EXECU
The purpPittsburghpotential analysis/r
Analysis 1
The Chevsuggestedof the worApplicatiohelp increin the fiel
Analysis 2
The instalthe Chevrthe architinterviewThe re-secosts invo
Analysis 3
The Chevequipmenprocess wAdditionabuildings
Analysis 4
The Chevincrease system. Treduce thenvironm
TIVE SUM
ose of this prh’s Chevron solutions, exresearch.
1: Integration
vron Annex dd that the prorkers. Tableons and progease the overld will have a
2: Re-Design/
llation and phron Annex. Atectural eyeb
wed to determequencing of olved with the
3: Commission
vron Annex dnt for the testwill be researally, it will bes in order to e
4: Addition of
vron Annex’s the efficiencyThis change whe mechanica
mentally frien
MMARY
roposal is to d Annex projexpected outco
of Tablet PC
did not utilizeoject team im
et PC’s will alsgrams applicrall productiv
a drastic effec
/Re-Sequence
hasing of theA re-sequencbrow will be cmine the prob the façade sye installation
ning of Labor
developed soting and balarched and ane suggested tensure they c
f a Green Roo
roofs were tyy of the buildwill reduce thal loads impodly, as well a
Archite
discuss four act. Backgrouome and the
’s in the Field
any new or umplement the
so be used toable for Tablvity of the prct on the over
e of the Facad
exterior skincing of the inscompleted in
blems and chystems will d
n.
ratory Spaces
ome complicaancing of the nalyzed to dethat the USGBcontinue to ru
f
ypical TPO roding. It is sughe storm wat
osed on the bas providing
ectural Engine
analyses thatund researchsteps that wi
d
unique metho use of Table
o close out thlet PC’s will aoject. It is esrall time savi
de
n caused a nustallation of t
n this analysishallenges facedecrease the
s
ations when i systems. Thrtermine the m
BC implemenun as expecte
oofs that did ggested that ter runoff, red
building. A grmoney savin
Universit
eering | Dec
t will be perfoh will be perfoill be perform
ods of technoet PC’s in the he job, as welalso be recomstimated that ings related t
umber of prothe façade sys. Members ed during theoverall sched
it came time troughout thismost efficiennt a LEED reced.
not use any ithese roofs bduce the builreen roof wil
ngs to the own
ty of Pittsbur
cember 9, 20
ormed for theformed, as wemed to achiev
ology during field to increll as filling oummended. T the implemeto the superin
oblems durinystems, as we of the projece installation dule, thus de
to turn on thes analysis, th
nt way to comcertification f
innovative sobe changed tolding’s heat ill also make tner in the lon
rgh – ChevroRobert
11 | 2
e University oell as examinve the technic
g constructionease the produt the punch lThese prograentation of Tantendent.
ng the construell as a re-desct team will b of these syst
ecreasing the
e mechanicalhe commissiommission. for sustainabl
olutions to heo a green rooisland effect athe building ng run.
on Annex t Mroskey
of ning the cal
n. It is ductivity list. ms will
ablet PC’s
uction of sign of
be tems.
e labor
l ning
le
elp ofing and more
TABLE
Executive
Project Ba
Technical
Problem
Backgr
Method
Potenti
Technical
Problem
Backgr
Method
Potenti
Technical
Problem
Backgr
Method
Potenti
Technical
Problem
Backgr
Method
Potenti
Analysis W
Timetable
Conclusio
OF CONT
e Summary ...
ackground ...
l Analysis 1 –
m Identificati
round Resear
dologies .......
ial Solutions &
l Analysis 2 –
m Identificati
round Resear
dologies .......
ial Solutions &
l Analysis 3 –
m Identificati
round Resear
dologies .......
ial Solutions &
l Analysis 4 –
m Identificati
round Resear
dologies .......
ial Solutions &
Weight Matri
e ..................
on ................
TENTS
....................
....................
– Integration
ion ..............
rch Performe
....................
& Expected O
– Re-Design/R
ion ..............
rch Performe
....................
& Expected O
– Commission
ion ..............
rch Performe
....................
& Expected O
– Addition of
ion ..............
rch Performe
....................
& Expected O
ix .................
....................
....................Archite
....................
....................
of Tablet PC’
....................
d .................
....................
Outcomes .....
Re-Sequence
....................
d .................
....................
Outcomes .....
ning of Labor
....................
d .................
....................
Outcomes .....
a Green Roo
....................
d .................
....................
