ermel elementary interior renovation · 2013. 12. 27. · 5555 west loop south, suite 400...
TRANSCRIPT
5555 WEST LOOP SOUTH, SUITE 400ARCHI*TECHNICS/3, INC.
HOUSTON, TEXAS 77401PH-713-868-0088
ARCHITECT
10400 NORTH FREEWAY HOUSTON, TX. 77037
KEY MAP # 412D (CITY OF HOUSTON)
ERMEL ELEMENTARY INTERIOR RENOVATION
ISSUED FOR PERMIT & BIDDecember 27, 2013
Jose Palacios, Jr.MEMBERMEMBER
Merlin D. Griggs Sr.
Dr. Alton Smith
Steve Mead
Rick Ogden
SECRETARYASSISTANT SECRETARY
VICE-PRESIDENTPRESIDENT
Rose Avalos
Dr. Viola M. Garcia
MEMBER
SUPERINTENDENT OF SCHOOLSDr. Wanda Bamberg
DEPUTY SUPERINTENDENT OF SCHOOLSDr. Archie L. Blanson
STRUCTURAL /CIVILSTANLEY ENGINEERS
3301 EDLOE ST.HOUSTON , TX 77027
PH - 713-776-9433FX - 713-776-2439
M.E.P. ENGINEERSJ.S.E.
3100 S. GESSNER SUITE 320HOUSTON , TX 77063
PH - 713-789-7899FX - 713-789-7891
ADA CONSULTANTSOTTEN CONSULTANTS
2825 WILCREST DR.HOUSTON , TX 77042
PH - 713-975-1029 FX-713-468-2613
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\Revi t Local Files\11_ 26_2013_erme ll renovation_c mitchell.rvt
12/24/2 013 2:30:30 PM
PROJECT ISSUE DATE
13350
SHEET INDEX
A0.01
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
01DRAWING SHEET INDEX
ARCHITECTURAL SHEET INDEX
SHEET NO. SHEET NAME
A6.53 INTERIOR ELEVATIONS
A6.54 INTERIOR ELEVATIONS
A6.55 INTERIOR ELEVATIONS
A6.56 INTERIOR ELEVATIONS
G1.02 LIFE SAFETY PLAN AREA A
G1.03 LIFE SAFETY PLAN AREA B
G1.04 LIFE SAFETY PLAN AREA C
A0.00 COVER SHEET
A0.01 SHEET INDEX
A0.02 PROJECT INFORMATION, ABBREVIATIONS, SYMBOLS &LEGEND
G1.01 LIFE SAFETY PLAN
G1.05 TEXAS ACCESSIBILITY GUIDELINES
G1.06 TYPICAL MOUNTING HEIGHTS
D1.40 OVERALL DEMOLITION PLAN
D1.41 ENLARGED DEMOLITION PLAN -AREA A
D1.42 ENLARGED DEMOLITION PLAN - AREA B
D1.43 ENLARGED DEMOLITION PLAN - AREA C
D1.50 ENLARGED RESTROOM DEMOLITION PLANS
D1.60 OVERALL DEMOLITION RCP
D1.61 ENLARGED DEMOLITION RCP PLAN AREA A
D1.62 ENLARGED DEMOLITION RCP PLAN AREA B
D1.63 ENLARGED DEMOLITION RCP PLAN AREA C
A1.01 MASTER FLOOR PLAN
A1.40 ENLARGED PLANS - AREA A
A1.41 ENLARGED PLAN - AREA B
A1.42 ENLARGED PLAN - AREA C
A1.50 RENOVATED RESTROOM PLANS
A1.60 OVERALL REFLECTED CEILING PLAN
A1.61 ENLARGED REFLECTED CEILING PLAN - AREA A
A1.62 ENLARGED REFLECTED CEILING PLAN - AREA B
A1.63 ENLARGED REFLECTED CEILING PLAN - AREA C
A1.81 FINISH PLAN
A4.60 DETAILS
A5.00 ROOM FINISH SCHEDULE
A5.10 PARTITION TYPES
A5.20 DOOR SCHEDULE & DETAILS
A6.20 RENOVATED RESTROOM INTERIOR ELEVATIONS
A6.40 INTERIOR ELEVATIONS
A6.41 INTERIOR ELEVATIONS
A6.42 INTERIOR ELEVATIONS
A6.43 INTERIOR ELEVATIONS
A6.44 INTERIOR ELEVATIONS
A6.45 INTERIOR ELEVATIONS
A6.46 INTERIOR ELEVATIONS
A6.47 INTERIOR ELEVATIONS
A6.48 INTERIOR ELEVATIONS
A6.49 INTERIOR ELEVATIONS
A6.50 INTERIOR ELEVATIONS
A6.51 INTERIOR ELEVATIONS
A6.52 INTERIOR ELEVATIONS
A7.60 MILLWORK SECTIONS & DETAILS
A7.61 MILLWORK SECTION & DETAILS
MECHANICAL ELECTRICAL PLUMBING SHEET INDEX
SHEET NO. SHEET NAME
M1.1 MECHANICAL FLOOR PLAN AREA A
M1.2 MECHANICAL FLOOR PLAN AREA C
M.2.0 MECHANICAL DETAILS AND SCHEDULES
E1.1 LIGHTING FLOOR PLAN AREA A
E1.2 POWER FLOOR PLAN AREA A
E1.3 LIGHTING FLOOR PLAN AREA C
E1.4 POWER FLOOR PLAN AREA C
E2.0 ELECTRICAL SCHEMATIC
E2.1 ELECTRICAL SCHEDULES
E3.0 ELECTRICAL DETAILS
E3.1 ELECTRICAL DETAILS
P1.1 PLUMBING FLOOR AREA A & C
P2.0 PLUMBING SCHEDULES AND DETAILS
SECTION
GRADE/EARTH
CMU
BRICK
PRECAST CONCRETE
CAST/CUT STONE
NATURAL STONE
STEEL
ALUMINUM
BRASS/BRONZE
CONT. WOOD BLOCKING
GRAVEL
SAND
CONCRETE
DISCONT. WOOD SHIM
FINISHED WOOD
PLYWOOD
SPRAYED FIREPROOFING
BATT/BLANKET/ACOUS INSULATON
RIGID INSULATION
ROOF DECK INSULATION
EXTERIOR PLASTER & LATH
GYPSUM SHEATHING
GYPSUM WALLBOARD
BACKER ROD & SEALANT
ACOUS. CEILING
PLASITIC LAMINATE
CERAMIC/QUARRY TILE
JOINT FILLER
CARPET
GLASS/MIRROR
OR
ELEVATION
OR
NORTH ARROW
01/A-1.10
ENLARGE FLOOR PLAN REFERENCE
01
A-7.20
ENLARGE DETAIL REFERENCE
01
A-3.00
BUILDING SECTION
01
A-3.20
WALL SECTION
01
A-4.00
DETAIL SECTION
01
A-2.00 EXTERIOR ELEVATION
01
A-6.40 INTERIOR ELEVATION
03
0204
11 5/8"
5"
DIMENSIONS
MATCHLINE
1 REVISION NUMBER & AFFECTED AREA
EXISTING ELEVATION
WINDOW TYPE
LEVEL NAME
0' - 0"VERTICAL ELEVATION
EX: 152' - 6"
NEW ELEVATION152' - 6"
A3
1
PARTITIONDESIGNATION
HOURLY "FIRERESISTIVE RATING"
22
ROOM NAMEROOM NAME & NUMBERINDENTIFICATION
PARTITION TYPERE: PARTITION SHEETS A-5.10 & A-5.11
1001A DOOR/OPENING IDENTIFICATION
1001
EXIT SIGN w/ CHEVRON(DIRECTIONAL ARROWS)
FLUORESCENTLIGHT FIXTURE
INCANDESCENTLIGHT FIXTURE
SYMBOLS DESCRIPTION
01
A-2.00OR
01
A-4.00
OR
OR01
A-2.00
01/A-1.13
01/A-1.14
09111.A02 -METAL STUDFRAMING
SPECIFICATIONSECTION
DESCRIPTION
KEYNOTE
N
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\Revi t Local Files\11_ 26_2013_erme ll renovation_c mitchell.rvt
12/24/2 013 2:30:32 PM
PROJECT ISSUE DATE
13350
PROJECTINFORMATION,ABBREVIATIONS,SYMBOLS & LEGEND
A0.02
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
STAB STABILIZE(D)
SSTL STAINLESS STEEL
STD STANDARD
STA STATION
STL STEEL
STOR STORAGE
STRUCT STRUCTURE/STRUCTURAL
S/AD SUPPLY AIR DIFFUSER
SUSP SUSPENDED
SW SWITCH
SYN SYNTHETIC
TKBD TACKBOARD
TEL TELEPHONE
TTC TELEPHONE TERMINALCABINET
TV TELEVISION
TEMP TEMPERED
TRZO TERRAZZO
TCOC TEXTURE COATING ONCONCRETE
THK THICK(NESS)
THRES THRESHOLD
TOC TOP OF CURB
TOS TOP OF STEEL
TOSS TOP OF STRUCTURALSLAB
TRANS TRANSFORMER
T TREAD
TYP TYPICAL
UL UNDERWRITERSLABORATORY
UofC UNIVERSITY OFCALIFORNIA
UNO UNLESS NOTEDOTHERWISE
UR URINAL
VAC VACUUM
VERT VERTICAL
VEST VESTIBULE
VCT VINYL COMPOSITE TILE
VWC VINYL WALLCOVERING
WH WALL HUNG
WC WATER CLOSET
WR WATER RESISTENT
WP WATERPROOF(ING)
WWF WELD WIRE FABRIC
WF WIDE FLANGE
W WIDTH
WT WIEGHT
WDW WINDOW
W/ WITH
W/I WITHIN
W/O WITHOUT
WD WOOD
W.P. WORK POINT
WI WROGHT IRON
& AND
ANGLE
@ AT
CENTERLINE
[ CHANNEL
/ PER
PLATE
ROUND/DIAMETER
SQUARE
GR GRADE/GRADING
GD GUARD
GMP GUARENTEED MAXIMUMPRICE
GYP. GYPSUM
HDCP HANDICAPPED
HDW HARDWARE
HDWD HARDWOOD
HD HEAD
HVAC HEATING/VENTILATING/AIR CONDITIONING
H HEIGHT
HC HOLLOW CORE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSEPOWER
HB HOSE BIBB
HR HOUR
HYD HYDRANT
INCAND INCANDESCENT
IN INCH
INCL INCLUDE
INFO INFORMATION
ID INSIDE DIAMETER
IPS INSIDE PIPE SIZE
INSUL INSULATION/INSULATING
INT INTERIOR
JAN JANITOR
JT JOINT
JST JOIST
LAM LAMINTE(D)
LAV LAVATORY
LH LEFT HAND
LGTH LENGTH
LV LEVEL
LT LIGHT
LWT LIGHTWEIGHT
LWC LIGHTWEIGHTCONCRETE
LIN LINEAR
LL LIVE LOAD
MACH MACHINE
MAINT MAINTENANCE
MH MANHOLE
MFR MANUFACTURER
MAS MASONRY
MO MASONRY OPENING
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEP MECHANICAL,ELECTRICAL, PLUMBING
MEMB MEMBRANE
MTL METAL
ML METAL LATH
MIN MINIMUM
MISC MISCELLANEOUS
MR MOISTURE RESISTANT
MTD MOUNTED
MTG MOUNTING
MULL MULLION
NRC NOISE REDUCTIONCOEFFICIENT
NOM NOMINAL
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO. or # NUMBER
OFF OFFICE
OC ON CENTER(S)
OPNG OPENING
OP OPERABLE PARTITION
OPP OPPOSITE
OPH OPPOSITE HAND
O/A OUTSIDE AIR
OD OUTSIDE DIAMETER
OA OVERALL
ORD OVERFLOW ROOFDRAIN
OH OVERHEAD
OFCI OWNER FURNISHED,CONTRACTORINSTALLED
OFOI OWNER FURNISHED,OWNER INSTALLED
PTD PAINTED
PR PAIR
PNL PANEL
PRKG PARKING
PART PARTITION
PVMT PAVEMENT
PVG PAVING
PERF PERFORATED
PLAST PLASTER
PLAS PLASTIC
PLBG PLUMBING
PLWD PLYWOOD
POL POLISHED
PVC POLYVINYL CHLORIDE
PCT PORCELIAN CERMICTILE
PCP PORTLAND CEMENTPLASTER
PCF POUNDS PER CUBICFOOT/FEET
PSF POUNDS PER SQUAREFOOT/FEET
PSI POUNDS PER SQUAREINCH
P/C PRECAST
PFP PREFINISHED PANEL
P.L. PROPERTY LINE
QTY QUANTITY
QT QUARRY TILE
RAD RADIUS
RECEP RECEPTACLE
RECEPT RECEPTION
REC RECESSED
RECOM RECOMMENDATION
RE: REFER TO
RCP REFLECTED CEILINGPLAN
REG REGULATION
REINF REINFORCED
REBAR REINFORCING BAR
REQD REQUIRED
RES RESILENT
RET RETURN
R/A RETURN AIR
R/AG RETURN AIR GRILLE
REV REVISION
RH RIGHT HAND
ROW RIGHT OF WAY
R RISER
RD ROOF DRAIN
RFG ROOFING
RM ROOM
SCHED SCHEDULE
SECT SECTION
SHTHG SHEATHING
SHT SHEET
SHLV SHELVES/SHELVING
SIM SIMILAR
SC SOLID CORE
STC SOUND TRANSMISSIONCOEFFICIENT
SPEC SPECIFICATION
SQ SQUARE
SF SQUARE FOOT/FEET
AFF ABOVE FINISH FLOOR
AP ACCESS PANEL
ACOUS ACOUSTICAL
ADJ ADJACENT
ADJUST ADJUSTABLE
AGG AGGREGATE
A/C AIR CONDITIONING
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
AB ANCHOR BOLT
ANOD ANODIZED
APPROX APPROXIMATELY
ARCH ARCHITECT(URAL)
ASPH ASPHALT
ATN ATTENUATION /ATTENUATING
AV AUDIO VISUAL
AUTO AUTOMATIC
AUX AUXILIARY
AVE AVENUE
AVG AVERAGE
B-B BACK TO BACK
B&B BALLED ANDBURLAPPED
BSMT BASEMENT
BM BEAM
BRG BEARING
B.M. BENCH MARK
BTW BETWEEN
BLK BLOCK
BLKG BLOCKING
BD. BOARD
B/F BOTH FACES
BOT BOTTOM
BRKT BRACKET
BLDG BUILDING
BUR BUILT UP ROOF(ING)
CAB CABINET
C.O. CASED OPENING
CSMT CASEMENT
CIP CAST IN PLACE
CI PIPE CAST IRON PIPE
CB CATCH BASIN
CLG CEILING
CEM CEMENT
CTR CENTER
C-C CENTER TO CENTER
CT CERAMIC TILE
CKBD CHALKBOARD
CLR CLEAR(ANCE)
CCTV CLOSED CIRCUITTELEVISION
CL CLOSET
CFMF COLD FORMED METALFRAMING
COL COLUMN
COMP COMPOSITION
COMPRES COMPRESSIBLE
CONC CONCRETE
CMU CONCRETE MASONRYUNIT
COND CONDITION
CONF CONFERENCE
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CJ CONTROL JOINT
CG CORNER GUARD
CORR CORRIDOR
CORRU CORRUGATED
CNTR COUNTER
CTSK COUNTERSINK
CU FT CUBIC FOOT/FEET
CU YD CUBIC YARD
C CURB
DMPFG DAMPROOFING
DL DEAD LOAD
DEFL DEFLECTION
D DEPTH
DTL DETAIL
DIAG DIAGONAL
DIA DIAMETER
DIM DIMENSION
DISC DISCONNECT
DISP DISPENSER
DR DOOR
DBL DOUBLE
DN DOWN
DS DOWNSPOUT
DWG DRAWING
DF DRINKING FOUNTAIN
DWC DRYWALL FURRINGCHANNEL
EA EACH
EW EACH WAY
ESR ELASTIC SHEETROOFING
ELAS ELASTIC/ELASTOMERIC
EWC ELECTRIC WATERCOOLER
EWH ELECTRIC WATERHEATER
ELEC ELECTRICAL
EL ELEVATION
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXH EXHAUST
(E) / EXIST EXISTING
EXPAN EXPANSION
EJ EXPANSION JOINT
EP EXPLOSION PROOF
EXP EXPOSED
EXT EXTERIOR
EFOB EXTERIOR FACE OFBUILDING
FM FACTORY MUTUAL
FCU FAN COIL UNIT
FIN FINISH/FINISHED
FA FIRE ALARM
FC FIRE CODE
FEC FIRE EXTINGUISHERCABINET
FHC FIRE HOSE CABINET
FH FIRE HYDRANT
FVC FIRE VALVE CABINET
FRPF FIREPROOF
FIXT FIXTURE
FLSHG FLASHING
F.P.W. FLOOD PROTECTION
FLR FLOOR
FD FLOOR DRAIN
FLRG FLOORING
FL FLOW LINE
FLUOR FLUORESCENT
FSEC FOOD SERVICEEQUIPMENTCONTRACTOR
FT FOOT/FEET
FTG FOOTING
FS FULL SIZE
FURN FURNISH(ED)
FURR FURRED/FURRING
GA GAGE
GAL GALLON
GALV GALVANIZED
GI GALVANIZED IRON
GEN GENERAL
GC GENERALCONTRACTOR
GL GLASS/GLAZING
21N/AABBREVIATIONS N/AMATERIAL INDICATIONS 16 N/ASYMBOLS LEGEND 11
ABCEFGJKLMNRTU DHPSVW
1920
22
24
26
23
25
28
748.55 SF
CLASSROOM
127
673.18 SF
CLASSROOM
128
593.2 SF
CLASSROOM
131
619.74 SF
CLASSROOM
130
684.29 SF
CLASSROOM
126
657.42 SF
CLASSROOM
129
849.68 SF
CLASSROOM
121
809.76 SF
CLASSROOM
122
628.98 SF
CLASSROOM
132
597.91 SF
CLASSROOM
172
745.78 SF
CLASSROOM
124
787.82 SF
CLASSROOM
123
635.65 SF
CLASSROOM
137
667.03 SF
CLASSROOM
136
872.84 SF
CLASSROOM
117
829.78 SF
CLASSROOM
116
707.08 SF
CLASSROOM
119
830.25 SF
CLASSROOM
118
674.59 SF
CLASSROOM
135
590.11 SF
CLASSROOM
173
463.26 SF
COMMON AREA
120
466.91 SF
COMMON AREA
115
375.91 SF
COMMON AREA
125
EXITEXIT
EXITEXIT
EXITEXIT
SRFEC
SRFEC
SRFEC
SRFEC
SRFEC
SRFEC
EXIT
DIST
INDICATESEMERGENCYEXIT ROUTE
INDICATESPOINTOF LOCATION
INDICATESDIRECTIONOF EXIT TRAVEL
TRAVEL DISTANCETO AN EXIT NOT TOEXCEED 200 FEET
EXIT
SEMI - RECESSEDFIRE EXTINGUISHERCABINET (SRFEC)WITH CODE COMPLIANTFIRE EXTINGUISHER,REFERENCESPECIFICATIONSFOR MANUFACTURER
(SRFEC)
(FE)
ONE HOUR (1) RATEDWALLCONSTRUCTION
WALL MOUNTED FIRE EXTINGUISHER(FE) TYPE ABC, 10LB UNITS TO MEETCURRENT ANSI/UL STANDARDS 711REQUIREMENTS, REFERENCESPECIFICATIONS FORMANUFACTURE
WALL MOUNTED FIRE EXTINGUISHER TYPE K
(FE-K) 10# UNITS TO MEET CURRENT ANSI/
UL STANDARDS 711 REQUIREMENTS (NOT USED)(FE-K)
TWO HOUR (2) RATED WALLCONSTRUCTION (NOT USED)
Drawing Number
Project Number
Drawing Name
Project Name
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi
t Loca
l File
s\11_26_2013_erm
ell
renova
tion_c m
itchell.
rvt
12/2
4/2
013
2:5
3:0
7 P
M
As indicated
71
03
WO
OD
SM
AN
TR
AIL
, H
OU
ST
ON
, T
X 7
70
40
PROJECT ISSUE DATE
13350
LIFE SAFETY PLAN
AREA A
G1.02
ER
ME
L E
LE
ME
NT
AR
Y I
NT
ER
IOR
RE
NO
VA
TIO
N
Revision Issue
No. Description Date
1/8" = 1'-0"LIFE SAFETY AREA A 1
3/32" = 1'-0"LIFE SAFETY LEGEND
N
ABCEFGJKLMNRTU DHPSVW
67
8
10
11
12
14
15
17
9
13
16
DIST
INDICATESEMERGENCYEXIT ROUTE
INDICATESPOINTOF LOCATION
INDICATESDIRECTIONOF EXIT TRAVEL
TRAVEL DISTANCETO AN EXIT NOT TOEXCEED 200 FEET
EXIT
SEMI - RECESSEDFIRE EXTINGUISHERCABINET (SRFEC)WITH CODE COMPLIANTFIRE EXTINGUISHER,REFERENCESPECIFICATIONSFOR MANUFACTURER
(SRFEC)
(FE)
ONE HOUR (1) RATEDWALLCONSTRUCTION
WALL MOUNTED FIRE EXTINGUISHER(FE) TYPE ABC, 10LB UNITS TO MEETCURRENT ANSI/UL STANDARDS 711REQUIREMENTS, REFERENCESPECIFICATIONS FORMANUFACTURE
WALL MOUNTED FIRE EXTINGUISHER TYPE K(FE-K) 10# UNITS TO MEET CURRENT ANSI/
UL STANDARDS 711 REQUIREMENTS (NOT USED)(FE-K)
TWO HOUR (2) RATED WALLCONSTRUCTION (NOT USED)
Drawing Number
Project Number
Drawing Name
Project Name
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi
t Loca
l File
s\11_26_2013_erm
ell
renova
tion_c m
itchell.
rvt
12/2
4/2
013
2:5
3:0
9 P
M
As indicated
71
03
WO
OD
SM
AN
TR
AIL
, H
OU
ST
ON
, T
X 7
70
40
PROJECT ISSUE DATE
13350
LIFE SAFETY PLAN
AREA B
G1.03
ER
ME
L E
LE
ME
NT
AR
Y I
NT
ER
IOR
RE
NO
VA
TIO
N
Revision Issue
No. Description Date
1/8" = 1'-0"LIFE SAFETY AREA B 1
3/32" = 1'-0"LIFE SAFETY LEGEND
N
ABCEFGJKLMNRTU DHPSVW
1
2
3
45
EXITEXIT
EXITEXIT
EXIT EXIT
SRFEC
SRFEC
SRFEC
SRFEC
SRFEC
SRFEC
EXIT
876.54 SF
CLASSROOM
114
982.92 SF
CLASSROOM
113
694.97 SF
CLASSROOM
133
628.39 SF
CLASSROOM
169
679.26 SF
CLASSROOM
142
962.91 SF
CLASSROOM
112
937.73 SF
CLASSROOM
111
981.55 SF
CLASSROOM
109
979.63 SF
CLASSROOM
108
666.63 SF
CLASSROOM
141
628.69 SF
CLASSROOM
170
651.69 SF
CLASSROOM
140
691.65 SF
CLASSROOM
139
625.87 SF
CLASSROOM
171
690.41 SF
CLASSROOM
138
977.64 SF
CLASSROOM
102
906.8 SF
CLASSROOM
101
946.26 SF
CLASSROOM
104
979.99 SF
CLASSROOM
103
955.64 SF
CLASSROOM
107
894.69 SF
CLASSROOM
106
458 SF
COMMON AREA
110
1,201.9 SF
COMMON AREA
105
1,339.17 SF
COMMON AREA
100
DIST
INDICATESEMERGENCYEXIT ROUTE
INDICATESPOINTOF LOCATION
INDICATESDIRECTIONOF EXIT TRAVEL
TRAVEL DISTANCETO AN EXIT NOT TOEXCEED 200 FEET
EXIT
SEMI - RECESSEDFIRE EXTINGUISHERCABINET (SRFEC)WITH CODE COMPLIANTFIRE EXTINGUISHER,REFERENCESPECIFICATIONSFOR MANUFACTURER
(SRFEC)
(FE)
ONE HOUR (1) RATEDWALLCONSTRUCTION
WALL MOUNTED FIRE EXTINGUISHER(FE) TYPE ABC, 10LB UNITS TO MEETCURRENT ANSI/UL STANDARDS 711REQUIREMENTS, REFERENCESPECIFICATIONS FORMANUFACTURE
WALL MOUNTED FIRE EXTINGUISHER TYPE K
(FE-K) 10# UNITS TO MEET CURRENT ANSI/
UL STANDARDS 711 REQUIREMENTS (NOT USED)(FE-K)
TWO HOUR (2) RATED WALLCONSTRUCTION (NOT USED)
Drawing Number
Project Number
Drawing Name
Project Name
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\Revit Local Files\11_26_2013_erm
ell renovation_c m
itchell.rvt
12/24/2013 3:02:52 PM
As indicated
71
03
WO
OD
SM
AN
TR
AIL
, H
OU
ST
ON
, T
X 7
70
40
PROJECT ISSUE DATE
13350
LIFE SAFETY PLAN
AREA C
G1.04
ER
ME
L E
LE
ME
NT
AR
Y I
NT
ER
IOR
RE
NO
VA
TIO
N
Revision Issue
No. Description Date
1/8" = 1'-0"LIFE SAFETY AREA C 1
3/32" = 1'-0"LIFE SAFETY LEGEND
N
DOOR HARDWARE:DOORS SHALL HAVE LEAVER-OPERATED MECHANISMS, PUSH-TYPEMECHANISMS, OR U-SHAPED HANDLES.
