estadio olímpico de londres 2012

Upload: antonio-suarez

Post on 13-Oct-2015

12 views

Category:

Documents


0 download

TRANSCRIPT

  • 5/22/2018 Estadio Olmpico de Londres 2012

    1/56

    London 2012 Olympic Stadium

    Estad io Olmpico de Londres 2012

  • 5/22/2018 Estadio Olmpico de Londres 2012

    2/56

    ENGLISH

  • 5/22/2018 Estadio Olmpico de Londres 2012

    3/56

    LOCALITATION

  • 5/22/2018 Estadio Olmpico de Londres 2012

    4/56

    GREAT BRITAIN

  • 5/22/2018 Estadio Olmpico de Londres 2012

    5/56

    LONDON

  • 5/22/2018 Estadio Olmpico de Londres 2012

    6/56

    OLYMPIC PARK

  • 5/22/2018 Estadio Olmpico de Londres 2012

    7/56

    OLYMPIC PARK

  • 5/22/2018 Estadio Olmpico de Londres 2012

    8/56

    STADIUM

  • 5/22/2018 Estadio Olmpico de Londres 2012

    9/56

    Olympic Stadium

    Capacity: 80,000

    The showpiece venue for the games. Thestadium is

    surrounded by wateron three sides, spectatorsreaching the arena via a series of bridges. The

    stadium is made with 75% less steel than other

    similar stadia.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    10/56

    Aquat ics centre

    Capacity: 22,500

    Seen as the gateway to the Olympic Park, building

    began on the Aquatic Centre in 2008. The venue isdominated by a 160m long wave-like-roof and will

    hold two 50m long pool solely reserved for diving.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    11/56

    Water po lo arena

    Capacity: 5,000

    Next to the Olympic Stadium and the Aquatics

    Centre, the water polo venue boasts both a warm-up

    and competition pool. The venue will cease to exist

    after the games. Elements will be relocated around

    the country.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    12/56

    VELODROME

  • 5/22/2018 Estadio Olmpico de Londres 2012

    13/56

    Velodrome

    Capacity: 6,000

    Situated in the north of the Olympic Park, the

    Velodrome is the most sustainable of all the Olympicvenues in terms of design and construction. Top

    athletes, including Sir Chris Hoy , were consulted so

    that the venue fulfillsthe needs of the 2012

    competitors.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    14/56

    Eton Mano r

    Capacity: 10.500

    The Eton Manor site has 13 courts in total that will

    be used for the wheelchair tennis competition. Thevenue will also provide training facilities for those

    competing in aquatic events.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    15/56

    BMX track

    Capacity: 6,000

    The 400m-long located next to the Velodrome in the

    north of the Olympic park. The 2012 course includesa series of jumps, bumps and tight corners which will

    test the 48 riders to their limits.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    16/56

    Basketbal l arena

    Capacity: 12,000 (reduced to 10,000 for the

    Paralympics)

    Situated in the north of the Olympic Park, theBasketball Arena is one of the largest temporary

    venues ever built for any Olympic games. This multi

    purpose building will have just 22 hours to transformitself from handball during the games.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    17/56

    HOCKEY PITCHES

  • 5/22/2018 Estadio Olmpico de Londres 2012

    18/56

    Handball arena

    Capacity: 7,000

    3,000 square metres of copper cladding will give this

    vibrant venue an unusual appearance. The arena will

    only host the preliminary rounds of the handball

    competiton. The semi-finals and final will be held at

    the larger basketball venue.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    19/56

    Hockey centre

    Capacity: 16,000

    The two main hockey pitches have been installed this

    summer in preparation for the test event in May

    2012.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    20/56

    OLYMPIC VILLAGE

  • 5/22/2018 Estadio Olmpico de Londres 2012

    21/56

    Olympic vi l lage

    The Olympic village is expected to be completed in early

    2012. Covering 27 hectares, the equivalent of St

    James's Park, it will accomodate approximately 23,000

    athletesand officials during the Games. There will bemore than 3,300 apartments fitted with a TV, internet

    access and a private courtyard, as well as a dining hall

    catering for 5,500 athletes at a time. Facilities will

    include a four-storey Polyclinic providing state-of-the-

    art healthcare. The site will be transformed after the

    Games into 2,818 new homes, with 50% designed for key

    workers and low income families.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    22/56

    Stratford Internat ional s tat ion

    Only a hundred yards from the Olympic stadium,

    Stratford International station, hosting ten

    different railway to the Games. After more than125m of upgrades, capacity has been trebled to

    accommodate 120,000 people during the Games, with

    more than 200 trains expected to pass through thestation per hour. A high-speed rail service called the

    Javelin will run from St Pancras International in just

    seven minutes.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    23/56

    Strat ford ci ty

    Boasting a new E20 postcode, Stratford City is a

    multi-use development area consisting of new homes,

    parks, retail and office space. Locals will benefitfrom 4,850 houses and apartments, four tall office

    buildings - Stratford Place, The Square, First

    Avenue and Station Square and 100 hectares of

    new parklands, including new gardens stretching upto half a mile. The recently completed Westfield

    Stratford City shopping centre in Europe.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    24/56

    WHAT IS ABOUT IT?

