Establishing a SeaPRISM site on the West Coast of the United States Presenter/Affiliation: Curtiss O. Davis, OSU P f C ti OD i C tV d tt 1) Define a VIIRS Proxy Data Stream Performers: Curtiss O. Davis, Curt Vandetta, Nick Tufillaro, OSU; Burt Jones, USC Thrust area: 2, SeaPRISM data; 5 Product 2) Define the required in situ data stream for Cal/Val 3) Tuning of Thrust area: 2, SeaPRISM data; 5 Product Validation Award date: July 1, 2009 algorithms and LUTS (Vicarious calibration and SDR feedback) 4) Ocean Algorithm, Total Man-Months Effort: FY09 FY10 FY11 OSU 5 4 4 stability evaluation and uncertainty 5) Product validation and OSU 5 4 4 USC 0.00 6 6 product long-term stability 6) Satellite inter- comparisons, robustness, Ocean Cal Val EDR Program Review, 2010 robustness, seasonal and product stability

Upload: others

Post on 12-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Establishing a SeaPRISM site on the West Coast of the ...cioss.coas.oregonstate.edu/CIOSS/workshops/VIIRS_CalVal...Eureka. They provide boat access twice daily. They have offered to

Establishing a SeaPRISM site on the West Coast of the United States

Presenter/Affiliation: Curtiss O. Davis, OSUP f C ti O D i C t V d tt

1) Define a VIIRS Proxy Data Stream

Performers: Curtiss O. Davis, Curt Vandetta, Nick Tufillaro, OSU; Burt Jones, USC

Thrust area: 2, SeaPRISM data; 5 Product

2) Define the required in situ data stream for Cal/Val

3) Tuning of Thrust area: 2, SeaPRISM data; 5 Product Validation

Award date: July 1, 2009

algorithms and LUTS (Vicarious calibration and SDR feedback)4) Ocean Algorithm,

Total Man-Months Effort:FY09 FY10 FY11

OSU 5 4 4

stability evaluation and uncertainty

5) Product validation and

OSU 5 4 4USC 0.00 6 6

product long-term stability

6) Satellite inter-comparisons, robustness,

Ocean Cal Val EDR Program Review, 2010

robustness, seasonal and product stability

Page 2: Establishing a SeaPRISM site on the West Coast of the ...cioss.coas.oregonstate.edu/CIOSS/workshops/VIIRS_CalVal...Eureka. They provide boat access twice daily. They have offered to

Establishing a SeaPRISM site on the West Coast of the United States

Project Objectives Major FY09 Challenges/Issues

1. Procure SeaPRISM, have it modified and Calibrated by the AERONET Program and

Identifying and Gaining permission to use a suitable site on an Oil Platform in y g

establish a SeaPRISM site on the west coast.

2. Routinely provide SeaPRISM data via the AERONET Program for validation of

Southern California waters.

Burt Jones contacted several oil companies before identifying suitable location on Platform Eureka operated by

Supports: Ocean cal/val plan elements 2,5

AERONET Program for validation of VIIRS remote sensing reflectance data for Southern California waters.

location on Platform Eureka operated by Pacific Energy who agreed to work with us.

Major Progress Milestones / Deliverables

Procured SeaPRISMSeaPRISM modified and Calibrated by

FY 091 2 3 4

FY101 2 3 4

FY111 2 3 4

yAERONET Program

SeaPRISM tested and modified to send data over the Internet

Id tifi d it d d t

1. Procure, modify , calibrate SEAPRISM

S C

2. Identify site and install SeaPRISM

S C

Ocean Cal Val EDR Program Review, 2010

Identified site and arranged tooperate SeaPRISM on PlatformEureka off LA

3.3. Operate SeaPRISM and provide validation data for VIIRS

S D

Page 3: Establishing a SeaPRISM site on the West Coast of the ...cioss.coas.oregonstate.edu/CIOSS/workshops/VIIRS_CalVal...Eureka. They provide boat access twice daily. They have offered to

