esa report - majorprojects.planningportal.nsw.gov.au

22
73° 45' 40" 173° 45' 40" 86.155 86.155 181° 46' 85.385 181° 46' 85.385 176°32'10" 1.725 CHORD 179°02' 21.87 ARC LENGTH 21.88 RADIUS 229.4 1°46' 5.205 175°02'40" 5.945 161°36'05" 5.945 139°10'40" 4.275 120°46'20" 3.34 91° 38' 25" 261.23 91° 25" 38' 261.23 46' 247.36 46' 247.36 46' 247.36 CHORD 177°45'50" 43.155 ARC LENGTH 43.19 RADIUS 309.1 CHORD 298°12'30" 59.20 ARC LENGTH 59.25 RADIUS 400.2 TP1(>0.4) TP1(>0.4) TP1(>0.4) TP1(>0.4) TP1(>0.4) TP2(>0.5) TP2(>0.5) TP2(>0.5) TP2(>0.5) TP2(>0.5) TP3(>0.7) TP3(>0.7) TP3(>0.7) TP3(>0.7) TP3(>0.7) BH7(4.0) BH7(4.0) BH7(4.0) BH7(4.0) BH7(4.0) BH18(2.0) BH18(2.0) BH18(2.0) BH18(2.0) BH18(2.0) BH8(1.7) BH8(1.7) BH8(1.7) BH8(1.7) BH8(1.7) BH6(2.6) BH6(2.6) BH6(2.6) BH6(2.6) BH6(2.6) BH11(1.5) BH11(1.5) BH11(1.5) BH11(1.5) BH11(1.5) BH9(1.4) BH9(1.4) BH9(1.4) BH9(1.4) BH9(1.4) BH10(1.4) BH10(1.4) BH10(1.4) BH10(1.4) BH10(1.4) BH12(2.6) BH12(2.6) BH12(2.6) BH12(2.6) BH12(2.6) BH13(2.6) BH13(2.6) BH13(2.6) BH13(2.6) BH13(2.6) BH4(3.0) BH4(3.0) BH4(3.0) BH4(3.0) BH4(3.0) BH14(2.4) BH14(2.4) BH14(2.4) BH14(2.4) BH14(2.4) BH15(0.4) BH15(0.4) BH15(0.4) BH15(0.4) BH15(0.4) BH3(1.0) BH3(1.0) BH3(1.0) BH3(1.0) BH3(1.0) BH16(0.3) BH16(0.3) BH16(0.3) BH16(0.3) BH16(0.3) BH17(0.6) BH17(0.6) BH17(0.6) BH17(0.6) BH17(0.6) BH5(2.0) BH5(2.0) BH5(2.0) BH5(2.0) BH5(2.0) BH1(2.0) BH1(2.0) BH1(2.0) BH1(2.0) BH1(2.0) BH2(1.4) BH2(1.4) BH2(1.4) BH2(1.4) BH2(1.4) 101(2.7) 101(2.7) 101(2.7) 101(2.7) 101(2.7) 102(2.3) 102(2.3) 102(2.3) 102(2.3) 102(2.3) 103(1.8) 103(1.8) 103(1.8) 103(1.8) 103(1.8) 104(2.6) 104(2.6) 104(2.6) 104(2.6) 104(2.6) 105(0.8) 105(0.8) 105(0.8) 105(0.8) 105(0.8) 106(1.7) 106(1.7) 106(1.7) 106(1.7) 106(1.7) 107(1.0) 107(1.0) 107(1.0) 107(1.0) 107(1.0) 108(2.0) 108(2.0) 108(2.0) 108(2.0) 108(2.0) 109(1.8) 109(1.8) 109(1.8) 109(1.8) 109(1.8) 110(1.6) 110(1.6) 110(1.6) 110(1.6) 110(1.6) 111(1.8) 111(1.8) 111(1.8) 111(1.8) 111(1.8) 112(1.5) 112(1.5) 112(1.5) 112(1.5) 112(1.5) 113(1.6) 113(1.6) 113(1.6) 113(1.6) 113(1.6) 114(2.2) 114(2.2) 114(2.2) 114(2.2) 114(2.2) 115(1.8) 115(1.8) 115(1.8) 115(1.8) 115(1.8) 116(1.6) 116(1.6) 116(1.6) 116(1.6) 116(1.6) 117(1.7) 117(1.7) 117(1.7) 117(1.7) 117(1.7) PLOT DATE: 7/02/2017 5:41:04 PM DWG FILE: S:\5 EIS\5C EIS JOBS\29000'S\E29593K ORAN PARK\CAD\E29593KRPT2.DWG This plan should be read in conjunction with the JK Geotechnics report. Report No: Project: Title: PROPOSED ORAN PARK HIGH SCHOOL SOUTH CIRCUIT, ORAN PARK, NSW E29593Krpt2 ENVIRONMENTAL INVESTIGATION SERVICES © EIS Figure No: CONTAMINATION LOCATION PLAN 3 0 SCALE @A3 METRES 1:1200 60 48 36 24 12 ORAN PARK PRIMARY SCHOOL TP (Fill Depth) APPROXIMATE SITE BOUNDARY LEGEND BOREHOLE LOCATION 1-18, NUMBER AND DEPTH OF FILL (m), (EIS, 2016) BH (Fill Depth) TEST PIT LOCATION, NUMBER AND DEPTH OF FILL (m), (EIS, 2016) BOREHOLE LOCATION 101-117, NUMBER AND DEPTH OF FILL (m), (EIS, 2017) BH (Fill Depth) SOIL CONTAMINATION ABOVE SAC FOR ECOLOGICAL RISK SAMPLE ID DEPTH (metres) CHEMICAL CONCENTRATION (mg/kg) BH106 0.05-0.2 NICKEL 40 ZINC 120

Upload: others

Post on 22-Oct-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ESA Report - majorprojects.planningportal.nsw.gov.au

173° 45' 40"

173° 45' 40"

86.155

86.155

181° 46'

85.385

181° 46'

85.385

176°32'10"

1.725

CH

OR

D 179°02' 21.87

AR

C LE

NG

TH

21.88 R

AD

IU

S 229.4

1°4

6'

5.2

05

175°02'40"

5.945

1

6

1

°

3

6

'0

5

"

5

.

9

4

5

1

3

9

°

1

0

'

4

0

"

4

.

2

7

5

1

2

0

°

4

6

'

2

0

"

3

.

3

4

91°

38'

25"

261.23

91°

25"

38'

261.23

46'

24

7.3

6

46'

247.36

46

'

247.36

CH

OR

D 177°45'50" 43.155

AR

C LE

NG

TH

43.19 R

AD

IU

S 309.1

C

H

O

R

D

2

9

8

°

1

2

'

3

0

"

5

9

.

2

0

A

R

C

L

E

N

G

T

H

5

9

.

2

5

R

A

D

I

U

S

4

0

0

.

2

9

1

.0

0

9

1

.

0

0

9

2

.

0

0

9

2

.

0

0

9

2

.

0

0

9

2

.

0

0

9

2

.

0

0

9

3

.

0

0

9

3

.

0

0

9

3

.0

0

9

3

.0

0

9

3

.

0

0

9

4

.

0

0

9

4

.

0

0

9

4

.

0

0

9

4

.0

0

9

4

.0

0

9

4

.0

0

9

5

.

0

0

9

5

.

0

0

9

5

.

0

0

9

5

.0

0

9

5

.0

0

95.00

9

5

.

0

0

9

5

.0

0

9

6

.

0

0

9

6

.

0

0

96.00

9

6

.

0

0

9

7

.

0

0

9

7

.0

0

9

7

.

0

0

9

7

.0

0

9

8

.0

0

9

8

.

0

0

9

8

.

0

0

9

8

.

0

0

9

8

.0

0

9

8

.0

0

9

8

.0

0

9

9

.

0

0

9

9

.0

0

99.00

1

0

0

.0

0

TP1(>0.4)

TP1(>0.4)TP1(>0.4)

TP1(>0.4)TP1(>0.4)

TP2(>0.5)

TP2(>0.5)TP2(>0.5)

TP2(>0.5)TP2(>0.5)

TP3(>0.7)

TP3(>0.7)TP3(>0.7)

TP3(>0.7)TP3(>0.7)

BH7(4.0)

BH7(4.0)BH7(4.0)

BH7(4.0)BH7(4.0)

BH18(2.0)

BH18(2.0)BH18(2.0)

BH18(2.0)BH18(2.0)

BH8(1.7)

BH8(1.7)BH8(1.7)

BH8(1.7)BH8(1.7)

BH6(2.6)

BH6(2.6)BH6(2.6)

BH6(2.6)BH6(2.6)

BH11(1.5)

BH11(1.5)BH11(1.5)

BH11(1.5)BH11(1.5)

BH9(1.4)

BH9(1.4)BH9(1.4)

BH9(1.4)BH9(1.4)

BH10(1.4)

BH10(1.4)BH10(1.4)

BH10(1.4)BH10(1.4)

BH12(2.6)

BH12(2.6)BH12(2.6)

BH12(2.6)BH12(2.6)

BH13(2.6)

BH13(2.6)BH13(2.6)

BH13(2.6)BH13(2.6)

BH4(3.0)

BH4(3.0)BH4(3.0)

BH4(3.0)BH4(3.0)

BH14(2.4)

BH14(2.4)BH14(2.4)

BH14(2.4)BH14(2.4)

BH15(0.4)

BH15(0.4)BH15(0.4)

BH15(0.4)BH15(0.4)

BH3(1.0)

BH3(1.0)BH3(1.0)

BH3(1.0)BH3(1.0)

BH16(0.3)

BH16(0.3)BH16(0.3)

BH16(0.3)BH16(0.3)

BH17(0.6)

BH17(0.6)BH17(0.6)

BH17(0.6)BH17(0.6)

BH5(2.0)

BH5(2.0)BH5(2.0)

BH5(2.0)BH5(2.0)

BH1(2.0)

BH1(2.0)BH1(2.0)

BH1(2.0)BH1(2.0)

BH2(1.4)

BH2(1.4)BH2(1.4)

BH2(1.4)BH2(1.4)

101(2.7)

101(2.7)101(2.7)

101(2.7)101(2.7)

102(2.3)

102(2.3)102(2.3)

102(2.3)102(2.3)

103(1.8)

103(1.8)103(1.8)

103(1.8)103(1.8)

104(2.6)

104(2.6)104(2.6)

104(2.6)104(2.6)

105(0.8)

105(0.8)105(0.8)

105(0.8)105(0.8)

106(1.7)

106(1.7)106(1.7)

106(1.7)106(1.7)

107(1.0)

107(1.0)107(1.0)

107(1.0)107(1.0)

108(2.0)

108(2.0)108(2.0)

108(2.0)108(2.0)

109(1.8)

109(1.8)109(1.8)

109(1.8)109(1.8)

110(1.6)

110(1.6)110(1.6)

110(1.6)110(1.6)

111(1.8)

111(1.8)111(1.8)

111(1.8)111(1.8)

112(1.5)

112(1.5)112(1.5)

112(1.5)112(1.5)

113(1.6)

113(1.6)113(1.6)

113(1.6)113(1.6)

114(2.2)

114(2.2)114(2.2)

114(2.2)114(2.2)

115(1.8)

115(1.8)115(1.8)

115(1.8)115(1.8)

116(1.6)

116(1.6)116(1.6)

116(1.6)116(1.6)

117(1.7)

117(1.7)117(1.7)

117(1.7)117(1.7)

PL

OT

D

AT

E: 7

/0

2/2

01

7 5

:4

1:0

4 P

M D

WG

F

IL

E: S

:\5

E

IS

\5

C E

IS

JO

BS

\2

90

00

'S

\E

29

59

3K

O

RA

N P

AR

K\C

AD

\E

29

59

3K

RP

T2

.D

WG

This plan should be read in conjunction with the JK Geotechnics report.

Report No:

Project:

Title:

PROPOSED ORAN PARK HIGH SCHOOL

SOUTH CIRCUIT, ORAN PARK, NSW

E29593Krpt2

ENVIRONMENTAL INVESTIGATION SERVICES

© EIS

Figure No:

CONTAMINATION LOCATION PLAN

3

0

SCALE

@A3 METRES

1:1200

6048362412

ORAN PARK

PRIMARY SCHOOL

TP (Fill Depth)

APPROXIMATE SITE BOUNDARY

LEGEND

BOREHOLE LOCATION 1-18, NUMBER AND DEPTH OF FILL (m), (EIS, 2016)BH (Fill Depth)

TEST PIT LOCATION, NUMBER AND DEPTH OF FILL (m), (EIS, 2016)

BOREHOLE LOCATION 101-117, NUMBER AND DEPTH OF FILL (m), (EIS, 2017)BH (Fill Depth)

SOIL CONTAMINATION ABOVE SAC

FOR ECOLOGICAL RISK

SAMPLE ID

DEPTH (metres)

CHEMICAL

CONCENTRATION (mg/kg)

