establishing a seaprism site on the west coast of the...
TRANSCRIPT
Establishing a SeaPRISM site on the West Coast of the United States
Presenter/Affiliation: Curtiss O. Davis, OSUP f C ti O D i C t V d tt
1) Define a VIIRS Proxy Data Stream
Performers: Curtiss O. Davis, Curt Vandetta, Nick Tufillaro, OSU; Burt Jones, USC
Thrust area: 2, SeaPRISM data; 5 Product
2) Define the required in situ data stream for Cal/Val
3) Tuning of Thrust area: 2, SeaPRISM data; 5 Product Validation
Award date: July 1, 2009
algorithms and LUTS (Vicarious calibration and SDR feedback)4) Ocean Algorithm,
Total Man-Months Effort:FY09 FY10 FY11
OSU 5 4 4
stability evaluation and uncertainty
5) Product validation and
OSU 5 4 4USC 0.00 6 6
product long-term stability
6) Satellite inter-comparisons, robustness,
Ocean Cal Val EDR Program Review, 2010
robustness, seasonal and product stability
Establishing a SeaPRISM site on the West Coast of the United States
Project Objectives Major FY09 Challenges/Issues
1. Procure SeaPRISM, have it modified and Calibrated by the AERONET Program and
Identifying and Gaining permission to use a suitable site on an Oil Platform in y g
establish a SeaPRISM site on the west coast.
2. Routinely provide SeaPRISM data via the AERONET Program for validation of
Southern California waters.
Burt Jones contacted several oil companies before identifying suitable location on Platform Eureka operated by
Supports: Ocean cal/val plan elements 2,5
AERONET Program for validation of VIIRS remote sensing reflectance data for Southern California waters.
location on Platform Eureka operated by Pacific Energy who agreed to work with us.
Major Progress Milestones / Deliverables
Procured SeaPRISMSeaPRISM modified and Calibrated by
FY 091 2 3 4
FY101 2 3 4
FY111 2 3 4
yAERONET Program
SeaPRISM tested and modified to send data over the Internet
Id tifi d it d d t
1. Procure, modify , calibrate SEAPRISM
S C
2. Identify site and install SeaPRISM
S C
Ocean Cal Val EDR Program Review, 2010
Identified site and arranged tooperate SeaPRISM on PlatformEureka off LA
3.3. Operate SeaPRISM and provide validation data for VIIRS
S D
Establishing a SeaPRISM site on the West Coast of the United States
NOAA - Coastwatch - P DiGacamo
INSIDE: S. Ahmed, G. Fargion, C. Trees, R. Arnone
Collaboration and CoordinationCollaboration and Coordinationwith Inside and Outside Activitieswith Inside and Outside Activities
Transition Partners Transition Partners
NOAA Coastwatch P. DiGacamo
NASA – AERONET (B. Holbin), SeaBASS (J.Werdell)
, g , ,OUTSIDE:ONR – Code 32 HICO Program (Ackleson/
Cleveland)NASA AERONET (B H lbi ) S BASSNASA: AERONET (B. Holbin), SeaBASS
(J.Werdell) NOAA: NESDIS/STAR (P. DiGiacomo) and
CoastWatch (P. DiGiacomo, D. Foley)
6.1 ONR – HICO
International PartnershipsInternational PartnershipsLeveraged RDT&E Projects Leveraged RDT&E Projects
JRC – (G. Zibordi)
CSIRO (V Brando)NOAA/STAR/CIOSS - MERIS data for the West
Coast
CSIRO – (V. Brando)
IOCCG – (C. Davis IOCCG member 2004-2010)
Ocean Cal Val EDR Program Review, 2010
Establishing a SeaPRISM site on the West Coast of the United States
FY 09- MILESTONES Completed In Progress
• Milestone 1 Procure SeaPRISM system COMPLETED• Milestone 1 Procure SeaPRISM system. COMPLETED.
• Milestone 2 Send the SeaPRISM system to the AERONET project at GSFC for filters and calibration. COMPLETED.
• Milestone 3 Receive the GSFC calibrated SeaPRISM back at OSU, set it up and test operations and data stream. In Progress.