Establishing a SeaPRISM site on the West Coast of the United States

NOAA - Coastwatch - P DiGacamo

INSIDE: S. Ahmed, G. Fargion, C. Trees, R. Arnone

Collaboration and CoordinationCollaboration and Coordinationwith Inside and Outside Activitieswith Inside and Outside Activities

Transition Partners Transition Partners

NOAA Coastwatch P. DiGacamo

NASA – AERONET (B. Holbin), SeaBASS (J.Werdell)

, g , ,OUTSIDE:ONR – Code 32 HICO Program (Ackleson/

Cleveland)NASA AERONET (B H lbi ) S BASSNASA: AERONET (B. Holbin), SeaBASS

(J.Werdell) NOAA: NESDIS/STAR (P. DiGiacomo) and

CoastWatch (P. DiGiacomo, D. Foley)

6.1 ONR – HICO

International PartnershipsInternational PartnershipsLeveraged RDT&E Projects Leveraged RDT&E Projects

JRC – (G. Zibordi)

CSIRO (V Brando)NOAA/STAR/CIOSS - MERIS data for the West

Coast

CSIRO – (V. Brando)

IOCCG – (C. Davis IOCCG member 2004-2010)

Ocean Cal Val EDR Program Review, 2010

Page 4: Establishing a SeaPRISM site on the West Coast of the ...cioss.coas.oregonstate.edu/CIOSS/workshops/VIIRS_CalVal...Eureka. They provide boat access twice daily. They have offered to

Establishing a SeaPRISM site on the West Coast of the United States

FY 09- MILESTONES Completed In Progress

• Milestone 1 Procure SeaPRISM system COMPLETED• Milestone 1 Procure SeaPRISM system. COMPLETED.

• Milestone 2 Send the SeaPRISM system to the AERONET project at GSFC for filters and calibration. COMPLETED.

• Milestone 3 Receive the GSFC calibrated SeaPRISM back at OSU, set it up and test operations and data stream. In Progress.

• Milestone 4 Work with colleagues in Southern California to identify and gain permissions to use a suitable site for the SeaPRISM. In Progress.

• Milestone 5 Set up the SeaPRISM on Platform Eureka and initiate dataMilestone 5 Set up the SeaPRISM on Platform Eureka and initiate data collection. SCHEDULED to begin in April 2010.

• Milestone 6 Develop methods for validation of VIIRS data with SeaPRISM data (report). In Progress.

Ocean Cal Val EDR Program Review, 2010

(report). In Progress.

Page 5: Establishing a SeaPRISM site on the West Coast of the ...cioss.coas.oregonstate.edu/CIOSS/workshops/VIIRS_CalVal...Eureka. They provide boat access twice daily. They have offered to

Establishing a SeaPRISM site on the West Coast of the United States

Milestone 1. Procure SeaPRISM system. We Initiated procurement of the SeaPRISM in July 2009. The S PRISM d li d t OSU D b 1 2009 ThSeaPRISM was delivered to OSU December 1, 2009. The SeaPRISM was set up and we completed acceptance testing of the SeaPRISM in early December 2009. Completed.

Milestone 2. Send the SeaPRISM system to the AERONET project at GSFC for filters and calibration. Brent Holben at the AREONET project at GSFC agreed to add the SeaPRISM to the AERONET program We delivered the SeaPRISM to Alexthe AERONET program. We delivered the SeaPRISM to Alex Tran at AERONET and the correct filters have been installed and it has been calibrated by GSFC. Received it at OSU on March 3, 2010. Completed. p

Milestone 3. Receive the GSFC calibrated SeaPRISM back at OSU, set it up and test operations and data stream. We are adding a ruggedized PC and modifying the SeaPRISM for

Ocean Cal Val EDR Program Review, 2010

are adding a ruggedized PC and modifying the SeaPRISM for use over the internet. Task to be completed by the end of March 2010. In Progress.

SeaPRISM being tested at OSU, March 17, 2010

Page 6: Establishing a SeaPRISM site on the West Coast of the ...cioss.coas.oregonstate.edu/CIOSS/workshops/VIIRS_CalVal...Eureka. They provide boat access twice daily. They have offered to

Establishing a SeaPRISM site on the West Coast of the United States

Milestone 4 Work with Burt Jones, University of Southern California to identify and gain permissions to use a suitable site for the SeaPRISM. In Progress.