Outcomes .....
....................
....................
....................ectural Engine
....................
....................
’s in the Field
....................
....................
....................
....................
e of the Façad
....................
....................
....................
....................
ratory Spaces
....................
....................
....................
....................
f ..................
....................
....................
....................
....................
....................
....................
....................
Universit
eering | Dec
....................
....................
d ..................
....................
....................
....................
....................
de ................
....................
....................
....................
....................
s ..................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ty of Pittsbur
cember 9, 20
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
rgh – ChevroRobert
11 | 3
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
on Annex t Mroskey
............ 2
............ 5
............ 6
............ 6
............ 6
............ 6
............ 7
............ 8
............ 8
............ 8
............ 8
............ 9
.......... 10
.......... 10
.......... 10
.......... 10
.......... 11
.......... 12
.......... 12
.......... 12
.......... 12
.......... 12
.......... 14
.......... 14
.......... 14
Appendix
Appendix
Structu
Mechan
Appendix
x A – Critical
x B – Breadth
ural Breadth –
nical Breadth
x C – Spring S
Issue Resear
h Topics ........
– Technical A
h – Technical
Semester Pre
Archite
rch Methods .
....................
Analysis #2 &
Analysis #3
eliminary Tim
ectural Engine
....................
....................
Technical An
& Technical A
metable ........
Universit
eering | Dec
....................
....................
nalysis #4 ...
Analysis #4 .
....................
ty of Pittsbur
cember 9, 20
....................
....................
....................
....................
....................
rgh – ChevroRobert
11 | 4
....................
....................
....................
....................
....................
on Annex t Mroskey
.......... 15
.......... 16
.......... 16
.......... 16
.......... 17
PROJEC
The ChevThe constfacility is existing afeet. TheBurchick for this th
Included level conare similaother roospace tha
The façadcotta, mewall and a
AdditionaGold builenvironmUniversity
The schedareas of thof the prowere devAnnex haproblems2012 sem
CT BACKG
vron Annex istruction of the a two phase auditorium, a Chevron An Construction
hesis.
in the projecsist of a mainar to each othms are also s
at houses mos
de of the buildtal panels, loan aluminum
ally, the Chevlding will hel
mental and hey of Pittsburg
dule was the he building o
oject was the veloped; howad several pros are expecte
mester.
GROUND
s an addition e Annex start project locat
as well as a thnnex was a $2n was the Gen
ct are spaces n lobby, compher and are dscattered throst of the mech
ding is a comouvers and gl
m cladded eye
vron Annex ilp acknowled
ealth performgh’s campus.
main conceronce the stud ongoing cha
wever, there woblematic fea
ed to be solve
Archite
to the Univerted on Novemted in Pittsbu
hree story ver25 million desneral Contrac
which encomputer lab, au
devoted to choughout the fhanical equip
mbination of alazing. Additebrow (Figur
s currently indge the build
mance, as wel
rn of this projdents returneanges that wewas no additiatures that wed throughou
Figure 1 Al
ectural Engine
rsity of Pittsbmber 20, 200urgh, Pennsylrtical additiosign-bid-builctor that was
mpass a numbditoriums an
hemistry labs floor. The foupment.
a number of stionally, a sunre 1) accents
n pursuit of a ding in its attel as adding a
ject because d to class. An
ere requestedional time adere previousut the analysi
uminum Cladde
Universit
eering | Dec
burgh’s Chev09 and was colvania that in
on above that ld project tha awarded thi
ber of functiond lounge are
and student urth floor of t
systems. Somnshade syste the southwes
LEED Gold rempt to impleanother LEED
the Universinother area td by the Univ
dded to the scsly identifiedis of four tech
ed Eyebrow
ty of Pittsbur
cember 9, 20
vron Tower anompleted in S
ncluded a ren is approximat was bid as is project, an
ons. The firstea. The secon desk areas. the new addi
me of these sem is integratst corner of th
rating. Beingement strateg
D certified bu
ty needed tohat was a risk
versity. Conschedule. Ove
d in Technicalhnical areas d
rgh – ChevroRobert
11 | 5
nd Ashe audiSeptember 20
novation to thmately 35,000
a multi-primd is also the
t floor and mnd and third A few officesition is a mec
ystems incluted into the che façade.
