eu-frågor, ekonomi-administrativ inriktning, vid liu:s ... · project . duration . 9 max 60 months...

26
EU-frågor, ekonomi-administrativ inriktning, vid LiU:s institutioner 30 januari 2014 Mårten Rosander Financial Coordinator Grants Office

Upload: others

Post on 29-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

EU-frågor, ekonomi-administrativ inriktning, vid LiU:s institutioner

30 januari 2014 Mårten Rosander

Financial Coordinator

Grants Office

Page 2: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

Grants Office Supporting Researchers at LiU! (3 heltid)

Johan Åkerman Johan Åkerman, Head of Unit Research Coordinator. EUs Framework Programme, mainly towards the Faculty of Arts and Sciences and the Faculty of Educational Sciences. Expert on the FP7 jurisdiction.

Per Dannetun Research Director. National Research Coordinator. Rapporteur at Vice-Chancellors Council for Research and at the Council for Research Infrastructure.

Bohdan Sklepkovych Science writer. Strategic project/grant development for H2020 (ERC), national and international programmes.

Svjetlana Stekovic Research Coordinator. EUs Framework Programme, mainly towards the Institute of Technology and the Faculty of Health Sciences.EU FP7 Project Management

2

Linda Forssén (50% Maternity leave) Coordinator. Coordinates the follow up on LiU:s participation in FP7. Responsible for the homepage and information about calls Coordinates seminars and events at Grants Office. Contact for Research Professional.

Mårten Rosander Financial Coordinator. Support with budget and revision of research projects. Support with contract negotiations. Support concerning form templates.

Sara Strömberg (50% Maternity leave) Research Coordinator. EUs Framework Programme, mainly towards th Faculty of Health Sciences..

Michael Lögdlund Research Coordinator. National Research Coordinator, EUs Framework Programme. Mainly towards the Institute of Technology

Page 3: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

Nytt i hos på LiU/GO 2020

• Grants Office Nya hemsida med Horizon 2020 handbok

• http://www.liu.se/go • LKP nu 51,25 % (2014), ifall någon

missat det? 3

Page 4: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

4

Page 5: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

5

LiU-id required

Page 6: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

Nytt hem i Key huset

6

Page 7: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

7

LiU slutade på 123 beviljade projekt inom FP7!

Page 8: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

Evaluation Possible EC Audit

Grant Preparation (Application stands)

Project Duration

9 Months Max 60 Months 24 Months

Total Maximum Lifecycle is 104 months (≈8,5 years)!

Pre-Award Post-Award

Draft Proposal

From Call to Deadline

5 Months 3-4 Months

8-9 Months! Time Available to Write Proposals

Without EC audit the total max lifecycles is 78 months (6.5 yea

Max Lifecycle of an EU project (Horizon 2020)

8

GPF GA CA (Nu även i vissa MSCA) (Budget)

2-4 Financial and Scientific reports FP7 CFS Audit>=375 k€

Budget

CFS Audit >=325 k€ FP7>=375 k€

Page 9: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

Juristenheten

• Elisabet Permvall • Maria Skoglund • [email protected]

9

Page 10: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

Upphandlingsenheten • Rut Jonsson • Öhrlings PricewaterhouseCoopers AB

(Linköpingskontoret) Revisionstjänster för forskningsprojekt

finansierade av svenska och EU finansiärer • Öhrlings PricewaterhouseCoopers AB

(Stockholmskontoret) Revisionstjänster för forskningsprojekt

finansierade av amerikanska finansiärer

10

Page 11: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

Revisor för forskningsprojekt • Öhrlings PricewaterhouseCoopers AB

(Linköpingskontoret) • Eva Myrén

11

Page 12: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

Horizon 2020

12

12

Top Priorities

Tackling Societal Challenges • Health, demographics changes and well-

being • Food security and sustainable bio-resources • Secure, clean and efficient energy • Smart, green and integrated transport • Resource efficiency and climate challenge • Secure, innovative and inclusive societies