BH106 0.05-0.2

NICKEL 40

ZINC 120

AutoCAD SHX Text
94.42
AutoCAD SHX Text
98.10
AutoCAD SHX Text
98.15
AutoCAD SHX Text
98.16
AutoCAD SHX Text
98.16
AutoCAD SHX Text
95.91
AutoCAD SHX Text
95.96
AutoCAD SHX Text
95.76
AutoCAD SHX Text
95.77
AutoCAD SHX Text
95.44
AutoCAD SHX Text
94.84
AutoCAD SHX Text
94.64
AutoCAD SHX Text
94.39
AutoCAD SHX Text
93.20
AutoCAD SHX Text
98.06
AutoCAD SHX Text
97.94
AutoCAD SHX Text
97.58
AutoCAD SHX Text
96.67
AutoCAD SHX Text
95.68
AutoCAD SHX Text
95.64
AutoCAD SHX Text
95.23
AutoCAD SHX Text
94.54
AutoCAD SHX Text
95.48
AutoCAD SHX Text
95.80
AutoCAD SHX Text
95.09
AutoCAD SHX Text
94.77
AutoCAD SHX Text
94.28
AutoCAD SHX Text
95.31
AutoCAD SHX Text
95.50
AutoCAD SHX Text
95.66
AutoCAD SHX Text
95.83
AutoCAD SHX Text
94.56
AutoCAD SHX Text
94.58
AutoCAD SHX Text
94.54
AutoCAD SHX Text
94.53
AutoCAD SHX Text
97.59
AutoCAD SHX Text
97.53
AutoCAD SHX Text
97.29
AutoCAD SHX Text
97.23
AutoCAD SHX Text
97.15
AutoCAD SHX Text
97.07
AutoCAD SHX Text
95.89
AutoCAD SHX Text
96.34
AutoCAD SHX Text
96.03
AutoCAD SHX Text
95.86
AutoCAD SHX Text
95.65
AutoCAD SHX Text
95.35
AutoCAD SHX Text
95.13
AutoCAD SHX Text
96.80
AutoCAD SHX Text
97.01
AutoCAD SHX Text
97.20
AutoCAD SHX Text
97.52
AutoCAD SHX Text
97.89
AutoCAD SHX Text
96.95
AutoCAD SHX Text
96.48
AutoCAD SHX Text
96.34
AutoCAD SHX Text
96.11
AutoCAD SHX Text
95.91
AutoCAD SHX Text
98.16
AutoCAD SHX Text
98.17
AutoCAD SHX Text
97.87
AutoCAD SHX Text
95.99
AutoCAD SHX Text
95.75
AutoCAD SHX Text
95.55
AutoCAD SHX Text
95.29
AutoCAD SHX Text
95.01
AutoCAD SHX Text
95.06
AutoCAD SHX Text
96.63
AutoCAD SHX Text
98.03
AutoCAD SHX Text
97.66
AutoCAD SHX Text
95.95
AutoCAD SHX Text
95.80
AutoCAD SHX Text
95.91
AutoCAD SHX Text
98.22
AutoCAD SHX Text
97.87
AutoCAD SHX Text
97.44
AutoCAD SHX Text
97.08
AutoCAD SHX Text
96.58
AutoCAD SHX Text
98.27
AutoCAD SHX Text
98.31
AutoCAD SHX Text
98.16
AutoCAD SHX Text
98.15
AutoCAD SHX Text
98.16
AutoCAD SHX Text
97.05
AutoCAD SHX Text
96.52
AutoCAD SHX Text
96.26
AutoCAD SHX Text
95.02
AutoCAD SHX Text
94.94
AutoCAD SHX Text
97.44
AutoCAD SHX Text
96.94
AutoCAD SHX Text
98.22
AutoCAD SHX Text
98.14
AutoCAD SHX Text
98.04
AutoCAD SHX Text
97.77
AutoCAD SHX Text
97.79
AutoCAD SHX Text
97.90
AutoCAD SHX Text
97.54
AutoCAD SHX Text
97.33
AutoCAD SHX Text
98.34
AutoCAD SHX Text
98.25
AutoCAD SHX Text
98.35
AutoCAD SHX Text
98.50
AutoCAD SHX Text
98.54
AutoCAD SHX Text
98.31
AutoCAD SHX Text
98.26
AutoCAD SHX Text
98.28
AutoCAD SHX Text
97.69
AutoCAD SHX Text
97.44
AutoCAD SHX Text
98.37
AutoCAD SHX Text
98.00
AutoCAD SHX Text
100.62
AutoCAD SHX Text
100.58
AutoCAD SHX Text
98.09
AutoCAD SHX Text
98.14
AutoCAD SHX Text
97.78
AutoCAD SHX Text
97.74
AutoCAD SHX Text
97.75
AutoCAD SHX Text
97.32
AutoCAD SHX Text
97.19
AutoCAD SHX Text
97.49
AutoCAD SHX Text
98.15
AutoCAD SHX Text
98.21
AutoCAD SHX Text
98.27
AutoCAD SHX Text
98.25
AutoCAD SHX Text
98.25
AutoCAD SHX Text
98.15
AutoCAD SHX Text
98.30
AutoCAD SHX Text
98.25
AutoCAD SHX Text
97.18
AutoCAD SHX Text
100.45
AutoCAD SHX Text
98.12
AutoCAD SHX Text
98.26
AutoCAD SHX Text
98.24
AutoCAD SHX Text
98.16
AutoCAD SHX Text
98.31
AutoCAD SHX Text
98.45
AutoCAD SHX Text
97.82
AutoCAD SHX Text
93.01
AutoCAD SHX Text
93.45
AutoCAD SHX Text
99.05
AutoCAD SHX Text
98.96
AutoCAD SHX Text
98.23
AutoCAD SHX Text
100.58
AutoCAD SHX Text
100.64
AutoCAD SHX Text
91.47
AutoCAD SHX Text
92.67
AutoCAD SHX Text
93.35
AutoCAD SHX Text
93.97
AutoCAD SHX Text
98.73
AutoCAD SHX Text
98.16
AutoCAD SHX Text
100.65
AutoCAD SHX Text
100.71
AutoCAD SHX Text
91.32
AutoCAD SHX Text
91.06
AutoCAD SHX Text
98.43
AutoCAD SHX Text
98.33
AutoCAD SHX Text
98.27
AutoCAD SHX Text
98.48
AutoCAD SHX Text
100.53
AutoCAD SHX Text
100.61
AutoCAD SHX Text
100.61
AutoCAD SHX Text
100.64
AutoCAD SHX Text
100.70
AutoCAD SHX Text
100.74
AutoCAD SHX Text
100.68
AutoCAD SHX Text
100.71
AutoCAD SHX Text
100.66
AutoCAD SHX Text
100.65
AutoCAD SHX Text
100.48
AutoCAD SHX Text
100.46
AutoCAD SHX Text
100.46
AutoCAD SHX Text
100.53
AutoCAD SHX Text
98.05
AutoCAD SHX Text
99.27
AutoCAD SHX Text
100.04
AutoCAD SHX Text
100.52
AutoCAD SHX Text
100.60
AutoCAD SHX Text
90.45
AutoCAD SHX Text
90.79
AutoCAD SHX Text
90.87
AutoCAD SHX Text
90.89
AutoCAD SHX Text
90.90
AutoCAD SHX Text
90.86
AutoCAD SHX Text
90.87
AutoCAD SHX Text
90.88
AutoCAD SHX Text
90.86
AutoCAD SHX Text
91.05
AutoCAD SHX Text
99.57
AutoCAD SHX Text
98.82
AutoCAD SHX Text
90.90
AutoCAD SHX Text
90.66
AutoCAD SHX Text
99.04
AutoCAD SHX Text
98.95
AutoCAD SHX Text
98.89
AutoCAD SHX Text
98.77
AutoCAD SHX Text
98.96
AutoCAD SHX Text
99.44
AutoCAD SHX Text
99.43
AutoCAD SHX Text
99.61
AutoCAD SHX Text
99.65
AutoCAD SHX Text
99.58
AutoCAD SHX Text
90.79
AutoCAD SHX Text
100.59
AutoCAD SHX Text
100.57
AutoCAD SHX Text
100.57
AutoCAD SHX Text
100.63
AutoCAD SHX Text
100.61
AutoCAD SHX Text
100.62
AutoCAD SHX Text
100.60
AutoCAD SHX Text
90.17
AutoCAD SHX Text
97.54
AutoCAD SHX Text
97.35
AutoCAD SHX Text
97.01
AutoCAD SHX Text
96.75
AutoCAD SHX Text
96.73
AutoCAD SHX Text
99.99
AutoCAD SHX Text
99.67
AutoCAD SHX Text
90.24
AutoCAD SHX Text
90.09
AutoCAD SHX Text
90.12
AutoCAD SHX Text
90.19
AutoCAD SHX Text
97.78
AutoCAD SHX Text
97.57
AutoCAD SHX Text
97.13
AutoCAD SHX Text
96.98
AutoCAD SHX Text
96.96
AutoCAD SHX Text
100.57
AutoCAD SHX Text
100.43
AutoCAD SHX Text
100.45
AutoCAD SHX Text
100.46
AutoCAD SHX Text
100.43
AutoCAD SHX Text
89.66
AutoCAD SHX Text
89.96
AutoCAD SHX Text
90.03
AutoCAD SHX Text
90.18
AutoCAD SHX Text
90.22
AutoCAD SHX Text
90.27
AutoCAD SHX Text
90.35
AutoCAD SHX Text
90.40
AutoCAD SHX Text
100.65
AutoCAD SHX Text
99.85
AutoCAD SHX Text
100.28
AutoCAD SHX Text
100.21
AutoCAD SHX Text
100.59
AutoCAD SHX Text
100.20
AutoCAD SHX Text
90.82
AutoCAD SHX Text
90.93
AutoCAD SHX Text
90.86
AutoCAD SHX Text
100.36
AutoCAD SHX Text
100.48
AutoCAD SHX Text
100.34
AutoCAD SHX Text
100.41
AutoCAD SHX Text
98.16
AutoCAD SHX Text
98.01
AutoCAD SHX Text
89.93
AutoCAD SHX Text
89.96
AutoCAD SHX Text
90.04
AutoCAD SHX Text
99.02
AutoCAD SHX Text
98.94
AutoCAD SHX Text
98.25
AutoCAD SHX Text
97.90
AutoCAD SHX Text
97.81
AutoCAD SHX Text
99.17
AutoCAD SHX Text
98.32
AutoCAD SHX Text
90.91
AutoCAD SHX Text
90.92
AutoCAD SHX Text
90.81
AutoCAD SHX Text
99.37
AutoCAD SHX Text
99.16
AutoCAD SHX Text
98.47
AutoCAD SHX Text
98.11
AutoCAD SHX Text
97.92
AutoCAD SHX Text
98.03
AutoCAD SHX Text
98.28
AutoCAD SHX Text
100.02
AutoCAD SHX Text
99.93
AutoCAD SHX Text
90.05
AutoCAD SHX Text
90.88
AutoCAD SHX Text
90.82
AutoCAD SHX Text
90.12
AutoCAD SHX Text
90.96
AutoCAD SHX Text
90.84
AutoCAD SHX Text
99.97
AutoCAD SHX Text
99.79
AutoCAD SHX Text
100.05
AutoCAD SHX Text
100.14
AutoCAD SHX Text
100.06
AutoCAD SHX Text
100.13
AutoCAD SHX Text
99.94
AutoCAD SHX Text
99.92
AutoCAD SHX Text
99.85
AutoCAD SHX Text
99.98
AutoCAD SHX Text
99.91
AutoCAD SHX Text
99.95
AutoCAD SHX Text
99.98
AutoCAD SHX Text
100.06
AutoCAD SHX Text
90.00
AutoCAD SHX Text
97.88
AutoCAD SHX Text
97.77
AutoCAD SHX Text
90.68
AutoCAD SHX Text
90.68
AutoCAD SHX Text
91.13
AutoCAD SHX Text
90.13
AutoCAD SHX Text
90.12
AutoCAD SHX Text
90.85
AutoCAD SHX Text
99.42
AutoCAD SHX Text
99.33
AutoCAD SHX Text
99.26
AutoCAD SHX Text
99.87
AutoCAD SHX Text
90.57
AutoCAD SHX Text
91.93
AutoCAD SHX Text
91.66
AutoCAD SHX Text
90.81
AutoCAD SHX Text
89.77
AutoCAD SHX Text
92.15
AutoCAD SHX Text
92.09
AutoCAD SHX Text
92.00
AutoCAD SHX Text
91.69
AutoCAD SHX Text
91.44
AutoCAD SHX Text
91.02
AutoCAD SHX Text
90.57
AutoCAD SHX Text
99.01
AutoCAD SHX Text
99.49
AutoCAD SHX Text
99.81
AutoCAD SHX Text
99.97
AutoCAD SHX Text
99.54
AutoCAD SHX Text
99.59
AutoCAD SHX Text
99.34
AutoCAD SHX Text
99.39
AutoCAD SHX Text
99.86
AutoCAD SHX Text
90.37
AutoCAD SHX Text
90.33
AutoCAD SHX Text
89.91
AutoCAD SHX Text
91.08
AutoCAD SHX Text
91.45
AutoCAD SHX Text
90.21
AutoCAD SHX Text
98.81
AutoCAD SHX Text
98.87
AutoCAD SHX Text
98.05
AutoCAD SHX Text
97.92
AutoCAD SHX Text
92.59
AutoCAD SHX Text
92.65
AutoCAD SHX Text
92.43
AutoCAD SHX Text
92.20
AutoCAD SHX Text
92.18
AutoCAD SHX Text
92.03
AutoCAD SHX Text
91.99
AutoCAD SHX Text
97.99
AutoCAD SHX Text
98.45
AutoCAD SHX Text
98.74
AutoCAD SHX Text
98.73
AutoCAD SHX Text
98.67
AutoCAD SHX Text
98.77
AutoCAD SHX Text
98.79
AutoCAD SHX Text
98.86
AutoCAD SHX Text
98.15
AutoCAD SHX Text
98.47
AutoCAD SHX Text
98.80
AutoCAD SHX Text
98.83
AutoCAD SHX Text
91.20
AutoCAD SHX Text
91.56
AutoCAD SHX Text
93.06
AutoCAD SHX Text
92.38
AutoCAD SHX Text
94.46
AutoCAD SHX Text
94.19
AutoCAD SHX Text
98.33
AutoCAD SHX Text
98.04
AutoCAD SHX Text
97.84
AutoCAD SHX Text
97.53
AutoCAD SHX Text
97.22
AutoCAD SHX Text
97.18
AutoCAD SHX Text
92.16
AutoCAD SHX Text
92.14
AutoCAD SHX Text
96.87
AutoCAD SHX Text
97.37
AutoCAD SHX Text
90.44
AutoCAD SHX Text
90.71
AutoCAD SHX Text
90.43
AutoCAD SHX Text
92.47
AutoCAD SHX Text
92.86
AutoCAD SHX Text
93.23
AutoCAD SHX Text
93.33
AutoCAD SHX Text
93.41
AutoCAD SHX Text
93.45
AutoCAD SHX Text
94.03
AutoCAD SHX Text
92.70
AutoCAD SHX Text
92.71
AutoCAD SHX Text
97.94
AutoCAD SHX Text
97.20
AutoCAD SHX Text
97.81
AutoCAD SHX Text
100.47
AutoCAD SHX Text
100.49
AutoCAD SHX Text
100.24
AutoCAD SHX Text
100.44
AutoCAD SHX Text
100.04
AutoCAD SHX Text
99.89
AutoCAD SHX Text
99.88
AutoCAD SHX Text
91.88
AutoCAD SHX Text
92.48
AutoCAD SHX Text
90.63
AutoCAD SHX Text
90.31
AutoCAD SHX Text
90.34
AutoCAD SHX Text
90.38
AutoCAD SHX Text
94.34
AutoCAD SHX Text
93.84
AutoCAD SHX Text
95.10
AutoCAD SHX Text
94.85
AutoCAD SHX Text
99.96
AutoCAD SHX Text
99.93
AutoCAD SHX Text
100.01
AutoCAD SHX Text
92.05
AutoCAD SHX Text
91.45
AutoCAD SHX Text
91.64
AutoCAD SHX Text
91.27
AutoCAD SHX Text
91.37
AutoCAD SHX Text
91.10
AutoCAD SHX Text
93.58
AutoCAD SHX Text
93.33
AutoCAD SHX Text
92.85
AutoCAD SHX Text
92.69
AutoCAD SHX Text
92.62
AutoCAD SHX Text
92.64
AutoCAD SHX Text