g certified as gies for bette
uilding to the
o turnover cerk for the comstant change erall, the Chel Report 3. Thduring the Sp
on Annex t Mroskey
itorium. 011. The
he square
me job. sponsor
mezzanine floors s and
chanical
ude terra curtain
a LEED er
rtain mpletion
orders evron hese pring
TECHN
PROBLE
The Chevwas a conwhich maconsiderahave beealso a lacof tablet P
BACKGR
There is aare spendthem gainof Tablet client appthat is higproductivprove to sTablet PC
METHO
In order t
Peco
Peim
Ain
In A Fa
fo
NICAL ANA
EM IDENTI
vron Annex dncern during ade it difficultable amount n utilized bek of communPC’s in the fie
ROUND RE
an increasingding a critican an edge on PC’s. Tabletprovals, compghly mobile. vity of the comsave time and
C’s will also b
DOLOGIES
to follow thro
erform detailosts, uses, eterform detail
mplementingA case study wnitial costs of ndustry profe
Applications aaculty and st
or Tablet PC’
ALYSIS 1 –
FICATION
did not utilize the project bt for the supeof time that wtter, thus incr
nication amoneld.
ESEARCH P
g interest andal amount of tin other compats are offeringplete inspect The amount mpany will ald money thro
be recommen
S
ough and perf
led researchc. of the consled research
g the use of Tawill be used t investment t
essionals thatand programaff of Penn Sts.
Archite
– INTEGRA
N
any new or ubecause the ferintendents twas wasted wreasing the qngst the proje
PERFORME
d use of technime and monanies. The mg constructiotions, arrang of informatiolso be lookedoughout the pnded.
form this tech
on the differstruction Tab on the time aablet PC’s. to evaluate coo the paybac
t have implems for Tablet Ptate will be in
ectural Engine
ATION OF
unique methofield office wto keep track
walking betwequality controect team, whi
ED
nology througney trying to
main form of teon users new e logistics an
on a superinted into. It is suproject. App
hnical analys
rent types of Tble PC. and cost savi
ost savings ock period. mented TablePC’s will alsonterviewed to
Universit
eering | Dec
F TABLET
ods of technowas located a
k of their doceen the site aol and supervich could be
ghout the con utilize differeechnology th ways to speend manage otendent needuggested tha
plications and
sis, the follow
Tablet PC’s;
ings that can
on the Chevro
et PC’s alreado be analyzedo get informe
ty of Pittsbur
cember 9, 20
T PC’S IN T
ology duringquarter mile
cuments. Addand field officvision of the p resolved wit
nstruction indent types of that will be aned up commuther complic
ds to efficientlat effective usd programs, s
wing steps are
while compa
be establish
on Annex, wh
dy will be intd. ed of new tec
rgh – ChevroRobert
11 | 6
THE FIELD
g construction west of the pditionally, thece. This timeproject. Therth the implem
dustry. Comtechnology tonalyzed will bunication, obcations in an ily increase thses of technosuch as Latist
e necessary:
aring the diffe
hed when
hile comparin
terviewed.
chnologies av
on Annex t Mroskey
D
n. This project; ere was a
e could re was
mentation
mpanies o help be the use btain industry he
ology will ta, for
erent
ng the
vailable
POTENT
ImplemenFor instanproblemsof upper mforms of dwell as filrecomme
It is estimtime savinand amousuperintealso increaccuracy actual lab
TIAL SOLU
nting Tablet Pnce, the learns; so ways to managementdocumentatiolling out the pended and the
mated that thengs related tount of time spendent’s timeease the amo will also ben
bor hours.
TIONS & E
PC’s into the ning curves inbypass this pt, and will beon used throupunch list. Apese program
e implementao the superin
pent travelinge, allowing hiunt of accura
nefit the estim
Archite
EXPECTED
field has sevnvolved withproblem will e used to recoughout the prpplications a
ms will help in
ation of Tablentendent. Impg between them to stay on
acy when recmating depar
ectural Engine
OUTCOM
veral advantah a new form be suggesteord work houroject. Tableand programsncrease the o
et PC’s in the plementing Te site and fiesite and over
cording work rtment by cre
Universit
eering | Dec
ES
ages and disaof technolog
ed. Tablets wurs, quantity ret PC’s will as applicable
overall produ
field will havTablet PC’s w
eld offices. Thrsee the proj
k hours and qeating a more
ty of Pittsbur
cember 9, 20
advantages agy in the fieldwill also be iss
reports, qualalso be used t for Tablet PC
uctivity of the
ve a drastic ewill decreasehis frees up mect for longe
quantities of me accurate int
rgh – ChevroRobert
11 | 7
associated wid can cause so
sued to eachlity control anto close out thC’s will be project.