HANDLES, PULLS, LATCHES, LOCKS, AND OTHER OPERATING DEVICES ONACCESSIBLE DOORS SHALL HAVE A SHAPE THAT IS EASY TO GRASPWITH ONE HAND AND DOES NOT REQUIRE TIGHT GRASPING, TIGHTPINCHING, OR TWISTING OF THE WRIST TO OPERATE.
SLIDING DOORS, IF ANY, WHEN FULLY OPEN SHALL HAVE OPERATINGHARDWARE EXPOSED AND USABLE FROM BOTH SIDES.
MOUNTING HEIGHT: HARDWARE REQUIRED FOR ACCESSIBLE DOORPASSAGE SHALL BE MOUNTED NO HIGHER THAN 48" ABOVEFINISHED FLOOR.
CLOSER OPERATION: THE SWEEP PERIOD OF A CLOSER SHALL BEADJUSTED SO THAT FROM AN OPEN POSITION OF 70 DEGREES, THEDOOR WILL TAKE AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROMTHE LATCH, MEASURED TO THE LEADING EDGE OF THE DOOR.
THE MAXIMUM FORCE FOR PUSHING OR PULLING OPEN A DOORSHALL BE AS FOLLOWS:
(a) EXTERIOR HINGED DOORS: NO REQUIREMENT.(b) INTERIOR HINGED DOORS: 5lbf(c) SLIDING OR FOLDING DOORS: 5lbf
EXCEPT THAT FIRE DOORS SHALL HAVE THE MANIMUM OPENINGFORCE ALLOWABLE BY THE APPROPRIATE ADMINISTRATIVEAUTHORITY.
THESE FORCES DO NOT APPLY TO THE FORCE REQUIRED TO RETRACT
LATCH BOLTS OR DISENGAGE OTHER DEVICES THAT MAY HOLDTHE DOOR IN A CLOSED POSITION.
AUTOMATIC DOORS, IF ANY,SHALL COMPLY WITH ANSI/BHMAA156.10-1985. SLOWLY OPENING, LOW-POWERED, AUTOMATICDOORS SHALL COMPLY WITH ANSI A156.19-1984. SUCH DOORSSHALL NOT OPEN TO BACK CHECK FASTER THAN 3 SECONDS AND SHALLREQUIRE NO MORE THAN 15lbf (66.6N) TO STOP DOOR MOVEMENT.IF USER - OPERATED CONTROLS ARE PROVIDED THEY SHALL COMPLYWITH TEXAS ACCESSIBILITY STANDARDS SECTION 4.27.
CONTROLS AND OPERATING MECHANISMS:
HEIGHT: SWITCHES, THERMOSTATS, CONTROLS, DISPENSERS,RECEPTACLES, AND THE HIGHEST OPERABLE PART OF OTHER OPERABLEEQUIPMENT SHALL BE PLACED NO HIGHER THAN 48" ABOVE THE FLOORAND WITHIN THE REACH RANGES REQUIRED BY THE TEXASACCESSIBILITY STANDARDS (TAS).RECEPTACLES OF ELECTRICAL AND COMMUNICATIONS SYSTEM ONWALLS SHALL BE MOUNTED NO LESS THAN 15" ABOVE THE FLOOREXCEPTION: THESE REQUIREMENTS DO NOT APPLY WHERE THEUSE OF SPECIAL EQUIPMENT DICTATES OTHERWISE OR WHEREELECTRICAL AND COMMUNICATIONS SYSTEMS RECEPTACLES ARE NOTNORMALLY INTENDED FOR USE BY BUILDING OCCUPANTS.
FLUSH CONTROLS SHALL BE HAND OPERATED OR AUTOMATIC. CONTROLSFOR FLUSH VALVES SHALL BE MOUNTED ON THE WIDE SIDE OF TOILETAREAS NO MORE THAN 44" ABOVE THE FLOOR.
OPERATION: CONTROLS AND OPERATING MECHANISMS SHALL BEOPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING,PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TOACTIVATE CONTROLS SHALL BE NO GREATER THAN 5lbf.
GRAB BARS, AND TUB AND SHOWER SEATS:
THE OUTSIDE DIAMETER OR WIDTH OF THE GRIPPING SURFACES OF AHANDRAIL OR GRAB BAR SHALL BE 1-1/4" TO 1-1/2", OR THE SHAPE SHALLPROVIDE AN EQUIVALENT GRIPPING SURFACE.
SPACE BETWEEN THE WALL AND THE GRAB BAR SHALL BE 1-1/2".IF HANDRAILS OR GRAB BARS ARE MOUNTED ADJACENT TO WALL, THE
BENDING STRESS IN A GRAB BAR OR SEAT INDUCED BY THE MAXIMUMBENDING MOMENT FROM THE APPLICATION OF 250 lbf SHALL BE LESSTHAN THE ALLOWABLE STRESS FOR THE MATERIAL OF THE GRAB BAR ORSEAT.
SHEAR STRESS INDUCED IN A GRAB BAR OR SEAT BY THE APPLICATIONOF 250 lbf SHALL BE LESS THAN THE ALLOWABLE SHEAR STRESS FORTHE MATERIAL OF THE GRAB BAR OR SEAT.
SHEAR FORCE INDUCED IN A FASTENER OR MOUNTING DEVICE FROMTHE APPLICATION OF 250 lbf SHALL BE LESS THAN THE ALLOWABLELATERAL LOAD OF EITHER THE FASTENER OR MOUNTING DEVICE OR THESUPPORTING STRUCTURE, WHICHEVER IS THE SMALLER ALLOWABLE LOAD.
TENSILE FORCE INDUCED IN A FASTNER BY A DIRECT TENSION FORCEOF 250 lbf PLUS THE MAXIMUM MOMENT FROM THE APPLICATION OF250 lbf SHALL BE LESS THAN THE ALLOWABLE WITHDRAWAL LOADBETWEEN THE FASTNER AND THE SUPPORTING STRUCTURE.
ROTATION OF GRAB BARS WITHIN THEIR FITTINGS IS NOT ACCEPTABLE.
SHARP OR ABRASIVE ELEMENTS ARE NOT ACCEPTABLE FOR A HANDRAILOR GRAB BAR OR ANY WALL OR OTHER SURFACE ADJACENT TO IT.EDGES SHALL HAVE A MINIMUM RADIUS OF 1/8".
SIGNAGE.
THE WIDTH -TO-HEIGHT RATIO OF LETTERS AND NUMBERS ON SIGNSSHALL HAVE A BETWEEN 3:5 AND 1:1 AND ASTROKE - WIDTH-TO-HEIGHT RATIO BETWEEN 1:5 AND 1:10 USING ANUPPER -CASE "X" FOR MEASUREMENT. LOWER CASE LETTERS AREPERMITTED.
OVERHEAD SIGN CHARACTERS AND NUMBERS SHALL BE SIZEDACCORDING TO THE VIEWING DISTANCE FROM WHICH THEY ARE TO BEREAD. FOR SUSPENDED OR PROJECTED OVERHEAD SIGNS, THEMINIMUM CHARACTER HEIGHT IS 3".
BRAILLED CHARACTERS AND PICTORIAL SYMBOL SIGNS(PICTOGRAMS) SHALL BE RAISED 1/32", UPPER CASE SANS SERIF ORSIMPLE SERIF TYPE AND SHALL BE ACCOMPAINIED WITH GRADE 2BRAILLE. RAISED CHARACTERS SHALL BE AT LEAST 5/8" HIGH, BUT NOHIGHER THAN 2". PICTOGRAMS SHALL BE ACCOMPANIED BY THEEQUIVALENT VERBAL DESCRIPTION PLACED DIRECTLY BELOW THEPICTOGRAM. THE BORDER DIMENSION OF THE PICTOGRAM SHALL BE6" MINIMUM IN HEIGHT.
FINISH: THE CHARACTERS AND BACKGROUND OF SIGNS SHALL BEEGGSHALL, MATTE, OR OTHER NON-GLARE FINISH. CHARACTERS ANDSYMBOLS SHALL CONTRAST WITH THEIR BACKGROUND.
PERMANENT IDENTIFICATION SIGNS PROVIDED FOR ROOMS ANDSPACES,SIGNS SHALL BE INSTALLED ON THE WALL ADJACENT TO THELATCH SIDE OF THE DOOR. WHERE THERE IS NO WALL SPACE TO THELATCH SIDE OF THE DOOR, INCLUDING AT DOUBLE LEAF DOORS, SIGNSSHALL BE PLACED ON THE NEAREST ADJACENT WALL. MOUNTINGHEIGHT SHALL BE 60" ABOVE THE FINISH FLOOR TO THE CENTERLINEOF THE SIGN.
MOUNTING LOCATION FOR SUCH SIGNAGE SHALL BE SO THAT A PERSONMAY APPROACH WITHIN 3" OF SIGNAGE WITHOUT ENCOUNTERINGPROTRUDING OBJECTS OR STANDING WITHIN THE SWING OF A DOOR.
TELEPHONES REQUIRED TO HAVE A VOLUME CONTROL BY4.1.3(17)(b) SHALL BE IDENTIFIED BY A SIGN CONTAINING ADEPICTION OF A TELEPHONE HANDSET WITH RADIATING SOUNDWAVES.
TEXT TELEPHONES SHALL BE IDENTIFIED BY THE INTERNATIONAL TDDSYMBOL, AND, IF A FACILITY HAS A PUBLIC TEXT TELEPHONE,DIRECTIONAL SIGNAGE INDICATING THE LOCATION OF THE NEAREST TEXTTELEPHONE SHALL BE PLACED ADJACENT TO ALL BANKS OF TELEPHONES.SUCH DIRECTIONAL SIGNAGE SHALL INCLUDE THE INTERNATIONAL TDDSYMBOL.
ACCESSIBLE PARKING SPACE SIGNS SHALL BE DESIGNATED ASRESERVED BY A VERTICALLY MOUNTED OR SUSPENDED SIGN SHOWINGTHE SYMBOL OF ACCESSIBILITY.
VAN ACCESSIBLE SPACES SHALL HAVE AN ADDITIONAL SIGNMOUNTED BELOW THE SYMBOL OF ACCESSIBILITY.
CHARACTERS AND SYMBOLS ON SUCH SIGNS SHALL BE LOCATED60" MINIMUM ABOVE THE GROUND, FLOOR, OR PAVING SURFACESO THEY CANNOT BE OBSCURED BY A VEHICLE PARKED IN THESPACE.
TO STANDARDS APPLICABLEAPPLY TO PROJECT. REFERINDICATED DO NOT DIRECTLYNOTE: ALL CONDITIONS
TO ACCESSIBILITYREQUIREMENTS.
HANDICAPPED ACCESSIBILTY DIMENSIONS/STANDARDS 1
LAVATORY CLEARANCES
BOTTOMMIRRORPART OFREFLECTIVE
TOE CLEARANCE
6" (150 mm) MAX.
17" (430 mm)
MIN. DEPTH
8" (205 mm)
CLEARANCEMIN. KNEE
29" (735 mm)
LAVATORY
MIN.
TOP OF
40"
(101
5 m
m)
34"
(865
mm
)
SPACE
48
" (1
22
0 m
m)
MIN
.
MIN.30" (760 mm)
MIN.9" (230 mm)
MA
X.
MA
X.
CLEAR
FLOOR
27" (685 mm)
MIN.
17"
(430
mm
)M
IN.
19" (485 mm)MAX.
CLEAR FLOOR SPACE AT WATER CLOSETS
48" (1220 mm) MIN.
66
" (1
67
5 m
m)
MIN
.
SPACE
FLOORCLEAR
LAVATORY
18" (455 mm)
MIN.
56
" (1
42
0 m
m)
MIN
.
48" (1220 mm) MIN.
SPACEFLOOR
CLEAR
18" (455 mm)
LAVATORY
MIN.
60" (1525 mm) MIN.
SPACEFLOOR
CLEAR
42" (1065 mm) MIN.
ELONGATED WALL-HUNG URINAL
44"
(112
0 m
m)
LEVEL PREFERRED
MAX. LOWER17" (430 mm)
OR FLOOR
MA
X.
SPACE
48"
(122
0 m
m)
29" (735 mm)CLEAR
SCREEN WALLS
NOT EXTENDOR SHIELDS DOSCREEN WALLS
FLOOR
CLEAR30 X 48"
BEYOND RIM
36" (915 mm) MIN.
6" MAX.
(840
- 9
15
mm
)
(840
- 9
15
mm
)
33
- 3
6"
ELEVATIONS
19" (485 mm) MIN.
33
- 3
6"
12" (305 mm) MAX.
42" (1065 mm) MIN.
36" (915 mm) MAX.18"
OTHER APPROACHES48" (1220 mm) MIN.
LATCH APPROACH42" (1065 mm) MIN.
12" (305 mm)
END-OF-ROW STALL
36"
(915
mm
)M
IN.
56
" (1
42
0 m
m)
MIN
.
FLOORCLEAR
SPACE
60" (1525 mm) MIN.
18" (455 mm)
STANDARD STALL
32" (815 mm)
MIN.
4" (100 mm)
18" (455 mm)
60" (1525 mm) MIN.
36" (915 mm)
59
" (1
50
0 m
m)
MIN
.
56
" (1
42
0 m
m)
MIN
.
FLO
OR
MO
UN
TE
D
WA
LL
MO
UN
TE
D
MAX,
MIN.
52
" (1
32
0 m
m)
MIN
.
6" (150 mm)
MAX.
MAX,
32" (815 mm)
48" (1220 mm) MIN.
42" (1065 mm) MIN.
ALTERNATE STALLS
alteration projects.
stalls are infeasible in
only where standard
Use alternate stalls
LATCH APPROACH
48" (1220 mm) MIN.
OTHER APPROACHES
32" (815 mm)MIN. MIN.
18" (455 mm)
MIN.
42
" (1
06
5 m
m)
MIN
.
36" (915 mm)
69
" (1
74
5 m
m)
MIN
.
WA
LL
MO
UN
TE
D6
6"
(167
5 m
m)
MIN
.
FLO
OR
MO
UN
TE
D
NOTE
18" (455 mm)
MIN.
16" (405 mm)MIN.
MIN
.36"
(915 m
m)
FOLDINGSEAT
MIN
.30"
(760 m
m)
MIN.
MIN.24" (610 mm)
36" (915 mm)
MIN
.
36 X 60 IN. ROLL-IN STALL
36"
(915 m
m)
27" (685 mm)MAX.
CONTROLAREA
33 -
36"
(840 -
915 m
m)
27" (685 mm)MAX.
MIN
.30"
(760 m
m)
MIN
.
NOTE
60" (1525 mm) MIN.
LAVATORY
30 X 60 IN. ROLL-IN STALL
In high vandalism areas, afixed head at 48 in. maximum
36"
(915 m
m)
27" (685 mm)MAX.
36"
(915 m
m)
18" (455 mm)
MIN
.36"
(915 m
m)
60" (1525 mm) MIN.
LAVATORY
30 X 60 IN. SHOWER STALL
NO CURB ALLOWED
AREACONTROL
hose spray.
33 - 36" (840 -915 mm)
48" (1220 mm) MAX.
38" (965 mm) MIN.
height may be used in lieu of
33 -
36"
(840 -
915 m
m)
18" (455 mm)
BACK WALL CONTROL WALL
36" (915 mm)
48" (1220 mm) MIN.
1/2 IN. CURB MAX.
17 -
19"
(430 -
485 m
m)
SEAT WALL
36 X 36 IN. SHOWER STALL
36 X 36 IN. SHOWER STALL ELEVATIONS 30 X 60 IN. SHOWER STALL ELEVATIONS
SCALE: N.T.S. SPECIAL ACCESSIBILITY REQUIREMENTS
SWINGING DOOR
FRONT APPROACH
MIN.
18"60"
MIN
.
24" PREFERRED
DRINKING - FOUNTAIN
2'-8"
CE
NT
ER
OF
SP
OU
T
LANDING REFER TO CIVILDRAWINGS FORCONSTRUCTIONREQUIREMENTS
EXTERIOR WALLCONSTRUCTION
1/2" MAX FOR THRESHOLDOR CHANGE IN ELEVATION
MINIMUM CLEAR FLOORSPACE, TYPICAL.
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi
t Loca
l File
s\11_26_2013_erm
ell
renova
tion_c m
itchell.
rvt
12/2
4/2
013
2:5
3:1
1 P
M
1/4" = 1'-0"
PROJECT ISSUE DATE
13350
TEXAS ACCESSIBILITY
GUIDELINES
G1.05
ER
ME
L E
LE
ME
NT
AR
Y
INT
ER
IOR
RE
NO
VA
TIO
N 7
10
3
WO
OD
SM
AN
TR
AIL
,
HO
US
TO
N,
TX
77
04
0
RE
:S
CH
ED
.
43"
36"
RE
:S
CH
ED
.
RE
:S
CH
ED
.
36"
18"
9"
18"
RE
:S
CH
ED
.
8"
9" 2
7"
MIN
.
EQ.EQ.
3'-0"
2'-0"
RE
:S
CH
ED
.
10"
RE
: S
CH
ED
.
RE
:S
CH
ED
.
20"
36" MAX.
RE
:S
CH
ED
.
RE
:S
CH
ED
.
RE
:S
CH
ED
2'-0"
5'-0"
14"
14"
18"
74"
TO
GLA
ZIN
G
RE
:S
CH
ED
.
48"
RE
:S
CH
ED
.
42"
RE
:S
CH
ED
.
42"
42"
36"42"
36"
78"
@ M
EN
S
34"
18"
14"
14"4
8"
44"
44"
15"
MIN
.34"
40"
TO
GLA
ZIN
G
2'-0"
3'-0"
24"
44"
48"
12"MIN.
EQUALLY SPACE ALL RECEPTACLES
9"
34"
6"36"
SEE PLANS
36"
46"
12"
42" S
EE
PLA
NS
46"
36"
SEE PLANS
SE
E P
LA
N
30"
32"
36"
MIN
.6
0"
MIN
.
44" MAX.
ALIG
NW
/T
.O.
T.P
.D.
20"
36" MAX.48" MAX.
ALIG
NW
/T
.O.
T.P
.D.
30" MIN.
4'-0"
CENTER SINGLE RECEPTACLE EQUALLY SPACE ALL RECEPTABLES
30" MINIMUM
EQUALLY SPACE ALL RECEPTACLES
2'-0"
ALIG
N W
HE
N IN
VA
CIN
ITY
6'-4"
30" MINIMUM
18"
36"
SEE PLANS
4'-6"
5'-10"
2'-8"
SE
E P
LA
NS
4'-6"
46"
36"
18"
36"
SE
E P
LA
NS
3'-8"
4'-1
1"
1'-7"
SEE PLANS
4'-6"
46"
36"
18"
36"S
EE
PLA
NS
1'-3"
6"
SEE PLANS
4'-6"
46"
36"
3'-9"
5'-4"
6'-0"
34"
5'-0"
PLAN
A
FRONT ELEVATION
B
SECTION
C
P U S H
ROOM101
30" x 48"
GRADES PRE
AGES 4-11
CLEAR FLOOR AREA: AT ALL FIXTURES
TURNING RADIUS:
MIN. SIDE APPROACH
MAX. SIDE APPROACH
MIN. FRONT APPROACH
MAX. FRONT APPROACH (PREFERRED)
SWITCHES, OUTLETS, CONTROLS, ETC.
DRINKING FOUNTAINS: MAX. A.F.F. TO SPOUT
FRONT APPROACH (OBSTRUCTED)
MAX. TO FAUCET FROM FRONT LIP
FRONT APPROACH (PREFERRED)
CONTROL & ACCESSORIES (A.F.F.)
MIRROR: MAX. A.F.F. TO REFLECT SURFACE
MAX. TO TOP OF BASIN
SIDE APPROACH:
MAX. TO FAUCET FROM FRONT LIP
MAX. TO TOP OF BASIN
MIN. KNEE CLEARANCE
FRONT APPROACH: (PREFERRED)
LAVATORIES:
GRAB BARS: MAX A.F.F. TO TOP OF
URINAL: MAX. A.F.F. TO TOP OF BASIN
WATER CLOSET: MAX. A.F.F. TOP OF SEAT
ITEM AND DISCRIPTION
30" x 48"
60"
48"
42"
42"
32"
15"
60"
54"
9"
48"
44"
36"
29"26"
16"
42"
34"
30"
18"
30"
48"
40"
34"
34"
14"
29"
14"-15"
16"
34"
17"-19"
ADULTS
GRADES
1
4
5
ACCESSIBLE SINGLE USER TOILETSACCESSIBLE SHOWER 17
STANDARD MOUNTING HEIGHTS
ACCESSIBLE MOUNTING HEIGHTS
P U S H
P U S H
WA
LL
WA
LL
WA
LL
WA
LL
WA
LL
WA
LL
WA
LL
P U S H
P U S H
36"
48"
60" 60"
48"
36"
60"
48"
36"
9"
15"
16"
20"
GENERAL & KEY NOTES
OPEN
STANDARD & ACCESSIBLE TOILET STALL
A
STANDARD STALL
ACCESSIBLE STALL
B
13
ACCESSIBLE MOUNTING HEIGHTS SCHEDULE
WA
LL
SINK WATER CLOSET URINAL ELECTRIC WATER COOLER ELECTRIC DRINKING FOUNTAIN PAPER TOWEL PAPER TOWEL DISPENSER SOAPGRAB BAR SANITARY NAPKIN TOILET PAPER DRESSING MIRROR SINK MIRROR COAT HOOK FIRE EXTIGUISHER CABINET
FRONT ELEVATION FRONT ELEVATION FRONT ELEVATION (EWC) (EDF) DISPENSER FRONT ELEVATION DISPENSERSEE PLANS FOR SIZE DISPOSAL DISPENSER (RECESSED &
SEMI-RECESSED)(SURFACE) (RECESSED/SEMI-RECESSED)
SINK WATER CLOSET URINAL ELECTRIC WATER COOLER ELECTRIC DRINKING FOUNTAIN PAPER TOWEL PAPER TOWEL DISPENSER SOAP SINK MIRROR
FRONT ELEVATION FRONT ELEVATION FRONT ELEVATION (EWC) (EDF) DISPENSER FRONT ELEVATION DISPENSER
(SURFACE) (RECESSED/SEMI-RECESSED)
CHILD CHANGING
STATION
SHOWER HEAD
69"
@ W
OM
EN
S
MOP HOLDER
GENERAL NOTES:
Refer to the tas accessibility guidelines sheet for all TDLR and TASrelated questions not shown on this sheet. Immediately bring to theattention of the Architect any discrepancies between the mounting heightsshown on this sheet and the guidelines prior to the commencement ofwork.
It is the responsibility of the General Contractor to ensure all tradescenter & align all items in each room and in the building as shown on this
sheet. It is the Architect's intent to have consistent placement of all itemsIn each room, and from room to room. The contractor must immediatelyreport to the Architect any situation in which these placement standardsare not feasible prior to commencement of work. No exceptionswill be allowed for TDLR accessible required items.
1. Scheduled TAS complaint grab bars. Refer to this sheet for mountinglocations and grab bar size.
2. Scheduled TAS complaint shower head. Re: MEP3. Scheduled TAS complaint shower control valve. Re: MEP4. Scheduled TAS complaint folding shower seat.5. Scheduled sink. Re: MEP6. Millwork shown for reference. Refer to plans, elevations, and casework
7. Scheduled light/thermostat control. Re: MEP.
8. Scheduled receptacle. Re: MEP for quantity and general location ofreceptacle.
9. Scheduled wall mounted light fixture. Re: MEP and architectural floorplans and elevations for actual location.
10. Scheduled emergency light strobe/exit sign. Re: MEP.11. Scheduled wall signage plaque. Refer to TAS guidelines and signage
schedule.