92.84
AutoCAD SHX Text
92.38
AutoCAD SHX Text
92.36
AutoCAD SHX Text
92.35
AutoCAD SHX Text
92.38
AutoCAD SHX Text
92.44
AutoCAD SHX Text
73.95
AutoCAD SHX Text
99.98
AutoCAD SHX Text
99.99
AutoCAD SHX Text
100.01
AutoCAD SHX Text
100.01
AutoCAD SHX Text
99.87
AutoCAD SHX Text
99.75
AutoCAD SHX Text
99.79
AutoCAD SHX Text
99.92
AutoCAD SHX Text
99.71
AutoCAD SHX Text
99.70
AutoCAD SHX Text
94.14
AutoCAD SHX Text
91.63
AutoCAD SHX Text
94.32
AutoCAD SHX Text
94.40
AutoCAD SHX Text
94.36
AutoCAD SHX Text
94.37
AutoCAD SHX Text
90.69
AutoCAD SHX Text
93.34
AutoCAD SHX Text
93.01
AutoCAD SHX Text
93.10
AutoCAD SHX Text
92.98
AutoCAD SHX Text
92.86
AutoCAD SHX Text
92.61
AutoCAD SHX Text
94.03
AutoCAD SHX Text
94.03
AutoCAD SHX Text
94.01
AutoCAD SHX Text
94.03
AutoCAD SHX Text
93.95
AutoCAD SHX Text
94.16
AutoCAD SHX Text
93.43
AutoCAD SHX Text
93.06
AutoCAD SHX Text
95.58
AutoCAD SHX Text
95.36
AutoCAD SHX Text
99.17
AutoCAD SHX Text
91.81
AutoCAD SHX Text
91.86
AutoCAD SHX Text
91.33
AutoCAD SHX Text
91.58
AutoCAD SHX Text
91.60
AutoCAD SHX Text
91.33
AutoCAD SHX Text
91.05
AutoCAD SHX Text
92.00
AutoCAD SHX Text
91.27
AutoCAD SHX Text
90.78
AutoCAD SHX Text
94.55
AutoCAD SHX Text
94.47
AutoCAD SHX Text
93.77
AutoCAD SHX Text
94.21
AutoCAD SHX Text
94.35
AutoCAD SHX Text
94.38
AutoCAD SHX Text
99.80
AutoCAD SHX Text
99.80
AutoCAD SHX Text
99.81
AutoCAD SHX Text
99.81
AutoCAD SHX Text
99.44
AutoCAD SHX Text
98.57
AutoCAD SHX Text
98.62
AutoCAD SHX Text
98.77
AutoCAD SHX Text
99.09
AutoCAD SHX Text
99.80
AutoCAD SHX Text
98.17
AutoCAD SHX Text
98.15
AutoCAD SHX Text
95.66
AutoCAD SHX Text
95.60
AutoCAD SHX Text
95.61
AutoCAD SHX Text
96.11
AutoCAD SHX Text
94.35
AutoCAD SHX Text
94.35
AutoCAD SHX Text
90.44
AutoCAD SHX Text
92.93
AutoCAD SHX Text
92.90
AutoCAD SHX Text
94.84
AutoCAD SHX Text
94.78
AutoCAD SHX Text
98.09
AutoCAD SHX Text
94.30
AutoCAD SHX Text
91.63
AutoCAD SHX Text
91.43
AutoCAD SHX Text
91.10
AutoCAD SHX Text
91.38
AutoCAD SHX Text
91.61
AutoCAD SHX Text
91.17
AutoCAD SHX Text
90.87
AutoCAD SHX Text
90.53
AutoCAD SHX Text
94.71
AutoCAD SHX Text
94.79
AutoCAD SHX Text
94.84
AutoCAD SHX Text
94.71
AutoCAD SHX Text
94.71
AutoCAD SHX Text
94.54
AutoCAD SHX Text
94.53
AutoCAD SHX Text
94.38
AutoCAD SHX Text
94.37
AutoCAD SHX Text
94.27
AutoCAD SHX Text
94.33
AutoCAD SHX Text
94.17
AutoCAD SHX Text
94.50
AutoCAD SHX Text
94.90
AutoCAD SHX Text
98.26
AutoCAD SHX Text
98.25
AutoCAD SHX Text
98.31
AutoCAD SHX Text
98.32
AutoCAD SHX Text
98.17
AutoCAD SHX Text
98.07
AutoCAD SHX Text
98.60
AutoCAD SHX Text
98.24
AutoCAD SHX Text
98.50
AutoCAD SHX Text
98.67
AutoCAD SHX Text
96.73
AutoCAD SHX Text
96.70
AutoCAD SHX Text
98.00
AutoCAD SHX Text
98.00
AutoCAD SHX Text
98.00
AutoCAD SHX Text
93.56
AutoCAD SHX Text
93.61
AutoCAD SHX Text
93.54
AutoCAD SHX Text
93.56
AutoCAD SHX Text
93.52
AutoCAD SHX Text
96.25
AutoCAD SHX Text
100.46
AutoCAD SHX Text
96.96
AutoCAD SHX Text
90.57
AutoCAD SHX Text
94.14
AutoCAD SHX Text
94.42
AutoCAD SHX Text
94.47
AutoCAD SHX Text
94.42
AutoCAD SHX Text
94.39
AutoCAD SHX Text
94.37
AutoCAD SHX Text
94.90
AutoCAD SHX Text
94.99
AutoCAD SHX Text
95.03
AutoCAD SHX Text
95.11
AutoCAD SHX Text
95.20
AutoCAD SHX Text
95.27
AutoCAD SHX Text
95.20
AutoCAD SHX Text
95.42
AutoCAD SHX Text
95.64
AutoCAD SHX Text
95.76
AutoCAD SHX Text
95.55
AutoCAD SHX Text
95.49
AutoCAD SHX Text
96.82
AutoCAD SHX Text
96.82
AutoCAD SHX Text
96.85
AutoCAD SHX Text
96.86
AutoCAD SHX Text
98.03
AutoCAD SHX Text
96.78
AutoCAD SHX Text
97.16
AutoCAD SHX Text
97.50
AutoCAD SHX Text
97.96
AutoCAD SHX Text
95.88
AutoCAD SHX Text
95.86
AutoCAD SHX Text
96.11
AutoCAD SHX Text
96.10
AutoCAD SHX Text
95.11
AutoCAD SHX Text
95.86
AutoCAD SHX Text
95.65
AutoCAD SHX Text
94.53
AutoCAD SHX Text
93.73
AutoCAD SHX Text
94.15
AutoCAD SHX Text
94.31
AutoCAD SHX Text
95.57
AutoCAD SHX Text
96.11
AutoCAD SHX Text
96.63
AutoCAD SHX Text
95.70
AutoCAD SHX Text
95.42
AutoCAD SHX Text
95.52
AutoCAD SHX Text
95.42
AutoCAD SHX Text
95.36
AutoCAD SHX Text
95.30
AutoCAD SHX Text
95.10
AutoCAD SHX Text
94.92
AutoCAD SHX Text
94.83
AutoCAD SHX Text
94.61
AutoCAD SHX Text
95.97
AutoCAD SHX Text
95.97
AutoCAD SHX Text
95.98
AutoCAD SHX Text
95.99
AutoCAD SHX Text
96.68
AutoCAD SHX Text
96.52
AutoCAD SHX Text
96.55
AutoCAD SHX Text
96.47
AutoCAD SHX Text
96.07
AutoCAD SHX Text
96.22
AutoCAD SHX Text
METAL
AutoCAD SHX Text
METAL
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
METAL
AutoCAD SHX Text
METAL
AutoCAD SHX Text
MESH
AutoCAD SHX Text
MESH
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
1000 D.P.1164435
AutoCAD SHX Text
1000 D.P.1164435
AutoCAD SHX Text
1000 D.P.1164435
AutoCAD SHX Text
1000 D.P.1164435
AutoCAD SHX Text
1000 D.P.1164435
AutoCAD SHX Text
AREA: 8.92ha
AutoCAD SHX Text
AREA: 8.92ha
AutoCAD SHX Text
AREA: 8.92ha
AutoCAD SHX Text
AREA: 8.92ha
AutoCAD SHX Text
AREA: 8.92ha
AutoCAD SHX Text
GRASSED AREA
AutoCAD SHX Text
GRASSED AREA
AutoCAD SHX Text
GRASSED AREA
AutoCAD SHX Text
GRASSED AREA
AutoCAD SHX Text
GRASSED AREA
AutoCAD SHX Text
SOUTH
AutoCAD SHX Text
SOUTH
AutoCAD SHX Text
CIRCUIT
AutoCAD SHX Text
CIRCUIT
AutoCAD SHX Text
HOLDEN
AutoCAD SHX Text
HOLDEN
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
ORAN PARK PRIMARY SCHOOL
AutoCAD SHX Text
SINGLE STOREY BRICK BUILDING
AutoCAD SHX Text
SINGLE STOREY BRICK BUILDING
AutoCAD SHX Text
SINGLE STOREY BRICK BUILDING
AutoCAD SHX Text
DETENTION BASIN (NOT SURVEYED)
AutoCAD SHX Text
STOCKPILE
AutoCAD SHX Text
STOCKPILE
AutoCAD SHX Text
STOCKPILE
AutoCAD SHX Text
STOCKPILE
AutoCAD SHX Text
TOP
AutoCAD SHX Text
OF
AutoCAD SHX Text
BANK
AutoCAD SHX Text
BANK
AutoCAD SHX Text
OF
AutoCAD SHX Text
BOTTOM
AutoCAD SHX Text
TOP
AutoCAD SHX Text
OF
AutoCAD SHX Text
BANK
AutoCAD SHX Text
BANK
AutoCAD SHX Text
OF
AutoCAD SHX Text
BOTTOM
AutoCAD SHX Text
BOTTOM
AutoCAD SHX Text
OF
AutoCAD SHX Text
BANK
AutoCAD SHX Text
BOTTOM
AutoCAD SHX Text
BANK
AutoCAD SHX Text
OF
AutoCAD SHX Text
TOP
AutoCAD SHX Text
OF
AutoCAD SHX Text
BANK
AutoCAD SHX Text
TOP
AutoCAD SHX Text
OF
AutoCAD SHX Text
BANK
AutoCAD SHX Text
BOTTOM
AutoCAD SHX Text
OF
AutoCAD SHX Text
BANK
AutoCAD SHX Text
BOTTOM
AutoCAD SHX Text
OF
AutoCAD SHX Text
BANK
AutoCAD SHX Text
BOTTOM
AutoCAD SHX Text
OF
AutoCAD SHX Text
BANK
AutoCAD SHX Text
BOTTOM
AutoCAD SHX Text
OF
AutoCAD SHX Text
BANK
AutoCAD SHX Text
TOP
AutoCAD SHX Text
OF
AutoCAD SHX Text
BANK
AutoCAD SHX Text
BANK
AutoCAD SHX Text
OF
AutoCAD SHX Text
TOP
AutoCAD SHX Text
TOP
AutoCAD SHX Text
OF
AutoCAD SHX Text
BANK
AutoCAD SHX Text
BANK
AutoCAD SHX Text
OF
AutoCAD SHX Text
TOP
AutoCAD SHX Text
TOP
AutoCAD SHX Text
OF
AutoCAD SHX Text
BANK
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
FOOTPATH
AutoCAD SHX Text
FOOTPATH
AutoCAD SHX Text
FOOTPATH
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
[RU] & [S]
AutoCAD SHX Text
[RU] & [S]
AutoCAD SHX Text
[RU] & [S]
AutoCAD SHX Text
[RU] & [S]
AutoCAD SHX Text
[RU] & [S]
AutoCAD SHX Text
[RU] & [S]
AutoCAD SHX Text
[RU] & [S]
AutoCAD SHX Text
TREE
AutoCAD SHX Text
0.1D 5H 2S
AutoCAD SHX Text
TREE
AutoCAD SHX Text
0.1D 5H 2S
AutoCAD SHX Text
TREE
AutoCAD SHX Text
0.1D 5H 2S
AutoCAD SHX Text
TREE
AutoCAD SHX Text
0.1D 5H 2S
AutoCAD SHX Text
TREE
AutoCAD SHX Text
0.1D 5H 2S
AutoCAD SHX Text
TREE
AutoCAD SHX Text
0.1D 5H 2S
AutoCAD SHX Text
TREE
AutoCAD SHX Text
0.1D 5H 2S
AutoCAD SHX Text
TREE
AutoCAD SHX Text
0.1D 5H 2S
AutoCAD SHX Text
TREE
AutoCAD SHX Text
0.1D 5H 2S
AutoCAD SHX Text
TREE
AutoCAD SHX Text
0.1D 5H 2S
AutoCAD SHX Text
[A]
AutoCAD SHX Text
[B]
AutoCAD SHX Text
SANDPIT
AutoCAD SHX Text
[ZEP],
AutoCAD SHX Text
[RU] & [S]
AutoCAD SHX Text
GRATE
AutoCAD SHX Text
GRATE
AutoCAD SHX Text
GRATE
AutoCAD SHX Text
GRATE
AutoCAD SHX Text
[ZEP],
AutoCAD SHX Text
[RU] & [S]
AutoCAD SHX Text
MESH
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
MESH
AutoCAD SHX Text
TOP
AutoCAD SHX Text
OF
AutoCAD SHX Text
BANK
AutoCAD SHX Text
ORAN PARK PUBLIC SCHOOL
AutoCAD SHX Text
BM. DH&W IN KERB R.L. 99.85 (A.H.D.)
AutoCAD SHX Text
BM. DH&W IN KERB R.L. 99.85 (A.H.D.)
AutoCAD SHX Text
E 290750 N 6235650
AutoCAD SHX Text
E 290800 N 6235650
AutoCAD SHX Text
E 290850 N 6235650
AutoCAD SHX Text
E 290900 N 6235650
AutoCAD SHX Text
E 290950 N 6235650
AutoCAD SHX Text
E 291000 N 6235650
AutoCAD SHX Text
E 291050 N 6235650
AutoCAD SHX Text
E 291100 N 6235650
AutoCAD SHX Text
E 290750 N 6235700
AutoCAD SHX Text
E 290800 N 6235700
AutoCAD SHX Text
E 290850 N 6235700
AutoCAD SHX Text
E 290900 N 6235700
AutoCAD SHX Text
E 290950 N 6235700
AutoCAD SHX Text
E 291000 N 6235700
AutoCAD SHX Text
E 291050 N 6235700
AutoCAD SHX Text
E 291100 N 6235700
AutoCAD SHX Text
E 290750 N 6235750
AutoCAD SHX Text
E 290800 N 6235750
AutoCAD SHX Text
E 290850 N 6235750
AutoCAD SHX Text
E 290900 N 6235750
AutoCAD SHX Text
E 290950 N 6235750
AutoCAD SHX Text
E 291000 N 6235750
AutoCAD SHX Text
E 291050 N 6235750
AutoCAD SHX Text
E 291100 N 6235750
AutoCAD SHX Text
E 290750 N 6235800
AutoCAD SHX Text
E 290800 N 6235800
AutoCAD SHX Text
E 290850 N 6235800
AutoCAD SHX Text
E 290900 N 6235800
AutoCAD SHX Text
E 290950 N 6235800
AutoCAD SHX Text
E 291000 N 6235800
AutoCAD SHX Text
E 291050 N 6235800
AutoCAD SHX Text
E 291100 N 6235800
AutoCAD SHX Text
E 290750 N 6235850
AutoCAD SHX Text
E 290800 N 6235850
AutoCAD SHX Text
E 290850 N 6235850
AutoCAD SHX Text
E 290900 N 6235850
AutoCAD SHX Text
E 290950 N 6235850
AutoCAD SHX Text
E 291000 N 6235850
AutoCAD SHX Text
E 291050 N 6235850
AutoCAD SHX Text
E 291100 N 6235850
AutoCAD SHX Text
E 290750 N 6235900
AutoCAD SHX Text
E 290800 N 6235900
AutoCAD SHX Text
E 290850 N 6235900
AutoCAD SHX Text
E 290900 N 6235900
AutoCAD SHX Text
E 290950 N 6235900
AutoCAD SHX Text
E 291000 N 6235900
AutoCAD SHX Text
E 291050 N 6235900
AutoCAD SHX Text
E 291100 N 6235900
Page 2: ESA Report - majorprojects.planningportal.nsw.gov.au