effect on the oe the number much of the er. Tablet PCmaterials. Thternal history
on Annex t Mroskey
ith them. ome
h member nd other he job, as
overall of trips
C’s will his y of
TECHN
PROBLE
The instalthe Chevrwere encinterdepe
Phasing ascaffoldinrelated tosouthwesand attachtrades on
BACKGR
Scope revthe interdcreate moscaffoldinsystems. this featurfeature, wstrong en
METHO
In order t
PeC
Men
Rin
Afe
NICAL ANA
EM IDENTI
llation and phron Annex. B
countered whendencies of
and sequencing systems wo space and sst corner of thhed on-site o
n the façade, p
ROUND RE
view and puldependencieore space forng system is c The architecre, while dec
which will reqnough to hold
DOLOGIES
to follow thro
erform reseaChevron AnneMembers of th
ncountered deview and an
nstallation of Analyze the ineature in orde
ALYSIS 2 –
FICATION
hasing of theBecause the rhen figuring o each of the f
ing of the façawere used to istaging. Addhe building coout of structurpushing back
ESEARCH P
l planning ms of the façad
r trades on thchosen to ensctural eyebrocreasing the squire a moded the weight o
S
ough and perf
arch of differeex. he project teaduring the conalyze the muthese system
nitial design oer to decreas
Archite
– RE-DESI
N
exterior skinroofing and cout which itemfaçade system
ade was anotinstall the diff
ditionally, cononsumed mural studs. Thek the start da
PERFORME
meetings will bde systems. Ohe building’s sure all proje
ow will also bschedule. Th
el of the strucof the eyebro
form this tech
ent scaffoldin
am will be inonstruction ofultiple façade
ms. of the architese the amoun
ectural Engine
GN/RE-SE
n caused a nucurtainwall coms were ownms created co
ther problemferent façadenstructing theuch of the sche finishing an
ates for the faç
ED
be suggestedOther scaffol exterior. Alsect participanbe analyzed inhe new desigture. This mo
ow’s new des
hnical analys
ng systems an
terviewed tof the façade. e systems and
ectural eyebrnt of time inst
Universit
eering | Dec
EQUENCE
umber of proontractors wened by whichonfusion and
m encounteree systems, whe architecturahedule and mnd waterprooçade system
d to solve thelding systemsso, a safety pnts are safe dn detail to de
gn may increaodel will help
sign.
sis, the follow
nd analyze w
o determine th
d determine
row and deteralling it.
ty of Pittsbur
cember 9, 20
E OF THE F
oblems durinere separate h contractor. d issues durin
ed. A limitedhich created al eyebrow th
manpower. Thofing of this it
ms.
e communicas will be look
plan will be dduring the insetermine the ase the overap determine
wing steps are
which system
he problems
the best way
rmine a way
rgh – ChevroRobert
11 | 8
FAÇADE
ng the constru primes, diffi In addition, t
ng installation
d number of some problehat is locatedhis feature wtem held up
ation issue relked into in or
developed onstallation of th best way to iall weight of t if the structu
e necessary:
will be best
s that were
y to sequence
to prefabrica
on Annex t Mroskey
uction of culties the
n.
ems d on the
was built other
lating to rder to nce a he façade install the
ure is
for the
e the
ate this
Ad
Osa
Joth
POTENT
The phasiappropriareview aninterdepe
The archiamount oto the eyeneed to b
Followingexpectedfaçade wiorganized
A model of theesigned.
OSHA regulatiafety plan. ob photos, prhe actual pha
TIAL SOLU
ing of the façate scaffoldinnd pull plannendencies of
itectural eyebf congestion
ebrow installbe changed a
g the re-sequd that the oveill be decread and detaile
e building’s s
ions will be r
rovided by Buasing of the fa
TIONS & E
çade will be rng system wilning meetings the systems.
brow will also on the site. Tation to begi
and will be de
uencing of therall schedulesed. Due to t
ed, reducing
Archite
structure will
reviewed to d
urchick Consacade.