12. Provide flush valve on wide (away from wall) side.13. Provide scheduled thermal protection of pipes under all sinks and
lavatories. Re: MEP.14. Specified toilet partition. Refer to plans for actual size.15. Scheduled toilet paper dispenser. Refer this sheet for mounting heights16. Scheduled sanitary napkin disposal. Refer to this sheet for mounting
locations. Provide only at womens stalls for use by women 12 to adults.17. Scheduled soap dispenser. Refer to this sheet for mounting locations.18. Scheduled sink mirror. Refer to this sheet for mounting locations.19. Scheduled paper towel dispenser. Refer to this sheet for mounting
locations.20. Refer to plans for actual door location.21. Refer to plans for horizontal location of tv mounting bracket U.N.O.
NOTE:ALL HEIGHTS TO BE FRONT APPROACH UNLESS OTHERWISE NOTED
16
15
1
12
1
22
14
16
22
14
15
2
3
14 1
2
3
4 1
2
3
9 10
11
7
21
8
6
22. Scheduled water closet. Re: MEP. Refer to this sheet for mounting heights
schedule for actual location and sizes.
Refer to accessory and equipment schedules for all scheduled items.
A.
B.
C.
NOTE:REFER TO PLANS FOR GENERAL LOCATIONS OF ALL ITEMS
P U S H
WA
LL
WA
LL
SANITARY NAPKIN TOILET PAPER
DISPOSAL DISPENSER
3ELECTRICAL STANDARD MOUNTING HEIGHTS
9
30" x 48"
15"
60"
51"
9"
45"
44"
34"
28"
44"
36"
32"
32"
15"
31"
15"-17"
AGES 11-15
16"
20"
K-5or6 6-8 OR 9
SIDE APPROACH 48" 54"51"
44"42" 44"MAX. FRONT APPROACH (OBSTRUCTED)
NOTE:REFER TO PLANS FOR GENERAL LOCATIONS OF ALL ITEMS
13
SECTION
5
WA
LL
WA
LL
WA
LL
WA
LL
WA
LL
18"
44"
60"
80"
SECTION
18"
44"
60"
80"
TV MOUNT
KEYED NOTES:
20
20
20
22
22
22
15
15
15
16
16
16
1
1
1
12
12
12
17
19
19
19
5
5
5
18
18
18
17
23. Baby changing station. Re: Specs.
23
23
17
23
HAIR DRYER
HAIR DRYER
(WOMENS)
HAIR DRYER
(MENS)
ACCESSIBLE MOUNTING HEIGHTS SCHEDULE 6
OPEN
CHILD CHANGING
STATION
60"
48"
36"
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi
t Loca
l File
s\11_26_2013_erm
ell
renova
tion_c m
itchell.
rvt
12/2
4/2
013
2:5
3:1
4 P
M
3/8" = 1'-0"
PROJECT ISSUE DATE
13350
TYPICAL MOUNTING
HEIGHTS
G1.06
ER
ME
L E
LE
ME
NT
AR
Y
INT
ER
IOR
RE
NO
VA
TIO
N 7
10
3
WO
OD
SM
AN
TR
AIL
,
HO
US
TO
N,
TX
77
04
0
ABCEFGJKLMNRTU DHPSVW
1
2
3
4
5
6
7
8
10
11
12
14
15
17
9
13
16
19
20
22
24
26
23
25
28
3
D1.50
1
D1.42
1
D1.43
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
GD1. Visit the site to become familiar with the scope of work and to field verifyexisting conditions prior to bidding this project. Report any and alldiscrepancies or ambiguous items to the architect prior to bidding forclarification.GD2. Note that there are demolition notes on the Civil and MEP plans, as well. Provide allother demolition work required by construction sequencing and means and methods toinstall the new and remodeled work shown, whether such related and necessarydemolition work is specifically noted on these drawings or not.GD3. Coordinate demolition work with floor plans. Refer to sections and details forframe types and details at new openings in existing walls.GD4. Refer to Civil and MEP drawings for additional demolition and alteration notes.GD5. Prior to start of demolition, secure from the owner a list of additional existingbuilding components to be salvaged such that salvaged components aredelivered to the owner in their existing condition.GD6. The Owner has first rights of salvage of all fixtures, equipment and buildingmaterials removed as part of the demolition and not reused in the newconstruction. Remove all other debris and waste from the site and disposeof properly, in accordance with any applicable federal, state and localregulations.GD7. Refer to Index Sheet G.000 for typical graphic symbols and abbreviation index.GD8. Refer to demolition photographs for additional information and guidelines.Photographs are for reference ONLY unless otherwise noted. All photographsare included for Contractor's reference ONLY unless noted otherwise.The photographs are to be used in conjunction with all drawings, both planand elevations. Information presented on all drawings supercedes anyinformation noted on photographs. It is not the Architect's intent to presentthe entire scope of work or all built conditions by the use of photographs.It is the responsibility of the Contractor to verify the scope of work andALL build conditions in the field prior to start of work.
GD9. Refer to specifications Division 1 for further demolition standards and requirements.GD10. Prior to cutting or altering any opening in an existing wall, footing or roofdeck provide shoring, bracing and supports as required to maintain thestructural integrity of the building/structure.GD11. Prior to removing any existing bearing wall provide shoring, bracing andsupports required to maintain the structural integrity of the building/structure.GD12. Provide materials for cutting and patching which will result inequal-or-better work than what was removed. Surface to match existing,U.NO.GD13. Existing construction that is being removed shall be removed carefully so asnot to damage any existing construction that is to remain. All surfacessurrounding objects being removed are to be repaired and patched (in arectangular pattern) to match existing conditions and made ready to receiveany new finishes where applicable.GD14. Plumbing lines that are to be removed shall be removed completely or becapped as closed to point of entry in floor or wall as possible, if removalis not possible. Patch floors and walls to match existing conditions.GD15. Where existing flooring, ceilings or wall finishes are to be removed andreplaced with new finishes the surfaces to remain shall be stripped clean ofall existing finishes and made ready to receive new finishes.GD16. Floor finishes being replaced shall be completely removed, and the floorcleaned and properly prepared prior to installation of new finish material.Inspect all floors that receive new finishes to assess existing conditionsprior to commencement of construction. Patch, fill and strip floor asrequired, to provide a smooth, durable surface free of burrs and adhesiveand suitable for application of new finish material. Under cut doors asrequired to accommodate new floor finishes.
GD17. Where new concrete topping is being poured over existing concrete slab:bush hammer existing concrete finish for better bond.GD18. Where existing door openings are to be sealed: remove frame and patchwall with the same material and finish as the existing construction. New andexisting wall shall align.GD19. Where light fixtures are being removed or replaced, ceiling surfacesshall be cleaned, repaired and patched to match the adjacent surfaces priorto installation of new light fixtures.GD20. Where door frames are to remain, repair frame - fill hinge pocket and allholes in frame to create finished case opening. Clean, sand smooth andpaint frame to match existing door frames.GD21. Where wall mounted urinal and water closets are to be removed, removeflush valves and prepare surfaces to be sloped and to drain to existingfloor drain. Prep surfaces to receive new finish.GD22. Remove floor slab as required for new restroom fixtures. Patch andrepair slab to match existing.GD23. Contractor to patch and repair roof vents if damaged during demolition ofplumbing fixtures. Repair roof to comply with existing roofing mfg. wawrranty.GD24. Contractor to install new mechanical, electrical and plumbing equipment tocomply with existing roof mfg. installation , specifications and details to meetall warranty approval.Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi
t Loca
l File
s\11_26_2013_erm
ell
renova
tion_c m
itchell.
rvt
12/2
4/2
013 2
:51:3
5 P
M
As indicated
PROJECT ISSUE DATE
13350
OVERALL DEMOLITION
PLAN
D1.40
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/16" = 1'-0"OVERALL DEMOLITION PLAN 1
3" = 1'-0"PLAN LEGEND 12" = 1'-0"DEMOLITION GENERAL NOTES
N
ABCEFGJKLMNRTU DHPSVW
19
20
22
24
26
23
25
28
3
D1.50
1
D1.50
CLASSROOM
131
CLASSROOM
130
CLASSROOM
132
CLASSROOM
172
CLASSROOM
137
CLASSROOM
136
CLASSROOM
173CLASSROOM
135
5
D1.50
25
25
25
25
25
25
25
25
25 2525
212121
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
GD1. Visit the site to become familiar with the scope of work and to field verifyexisting conditions prior to bidding this project. Report any and alldiscrepancies or ambiguous items to the architect prior to bidding forclarification.GD2. Note that there are demolition notes on the Civil and MEP plans, as well. Provide allother demolition work required by construction sequencing and means and methods toinstall the new and remodeled work shown, whether such related and necessarydemolition work is specifically noted on these drawings or not.GD3. Coordinate demolition work with floor plans. Refer to sections and details forframe types and details at new openings in existing walls.GD4. Refer to Civil and MEP drawings for additional demolition and alteration notes.GD5. Prior to start of demolition, secure from the owner a list of additional existingbuilding components to be salvaged such that salvaged components aredelivered to the owner in their existing condition.GD6. The Owner has first rights of salvage of all fixtures, equipment and buildingmaterials removed as part of the demolition and not reused in the newconstruction. Remove all other debris and waste from the site and disposeof properly, in accordance with any applicable federal, state and localregulations.GD7. Refer to Index Sheet G.000 for typical graphic symbols and abbreviation index.GD8. Refer to demolition photographs for additional information and guidelines.Photographs are for reference ONLY unless otherwise noted. All photographsare included for Contractor's reference ONLY unless noted otherwise.The photographs are to be used in conjunction with all drawings, both planand elevations. Information presented on all drawings supercedes anyinformation noted on photographs. It is not the Architect's intent to presentthe entire scope of work or all built conditions by the use of photographs.It is the responsibility of the Contractor to verify the scope of work andALL build conditions in the field prior to start of work.
GD9. Refer to specifications Division 1 for further demolition standards and requirements.GD10. Prior to cutting or altering any opening in an existing wall, footing or roofdeck provide shoring, bracing and supports as required to maintain thestructural integrity of the building/structure.GD11. Prior to removing any existing bearing wall provide shoring, bracing andsupports required to maintain the structural integrity of the building/structure.GD12. Provide materials for cutting and patching which will result inequal-or-better work than what was removed. Surface to match existing,U.NO.GD13. Existing construction that is being removed shall be removed carefully so asnot to damage any existing construction that is to remain. All surfacessurrounding objects being removed are to be repaired and patched (in arectangular pattern) to match existing conditions and made ready to receiveany new finishes where applicable.GD14. Plumbing lines that are to be removed shall be removed completely or becapped as closed to point of entry in floor or wall as possible, if removalis not possible. Patch floors and walls to match existing conditions.GD15. Where existing flooring, ceilings or wall finishes are to be removed andreplaced with new finishes the surfaces to remain shall be stripped clean ofall existing finishes and made ready to receive new finishes.GD16. Floor finishes being replaced shall be completely removed, and the floorcleaned and properly prepared prior to installation of new finish material.Inspect all floors that receive new finishes to assess existing conditionsprior to commencement of construction. Patch, fill and strip floor asrequired, to provide a smooth, durable surface free of burrs and adhesiveand suitable for application of new finish material. Under cut doors asrequired to accommodate new floor finishes.
GD17. Where new concrete topping is being poured over existing concrete slab:bush hammer existing concrete finish for better bond.GD18. Where existing door openings are to be sealed: remove frame and patchwall with the same material and finish as the existing construction. New andexisting wall shall align.GD19. Where light fixtures are being removed or replaced, ceiling surfacesshall be cleaned, repaired and patched to match the adjacent surfaces priorto installation of new light fixtures.GD20. Where door frames are to remain, repair frame - fill hinge pocket and allholes in frame to create finished case opening. Clean, sand smooth andpaint frame to match existing door frames.GD21. Where wall mounted urinal and water closets are to be removed, removeflush valves and prepare surfaces to be sloped and to drain to existingfloor drain. Prep surfaces to receive new finish.GD22. Remove floor slab as required for new restroom fixtures. Patch andrepair slab to match existing.GD23. Contractor to patch and repair roof vents if damaged during demolition ofplumbing fixtures. Repair roof to comply with existing roofing mfg. wawrranty.GD24. Contractor to install new mechanical, electrical and plumbing equipment tocomply with existing roof mfg. installation , specifications and details to meetall warranty approval.Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi
t Loca
l File
s\11_26_2013_erm
ell
renova
tion_c m
itchell.
rvt
12/2
4/2
013 2
:51:3
7 P
M
As indicated
PROJECT ISSUE DATE
13350
ENLARGED DEMOLITION
PLAN -AREA A
D1.41
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/8" = 1'-0"DEMOLITION PLAN AREA A 1
3" = 1'-0"PLAN LEGEND
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
12" = 1'-0"DEMOLITION GENERAL NOTES NOTES TO DRAWING
N
ABCEFGJKLMNRTU DHPSVW
6
7
8
10
11
12
14
15
17
9
13
16
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi
t Loca
l File
s\11_26_2013_erm
ell
renova
tion_c m
itchell.
rvt
12/2
4/2
013 2
:51:3
8 P
M
As indicated
PROJECT ISSUE DATE
13350
ENLARGED DEMOLITION
PLAN - AREA B
D1.42
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/8" = 1'-0"DEMOLITION PLAN AREA B 1
3" = 1'-0"PLAN LEGEND
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
NOTES TO DRAWING
N
ABCEFGJKLMNRTU DHPSVW
1
2
3
4
5
4
D1.50 2
D1.50
6
D1.50
COMMON AREA
100
COMMON AREA
105
CORRIDOR
113
2525
25 25
25
25 25 25 25
CLASSROOM
133
CLASSROOM
142
CLASSROOM
169
CLASSROOM
141
CLASSROOM
140
CLASSROOM
139
CLASSROOM
138
25 2525
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi
t Loca
l File
s\11_26_2013_erm
ell
renova
tion_c m
itchell.
rvt
12/2
4/2
013 2
:51:3
9 P
M
As indicated
PROJECT ISSUE DATE
13350
ENLARGED DEMOLITION
PLAN - AREA C
D1.43
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/8" = 1'-0"DEMOLITION PLAN AREA C 1
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
3" = 1'-0"PLAN LEGENDNOTES TO DRAWING
N
BC
19
20
GIRLS RESTROOM
162
BOYS RESTROOM
161
202020 20 20 20 2121 21 21
20 2021 21 20 20 20
MNR P
4
5
GIRLS RESTROOM
144
BOYS RESTROOM
1432020 2121
202020
20 20 21 21 21 2120 20 20 20
J
19
20
GIRLS RESTROOM
159
BOYS RESTROOM
160
20 20 20 20 20 202121 21 21
21 212020
20 20 20
J
4
5
BOYS RESTROOM
149
GIRLS RESTROOM
148
20
21 21 21 21
2121
20
20
20
20
2020
20 20 20 20
MNR P
19
20
BOYS RESTROOM
174
GIRLS RESTROOM
175
202120202020
202120212021
2020
BC
4
5
BOYS RESTROOM
151
GIRLS RESTROOM
150
2020 21 21
20 20 20
20 20 20 20 212121 21
20 20
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi
t Loca
l File
s\11_26_2013_erm
ell
renova
tion_c m
itchell.
rvt
12/2
4/2
013 2
:51:4
2 P
M
1/4" = 1'-0"
PROJECT ISSUE DATE
13350
ENLARGED RESTROOM
DEMOLITION PLANS
D1.50
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/4" = 1'-0"DEMOLITION RR PLANS - AREA 1A 1
1/4" = 1'-0"DEMOLITION RR PLANS - AREA 1C 6
1/4" = 1'-0"DEMOLITION RR PLANS - AREA 2A 3
1/4" = 1'-0"DEMOLITION RR PLANS - AREA 2C 4
1/4" = 1'-0"DEMOLITION RR PLANS - AREA 3A 5
1/4" = 1'-0"DEMOLITION RR PLANS - AREA 3C 2
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
N N N
NNN
ABCEFGJKLMNRTU DHPSVW
1
2
3
4
5
6
7
8
10
11
12
14
15
17
9
13
16
19
20
22
24
26
23
25
28
Sim2
D1.62
Sim1
D1.61
Sim1
D1.63
3' -
6"
2' - 6"
3' - 2"
3' -
8"
3' -
6" 3' - 2"
2' - 11"
3' -
6"
19' -
5 5
/8"
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
GD1. Visit the site to become familiar with the scope of work and to field verifyexisting conditions prior to bidding this project. Report any and alldiscrepancies or ambiguous items to the architect prior to bidding forclarification.GD2. Note that there are demolition notes on the Civil and MEP plans, as well. Provide allother demolition work required by construction sequencing and means and methods toinstall the new and remodeled work shown, whether such related and necessarydemolition work is specifically noted on these drawings or not.GD3. Coordinate demolition work with floor plans. Refer to sections and details forframe types and details at new openings in existing walls.GD4. Refer to Civil and MEP drawings for additional demolition and alteration notes.GD5. Prior to start of demolition, secure from the owner a list of additional existingbuilding components to be salvaged such that salvaged components aredelivered to the owner in their existing condition.GD6. The Owner has first rights of salvage of all fixtures, equipment and buildingmaterials removed as part of the demolition and not reused in the newconstruction. Remove all other debris and waste from the site and disposeof properly, in accordance with any applicable federal, state and localregulations.GD7. Refer to Index Sheet G.000 for typical graphic symbols and abbreviation index.GD8. Refer to demolition photographs for additional information and guidelines.Photographs are for reference ONLY unless otherwise noted. All photographsare included for Contractor's reference ONLY unless noted otherwise.The photographs are to be used in conjunction with all drawings, both planand elevations. Information presented on all drawings supercedes anyinformation noted on photographs. It is not the Architect's intent to presentthe entire scope of work or all built conditions by the use of photographs.It is the responsibility of the Contractor to verify the scope of work andALL build conditions in the field prior to start of work.
GD9. Refer to specifications Division 1 for further demolition standards and requirements.GD10. Prior to cutting or altering any opening in an existing wall, footing or roofdeck provide shoring, bracing and supports as required to maintain thestructural integrity of the building/structure.GD11. Prior to removing any existing bearing wall provide shoring, bracing andsupports required to maintain the structural integrity of the building/structure.GD12. Provide materials for cutting and patching which will result inequal-or-better work than what was removed. Surface to match existing,U.NO.GD13. Existing construction that is being removed shall be removed carefully so asnot to damage any existing construction that is to remain. All surfacessurrounding objects being removed are to be repaired and patched (in arectangular pattern) to match existing conditions and made ready to receiveany new finishes where applicable.GD14. Plumbing lines that are to be removed shall be removed completely or becapped as closed to point of entry in floor or wall as possible, if removalis not possible. Patch floors and walls to match existing conditions.GD15. Where existing flooring, ceilings or wall finishes are to be removed andreplaced with new finishes the surfaces to remain shall be stripped clean ofall existing finishes and made ready to receive new finishes.GD16. Floor finishes being replaced shall be completely removed, and the floorcleaned and properly prepared prior to installation of new finish material.Inspect all floors that receive new finishes to assess existing conditionsprior to commencement of construction. Patch, fill and strip floor asrequired, to provide a smooth, durable surface free of burrs and adhesiveand suitable for application of new finish material. Under cut doors asrequired to accommodate new floor finishes.
GD17. Where new concrete topping is being poured over existing concrete slab:bush hammer existing concrete finish for better bond.GD18. Where existing door openings are to be sealed: remove frame and patchwall with the same material and finish as the existing construction. New andexisting wall shall align.GD19. Where light fixtures are being removed or replaced, ceiling surfacesshall be cleaned, repaired and patched to match the adjacent surfaces priorto installation of new light fixtures.GD20. Where door frames are to remain, repair frame - fill hinge pocket and allholes in frame to create finished case opening. Clean, sand smooth andpaint frame to match existing door frames.GD21. Where wall mounted urinal and water closets are to be removed, removeflush valves and prepare surfaces to be sloped and to drain to existingfloor drain. Prep surfaces to receive new finish.GD22. Remove floor slab as required for new restroom fixtures. Patch andrepair slab to match existing.GD23. Contractor to patch and repair roof vents if damaged during demolition ofplumbing fixtures. Repair roof to comply with existing roofing mfg. wawrranty.GD24. Contractor to install new mechanical, electrical and plumbing equipment tocomply with existing roof mfg. installation , specifications and details to meetall warranty approval.Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi
t Loca
l File
s\11_26_2013_erm
ell
renova
tion_c m
itchell.
rvt
12/2
4/2
013 2
:51:4
5 P
M
As indicated
PROJECT ISSUE DATE
13350
OVERALL DEMOLITION
RCP
D1.60
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/16" = 1'-0"REFLECTED CEILING PLAN - LEVEL 1 1
3" = 1'-0"PLAN LEGEND 12" = 1'-0"DEMOLITION GENERAL NOTES
N
ABCEFGJKLMNRTU DHPSVW
19
20
22
24
26
23
25
28
22
2323
2222
22 22222222
2222
22
2323 2323
2222
2222
36
36
2222
2222
36
2222
2222
22
2222
2222
2222
2222
2222
2222
2222
2222
3636
36
3636
3636
36
36
2222
2222
2222
2323
2222
2222
2222
2323
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
GD1. Visit the site to become familiar with the scope of work and to field verifyexisting conditions prior to bidding this project. Report any and alldiscrepancies or ambiguous items to the architect prior to bidding forclarification.GD2. Note that there are demolition notes on the Civil and MEP plans, as well. Provide allother demolition work required by construction sequencing and means and methods toinstall the new and remodeled work shown, whether such related and necessarydemolition work is specifically noted on these drawings or not.GD3. Coordinate demolition work with floor plans. Refer to sections and details forframe types and details at new openings in existing walls.GD4. Refer to Civil and MEP drawings for additional demolition and alteration notes.GD5. Prior to start of demolition, secure from the owner a list of additional existingbuilding components to be salvaged such that salvaged components aredelivered to the owner in their existing condition.GD6. The Owner has first rights of salvage of all fixtures, equipment and buildingmaterials removed as part of the demolition and not reused in the newconstruction. Remove all other debris and waste from the site and disposeof properly, in accordance with any applicable federal, state and localregulations.GD7. Refer to Index Sheet G.000 for typical graphic symbols and abbreviation index.GD8. Refer to demolition photographs for additional information and guidelines.Photographs are for reference ONLY unless otherwise noted. All photographsare included for Contractor's reference ONLY unless noted otherwise.The photographs are to be used in conjunction with all drawings, both planand elevations. Information presented on all drawings supercedes anyinformation noted on photographs. It is not the Architect's intent to presentthe entire scope of work or all built conditions by the use of photographs.It is the responsibility of the Contractor to verify the scope of work andALL build conditions in the field prior to start of work.
GD9. Refer to specifications Division 1 for further demolition standards and requirements.GD10. Prior to cutting or altering any opening in an existing wall, footing or roofdeck provide shoring, bracing and supports as required to maintain thestructural integrity of the building/structure.GD11. Prior to removing any existing bearing wall provide shoring, bracing andsupports required to maintain the structural integrity of the building/structure.GD12. Provide materials for cutting and patching which will result inequal-or-better work than what was removed. Surface to match existing,U.NO.GD13. Existing construction that is being removed shall be removed carefully so asnot to damage any existing construction that is to remain. All surfacessurrounding objects being removed are to be repaired and patched (in arectangular pattern) to match existing conditions and made ready to receiveany new finishes where applicable.GD14. Plumbing lines that are to be removed shall be removed completely or becapped as closed to point of entry in floor or wall as possible, if removalis not possible. Patch floors and walls to match existing conditions.GD15. Where existing flooring, ceilings or wall finishes are to be removed andreplaced with new finishes the surfaces to remain shall be stripped clean ofall existing finishes and made ready to receive new finishes.GD16. Floor finishes being replaced shall be completely removed, and the floorcleaned and properly prepared prior to installation of new finish material.Inspect all floors that receive new finishes to assess existing conditionsprior to commencement of construction. Patch, fill and strip floor asrequired, to provide a smooth, durable surface free of burrs and adhesiveand suitable for application of new finish material. Under cut doors asrequired to accommodate new floor finishes.