• Milestone 4 Work with colleagues in Southern California to identify and gain permissions to use a suitable site for the SeaPRISM. In Progress.
• Milestone 5 Set up the SeaPRISM on Platform Eureka and initiate dataMilestone 5 Set up the SeaPRISM on Platform Eureka and initiate data collection. SCHEDULED to begin in April 2010.
• Milestone 6 Develop methods for validation of VIIRS data with SeaPRISM data (report). In Progress.
Ocean Cal Val EDR Program Review, 2010
(report). In Progress.
Establishing a SeaPRISM site on the West Coast of the United States
Milestone 1. Procure SeaPRISM system. We Initiated procurement of the SeaPRISM in July 2009. The S PRISM d li d t OSU D b 1 2009 ThSeaPRISM was delivered to OSU December 1, 2009. The SeaPRISM was set up and we completed acceptance testing of the SeaPRISM in early December 2009. Completed.
Milestone 2. Send the SeaPRISM system to the AERONET project at GSFC for filters and calibration. Brent Holben at the AREONET project at GSFC agreed to add the SeaPRISM to the AERONET program We delivered the SeaPRISM to Alexthe AERONET program. We delivered the SeaPRISM to Alex Tran at AERONET and the correct filters have been installed and it has been calibrated by GSFC. Received it at OSU on March 3, 2010. Completed. p
Milestone 3. Receive the GSFC calibrated SeaPRISM back at OSU, set it up and test operations and data stream. We are adding a ruggedized PC and modifying the SeaPRISM for
Ocean Cal Val EDR Program Review, 2010
are adding a ruggedized PC and modifying the SeaPRISM for use over the internet. Task to be completed by the end of March 2010. In Progress.
SeaPRISM being tested at OSU, March 17, 2010
Establishing a SeaPRISM site on the West Coast of the United States
Milestone 4 Work with Burt Jones, University of Southern California to identify and gain permissions to use a suitable site for the SeaPRISM. In Progress.
LA/LB Harbor
14k~14km
Ocean Cal Val EDR Program Review, 2010
Platform Eureka 17 km south of Long Beach, CA
Establishing a SeaPRISM site on the West Coast of the United States
Milestone 4 Work with Burt Jones, University of Southern California to identify and gain permissions to use a suitable site for the SeaPRISM. In Progress.
Pacific Energy operates Platform Eureka. They provide boat access twice daily. They have offered to provide us 110V power and 50mb/sec internet access with a fixed IP address.
The location (yellow circle) on the platform appears to be excellent for SeaPRISM measurements which are taken to the south and west of the platform.
Ocean Cal Val EDR Program Review, 2010
Establishing a SeaPRISM site on the West Coast of the United StatesWest Coast of the United States
Field of Regard:
Burt Jones and collaborators make extensive in situ measurements in thismeasurements in this area using moorings, gliders and cruises that will provide essential ancillary data for this effort.
SeaPRISM to beSeaPRISM to be installed and begin operation in April 2010. (Milestone 5)
Ocean Cal Val EDR Program Review, 2010
Establishing a SeaPRISM site on the West Coast of the United States
Milestone 6. Develop methods for validation of VIIRS data with SeaPRISM data. (report). Efforts focused on geolocation of in situ data sets and matching up in situ and satellite data. We will begin using VIIRS proxy data from NRL p g g p ySSC when it becomes available. In Progress.
1. Match up with SeaPRISM and USC Glider and Cruise Data.2. Cross-calibration with other sensors (MODIS, MERIS and HICO).
USC work done in Coordination with:1. Southern California Coastal
Ocean Observing SystemOcean Observing System2. Minerals Management
Service3. State Water Resources
Control Board
Ocean Cal Val EDR Program Review, 2010
Control Board
Cruise and glider tracks on MODIS image. Platform Eureka is at yellow arrow.
Establishing a SeaPRISM site on the West Coast of the United States
FY 10- MILESTONES (Deliverables) Plans
• Milestone 7 Routine operation and maintenance of the SeaPRISM systemMilestone 7 Routine operation and maintenance of the SeaPRISM system for the year. (Deliverable – data to AERONET and for VIIRS cal/val.) Scheduled to begin in April 2010.