LABORATORY SUMMARY TABLES

Page 3: ESA Report - majorprojects.planningportal.nsw.gov.au

Supplementary Environmental Site Screening

South Circuit, Oran Park, NSW

E29593K

OP PESTICIDES (OPPs)

Total B(a)P HCB Endosulfan Methoxychlor Aldrin & Chlordane DDT, DDD Heptachlor Chlorpyrifos

PAHs TEQ 3 Dieldrin & DDE

4 0.4 1 1 1 0.1 1 1 - 0.5 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 100

300 90 300 17000 600 80 1200 30000 300 3 10 340 400 10 70 400 10 250 1 Detected/Not Detected

Sample

Reference

Sample

DepthSample Description

BH1 0.1-0.3 Fill: silty clay 4 LPQL 12 39 15 LPQL 18 62 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH2 0.2-0.5 Fill: silty clay LPQL LPQL 15 38 9 LPQL 7 35 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH2 3-3.45 Silty clay 16 LPQL 24 32 17 LPQL 8 41 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH3 0-0.4 Fill: silty clay 8 LPQL 20 18 16 LPQL 8 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH4 2.5-3.0 Fill: silty clay 8 LPQL 16 31 16 LPQL 12 48 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH6 0-0.05 Fill: silty clay 7 LPQL 24 16 20 LPQL 8 24 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH7 0.1-0.3 Fill: silty clay 6 LPQL 14 45 11 LPQL 12 42 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH8 0.5-1.0 Fill: silty clay 6 LPQL 16 22 13 LPQL 8 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH8 1.7-2.0 Silty clay 7 LPQL 13 28 14 LPQL 17 70 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH9 0.2-0.5 Fill: silty clay 8 LPQL 8 20 9 LPQL 6 22 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH10 0-0.2 Fill: silty clay 5 LPQL 14 26 14 LPQL 11 48 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH10 1.4-1.6 Silty clay LPQL LPQL 9 14 8 LPQL 8 20 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH11 0.5-1.0 Fill: silty clay 6 LPQL 15 29 16 LPQL 13 51 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH11 1.5-1.7 Silty clay 6 LPQL 16 20 12 LPQL 8 28 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH13 0.2-0.4 Fill: silty clay 6 LPQL 11 34 14 LPQL 18 60 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH13 3.0-3.45 Silty clay 8 LPQL 15 30 14 LPQL 11 51 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH14 0.2-0.5 Fill: silty clay LPQL LPQL 9 23 12 LPQL 9 37 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH15 0.1-0.3 Fill: silty clay 10 LPQL 18 19 15 LPQL 8 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH16 0.6-0.7 Silty clay 5 LPQL 10 15 7 LPQL 4 21 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH17 0-0.1 Fill: silty clay 7 LPQL 18 18 14 LPQL 9 31 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH18 0.5-0.95 Fill: silty clay 6 LPQL 15 28 14 LPQL 10 43 1.8 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH18 2.0-2.2 Silty clay 5 LPQL 13 17 10 LPQL 4 14 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

TP19 0.1-0.4 Fill: silty clay 7 LPQL 13 23 11 LPQL 7 28 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

TP20 0.2-0.5 Fill: silty sandy clay 8 LPQL 20 20 20 LPQL 9 37 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

TP21 0.1-0.4 Fill: silty sandy clay 7 LPQL 15 29 16 LPQL 9 35 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH101 0.8-1.0 Fill: silty clay 7 LPQL 17 33 19 LPQL 13 54 0.05 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH101 3-3.2 Silty clay 22 LPQL 17 40 17 LPQL 16 64 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH102 0-0.2 Fill: silty clay 7 LPQL 23 17 21 LPQL 8 25 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH102 2.5-2.7 Silty clay LPQL LPQL 12 25 10 LPQL 4 20 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH103 0.8-1.0 Fill: silty clay 7 LPQL 16 45 20 LPQL 22 75 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH103 2.7-3.0 Silty clay 6 LPQL 18 34 17 LPQL 12 56 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH104 0-0.2 Fill: silty clay 6 LPQL 16 33 18 LPQL 13 50 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH104 3.8-3.0 Silty clay 10 LPQL 16 27 20 LPQL 7 33 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH105 0-0.1 Fill: silty sand 5 LPQL 8 27 27 LPQL 9 89 1.25 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH105 1.2-1.4 Silty clay 7 LPQL 14 26 16 LPQL 9 33 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH106 1.95-2.05 Silty clay 7 LPQL 12 28 10 LPQL 5 23 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH107 0-0.2 Fill: sandy gravel 5 LPQL 16 24 18 LPQL 11 46 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH107 1.3-1.5 Silty clay 11 LPQL 13 18 10 LPQL 4 19 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH108 0.05-0.2 Fill: silty sand 8 LPQL 22 19 22 LPQL 9 41 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH108 1.6-1.8 Fill: silty clay 6 LPQL 20 24 21 LPQL 16 54 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH108 2.5-2.6 Silty clay 13 LPQL 28 26 23 LPQL 8 38 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH109 0-0.15 Fill: sandy silty clay 7 LPQL 14 33 18 LPQL 13 53 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH109 2-2.15 Silty clay 9 LPQL 28 19 16 LPQL 8 25 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH110 0.4-0.5 Fill: silty clay 4 LPQL 15 24 18 LPQL 15 53 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH110 1.9-2.0 Silty clay 6 LPQL 14 16 13 LPQL 5 16 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH111 0-0.2 Fill: sandy silty clay 6 LPQL 19 19 17 LPQL 9 27 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH111 2.0-2.2 Silty clay 6 LPQL 15 20 12 LPQL 8 25 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH112 0-0.15 Fill: sandy silty clay 9 LPQL 22 21 25 LPQL 11 40 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH113 0-0.2 Fill: sandy silty clay 9 LPQL 24 17 28 LPQL 11 33 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH113 1.9-2.0 Silty clay LPQL LPQL 11 15 10 LPQL 5 16 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH114 0-0.2 Fill: sandy silty clay 10 LPQL 24 23 28 LPQL 11 39 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH114 2.6-2.8 Silty clay 5 LPQL 16 16 12 LPQL 5 19 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH115 0.8-0.9 Fill: silty clay LPQL LPQL 13 27 15 LPQL 9 45 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH115 2.0-2.1 Silty clay 8 LPQL 19 18 18 LPQL 10 37 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH116 0-0.15 Fill: sandy silty clay 9 LPQL 27 14 21 LPQL 7 19 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH117 0-0.15 Fill: sandy silty clay 5 LPQL 22 17 21 LPQL 7 20 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH117 1.9-2.05 Silty clay 5 LPQL 12 15 13 LPQL 6 23 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 33

22 LPQL 28 45 28 LPQL 40 120 2.1 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NC

Explanation:

1 - Site Assessment Criteria (SAC): NEPM 2013, HIL-C: 'Public open space; secondary schools; and footpaths'

2 - The results are for Total Chromium which includes Chromium III and VI. For initial screening purposes, we have assumed that the samples contain only Chromium VI unless demonstrated otherwise by additional analysis.

3 - B(a)P TEQ - Benzo(a)pyrene Toxicity Equivalence Quotient has been calculated based on 8 carcinogenic PAHs and their Toxic Equivalence Factors (TEFs) outlined in NEPM 2013

Concentration above the SAC VALUE

Abbreviations:

PAHs: Polycyclic Aromatic Hydrocarbons UCL: Upper Level Confidence Limit on Mean Value

B(a)P: Benzo(a)pyrene HILs: Health Investigation Levels

PQL: Practical Quantitation Limit NA: Not Analysed

LPQL: Less than PQL NC: Not Calculated

OPP: Organophosphorus Pesticides NSL: No Set Limit

OCP: Organochlorine Pesticides SAC: Site Assessment Criteria

PCBs: Polychlorinated Biphenyls NEPM: National Environmental Protection Measure

Lead Mercury Nickel

PQL - Envirolab Services

Site Assessment Criteria (SAC) 1

Total Number of Samples

Maximum Value

TABLE A

SOIL LABORATORY RESULTS COMPARED TO HILs

Zinc

All data in mg/kg unless stated otherwise

HEAVY METALS PAHs

TOTAL PCBs ASBESTOS FIBRESArsenic

ORGANOCHLORINE PESTICIDES (OCPs)

Chromium

VI 2Cadmium Copper

Copyright Environmental Investigation Services

Page 4: ESA Report - majorprojects.planningportal.nsw.gov.au

Supplementary Environmental Site Screening

South Circuit, Oran Park, NSW

E29593K

C6-C10 (F1) >C10-C16 (F2) Benzene Toluene Ethylbenzene Xylenes Naphthalene PID 2

25 50 0.2 0.5 1 3 1

Sample

Reference

Sample

DepthSample Description

Depth

CategorySoil Category

BH1 0.1-0.3 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH2 0.2-0.5 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH3 0-0.4 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH6 0-0.05 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH7 0.1-0.3 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH8 0.5-1.0 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH8 1.7-2.0 Silty clay 1m to <2m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH9 0.2-0.5 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH10 0-0.2 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH10 1.4-1.6 Silty clay 1m to <2m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH11 0.5-1.0 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH11 1.5-1.7 Silty clay 1m to <2m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH13 0.2-0.4 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH14 0.2-0.5 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH15 0.1-0.3 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH16 0.6-0.7 Silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH17 0-0.1 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH18 0.5-0.95 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

TP19 0.1-0.4 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

TP20 0.2-0.5 Fill: silty sandy clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

TP21 0.1-0.4 Fill: silty sandy clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH101 0.8-1.0 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH102 0-0.2 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH103 0.8-1.0 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH104 0-0.2 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH105 0-0.1 Fill: silty sand 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH105 1.2-1.4 Silty clay 1m to <2m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH106 0.05-0.2 Fill: silty sandy gravel 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH107 0-0.2 Fill: sandy gravel 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH107 1.3-1.5 Silty clay 1m to <2m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH108 0.05-0.2 Fill: silty sand 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH108 1.6-1.8 Fill: silty clay 1m to <2m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH109 0-0.15 Fill: sandy silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH109 2-2.15 Silty clay 2m to <4m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH110 0.4-0.5 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH110 1.9-2.0 Silty clay 1m to <2m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH111 0-0.2 Fill: sandy silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH112 0-0.15 Fill: sandy silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH112 1.8-2.0 Silty clay 1m to <2m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH113 0-0.2 Fill: sandy silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH113 1.9-2.0 Silty clay 1m to <2m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH114 0-0.2 Fill: sandy silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH115 0.8-0.9 Fill: silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH116 0-0.15 Fill: sandy silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH117 0-0.15 Fill: sandy silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH117 1.9-2.05 Silty clay 1m to <2m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

47 47 47 47 47 47 47 47

LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

Explanation:

1 - Site Assessment Criteria (SAC): NEPM 2013

2 - Field PID values obtained during the investigation

Concentration above the SAC VALUE

The guideline corresponding to the elevated value is highlighted in grey in the Site Assessment Criteria Table below

Abbreviations:

UCL: Upper Level Confidence Limit on Mean Value NC: Not Calculated PQL: Practical Quantitation Limit

HSLs: Health Screening Levels NL: Not Limiting LPQL: Less than PQL

NA: Not Analysed SAC: Site Assessment Criteria NEPM: National Environmental Protection Measure

SITE ASSESSMENT CRITERIA

C6-C10 (F1) >C10-C16 (F2) Benzene Toluene Ethylbenzene Xylenes Naphthalene

25 50 0.2 0.5 1 3 1

Sample

Reference

Sample

DepthSample Description

Depth

CategorySoil Category

BH1 0.1-0.3 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH2 0.2-0.5 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH3 0-0.4 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH6 0-0.05 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH7 0.1-0.3 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH8 0.5-1.0 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH8 1.7-2.0 Silty clay 1m to <2m Clay 90 NL 1 NL NL 310 NL

BH9 0.2-0.5 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH10 0-0.2 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH10 1.4-1.6 Silty clay 1m to <2m Clay 90 NL 1 NL NL 310 NL

BH11 0.5-1.0 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH11 1.5-1.7 Silty clay 1m to <2m Clay 90 NL 1 NL NL 310 NL

BH13 0.2-0.4 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH14 0.2-0.5 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH15 0.1-0.3 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH16 0.6-0.7 Silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH17 0-0.1 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH18 0.5-0.95 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

TP19 0.1-0.4 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

TP20 0.2-0.5 Fill: silty sandy clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

TP21 0.1-0.4 Fill: silty sandy clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH101 0.8-1.0 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH102 0-0.2 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH103 0.8-1.0 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH104 0-0.2 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH105 0-0.1 Fill: silty sand 0m to < 1m Sand 45 110 0.5 160 55 40 3