GD17. Where new concrete topping is being poured over existing concrete slab:bush hammer existing concrete finish for better bond.GD18. Where existing door openings are to be sealed: remove frame and patchwall with the same material and finish as the existing construction. New andexisting wall shall align.GD19. Where light fixtures are being removed or replaced, ceiling surfacesshall be cleaned, repaired and patched to match the adjacent surfaces priorto installation of new light fixtures.GD20. Where door frames are to remain, repair frame - fill hinge pocket and allholes in frame to create finished case opening. Clean, sand smooth andpaint frame to match existing door frames.GD21. Where wall mounted urinal and water closets are to be removed, removeflush valves and prepare surfaces to be sloped and to drain to existingfloor drain. Prep surfaces to receive new finish.GD22. Remove floor slab as required for new restroom fixtures. Patch andrepair slab to match existing.GD23. Contractor to patch and repair roof vents if damaged during demolition ofplumbing fixtures. Repair roof to comply with existing roofing mfg. wawrranty.GD24. Contractor to install new mechanical, electrical and plumbing equipment tocomply with existing roof mfg. installation , specifications and details to meetall warranty approval.Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi
t Loca
l File
s\11_26_2013_erm
ell
renova
tion_c m
itchell.
rvt
12/2
4/2
013 2
:51:4
7 P
M
As indicated
PROJECT ISSUE DATE
13350
ENLARGED DEMOLITION
RCP PLAN AREA A
D1.61
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/8" = 1'-0"DEMOLITION RCP PLAN AREA A 1
3" = 1'-0"PLAN LEGEND
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
12" = 1'-0"DEMOLITION GENERAL NOTES NOTES TO DRAWING
N
ABCEFGJKLMNRTU DHPSVW
6
7
8
10
11
12
14
15
17
9
13
16
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
GD1. Visit the site to become familiar with the scope of work and to field verifyexisting conditions prior to bidding this project. Report any and alldiscrepancies or ambiguous items to the architect prior to bidding forclarification.GD2. Note that there are demolition notes on the Civil and MEP plans, as well. Provide allother demolition work required by construction sequencing and means and methods toinstall the new and remodeled work shown, whether such related and necessarydemolition work is specifically noted on these drawings or not.GD3. Coordinate demolition work with floor plans. Refer to sections and details forframe types and details at new openings in existing walls.GD4. Refer to Civil and MEP drawings for additional demolition and alteration notes.GD5. Prior to start of demolition, secure from the owner a list of additional existingbuilding components to be salvaged such that salvaged components aredelivered to the owner in their existing condition.GD6. The Owner has first rights of salvage of all fixtures, equipment and buildingmaterials removed as part of the demolition and not reused in the newconstruction. Remove all other debris and waste from the site and disposeof properly, in accordance with any applicable federal, state and localregulations.GD7. Refer to Index Sheet G.000 for typical graphic symbols and abbreviation index.GD8. Refer to demolition photographs for additional information and guidelines.Photographs are for reference ONLY unless otherwise noted. All photographsare included for Contractor's reference ONLY unless noted otherwise.The photographs are to be used in conjunction with all drawings, both planand elevations. Information presented on all drawings supercedes anyinformation noted on photographs. It is not the Architect's intent to presentthe entire scope of work or all built conditions by the use of photographs.It is the responsibility of the Contractor to verify the scope of work andALL build conditions in the field prior to start of work.
GD9. Refer to specifications Division 1 for further demolition standards and requirements.GD10. Prior to cutting or altering any opening in an existing wall, footing or roofdeck provide shoring, bracing and supports as required to maintain thestructural integrity of the building/structure.GD11. Prior to removing any existing bearing wall provide shoring, bracing andsupports required to maintain the structural integrity of the building/structure.GD12. Provide materials for cutting and patching which will result inequal-or-better work than what was removed. Surface to match existing,U.NO.GD13. Existing construction that is being removed shall be removed carefully so asnot to damage any existing construction that is to remain. All surfacessurrounding objects being removed are to be repaired and patched (in arectangular pattern) to match existing conditions and made ready to receiveany new finishes where applicable.GD14. Plumbing lines that are to be removed shall be removed completely or becapped as closed to point of entry in floor or wall as possible, if removalis not possible. Patch floors and walls to match existing conditions.GD15. Where existing flooring, ceilings or wall finishes are to be removed andreplaced with new finishes the surfaces to remain shall be stripped clean ofall existing finishes and made ready to receive new finishes.GD16. Floor finishes being replaced shall be completely removed, and the floorcleaned and properly prepared prior to installation of new finish material.Inspect all floors that receive new finishes to assess existing conditionsprior to commencement of construction. Patch, fill and strip floor asrequired, to provide a smooth, durable surface free of burrs and adhesiveand suitable for application of new finish material. Under cut doors asrequired to accommodate new floor finishes.
GD17. Where new concrete topping is being poured over existing concrete slab:bush hammer existing concrete finish for better bond.GD18. Where existing door openings are to be sealed: remove frame and patchwall with the same material and finish as the existing construction. New andexisting wall shall align.GD19. Where light fixtures are being removed or replaced, ceiling surfacesshall be cleaned, repaired and patched to match the adjacent surfaces priorto installation of new light fixtures.GD20. Where door frames are to remain, repair frame - fill hinge pocket and allholes in frame to create finished case opening. Clean, sand smooth andpaint frame to match existing door frames.GD21. Where wall mounted urinal and water closets are to be removed, removeflush valves and prepare surfaces to be sloped and to drain to existingfloor drain. Prep surfaces to receive new finish.GD22. Remove floor slab as required for new restroom fixtures. Patch andrepair slab to match existing.GD23. Contractor to patch and repair roof vents if damaged during demolition ofplumbing fixtures. Repair roof to comply with existing roofing mfg. wawrranty.GD24. Contractor to install new mechanical, electrical and plumbing equipment tocomply with existing roof mfg. installation , specifications and details to meetall warranty approval.Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi
t Loca
l File
s\11_26_2013_erm
ell
renova
tion_c m
itchell.
rvt
12/2
4/2
013 2
:51:4
9 P
M
As indicated
PROJECT ISSUE DATE
13350
ENLARGED DEMOLITION
RCP PLAN AREA B
D1.62
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/8" = 1'-0"DEMOLITION RCP PLAN AREA B 2
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
3" = 1'-0"PLAN LEGEND 12" = 1'-0"DEMOLITION GENERAL NOTES NOTES TO DRAWING
N
ABCEFGJKLMNRTU DHPSVW
1
2
3
4
5
2222 2222
2222
2222 222222
222222222222
2222 2222
22
22
2222
2222
2222
2323
2222
2222
23
23
2222
2222
2222
23
23
22
22
22
22 2222
2222
2222
2222
2222
2222
2222
2222
2222
2222
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
GD1. Visit the site to become familiar with the scope of work and to field verifyexisting conditions prior to bidding this project. Report any and alldiscrepancies or ambiguous items to the architect prior to bidding forclarification.GD2. Note that there are demolition notes on the Civil and MEP plans, as well. Provide allother demolition work required by construction sequencing and means and methods toinstall the new and remodeled work shown, whether such related and necessarydemolition work is specifically noted on these drawings or not.GD3. Coordinate demolition work with floor plans. Refer to sections and details forframe types and details at new openings in existing walls.GD4. Refer to Civil and MEP drawings for additional demolition and alteration notes.GD5. Prior to start of demolition, secure from the owner a list of additional existingbuilding components to be salvaged such that salvaged components aredelivered to the owner in their existing condition.GD6. The Owner has first rights of salvage of all fixtures, equipment and buildingmaterials removed as part of the demolition and not reused in the newconstruction. Remove all other debris and waste from the site and disposeof properly, in accordance with any applicable federal, state and localregulations.GD7. Refer to Index Sheet G.000 for typical graphic symbols and abbreviation index.GD8. Refer to demolition photographs for additional information and guidelines.Photographs are for reference ONLY unless otherwise noted. All photographsare included for Contractor's reference ONLY unless noted otherwise.The photographs are to be used in conjunction with all drawings, both planand elevations. Information presented on all drawings supercedes anyinformation noted on photographs. It is not the Architect's intent to presentthe entire scope of work or all built conditions by the use of photographs.It is the responsibility of the Contractor to verify the scope of work andALL build conditions in the field prior to start of work.
GD9. Refer to specifications Division 1 for further demolition standards and requirements.GD10. Prior to cutting or altering any opening in an existing wall, footing or roofdeck provide shoring, bracing and supports as required to maintain thestructural integrity of the building/structure.GD11. Prior to removing any existing bearing wall provide shoring, bracing andsupports required to maintain the structural integrity of the building/structure.GD12. Provide materials for cutting and patching which will result inequal-or-better work than what was removed. Surface to match existing,U.NO.GD13. Existing construction that is being removed shall be removed carefully so asnot to damage any existing construction that is to remain. All surfacessurrounding objects being removed are to be repaired and patched (in arectangular pattern) to match existing conditions and made ready to receiveany new finishes where applicable.GD14. Plumbing lines that are to be removed shall be removed completely or becapped as closed to point of entry in floor or wall as possible, if removalis not possible. Patch floors and walls to match existing conditions.GD15. Where existing flooring, ceilings or wall finishes are to be removed andreplaced with new finishes the surfaces to remain shall be stripped clean ofall existing finishes and made ready to receive new finishes.GD16. Floor finishes being replaced shall be completely removed, and the floorcleaned and properly prepared prior to installation of new finish material.Inspect all floors that receive new finishes to assess existing conditionsprior to commencement of construction. Patch, fill and strip floor asrequired, to provide a smooth, durable surface free of burrs and adhesiveand suitable for application of new finish material. Under cut doors asrequired to accommodate new floor finishes.
GD17. Where new concrete topping is being poured over existing concrete slab:bush hammer existing concrete finish for better bond.GD18. Where existing door openings are to be sealed: remove frame and patchwall with the same material and finish as the existing construction. New andexisting wall shall align.GD19. Where light fixtures are being removed or replaced, ceiling surfacesshall be cleaned, repaired and patched to match the adjacent surfaces priorto installation of new light fixtures.GD20. Where door frames are to remain, repair frame - fill hinge pocket and allholes in frame to create finished case opening. Clean, sand smooth andpaint frame to match existing door frames.GD21. Where wall mounted urinal and water closets are to be removed, removeflush valves and prepare surfaces to be sloped and to drain to existingfloor drain. Prep surfaces to receive new finish.GD22. Remove floor slab as required for new restroom fixtures. Patch andrepair slab to match existing.GD23. Contractor to patch and repair roof vents if damaged during demolition ofplumbing fixtures. Repair roof to comply with existing roofing mfg. wawrranty.GD24. Contractor to install new mechanical, electrical and plumbing equipment tocomply with existing roof mfg. installation , specifications and details to meetall warranty approval.Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi
t Loca
l File
s\11_26_2013_erm
ell
renova
tion_c m
itchell.
rvt
12/2
4/2
013 2
:51:5
1 P
M
As indicated
PROJECT ISSUE DATE
13350
ENLARGED DEMOLITION
RCP PLAN AREA C
D1.63
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/8" = 1'-0"DEMOLITION RCP PLAN AREA C 1
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
3" = 1'-0"PLAN LEGENDNOTES TO DRAWING 12" = 1'-0"DEMOLITION GENERAL NOTES
N
A
A
B
B
C
C
E
E
F
F
G
G
J
J
K
K
L
L
M
M
N
N
R
R
T
T
U
U
D
D
H
H
P
P
S
S
V
V
W
W
1
2
3
4
5
6
7
8
10
11
12
14
15
17
9
13
16
19
20
22
24
26
23
25
1
A1.40
1
A1.41
1
A1.42
28
619.74 SF
CLASSROOM
130
593.2 SF
CLASSROOM
131
628.98 SF
CLASSROOM
132
635.65 SF
CLASSROOM
137
673.18 SF
CLASSROOM
128
809.76 SF
CLASSROOM
122
849.68 SF
CLASSROOM
121
657.42 SF
CLASSROOM
129
684.29 SF
CLASSROOM
126
748.55 SF
CLASSROOM
127
667.03 SF
CLASSROOM
136
674.59 SF
CLASSROOM
135
830.25 SF
CLASSROOM
118
872.84 SF
CLASSROOM
117
829.78 SF
CLASSROOM
116
707.08 SF
CLASSROOM
119745.78 SF
CLASSROOM
124
982.92 SF
CLASSROOM
113
962.91 SF
CLASSROOM
112
937.73 SF
CLASSROOM
111
981.55 SF
CLASSROOM
109
979.63 SF
CLASSROOM
108
666.63 SF
CLASSROOM
141
679.26 SF
CLASSROOM
142
694.97 SF
CLASSROOM
133
651.69 SF
CLASSROOM
140
955.64 SF
CLASSROOM
107
946.26 SF
CLASSROOM
104
906.8 SF
CLASSROOM
101
977.64 SF
CLASSROOM
102
690.41 SF
CLASSROOM
138
691.65 SF
CLASSROOM
139
GIRLS RESTROOM
148
BOYS RESTROOM
149
BOYS RESTROOM
151
GIRLS RESTROOM
150
894.69 SF
CLASSROOM
106
979.99 SF
CLASSROOM
103
876.54 SF
CLASSROOM
114
GIRLS RESTROOM
159
BOYS RESTROOM
160
BOYS RESTROOM
161
GIRLS RESTROOM
162
CLASSROOM
123
628.39 SF
CLASSROOM
169
628.69 SF
CLASSROOM
170
625.87 SF
CLASSROOM
171
597.91 SF
CLASSROOM
172590.11 SF
CLASSROOM
173
8' - 0" 8' - 0"
8' - 0" 6' - 0"
8' - 0"
4' - 0"
5' - 0"
5' - 0"
BOYS RESTROOM
143
GIRLS RESTROOM
144
BOYS RESTROOM
174
GIRLS RESTROOM
175
COMMON AREA
105
COMMON AREA
100
COMMON AREA
115COMMON AREA
120
COMMON AREA
125
COMMON AREA
110
FP1. Refer to index sheet A0.02 for typical graphical symbols and abbreviation index.FP2. Refer to sheet G.030 for accessibility guidelines.FP3. All horizontal dimensions are provided on plans, and all vertical dimensionsare provided on elevations and/or sections unless otherwise noted.FP4. Overall plan indicates exterior building dimensions, room numbers and names,door designations, window designations, exterior elevations designations,exterior plan designations, sign designations, and building sectiondesignations. All other plan information is indicated on referenced enlargedplans.FP5. Enlarged plans indicate interior building dimensions to face of partition material,interior plan detail designations, interior elevation designations, partition typedesignations, finish designations, and general building material.FP6. All dimensions are to be tied to a column line. Contractor will immediately reportany omission of dimensions not tied to a column line to the Architectprior to start of construction.FP7. Refer to sheet A1.01 for partition types, sheet A1.81 & A5.00 for finishschedule, sheet A5.20 door and hardware schedule.FP8. Coordinate all MEP access panels not shown on architectural constructiondocuments with Architect prior to installation.FP9. Provide adequate blocking as required at every location where millwork, plumbingfixtures, etc., are to be mounted.FP10. There are items shown, i.e. outlets, switches, thermostats, on the MEPdrawings that are not drawn on the architectural plans. Contractor tocoordinate and mount all MEP items per Architectural dimensions unlessnoted otherwise.FP11. All wood blocking to be Fire ResistantDrawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\Revi t Local Files\11_ 26_2013_erme ll renovation_c mitchell.rvt
12/24/2 013 2:30:35 PM
As indicated
PROJECT ISSUE DATE
13350
MASTER FLOOR PLAN
A1.01
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/16" = 1'-0"MASTER FLOOR PLAN 1 12" = 1'-0"FLOOR PLAN GENERAL NOTES
N
ABCEFGJKLMNRTU DHPSVW
17
16
19
20
22
24
26
23
25
28
674.59 SF
CLASSROOM
135
830.25 SF
CLASSROOM
118
707.08 SF
CLASSROOM
119
GIRLS RESTROOM
162
BOYS RESTROOM
161
745.78 SF
CLASSROOM
124
829.78 SF
CLASSROOM
116
872.84 SF
CLASSROOM
117
787.82 SF
CLASSROOM
123
849.68 SF
CLASSROOM
121
809.76 SF
CLASSROOM
122
628.98 SF
CLASSROOM
132635.65 SF
CLASSROOM
137
667.03 SF
CLASSROOM
136
593.2 SF
CLASSROOM
131
673.18 SF
CLASSROOM
128
657.42 SF
CLASSROOM
129684.29 SF
CLASSROOM
126
619.74 SF
CLASSROOM
130
748.55 SF
CLASSROOM
127
BOYS RESTROOM
160
GIRLS RESTROOM
159
597.91 SF
CLASSROOM
172590.11 SF
CLASSROOM
173
BOYS RESTROOM
174
GIRLS RESTROOM
175
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
8' - 0" 6' - 0"31' - 4 5/8" 30' - 9 3/8"
28' - 0 1/2"
27' - 4 5/8"
34' - 2 3/4" 32' - 2 1/4"
28' - 0 1/2"
22' - 1 3/4"
131
A6.47
2
A6.479
4
5
A6.46
A6.46
7
6
8
3
4
A6.49
3
4
A6.48
2
A6.48
6
A6.55
3
4
7
8
10
A6.55
7
84
3
A6.51
8
7
1
A1.50
2
A1.50
3
A1.50
1 111
21
11
11
11
1111
11
11
11
1111
11
1111
11
11
11
1
1
121
124
122
172 173
A
1
8
2
120 120A
115 115A
126
129
128
127
A6.506
A6.502
A6.51
2
4
3
8
7
6
DD
A
3
A
DD
C
C
C
D
C
A
CC
A6.52 1
2
3A6.52
5
67
25' - 5 1/8"8' - 0"29' - 3 3/8"
C
A
D
DD
C
D
D
A
DD
D
C
C
D
D
D
C
D
D
D
D
A
C
D
D
C
125 125A
2
2
2
2
2
D D123 117
118
119
116
2
2
2
COMMON AREA
125
COMMON AREA
120
COMMON AREA
115 A6.42 9A6.42 10
A6.439
A6.514
4' - 0"
D
A6.541 2A6.541 2
130 131A 132 137 136 135
162
161
159
160
174
175
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"3' - 0"
3' - 0"
3' - 0"
3' - 0"
CC
CCC
C
C
CORRIDOR
177
CORRIDOR
178
CORRIDOR
179
2
1
A4.60
2
A4.60
2
A4.602
A4.60
2
A4.60
2
A4.60
A6.52
4
A6.52
8
3' - 0"
3' - 0 7/8"
3' - 1"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0" 3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
5' - 8"
3' - 0"
5
3' - 0"
3' - 1 7/8"
A6.46
2
A6.465
A6.55
3
3' - 0"
A6.47 7
A6.47
2
A6.49
1
A6.49
6
4 5/8"
5
5
1
1
5
1
6
8
5 7
2
22
2
22
2
D
D
D
D
D
D
D
2
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
FP1. Refer to index sheet A0.02 for typical graphical symbols and abbreviation index.FP2. Refer to sheet G.030 for accessibility guidelines.FP3. All horizontal dimensions are provided on plans, and all vertical dimensionsare provided on elevations and/or sections unless otherwise noted.FP4. Overall plan indicates exterior building dimensions, room numbers and names,door designations, window designations, exterior elevations designations,exterior plan designations, sign designations, and building sectiondesignations. All other plan information is indicated on referenced enlargedplans.FP5. Enlarged plans indicate interior building dimensions to face of partition material,interior plan detail designations, interior elevation designations, partition typedesignations, finish designations, and general building material.FP6. All dimensions are to be tied to a column line. Contractor will immediately reportany omission of dimensions not tied to a column line to the Architectprior to start of construction.FP7. Refer to sheet A1.01 for partition types, sheet A1.81 & A5.00 for finishschedule, sheet A5.20 door and hardware schedule.FP8. Coordinate all MEP access panels not shown on architectural constructiondocuments with Architect prior to installation.FP9. Provide adequate blocking as required at every location where millwork, plumbingfixtures, etc., are to be mounted.FP10. There are items shown, i.e. outlets, switches, thermostats, on the MEPdrawings that are not drawn on the architectural plans. Contractor tocoordinate and mount all MEP items per Architectural dimensions unlessnoted otherwise.FP11. All wood blocking to be Fire ResistantDrawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\Revi t Local Files\11_ 26_2013_erme ll renovation_c mitchell.rvt
12/24/2 013 2:30:40 PM
As indicated
PROJECT ISSUE DATE
13350
ENLARGED PLANS -AREA A
A1.40
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/8" = 1'-0"CLASSROOM 124 1
3" = 1'-0"PLAN LEGEND
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
12" = 1'-0"FLOOR PLAN GENERAL NOTES 1/64" = 1'-0"KEY PLAN - AREA A 2
N
ABCEFGJKLMNRTU DHPSVW
6
7
8
10
11
12
14
15
17
9
13
16
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
