links) Real-time monitoring of performance

parameters & inspection of History Logs Setting of thresholds & alarm reporting to

Initiating PNO when exceeded

REQUIREMENTS

REQUIREMENTS

ISSUES

ISSUES PNOs are not comfortable with other PNOs reading their performance data

Standards at the Network Level for ATM are still immature

TMN WorkshopAntwerp, 27 May1998

Accounting Accounting ManagementManagement• No billing or charging scheme is to be produced

• Provide the PNOs with the necessary information to be able to account for the resources actually used by the customer

• Need to identify parameters to quantify the actual use of resources involved in an international VP service

• Real-time charging to customer

TMN WorkshopAntwerp, 27 May1998

Validation MethodologyValidation Methodology1 Specification phase

Xcoop SpecificationXcoop Specification

2 Separate implementation

3 Test Specification

4 Test Execution over the PET-Lab

TestExecution

NONOYESYES

Passed?

revision ofspecification

implementation updating

ValidatedX-Interface Specification

TMN WorkshopAntwerp, 27 May1998

Interconnection of 6 Labs with multi-vendorInterconnection of 6 Labs with multi-vendorManagement Platforms InteroperatingManagement Platforms InteroperatingEach lab has an OSI stack Each lab has an OSI stack Platform & ToolkitPlatform & Toolkit

Testing of other networks TCP/IP (RFC 1006) Testing of other networks TCP/IP (RFC 1006) ISDNISDN

Pan-European TMN LaboratoryPan-European TMN Laboratory

Management Platform

X.25

OSI stack

TMN WorkshopAntwerp, 27 May1998

X - Interface SecurityX - Interface Security• Key feature for a trustworthy Inter- domain Key feature for a trustworthy Inter- domain

managementmanagement• Co-operation with EURESCOM project P710 to test Co-operation with EURESCOM project P710 to test

the security solutions they proposethe security solutions they propose

• A security reference architecture will be defined A security reference architecture will be defined allowing the integration of standard APIs (GSS) with allowing the integration of standard APIs (GSS) with off-the-shelf components and existing management off-the-shelf components and existing management applicationsapplications

• Liaison with platform vendors to get security features Liaison with platform vendors to get security features into commercial TMN platformsinto commercial TMN platforms

TMN WorkshopAntwerp, 27 May1998

ConclusionsConclusions• X-interfacesX-interfaces are necessary for a global services are necessary for a global services

• Only Only Validated SpecificationsValidated Specifications should be should be issuedissued

• The The Pan-European TMN LabPan-European TMN Lab is used for X- is used for X- Interface specification validationInterface specification validation

• Performance and AccountingPerformance and Accounting are still very are still very immature, but clear requirements for theimmature, but clear requirements for the X-Interface have been identifiedX-Interface have been identified

• SecuritySecurity needed for commercial services needed for commercial services

TMN WorkshopAntwerp, 27 May1998

Colin C SmithBT Laboratories (B54/134)Martlesham HeathIpswich. IP5 3RE, UK

CONTACT INFORMATION

THANK YOUTHANK YOU

THE ENDTHE END

E-Mail: [email protected] Phone: +44 1473 648123Fax: +44 1473 643545