BH105 1.2-1.4 Silty clay 1m to <2m Clay 90 NL 1 NL NL 310 NL

BH106 0.05-0.2 Fill: silty sandy gravel 0m to < 1m Sand 45 110 0.5 160 55 40 3

BH106 1.95-2.05 Silty clay 1m to <2m Clay 90 NL 1 NL NL 310 NL

BH107 0-0.2 Fill: sandy gravel 0m to < 1m Sand 45 110 0.5 160 55 40 3

BH107 1.3-1.5 Silty clay 1m to <2m Clay 90 NL 1 NL NL 310 NL

BH108 0.05-0.2 Fill: silty sand 0m to < 1m Sand 45 110 0.5 160 55 40 3

BH108 1.6-1.8 Fill: silty clay 1m to <2m Clay 90 NL 1 NL NL 310 NL

BH109 0-0.15 Fill: sandy silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH110 0.4-0.5 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH110 1.9-2.0 Silty clay 1m to <2m Clay 90 NL 1 NL NL 310 NL

BH111 0-0.2 Fill: sandy silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH112 0-0.15 Fill: sandy silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH112 1.8-2.0 Silty clay 1m to <2m Clay 90 NL 1 NL NL 310 NL

BH113 0-0.2 Fill: sandy silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH113 1.9-2.0 Silty clay 1m to <2m Clay 90 NL 1 NL NL 310 NL

BH114 0-0.2 Fill: sandy silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH115 0.8-0.9 Fill: silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH116 0-0.15 Fill: sandy silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH117 0-0.15 Fill: sandy silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5

BH117 1.9-2.05 Silty clay 1m to <2m Clay 90 NL 1 NL NL 310 NL

Total Number of Samples

Maximum Value

PQL - Envirolab Services

HIGH DENSITY RESIDENTIALHSL Land Use Category 1

PQL - Envirolab Services

HSL Land Use Category 1 HIGH DENSITY RESIDENTIAL

TABLE B

SOIL LABORATORY RESULTS COMPARED TO HSLs

All data in mg/kg unless stated otherwise

Copyright Environmental Investigation Services

Page 5: ESA Report - majorprojects.planningportal.nsw.gov.au

Supplementary Environmental Site Screening

South Circuit, Oran Park, NSW

E29593K

- 1 - 4 1 1 1 1 1 0.1 0.1 25 50 100 100 0.2 0.5 1 3 0.05

Ambient Background Concentration (ABC) 2 - - - NSL 9 11 17 5 24 NSL NSL NSL NSL NSL NSL NSL NSL NSL NSL NSL

Sample

Reference

Sample

DepthSample Description Soil Texture

BH1 0.1-0.3 Fill: silty clay Fine NA NA NA 4 12 39 15 18 62 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH2 0.2-0.5 Fill: silty clay Fine NA NA NA LPQL 15 38 9 7 35 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH2 3-3.45 Silty clay Fine NA NA NA 16 24 32 17 8 41 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH3 0-0.4 Fill: silty clay Fine NA NA NA 8 20 18 16 8 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH4 2.5-3.0 Fill: silty clay Fine NA NA NA 8 16 31 16 12 48 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH6 0-0.05 Fill: silty clay Fine NA NA NA 7 24 16 20 8 24 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH7 0.1-0.3 Fill: silty clay Fine NA NA NA 6 14 45 11 12 42 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH8 0.5-1.0 Fill: silty clay Fine NA NA NA 6 16 22 13 8 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH8 1.7-2.0 Silty clay Fine NA NA NA 7 13 28 14 17 70 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH9 0.2-0.5 Fill: silty clay Fine NA NA NA 8 8 20 9 6 22 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH10 0-0.2 Fill: silty clay Fine NA NA NA 5 14 26 14 11 48 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH10 1.4-1.6 Silty clay Fine NA NA NA LPQL 9 14 8 8 20 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH11 0.5-1.0 Fill: silty clay Fine NA NA NA 6 15 29 16 13 51 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH11 1.5-1.7 Silty clay Fine NA NA NA 6 16 20 12 8 28 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH13 0.2-0.4 Fill: silty clay Fine NA NA NA 6 11 34 14 18 60 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH13 3.0-3.45 Silty clay Fine NA NA NA 8 15 30 14 11 51 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH14 0.2-0.5 Fill: silty clay Fine NA NA NA LPQL 9 23 12 9 37 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH15 0.1-0.3 Fill: silty clay Fine NA NA NA 10 18 19 15 8 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH16 0.6-0.7 Silty clay Fine NA NA NA 5 10 15 7 4 21 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH17 0-0.1 Fill: silty clay Fine NA NA NA 7 18 18 14 9 31 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH18 0.5-0.95 Fill: silty clay Fine NA NA NA 6 15 28 14 10 43 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0.3

TP19 0.1-0.4 Fill: silty clay Fine NA NA NA 7 13 23 11 7 28 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

TP20 0.2-0.5 Fill: silty sandy clay Fine NA NA NA 8 20 20 20 9 37 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

TP21 0.1-0.4 Fill: silty sandy clay Fine NA NA NA 7 15 29 16 9 35 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH101 0.8-1.0 Fill: silty clay Fine NA NA NA 7 17 33 19 13 54 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0.05

BH101 3-3.2 Silty clay Fine NA NA NA 22 17 40 17 16 64 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH102 0-0.2 Fill: silty clay Fine NA NA NA 7 23 17 21 8 25 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH102 2.5-2.7 Silty clay Fine NA NA NA LPQL 12 25 10 4 20 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH103 0.8-1.0 Fill: silty clay Fine NA NA NA 7 16 45 20 22 75 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH103 2.7-3.0 Silty clay Fine NA NA NA 6 18 34 17 12 56 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH104 0-0.2 Fill: silty clay Fine NA NA NA 6 16 33 18 13 50 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH104 3.8-3.0 Silty clay Fine NA NA NA 10 16 27 20 7 33 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH105 0-0.1 Fill: silty sand Coarse NA NA NA 5 8 27 27 9 89 0.1 LPQL LPQL LPQL 150 LPQL LPQL LPQL LPQL LPQL 0.05

BH105 1.2-1.4 Silty clay Fine NA NA NA 7 14 26 16 9 33 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH106 0.05-0.2 Fill: silty sandy gravel Coarse NA NA NA 9 11 29 13 40 120 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0.2

BH106 1.95-2.05 Silty clay Fine NA NA NA 7 12 28 10 5 23 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH107 0-0.2 Fill: sandy gravel Coarse NA NA NA 5 16 24 18 11 46 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH107 1.3-1.5 Silty clay Fine NA NA NA 11 13 18 10 4 19 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH108 0.05-0.2 Fill: silty sand Coarse NA NA NA 8 22 19 22 9 41 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH108 1.6-1.8 Fill: silty clay Fine NA NA NA 6 20 24 21 16 54 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH108 2.5-2.6 Silty clay Fine NA NA NA 13 28 26 23 8 38 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH109 0-0.15 Fill: sandy silty clay Fine NA NA NA 7 14 33 18 13 53 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH109 2-2.15 Silty clay Fine NA NA NA 9 28 19 16 8 25 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH110 0.4-0.5 Fill: silty clay Fine NA NA NA 4 15 24 18 15 53 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH110 1.9-2.0 Silty clay Fine NA NA NA 6 14 16 13 5 16 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH111 0-0.2 Fill: sandy silty clay Fine NA NA NA 6 19 19 17 9 27 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH111 2.0-2.2 Silty clay Fine NA NA NA 6 15 20 12 8 25 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH112 0-0.15 Fill: sandy silty clay Fine NA NA NA 9 22 21 25 11 40 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH112 1.8-2.0 Silty clay Fine NA NA NA 6 17 21 16 9 28 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH113 0-0.2 Fill: sandy silty clay Fine NA NA NA 9 24 17 28 11 33 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH113 1.9-2.0 Silty clay Fine NA NA NA LPQL 11 15 10 5 16 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH114 0-0.2 Fill: sandy silty clay Fine NA NA NA 10 24 23 28 11 39 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH114 2.6-2.8 Silty clay Fine NA NA NA 5 16 16 12 5 19 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH115 0.8-0.9 Fill: silty clay Fine NA NA NA LPQL 13 27 15 9 45 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH115 2.0-2.1 Silty clay Fine NA NA NA 8 19 18 18 10 37 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH116 0-0.15 Fill: sandy silty clay Fine NA NA NA 9 27 14 21 7 19 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH117 0-0.15 Fill: sandy silty clay Fine NA NA NA 5 22 17 21 7 20 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

0 0 0 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58

LPQL LPQL LPQL 22 28 45 28 40 120 0.1 LPQL LPQL LPQL 150 LPQL LPQL LPQL LPQL LPQL 0.2

Explanation:

1 - Site Assessment Criteria (SAC): NEPM 2013

2 - ABC Values for selected metals has been adopted from the published background concentrations presented in Olszowy et. al., (1995), Trace Element Concentrations in Soils from Rural and Urban New South Wales (the 25th percentile values for new suburbs with low traffic have been quoted)

Concentration above the SAC VALUE

The guideline corresponding to the elevated value is highlighted in grey in the EIL and ESL Assessment Criteria Table below

Abbreviations:

EILs: Ecological Investigation Levels UCL: Upper Level Confidence Limit on Mean Value LPQL: Less than PQL NC: Not Calculated

B(a)P: Benzo(a)pyrene ESLs: Ecological Screening Levels SAC: Site Assessment Criteria NSL: No Set Limit

PQL: Practical Quantitation Limit NA: Not Analysed NEPM: National Environmental Protection Measure ABC: Ambient Background Concentration

EIL AND ESL ASSESSMENT CRITERIA

- 1 - 4 1 1 1 1 1 0.1 0.1 25 50 100 100 0.2 0.5 1 3 0.05

Ambient Background Concentration (ABC) 2 - - - NSL 9 11 17 5 24 NSL NSL NSL NSL NSL NSL NSL NSL NSL NSL NSL

Sample

Reference

Sample

DepthSample Description Soil Texture

BH1 0.1-0.3 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH2 0.2-0.5 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH2 3-3.45 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH3 0-0.4 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH4 2.5-3.0 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH6 0-0.05 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH7 0.1-0.3 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH8 0.5-1.0 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH8 1.7-2.0 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH9 0.2-0.5 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH10 0-0.2 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH10 1.4-1.6 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH11 0.5-1.0 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH11 1.5-1.7 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH13 0.2-0.4 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH13 3.0-3.45 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH14 0.2-0.5 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH15 0.1-0.3 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH16 0.6-0.7 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH17 0-0.1 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH18 0.5-0.95 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

TP19 0.1-0.4 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

TP20 0.2-0.5 Fill: silty sandy clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

TP21 0.1-0.4 Fill: silty sandy clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 65 105 125 45 0.7

BH101 0.8-1.0 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH101 3-3.2 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH102 0-0.2 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH102 2.5-2.7 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH103 0.8-1.0 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH103 2.7-3.0 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH104 0-0.2 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH104 3.8-3.0 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH105 0-0.1 Fill: silty sand Coarse NA NA NA 100 199 71 1117 35 94 170 180 180 120 300 2800 50 85 70 105 0.7

BH105 1.2-1.4 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH106 0.05-0.2 Fill: silty sandy gravel Coarse NA NA NA 100 199 71 1117 35 94 170 180 180 120 300 2800 50 85 70 105 0.7

BH106 1.95-2.05 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH107 0-0.2 Fill: sandy gravel Coarse NA NA NA 100 199 71 1117 35 94 170 180 180 120 300 2800 50 85 70 105 0.7

BH107 1.3-1.5 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH108 0.05-0.2 Fill: silty sand Coarse NA NA NA 100 199 71 1117 35 94 170 180 180 120 300 2800 50 85 70 105 0.7

BH108 1.6-1.8 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH108 2.5-2.6 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH109 0-0.15 Fill: sandy silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH109 2-2.15 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH110 0.4-0.5 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH110 1.9-2.0 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH111 0-0.2 Fill: sandy silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH111 2.0-2.2 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH112 0-0.15 Fill: sandy silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH112 1.8-2.0 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH113 0-0.2 Fill: sandy silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH113 1.9-2.0 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH114 0-0.2 Fill: sandy silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH114 2.6-2.8 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH115 0.8-0.9 Fill: silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH115 2.0-2.1 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH116 0-0.15 Fill: sandy silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH117 0-0.15 Fill: sandy silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

BH117 1.9-2.05 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7

PQL - Envirolab Services

Toluene Ethylbenzene Total Xylenes B(a)PC6-C10 (F1) >C10-C16 (F2) >C16-C34 (F3) >C34-C40 (F4) Benzene

Land Use Category 1 URBAN RESIDENTIAL AND PUBLIC OPEN SPACE

pH CEC (cmolc/kg)Clay Content

(% clay)

AGED HEAVY METALS-EILs EILs ESLs

Arsenic Chromium Copper Lead Nickel Zinc Naphthalene DDT

Naphthalene

AGED HEAVY METALS-EILs

>C16-C34 (F3)

Maximum Value

PQL - Envirolab Services

Chromium Copper

Clay Content

(% clay) Arsenic

TABLE C

SOIL LABORATORY RESULTS COMPARED TO EILs AND ESLs

All data in mg/kg unless stated otherwise

EILs

Land Use Category 1 URBAN RESIDENTIAL AND PUBLIC OPEN SPACE

ESLs

Total Number of Samples

B(a)PZincLead Nickel Total Xylenes>C34-C40 (F4) Benzene Toluene EthylbenzenepH CEC (cmolc/kg)

DDT C6-C10 (F1) >C10-C16 (F2)

Copyright Environmental Investigation Services

Page 6: ESA Report - majorprojects.planningportal.nsw.gov.au

Supplementary Environmental Site Screening

South Circuit, Oran Park, NSW

E29593K

Total

Total B(a)P Total Chloropyrifos Total Moderately Total PCBs C6-C9 C10-C14 C15-C28 C29-C36 Total Benzene Toluene Ethyl Total

