Page 1: ESCO Implementations in Austria and Germany – Some Good Practices DDI Jan W. Bleyl, Graz Energy Agency Ltd, Austria phone: +43 316 811848-0; email: bleyl@grazer-ea.at

ESCO Implementations ESCO Implementations in Austria and Germany – in Austria and Germany –

Some Good PracticesSome Good Practices

DDI Jan W. Bleyl, Graz Energy Agency Ltd, Austria

phone: +43 316 811848-0; email: [email protected]

internet: www.grazer-ea.at

Page 2: ESCO Implementations in Austria and Germany – Some Good Practices DDI Jan W. Bleyl, Graz Energy Agency Ltd, Austria phone: +43 316 811848-0; email: bleyl@grazer-ea.at

Overview of Content

Delivery/Supply Contracting

1. Public housing: 130 kWelt natural gas CHP Berlin, Germany

2. Military air field: 500 kWelt Biogas CHP Zeltweg, Austria

Perfomance Contracting

3. Public school „Jägergrund“, Graz, Austria

4. 500 public buildings in Austria: „Federal Real Estate Agency“ (BIG), Vienna, Austria

Page 3: ESCO Implementations in Austria and Germany – Some Good Practices DDI Jan W. Bleyl, Graz Energy Agency Ltd, Austria phone: +43 316 811848-0; email: bleyl@grazer-ea.at

General project data:

21 residential buildings

(402 units, 26,800 m2)

Energy demand:

4.000 MWhtherm/a

650 MWhelt/a

CHP-System for residential housing 1/2

Supply system: 130 kWelt CHP-unit, 1,3MWtherm peak load boiler, local heat + electricity grid

Source: Berlin Energy Agency 2002

Page 4: ESCO Implementations in Austria and Germany – Some Good Practices DDI Jan W. Bleyl, Graz Energy Agency Ltd, Austria phone: +43 316 811848-0; email: bleyl@grazer-ea.at

Some technical data of CHP-unit

installed capacity:130 kWelt/227 kWtherm

type: reciprocating engine

fuel: natural gas

Results:

thermal energy: about 50 % of total demand covered by CHP-unit

electricity:about 80 % of total demand covered by CHP

Primary Energy Saving: ca. 30%

CHP-System for residential housing 2/2

Source: Berlin Energy Agency 2002

Page 5: ESCO Implementations in Austria and Germany – Some Good Practices DDI Jan W. Bleyl, Graz Energy Agency Ltd, Austria phone: +43 316 811848-0; email: bleyl@grazer-ea.at

Biogas CHP Plant Zeltweg (Military Airfield) 1/3

Largest Military Air Facility in Austria

Gras area : appr. 270 ha

Results:

Public-Private Partnership between Austrian military and private energy service company (ESCO/Contractor)

Europeanwide tendering process

Private investment: appr. 2,5 Mio €

Saving of 1 Mio € for composting facility

Contract duration: 10 years

Page 6: ESCO Implementations in Austria and Germany – Some Good Practices DDI Jan W. Bleyl, Graz Energy Agency Ltd, Austria phone: +43 316 811848-0; email: bleyl@grazer-ea.at

Biogas CHP Plant Zeltweg 2/3

500 kWelt biogas fired CHP plant

Electricity is fed into public grid (high feed in tarifs for renewable electricity – 13 €cent/kWh)

Heat is fed into local heating net work of the air field

Farming machines are provided by service company

Mowing, stowing into silo, distribution of liquid manure is executed by military personal

Page 7: ESCO Implementations in Austria and Germany – Some Good Practices DDI Jan W. Bleyl, Graz Energy Agency Ltd, Austria phone: +43 316 811848-0; email: bleyl@grazer-ea.at

Biogas CHP Plant Zeltweg – Schematic 3/3

Page 8: ESCO Implementations in Austria and Germany – Some Good Practices DDI Jan W. Bleyl, Graz Energy Agency Ltd, Austria phone: +43 316 811848-0; email: bleyl@grazer-ea.at

Reconstruction of heating system and energetic optimisation

Public School (Jägergrund/Webling) 1/2

Page 9: ESCO Implementations in Austria and Germany – Some Good Practices DDI Jan W. Bleyl, Graz Energy Agency Ltd, Austria phone: +43 316 811848-0; email: bleyl@grazer-ea.at

Public School Jägergrund/Webling) 2/2

Measures Conversion from electrical heating to central heating Connection to district heating and installation of a substation Controlling system and optimisation Electric installations and light management Changing windows, frames (incl. parapets and wall elements)

Results:

Private Investment: 1,17 Mio. Euro

Guaranteed energy saving: 47% (40.000 Euro/a)

CO2-reduction: 335t/year (-84%)

Duration of contract: 15 years

Contractin

g-Award

Energieprofi 2000

Page 10: ESCO Implementations in Austria and Germany – Some Good Practices DDI Jan W. Bleyl, Graz Energy Agency Ltd, Austria phone: +43 316 811848-0; email: bleyl@grazer-ea.at

Saving potentials in public buildings – results from the Austrian EPC-Campaign

project start implementation of measures end of contract

years

energy cost

payment to ESCo

controlling cost

service & operationt

project management (tendering, ...)

Source: EVA 2003

Page 11: ESCO Implementations in Austria and Germany – Some Good Practices DDI Jan W. Bleyl, Graz Energy Agency Ltd, Austria phone: +43 316 811848-0; email: bleyl@grazer-ea.at