    The Olympic Stadium will host the Athletics and Paralympic

    Athletics events at the London 2012 Games, as well as the

    Opening and Closing Ceremonies.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    25/56

    Where is i t?

  • 5/22/2018 Estadio Olmpico de Londres 2012

    26/56

    About the Olympic Stadium

  • 5/22/2018 Estadio Olmpico de Londres 2012

    27/56

    During the Games...

    The Olympic Stadium is located in the south of the Olympic Parkon an island site, surrounded by waterways on three sides.

    Spectators will reach the venue via five bridges that link the site

    to the surrounding area.

    The Stadium will have a capacity of 80,000 during the Games:25,000 permanent seats in its permanent lower tier, and a

    temporary lightweight steel and concrete upper tier holding a

    further 55,000 spectators that can be removed after the Games.

    Facilities for athletes within the Stadium include changing rooms,medical support facilities and an 80m warm-up track. Spectator

    services, refreshments and merchandise outlets will be located

    outside the venue on a podium that will surround the Stadium,

    rather than being located within the Stadium itself.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    28/56

    After the Games...

    The Stadium is designed to be flexible enough to

    accommodate a number of different requirements and

    capacities in legacy. It will continue to be a venue forsport and athletics, as well as cultural and community

    events leaving a lasting legacy.

    The Olympic Park Lagacy Company and Mayor of LondonBoris Johnson have taken the decision to keep the

    Stadium under public ownership.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    29/56

    CASTELLANO

  • 5/22/2018 Estadio Olmpico de Londres 2012

    30/56

    LOCALIZACIN

  • 5/22/2018 Estadio Olmpico de Londres 2012

    31/56

    GRAN BRETAA

  • 5/22/2018 Estadio Olmpico de Londres 2012

    32/56

    LONDRES

  • 5/22/2018 Estadio Olmpico de Londres 2012

    33/56

    PARQUE OLMPICO

  • 5/22/2018 Estadio Olmpico de Londres 2012

    34/56

    PARQUE OLMPICO

  • 5/22/2018 Estadio Olmpico de Londres 2012

    35/56

    EL ESTADIO

  • 5/22/2018 Estadio Olmpico de Londres 2012

    36/56

    Estad io o lmpico

    Capacidad: 80,000 personas

    Esta es la gran obra maestra para los juegos. El

    estadio est rodeado de agua por tres lados. Los

    espectadores llegan a la arena por una serie de

    puentes. El estadio est compuesto por el 75% de

    acero como otros estadios similares.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    37/56

    Cen tro acutico

    Capacidad: 22,500 personas

    Considerada como la puerta de entrada al Parque

    Olmpico, se construy antes que el centro acuticoen 2008. El lugar est constituido por 160m de largo

    con el techo ondulado y dos piscinas de 50 m de largo

    para buceo.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    38/56

    Water po lo arena

    Capacidad: 5,000 personas

    Junto al Estadio Olmpico y el centro acutico, el

    lugar de water polo cuenta con piscina un

    calentamiento y competencia. El lugar dejar deexistir despus de los juegos.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    39/56

    VELDROMO

  • 5/22/2018 Estadio Olmpico de Londres 2012

    40/56

    Veldromo

    Capacidad: 6,000 personas

    Situado en el norte del Parque Olmpico, el

    Veldromo es la ms sostenible de todas las sedesolmpicas en trminos de diseo y construccin.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    41/56

    Eton Mano r

    Capacidad: 10.500 personas

    El sitio de Eton Manor tiene 13 tribunales en total

    que se utilizar para la competencia de tenis de sillade ruedas. El recinto tambin proporcionar servicios

    de capacitacin para quienes compiten en eventos

    acuticos.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    42/56

    BMX track

    Capacidad: 6,000 personas

    Est formado por 400 m de largo, situada prxima al

    Veldromo en el norte del Parque Olmpico. Este aoincluye una serie de saltos, baches y esquinas

    apretados que pondr a prueba los 48 jinetes a sus

    lmites.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    43/56

    Arena de balon cesto

    Capacidad: 12,000 personas

    Situado en el norte del Parque Olmpico, la Arena de

    baloncesto es una de las sedes temporales msgrandes jams construidas para los Juegos

