eurailspeed - uic · pdf file1 joachim janle director sales,international business transport...

22
1 Joachim Janle Director Sales,International Business Transport Solutions Division, Alcatel Eurailspeed Parallel Session D.5

Upload: hoangcong

Post on 07-Feb-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

1

Joachim JanleDirector Sales,International Business Transport Solutions Division, Alcatel

EurailspeedParallel Session D.5

Alle Rechte vorbehalten © 2005, Alcatel

ETCS Interoperability

J. Janle, Director Sales, International Business

A Suppliers Point of View

Page 3

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

ETCS/ERTMS Targetsn Increase of Speed and Decrease of headway n Increase of SafetynEuropean Specifications -> Acceleration of Cross-Border Rail TrafficnCompetitive Open market for suppliers and railways

-> Increasing Competitiveness of Railways

Current StatusnApproximately 60 ETCS projects have been contracted so farnETCS solutions for approx. 10.100 km of track and 1.200 OBUsnCorresponding value project value roughly 1.000 M€ in totalnMostly to be realised until 2007, around 30% already completed

ETCS Interoperability

Page 4

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

Definition of Interoperabilityn Interoperability is achieved when a system is able and allowed to

operate together with other systems of different origin within predefined limitsn Interoperability is possible in many different areas

-> Most important Interoperability areas for ETCS Level 2nRBC-OBU interfacenRBC-RBC interfaces

ETCS Interoperability

Page 5

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

Why do we need Interoperability Testing ? We have Specifications !

ETCS Interoperability

UNISIG 2.2.2 + Subsets XXX UIC ETCS FRS

EEIG 97SO66 EIRENE FRS

MORANE FFFIS TSIs CENELEC EN 50XXX

Page 6

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

Syntax and Semantic

ETCS Interoperability

COW ?

Page 7

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

Why do we need Interoperability Testing ? We have Specifications !

ETCS Interoperability

So:nThe solutions defined by UNISIG 2.3.0 (= 2.2.2 + Subset 108 + …) will

only form the basis to reach interoperabilitynUNISIG does not specify operational interoperability

SYNTAX = UNISIG SEMANTIC = Operational Scenarios

Page 8

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

Jüterbog –Halle/Leipzig

ETCS L2

Seetallinie,Delemont

ETCS L1

Seetallinie,Delemont

ETCS L1

Ludwigsfelde –Jüterbog

ETCS L2,L3

Czech Validation CircuitETCS L1

LötschbergTunnel

ETCS L1,L2

LötschbergTunnel

ETCS L1,L2

Ankara –IstanbulETCS L1

Ankara –IstanbulETCS L1

Vienna –HU Border

ETCS L1

Sofia –BurgasETCS L1

Hungaria –SloveniaETCS L1

Vienna –Budapest

ETCS L1

Budapest –HU Border

ETCS L1

Budapest –HU Border

ETCS L1

LuxembourgETCS L1

LuxembourgETCS L1

Amsterdam –Antwerpen

ETCS L2

EMSETETCS L1

La Sagra –Toledo

ETCS L1,L2

La Sagra –Toledo

ETCS L1,L2

Lleida –BarcelonaETCS L1,L2

Lleida –BarcelonaETCS L1,L2

Segovia –ValladolidETCS L1,L2

Segovia –ValladolidETCS L1,L2

Brucoli –MegaraETCS L1

Brucoli –MegaraETCS L1

ETCS Interoperability, Alcatel ETCS Projects

Page 9

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

Germany: Ludwigsfelde-Jüterbog Projectn 1 RBC for 35 km

Germany: Jüterbog-Halle/Leipzig Projectn 2 RBCs for 120 km

ETCS Interoperability, Alcatel ETCS Level 2

Page 10

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

ETCS Interoperability, Alcatel ETCS Level 2

RBCALCATEL OBU

ALCATELSIEMENS √

Germany: 2 ETCS Level 2 Projectsn Interoperability Status

Page 11

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

Switzerland: Lötschberg Base Tunnel Projectn 200 km/hn 1 RBC for 35 km n 5 Alcatel Electronic Interlockings

ETCS Interoperability, Alcatel ETCS Level 2

Page 12

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

ETCS Interoperability, Alcatel ETCS Level 2

RBCOBUALCATEL ALSTOM

OBU

OBU SIEMENS

BOMBARDIER

Switzerland: Lötschberg Base Tunnel Projectn Interoperability Status

Page 13

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

ETCS Interoperability, Alcatel ETCS Level 2

Spain: 3 ETCS Level 2 Projects

Lleida - Barcelonan 350 km/hn 4 RBCs for 176 km

La Sagra - Toledon 250 km/hn 1 RBC for 20 km

Segovia - Valladolidn 350 km/hn 2 RBCs for 91 km

Page 14

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

ETCS Interoperability, Alcatel ETCS Level 2

RBCOBUALCATEL ALSTOM

OBU SIEMENS

Spain: 3 ETCS Level 2 Projectsn Interoperability Status

OBU CSEE

Page 15

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

Netherlands: HSL Zuidn 350 km/hn 2 RBCs for 45 km

ETCS Interoperability, Alcatel ETCS Level 2

Page 16

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

ETCS Interoperability, Alcatel ETCS Level 2

RBCALCATEL

OBU

OBU SIEMENS

ANSALDO

Netherlands: HSL Zuidn Interoperability Status

Page 17

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

ETCS Interoperability, Alcatel ETCS Level 2

Netherlands (HSL Zuid) / Belgium (L4)n Interoperability Status

RBCALCATEL √ALSTOM

RBC

SolutionnNew Specification for RBC-RBC-Interface based on UNISIG (Subset

039) will become the new standard in EuropenGateway Solution: Alstom and Alcatel Adaptation of Communication

Protocol separately in RBC, joint specification and implementation of UNISIG Application Protocol in Alcatel RBC and Alstom RBC

Page 18

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

ETCS Interoperability, Alcatel ETCS Level 2

Netherlands (HSL Zuid) / Belgium (L4)n Interoperability Status

RBCALCATEL √ALSTOM

RBC

Alcatel and AlstomLeader in Interoperability Verification

Page 19

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

OBU

IL ProductTest IL

ProductTest RBC

ProductTest OBU

IntegrationInfrastructure

IntegrationETCS

System testInfrastructure

System testETCS

LocoProduct

Test Loco

IntegrationTrainborne

System testTrainborne C

ompl

ete

Sig

nalli

ng S

yste

m

Fit

for

Pur

poseRBC

Project Content

Interoperability Test

ETCS Interoperability, Testing

Page 20

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

Interoperability Testing Example: RBC-OBUnActivation and DeactivationnMode- and Level-ChangenReversingnEmergency StopnData Transmission LimitsnTemporary Speed RestrictionsnTrain Data ChangenMessaging

-> Around 1200 Test Cases for Laboratory and Field !

ETCS Interoperability, Testing

Page 21

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

SummarynAwareness of Interoperability Verification requirednProvide the Basis for Definition of Test SpecificationsnRailways to maintain Differences in operational Scenarios as small

as possiblenExchange Experience in Definition of Operational Scenarios

between RailwaysnDefinition of which CR requests are relevant for the individual

Railway

ETCS Interoperability

Page 22

All rights reserved © 2005, AlcatelETCS Interoperability, November 2005.PPT

www.alcatel.de/transport

T R A I N C O N T R O L B Y A L C A T E L

Mille Grazie !