ETHIOPIAN RAILWAYS CORPORATION
MAY 2012
THE FEDERAL DEMOCRATIC REPUPLIC OF ETHIOPIA (FDRE)
MINISTRY OF TRANSPORT (MOT)
Global Project Plaza 2012
May 30 - June 1, 2012
Lotte Hotel World, Seoul, Korea
2
ETHIOPIAN RAILWAYS CORPORATION
Introduction
Identification of Railway Corridors.
Preliminary railway priority ranking
The establishment of Ethiopian Railways Corporation
Railways Alignment selection
Ethiopian national railway network
Project Financing
Status of the Projects
Introduction
-The Governments’ appropriate socio-economic reforms -Sustainable macro-economic policies -Successful sectoral and regional strategies and programs
unleashing the potentials for accelerated development
ETHIOPIAN RAILWAYS CORPORATION
Adversely affected unless development in the transportation sector is attained with sufficient capacity
The Ministry of Transport of Federal Democratic Republic of Ethiopia was found to be prudent to develop Railway in the country
Technical Advisory Group(TAG) has been Formed to indicate
framework for Railway network in Ethiopia
Introduction >>>> ETHIOPIAN RAILWAYS CORPORATION
Identification of railway corridors
No Project Estimated
Length (Km)
1 Addis Ababa-Dessie-Mekele
722
2 Modjo- Jima 328
3 Modjo-Nekmpt 348
4 Bahir Dar-Wodeiya-Mile-Djibouti
655
5 Addis Ababa-DireDawa-Djibouti
650
GROUP A
No Project Estimated
Length (Km)
1 Adama-Dera-Seru-Ginir
300
2 Modjo-Awassa-Arbaminch
400
3 Bahir Dar-Gondar (Azezo)
170
No Project Estimated
Length (Km)
1 Azezo-Metema 180
2 Jima-Bonga-Ethiopia Border
253
3 Arbaminch-Moyale 370
4 Diredawa-Jigjiga-Togowuchale
200
5 Nekmpt-Gimbi-Asossa 300
6 Nekempt-Gimbi-Dembidolo-Gambella
280
GROUP B
GROUP C
ETHIOPIAN RAILWAYS CORPORATION
Identified Railway Corridors
Group A
Group B
Group C
Mekele
Azezo Metema
Bahir Dar
Addis Ababa
Modjo
Ginir
Arba Minch
Moyale
Jimma
Nekemte
Asosa
Gambella
Djibouti
Togowuchale
Dima
Identification of railway corridors >>>> ETHIOPIAN RAILWAYS CORPORATION
7
Preliminary railway priority ranking
Different multi objective Socio-economic indicators or criteria have been utilized to prioritize for the development of National Railway Network
Population Served By the Railway Link (20%) The existing agriculture production and future potential of the Woredas crosses by the link (20%) Existing livestock potentials for the Woredas 10%) The Availability of mining and the types of mines soon ready for immediate production (10%) Contribution of the link for National and International trade and access (5%) Existing Road density and distribution on the Woredas crosses by the link (5%) Investment cost for the link (30%)
Analysis is done based on data collected from different studies under woreda level.
The Existing Addis Ababa-Dire Dawa-Djibouti link is considered to be the first priority as it has already
developed huge corridor traffic and hence is not included in the analysis.
ETHIOPIAN RAILWAYS CORPORATION
Project Total
(100%) Rank
Addis Ababa-Dessie-Mekele
69.7 2
Modjo- Jima 77.8 1
Modjo-Nekmpt 66.7 3
Bahir Dar-Wodeiya-Mile-Djibouti
52.1 4
GROUP A
Project Total
(100%) Rank
Adama-Dera-Seru-Ginir
47.1 3
Modjo-Awassa-Arbaminch
77.1 1
Bahir Dar-Gondar (Azezo)
63.4 2
Project Total
(100%) Rank
Azezo-Metema 72.3 3
Jima-Bonga-Ethiopia Border
77.9 2
Arbaminch-Moyale 47.4 6
Diredawa-Jigjiga-Togowuchale
78.7 1
Nekmpt-Gimbi-Asossa 63.5 5
Nekempt-Gimbi-Dembidolo-Gambella
66.3 4
GROUP B
GROUP C
result of multi-criteria analysis and ranking Preliminary railway priority ranking>>>>
ETHIOPIAN RAILWAYS CORPORATION
9
The establishment of Ethiopian Railways Corporation
To Build Railway Infrastructures To Operate Cargo Railway Transport Services To Provide Passenger Railway Transport Services To Engage in other related activities necessary for the attainment of its purpose
Based on the Recommendation of TAG , The Ethiopian Railways Corporation (ERC) has been established by the Council of Ministers
Regulation No. 141/2007 to carry out the following purposes:
ETHIOPIAN RAILWAYS CORPORATION
10
Ethiopian Railways Alignment selection
The selection of Ethiopian railway alignment is done
using GIS and Remote Sensing technology What are GIS-RS ?
GIS:- Geographic Information System:
a computerized system for collection, storage, manipulation, analysis and presentation of geographically referenced data.