LA/LB Harbor

14k~14km

Ocean Cal Val EDR Program Review, 2010

Platform Eureka 17 km south of Long Beach, CA

Page 7: Establishing a SeaPRISM site on the West Coast of the ...cioss.coas.oregonstate.edu/CIOSS/workshops/VIIRS_CalVal...Eureka. They provide boat access twice daily. They have offered to

Establishing a SeaPRISM site on the West Coast of the United States

Milestone 4 Work with Burt Jones, University of Southern California to identify and gain permissions to use a suitable site for the SeaPRISM. In Progress.

Pacific Energy operates Platform Eureka. They provide boat access twice daily. They have offered to provide us 110V power and 50mb/sec internet access with a fixed IP address.

The location (yellow circle) on the platform appears to be excellent for SeaPRISM measurements which are taken to the south and west of the platform.

Ocean Cal Val EDR Program Review, 2010

Page 8: Establishing a SeaPRISM site on the West Coast of the ...cioss.coas.oregonstate.edu/CIOSS/workshops/VIIRS_CalVal...Eureka. They provide boat access twice daily. They have offered to

Establishing a SeaPRISM site on the West Coast of the United StatesWest Coast of the United States

Field of Regard:

Burt Jones and collaborators make extensive in situ measurements in thismeasurements in this area using moorings, gliders and cruises that will provide essential ancillary data for this effort.

SeaPRISM to beSeaPRISM to be installed and begin operation in April 2010. (Milestone 5)

Ocean Cal Val EDR Program Review, 2010

Page 9: Establishing a SeaPRISM site on the West Coast of the ...cioss.coas.oregonstate.edu/CIOSS/workshops/VIIRS_CalVal...Eureka. They provide boat access twice daily. They have offered to

Establishing a SeaPRISM site on the West Coast of the United States

Milestone 6. Develop methods for validation of VIIRS data with SeaPRISM data. (report). Efforts focused on geolocation of in situ data sets and matching up in situ and satellite data. We will begin using VIIRS proxy data from NRL p g g p ySSC when it becomes available. In Progress.

1. Match up with SeaPRISM and USC Glider and Cruise Data.2. Cross-calibration with other sensors (MODIS, MERIS and HICO).

USC work done in Coordination with:1. Southern California Coastal

Ocean Observing SystemOcean Observing System2. Minerals Management

Service3. State Water Resources

Control Board

Ocean Cal Val EDR Program Review, 2010

Control Board

Cruise and glider tracks on MODIS image. Platform Eureka is at yellow arrow.

Page 10: Establishing a SeaPRISM site on the West Coast of the ...cioss.coas.oregonstate.edu/CIOSS/workshops/VIIRS_CalVal...Eureka. They provide boat access twice daily. They have offered to

Establishing a SeaPRISM site on the West Coast of the United States

FY 10- MILESTONES (Deliverables) Plans

• Milestone 7 Routine operation and maintenance of the SeaPRISM systemMilestone 7 Routine operation and maintenance of the SeaPRISM system for the year. (Deliverable – data to AERONET and for VIIRS cal/val.) Scheduled to begin in April 2010.

Mil t 8 S d th S PRISM t GSFC f l i t d• Milestone 8 Send the SeaPRISM to GSFC for annual maintenance and recalibration (Deliverable - calibration update). Scheduled for March 2011.

• Milestone 9 Demonstrate validation of VIIRS proxy data products using the SeaPRISM data (Deliverable - demo and report) Scheduled for winter 2011.