EXPECTED
re-sequencedll be chosen,s will be held
o be re-desigThe re-desigin sooner thanetermined by
e facade and e duration wilthis decreasethe number o
ectural Engine
l be performe
determine the
struction, will
OUTCOM
d to increase as well as a
d to solve the
gned to try angn of the eyebn anticipatedy modeling th
preliminary ll be decrease in scheduleof conflicts re
Universit
eering | Dec
ed using etab
e information
l be reviewe
ES
e the producti simplified sa
e communicat
nd reduce thbrow will alsod. Due to thishe structure t
design of thesed. Also, thee, the façade elated to the
ty of Pittsbur
cember 9, 20
bs once the e
n necessary f
ed to develop
ivity of the crafety plan wiltion issue rel
he schedule, ao allows activs re-design, tthrough etab
e architecture labor costs installation w systems’ diff
rgh – ChevroRobert
11 | 9
eyebrow is re
for a fully fun
p an understa
rews. The ll be createdlating to the
as well as redvities that arethe structure
bs.
al eyebrow, s involved wiwill be more ficulties.
on Annex t Mroskey
e-
nctional
anding of
. Scope
duce the e linked may
it is th the
TECHN
PROBLE
LaboratorChevron for the tescompleteitems thatdate, resunegative job more
BACKGR
A better ucoordinatcommissiwill also bdiscovere
In additiosystems abuilding sperform dsuggestedconfirm thCertified place in o
METHO
In order t
Su Th
oc V
g
NICAL ANA
EM IDENTI
ry spaces havAnnex develsting and bal
ely dust free bt needed to bulting in scheair condition difficult with
ROUND RE
understandintion needed wioning will bebe determineed.
on to the comand controls wsystems’ efficduring occupd that the UShat the buildi buildings wiorder to be LE
DOLOGIES
to follow thro
uggestions whe MEP Coorccurred duri
Various booksain a better u
ALYSIS 3 –
FICATION
ve extreme cloped some clancing of thebefore any ofbe installed thedule complicn; which tendh cleanliness.
ESEARCH P
ng of the comwill be detere understooded. Reasons
mmissioning, twill be analyciencies befo
pancy as comGBC incorpoings are perfill help ensurEED Certified
S
ough and perf
will be made trdinator of thng the testings and magaziunderstandin
Architec
– COMMIS
N
cautions relatcomplicatione systems. Thf the systemshat producedcations. Added to suck th.
PERFORME
mmissioning prmined, as wed. Documentawhy this com
the pre and pyzed. LEED Core occupanc
mpared to the orate some soforming to there that occupd.
form this tech
to help ownehe project teag and balancines dealing wng of the proc
ctural Enginee
SSIONING
ting to the clens when it camhe owner ins
s could be turd dust and deditionally, thehe dirt from th
ED
process will bell as the veration and tra
mmissioning p
post occupanCertified buildcy and during expected pe
ort of re-certie requiremenants and own
hnical analys
ers benefit anam will be intcing of the sywith the comcess.
Universit
ering | Dece
G OF LABO
eanliness andme time to tursisted on the lrned on; howebris. This ine existing Chhe project int
be gained thrification and ining for the process was
ncy efficienciedings will beg occupancyerformance wification for Lnts after certners are conf
sis, the follow
nd prepare foterview to de
ystems. mmissioning o
ty of Pittsbur
ember 9, 201
ORATORY
d precision orn on the melaboratory sp
wever, there wnterrupted thhevron Towerto the existin
roughout this testing that i future facility so complicat
es of LEED Ce analyzed wi. How the sy
will be analyzLEED Certifieification. Re-
forming to the
wing steps are
or eventual LEetermine the
of buildings w
rgh – ChevroRobert
1 | 10
Y SPACES
of the areas. Tchanical equpaces being were still long
he owner’s ocr was in an exng tower, mak
s analysis. This involved wy managemeted will also b
Certified buildith respect to
ystems actualzed. It will beed buildings t-Certificatione requiremen
e necessary:
EED recertifimajor proble
will be refere
on Annex t Mroskey
The uipment
g lead ccupancy xtreme king the
he with the ent staff be
ding o their ly e to n of LEED nts put in
ication. ems that
enced to
Th
POTENT
A commiscommissianalyzed suggestedfor the fut
An increaeffective Analysis for the coensure th
he document
TIAL SOLU
ssioning teamioning proce and organized to the USGBture re-certif
ase in the amknowledge a1 will also be
ommissioninghat their build
tation needed
TIONS & E
m and coordiss. The docued using a TaBC for the fut
fication of LEE
ount of coordand use of thee put to good g process anddings are con
Architec
d for the com
EXPECTED
nation plan wumentation neablet PC. A rture. SuggesED certified b
dination of the commission use by usingd turnover of nforming to th
ctural Enginee
mmissioning p
OUTCOM
will be develoeeded for there-certificatiosted solutionsbuildings.