FP1. Refer to index sheet A0.02 for typical graphical symbols and abbreviation index.FP2. Refer to sheet G.030 for accessibility guidelines.FP3. All horizontal dimensions are provided on plans, and all vertical dimensionsare provided on elevations and/or sections unless otherwise noted.FP4. Overall plan indicates exterior building dimensions, room numbers and names,door designations, window designations, exterior elevations designations,exterior plan designations, sign designations, and building sectiondesignations. All other plan information is indicated on referenced enlargedplans.FP5. Enlarged plans indicate interior building dimensions to face of partition material,interior plan detail designations, interior elevation designations, partition typedesignations, finish designations, and general building material.FP6. All dimensions are to be tied to a column line. Contractor will immediately reportany omission of dimensions not tied to a column line to the Architectprior to start of construction.FP7. Refer to sheet A1.01 for partition types, sheet A1.81 & A5.00 for finishschedule, sheet A5.20 door and hardware schedule.FP8. Coordinate all MEP access panels not shown on architectural constructiondocuments with Architect prior to installation.FP9. Provide adequate blocking as required at every location where millwork, plumbingfixtures, etc., are to be mounted.FP10. There are items shown, i.e. outlets, switches, thermostats, on the MEPdrawings that are not drawn on the architectural plans. Contractor tocoordinate and mount all MEP items per Architectural dimensions unlessnoted otherwise.FP11. All wood blocking to be Fire ResistantDrawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\Revi t Local Files\11_ 26_2013_erme ll renovation_c mitchell.rvt
12/24/2 013 2:30:44 PM
As indicated
PROJECT ISSUE DATE
13350
ENLARGED PLAN - AREAB
A1.41
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/8" = 1'-0"LEVEL 1 - AREA B 1
3" = 1'-0"PLAN LEGEND
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
NOTES TO DRAWINGS 12" = 1'-0"FLOOR PLAN GENERAL NOTES 1/64" = 1'-0"KEY PLAN - AREA B 2
N
ABCEFGJKLMNRTU DHPSVW
1
2
3
4
5
5' - 0" 5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
690.41 SF
CLASSROOM
138
977.64 SF
CLASSROOM
102
906.8 SF
CLASSROOM
101
946.26 SF
CLASSROOM
104
979.99 SF
CLASSROOM
103
691.65 SF
CLASSROOM
139
625.87 SF
CLASSROOM
171
651.69 SF
CLASSROOM
140
628.69 SF
CLASSROOM
170666.63 SF
CLASSROOM
141679.26 SF
CLASSROOM
142
628.39 SF
CLASSROOM
169
694.97 SF
CLASSROOM
133
982.92 SF
CLASSROOM
113962.91 SF
CLASSROOM
112
979.63 SF
CLASSROOM
108 955.64 SF
CLASSROOM
107
894.69 SF
CLASSROOM
106981.55 SF
CLASSROOM
109
937.73 SF
CLASSROOM
111
876.54 SF
CLASSROOM
114
BOYS RESTROOM
143
GIRLS RESTROOM
144
BOYS RESTROOM
149
GIRLS RESTROOM
148
GIRLS RESTROOM
150
BOYS RESTROOM
151
8' - 0" 8' - 0"
1' - 0"
1' - 0"
32' - 2 1/4" 8' - 0" 31' - 7 5/8"
32' - 8 3/8"
33' - 0 1/2"
31' - 1 3/8" 31' - 4 3/4" 32' - 1 3/8" 32' - 1 5/8"
28' - 5 1/2"
33' - 0 1/2"
33' - 0 1/2"
32' - 8 3/8"
33' - 0 1/2"
32' - 8 3/8"
33' - 11 1/8"
31' - 9 3/4"
33' - 0 1/2"
27' - 5 1/2"
A6.40
5
6
4
A6.408
9
10
A6.41 2
4
3
A6.41 8
9
A6.424A6.43 6
A6.43 2
A6.446
A6.45
4
A6.45
7
8 6
1
3
8
7
7
4
3
3
8
4
A1.505
A1.50
6
A1.50
1
11 11
1
11
1111
11
1111
1
11
11
11
1111
1111
1111
1111
1111
111
11111111
11 11
11
11
11111111
7
2
113
111
112
169
114
108
109
106
107
170
104
103
102
101
171
110 110A105 105A 100 100A
DD
D
A
CC
A
DD
C
D
C
D
DD
COMMON AREA
110
DD
A
DD
D
C
DD
A6.40 1A6.41 6A6.4310
D
D
CC
DD
A
C C
A
D
D
AAA
D
DD
A
D DD
D D
13
A6.44
2
A6.443 1
A6.42
8
7
A6.42
6
COMMON AREA
105
COMMON AREA
100
5' - 0"
A6.535 6A6.548 10 A6.548 10 A6.548 10 A6.548 10 A6.548 10
133 142 141 140 139 138
150
151
148
149
143
144
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"3' - 0"3' - 0" 3' - 0" 3' - 0"3' - 0"3' - 0" 3' - 0"
CC
C CCC CCC
1
A4.60
2
A4.60
2
A4.60
2
A4.60 2
A4.602
A4.60
A6.548 10A6.548 10
A6.53
8
A6.548 10
A6.55
9
A6.54
9
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0" 3' - 0"
3' - 0"
3' - 0"3' - 0"
3' - 1 5/8"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
A6.45
5
A6.452 A6.44 5
A6.431
7
5
1
A6.42 5
1
5
A6.44
4
2
51
3
A6.54
6
7
A6.55
9
1
A6.55
9
1
A6.54
9
5
A6.54
9
5
A6.54
9
5
C
C
CC
C C C C C C C C C
D
C
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
FP1. Refer to index sheet A0.02 for typical graphical symbols and abbreviation index.FP2. Refer to sheet G.030 for accessibility guidelines.FP3. All horizontal dimensions are provided on plans, and all vertical dimensionsare provided on elevations and/or sections unless otherwise noted.FP4. Overall plan indicates exterior building dimensions, room numbers and names,door designations, window designations, exterior elevations designations,exterior plan designations, sign designations, and building sectiondesignations. All other plan information is indicated on referenced enlargedplans.FP5. Enlarged plans indicate interior building dimensions to face of partition material,interior plan detail designations, interior elevation designations, partition typedesignations, finish designations, and general building material.FP6. All dimensions are to be tied to a column line. Contractor will immediately reportany omission of dimensions not tied to a column line to the Architectprior to start of construction.FP7. Refer to sheet A1.01 for partition types, sheet A1.81 & A5.00 for finishschedule, sheet A5.20 door and hardware schedule.FP8. Coordinate all MEP access panels not shown on architectural constructiondocuments with Architect prior to installation.FP9. Provide adequate blocking as required at every location where millwork, plumbingfixtures, etc., are to be mounted.FP10. There are items shown, i.e. outlets, switches, thermostats, on the MEPdrawings that are not drawn on the architectural plans. Contractor tocoordinate and mount all MEP items per Architectural dimensions unlessnoted otherwise.FP11. All wood blocking to be Fire ResistantDrawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\Revi t Local Files\11_ 26_2013_erme ll renovation_c mitchell.rvt
12/24/2 013 2:30:49 PM
As indicated
PROJECT ISSUE DATE
13350
ENLARGED PLAN - AREAC
A1.42
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/8" = 1'-0"CLASSROOM 133 1
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
3" = 1'-0"PLAN LEGENDNOTES TO DRAWING 12" = 1'-0"FLOOR PLAN GENERAL NOTES 1/64" = 1'-0"KEY PLAN - AREA C 2
N
BC
19
20
BOYS RESTROOM
161A6.20
9
A6.20
7
GIRLS RESTROOM
162
F
E
3' - 0 5/8"
2' - 7 5/8"
1' - 3"
E
F
5
4 8 8
8 8
5
4' - 6 1/8"
3' - 3 3/4"
1' - 3"
GD
D
G
B
B B B
B
B
H H
5' - 0 1/2"
BOYS RESTROOM
161-
-
-
-
GIRLS RESTROOM
162
F
E
1' - 6" 3' - 6" 1' - 6" 1' - 6" 1' - 3"3' - 0 5/8"1' - 3" 1' - 3" 1' - 3"
3' - 6" 1' - 5" 1' - 5" 1' - 5" 1' - 5" 1' - 3"2' - 7 5/8"
1' - 3" 1' - 3"
1' - 6"
E
F
54
4 4 8 84
4 4 7 7 8 8
5
2' - 11 1/2"
4' - 6 1/8"
3' - 3 3/4"
1' - 3"1' - 5" 1' - 5"
4
B GD
D
G
B
B B B
B
B
H H
5' - 0"
5' - 0 1/2"
J
19
20
GIRLS RESTROOM
159
BOYS RESTROOM
160
A6.20
11
A6.20
8
2' - 8 1/8"1' - 3"
1' - 6" 2' - 7 1/4"
3' - 1 1/4"
5' - 8 1/8"
2' - 6"
4 8 87 7 8 8
D
G
G
BB B
D
F
E
B
BB
H H
GIRLS RESTROOM
159
BOYS RESTROOM
160
-
-
-
-
3' - 6" 1' - 5" 1' - 3"2' - 8 1/8"1' - 6" 1' - 5" 1' - 5" 1' - 5" 1' - 5" 1' - 5" 1' - 3"
3' - 6"1' - 6" 1' - 6"1' - 6" 1' - 3" 1' - 3" 1' - 3" 1' - 3" 1' - 6" 2' - 7 1/4" 1' - 6"5' - 0"
3' - 1 1/4"
5' - 8 1/8"
2' - 6"
5' - 0"
4
B
4 4 4 8 84 7 7 8 8
D
G
G
BB B
D
F
E
B
BB
H H
MNR P
19
20
BOYS RESTROOM
174
GIRLS RESTROOM
175
A6.20
12
A6.20
10
2' - 5 1/2" 1' - 3"
2' - 6" 1' - 3"
88
8 87
E
F
D
D 5' - 0"
2' - 7 3/8"
5' - 0"
2' - 11 5/8"
G
G
BB
B
B
B
BOYS RESTROOM
174
GIRLS RESTROOM
175
-
-
-
-
1' - 6"3' - 6"1' - 5"1' - 5"1' - 3" 2' - 5 1/2" 1' - 3" 1' - 3" 1' - 3"
3' - 6" 1' - 6"1' - 4" 1' - 4"1' - 4"1' - 4"1' - 3" 2' - 6" 1' - 3"
B
88
8 8 47
4 4
E
F
D
DF
E
5' - 0"
2' - 7 3/8"
5' - 0"
2' - 11 5/8"
G
G
BB
B
B
B
MNR P
4
5
GIRLS RESTROOM
144
BOYS RESTROOM
143
A6.20
A6.20
1
2
2' - 5 3/8"
2' - 10 3/8" 1' - 3"
3' - 10 1/8"
3' - 9 5/8"
1' - 3"
8 88 8
5
5
6 6
E
F
G
G
D
D
B
B
F
E
B
GIRLS RESTROOM
144
BOYS RESTROOM
143
-
-
-
-
1' - 5"2' - 5 3/8"1' - 3" 1' - 5"1' - 5"1' - 5"
1' - 6"3' - 6"1' - 3"1' - 3"1' - 3" 2' - 10 3/8" 1' - 3" 1' - 6"1' - 6"1' - 3" 1' - 3"
5' - 0"
3' - 10 1/8"
3' - 11 1/2"
2' - 1 1/2"
5' - 0"
3' - 6" 1' - 6"1' - 3" 1' - 5"1' - 5"
8 8 4 4 4 47 78 8
5
4 4
5
6 6
E
F
B
G
G
D
D
B
B
F
E
B
J
4
5
BOYS RESTROOM
149
GIRLS RESTROOM
148
A6.20
4
A6.20
3
3' - 6" 1' - 6"1' - 6" 1' - 6" 1' - 3"1' - 3" 1' - 6"2' - 11 3/8"1' - 3" 1' - 3" 1' - 6"
1' - 6" 1' - 6" 1' - 6"3' - 6" 1' - 6" 1' - 6" 1' - 3"2' - 6 3/8"1' - 6" 1' - 6" 1' - 3"
B
4 4 7 7 8 84 4 4 4 8 8
G
GD
D
F
A
F
E
E
B
B B B
B
B
BC
4
5
BOYS RESTROOM
151
GIRLS RESTROOM
150
A6.20
6
A6.20
5
1' - 6"
2' - 5 7/8"
3' - 6" 1' - 6" 1' - 6" 1' - 3" 1' - 3" 1' - 3" 2' - 6"11 1/2"11 1/2"
3' - 0"
4' - 5 7/8"
1' - 3"
BG
F
B
F
E
B B B
BD
D
4 44 7 7 8 8 8 8
G
BOYS RESTROOM
151
GIRLS RESTROOM
150
-
-
-
-
1' - 6"
3' - 6"1' - 6" 1' - 3"2' - 5 7/8"
3' - 6" 1' - 6" 1' - 3"1' - 6" 1' - 3" 1' - 3" 1' - 3" 2' - 6"11 1/2"11 1/2"
5' - 0"
3' - 0"
2' - 3 1/4"
5' - 0"
4' - 5 7/8"
1' - 3" 1' - 3" 1' - 3" 1' - 3"1' - 3"
B
1' - 3" 1' - 3"
G
F
E
B
F
E
B B B
BD
D
44 44 4 7 7 4 8 8 8 8
G
TOILET PARTITIONS.
.
.
.
TOILET PAPER DISPENSER
MIRROR 24' X 36'
PAPER TOWEL DISPENSER
A
B
C
D
.E
.F
.G
.H
GRAB BAR 36"
GRAB BAR 42"
SOAP DISPENSER
URINAL SCREEN
SYMBOL DESCRIPTION MANUFACTURERAND MODEL No.
MOUNTINGHEIGHTS
CHILDREN
GENERAL NOTES
SOLID PHENOLIC
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\Revi t Local Files\11_ 26_2013_erme ll renovation_c mitchell.rvt
12/24/2 013 2:30:52 PM
As indicated
PROJECT ISSUE DATE
13350
RENOVATEDRESTROOM PLANS
A1.50
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/4" = 1'-0"RENOVATED RESTROOM PLANS - AREA 1A 1 1/4" = 1'-0"RENOVATED RESTROOM PLANS - AREA 2A 2 1/4" = 1'-0"RENOVATED RESTROOM PLANS - AREA 3A 3
1/4" = 1'-0"RENOVATED RESTROOM PLANS - AREA 1C 4 1/4" = 1'-0"RENOVATED RESTROOM PLANS - AREA 2C 5 1/4" = 1'-0"RENOVATED RESTROOM PLANS - AREA 3C 6
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
NOTES TO DRAWING 1" = 1'-0"TOILET ACCESSORIES
N N N
NNN
ABCEFGJKLMNRTU DHPSVW
1
2
3
4
5
6
7
8
10
11
12
14
15
17
9
13
16
19
20
22
24
26
23
25
1
A1.61
1
A1.62
1
A1.63
CLASSROOM
101
CLASSROOM
102
CLASSROOM
104
CLASSROOM
107
CLASSROOM
108
CLASSROOM
109
CLASSROOM
111
CLASSROOM
112
CLASSROOM
113
CLASSROOM
119
CLASSROOM
118
CLASSROOM
117
CLASSROOM
116
CLASSROOM
124
CLASSROOM
122
CLASSROOM
121
CLASSROOM
128
CLASSROOM
129
CLASSROOM
127
CLASSROOM
126
CLASSROOM
130
CLASSROOM
131
CLASSROOM
132
CLASSROOM
133
282' - 10"
1' - 6"
3' - 4"
1' - 6"
CLASSROOM
169
CLASSROOM
142
CLASSROOM
141
CLASSROOM
170
CLASSROOM
140
CLASSROOM
139
CLASSROOM
171
CLASSROOM
138
COMMON AREA
110
CLASSROOM
114
CLASSROOM
106
CLASSROOM
103
COMMON AREA
100
CLASSROOM
123
CLASSROOM
137
CLASSROOM
136
CLASSROOM
173
CLASSROOM
135CLASSROOM
172
COMMON AREA
115COMMON AREA
120
COMMON AREA
125
BOYS RESTROOM
174
GIRLS RESTROOM
175
GIRLS RESTROOM
159
BOYS RESTROOM
160
GIRLS RESTROOM
162
BOYS RESTROOM
161
BOYS RESTROOM
161
BOYS RESTROOM
151
GIRLS RESTROOM
150
COMMON AREA
105
GIRLS RESTROOM
144
BOYS RESTROOM
143
BOYS RESTROOM
143
BOYS RESTROOM
149
GIRLS RESTROOM
148
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\Revi t Local Files\11_ 26_2013_erme ll renovation_c mitchell.rvt
12/24/2 013 2:30:55 PM
1/16" = 1'-0"
PROJECT ISSUE DATE
13350
OVERALL REFLECTEDCEILING PLAN
A1.60
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/16" = 1'-0"REFLECTED CEILING PLAN - LEVEL 1 1
N
ABCEFGJKLMNRTU DHPSVW
19
20
22
24
26
23
25
28
CLASSROOM
135
CLASSROOM
173
CLASSROOM
136
CLASSROOM
137
CLASSROOM
172
CLASSROOM
132
CLASSROOM
131
CLASSROOM
130
CLASSROOM
127
CLASSROOM
128
CLASSROOM
122
CLASSROOM
123
CLASSROOM
121CLASSROOM
129
CLASSROOM
126
CLASSROOM
124
CLASSROOM
116
CLASSROOM
117
CLASSROOM
119
CLASSROOM
118
GIRLS RESTROOM
159
BOYS RESTROOM
160
BOYS RESTROOM
161
GIRLS RESTROOM
162
BOYS RESTROOM
174
GIRLS RESTROOM
175
COMMON AREA
125
COMMON AREA
120
COMMON AREA
115
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
RP2. Refer to interior elevations for furred down heights U.N.O.
RP8. All ceiling 8'-5" A.F.F. U.N.O.
RP1. Refer to floor plans for finished ceiling heights.RP3. Center lay-in acoustical ceiling system in each room withequal tile dimensions on opposite walls unless otherwisenoted. Notify architect if any tile abutting the partition is lessthan 6" in width. Secondary wall angles to support "short"runs will not be accepted.RP4. In lay-in acoustical ceilings locate all HVAC items, emergencylighting, sprinkler heads, etc in center of tile unless otherwisenoted.RP5. In gypsum board ceilings locate all HVAC items, emergencylighting, sprinkler heads in center of space and equal distantapart from each other unless otherwise noted.RP6. Coordinate all MEP ceiling and access panels not shown on thearchitectural construction documents with architect prior to installation.RP7. In exposed ceilings evenly space all fixtures at or belowexposed structure or MEP ductwork. Cooridinate with MEP toprovide lighting "around" final MEP layout to avoid "dark" spots.Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\Revi t Local Files\11_ 26_2013_erme ll renovation_c mitchell.rvt
12/24/2 013 2:31:00 PM
As indicated
PROJECT ISSUE DATE
13350
ENLARGED REFLECTEDCEILING PLAN - AREA A
A1.61
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/8" = 1'-0"LEVEL 1 RCP - AREA A 1
3" = 1'-0"PLAN LEGEND
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
NOTES TO DRAWING 12" = 1'-0"RCP GENERAL NOTES 1/64" = 1'-0"RCP KEY PLAN - AREA A 2
N
ABCEFGJKLMNRTU DHPSVW
6
7
8
10
11
12
14
15
17
9
13
16
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
RP2. Refer to interior elevations for furred down heights U.N.O.
RP8. All ceiling 8'-5" A.F.F. U.N.O.
RP1. Refer to floor plans for finished ceiling heights.RP3. Center lay-in acoustical ceiling system in each room withequal tile dimensions on opposite walls unless otherwisenoted. Notify architect if any tile abutting the partition is lessthan 6" in width. Secondary wall angles to support "short"runs will not be accepted.RP4. In lay-in acoustical ceilings locate all HVAC items, emergencylighting, sprinkler heads, etc in center of tile unless otherwisenoted.RP5. In gypsum board ceilings locate all HVAC items, emergencylighting, sprinkler heads in center of space and equal distantapart from each other unless otherwise noted.RP6. Coordinate all MEP ceiling and access panels not shown on thearchitectural construction documents with architect prior to installation.RP7. In exposed ceilings evenly space all fixtures at or belowexposed structure or MEP ductwork. Cooridinate with MEP toprovide lighting "around" final MEP layout to avoid "dark" spots.Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi t
Loca
l File
s\11
_ 26_
2013
_erm
e ll r
enov
atio
n_c m
itche
ll.rv
t12
/24/
2 013
2:3
2:11
PM
As indicated
PROJECT ISSUE DATE
13350
ENLARGED REFLECTEDCEILING PLAN - AREA B
A1.62
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/8" = 1'-0"LEVEL 1 RCP - AREA B 1
3" = 1'-0"PLAN LEGEND
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
NOTES TO DRAWING 12" = 1'-0"RCP GENERAL NOTES 1/64" = 1'-0"RCP KEY PLAN - AREA B 2
N
ABCEFGJKLMNRTU DHPSVW
1
2
3
4
5
CLASSROOM
101
CLASSROOM
104
CLASSROOM
106
CLASSROOM
109
CLASSROOM
111
CLASSROOM
114
CLASSROOM
113
CLASSROOM
112
CLASSROOM
108
CLASSROOM
107
CLASSROOM
103
CLASSROOM
102
CLASSROOM
138
CLASSROOM
171
CLASSROOM
139
CLASSROOM
140
CLASSROOM
170
CLASSROOM
141
CLASSROOM
142
CLASSROOM
169
CLASSROOM
133
COMMON AREA
110
GIRLS RESTROOM
144
BOYS RESTROOM
143
BOYS RESTROOM
149
GIRLS RESTROOM
148
COMMON AREA
105
BOYS RESTROOM
151
GIRLS RESTROOM
150COMMON AREA
100
34
34
3
3
34
34
3
3
34
34
3
34
33
34
3434 34
34
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
RP2. Refer to interior elevations for furred down heights U.N.O.
RP8. All ceiling 8'-5" A.F.F. U.N.O.
RP1. Refer to floor plans for finished ceiling heights.RP3. Center lay-in acoustical ceiling system in each room withequal tile dimensions on opposite walls unless otherwisenoted. Notify architect if any tile abutting the partition is lessthan 6" in width. Secondary wall angles to support "short"runs will not be accepted.RP4. In lay-in acoustical ceilings locate all HVAC items, emergencylighting, sprinkler heads, etc in center of tile unless otherwisenoted.RP5. In gypsum board ceilings locate all HVAC items, emergencylighting, sprinkler heads in center of space and equal distantapart from each other unless otherwise noted.RP6. Coordinate all MEP ceiling and access panels not shown on thearchitectural construction documents with architect prior to installation.RP7. In exposed ceilings evenly space all fixtures at or belowexposed structure or MEP ductwork. Cooridinate with MEP toprovide lighting "around" final MEP layout to avoid "dark" spots.Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi t
Loca
l File
s\11
_ 26_
2013
_erm
e ll r
enov
atio
n_c m
itche
ll.rv
t12
/24/
2 013
2:3
2:15
PM
As indicated
PROJECT ISSUE DATE
13350
ENLARGED REFLECTEDCEILING PLAN - AREA C
A1.63
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/8" = 1'-0"LEVEL 1 RCP - AREA C 1
3" = 1'-0"PLAN LEGEND
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
12" = 1'-0"RCP GENERAL NOTES NOTES TO DRAWING 1/64" = 1'-0"RCP KEY PLAN - AREA C 2
N
MANUFACTURER
MANUFACTURER
FINISH MANUFACTURER COLOR PAINT FINISH LOCATION SPECS
P-1 TBD TBD TBDFIELD/CORRIDORS 09 91 23 INTERIOR
PAINT
P-2 TBD TBD ACCENT
P-3 TBD TBD FIELD
PAINT
TBD
TBD
09 91 23 INTERIORPAINT
09 91 23 INTERIORPAINT
CARPET
ACOUSTICAL CEILING TILE
FINISH COLOR SIZE LOCATION NOTE DESCRIPTION
B-1 TBD TBD 4" REFER TOFINISHPLANS
09 65 13 RESILENTBASE ANDACCESSORIES
FINISH MANUFACTURER COLOR DESCRIPTION SIZE LOCATION NOTE
PL-1 TBD TBD 06 40 23 INTERIORARCHITECTURALWOODWORK
CASEWORK
WALL BASE
PLASTIC LAMINATE
PL-2 TBD 06 40 23 INTERIORARCHITECTURALWOODWORK
COUNTERTOPS
TBD
FINISH SIZE LOCATION PRODUCT DESCRIPTION
TLP-1 SOLID PHENOLIC TBD TBD REFER TOFINISHPLANS
TBD
TOILETS PARTITIONSCOLOR
FINISH MANUF. SERIES
COLOR/
FINISH
SIZE /
THICKNESS
GROUT LOCATION NOTE SPECS
CT-1 TBD TBD WALLS -RESTROOMS
09 30 00TILING
TBD 09 30 00TILING
CT-2
4" X 4",THICKNESS5/16"
TBD
TBD 4" X 4",THICKNESS5/16"
TBD ACCENT TILE
CERAMIC TILE
CONTACT
1/16"/WHITE
1/16"/TBD
WALLS -RESTROOMS
TBD 09 30 00TILING
CT-3 REFER TOFINISHPLANS
TBD 4" X 4"THICKNESS5/16"
ACCENT TILE1/16"/TBD
TBD
FINISH MANUF. SERIES COLOR SIZE LOCATION NOTE
AC-1TO MATCHEXISTING
TBD 24" X 24"X 5/8"TOMATCHEXISTING
TBD NRC:CAC:LIGHT REFLECTANCE:RECYCLE CONTENT:EDGE:
REFER TORCP PLAN
FIELD TILE
DEMOUNTABLE PARTITIONMANUFACTURERFINISH SIZE LOCATION PRODUCT DESCRIPTION
DP-1 TBD TBD TBD REFER TOFINISHPLANS
TBD
COLOR
FINISH MANUF. PATTERN SIZE LOCATION NOTE SPECS CONTACT
CP-1 C&A Tandus Style: 02803 Applause III
REFER TOFINISHPLANS
ROLL
WT
Color:28524Moody Blues
B-2 TBD TBD 4" REFER TOFINISHPLANS
09 30 00TILING
TBD 09 30 00TILING
CT-4 REFER TOFINISHPLANS
TBD 2" X 2"THICKNESS15/16"
FLOOR TILE1/8"/TBD
TBD
CERAMIC COVE BASE
A
A
B
B
C
C
E
E
F
F
G
G
J
J
K
K
L
L
M
M
N
N
R
R
T
T
U
U
D
D
H
H
P
P
S
S
V
V
W
W
1
2
3
4
5
6
7
8
1011
12
14
15
17
9
13
16
19
20
22
24
26
23
25
28
CLASSROOM
138
CLASSROOM
171
CLASSROOM
139
CLASSROOM
140
CLASSROOM
170
CLASSROOM
141
CLASSROOM
142
CLASSROOM
169
CLASSROOM
133
CLASSROOM
102
CLASSROOM
103
CLASSROOM
107
CLASSROOM
108
CLASSROOM
112
CLASSROOM
113
CLASSROOM
114
CLASSROOM
111
CLASSROOM
109
CLASSROOM
106
CLASSROOM
104
CLASSROOM
101
COMMON AREA
100
COMMON AREA
105
CORRIDOR
113
CLASSROOM
130
CLASSROOM
131 CLASSROOM
132
CLASSROOM
172
CLASSROOM
137
CLASSROOM
136
CLASSROOM
173
CLASSROOM
135
?
?CLASSROOM
128
CLASSROOM
122
CLASSROOM
117
CLASSROOM
118
CLASSROOM
119
CLASSROOM
116
CLASSROOM
124
CLASSROOM
121
CLASSROOM
129
CLASSROOM
126
COMMON AREA
125
COMMON AREA
120
COMMON AREA
115
CLASSROOM
127CLASSROOM
123
COMMON AREA
110
1. DO NOT SCALE DRAWINGS. CONTRACTOR TO REPORT ANY
DISCREPANCIES OR OMISSIONS PRIOR TO START WORK. CONTRACTOR
SHALL BE RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE
ARCHITECT BEFORE CONTINUING CONSTRUCTION.
2. GRID LINES ARE TO CENTERLINE OF STRUCTURAL COLUMN UNLESS NOTED
OTHERWISE.
3. ALL CONSTRUCTION SHALL COMPLY WITH ALL BUILDING CODES AND
REQUIREMENTS HAVING JURISDICTION OVER THIS PROJECT.
4. ALL INTERIOR WALL DIMENSIONS ARE TO FACE OF WALL FINISH UNLESS
NOTED OTHERWISE.
5. ALL INTERIOR FINISHES TO BE INCLUDED IN THE BUILDING SHOULD BE
CERTIFIED BY AT LEAST ONE THIRD PARTY CRITERIA: GREENGARD,
FLOORSCORE, CARPET AND RUG INSTITUTE GREEN LABEL PLUS ,ETC.
6. LOCALLY EXTRACTED, HARVESTED, RECOVERED AND MANUFACTURED
MATERIALS WITHIN 500 MILES ARE PREFERRED.
7. DIMENSIONS FOR ELEVATIONS, SECTIONS AND DETAILS ARE CALLED OUT
FROM TOP OF SLAB.
8. CONTRACTOR TO PROVIDE WOOD BLOCKING FOR ALL MILLWORK AND ANY
WALL HUNG COUNTERS, SHELVING AND PLUMBING FIXTURES. ALL WOOD
BLOCKING TO BE FIRE RESISTANT.
9. ALL FINISH WORK TO BE SMOOTH AND FREE FROM ABRASIONS. ALL
SPECIFIED FINISHES SHALL BE INSTALLED PER MANUFACTURER'S
INSTRUCTIONS.
10. REFER TO SHEET A5.20 FOR DOOR SCHEDULE INFORMATION
11. REFER TO SHEET A5.10 FOR PARTITION TYPES
12. REFER TO SHEET A1.81 FINISH SCHEDULE AND FOR FINISH PLAN FOR ALL
FINISHES
13. REFER TO G1.03 FOR ACCESSIBLE MOUNTING HEIGHTS FOR PLUMBING
FIXTURES AND TOILET ACCESSORIES.