Ocean Cal Val EDR Program Review, 2010

Page 11: Establishing a SeaPRISM site on the West Coast of the ...cioss.coas.oregonstate.edu/CIOSS/workshops/VIIRS_CalVal...Eureka. They provide boat access twice daily. They have offered to

Establishing a SeaPRISM site on the West Coast of the United States

Status and Issues:• Deliverable: Receive, modify and calibrate SeaPRISM, y

1. March 20102. Development status: 100% completed3 Major technical issues and their impacts: None3. Major technical issues and their impacts: None

• Deliverable: Selection of Site for SeaPRISM1. January 20102 Development status: 100% completed2. Development status: 100% completed3. Major technical issues and their impacts: None

• Deliverable: Installation and operation of SeaPRISM1. Expected end of April 20102. Development Status: 0% completed3. Major technical issues and their impacts: Fabrication of mount. Electrical and

Ocean Cal Val EDR Program Review, 2010

communications provided by the platform operator.

Page 12: Establishing a SeaPRISM site on the West Coast of the ...cioss.coas.oregonstate.edu/CIOSS/workshops/VIIRS_CalVal...Eureka. They provide boat access twice daily. They have offered to

Establishing a SeaPRISM site on the West Coast of the United States

Summary : Impact of Deliverables on Program: This site will provide a West Coast SeaPRISM, coastal validation site for VIIRS d t th t i dil ibl d f hi h dditi l b tidata that is readily accessible and for which additional corroborative measurements can be provided from ships moorings and gliders.Role of the milestones on IPO efforts (SDR/ EDR): SeaPRISM data and related ancillary data will be essential for validating VIIRS Remote Sensing reflectanceancillary data will be essential for validating VIIRS Remote Sensing reflectance and chlorophyll and other data products.Role of efforts on other partners: Collaborating with Ahmed, Arnone, Trees and Fargion to share experiences operating the SeaPRISM and sharing results and g p p g gprocedures for using the SeaPRISM data and ancillary data to validate satellite ocean color data products (MODIS, MERIS, VIIRS Proxy and HICO data, and after launch VIIRS data).Relationship to VIIRS Launch Schedule: The SeaPRISM will be installed and we will have 1 year experience operating it and validating Proxy VIIRS data products before the NPP launch. Thus we will be ready to use this data for validation of VIIRS Rrs and other products

Ocean Cal Val EDR Program Review, 2010

be ready to use this data for validation of VIIRS Rrs and other products immediately after launch.

Page 13: Establishing a SeaPRISM site on the West Coast of the ...cioss.coas.oregonstate.edu/CIOSS/workshops/VIIRS_CalVal...Eureka. They provide boat access twice daily. They have offered to

Establishing a SeaPRISM site on the West Coast of the United StatesSchedule with Major Deliverables

Red background indicates delays and green indicates on or ahead of schedule (as compared to FY09 DD1498)

Title Establishing a SeaPRISM site on the West Coast of the United States

Milestones

Title Establishing a SeaPRISM site on the West Coast of the United States

FY08 FY09 FY10 FY11 FY12

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

TODAY NPP

1. Procure, modify , calibrate SEAPRISM S C2. Identify site and install SeaPRISM S C3 Operate SeaPRISM3. Operate SeaPRISM and provide validation data for VIIRS

S P2. Use SeaPRISM data to validate VIIRS Rrs S D

Note: Timeliness of deliverables science and transition (i.e., documents/demo/software, etc). Indicate changes from FY09 1498 by highlighting original planned time in red You can use this table legend:

Ocean Cal Val EDR Program Review, 2010

original planned time in red. You can use this table legend: S – Start, C – Complete, D – Demo, P – Products (data) I-Issues, M -Manual/Documentation, R – Final Report, T- Transition

Page 14: Establishing a SeaPRISM site on the West Coast of the ...cioss.coas.oregonstate.edu/CIOSS/workshops/VIIRS_CalVal...Eureka. They provide boat access twice daily. They have offered to

Establishing a SeaPRISM site on the West Coast of the United States

1) Define a VIIRS Proxy Data Stream

Questions ?2) Define the required in situ data stream for Cal/Val3) Tuning of Questions ?algorithms and LUTS (Vicarious calibration and SDR feedback)

4) Ocean )Algorithm, stability evaluation and uncertainty

5) Product validation and product long-term stability

6) Satellite inter-comparisons, robustness

Ocean Cal Val EDR Program Review, 2010

robustness, seasonal and product stability