e mechanicaning processg them for thef the buildinghe requireme
Universit
ering | Dece
process will b
ES
oped to ensue commissionon of LEED ces will be mad
al systems wil. The Tablet e documenta
g to the ownerents put in pl
ty of Pittsbur
ember 9, 201
be organized
ure an efficienning of the buertified buildde to the own
ll be accomp PC’s sugges
ation and trainr. Owners wace in order
rgh – ChevroRobert
1 | 11
d using a Tab
nt and coordiuilding will a
dings will alsoner on how to
plished througsted in Technning that is n
will also be for to be LEED c
on Annex t Mroskey
blet PC.
inated also be o be o prepare
gh the nical needed
rced to certified.
TECHN
PROBLE
The Chevprotectionplaced onseparatelsystems.
BACKGR
Throughocomparedstructure additionaassociatereceived
METHO
In order t
R A C Ev M
POTENT
A green rthe locatiwell as anroof will hloads. A savings to
NICAL ANA
EM IDENTI
vron Annex’s n board on thn top of metaly, which cau
ROUND RE
out this analyd. Valuable i will also be a
al weight of a d with the he from implem
DOLOGIES
to follow thro
esearch varioAssess the cosCalculate any
valuate the cModel the bui
TIAL SOLU
roof is proposon and type o
ny changes tohelp reduce sgreen roof wo the owner i
ALYSIS 4 –
FICATION
roofs consisthree inch tapl decking sup
used some co
ESEARCH P
sis, the primainformation ranalyzed to d green roof s
eating and comenting a gre
S
ough and perf
ous types of gst and schedu energy and
constructabiliilding in etab
TIONS & E
sed to replacof building wo any other bstorm water r
will make the in the long ru
Architec
– ADDITIO
N
t of a new Thped insulationpported by thmplications w
PERFORME
ary costs invorelated to gredetermine whsystem. Addiooling of the been roof will a
form this tech
green roof syule implicatiocost savings ity issues ass
bs to determin
EXPECTED
ce the existinwill be chosenbuilding comprunoff, reducbuilding mor
un. However
ctural Enginee
ON OF A G
ermoplastic-n with air barhe building’swhen installin
ED
olved with theen roof techhether additioitionally, the building will also be deter
hnical analys
ystems. ons of a gree involved witociated with ne if any chan
OUTCOM
ng TPO roof. n. Necessaryponents. Ch
ce the buildinre environme, the schedul
Universit
ering | Dece
GREEN RO
-Polyolefin (Trrier and gyps steel frameng the transi
he existing rohnology will aonal framing change in m be analyzedrmined.
sis, the follow
n roof additioth adding a g the green ronges are nee
ES
The green roy changes to anging the o
ng’s heat islanentally friendle involved w
ty of Pittsbur
ember 9, 201
OOF
TPO) system tpsum board s. This roofingtions and flas
oof and new galso be provi
g will be needmechanical load. The amoun
wing steps are
on. green roof. oof. eded to the st
oof system th the structure
original TPO rnd effect, anddly, as well aswith the instal
rgh – ChevroRobert
1 | 12
that is placedsheathing. Thg package wshing to the f
green roof wiided. The buded to suppoads and costsnt of LEED po
e necessary:
tructure.
hat is most suie will be madroof to a newd reduce mes provide mollation of the
on Annex t Mroskey
d over his is all
was bid façade
ill be uilding’s ort the s
oints
itable for de, as
w green chanical
oney roof will
be increaby the lonof the bui
ased, as well ng term enerilding.
as the materirgy savings to
Architec
ial and laboro the owner d
ctural Enginee
costs involvedue to the ex
Universit
ering | Dece
ed. These coxtended lifecy
ty of Pittsbur
ember 9, 201
osts will evenycle and over
rgh – ChevroRobert
1 | 13
ntually be courall thermal e
on Annex t Mroskey
untered efficiency
ANALY
Four corefour areasreductioninvestiga
D
Integra
Re-Desi
ComLab
Additio
TIMETA
In order tcreated. and revie
CONCL
Overall, tAnnex. Inschedule building’would havdecrease
SIS WEIG
e areas of invs of investiga
n. The figuretion.