    Olmpicos. Este edificio de multi-propsito tendr

    slo 22 horas para transformarse de balonmano

    durante los juegos.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    44/56

    PISTAS DE HOCKEY

    A d b l

  • 5/22/2018 Estadio Olmpico de Londres 2012

    45/56

    Arena de balon -mano

    Capacidad: 7,000 personas

    Los 3.000 metros cuadrados de revestimiento de

    cobre dar a este lugar vibrante un aspecto inusual.

    La arena slo ser anfitrin de las rondaspreliminares de la competencia de balonmano. Las

    semifinales y la final se celebrar en el recinto ms

    grande del baloncesto.

    C t d h k

  • 5/22/2018 Estadio Olmpico de Londres 2012

    46/56

    Centro de hockey

    Capacidad: 16,000 personas

    Los dos lanzamientos de hockey principales se han

    instalado este verano en preparacin para el evento

    de prueba en mayo de 2012.

  • 5/22/2018 Estadio Olmpico de Londres 2012

    47/56

    VILLA OLMPICA

    Vi l l l i

  • 5/22/2018 Estadio Olmpico de Londres 2012

    48/56

    Vi l la o lmpica

    En la villa olmpica se espera que concluyan las obras en

    comienzos de 2012. Habr ms de 3.300 apartamentos

    equipados con TV, acceso a internet y un patio privado,

    as como un saln comedor de catering para 5.500 atletasen un momento. El sitio se transformar despus de los

    juegos en 2.818 casas nuevas, con 50% diseado para

    trabajadores claves y familias de bajos ingresos.

    Estacin in ternacional de

  • 5/22/2018 Estadio Olmpico de Londres 2012

    49/56

    Strat ford

    A tan slo cien metros del Estadio Olmpico, la

    estacin internacional de Stratford tiene de

    alojamiento hasta diez trenes diferentes a losjuegos. Despus de ms de 125 millones de libras de

    actualizaciones, se ha triplicado capacidad para

    120.000 personas durante los juegos, con ms de 200

    trenes esperados pasar a travs de la estacin por

    hora.

    Ciudad de Stratford

  • 5/22/2018 Estadio Olmpico de Londres 2012

    50/56

    Ciudad de Stratford

    Con un nuevo cdigo postal de E20, Stratford City es

    un rea de desarrollo multiuso consistente en nuevas

    viviendas, parques, espacio de oficina y minoristas.

    Los locales se beneficiarn de 4.850 casas y

    apartamentos.

    Qu es?

  • 5/22/2018 Estadio Olmpico de Londres 2012

    51/56

    Qu es?

    El Estadio Olmpico ser la sede de los eventos de atletismo y

    atletismo paralmpico en los juegos de Londres 2012, as como

    la apertura y cierre de ceremonias.

    Donde es t?

  • 5/22/2018 Estadio Olmpico de Londres 2012

    52/56

    Donde es t?

    About the Olympic Stadium

  • 5/22/2018 Estadio Olmpico de Londres 2012

    53/56

    About the Olympic Stadium

    Duran te los juegos

  • 5/22/2018 Estadio Olmpico de Londres 2012

    54/56

    Duran te los juegos ...

    El Estadio Olmpico se encuentra en el sur del Parque Olmpico en

    un sitio de isla, rodeado por las vas navegables en tres lados.

    Los espectadores llegarn a la sede a travs de cinco puentes

    que unen el sitio a la zona circundante. El estadio tendr una

    capacidad de 80.000 personas. Durante los Juegos habr 25.000asientos permanentes (en su permanente menor nivel) y un ligero

    temporal de acero y hormign.

    Despus de los juegos

  • 5/22/2018 Estadio Olmpico de Londres 2012

    55/56

    Despus de los juegos ...

    El estadio est diseado para ser lo suficientemente

    flexible como para acomodar a un nmero de diferentes

    necesidades y capacidades de legado. Seguir siendo un

    lugar de deporte y atletismo, as como cultural yeventos de la comunidad dejando un duradero legado.

    ANTONIO SUREZ MUOZ

  • 5/22/2018 Estadio Olmpico de Londres 2012

    56/56

    3A

    ALEJANDRO JERNIMO FUENTES