Mil t 8 S d th S PRISM t GSFC f l i t d• Milestone 8 Send the SeaPRISM to GSFC for annual maintenance and recalibration (Deliverable - calibration update). Scheduled for March 2011.
• Milestone 9 Demonstrate validation of VIIRS proxy data products using the SeaPRISM data (Deliverable - demo and report) Scheduled for winter 2011.
Ocean Cal Val EDR Program Review, 2010
Establishing a SeaPRISM site on the West Coast of the United States
Status and Issues:• Deliverable: Receive, modify and calibrate SeaPRISM, y
1. March 20102. Development status: 100% completed3 Major technical issues and their impacts: None3. Major technical issues and their impacts: None
• Deliverable: Selection of Site for SeaPRISM1. January 20102 Development status: 100% completed2. Development status: 100% completed3. Major technical issues and their impacts: None
• Deliverable: Installation and operation of SeaPRISM1. Expected end of April 20102. Development Status: 0% completed3. Major technical issues and their impacts: Fabrication of mount. Electrical and
Ocean Cal Val EDR Program Review, 2010
communications provided by the platform operator.
Establishing a SeaPRISM site on the West Coast of the United States
Summary : Impact of Deliverables on Program: This site will provide a West Coast SeaPRISM, coastal validation site for VIIRS d t th t i dil ibl d f hi h dditi l b tidata that is readily accessible and for which additional corroborative measurements can be provided from ships moorings and gliders.Role of the milestones on IPO efforts (SDR/ EDR): SeaPRISM data and related ancillary data will be essential for validating VIIRS Remote Sensing reflectanceancillary data will be essential for validating VIIRS Remote Sensing reflectance and chlorophyll and other data products.Role of efforts on other partners: Collaborating with Ahmed, Arnone, Trees and Fargion to share experiences operating the SeaPRISM and sharing results and g p p g gprocedures for using the SeaPRISM data and ancillary data to validate satellite ocean color data products (MODIS, MERIS, VIIRS Proxy and HICO data, and after launch VIIRS data).Relationship to VIIRS Launch Schedule: The SeaPRISM will be installed and we will have 1 year experience operating it and validating Proxy VIIRS data products before the NPP launch. Thus we will be ready to use this data for validation of VIIRS Rrs and other products
Ocean Cal Val EDR Program Review, 2010
be ready to use this data for validation of VIIRS Rrs and other products immediately after launch.
Establishing a SeaPRISM site on the West Coast of the United StatesSchedule with Major Deliverables
Red background indicates delays and green indicates on or ahead of schedule (as compared to FY09 DD1498)
Title Establishing a SeaPRISM site on the West Coast of the United States
Milestones
Title Establishing a SeaPRISM site on the West Coast of the United States
FY08 FY09 FY10 FY11 FY12
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
TODAY NPP
1. Procure, modify , calibrate SEAPRISM S C2. Identify site and install SeaPRISM S C3 Operate SeaPRISM3. Operate SeaPRISM and provide validation data for VIIRS
S P2. Use SeaPRISM data to validate VIIRS Rrs S D
Note: Timeliness of deliverables science and transition (i.e., documents/demo/software, etc). Indicate changes from FY09 1498 by highlighting original planned time in red You can use this table legend:
Ocean Cal Val EDR Program Review, 2010
original planned time in red. You can use this table legend: S – Start, C – Complete, D – Demo, P – Products (data) I-Issues, M -Manual/Documentation, R – Final Report, T- Transition
Establishing a SeaPRISM site on the West Coast of the United States
1) Define a VIIRS Proxy Data Stream
Questions ?2) Define the required in situ data stream for Cal/Val3) Tuning of Questions ?algorithms and LUTS (Vicarious calibration and SDR feedback)
4) Ocean )Algorithm, stability evaluation and uncertainty
5) Product validation and product long-term stability
6) Satellite inter-comparisons, robustness
Ocean Cal Val EDR Program Review, 2010
robustness, seasonal and product stability