Description
ation of Tablin the Field
ign/Re-Sequthe Façade
mmissioningboratory Spac
on of a Gree
Total
ABLE
to stay organ This schedul
ew of the anal
LUSION
this analysis wntegration of of the projecs overall andve been intro
e in the overa
HT MATR
vestigation wiation include below displa
Re
et PC's
uence of
g of ces
n Roof
ized throughle, found in Alyses method
will help incrf technology ict. Additionad life time peroduced to thell cost of the
Architec
RIX
ill be accoun research, vaays the weigh
esearch En
5%
5%
10%
5%
25%
hout the SprinAppendix C, ds.
rease the efficin the field an
ally, the commrformances. e project, thebuilding.
ctural Enginee
ted for durinalue engineerht percentag
Value ngineering
10%
5%
10%
25%
ng 2012 semewill allow a s
ciency of thend re-sequenmissioning an If these meth
e owner woul
Universit
ering | Dece
ng the four tecring, constru
ges expected
ConstructaReview
10%
15%
10%
35%
ester, a prelimsignificant am
e constructionncing the tradnd addition ohods of constld have seen
ty of Pittsbur
ember 9, 201
chnical analyuctability revid to be related
ability w
SchRed
1
1
minary sememount of time
n process reldes will bothof a green rootruction and n a reduction i
rgh – ChevroRobert
1 | 14
ysis methodsiew and sched to the core
hedule duction
5%
10%
15%
ester schedule for the comp
lated to the Ch help the oveof will help wnew technoloin schedule a
on Annex t Mroskey
. The edule areas of
Total
30%
35%
20%
15%
100%
e was pletion
Chevron erall with the ogies and a
APPEN
Through rissues, antechnical subtopic potential
It is thougbeen avoaccordingtype of sybest poss
In additiosystems abuilding sperform dsuggestedconfirm thCertified place in o
DIX A – C
research basn analysis wa analysis is thdiscussed du for future re-
ght that throuided. In ordgly. Multipleystems used, sible solution
on to the comand controls wsystems’ efficduring occupd that the UShat the buildi buildings wiorder to be LE
RITICAL
sed on the exs formed aro
he commissiouring the ene-certification
ugh detailed cer to fully an
e laboratory s timing of com
n for the phas
mmissioning, twill be analyciencies befo
pancy as comGBC incorpoings are perfill help ensurEED Certified
Architec
ISSUE RES
xperience at tound this topioning of laboergy managem of LEED cert
coordination alyze this prospaces will bmmissioning ing of the sys
the pre and pyzed. LEED Core occupanc
mpared to the orate some soforming to there that occupd.
ctural Enginee
SEARCH M
the 2011 PACic. The criticaratory spacement servicetified buildin
and scheduloblem, the sce also be ana and parties istems.
post occupanCertified buildcy and during expected pe
ort of re-certie requiremenants and own
Universit
ering | Dece
METHODS
CE Roundtablal industry is
es. The commes breakout sngs was analy
ling meetingschedule will balyzed from ainvolved will
ncy efficienciedings will beg occupancyerformance wification for Lnts after certners are conf
ty of Pittsbur
ember 9, 201
S
le and discusssue that will missioning of session. Thisyzed in Techn
s that this probe revieweda number of al be evaluate
es of LEED Ce analyzed wi. How the sy
will be analyzLEED Certifieification. Re-
forming to the
rgh – ChevroRobert
1 | 15
ssing critical be pursued f a building w topic, as we
nical Analysis
oblem could d and adjustedareas of inter
ed to determi
Certified buildith respect to
ystems actualzed. It will beed buildings t-Certificatione requiremen
on Annex t Mroskey
industry through a
was a ll as the s 3.
have d rest. The ine the
ding o their ly e to n of LEED nts put in
APPEN
The demoin one or breadth t
STRUCT
When anarecommerequire abe reviewchanged,
Th In
Additionaanalysis wnew greeAlso, diffeIf a chang
MECHA
Technicalrecertificdemonstrbe gainedverificatiotraining foprocess w
Technicalwith a greperformewill also bbe determ
DIX B – B
onstration of more of the fopics will be
TURAL BRE
alyzing the exended. This rn analysis of
wed to determ some of the
he addition oncrease the s
ally, Technicawill also requen roof systemerent size bege in the struc
ANICAL BRE
l Analysis 3 dation. This arated throughd throughouton and testinor the future
was so compl
l Analysis 4 ween roof systeed. These loabe determinemined.