Creating Industrial Leadership and Competitive Frameworks

• Leadership in enabling technologies ICT, nanotechnology, advanced

materials, advanced manufacturing and processing, biotechnology, space

• Access to risk finance • Innovation in SMEs

Excellence in the Science Base • Frontier research (ERC) • Future and Emerging Technologies (FET) • Skills, training and career development

(Marie Sklodowska Curie Actions) • Research infrastructure

Common rules, toolkit and funding schemes

Simplified access

Page 13: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

Financial News in Horizon 2020 • CFS*: ”only for payment at the balance (final

payments), when total EU contribution claimed by the beneficiary on the basis of actual costs > 325 000 €“

• Only Actual cost (and unit cost) counts= 406 250 € according to the old rules

• This means only one audit certificate per Grant • CFS is a DIRECT COST and not subcontracting in

Horizon 2020 • In principle all subcontacting is a direct cost=

we get indirect cost (25 %) on those too. • Audit Rules for FP7 remains at 375 k€ or more

for each period. • 25 % coverage for indirect costs

13

*CFS=Certificate of Financial Statement=Revisionsintyg

Page 14: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

News in Horizon 2020 • Exchange rate is euro at the

average of the daily exchange rates published on the European Central Bank website, calculated over the corresponding reporting period.

• http://www.ecb.europa.eu/stats/exchange/eurofxref/html/eurofxref-graph-sek.en.html

14

Page 15: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

News in Horizon 2020 • 1720<90% hours is always allowed

to be used as productive hours • Maximum time for an EC Ex Post

Audit is up to 2 years after the payment of the balance

• No more negotiations: each proposal evaluated 'as it is', not as 'what could be';

• No more paper: e-communication & e-signature of grants.

15

Page 16: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

Application/Budget • RTD (Research and Technical

Development) is now R&I (Research and Innovation)

• Types of actions: • Research and Innovation Actions (100 %) • Innovation actions (100/70 %) (produce

plans & arrangements or designs for new, altered or improved products, processes or services)

• Coordination and support actions (100 %) • MSCA (Marie Sklodowska Curie) (Unit

Cost) • ERC (100 %)

16

Page 17: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

Application

• Place to find your calls, apply and report

Participant portal

• http://ec.europa.eu/research/participants/portal/desktop/en/home.html

17

Page 18: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

18

Page 19: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

19

Page 20: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

20

Page 21: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

21

Page 22: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

SUMMARY Reporting • FSIGN for all grants signed after 1 January 2013,

amendment or paper for those prior to that date.

• Average exchange rate

• CFS*: ”only for payment at the balance (final payments), when total EU contribution claimed by the beneficiary on the basis of actual costs > 325 000 € “

22

Page 23: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

Financial Statement Authorised Signatory (FSIGN)

• For grants signed after 1 January 2013 otherwise the current process of parallel electronic submission and paper signature will still be available.

• Organisations have to identify online the persons authorised to sign forms C

• The nomination of a LEAR for each participating organisation becomes thus mandatory. LEARs can register an unlimited number of FSIGNs for their organisation, can add comments to each name and can revoke or replace them at any time.

• The link between a particular FSIGN (from the list you have encoded) and a specific project will be made by one of the Participant Contacts (PaCo) (or Coordinator Contacts for the coordinating organisation) of the respective project.

• When a Form C is ready for submission a notification will be sent to the FSIGN

23

Page 24: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

24

Budget PART A

Auto calculated at 25 % of your Total Eligible costs!

Only Totals in Part A

Usaully doesn’t apply at LiU!

Budget in PP

Page 25: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

CFS • Öhrlings PricewaterhouseCoopers AB • Org.nr: 556029-6740 • Tel.nr: 010-212 40 00 • E-post: [email protected]

• Kontaktperson • Eva Myrén • PwC • 581 02 Linköping • Tel. 010-212 95 39 • E-post: [email protected] • Ca 3 500 € per revision i budget

(subcontracting under management)

25

Page 26: EU-frågor, ekonomi-administrativ inriktning, vid LiU:s ... · Project . Duration . 9 Max 60 Months . Months 24 Months Total Maximum Lifecycle is 104 months (≈8,5 years)! Pre-Award

www.liu.se