PAHs Endosulfans Harmful 2

Scheduled3

C10-C36 benzene Xylenes

4 0.4 1 1 1 0.1 1 1 - 0.05 0.1 0.1 0.1 0.1 0.1 25 50 100 100 250 0.2 0.5 1 3 100

100 20 100 NSL 100 4 40 NSL 200 0.8 60 4 250 <50 <50 650 10,000 10 288 600 1,000 -

500 100 1900 NSL 1500 50 1050 NSL 200 10 108 7.5 250 <50 <50 650 10,000 18 518 1,080 1,800 -

400 80 400 NSL 400 16 160 NSL 800 3.2 240 16 1000 <50 <50 2600 40,000 40 1,152 2,400 4,000 -

2000 400 7600 NSL 6000 200 4200 NSL 800 23 432 30 1000 <50 <50 2600 40,000 72 2,073 4,320 7,200 -

Sample

Reference

Sample

DepthSample Description

BH1 0.1-0.3 Fill: silty clay 4 LPQL 12 39 15 LPQL 18 62 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH2 0.2-0.5 Fill: silty clay LPQL LPQL 15 38 9 LPQL 7 35 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH2 3-3.45 Silty clay 16 LPQL 24 32 17 LPQL 8 41 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH3 0-0.4 Fill: silty clay 8 LPQL 20 18 16 LPQL 8 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH4 2.5-3.0 Fill: silty clay 8 LPQL 16 31 16 LPQL 12 48 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH6 0-0.05 Fill: silty clay 7 LPQL 24 16 20 LPQL 8 24 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH7 0.1-0.3 Fill: silty clay 6 LPQL 14 45 11 LPQL 12 42 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH8 0.5-1.0 Fill: silty clay 6 LPQL 16 22 13 LPQL 8 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH8 1.7-2.0 Silty clay 7 LPQL 13 28 14 LPQL 17 70 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH9 0.2-0.5 Fill: silty clay 8 LPQL 8 20 9 LPQL 6 22 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH10 0-0.2 Fill: silty clay 5 LPQL 14 26 14 LPQL 11 48 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH10 1.4-1.6 Silty clay LPQL LPQL 9 14 8 LPQL 8 20 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH11 0.5-1.0 Fill: silty clay 6 LPQL 15 29 16 LPQL 13 51 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH11 1.5-1.7 Silty clay 6 LPQL 16 20 12 LPQL 8 28 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH13 0.2-0.4 Fill: silty clay 6 LPQL 11 34 14 LPQL 18 60 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH13 3.0-3.45 Silty clay 8 LPQL 15 30 14 LPQL 11 51 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH14 0.2-0.5 Fill: silty clay LPQL LPQL 9 23 12 LPQL 9 37 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH15 0.1-0.3 Fill: silty clay 10 LPQL 18 19 15 LPQL 8 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH16 0.6-0.7 Silty clay 5 LPQL 10 15 7 LPQL 4 21 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH17 0-0.1 Fill: silty clay 7 LPQL 18 18 14 LPQL 9 31 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH18 0.5-0.95 Fill: silty clay 6 LPQL 15 28 14 LPQL 10 43 1.8 0.3 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH18 2.0-2.2 Silty clay 5 LPQL 13 17 10 LPQL 4 14 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

TP19 0.1-0.4 Fill: silty clay 7 LPQL 13 23 11 LPQL 7 28 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

TP20 0.2-0.5 Fill: silty sandy clay 8 LPQL 20 20 20 LPQL 9 37 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

TP21 0.1-0.4 Fill: silty sandy clay 7 LPQL 15 29 16 LPQL 9 35 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH101 0.8-1.0 Fill: silty clay 7 LPQL 17 33 19 LPQL 13 54 0.05 0.05 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH101 3-3.2 Silty clay 22 LPQL 17 40 17 LPQL 16 64 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH102 0-0.2 Fill: silty clay 7 LPQL 23 17 21 LPQL 8 25 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH102 2.5-2.7 Silty clay LPQL LPQL 12 25 10 LPQL 4 20 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH103 0.8-1.0 Fill: silty clay 7 LPQL 16 45 20 LPQL 22 75 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH103 2.7-3.0 Silty clay 6 LPQL 18 34 17 LPQL 12 56 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH104 0-0.2 Fill: silty clay 6 LPQL 16 33 18 LPQL 13 50 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH104 3.8-3.0 Silty clay 10 LPQL 16 27 20 LPQL 7 33 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH105 0-0.1 Fill: silty sand 5 LPQL 8 27 27 LPQL 9 89 1.25 0.05 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL 150 150 LPQL LPQL LPQL LPQL No asbestos detected

BH105 1.2-1.4 Silty clay 7 LPQL 14 26 16 LPQL 9 33 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH106 1.95-2.05 Silty clay 7 LPQL 12 28 10 LPQL 5 23 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH107 0-0.2 Fill: sandy gravel 5 LPQL 16 24 18 LPQL 11 46 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH107 1.3-1.5 Silty clay 11 LPQL 13 18 10 LPQL 4 19 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH108 0.05-0.2 Fill: silty sand 8 LPQL 22 19 22 LPQL 9 41 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH108 1.6-1.8 Fill: silty clay 6 LPQL 20 24 21 LPQL 16 54 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH108 2.5-2.6 Silty clay 13 LPQL 28 26 23 LPQL 8 38 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH109 0-0.15 Fill: sandy silty clay 7 LPQL 14 33 18 LPQL 13 53 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH109 2-2.15 Silty clay 9 LPQL 28 19 16 LPQL 8 25 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH110 0.4-0.5 Fill: silty clay 4 LPQL 15 24 18 LPQL 15 53 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH110 1.9-2.0 Silty clay 6 LPQL 14 16 13 LPQL 5 16 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH111 0-0.2 Fill: sandy silty clay 6 LPQL 19 19 17 LPQL 9 27 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH111 2.0-2.2 Silty clay 6 LPQL 15 20 12 LPQL 8 25 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH112 0-0.15 Fill: sandy silty clay 9 LPQL 22 21 25 LPQL 11 40 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH112 1.8-2.0 Silty clay 6 LPQL 17 21 16 LPQL 9 28 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH113 0-0.2 Fill: sandy silty clay 9 LPQL 24 17 28 LPQL 11 33 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH113 1.9-2.0 Silty clay LPQL LPQL 11 15 10 LPQL 5 16 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH114 0-0.2 Fill: sandy silty clay 10 LPQL 24 23 28 LPQL 11 39 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH114 2.6-2.8 Silty clay 5 LPQL 16 16 12 LPQL 5 19 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH115 0.8-0.9 Fill: silty clay LPQL LPQL 13 27 15 LPQL 9 45 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH115 2.0-2.1 Silty clay 8 LPQL 19 18 18 LPQL 10 37 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH116 0-0.15 Fill: sandy silty clay 9 LPQL 27 14 21 LPQL 7 19 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH117 0-0.15 Fill: sandy silty clay 5 LPQL 22 17 21 LPQL 7 20 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH117 1.9-2.05 Silty clay 5 LPQL 12 15 13 LPQL 6 23 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 33

22 LPQL 28 45 28 LPQL 40 120 2.1 0.2 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL 150 150 LPQL LPQL LPQL LPQL No asbestos detected

Explanation:1 - NSW EPA Waste Classification Guidelines, Part 1: Classifying Waste (2014)2 - Assessment of Total Moderately Harmful pesticides includes: Dichlorovos, Dimethoate, Fenitrothion, Ethion, Malathion and Parathion3 - Assessment of Total Scheduled pesticides include: HBC, alpha-BHC, gamma-BHC, beta-BHC, Heptachlor, Aldrin, Heptachlor Epoxide, gamma-Chlordane, alpha-chlordane, pp-DDE, Dieldrin, Endrin, pp-DDD, pp-DDT, Endrin Aldehyde

Concentration above the CT1 VALUE

Concentration above SCC1 VALUE

Concentration above the SCC2 VALUE

Abbreviations:

PAHs: Polycyclic Aromatic Hydrocarbons UCL: Upper Level Confidence Limit on Mean Value CT: Contaminant Threshold

B(a)P: Benzo(a)pyrene NA: Not Analysed SCC: Specific Contaminant Concentration

PQL: Practical Quantitation Limit NC: Not Calculated HILs: Health Investigation Levels

LPQL: Less than PQL NSL: No Set Limit NEPM: National Environmental Protection Measure

PID: Photoionisation Detector SAC: Site Assessment Criteria BTEX: Monocyclic Aromatic Hydrocarbons

PCBs: Polychlorinated Biphenyls TRH: Total Recoverable Hydrocarbons

Total Number of samples

Maximum Value

General Solid Waste SCC1 1

NSL

Restricted Solid Waste CT2 1

NSL

Restricted Solid Waste SCC2 1 NSL

Copper Lead

TABLE D

SOIL LABORATORY RESULTS COMPARED TO WASTE CLASSIFICATION GUIDELINES

Mercury

PQL - Envirolab Services

General Solid Waste CT1 1

NSL

All data in mg/kg unless stated otherwise

HEAVY METALS PAHs

Nickel

TRH BTEX COMPOUNDS

ASBESTOS FIBRESArsenic ZincCadmium

OC/OP PESTICIDES

Chromium

Copyright Environmental Investigation Services

Page 7: ESA Report - majorprojects.planningportal.nsw.gov.au

Supplementary Environmental Site Screening

South Circuit, Oran Park, NSW

E29593K

Envirolab INITIAL REPEAT MEAN RPD

PQL %

Sample Ref = BH1 (0.1-0.3) Arsenic 4 4 6 5.0 40

Dup Ref = DUPTC1 Cadmium 0.4 LPQL LPQL NC NC

Chromium 1 12 15 13.5 22

Envirolab Report: 151783 Copper 1 39 31 35.0 23

Lead 1 15 14 14.5 7

Mercury 0.1 LPQL LPQL NC NC

Nickel 1 18 11 14.5 48

Zinc 1 62 47 54.5 28

Naphthalene 0.1 LPQL LPQL NC NC

Acenaphthylene 0.1 LPQL LPQL NC NC

Acenaphthene 0.1 LPQL LPQL NC NC

Fluorene 0.1 LPQL LPQL NC NC

Phenanthrene 0.1 LPQL LPQL NC NC

Anthracene 0.1 LPQL LPQL NC NC

Fluoranthene 0.1 LPQL LPQL NC NC

Pyrene 0.1 LPQL LPQL NC NC

Benzo(a)anthracene 0.1 LPQL LPQL NC NC

Chrysene 0.1 LPQL LPQL NC NC

Benzo(b,j+k)fluoranthene 0.2 LPQL LPQL NC NC

Benzo(a)pyrene 0.05 LPQL LPQL NC NC

Indeno(123-cd)pyrene 0.1 LPQL LPQL NC NC

Dibenzo(ah)anthracene 0.1 LPQL LPQL NC NC

Benzo(ghi)perylene 0.1 LPQL LPQL NC NC

Total OCPs 0.1 LPQL LPQL NC NC

Total OPPs 0.1 LPQL LPQL NC NC

Total PCBs 0.1 LPQL LPQL NC NC

TRH C6-C10 (F1) 25 LPQL LPQL NC NC

TRH >C10-C16 (F2) 50 LPQL LPQL NC NC

TRH >C16-C34 (F3) 100 LPQL LPQL NC NC

TRH >C34-C40 (F4) 100 LPQL LPQL NC NC

Benzene 0.5 LPQL LPQL NC NC

Toluene 0.5 LPQL LPQL NC NC

Ethylbenzene 1 LPQL LPQL NC NC

m+p-xylene 2 LPQL LPQL NC NC

o-xylene 1 LPQL LPQL NC NC

Explanation:

The RPD value is calculated as the absolute value of the difference between the initial and

repeat results divided by the average value expressed as a percentage. The following acceptance

criteria will be used to assess the RPD results:

Results > 10 times PQL = RPD value <= 50% are acceptable

Results between 5 & 10 times PQL = RPD value <= 75% are acceptable

Results < 5 times PQL = RPD value <= 100% are acceptable

If result is LPQL then 50% of the PQL is used for the calculation

RPD Results Above the Acceptance Criteria VALUE

Abbreviations:

PQL: Practical Quantitation Limit OCP: Organochlorine Pesticides

LPQL: Less than PQL OPP: Organophosphorus Pesticides

NA: Not Analysed PCBs: Polychlorinated Biphenyls

NC: Not Calculated TRH: Total Recoverable Hydrocarbons

SAMPLE ANALYSIS

All results in mg/kg unless stated otherwise

TABLE E.1

SOIL INTRA-LABORATORY DUPLICATE RESULTS & RPD CALCULATIONS

Copyright Environmental Investigation Services

Page 8: ESA Report - majorprojects.planningportal.nsw.gov.au

Supplementary Environmental Site Screening

South Circuit, Oran Park, NSW

E29593K

Envirolab INITIAL REPEAT MEAN RPD

PQL %

Sample Ref = BH105 (0.0-0.1) Arsenic 4 5 6 5.5 18

Dup Ref = DUPKT1 Cadmium 0.4 LPQL LPQL NC NC

Chromium 1 8 13 10.5 48

Envirolab Report: 160502 Copper 1 27 26 26.5 4

Lead 1 27 23 25.0 16

Mercury 0.1 LPQL LPQL NC NC

Nickel 1 9 11 10.0 20

Zinc 1 89 68 78.5 27

Naphthalene 0.1 0.1 LPQL 0.1 67

Acenaphthylene 0.1 LPQL LPQL NC NC

Acenaphthene 0.1 LPQL LPQL NC NC

Fluorene 0.1 LPQL LPQL NC NC

Phenanthrene 0.1 0.6 0.4 0.5 40

Anthracene 0.1 LPQL LPQL NC NC

Fluoranthene 0.1 0.2 0.2 0.2 0

Pyrene 0.1 0.1 0.2 0.2 67

Benzo(a)anthracene 0.1 LPQL 0.1 0.1 67

Chrysene 0.1 0.2 0.2 0.2 0

Benzo(b,j+k)fluoranthene 0.2 LPQL LPQL NC NC

Benzo(a)pyrene 0.05 0.05 0.05 0.1 0

Indeno(123-cd)pyrene 0.1 LPQL LPQL NC NC

Dibenzo(ah)anthracene 0.1 LPQL LPQL NC NC

Benzo(ghi)perylene 0.1 LPQL LPQL NC NC

Total OCPs 0.1 LPQL LPQL NC NC

Total OPPs 0.1 LPQL LPQL NC NC

Total PCBs 0.1 LPQL LPQL NC NC

TRH C6-C10 (F1) 25 LPQL LPQL NC NC

TRH >C10-C16 (F2) 50 LPQL LPQL NC NC

TRH >C16-C34 (F3) 100 LPQL LPQL NC NC

TRH >C34-C40 (F4) 100 LPQL LPQL NC NC

Benzene 0.5 LPQL LPQL NC NC

Toluene 0.5 LPQL LPQL NC NC

Ethylbenzene 1 LPQL LPQL NC NC

m+p-xylene 2 LPQL LPQL NC NC

o-xylene 1 LPQL LPQL NC NC

Explanation:

The RPD value is calculated as the absolute value of the difference between the initial and

repeat results divided by the average value expressed as a percentage. The following acceptance

criteria will be used to assess the RPD results:

Results > 10 times PQL = RPD value <= 50% are acceptable

Results between 5 & 10 times PQL = RPD value <= 75% are acceptable

Results < 5 times PQL = RPD value <= 100% are acceptable

If result is LPQL then 50% of the PQL is used for the calculation

RPD Results Above the Acceptance Criteria VALUE

Abbreviations:

PQL: Practical Quantitation Limit OCP: Organochlorine Pesticides

LPQL: Less than PQL OPP: Organophosphorus Pesticides

NA: Not Analysed PCBs: Polychlorinated Biphenyls

NC: Not Calculated TRH: Total Recoverable Hydrocarbons

All results in mg/kg unless stated otherwise

SAMPLE ANALYSIS

TABLE E.2

SOIL INTRA-LABORATORY DUPLICATE RESULTS & RPD CALCULATIONS

Copyright Environmental Investigation Services

Page 9: ESA Report - majorprojects.planningportal.nsw.gov.au

Supplementary Environmental Site Screening

South Circuit, Oran Park, NSW

E29593K

Envirolab Envirolab VIC INITIAL REPEAT MEAN RPD

PQL PQL %

Sample Ref = BH107 (0.0-0.2) Arsenic 4 4 5 4 4.5 22

Dup Ref = DUPKT2 Cadmium 0.4 0.4 LPQL LPQL NC NC

Chromium 1 1 16 13 14.5 21

Envirolab Report: 160502 Copper 1 1 24 30 27.0 22

Envirolab VIC Report: 191231 Lead 1 1 18 17 17.5 6

Mercury 0.1 0.1 LPQL 0.2 0.1 120

Nickel 1 1 11 16 13.5 37

Zinc 1 1 46 57 51.5 21

Naphthalene 0.1 0.1 LPQL LPQL NC NC

Acenaphthylene 0.1 0.1 LPQL LPQL NC NC

Acenaphthene 0.1 0.1 LPQL LPQL NC NC

Fluorene 0.1 0.1 LPQL LPQL NC NC

Phenanthrene 0.1 0.1 LPQL LPQL NC NC

Anthracene 0.1 0.1 LPQL LPQL NC NC

Fluoranthene 0.1 0.1 LPQL LPQL NC NC

Pyrene 0.1 0.1 LPQL LPQL NC NC

Benzo(a)anthracene 0.1 0.1 LPQL LPQL NC NC

Chrysene 0.1 0.1 LPQL LPQL NC NC

Benzo(b,j+k)fluoranthene 0.2 0.2 LPQL LPQL NC NC

Benzo(a)pyrene 0.05 0.05 LPQL LPQL NC NC

Indeno(123-cd)pyrene 0.1 0.1 LPQL LPQL NC NC

Dibenzo(ah)anthracene 0.1 0.1 LPQL LPQL NC NC

Benzo(ghi)perylene 0.1 0.1 LPQL LPQL NC NC

Benzo(a)pyrene TEQ 0.5 0.5 LPQL LPQL NC NC

Total OCPs 0.1 0.1 LPQL LPQL NC NC

Total OPPs 0.1 0.1 LPQL LPQL NC NC

Total PCBs 0.1 0.1 LPQL LPQL NC NC

TRH C6-C10 (F1) 25 25 LPQL LPQL NC NC

TRH >C10-C16 (F2) 50 50 LPQL LPQL NC NC

TRH >C16-C34 (F3) 100 100 LPQL LPQL NC NC

TRH >C34-C40 (F4) 100 100 LPQL LPQL NC NC

Benzene 0.5 0.5 LPQL LPQL NC NC

Toluene 0.5 0.5 LPQL LPQL NC NC

Ethylbenzene 1 1 LPQL LPQL NC NC

m+p-xylene 2 2 LPQL LPQL NC NC

o-xylene 1 1 LPQL LPQL NC NC

Explanation:

The RPD value is calculated as the absolute value of the difference between the initial and

repeat results divided by the average value expressed as a percentage. The following acceptance

criteria will be used to assess the RPD results:

Results > 10 times PQL = RPD value <= 50% are acceptable

Results between 5 & 10 times PQL = RPD value <= 75% are acceptable

Results < 5 times PQL = RPD value <= 100% are acceptable

If result is LPQL then 50% of the PQL is used for the calculation

RPD Results Above the Acceptance Criteria VALUE

Abbreviations:

PQL: Practical Quantitation Limit OCP: Organochlorine Pesticides

LPQL: Less than PQL OPP: Organophosphorus Pesticides

NA: Not Analysed PCBs: Polychlorinated Biphenyls

NC: Not Calculated TRH: Total Recoverable Hydrocarbons

SAMPLE ANALYSIS

All results in mg/kg unless stated otherwise

TABLE F

SOIL INTER-LABORATORY DUPLICATE RESULTS & RPD CALCULATIONS

Copyright Environmental Investigation Services

Page 10: ESA Report - majorprojects.planningportal.nsw.gov.au

Supplementary Environmental Site Screening

South Circuit, Oran Park, NSW

E29593K

TBs TBs

5/08/2016 17/01/2017

151783 160502

mg/kg % Recovery

Benzene 1 1 LPQL LPQL

Toluene 1 1 LPQL LPQL

Ethylbenzene 1 1 LPQL LPQL

m+p-xylene 2 2 LPQL LPQL

o-xylene 1 1 LPQL LPQL

Explanation:W Sample type (water)S Sample type (sand)

BTEX concentrations in trip spikes are presented as % recovery

Values above PQLs/Acceptance criteria VALUE

Abbreviations:

PQL: Practical Quantitation Limit TB: Trip Blank

LPQL: Less than PQL TS: Trip Spike

NA: Not Analysed RS: Rinsate Sample

NC: Not Calculated TRH: Total Recoverable Hydrocarbons

ANALYSIS

Envirolab PQL

mg/kg µg/L

TABLE G

SUMMARY OF FIELD QA/QC RESULTS

Copyright Environmental Investigation Services

Page 11: ESA Report - majorprojects.planningportal.nsw.gov.au

REPORT APPENDICES

Page 12: ESA Report - majorprojects.planningportal.nsw.gov.au

Appendix A: Borehole Logs

Page 13: ESA Report - majorprojects.planningportal.nsw.gov.au

ES

U50

DB

DS

GRASS COVER

TOO FRIABLE FOR HPTESTING

VERY LOW TO LOW 'TC'BIT RESISTANCE

(H)

VL

>600>600>600

>600>600>600

D

MC<PL

MC<PL

DW

N = 93,5,4

N = 133,5,8

N > 153,11,4/ 50mm

REFUSAL

N=SPT10/ 100mmREFUSAL

DR

Y O

NC

OM

PLE

TIO

NO

F A

UG

ER

ING

CL-CH

FILL: Silty gravelly sand, fine to coarsegrained, dark brown, with clay.

FILL: Silty clay, medium plasticity, brownmottled grey and orange brown, withfine grained igneous and shale gravel.

SILTY CLAY: medium to high palsticity,orange brown and grey, with VL strengthshale and sandstone bands.

SANDSTONE: fine grained, dark greyand brown.

REFER TO CORED BOREHOLE LOG

Gro

undw

ater

Rec

ord

RL

(m A

HD

)

Str

engt

h/R

el D

ensi

ty

Han

dP

enet

rom

ete

rR

eadi

ngs

(kP

a)

Remarks

Moi

stu

reC

ondi

tion/

Wea

ther

ing

Fie

ld T

ests

COPYRIGHT

Logged/Checked By: K.S./P.S.

Method: SPIRAL AUGERJob No.: 29593V

Date: 16/1/17

Plant Type: JK308

R.L. Surface: ~95.5 m

Datum: AHD

1 / 2

101Borehole No.

BOREHOLE LOG

JKGEOTECHNICAL AND ENVIRONMENTAL ENGINEERS

Geotechnics

Client: WOOLACOTTS CONSULTING ENGINEERS

Project: PROPOSED ORAN PARK HIGH SCHOOL

Location: SOUTH CIRCUIT, ORAN PARK, NSW

JK_L

IB_C

UR

RE

NT

- V

8.00

.GLB

Log

J &

K A

UG

ER

HO

LE -

MA

ST

ER

295

93V

OR

AN

PA

RK

.GP

J <

<D

raw

ingF

ile>

> 0

2/02

/201

7 17

:34

Pro

duc

ed b

y gI

NT

Pro

fess

iona

l, D

evel

oped

by

Dat

gel

Gra

phic

Log

Uni

fied

Cla

ssifi

catio

n

DESCRIPTIONSAMPLES

95

94

93

92

91

90

89

Dep

th (

m)

1

2

3

4

5

6

Page 14: ESA Report - majorprojects.planningportal.nsw.gov.au

100

%R

ET

UR

N

SANDSTONE: fine to medium grained,brown and grey.

CORE LOSS 0.35m

SHALE: grey and brown.

START CORING AT 4.96m

END OF BOREHOLE AT 10.58 m

M

EL

EL

L

EL

DW

XW

XW

DW

XW

Wat

erLo

ss\L

evel

Bar

rel L

ift

RL

(m A

HD

)

JK_L

IB_C

UR

RE

NT

- V

8.00

.GLB

Log

J &

K C

OR

ED

BO

RE

HO

LE -

MA

ST

ER

295

93V

OR

AN

PA

RK

.GP

J <

<D

raw

ingF

ile>

> 0

2/02

/201

7 17

:34

Pro

duce

d by

gIN

T P

rofe

ssio

nal,

Dev

elop

ed b

y D

atge

l

Client: WOOLACOTTS CONSULTING ENGINEERS

Project: PROPOSED ORAN PARK HIGH SCHOOL

Location: SOUTH CIRCUIT, ORAN PARK, NSW

COPYRIGHT

Core Size: NMLC

Inclination: VERTICAL

Bearing: N/A

Job No.: 29593V

Date: 16/1/17

Plant Type: JK308

GEOTECHNICAL AND ENVIRONMENTAL ENGINEERS

JK Geotechnics

CORED BOREHOLE LOG

R.L. Surface: ~95.5 m

Datum: AHD

Logged/Checked By: K.S./P.S.

2 / 2

101Borehole No.

General

DESCRIPTION

EL

VL

L M H VH

EH

POINT LOADSTRENGTH

INDEXIs(50)

CORE DESCRIPTION

Specific500

300

100

50 30 10

DEFECT DETAILS

Gra

phic

Log

-0.0

3

-0.1

-0.3

-1 -3 -10

Rock Type, grain characteristics, colour,structure, minor components. Type, inclination, thickness,

planarity, roughness, coating.

Str

engt

h

Wea

ther

ing

(6.02m) J, 40°, P, S(6.10m) J, 90°, P, S

91

90

89

88

87

86

85

Dep

th (

m)

5

6

7

8

9

10

DEFECTSPACING

(mm)

DEFECTSPACING

(mm)

Page 15: ESA Report - majorprojects.planningportal.nsw.gov.au

ES

U50

DB

DS

GRASS COVER

VERY LOW TO LOW 'TC'BIT RESISTANCE

H

VSt

H

EL

VL - L

>600>600>600

280280320

400440500

>600>600>600

MC<PL

MC~PL

XW

DW

N = 133,6,7

N = 154,6,9

N = 93,4,5

N = 2916,13,16

DR

Y O

NC

OM

PLE

TIO

NO

F A

UG

ER

ING

CL

FILL: Silty clay, medium plasticity,orange brown mottled grey.

SILTY CLAY: medium plasticity, greymottled red brown, with fine to mediumgrained ironstone gravel.

SHALE: grey, with iron indurated bands.

REFER TO CORED BOREHOLE LOG

Gro

undw

ater

Rec

ord

RL

(m A

HD

)

Str

engt

h/R

el D

ensi

ty

Han

dP

enet

rom

ete

rR

eadi

ngs

(kP

a)

Remarks

Moi

stu

reC

ondi

tion/

Wea

ther

ing

Fie

ld T

ests

COPYRIGHT

Logged/Checked By: K.S./P.S.

Method: SPIRAL AUGERJob No.: 29593V

Date: 16/1/17

Plant Type: JK308

R.L. Surface: ~95.0 m

Datum: AHD

1 / 2

102Borehole No.

BOREHOLE LOG

JKGEOTECHNICAL AND ENVIRONMENTAL ENGINEERS

Geotechnics

Client: WOOLACOTTS CONSULTING ENGINEERS

Project: PROPOSED ORAN PARK HIGH SCHOOL

Location: SOUTH CIRCUIT, ORAN PARK, NSW

JK_L

IB_C

UR

RE

NT

- V

8.00

.GLB

Log

J &

K A

UG

ER

HO

LE -

MA

ST

ER

295

93V

OR

AN

PA

RK

.GP

J <

<D

raw

ingF

ile>

> 0

2/02

/201

7 17

:34

Pro

duc

ed b

y gI

NT

Pro

fess

iona

l, D

evel

oped

by

Dat

gel

Gra

phic

Log

Uni

fied

Cla

ssifi

catio

n

DESCRIPTIONSAMPLES

94

93

92

91

90

89

Dep

th (

m)

1

2

3

4

5

6

Page 16: ESA Report - majorprojects.planningportal.nsw.gov.au

100

%R

ET

UR

N

SHALE: grey and brown.

INTERBEDDED SHALE ANDSANDSTONE

SANDSTONE: fine grained, grey.

SHALE: dark grey.

INTERBEDDED SHALE ANDSANDSTONE

START CORING AT 6.44m

END OF BOREHOLE AT 9.50 m

L - M

M - H

H

VL - L

H

EL

DW

XW

Wat

erLo

ss\L

evel

Bar

rel L

ift

RL

(m A

HD

)

JK_L

IB_C

UR

RE

NT

- V

8.00

.GLB

Log

J &

K C

OR

ED

BO

RE

HO

LE -

MA

ST

ER

295

93V

OR

AN

PA

RK

.GP

J <

<D

raw

ingF

ile>

> 0

2/02

/201

7 17

:34

Pro

duce

d by

gIN

T P

rofe

ssio

nal,

Dev

elop

ed b

y D

atge

l

Client: WOOLACOTTS CONSULTING ENGINEERS

Project: PROPOSED ORAN PARK HIGH SCHOOL

Location: SOUTH CIRCUIT, ORAN PARK, NSW

COPYRIGHT

Core Size: NMLC

Inclination: VERTICAL

Bearing: N/A

Job No.: 29593V

Date: 16/1/17

Plant Type: JK308

GEOTECHNICAL AND ENVIRONMENTAL ENGINEERS

JK Geotechnics

CORED BOREHOLE LOG

R.L. Surface: ~95.0 m

Datum: AHD

Logged/Checked By: K.S./P.S.

2 / 2

102Borehole No.

General

DESCRIPTION

EL

VL

L M H VH

EH

POINT LOADSTRENGTH

INDEXIs(50)

CORE DESCRIPTION

Specific500

300

100

50 30 10

DEFECT DETAILS

Gra

phic

Log

-0.0

3

-0.1

-0.3

-1 -3 -10

Rock Type, grain characteristics, colour,structure, minor components. Type, inclination, thickness,

planarity, roughness, coating.