- 2" X 2" CERAMIC TILE
- CARPET
XXXX
XXXXXXXXXXXX
WAINSCOT FINISH
WALL FINISH
EXTENT OF FINISH
BASE FINISH
CHANGE IN FLOOR FINISH
WALL FINISH
BASE FINISHXXXX
EXTENT OF FINISH
- EXISTING PARTITION TO REMAIN
- NEW DEMOUNTABLE PARTITION
- AREA OF WORK NOT IN CONTRACT
- EXISTING TO BE REMOVED
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi t
Loca
l File
s\11
_ 26_
2013
_erm
e ll r
enov
atio
n_c m
itche
ll.rv
t12
/24/
2 013
2:3
2:20
PM
As indicated
PROJECT ISSUE DATE
13350
FINISH PLAN
A1.81
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1/8" = 1'-0"FINISH LEGEND 1/16" = 1'-0"FLOOR PLAN - LEVEL 1 1 1/8" = 1'-0"FINISH PLAN GENERAL NOTES
3" = 1'-0"PLAN LEGEND
FINISH LEGEND
N
2 1/
8"
3 3/
8"
1' - 5 1/2"
4 1/
2"4
1/2"
3 5/8" metal stud framing.
Existing HSS steel column.
Termination closure by demountable wall manufaturer.
Demountable wall system with gypsum panelsinstalled per manufacturer specifications.
5/8" gypum boardsecured to stud framing.
5"
2 1/
8"
3 3/
8"
1' - 2"
5 3/
8"5
1/4"
3 5/8" metal stud framing.
Existing HSS steel column.
Termination closure by demountable wall manufaturer.
Demountable wall system with gypsum panelsinstalled per manufacturer specifications.
5/8" gypum boardsecured to stud framing.
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi t
Loca
l File
s\11
_ 26_
2013
_erm
e ll r
enov
atio
n_c m
itche
ll.rv
t12
/24/
2 013
2:3
2:20
PM
3" = 1'-0"
PROJECT ISSUE DATE
13350
DETAILS
A4.60
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
3" = 1'-0"COLUMN DETAIL - EXPANSION 1
3" = 1'-0"COLUMN DETAIL- TYPICAL 2
F.F.
F.F.
F.F.
SCHEDULED CEILING HEIGHT
WHERE INSUL OCCURS IN PTN,SPACER AS REQUIREDCONT ACOUSTICAL TAPESCHED. CEILING
MTL. RUNNER CHANNEL BYDEMOUNTABLE WALL MFG.SCHED. MTL. STUDSBY DEMOUNTABLE WALL MFG.SCHED. ACOUSTICAL INSUL.SCHEDULE BASEMTL. RUNNER CHANNELSCHED. FLOORING
LAY 3 1/2" SOUND ATTEN INSULABOVE CLG, 4'-0" MIN EACH SIDEOF PTN CENTERLINE
3/4" x 24 ULTRAWALL GYPSUMPANELS SECURED TO MTLSTUDS TYPICAL BOTH SIDES.
SECTION
CONT. SEALANT AT BOTHSIDES OF WALL.PACK VOID W/ SOUND ATTENUATIONINSULATION. USE FIRE SEAL @ RATEDWALLS.FLUSH MORTAR JOINT TYP.8" GLAZED CONCRETE MASONRY UNITTO SLAB ABOVE (USE CLASSD2 CMU @ RATED WALLCONSTRUCTION ONLY)
RE: STRUCTURAL FOR CMUBOND BEAM & REINFORCE AS REQ'DSCHEDULED CEILINGMETAL JOINT REINFORCING@ 16" O.C. HORIZONTALLYRE: STRUCTURAL VERTICAL DOWELS& REINF. AS REQUIREDCMU CONSTRUCTION TO HAVESOLID GROUT JOINTFLOOR SLAB SEAL ALL PENETRATIONSPROVIDE UL RATED CLOSURE
CEILING LINE
UNDERSIDE OF METAL DECK ABOVE3" X 3" 1/2" CONT.STEEL ANGLEWELDED TO UNDERSIDEOF METAL DECKING
SCHEDULED TERRAZO BASE
SEE PLAN
SC
HE
DU
LE
D C
EIL
ING
HE
IGH
T
F.F.
SCHED CEILING MATERIAL
HORIZONTAL MTL STUD BRACINGAT 4'-0" O.C. MAXSCHED ACOUSTICAL INSULMTL RUNNER CHANNELSCHED FLOORING
MTL. RUNNER CHANNEL BYDEMOUNTABLE WALL MFG.SCHED. MTL. STUDSBY DEMOUNTABLE WALL MFG.3/4" x 24 ULTRAWALL GYPSUMPANELS SECURED TO MTLSTUDS ON ROOM SIDEEXISTING EXTERIOR WALL ROOM
SC
HE
DU
LED
CE
ILIN
G H
EIG
HT
EQUAL EQUAL
6"2'-6" 6"6"6"6"
XX XXSET RUNNERS IN A CONTINUOUS BED OF SEALANT.SEAL ALL VOIDS BETWEEN PARTITION AND UNDERSIDE OF DECK W/ MINERAL WOOL FIRE SAFING AND FIRE CAULK ATFIRE RATED PARTIONS.ALL GYPSUM BOARD TO BE 5/8" TYPE X UNLESS NOTED OTHERWISE.PROVIDE 5/8" TYPE X DENSHIELD TILE BACKER @ ALL WALLS RECIEVING TILE FINISH.
A.B.C.D. INSTALL 5/8" FIRE SHIELD TYPE X NATIONAL GYPSUM HI-IMPACT BRAND 3000 UP TO 4'-0" ABOVE FINISH FLOOR ONALL CORRIDORS.E. PROVIDE USG 093 CONTROL JOINT @ ALL HORIZONTAL WALL DIMENSIONS EXCEEDING 30'-0" COORDINATE IN FIELD W/ARCHITECT FOR EXACT LOCATIONS.F. SEAL ALL PENETRATIONS @ PENETRATIONS THROUGH RATED WALLS. SEAL W/ UL APPROVED ASSEMBLY TO MATCH RATEDPARTITION CONSTRUCTION.G. PROVIDE 3" DEEP TOP RUNNER W/ STUDS TO BE FRICTION FIT IN RUNNER. TO ALLOW FOR DEFLECTION, CUT STUDS 1"SHORT FRICTION FIT & DO NOT SECURE GYP. BD. TO RUNNER.H.I. ACOUSTICAL SEALANT: CONTINUOUS AT PARTITION PERIMETER & ALL PENETRATIONS. AT ACOUSTICAL CEILINGS, PROVIDEACOUSTICAL FOAM TAPE AT HEAD IN LIEU OF SEALANT. INSTALL SEALANT AT EDGE OF GYP. BD. COPE GYP. BD. ORPROVIDE SHEET METAL CLOSURE AT STRUCTURAL DECK VOIDS. FILL VOIDS SOLID W/ ACOUSTICAL INSULATION ATNON-RATED PARTITIONS & W/ FIRE PROOFING AT THE FIRE RATED PARTITIONS (MATCHING SCHED. RATING)J. BRACE ALL PARTITIONS THAT EXCEED MANUFACTURER'S RECOMMENDED LIMITING HEIGHTS. BRACE & PROVIDE STIFFENERSAT PENS WHERE STRAIGHT UNINTERRUPTED RUNS EXCEED 20 FT. BRACE DOOR JAMBS.K. REFER TO PLANS FOR PARTITION TYPES USED. ALL PTNS SHOWN MAY NOT BE USEDL. AT EXPOSED STRUCTURE CEILING TAPE AND FLOAT WALL FINISH TO STRUCTURE. PROVIDE 1/4" SEALANT JOINT BETWEENGYP. BD. AND STRUCTURE. SEALANT COLOR TO MATCH PARTITION PAINT COLOR.M. PROVIDE USG 093 CONTROL JOINT @ ALL HORIZONTAL WALL DIMENSIONS EXCEEDING 30'-0" COORDINATE IN FIELD W/ARCHITECT FOR EXACT LOCATIONS.N. ALL GYPSUM BOARD INSTALLED AT WET WALLS TO BE WATER RESISTANT GYPSUM BOARD OR EQUIVALENT MATERIAL ASREQUIRED BY SECTION 2509.2 OF THE AMMENDED I.B.C. 2003 EDITION, TYPICAL.O.
2'-6" A.F.F.TYPE D
16 GA MTL. RUNNERTRACK-CLIP FLANGES TOFIT OVER STUDS
METAL WALL STUDSMIN.20 GA.
REFER TYPICAL MOUNTING HEIGHTSTYPE C
TYPE B
TYPE A
TYPICAL HEIGHTSMOUNTINGREFER CONT. 16 GA. X 4" WIDEMTL. BACK-UP PLATEMETAL WALL STUDS MIN.20 GA.16 GA MTL. RUNNERTRACK-CLIP FLANGES TOFIT OVER STUDS
3 5
/
8 " MIN.DEEPER IFREQUIRED16 GA STL. RUNNERTRACK-CLIP FLANGESAND FOLD WEB TOFORM ATTACHMENTFLANGE8" MIN. DEEPERIF REQUIREDMIN. 20 GA. MTL. STUDSFACING OPPOSITEDIRECTIONS TO ALLOWMOUNTING PLATE ATTACHMENT
SECTION ABOVE CEILING
PLAN SECTION
FIRE RATED PARTITIONSCREW GYPSUM BOARD TO FRAMING ON ALL 4SIDES AND SEAL JOINT BETWEEN DUCT ANDPARTITIONDUCT (DAMPER NOT SHOWN FOR CLARITY)PROVIDE METAL STUD FRAMING ON BOTH SIDESAND AT THE TOP AND BOTTOM OF DUCTOPENINGS IN FIRE RATED PARTITIONS
IN-WALL BRACING SHALL BE NO LESS THAN A 6" X 11
/
4 " X 14 GUAGE CHANNEL, STEEL FY= 50 ksi, AND SHALLSUPPORT A 250 POUND GRAVITY LOAD CONCENTRATED AT ANY POINT ON THE DEVICE BEING ANCHOREDSTUD CAVITY IN-WALL BRACINGSTUDS
GRAB BARPROVIDE IN-WALL BRACING IN ALL PARTITIONS OR EXTERIOR WALLS WHERE GRAB BARS, HANDRAILS, SHOWER SEATS OROTHER EQUIPTMENT ANCHORS TO METAL STUD WALLS AND IN OTHER LOCATIONS AS NOTED ON THE DRAWINGS.CENTER STUDS ABOUT THE LOCATION OF THE DEVICE ANCHOR POINTGRAB BAR BRACKET SHOWN, OTHER DEVICES SIMILAR
PARTITION NOTESPARTITION TAG LEGENDPARTITION TAG DESIGNATED PARTITION TYPE; LOWER CASE LETTER INDICATESPARTITION WITH INSULATIONDESIGNATED STUD OPTION, DEPTH AND GAUGE. SEE STUD SCHEDULEBELOW.PARTITIONS REQUIRED FOR THIS PROJECT ARE INDICATED BY TAG REFERENCE SHOWN ON THE ARCHITECTURAL FLOORPLANS. UNTAGGED PARTITIONS SHALL BE TYPE "A3" THIS PARTITION SCHEDULE MAY CONTAIN A PARTITION TYPE ORSTUD OPTION THAT IS NOT REFERENCED FROM THE PLANS. ONLY REFERENCED TYPES ARE REQUIRED.
PARTITION TYPE DRAWINGS ARE NOT TO SCALE.WALLS AND PARTITIONS ARE INTERIOR NON-BEARING SYSTEMS AND ARE NOT REQUIRED OR INTENDED TO RESISTWIND LOADS OR SUPPORT FLOOR LOADSPARTITIONS ARE CONTINUOUS ACROSS DOORWAYS, OPENINGS AND ABUTTING PARTITIONS. A TAG SHOWN IN ONESEGMENT OF A PARTITION APPLIES TO ALL UNMARKED SEGMENTS THAT ARE IN LINE WITH AND CONTINUOUS WITH THETAGGED SEGMENT. RATED WALLS AND PARTITIONS EXTEND THRU THE CEILING TO THE STRUCTURE OVER. PARTITIONSSHALL EXTEND TO THE DECK AND BE PROFILED TO FIT NEATLY AROUND FRAMING MEMBERS WITHIN1
/
2 ". JOINTS TO BESEALED ALONG THE ENTIRE LENGTH. PORTIONS OF THE PARTITION ABOVE THE CEILING ARE CONTINUOUS, WITHOUTOPENINGS OTHER THAN THOSE REQUIRED FOR PENETRATION OF SERVICES.WHERE WALLS OR PARTITIONS WITH DISIMILAR RATINGS INTERSECT, ASSEMBLIES WITH HIGHER RATINGS HAVE PRIORITY.SMOKE PARTITIONS HAVE PRIORITY OVER FIRE PARTITIONS WITH EQUAL RATINGS. FIRE RATINGS HAVE PRIORITY OVERACOUSTIC RATINGS. CONSTRUCT PARTITION SUCH THAT THE HIGHER RATED ASSEMBLY IS CONTINUOUS THRU THEINTERSECTION.REQUIREMENTS TO LABEL WALLS ABOVE CEILINGS AND IN CONCEALED SPACES APPLY ONLY TO PROJECTS UNDERSTANDARD BUILDING CODE JURISDICTION. IF A PARTITION IS DESIGNATED AS A "SMOKE" PARTITION, THE WORD SMOKESHALL BE INCORPORATED INTO THE LABEL; EG "2 HOUR FIRE WALL" BECOMES "2 HOUR SMOKE AND FIRE WALL".
INSTALL DOUBLE 20 GAUGE STUDS AT ALL DOOR JAMBS
REFER TYPICAL MOUNTING HEIGHTS
P.Q.R.S.T. U.
1 1/2"
SC
HE
DU
LE
D C
EIL
ING
HE
IGH
T
CEILING LINE
UNDERSIDE OF METAL DECK ABOVECUT GYP. BD. 1-1/2" BELOW DECK &SEAL W/ FIRE SEALANT3" DEEP LEG RUNNER. SECURETO DECK @ 24" O.C. MAX.SCHED CEILING MATERIAL
HORIZONTAL MTL STUD BRACINGAT 4'-0" O.C. MAXSCHED ACOUSTICAL INSULMTL RUNNER CHANNELSCHED FLOORING
MTL. RUNNER CHANNEL BYDEMOUNTABLE WALL MFG.
SCHED. MTL. STUDSBY DEMOUNTABLE WALL MFG.3/4" x 24 ULTRAWALL GYPSUMPANELS SECURED TO MTLSTUDS TYPICAL BOTH SIDES.
ROOM CORRIDOR
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi t
Loca
l File
s\11
_ 26_
2013
_erm
e ll r
enov
atio
n_c m
itche
ll.rv
t12
/24/
2 013
2:3
2:22
PM
1" = 1'-0"
PROJECT ISSUE DATE
13350
PARTITION TYPES
A5.10
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1" = 1'-0"PARTITION TYPE - A 1 1" = 1'-0"PARTITION TYPE - B 2 1" = 1'-0"PARTITION TYPE - C 3
1" = 1'-0"PARTITION TYPE NOTES 1" = 1'-0"PARTITION TYPE - D - 1 HOUR RATED 4
PR - PAIR OF DOORSH.M. - HOLLOW METALALUM. - ALUMINUMANOD - ANODIZEDDOOR SCHEDULE ABBREVIATIONSP.LAM - PLASTIC LAMINATEPT - PAINTS.C. - SOLID CORE
Manufacturer ListCode Name AB ABH Manufacturing Inc. AD Adams Rite BE Best Access Systems BY By Others NA National Guard PR Precision ST Stanley SY Key Systems TR TrimcoOption ListCode Description 18 CONCEALED WIRES - 18 AWG (8) CD CYLINDER DOGGING CE CONC. WIRES FL Fire Exit Hardware LS LATCHBOLT MONITOR SWITCH SN Sex Nuts TS TOUCHBAR MONITORING SWITCH B4E BEVELED 4 EDGES ELR ELECTRIC LATCH RETRACTION RQE REQUEST TO EXIT TDS TOUCHBAR MONITORING DOUBLE SWITCH VIN Visual Indicator 48" ROD 48" Rod CUT-CYL CUT FOR CYLINDER SNB SEX BOLTS END CAPS Set of End Caps EPT Prep EPT Prep (full mortise) CUT-MORTISE CUT FOR MORTISE LOCK 1/4-20 MS/LA STAINLESS MACHINE SCREWS/LEAD ANCHOR C-SUNK HOLES COUNTER SINKINGFinish ListCode Description AL Aluminum PC Prime Coat S1 Sprayed Aluminum Finish 600 Primed for Painting 626 Satin Chromium Plated 628 Satin Aluminum, Clear Anodized 630 Satin Stainless Steel 689 Aluminum Painted GREY Grey US28 Aluminum - Clear Anodized BLACK Black US26D Chromium Plated, Dull US32D Stainless Steel, Dull
SCHED. DOOR WIDTH
SC
HE
D. D
OO
R H
T.
HOLLOW METAL DOORSW/ 1/4" THK WIRE GLASS VISION
PANEL (PAINT)
SCHED. DOOR WIDTH
SC
HE
D. D
OO
R H
T.
SOLID CORE WOOD DOORWITH 1/4" THK. CLEAR 1 A.M.
GLASS VISION PANEL
21
SCHED. DOOR WIDTH
SC
HE
D. D
OO
R H
T.
SOLID CORE WOOD DOOR
3
3' -
6"
2' -
0"
6"
3' -
6"
2' -
0"
6" 6"
4" 4"
3'-2" 2'-8"
SCHED. DOORWIDTH
SCHED. DOOR HT.
HOLLOW METAL(PAINT)CENTERLINE OF LEVERCENTERLINE OF PUSH/PULL BAR AND PULL
MOUNTING HEIGHTS
C-C C-C
A
JAMB DEPTH2"
1 15/16"1/2"
1/2" 5/8"
1SECTION C-CFRAME TO BE PAINTED WITH ARCHITECT APPROVED COLORNOTE:TYPICAL HOLLOW METAL FRAME
DD1. Contractor to feild verify all existing door frames scheduled to receive new doorsprior to ordering replacement doors.DD2. Replace all existing doors scheduled and replace with new door and new door hardware.DD3. Paint existing door frame . Verify color with Archtect prior to installation.
RESILIENT FLOORING
ALIGN TRANSITION STRIPWITH CENTER OF DOOR
CARPET
1/4"
EQ EQ
TS-1
CARPET
ALIGN CARPET TRANSITIONWITH INSIDE FACE OF DOOR
CARPET
RESILIENT FLOORING
ALIGN TRANSITIONWITH CENTER OF DOOR
EQ EQ
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi t
Loca
l File
s\11
_ 26_
2013
_erm
e ll r
enov
atio
n_c m
itche
ll.rv
t12
/24/
2 013
2:3
2:24
PM
As indicated
PROJECT ISSUE DATE
13350
DOOR SCHEDULE &DETAILS
A5.20
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
DOOR SCHEDULE (SHARED DETAIL & HDW SET PARAMETERS)
DOOR NO. ROOM NAME
DOOR DOOR FRAME DETAILS
Fire Rating Comments
SIZE
DOOR TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB SILLW H THK
100 COMMON AREA 100 5' - 4" 8' - 3" 1 3/4" 2 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
100A COMMON AREA 100 5' - 4" 8' - 3" 1 3/4" 2 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
101 CLASSROOM 101 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
102 CLASSROOM 102 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
103 CLASSROOM 103 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
104 CLASSROOM 104 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
105 COMMON AREA 105 5' - 4" 8' - 3" 1 3/4" 2 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
105A COMMON AREA 105 5' - 4" 8' - 3" 1 3/4" 2 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
106 CLASSROOM 106 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
107 CLASSROOM 107 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
108 CLASSROOM 108 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
109 CLASSROOM 109 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
110 COMMON AREA 110 5' - 4" 8' - 3" 1 3/4" 2 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
110A COMMON AREA 110 5' - 4" 8' - 3" 1 3/4" 2 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
111 CLASSROOM 111 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
112 CLASSROOM 112 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
113 CLASSROOM 113 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
114 CLASSROOM 114 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
115 COMMON AREA 115 5' - 4" 8' - 3" 1 3/4" 2 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
115A COMMON AREA 115 5' - 4" 8' - 3" 1 3/4" 2 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
116 CLASSROOM 116 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
117 CLASSROOM 117 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
118 CLASSROOM 118 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
119 CLASSROOM 119 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
120 COMMON AREA 120 5' - 4" 8' - 3" 1 3/4" 2 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
120A COMMON AREA 120 5' - 4" 8' - 3" 1 3/4" 2 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
121 CLASSROOM 121 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
122 CLASSROOM 122 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
123 CLASSROOM 123 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
124 CLASSROOM 124 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
125 COMMON AREA 125 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
125A COMMON AREA 125 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 7 / A5.20 20 Min VERIFY EXISTING OPENING
126 CLASSROOM 126 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
127 CLASSROOM 127 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
128 CLASSROOM 128 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
129 CLASSROOM 129 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
130 CLASSROOM 130 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
131 CLASSROOM 131 3' - 0" 8' - 0" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
131A CLASSROOM 131 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
132 CLASSROOM 132 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
133 CLASSROOM 133 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXITING OPENING
135 CLASSROOM 135 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
136 CLASSROOM 136 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
137 CLASSROOM 137 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
138 CLASSROOM 138 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
139 CLASSROOM 139 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
140 CLASSROOM 140 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXITING OPENING
141 CLASSROOM 141 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXITING OPENING
142 CLASSROOM 142 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXITING OPENING
143 BOYS RESTROOM 143 3' - 0" 6' - 11" 1 3/4" 3 SC/WD P.Lam A HM PAINT 7 / A5.20
144 GIRLS RESTROOM 144 3' - 0" 6' - 11" 1 3/4" 3 SC/WD P.Lam A HM PAINT 7 / A5.20
148 GIRLS RESTROOM 148 3' - 0" 6' - 11" 1 3/4" 3 SC/WD P.Lam A HM PAINT 7 / A5.20
149 BOYS RESTROOM 149 3' - 0" 6' - 11" 1 3/4" 3 SC/WD P.Lam A HM PAINT 7 / A5.20
150 GIRLS RESTROOM 150 3' - 0" 6' - 11" 1 3/4" 3 SC/WD P.Lam A HM PAINT 7 / A5.20
151 BOYS RESTROOM 151 3' - 0" 6' - 11" 1 3/4" 3 SC/WD P.Lam A HM PAINT 7 / A5.20
159 GIRLS RESTROOM 159 3' - 0" 6' - 11" 1 3/4" 3 SC/WD P.Lam A HM PAINT 7 / A5.20 VERIFY EXISTING OPENING
160 BOYS RESTROOM 160 3' - 0" 6' - 11" 1 3/4" 3 SC/WD P.Lam A HM PAINT 7 / A5.20 VERIFY EXISTING OPENING
161 BOYS RESTROOM 161 3' - 0" 6' - 11" 1 3/4" 3 SC/WD P.Lam A HM PAINT 7 / A5.20
162 GIRLS RESTROOM 162 3' - 0" 6' - 11" 1 3/4" 3 SC/WD P.Lam A HM PAINT 7 / A5.20
169 CLASSROOM 169 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
170 CLASSROOM 170 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
171 CLASSROOM 171 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
172 CLASSROOM 172 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
173 CLASSROOM 173 3' - 0" 8' - 3" 1 3/4" 1 SC/WD P.Lam A HM *PAINT 8 / A5.20 20 Min VERIFY EXISTING OPENING
174 BOYS RESTROOM 174 3' - 0" 6' - 11" 1 3/4" 3 SC/WD P.Lam A HM PAINT 7 / A5.20 VERIFY EXISTING OPENING
175 GIRLS RESTROOM 175 3' - 0" 6' - 11" 1 3/4" 3 SC/WD PAINT A HM PAINT 7 / A5.20 VERIFY EXISTING OPENING
1/2" = 1'-0"DOOR TYPES 20 1/2" = 1'-0"DOOR FRAME 1/4" = 1'-0"DOOR FRAME PROFILE
12" = 1'-0"DOOR LEGEND ABBREVIATIONS
DOOR SCHEDULE
12" = 1'-0"GENERAL NOTES
6" = 1'-0"TRANSITION DETAIL @ CARPET/ VCT 7
6" = 1'-0"TRANSITION DETAIL @ CARPET/CARPET 8
6" = 1'-0"TRANSITION DETAIL @ VCT/VCT 9
LEVEL 10' - 0"
27 5
7 788
2' -
1"
E F
2' -
10"
2' -
10"
A
G
C C
3131
1' -
3"
4 4
LEVEL 10' - 0"
2' -
10"
A
E
884
C C
G31 31444
LEVEL 10' - 0"
A
88
2' -
10"
1' -
3"
1' -
3"
1' -
3"
1' -
3"
AE
4 4 4 4
LEVEL 10' - 0"
1' -
3"
1' -
3"2'
- 1
0"
2' -
10"
8 87 7 4 4
EA
1' -
3"
1' -
3"
A27
2' -
1"
3131
CC
LEVEL 10' - 0"
2' -
10"
2' -
10"
A
EF
C C
2' -
1"
8 8 31G4 4
LEVEL 10' - 0"
1' -
3"
1' -
3"2'
- 1
0"
2' -
10"
A
8 87 7 4 5
C C
G
2' -
1"
EF
LEVEL 10' - 0"
2' -
10"
2' -
10"
8 8 4 4 4
E
F
A
2' -
1"
C C
G3131
LEVEL 10' - 0"
2' -
10"
2' -
10"
8 84
A
2' -
1"
F
G
C C
E
3131
1' -
3"
774
1' -
3"
LEVEL 10' - 0"
2' -
10"
2' -
1"
7 7 8 84
E
G
C C
F
A
1' -
3"
31314
LEVEL 10' - 0"
2' -
10"
2' -
10"
A
88 4
E
F
CC
LEVEL 10' - 0"
2' -
10"
2' -
10"
A
E
84
F
31 831
CC
LEVEL 10' - 0"
2' -
10"
2' -
10"
8 8
1' -
3"
3131744
2' -
1"
C C
E
F
A
IE1. Refer to General sheets for typical graphic, symbols, abbreviationindex.IE2. Refer to Texas Accessibility Guidelines sheet(s).IE3. All horizontal dimensions are provided on plans, and all verticaldimensions are provided on elevations and/or sections unlessotherwise noted.IE4. Provide adequate blocking as required at every location wheremillwork, wall light fixtures, plumbing fixtures, etc., areto be mounted. Items are required to resist 250 pound point load.IE5. There are items shown, i.e. outlets, switches, thermostats, on theMEP drawings that are not drawn on the architectural elevations.Contractor to coordinate and mount all MEP items perarchitectural dimensions unless noted otherwise.IE6. Refer to finish schedule and plans for all finishes unless notedotherwise.IE7. All custom millwork, if in scope of work, is shown in elevation anddesigned per designated details. Refer to interior elevations,millwork details, and specifications divisions 06 00 00 and/or divisionIE8. All manufacturer casework, if in scope of work, is designated onenlarged floor plans. Refer to casework schedule and specificationsdivision 06 00 00 for detailed information. Contractor is to follow thescheduled manufacturer's specifications, instructions, andrecommendations unless directed otherwise by the contract manual.