READTH T
at least two bfour analyses
e discussed:
EADTH – TE
xterior façadre-design wil the structuremine if the str potential sol
of steel beamize of the exi
al Analysis 4 uire an analysm. If requiredams, columncture is requi
EADTH – T
deals with thenalysis will rh a mechanict this analysisg that is invo facility manalicated will al
will also haveem. A calculads will be coed. The amou
Architec
TOPICS
breadth topics topics. For
ECHNICAL
de of the buildll place addite through a mructure will nlutions includ
ms or columnsisting beams
involves repsis of the exisd, additional
ns and deckinired, the cost
TECHNICA
e commissionequire the kn
cal breadth. As. The coordiolved with theagement stafflso be discov
e a mechanicalation of the rompared agaunt of LEED p
ctural Enginee
cs in Architec the technical
L ANALYSIS
ding, a re-detional stress o
model of the bneed to be chde:
s to the desig or columns
placing the TPsting structur supports wil
ng may be ret and schedu
AL ANALYS
ning of laboranowledge of A better undeination needee commissionf will also be vered.
al breadth. Treduction in tainst the desigpoints receiv
Universit
ering | Dece
ctural Enginel analyses alr
S #2 & TEC
esign of the aron the structubuilding. Onhanged. If th
gn
PO roofs withre to determill be added t
equired for thule impacts w
IS #3 & TE
atory spaces mechanical serstanding oed will be dening will be u determined.
This analysis the total heatgned loads, w
ved from imp
ty of Pittsbur
ember 9, 201
eering are reqready descri
CHNICAL A
rchitectural eure of the bui
nce the modee structural s
h a green rooine if it can suto the buildinhe roof of the will also be an
ECHNICAL
and the impsystems, whi
of the commisetermined, asunderstood. . Reasons wh
involves repting and coolwhile the coslementing a
rgh – ChevroRobert
1 | 16
quired to be ibed, the follo
ANALYSIS
eyebrow is ilding and wi
el is developesystem needs
of system. Thupport the loang’s existing r new Chevro
nalyzed.
ANALYSIS
lementation ich will be ssioning procs well as the Documentatihy this comm
placing the TPing loads wil
st savings assgreen roof w
on Annex t Mroskey
analyzed owing
#4
ill ed, it will s to be
his ad of the roof.
on Annex.
S #4
of LEED
cess will
ion and missioning
PO roofs ll be sociated
will also
APPEN
DIX C – SPPRING SE
Architec
EMESTER
ctural Enginee
PRELIMIN
Universit
ering | Dece
NARY TIM
ty of Pittsbur
ember 9, 201
METABLE
rgh – ChevroRobert
1 | 17
on Annex t Mroskey
SENIOR THESIS FINAL PROPOSAL12/9/11
UNIVERSITY OF PITTSBURGHCHEVRON ANNEX
ROBERT MROSKEYCONSTRUCTION
Milestone 1 Milestone 3
1/27/2012 3/2/2012
9-Jan-12 16-Jan-12 23-Jan-12 30-Jan-12 6-Feb-12 13-Feb-12 20-Feb-12 27-Feb-12 5-Mar-12 12-Mar-12 19-Mar-12 26-Mar-12 2-Apr-12 9-Apr-12 16-Apr-12 23-Apr-12
Analysis 1
1 Analysis 2
2 Analysis 3
3 Analysis 4
4
Chevron Project Team Interviews Complete
All Appropriate Research Complete
All Analyses in Evaluation Stages
All Analyses Complete & Ready for Formatting
Milestones
2/13/2012
Milestone 2
3/26/2012
Milestone 4
Research Tablet PC Uses
Develop Problems Solved by Tablet PC's
Perform Constructability & Schedule Analysis
Perform Final Analysis
Develop Final Schedule
Create a New Phasing Plan
Model the Building's Structure
Develop New Eyebrow Designs
Review/Study Actual Façade Phasing/Details
Research Commissioning Requirements
Commissioning Coordintation & LEED ReCertification Details
Develop a Training Program
Final Documentation & Commissioning Plan
Proposed Spring Semester Thesis Schedule
Fa
cult
y J
ury
Pre
sen
tati
ons
Fin
al
Rep
orts
Du
e
Spri
ng
Bre
ak
201
2
Assess Cost Savings
Develop Maintenance Requirements
Analyze Impacts to Systems & Structure
Research Green Roofs
Integration of Tablet PC's in the Field
Re-Design/Re-Sequence of the Façade
Commissioning of Laboratory Spaces
Addition of a Green Roof