RS:- Remote Sensing :
a satellite based geographic data collection of the earth objects using the response of earth features to electromagnetic radiation of the sun.
Advantages of using GIS-RS
Efficient
Accurate
Cost saving
Fast
Tool that help for decision making
ETHIOPIAN RAILWAYS CORPORATION
11
DESK STUDY
GIS MODELLING
INPUT DATA
FINAL PATH
SUITABILITY MAP
ORIGIN AND DESTINATION
RECLASSIFICATION
MULTI-CRITERIA SETTING
COST SURFACE
LEAST COST PATH
SELECTION0N
DERIVED DATA
WEIGHTED OVERLAY ANALYSIS
LITERATURE REVIEW
METHODOLOGY SETTING
CRITERIA SELECTION
WEIGHTING FACTORS
FIELD
VERIFICATION
Field Work
Ethiopian Railways Alignment selection >>>> Data and Methodology…
Methodology
ETHIOPIAN RAILWAYS CORPORATION
14
Ethiopian national railway network >>>>
The selected ENRN and LRT have been surveyed (500 m band) using
the latest technology that found in the world i.e Airborne Laser
Scanning Technology (3-D Object Mapping) using Light Detection
and Ranging (LiDAR) technology.
15
Ethiopia’s Five Year Development Plan (2010/11-2014/15) Growth and Transformation Plan(GTP)
Five Year National Growth and Transformation plan would enable the nation to double the
agricultural produces and the general economic growth by registering 14.9 percent growth
on average.
Facilitate for the industry sector to take the lead in the over all development activities in the country.
Expanding and ensuring quality health and education services towards meeting MDGs targets in the sectors.
Register fast and sustainable economic growth in which the industry sector would play significant role.
Benefits of youth and women have also been the targets by enhancing capacity building and good governance
issues.
Ensure food security at household and national level.
Intensify efforts to address hurdles of investment flow by expanding infrastructure facilities.
Due attention for the development of train, road, telecommunication, power, irrigation, potable water
and sanitation sectors
More than 2,000 km of railway networks would be constructed Generate 8,000 to 10,000 MW from water and wind resources
Thus, Railway construction in different part of the country is one of the
major activities that the GTP gives due attention
16
LOT 14,15,16,17,18
LOT 1,2,3,4,5
LOT 19,20,21,22,23,24
LOT 6,7,8,9
LOT 10,11,12,13
551 km
496 km
375 km
682 km
587 km
Ethiopian National Railways Construction Phases
17
Route Project Name Lot Lot Name Name of contracted Company
Route 1
Addis Ababa – Djibouti
1 & 2 Addis – Adama -Meiso
Local consultant and International consultant, Chinese Company CREGC & CREEC
3 Meiso - Dire Dawa Local consultant
4 Dire Dawa - Adigala Local consultant
5 Adigala - Dewanle Local consultant
Route 3
Addis Ababa (Sebeta) – Ejaji –
Jimma- Dima including Bedele
6 Sebeta - Ambo Local consultant
7 Ambo - Ijaji Local consultant
8 Ijaji - Seka Local consultant
9 Seka - Jimma - Bedele Local consultant
Route 5
Awash - Mekelle
10 Awash - Armenya Local consultant
11 Armenya - Kemise Local consultant
12 Kemise - Hayk Local consultant
13 Hayk -Robit Local consultant
14 Robit - Adishoh Local consultant and International consultant , Indian company
15 Adishoh - Mekelle Local consultant and International consultant , Indian company
Route 6
Hara Gebeya - Semera - Dicheto -
Galafi
16 Hara Gebeya - Semera Local consultant and International consultant , Indian company
17 Semera-Dicheto Local consultant and International consultant , Indian company
18 Dicheto - Elidar Local consultant and International consultant , Indian company
Detailed Engineering design and Tender Document Preparation are being done by 16 local and 2
international consultant Companies.
Ethiopian National Railways Construction Phases >>>
STATUS OF THE PROJECTS
18
A) Route I: Addis Ababa-Djibouti Railway Project:
• Segmented into two sections (Addis Ababa – Mieso and Mieso – Dewelle)
• Contracted to two international contractors with EPC/Turnkey
arrangement
• Bankable feasibility study and Environmental & Social impact
assessment completed and approved
• The Contractors have been paid advance payment Mobilization is underway
• Temporary works are in advance level (access road, sleeper
manufacturing plant, testing laboratory installation, concrete batch plan,
stone crusher plant…etc)
• Civil woks (earth work) have been started
STATUS OF THE PROJECTS
19
B) Other National Railway Projects:
• Design for the civil work has been carried out by local consultants
Optimization of alignment, material study, hydrological and geological
study, traffic study, structural design, Topographic survey …etc)
• Bankable feasibility and environmental & social impact assessment
studies completed and approved
• Construction contract negotiations are underway for:
Weldiya – Elidar
Awash – Weldya and
Weldya – Mekelle Railway Projects
PROJECT FINANCING
20
Segregated in to two portions:
• Local Portion (From Government treasury)
Earth work
Bridge and Culvert
Buildings..etc
• Foreign Portion (mobilized by the EPC Contractor)
Track work
Communication, signaling and information
Power supply and traction
Other operation equipment