TOILET PARTITIONS.
.
.
.
TOILET PAPER DISPENSER
MIRROR 24' X 36'
PAPER TOWEL DISPENSER
A
B
C
D
.E
.F
.G
.H
GRAB BAR 36"
GRAB BAR 42"
SOAP DISPENSER
URINAL SCREEN
SYMBOL DESCRIPTION MANUFACTURERAND MODEL No.
MOUNTINGHEIGHTS
CHILDREN
GENERAL NOTES
SOLID PHENOLIC
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\R
evi t
Loca
l File
s\11
_ 26_
2013
_erm
e ll r
enov
atio
n_c m
itche
ll.rv
t12
/24/
2 013
2:3
2:29
PM
As indicated
PROJECT ISSUE DATE
13350
RENOVATEDRESTROOM INTERIORELEVATIONS
A6.20
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
3/8" = 1'-0"BOY'S RESTROOM 143 1
3/8" = 1'-0"GIRLS RESTROOM 144 2
3/8" = 1'-0"GIRLS RESTROOM 148 3
3/8" = 1'-0"BOYS RESTROOM 149 4
3/8" = 1'-0"GIRLS RESTROOM 150 5
3/8" = 1'-0"BOYS RESTROOM 151 6
3/8" = 1'-0"GIRLS RESTROOM 162 7
3/8" = 1'-0"BOYS RESTROOM 160 8
3/8" = 1'-0"BOYS RESTROOM 161 9
3/8" = 1'-0"GIRLS RESTROOM 175 10
3/8" = 1'-0"GIRLS RESTROOM 159 11
3/8" = 1'-0"BOYS RESTROOM 174 12 NOTES TO DRAWING
12" = 1'-0"INTERIOR ELEVATION GENERAL NOTES
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
1" = 1'-0"TOILET ACCESSORIES
LEVEL 10' - 0"
7' -
0"
3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0"
13 13 13 13 13
1
A7.61
LEVEL 10' - 0"4' - 0" 8' - 0" 1' - 6" 3' - 2"
6
A7.60
5
A7.60
3
A7.61
2
A7.61
4
A7.61
LEVEL 10' - 0"
6
A7.60
5
A7.60
3
A7.61
2
A7.61
4
A7.61
4' - 0" 8' - 0" 1' - 6" 3' - 2"
LEVEL 10' - 0"
1129 29
9
11
10
VA
RIE
S4
' - 0
"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
28
LEVEL 10' - 0"
4' - 0" 10' - 10" 3' - 0"
14
1313
10
2
A7.60
5
A7.61
1
A7.61
2
A7.60
2' - 6" 2' - 6" 2' - 6" 2' - 6"
LEVEL 10' - 0"
29 11 29
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.VA
RIE
S4
' - 0
"
28
LEVEL 10' - 0"
9
10
2911
11MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
28
LEVEL 10' - 0"
4' -
0"
VA
RIE
S
10
29 11 29
11 MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
28
LEVEL 10' - 0"
1313
4' - 0" 10' - 10" 3' - 0"
7' -
0"
14
1010
2
A7.60
2' - 6" 2' - 6" 2' - 6" 2' - 6"
5
A7.61
1
A7.61
IE1. Refer to General sheets for typical graphic, symbols, abbreviationindex.IE2. Refer to Texas Accessibility Guidelines sheet(s).IE3. All horizontal dimensions are provided on plans, and all verticaldimensions are provided on elevations and/or sections unlessotherwise noted.IE4. Provide adequate blocking as required at every location wheremillwork, wall light fixtures, plumbing fixtures, etc., areto be mounted. Items are required to resist 250 pound point load.IE5. There are items shown, i.e. outlets, switches, thermostats, on theMEP drawings that are not drawn on the architectural elevations.Contractor to coordinate and mount all MEP items perarchitectural dimensions unless noted otherwise.IE6. Refer to finish schedule and plans for all finishes unless notedotherwise.IE7. All custom millwork, if in scope of work, is shown in elevation anddesigned per designated details. Refer to interior elevations,millwork details, and specifications divisions 06 00 00 and/or divisionIE8. All manufacturer casework, if in scope of work, is designated onenlarged floor plans. Refer to casework schedule and specificationsdivision 06 00 00 for detailed information. Contractor is to follow thescheduled manufacturer's specifications, instructions, andrecommendations unless directed otherwise by the contract manual. Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:56
:43
PM
As indicated
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.40
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
NOTES TO DRAWING
3/8" = 1'-0"COMMON AREA 100 1
3/8" = 1'-0"CLASSROOM 101 2
3/8" = 1'-0"CLASSROOM 102 3
3/8" = 1'-0"CLASSROOM 101 4
3/8" = 1'-0"CLASSROOM 101 5
3/8" = 1'-0"CLASSROOM 101 6
3/8" = 1'-0"CLASSROOM 102 8
3/8" = 1'-0"CLASSROOM 102 9
3/8" = 1'-0"CLASSROOM 102 10
N/AINTERIOR ELEVATION GENERAL NOTES
LEVEL 1
0' - 0"
5
A7.61
2
A7.60
1
A7.61
14
13 13
10
4' - 0" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 3' - 0"
LEVEL 1
0' - 0"
10
6
A7.60
5
A7.60
4' - 0" 8' - 0" 1' - 6" 3' - 2"
2
A7.61
4
A7.61
3
A7.6113
LEVEL 1
0' - 0"
4' - 0"
VARIES
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F. 10
9
2929 11
11
28
LEVEL 1
0' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.VARIES
4' - 0"
29 11 29
10
28
LEVEL 1
0' - 0"
6
A7.60
5
A7.60
3
A7.61
2
A7.61
4
A7.61
4' - 0" 8' - 0" 1' - 6" 3' - 2"
11
10
13
LEVEL 1
0' - 0"
29 11 29 9
10
4' - 0"
VARIES
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
28
LEVEL 1
0' - 0"
VARIES
4' - 0"
29 11 29
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
28
10
LEVEL 1
0' - 0"
13 13
14
4' - 0" 10' - 10 1/8" 3' - 0"
10
2' - 6" 2' - 6" 2' - 6" 2' - 6"
5
A7.61
1
A7.61
2
A7.60
LEVEL 1
0' - 0"
7' - 0"
13 13 13 13 13
3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0"
1
A7.61
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\Revit Local Files\11_26_2013_erm
ell renovation_c m
itchell.rvt
12/24/2013 3:03:27 PM
3/8" = 1'-0"
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.41
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
NOTES TO DRAWING
3/8" = 1'-0"CLASSROOM 104 5
3/8" = 1'-0"CLASSROOM 104 7
3/8" = 1'-0"CLASSROOM 104 8
3/8" = 1'-0"CLASSROOM 104 9
3/8" = 1'-0"CLASSROOM 103 1
3/8" = 1'-0"CLASSROOM 103 2
3/8" = 1'-0"CLASSROOM 103 3
3/8" = 1'-0"CLASSROOM 103 4 3/8" = 1'-0"COMMON AREA 105 6
IE1. Refer to General sheets for typical graphic, symbols, abbreviationindex.IE2. Refer to Texas Accessibility Guidelines sheet(s).IE3. All horizontal dimensions are provided on plans, and all verticaldimensions are provided on elevations and/or sections unlessotherwise noted.IE4. Provide adequate blocking as required at every location wheremillwork, wall light fixtures, plumbing fixtures, etc., areto be mounted. Items are required to resist 250 pound point load.IE5. There are items shown, i.e. outlets, switches, thermostats, on theMEP drawings that are not drawn on the architectural elevations.Contractor to coordinate and mount all MEP items perarchitectural dimensions unless noted otherwise.IE6. Refer to finish schedule and plans for all finishes unless notedotherwise.IE7. All custom millwork, if in scope of work, is shown in elevation anddesigned per designated details. Refer to interior elevations,millwork details, and specifications divisions 06 00 00 and/or divisionIE8. All manufacturer casework, if in scope of work, is designated onenlarged floor plans. Refer to casework schedule and specificationsdivision 06 00 00 for detailed information. Contractor is to follow thescheduled manufacturer's specifications, instructions, andrecommendations unless directed otherwise by the contract manual.LEVEL 10' - 0"4' - 0" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 3' - 0"
5
A7.61
2
A7.60
1
A7.61
14
10
11
LEVEL 10' - 0"
10
4
A7.61
3
A7.61
2
A7.61
5
A7.60
6
A7.60
3' - 2" 1' - 6" 8' - 0" 4' - 0"
13
LEVEL 10' - 0"
29 11 28 29
11
10
VA
RIE
S4
' - 0
"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
LEVEL 10' - 0"
29 2911
9
10
4' -
0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
28
LEVEL 10' - 0"
6
A7.60
5
A7.60
3
A7.61
2
A7.61
4
A7.61
1' - 6" 8' - 0" 4' - 0"3' - 2"
13
10
LEVEL 10' - 0"
13
14
10
11
4' - 0"
2
A7.60
10' - 10" 3' - 0"
5
A7.61
2
A7.60
1
A7.61
2' - 6" 2' - 6" 2' - 6" 2' - 6"
LEVEL 10' - 0"
9
10
29 11 29
4' -
0"
3' -
0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F. 10
2813
LEVEL 10' - 0"
11
29 11 28 29
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S 10
LEVEL 10' - 0"
3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0"
7' -
0"
13 13 13 13 13
1
A7.61
LEVEL 10' - 0"
3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0"
13 13 13 13 13
7' -
0"
1
A7.61
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:56
:50
PM
As indicated
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.42
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
NOTES TO DRAWING
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
N/AINTERIOR ELEVATION GENERAL NOTES 3/8" = 1'-0"CLASSROOM 106 1
3/8" = 1'-0"CLASSROOM 106 2
3/8" = 1'-0"CLASSROOM 106 3
3/8" = 1'-0"CLASSROOM 106 4
3/8" = 1'-0"CLASSROOM 107 5
3/8" = 1'-0"CLASSROOM 107 6
3/8" = 1'-0"CLASSROOM 107 7
3/8" = 1'-0"CLASSROOM 107 8
3/8" = 1'-0"COMMON AREA 115 9
3/8" = 1'-0"COMMON AREA 120 10
IE1. Refer to General sheets for typical graphic, symbols, abbreviationindex.IE2. Refer to Texas Accessibility Guidelines sheet(s).IE3. All horizontal dimensions are provided on plans, and all verticaldimensions are provided on elevations and/or sections unlessotherwise noted.IE4. Provide adequate blocking as required at every location wheremillwork, wall light fixtures, plumbing fixtures, etc., areto be mounted. Items are required to resist 250 pound point load.IE5. There are items shown, i.e. outlets, switches, thermostats, on theMEP drawings that are not drawn on the architectural elevations.Contractor to coordinate and mount all MEP items perarchitectural dimensions unless noted otherwise.IE6. Refer to finish schedule and plans for all finishes unless notedotherwise.IE7. All custom millwork, if in scope of work, is shown in elevation anddesigned per designated details. Refer to interior elevations,millwork details, and specifications divisions 06 00 00 and/or divisionIE8. All manufacturer casework, if in scope of work, is designated onenlarged floor plans. Refer to casework schedule and specificationsdivision 06 00 00 for detailed information. Contractor is to follow thescheduled manufacturer's specifications, instructions, andrecommendations unless directed otherwise by the contract manual.LEVEL 10' - 0"4' - 0" 8' - 0" 1' - 6" 3' - 2"
6
A7.60
5
A7.60
3
A7.61
2
A7.61
4
A7.61
11
10
LEVEL 10' - 0"
29 11 29
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
9
10
28
11
LEVEL 10' - 0"
4' - 0" 10' - 10" 3' - 0"
13 13
14
10
11
2
A7.60
5
A7.61
2
A7.60
1
A7.61
4' - 0" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 3' - 0"
LEVEL 10' - 0"
29 1129
11
10MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.V
AR
IES
4' -
0"
28
LEVEL 10' - 0"
4
A7.61
2
A7.61
3
A7.61
5
A7.60
6
A7.60
4' - 0" 8' - 0" 1' - 6" 3' - 2"
13
LEVEL 10' - 0"
10
11
291129
9
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.VA
RIE
S4
' - 0
"
28
LEVEL 10' - 0"
29 11 29
10
4' -
0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
28
LEVEL 10' - 0"
3' - 0" 10' - 10" 4' - 0"
13 13
14
10
11
2
A7.60
2' - 6" 2' - 6" 2' - 6" 2' - 6"
5
A7.61
2
A7.60
1
A7.61
LEVEL 10' - 0"
7' -
0"
13 13 13 13 13
3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0"
1
A7.61
1
A7.61
1
A7.61
1
A7.61
1
A7.61
LEVEL 10' - 0"
7' -
0"
3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0"
1313131313
1
A7.61
1
A7.61
1
A7.61
1
A7.61
1
A7.61
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:56
:54
PM
As indicated
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.43
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
N/AINTERIOR ELEVATION GENERAL NOTES 3/8" = 1'-0"CLASSROOM 108 1
3/8" = 1'-0"CLASSROOM 108 2
3/8" = 1'-0"CLASSROOM 108 3
3/8" = 1'-0"CLASSROOM 108 4
3/8" = 1'-0"CLASSROOM 109 5
3/8" = 1'-0"CLASSROOM 109 6
3/8" = 1'-0"CLASSROOM 109 7
3/8" = 1'-0"CLASSROOM 109 8
3/8" = 1'-0"COMMON AREA 125 9
3/8" = 1'-0"COMMON AREA 110 10
NOTES TO DRAWING
LEVEL 10' - 0"
4' - 0" 10' - 10" 3' - 0"
13 13
14
10
11
2
A7.60
5
A7.61
2' - 6" 2' - 6" 2' - 6" 2' - 6"
1
A7.61
2
A7.60
LEVEL 10' - 0"
29 11 29
11
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
28
LEVEL 10' - 0"
10
9
29 11 29
VA
RIE
S4
' - 0
"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.11
28
LEVEL 1
0' - 0"4' - 0" 8' - 0" 1' - 6" 3' - 2"
4
A7.61
2
A7.61
3
A7.61
5
A7.60
6
A7.60
7' -
0"
LEVEL 10' - 0"
6
A7.60
5
A7.60
3
A7.61
2
A7.61
4
A7.61
7' -
0"
LEVEL 10' - 0"
291129 28
10
9
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
LEVEL 10' - 0"
11
29 11 29
10
4' -
0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
28
LEVEL 10' - 0"
10
11
1313
14
2
A7.60
4' - 0" 10' - 10" 3' - 0"
2
A7.60
1
A7.61
5
A7.61
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:56
:57
PM
3/8" = 1'-0"
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.44
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
3/8" = 1'-0"CLASSROOM 111 1
3/8" = 1'-0"CLASSROOM 111 2
3/8" = 1'-0"CLASSROOM 111 3
3/8" = 1'-0"CLASSROOM 111 4
3/8" = 1'-0"CLASSROOM 112 5
3/8" = 1'-0"CLASSROOM 112 6
3/8" = 1'-0"CLASSROOM 112 7
3/8" = 1'-0"CLASSROOM 112 8
NOTES TO DRAWING
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.VA
RIE
S4
' - 0
"
9
29 11 2928 13
LEVEL 10' - 0"
6
A7.60
5
A7.60
3
A7.61
2
A7.61
4
A7.61
4' - 0" 8' - 0" 1' - 6" 3' - 2"
13
11
10
LEVEL 10' - 0"
10
13 13
14
11
2
A7.60
4' - 0" 10' - 10" 3' - 0"
1
A7.61
5
A7.61
LEVEL 10' - 0"
11
10
291129
4' -
0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
28
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
2929 11 28
10
LEVEL 10' - 0"
9
11
10
6
A7.60
5
A7.60
3
A7.612
A7.61
4
A7.61
LEVEL 10' - 0"
4' -
0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
29 2911
10
28
LEVEL 10' - 0"
10
11
4' - 0" 10' - 10" 3' - 0"
2
A7.60
13 13
11
14
2' - 6" 2' - 6" 2' - 6" 2' - 6"
1
A7.61
5
A7.61
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:57
:00
PM
3/8" = 1'-0"
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.45
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
3/8" = 1'-0"CLASSROOM 113 1
3/8" = 1'-0"CLASSROOM 113 2
3/8" = 1'-0"CLASSROOM 113 3
3/8" = 1'-0"CLASSROOM 113 4
3/8" = 1'-0"CLASSROOM 114 5
3/8" = 1'-0"CLASSROOM 114 6
3/8" = 1'-0"CLASSROOM 114 7
3/8" = 1'-0"CLASSROOM 114 8
NOTES TO DRAWING
LEVEL 1
0' - 0"
3' - 0" 10' - 10" 4' - 0"
1313
11
2
A7.60
10
2929
10
14
5
A7.61
1
A7.61
3' - 0" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 4' - 0"
LEVEL 1
0' - 0"4' - 0" 8' - 0" 1' - 6" 3' - 2"
5
A7.60
6
A7.60
2
A7.60
10
13
2
A7.61
4
A7.61
LEVEL 1
0' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.VA
RIE
S4
' - 0
"
11 289
LEVEL 1
0' - 0"
29 11 29
10
11
4' -
0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
28
LEVEL 1
0' - 0"3' - 2" 1' - 6" 8' - 0" 4' - 0"
10
11
6
A7.60
5
A7.60
3
A7.61
2
A7.61
4
A7.61
LEVEL 1
0' - 0"
10
2911 28
4' -
0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
13
9
LEVEL 1
0' - 0"
29 11 29
10
11
VA
RIE
S4
' - 0
"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
LEVEL 1
0' - 0"
4' - 0" 10' - 10" 3' - 0"
13
14
4' - 0" 3' - 0"
2
A7.60
2' - 6" 2' - 6" 2' - 6" 2' - 6"
10
13
5
A7.61
1
A7.61
IE1. Refer to General sheets for typical graphic, symbols, abbreviationindex.IE2. Refer to Texas Accessibility Guidelines sheet(s).IE3. All horizontal dimensions are provided on plans, and all verticaldimensions are provided on elevations and/or sections unlessotherwise noted.IE4. Provide adequate blocking as required at every location wheremillwork, wall light fixtures, plumbing fixtures, etc., areto be mounted. Items are required to resist 250 pound point load.IE5. There are items shown, i.e. outlets, switches, thermostats, on theMEP drawings that are not drawn on the architectural elevations.Contractor to coordinate and mount all MEP items perarchitectural dimensions unless noted otherwise.IE6. Refer to finish schedule and plans for all finishes unless notedotherwise.IE7. All custom millwork, if in scope of work, is shown in elevation anddesigned per designated details. Refer to interior elevations,millwork details, and specifications divisions 06 00 00 and/or divisionIE8. All manufacturer casework, if in scope of work, is designated onenlarged floor plans. Refer to casework schedule and specificationsdivision 06 00 00 for detailed information. Contractor is to follow thescheduled manufacturer's specifications, instructions, andrecommendations unless directed otherwise by the contract manual. Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13
3:0
1:0
3 P
M
As indicated
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.46
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
3/8" = 1'-0"CLASSROOM 116 1
3/8" = 1'-0"CLASSROOM 116 2
3/8" = 1'-0"CLASSROOM 116 3
3/8" = 1'-0"CLASSROOM 116 4
3/8" = 1'-0"CLASSROOM 117 5
3/8" = 1'-0"CLASSROOM 117 6
3/8" = 1'-0"CLASSROOM 117 7
3/8" = 1'-0"CLASSROOM 117 8
NOTES TO DRAWING
12" = 1'-0"INTERIOR ELEVATION GENERAL NOTES
LEVEL 10' - 0"
4' - 0" 3' - 0"
13
14
13
11
10
10' - 10"
2
A7.60
2' - 6" 2' - 6" 2' - 6" 2' - 6"
LEVEL 10' - 0"
29
10
11
4' -
0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
11 2928
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
9
11 29
10
LEVEL 10' - 0"
11 29
10
VA
RIE
S4
' - 0
"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
9
28
LEVEL 10' - 0"
11
10
13 13
4' - 0" 10' - 10" 3' - 0"
7' -
0"
14
2
A7.60
2' - 6" 2' - 6" 2' - 6" 2' - 6"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
5
A7.61
1
A7.61
LEVEL 10' - 0"
291129
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.VA
RIE
S4
' - 0
"
2829
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.VA
RIE
S4
' - 0
"
LEVEL 10' - 0"
3' - 2"1' - 6"8' - 0"4' - 0"
5
A7.60
6
A7.60
3
A7.61
2
A7.61
4
A7.6113
10
11
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
29
10
13
4' -
0"
VA
RIE
S
112829
29
LEVEL 10' - 0"
96
A7.60
5
A7.60
4' - 0" 8' - 0" 1' - 6" 3' - 2"
16' - 8"
3
A7.61
2
A7.61
4
A7.61
LEVEL 10' - 0"
13
14
2
A7.60
11
4' - 0" 10' - 10" 3' - 0"
10
5
A7.61
1
A7.61
2' - 6" 2' - 6" 2' - 6" 2' - 6"
IE1. Refer to General sheets for typical graphic, symbols, abbreviationindex.IE2. Refer to Texas Accessibility Guidelines sheet(s).IE3. All horizontal dimensions are provided on plans, and all verticaldimensions are provided on elevations and/or sections unlessotherwise noted.IE4. Provide adequate blocking as required at every location wheremillwork, wall light fixtures, plumbing fixtures, etc., areto be mounted. Items are required to resist 250 pound point load.IE5. There are items shown, i.e. outlets, switches, thermostats, on theMEP drawings that are not drawn on the architectural elevations.Contractor to coordinate and mount all MEP items perarchitectural dimensions unless noted otherwise.IE6. Refer to finish schedule and plans for all finishes unless notedotherwise.IE7. All custom millwork, if in scope of work, is shown in elevation anddesigned per designated details. Refer to interior elevations,millwork details, and specifications divisions 06 00 00 and/or divisionIE8. All manufacturer casework, if in scope of work, is designated onenlarged floor plans. Refer to casework schedule and specificationsdivision 06 00 00 for detailed information. Contractor is to follow thescheduled manufacturer's specifications, instructions, andrecommendations unless directed otherwise by the contract manual. Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:57
:06
PM
As indicated
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.47
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
NOTES TO DRAWING
3/8" = 1'-0"CLASSROOM 118 1
3/8" = 1'-0"CLASSROOM 118,119 2
3/8" = 1'-0"CLASSROOM 118 3
3/8" = 1'-0"CLASSROOM 118 4
3/8" = 1'-0"CLASSROOM 118 5
3/8" = 1'-0"CLASSROOM 118 6
3/8" = 1'-0"CLASSROOM 118 7
3/8" = 1'-0"CLASSROOM 119 8
3/8" = 1'-0"CLASSROOM 119 9
3/8" = 1'-0"CLASSROOM 119 10
12" = 1'-0"INTERIOR ELEVATION GENERAL NOTES
LEVEL 10' - 0"
6
A7.60
5
A7.60
3
A7.612
A7.61
4
A7.61
3' - 2" 1' - 6" 8' - 0" 4' - 0"
13
LEVEL 10' - 0"
13 13
4' - 0" 10' - 10" 3' - 0"
14
10
11
2
A7.60
2' - 6" 2' - 6" 2' - 6" 2' - 6"
5
A7.61
1
A7.61
LEVEL 10' - 0"
29 2911
9
VA
RIE
S4
' - 0
"
10
28
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
LEVEL 10' - 0"
4' -
0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
29 11 29
29
10
28
LEVEL 10' - 0"
11
6
A7.60
5
A7.60
3
A7.61
2
A7.61
4
A7.61
13
10
LEVEL 10' - 0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
29 11 29
29
28
10
LEVEL 10' - 0"
11
9
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
28
11
13
1' - 6"
LEVEL 10' - 0"
4' - 0" 10' - 10" 3' - 0"
10
13 13
14
29
4' -
0"
VA
RIE
S
2
A7.60
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.2' - 6" 2' - 6" 2' - 6" 2' - 6"