Str

engt

h

Wea

ther

ing

(6.68m) Be, 5°, P, S(6.72m) XWS, 0°, 18 mm.t(6.80m) XWS, 0°, 28 mm.t(6.92m) Be, 0°, P, S

(7.29m) Be, 0°, P, S

(7.59m) J, 30°, P, S, IS

(7.70m) J, 70°, P, S, IS

(7.83m) XWS, 0°, 6 mm.t

(8.67m) XWS, 0°, 3 mm.t(8.70m) XWS, 0°, 4 mm.t(8.75m) XWS, 0°, 34 mm.t(8.82m) FRAGMENTED ZONE, 0°, 25 mm.t(8.88m) XWS, 0°, 40 mm.t(8.93m) XWS, 0°, 15 mm.t(9.12m) Be, 0°, P, S(9.14m) J, 80°, P, S(9.17m) Be, 0°, P, S

88

87

86

85

84

83

Dep

th (

m)

7

8

9

10

11

12

DEFECTSPACING

(mm)

DEFECTSPACING

(mm)

Page 17: ESA Report - majorprojects.planningportal.nsw.gov.au

ES

U50

DB

DS

GRASS COVER

VERY LOW 'TC' BITRESISTANCE

LOW RESISTANCE

H

VL

L

>600>600

>600>600>600

MC<PL

MC<PL

DW

N = 143,6,8

N = 196,8,11

N = 2710,13,14

DR

Y O

NC

OM

PLE

TIO

NO

F A

UG

ER

ING

CL-CH

FILL: Silty clay, low to medium plasticity,brown mottled orange brown and grey,with fine to medium grained igneousgravel and roots.

SILTY CLAY: medium to high plasticity,red brown mottled orange brown.

as above,but grey mottled red brown.

SHALE: brown and grey, with ELstrength bands.

REFER TO CORED BOREHOLE LOG

Gro

undw

ater

Rec

ord

RL

(m A

HD

)

Str

engt

h/R

el D

ensi

ty

Han

dP

enet

rom

ete

rR

eadi

ngs

(kP

a)

Remarks

Moi

stu

reC

ondi

tion/

Wea

ther

ing

Fie

ld T

ests

COPYRIGHT

Logged/Checked By: K.S./P.S.

Method: SPIRAL AUGERJob No.: 29593V

Date: 18/1/17

Plant Type: JK308

R.L. Surface: ~95.5 m

Datum: AHD

1 / 2

103Borehole No.

BOREHOLE LOG

JKGEOTECHNICAL AND ENVIRONMENTAL ENGINEERS

Geotechnics

Client: WOOLACOTTS CONSULTING ENGINEERS

Project: PROPOSED ORAN PARK HIGH SCHOOL

Location: SOUTH CIRCUIT, ORAN PARK, NSW

JK_L

IB_C

UR

RE

NT

- V

8.00

.GLB

Log

J &

K A

UG

ER

HO

LE -

MA

ST

ER

295

93V

OR

AN

PA

RK

.GP

J <

<D

raw

ingF

ile>

> 0

2/02

/201

7 17

:34

Pro

duc

ed b

y gI

NT

Pro

fess

iona

l, D

evel

oped

by

Dat

gel

Gra

phic

Log

Uni

fied

Cla

ssifi

catio

n

DESCRIPTIONSAMPLES

95

94

93

92

91

90

89

Dep

th (

m)

1

2

3

4

5

6

Page 18: ESA Report - majorprojects.planningportal.nsw.gov.au

100

%R

ET

UR

N

SHALE: brown and dark grey.

INTERBEDDED SHALE ANDSANDSTONE: fine grained, grey andlight grey.

START CORING AT 6.78m

END OF BOREHOLE AT 9.84 m

L - M

M

H

DW

SW

Wat

erLo

ss\L

evel

Bar

rel L

ift

RL

(m A

HD

)

JK_L

IB_C

UR

RE

NT

- V

8.00

.GLB

Log

J &

K C

OR

ED

BO

RE

HO

LE -

MA

ST

ER

295

93V

OR

AN

PA

RK

.GP

J <

<D

raw

ingF

ile>

> 0

2/02

/201

7 17

:34

Pro

duce

d by

gIN

T P

rofe

ssio

nal,

Dev

elop

ed b

y D

atge

l

Client: WOOLACOTTS CONSULTING ENGINEERS

Project: PROPOSED ORAN PARK HIGH SCHOOL

Location: SOUTH CIRCUIT, ORAN PARK, NSW

COPYRIGHT

Core Size: NMLC

Inclination: VERTICAL

Bearing: N/A

Job No.: 29593V

Date: 18/1/17

Plant Type: JK308

GEOTECHNICAL AND ENVIRONMENTAL ENGINEERS

JK Geotechnics

CORED BOREHOLE LOG

R.L. Surface: ~95.5 m

Datum: AHD

Logged/Checked By: K.S./P.S.

2 / 2

103Borehole No.

General

DESCRIPTION

EL

VL

L M H VH

EH

POINT LOADSTRENGTH

INDEXIs(50)

CORE DESCRIPTION

Specific500

300

100

50 30 10

DEFECT DETAILS

Gra

phic

Log

-0.0

3

-0.1

-0.3

-1 -3 -10

Rock Type, grain characteristics, colour,structure, minor components. Type, inclination, thickness,

planarity, roughness, coating.

Str

engt

h

Wea

ther

ing

(6.92m) Be, 0°, P, R(6.93m) XWS, 0°, 3 mm.t(7.06m) XWS, 0°, 5 mm.t(7.09m) XWS, 0°, 3 mm.t(7.15m) XWS, 0°, 3 mm.t(7.20m) XWS, 0°, 15 mm.t

(7.50m) XWS, 0°, 55 mm.t(7.58m) XWS, 0°, 15 mm.t(7.66m) XWS, 0°, 17 mm.t

(7.79m) HEALED J, 70°, IS

(7.90m) J, 70°, P, S, IS

(8.31m) XWS, 0°, 3 mm.t(8.38m) XWS, 0°, 11 mm.t

(8.49m) J, 70°, P, S(8.55m) XWS, 0°, 140 mm.t

(9.10m) XWS, 0°, 9 mm.t(9.13m) XWS, 0°, 18 mm.t(9.17m) XWS, 0°, 6 mm.t(9.29m) XWS, 0°, 8 mm.t(9.39m) XWS, 5°, 10 mm.t(9.45m) XWS, 5°, 7 mm.t

(9.76m) Be, 0°, P, S

89

88

87

86

85

84

83

Dep

th (

m)

7

8

9

10

11

12

DEFECTSPACING

(mm)

DEFECTSPACING

(mm)

Page 19: ESA Report - majorprojects.planningportal.nsw.gov.au

ES

U50

DB

DS

GRASS COVER

VERY LOW TO LOW 'TC'BIT RESISTANCE

LOW RESISTANCE

H

EL

VL - L

L

>600>600>600

MC<PL

MC<PL

XW

DW

N > 1410,6,8/100mm

REFUSAL

N = 188,10,8

N = 184,7,11

N > 1010,10/ 80mm

REFUSAL

DR

Y O

NC

OM

PLE

TIO

NO

F A

UG

ER

ING

CL-CH

FILL: Silty clay, medium plasticity, brownmottled grey, with fine to mediumgrained sandstone and igneous gravel.

SILTY CLAY: medium to high plasticity,red brown and grey, with fine to mediumgrained ironstone gravel.

SHALE: grey.

REFER TO CORED BOREHOLE LOG

Gro

undw

ater

Rec

ord

RL

(m A

HD

)

Str

engt

h/R

el D

ensi

ty

Han

dP

enet

rom

ete

rR

eadi

ngs

(kP

a)

Remarks

Moi

stu

reC

ondi

tion/

Wea

ther

ing

Fie

ld T

ests

COPYRIGHT

Logged/Checked By: K.S./P.S.

Method: SPIRAL AUGERJob No.: 29593V

Date: 18/1/17

Plant Type: JK308

R.L. Surface: ~92.7 m

Datum: AHD

1 / 2

104Borehole No.

BOREHOLE LOG

JKGEOTECHNICAL AND ENVIRONMENTAL ENGINEERS

Geotechnics

Client: WOOLACOTTS CONSULTING ENGINEERS

Project: PROPOSED ORAN PARK HIGH SCHOOL

Location: SOUTH CIRCUIT, ORAN PARK, NSW

JK_L

IB_C

UR

RE

NT

- V

8.00

.GLB

Log

J &

K A

UG

ER

HO

LE -

MA

ST

ER

295

93V

OR

AN

PA

RK

.GP

J <

<D

raw

ingF

ile>

> 0

2/02

/201

7 17

:34

Pro

duc

ed b

y gI

NT

Pro

fess

iona

l, D

evel

oped

by

Dat

gel

Gra

phic

Log

Uni

fied

Cla

ssifi

catio

n

DESCRIPTIONSAMPLES

92

91

90

89

88

87

86

Dep

th (

m)

1

2

3

4

5

6

Page 20: ESA Report - majorprojects.planningportal.nsw.gov.au

100

%R

ET

UR

N

SHALE: grey and brown.

INTERBEDDED SHALE ANDSANDSTONE

START CORING AT 6.71m

END OF BOREHOLE AT 9.69 m

L

EL

M

DW

XW

DW

Wat

erLo

ss\L

evel

Bar

rel L

ift

RL

(m A

HD

)

JK_L

IB_C

UR

RE

NT

- V

8.00

.GLB

Log

J &

K C

OR

ED

BO

RE

HO

LE -

MA

ST

ER

295

93V

OR

AN

PA

RK

.GP

J <

<D

raw

ingF

ile>

> 0

2/02

/201

7 17

:34

Pro

duce

d by

gIN

T P

rofe

ssio

nal,

Dev

elop

ed b

y D

atge

l

Client: WOOLACOTTS CONSULTING ENGINEERS

Project: PROPOSED ORAN PARK HIGH SCHOOL

Location: SOUTH CIRCUIT, ORAN PARK, NSW

COPYRIGHT

Core Size: NMLC

Inclination: VERTICAL

Bearing: N/A

Job No.: 29593V

Date: 18/1/17

Plant Type: JK308

GEOTECHNICAL AND ENVIRONMENTAL ENGINEERS

JK Geotechnics

CORED BOREHOLE LOG

R.L. Surface: ~92.7 m

Datum: AHD

Logged/Checked By: K.S./P.S.

2 / 2

104Borehole No.

General

DESCRIPTION

EL

VL

L M H VH

EH

POINT LOADSTRENGTH

INDEXIs(50)

CORE DESCRIPTION

Specific500

300

100

50 30 10

DEFECT DETAILS

Gra

phic

Log

-0.0

3

-0.1

-0.3

-1 -3 -10

Rock Type, grain characteristics, colour,structure, minor components. Type, inclination, thickness,

planarity, roughness, coating.

Str

engt

h

Wea

ther

ing

(6.76m) Be, 0°, P, S(6.78m) XWS, 0°, 6 mm.t(6.88m) XWS, 0°, 52 mm.t(6.95m) FRAGMENTED ZONE

(9.15m) J, 80°, P, S(9.20m) J, 90°, P, S

(9.44m - 9.56m) FRAGMENTED ZONE

86

85

84

83

82

81

80

Dep

th (

m)

7

8

9

10

11

12

DEFECTSPACING

(mm)

DEFECTSPACING

(mm)

Page 21: ESA Report - majorprojects.planningportal.nsw.gov.au

0

0.5

1

1.5

2

2.5

3

3.5

DRY ONCOMPLET-

ION

CL-CH

FILL: Silty sand, fine to mediumgrained, dark brown, with fine tomedium grained igneous gravel androot fibres.FILL: Silty clay, medium to highplasticity, light brown, with fine tomedium grained ironstone gravel androot fibres.

SILTY CLAY: medium to highplasticity, light brown, with root fibres.

END OF BOREHOLE AT 1.5m

D

MC<PL

MC<PL

GRASS COVER

ENVIRONMENTAL INVESTIGATION SERVICESCONSULTING ENVIRONMENTAL ENGINEERS

ENVIRONMENTAL LOGBorehole No.

105Environmental logs are not to be used for geotechnical purposes

Client: WOOLACOTTS CONSULTING ENGINEERS

Project: PROPOSED ORAN PARK HIGH SCHOOL

Location: SOUTH CIRCUIT, ORAN PARK, NSW

Job No. E29593K Method: EZIPROBE R.L. Surface: N/A

Date: 17/1/17 Datum:

Logged/Checked by: K.T./G.F.

Gro

undw

ate

rR

ecord

ES

SA

MP

LE

SA

SS

AS

BS

AL

Fie

ld T

ests

Depth

(m

)

Gra

phic

Log

Unifie

dC

lassific

ation

DESCRIPTION

Mois

ture

Conditio

n/

Weath

eri

ng

Str

ength

/R

el. D

ensity

Hand

Penetr

om

ete

rR

eadin

gs (

kP

a.)

Remarks

CO

PY

RIG

HT

1/1

Page 22: ESA Report - majorprojects.planningportal.nsw.gov.au

0

0.5

1

1.5

2

2.5

3

3.5

DRY ONCOMPLET-

ION

CL-CH

FILL: Silty sandy gravel, fine to coarsegrained, igneous, dark brown andgrey, with root fibres and trace of ash.

FILL: Silty clay, medium to highplasticity, brown, with fine to coarsegrained igneous gravel, and rootfibres.

as above,but with fragments of asphalticconcrete.

as above,but no igneous gravel.

SILTY CLAY: medium to highplasticity, grey and red brown, withtrace of root fibres.

END OF BOREHOLE AT 2.1m

D

MC<PL

MC<PL

GRASS COVER

ENVIRONMENTAL INVESTIGATION SERVICESCONSULTING ENVIRONMENTAL ENGINEERS

ENVIRONMENTAL LOGBorehole No.

106Environmental logs are not to be used for geotechnical purposes

Client: WOOLACOTTS CONSULTING ENGINEERS

Project: PROPOSED ORAN PARK HIGH SCHOOL

Location: SOUTH CIRCUIT, ORAN PARK, NSW

Job No. E29593K Method: EZIPROBE R.L. Surface: N/A

Date: 17/1/17 Datum:

Logged/Checked by: K.T./G.F.

Gro

undw

ate

rR

ecord

ES

SA

MP

LE

SA

SS

AS

BS

AL

Fie

ld T

ests

Depth

(m

)

Gra

phic

Log

Unifie

dC

lassific

ation

DESCRIPTION

Mois

ture

Conditio

n/

Weath

eri

ng

Str

ength

/R

el. D

ensity

Hand

Penetr

om

ete

rR

eadin

gs (

kP

a.)

Remarks

CO

PY

RIG

HT

1/1