5
A7.61
1
A7.61
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:57
:09
PM
3/8" = 1'-0"
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.48
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
3/8" = 1'-0"CLASSROOM 121 1
3/8" = 1'-0"CLASSROOM 121 2
3/8" = 1'-0"CLASSROOM 121 3
3/8" = 1'-0"CLASSROOM 121 4
3/8" = 1'-0"CLASSROOM 122 5
3/8" = 1'-0"CLASSROOM 122 6
3/8" = 1'-0"CLASSROOM 122 7
3/8" = 1'-0"CLASSROOM 122 8
NOTES TO DRAWING
LEVEL 10' - 0"2' - 6" 2' - 6" 2' - 6" 2' - 6"
3' - 0"10' - 10"4' - 0"
5
A7.61
2
A7.60
1
A7.61
10
LEVEL 10' - 0"
11
4' - 0" 8' - 0" 1' - 6" 3' - 2"
10
6
A7.60
5
A7.60
3
A7.61
2
A7.61
4
A7.61
1313
LEVEL 10' - 0"
2928 1129
10
11
4' -
0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
LEVEL 10' - 0"
VA
RIE
S4
' - 0
"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
29 11
10
9
28
13
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
2911 289
10
LEVEL 10' - 0"
5
A7.60
6
A7.60
3
A7.61
2
A7.61
4
A7.61
4' - 0" 8' - 0" 1' - 6" 3' - 2"
10
1313
LEVEL 10' - 0"2' - 6" 2' - 6" 2' - 6" 2' - 6"
10' - 10" 3' - 0"4' - 0"
11
10
1213
14
5
A7.61
1
A7.61
2
A7.60
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
VA
RIE
S4
' - 0
"
1129 292829 13
10
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:57
:13
PM
3/8" = 1'-0"
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.49
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
3/8" = 1'-0"CLASSROOM 123 1
3/8" = 1'-0"CLASSROOM 123 2
3/8" = 1'-0"CLASSROOM 123 3
3/8" = 1'-0"CLASSROOM 123 4
3/8" = 1'-0"CLASSROOM 124 5
3/8" = 1'-0"CLASSROOM 124 6
3/8" = 1'-0"CLASSROOM 124 7
3/8" = 1'-0"CLASSROOM 124 8
NOTES TO DRAWING
LEVEL 10' - 0"
10
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
29 29 11 28
11
LEVEL 10' - 0"
2
A7.60
7' -
0"
4' - 0" 3' - 0"
10
14
13 13
2' - 6" 2' - 6" 2' - 6" 2' - 6"
10' - 10"
-
---
-
---
11
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
9
11 28 29
10
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F. 10
VA
RIE
S4
' - 0
"
5
A7.60
6
A7.60
3
A7.61
2
A7.61
4
A7.61 1329
4' - 0" 8' - 0" 1' - 6" 3' - 2"
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F. MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
112829 29
LEVEL 10' - 0"
2
A7.60
7' -
0"
4' - 0" 3' - 0"
5
A7.60
6
A7.60
5
A7.60
6
A7.60
14
11
10
13 13
10' - 10"
2' - 6" 2' - 6" 2' - 6" 2' - 6"
LEVEL 10' - 0"
9
10
5
A7.60
6
A7.60
4' - 0" 8' - 0" 1' - 6" 3' - 2"
3
A7.61
2
A7.61
4
A7.61
11
LEVEL 10' - 0"
2911 28 29
10MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
IE1. Refer to General sheets for typical graphic, symbols, abbreviationindex.IE2. Refer to Texas Accessibility Guidelines sheet(s).IE3. All horizontal dimensions are provided on plans, and all verticaldimensions are provided on elevations and/or sections unlessotherwise noted.IE4. Provide adequate blocking as required at every location wheremillwork, wall light fixtures, plumbing fixtures, etc., areto be mounted. Items are required to resist 250 pound point load.IE5. There are items shown, i.e. outlets, switches, thermostats, on theMEP drawings that are not drawn on the architectural elevations.Contractor to coordinate and mount all MEP items perarchitectural dimensions unless noted otherwise.IE6. Refer to finish schedule and plans for all finishes unless notedotherwise.IE7. All custom millwork, if in scope of work, is shown in elevation anddesigned per designated details. Refer to interior elevations,millwork details, and specifications divisions 06 00 00 and/or divisionIE8. All manufacturer casework, if in scope of work, is designated onenlarged floor plans. Refer to casework schedule and specificationsdivision 06 00 00 for detailed information. Contractor is to follow thescheduled manufacturer's specifications, instructions, andrecommendations unless directed otherwise by the contract manual. Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:57
:16
PM
As indicated
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.50
ERMEL ELEMENTARY
INTERIOR RENOVATION 7103
WOODSMAN TRAIL,
HOUSTON, TX 77040
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
3/8" = 1'-0"CLASSROOM 126 1
3/8" = 1'-0"CLASSROOM 126 2
3/8" = 1'-0"CLASSROOM 126 3
3/8" = 1'-0"CLASSROOM 126 4
3/8" = 1'-0"CLASSROOM 127 5
3/8" = 1'-0"CLASSROOM 127 6
3/8" = 1'-0"CLASSROOM 127 7
3/8" = 1'-0"CLASSROOM 127 8
NOTES TO DRAWING
12" = 1'-0"INTERIOR ELEVATION GENERAL NOTES
LEVEL 10' - 0"
4
A7.61
2
A7.61
3
A7.61
5
A7.60
6
A7.60
4' - 0" 8' - 0" 1' - 6" 3' - 2"
LEVEL 10' - 0"
4' - 0" 10' - 10" 3' - 0"
13 13
14
10
2
A7.60
11
2' - 6" 2' - 6" 2' - 6" 2' - 6"
5
A7.61
1
A7.61
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.4
' - 0
"V
AR
IES
2911 2829
10
29
LEVEL 1
0' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
9
11 28 29
10
13
LEVEL 10' - 0"
4
A7.61
2
A7.61
3
A7.61
5
A7.60
6
A7.60
4' - 0" 8' - 0" 1' - 6" 3' - 2"
10
LEVEL 10' - 0"
2
A7.60
7' -
0"
4' - 0" 3' - 0"
13 13
14
10
10' - 10"
2' - 6" 2' - 6" 2' - 6" 2' - 6"
1
A7.61
5
A7.61
LEVEL 10' - 0"
4' -
0"
VA
RIE
S
11 28 29
9
10
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
13
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F. 10
4' -
0"
VA
RIE
S
11 2829 29 13
29
10
IE1. Refer to General sheets for typical graphic, symbols, abbreviationindex.IE2. Refer to Texas Accessibility Guidelines sheet(s).IE3. All horizontal dimensions are provided on plans, and all verticaldimensions are provided on elevations and/or sections unlessotherwise noted.IE4. Provide adequate blocking as required at every location wheremillwork, wall light fixtures, plumbing fixtures, etc., areto be mounted. Items are required to resist 250 pound point load.IE5. There are items shown, i.e. outlets, switches, thermostats, on theMEP drawings that are not drawn on the architectural elevations.Contractor to coordinate and mount all MEP items perarchitectural dimensions unless noted otherwise.IE6. Refer to finish schedule and plans for all finishes unless notedotherwise.IE7. All custom millwork, if in scope of work, is shown in elevation anddesigned per designated details. Refer to interior elevations,millwork details, and specifications divisions 06 00 00 and/or divisionIE8. All manufacturer casework, if in scope of work, is designated onenlarged floor plans. Refer to casework schedule and specificationsdivision 06 00 00 for detailed information. Contractor is to follow thescheduled manufacturer's specifications, instructions, andrecommendations unless directed otherwise by the contract manual. Drawing Number
Project Number
Drawing Name
Project Name
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:57
:19
PM
As indicated
7103 WOODSMAN TRAIL, HOUSTON, TX 77040
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.51
ERMEL ELEMENTARY INTERIOR RENOVATION
Revision Issue
No. Description Date
3/8" = 1'-0"CLASSROOM 128 1
3/8" = 1'-0"CLASSROOM 128 2
3/8" = 1'-0"CLASSROOM 128 3
3/8" = 1'-0"CLASSROOM 128 4
3/8" = 1'-0"CLASSROOM 129 5
3/8" = 1'-0"CLASSROOM 129 6
3/8" = 1'-0"CLASSROOM 129 7
3/8" = 1'-0"CLASSROOM 129 8
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
NOTES TO DRAWING
12" = 1'-0"INTERIOR ELEVATION GENERAL NOTES
LEVEL 10' - 0"
11 28 299
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
10
13
LEVEL 10' - 0"
11
1' - 6" 3' - 2"8' - 0"4' - 0"
9
10
13
4
A7.61
2
A7.61
3
A7.61
5
A7.60
6
A7.60
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
9
10
4' -
0"
VA
RIE
S
2829 11
LEVEL 1
0' - 0"
4' - 0" 10' - 10" 3' - 0"
13 13
10
11
2' - 6" 2' - 6" 2' - 6" 2' - 6"
14
5
A7.61
2
A7.60
1
A7.61
LEVEL 10' - 0"
10
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
1128
4' -
0"
VA
RIE
S
9
LEVEL 10' - 0"
10
4' - 0" 10' - 10" 3' - 0"
2' - 6" 2' - 6" 2' - 6" 2' - 6"
14
1313
2
A7.60
5
A7.61
1
A7.61
LEVEL 10' - 0"
11
4' -
0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
28
9
10
29
10
29
LEVEL 10' - 0"
29
10
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
5
A7.60
6
A7.60
4' - 0" 8' - 0" 1' - 6" 3' - 2"
3
A7.61
2
A7.61
4
A7.61
IE1. Refer to General sheets for typical graphic, symbols, abbreviationindex.IE2. Refer to Texas Accessibility Guidelines sheet(s).IE3. All horizontal dimensions are provided on plans, and all verticaldimensions are provided on elevations and/or sections unlessotherwise noted.IE4. Provide adequate blocking as required at every location wheremillwork, wall light fixtures, plumbing fixtures, etc., areto be mounted. Items are required to resist 250 pound point load.IE5. There are items shown, i.e. outlets, switches, thermostats, on theMEP drawings that are not drawn on the architectural elevations.Contractor to coordinate and mount all MEP items perarchitectural dimensions unless noted otherwise.IE6. Refer to finish schedule and plans for all finishes unless notedotherwise.IE7. All custom millwork, if in scope of work, is shown in elevation anddesigned per designated details. Refer to interior elevations,millwork details, and specifications divisions 06 00 00 and/or divisionIE8. All manufacturer casework, if in scope of work, is designated onenlarged floor plans. Refer to casework schedule and specificationsdivision 06 00 00 for detailed information. Contractor is to follow thescheduled manufacturer's specifications, instructions, andrecommendations unless directed otherwise by the contract manual. Drawing Number
Project Number
Drawing Name
Project Name
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:57
:22
PM
As indicated
7103 WOODSMAN TRAIL, HOUSTON, TX 77040
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.52
ERMEL ELEMENTARY INTERIOR RENOVATION
Revision Issue
No. Description Date
3/8" = 1'-0"CLASSROOM 130 1
3/8" = 1'-0"CLASSROOM 130 2
3/8" = 1'-0"CLASSROOM 130 3
3/8" = 1'-0"CLASSROOM 130 4
3/8" = 1'-0"CLASSROOM 131 5
3/8" = 1'-0"CLASSROOM 131 6
3/8" = 1'-0"CLASSROOM 131 7
3/8" = 1'-0"CLASSROOM 131 8
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
NOTES TO DRAWING
N/AINTERIOR ELEVATION GENERAL NOTES
LEVEL 10' - 0"
VA
RIE
S4
' - 0
"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
29 2911 28
10
LEVEL 10' - 0"
4' -
0"
VA
RIE
S
29 11 28 29
10
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
LEVEL 10' - 0"
4' - 0" 10' - 10" 3' - 0"
11
13 13
2' - 6"
14
2' - 6" 2' - 6"2' - 6"
10
2
A7.60
5
A7.61
1
A7.61
LEVEL 10' - 0"4' - 0" 8' - 0" 1' - 6" 3' - 2"
6
A7.60
5
A7.60
2
A7.6013
11
92
A7.61
4
A7.61
10
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0"A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
29 11 28 29
10
4' -
0"
VA
RIE
S
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
29 11 28 29
10
LEVEL 10' - 0"
4
A7.61
2
A7.61
3
A7.61
5
A7.60
6
A7.60
8' - 0" 1' - 6" 3' - 2"4' - 0"
9
LEVEL 10' - 0"
4' - 0" 10' - 10" 3' - 0"
11
13
10
14
13
11
10
2' - 6" 2' - 6" 2' - 6" 2' - 6"
1
A7.615
A7.61
2
A7.60
IE1. Refer to General sheets for typical graphic, symbols, abbreviationindex.IE2. Refer to Texas Accessibility Guidelines sheet(s).IE3. All horizontal dimensions are provided on plans, and all verticaldimensions are provided on elevations and/or sections unlessotherwise noted.IE4. Provide adequate blocking as required at every location wheremillwork, wall light fixtures, plumbing fixtures, etc., areto be mounted. Items are required to resist 250 pound point load.IE5. There are items shown, i.e. outlets, switches, thermostats, on theMEP drawings that are not drawn on the architectural elevations.Contractor to coordinate and mount all MEP items perarchitectural dimensions unless noted otherwise.IE6. Refer to finish schedule and plans for all finishes unless notedotherwise.IE7. All custom millwork, if in scope of work, is shown in elevation anddesigned per designated details. Refer to interior elevations,millwork details, and specifications divisions 06 00 00 and/or divisionIE8. All manufacturer casework, if in scope of work, is designated onenlarged floor plans. Refer to casework schedule and specificationsdivision 06 00 00 for detailed information. Contractor is to follow thescheduled manufacturer's specifications, instructions, andrecommendations unless directed otherwise by the contract manual. Drawing Number
Project Number
Drawing Name
Project Name
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:57
:24
PM
As indicated
7103 WOODSMAN TRAIL, HOUSTON, TX 77040
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.53
ERMEL ELEMENTARY INTERIOR RENOVATION
Revision Issue
No. Description Date
3/8" = 1'-0"CLASSROOM 1
3/8" = 1'-0"CLASSROOM 2
3/8" = 1'-0"CLASSROOM 3
3/8" = 1'-0"CLASSROOM 4
3/8" = 1'-0"CLASSROOM 133 5
3/8" = 1'-0"CLASSROOM 133 6
3/8" = 1'-0"CLASSROOM 133 7
3/8" = 1'-0"CLASSROOM 133 8
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
NOTES TO DRAWING
12" = 1'-0"INTERIOR ELEVATION GENERAL NOTES
LEVEL 10' - 0"
4' -
0"
VA
RIE
S
29 2911 28
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.10
LEVEL 1
0' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
29 2911 28
10
LEVEL 10' - 0"2' - 6" 2' - 6" 2' - 6" 2' - 6"
353' - 0" 10' - 10" 3' - 0"
5
A7.61
2
A7.60
1
A7.61
LEVEL 10' - 0"
4
A7.61
2
A7.61
3
A7.61
5
A7.60
6
A7.60
4' - 0" 8' - 0" 1' - 6" 3' - 2"
10
9
11
13
LEVEL 10' - 0"
4
A7.61
2
A7.61
3
A7.61
5
A7.60
6
A7.60
4' - 0" 8' - 0" 1' - 6" 3' - 2"
9 13
10
11
LEVEL 10' - 0"
4
A7.61
2
A7.61
3
A7.61
5
A7.60
6
A7.60
4' - 0" 8' - 0" 1' - 6" 3' - 2"
10
9
13
LEVEL 10' - 0"
4' - 0" 10' - 10" 3' - 0"35
13 13
14
10
5
A7.61
2
A7.60
1
A7.61
2' - 6" 2' - 6" 2' - 6" 2' - 6"
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
29 1128 29
10
LEVEL 10' - 0"
4' - 0" 10' - 9 7/8" 3' - 0"
13 13
14
10
35
5
A7.61
2
A7.60
2' - 6" 2' - 6" 2' - 6" 2' - 6"
1
A7.61
LEVEL 10' - 0"
29 1128 29
4' -
0"
VA
RIE
S
10 MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
IE1. Refer to General sheets for typical graphic, symbols, abbreviationindex.IE2. Refer to Texas Accessibility Guidelines sheet(s).IE3. All horizontal dimensions are provided on plans, and all verticaldimensions are provided on elevations and/or sections unlessotherwise noted.IE4. Provide adequate blocking as required at every location wheremillwork, wall light fixtures, plumbing fixtures, etc., areto be mounted. Items are required to resist 250 pound point load.IE5. There are items shown, i.e. outlets, switches, thermostats, on theMEP drawings that are not drawn on the architectural elevations.Contractor to coordinate and mount all MEP items perarchitectural dimensions unless noted otherwise.IE6. Refer to finish schedule and plans for all finishes unless notedotherwise.IE7. All custom millwork, if in scope of work, is shown in elevation anddesigned per designated details. Refer to interior elevations,millwork details, and specifications divisions 06 00 00 and/or divisionIE8. All manufacturer casework, if in scope of work, is designated onenlarged floor plans. Refer to casework schedule and specificationsdivision 06 00 00 for detailed information. Contractor is to follow thescheduled manufacturer's specifications, instructions, andrecommendations unless directed otherwise by the contract manual. Drawing Number
Project Number
Drawing Name
Project Name
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:57
:25
PM
As indicated
7103 WOODSMAN TRAIL, HOUSTON, TX 77040
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.54
ERMEL ELEMENTARY INTERIOR RENOVATION
Revision Issue
No. Description Date
3/8" = 1'-0"CLASSROOM 135, 136 1
3/8" = 1'-0"CLASSROOM 135,136 2
3/8" = 1'-0"CLASSROOM 135, 136 3
3/8" = 1'-0"CLASSROOM 135, 136 4
3/8" = 1'-0"CLASSROOM 138, 139, 140 ,141, 142 5
3/8" = 1'-0"CLASSROOM 138, 139, 140 ,141, 142 6
3/8" = 1'-0"CLASSROOM 138, 139, 140 ,141, 142 7
3/8" = 1'-0"CLASSROOM 138, 139, 140 ,141, 142 8
3/8" = 1'-0"CLASSROOM 138, 139,140, 141,142, 9
3/8" = 1'-0"CLASSROOM 138, 139, 140 ,141, 142 10
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
NOTES TO DRAWING
N/AINTERIOR ELEVATION GENERAL NOTES
LEVEL 10' - 0"4' - 0" 8' - 0" 1' - 6" 3' - 2"
9 13
4
A7.61
2
A7.61
3
A7.61
5
A7.60
6
A7.60
11
LEVEL 10' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.VA
RIE
S4
' - 0
"
29 11 28 29
10
LEVEL 10' - 0"
9
2
A7.60
4' - 0" 10' - 10" 3' - 0"
2' - 6" 2' - 6" 2' - 6" 2' - 6"
14
13 13
10
5
A7.611
A7.61
LEVEL 10' - 0"
29 11 2928
10
4' -
0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
LEVEL 10' - 0"
4
A7.61
2
A7.61
3
A7.61
5
A7.60
6
A7.60
4' - 0" 8' - 0" 1' - 6" 3' - 2"
9
11
10
LEVEL 1
0' - 0"
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
4' -
0"
VA
RIE
S
2911 2829
10
13
LEVEL 10' - 0"
9
10
4' - 0" 8' - 0" 1' - 6" 3' - 2"
3
A7.61
5
A7.60
6
A7.60
2
A7.61
4
A7.61
LEVEL 10' - 0"
29 11 29
4' -
0"
VA
RIE
S
MOUNTING HEIGHTSPRE-K,KINDER= 2'-0" A.F.F.GRADES 1-2= 2'-6" A.F.F.GRADES 3-5= 2'-10" A.F.F.
28
LEVEL 10' - 0"
10' - 10" 3' - 0"4' - 0"
13 13 9
14
10
5
A7.61
2
A7.60
2
A7.60
2' - 6" 2' - 6" 2' - 6" 2' - 6"
IE1. Refer to General sheets for typical graphic, symbols, abbreviationindex.IE2. Refer to Texas Accessibility Guidelines sheet(s).IE3. All horizontal dimensions are provided on plans, and all verticaldimensions are provided on elevations and/or sections unlessotherwise noted.IE4. Provide adequate blocking as required at every location wheremillwork, wall light fixtures, plumbing fixtures, etc., areto be mounted. Items are required to resist 250 pound point load.IE5. There are items shown, i.e. outlets, switches, thermostats, on theMEP drawings that are not drawn on the architectural elevations.Contractor to coordinate and mount all MEP items perarchitectural dimensions unless noted otherwise.IE6. Refer to finish schedule and plans for all finishes unless notedotherwise.IE7. All custom millwork, if in scope of work, is shown in elevation anddesigned per designated details. Refer to interior elevations,millwork details, and specifications divisions 06 00 00 and/or divisionIE8. All manufacturer casework, if in scope of work, is designated onenlarged floor plans. Refer to casework schedule and specificationsdivision 06 00 00 for detailed information. Contractor is to follow thescheduled manufacturer's specifications, instructions, andrecommendations unless directed otherwise by the contract manual. Drawing Number
Project Number
Drawing Name
Project Name
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:57
:27
PM
As indicated
7103 WOODSMAN TRAIL, HOUSTON, TX 77040
PROJECT ISSUE DATE
13350
INTERIOR ELEVATIONS
A6.55
ERMEL ELEMENTARY INTERIOR RENOVATION
Revision Issue
No. Description Date
3/8" = 1'-0"CLASSROOM 169,170,171 1
3/8" = 1'-0"CLASSROOM 172 2
3/8" = 1'-0"CLASSROOM 172 3
3/8" = 1'-0"CLASSROOM 172 4
3/8" = 1'-0"CLASSROOM 172 5
3/8" = 1'-0"CLASSROOM 173 6
3/8" = 1'-0"CLASSROOM 173 7
3/8" = 1'-0"CLASSROOM 173 8
3/8" = 1'-0"CLASSROOM 169,170,171 9
1 Install new relocatable wall per manufacturerspecifications.
2 Install new door as scheduled.
3 Install new light fixture as scheduled.
4 Install new wall mounted water closet
5 install new toilet partitions as scheduled
6 Install new urinal screen as scheduled
7 install new urinal
8 install new lavatory
9 Scheduled door and frame.
10 Scheduled wall base .
11 4' x 12' Markerboard
12 Upper cabinet
13 Tall storage cabinet
14 Countertop
20 Remove existing plumbing fixtures
21 Remove existing 4" C.M.U. partition
22 Remove and relocate existing light fixture andinstall at new location Re: Renovated reflectedceiling plan
23 Remove all acoustical tile and replace with new.
25 Remove existing millwork.
27 4" x 4" Ceramic tile full height on C.M.U.
28 Display rail and accessories : 2 flag holders, 4hook clips, 2 map binders
29 4' x 4' tackboard
31 Insulate all exposed piping.
34 Install moisture resistant ceiling.
35 Existing window to remain.
36 Remove existing Gyp. Board ceiling
N/AINTERIOR ELEVATION GENERAL NOTES
NOTES TO DRAWING
KNEE SPACE
2' -
3"
4"
2' - 0"
PLASTIC LAMINATE ON1/2" PLYWOOD COUNTERAND BACKSPLASH
1" X 4" WOOD NAILERHARDWOOD BULLNOSE EDGEWITH PLASTIC LAMINATE FINISH
4" SCHEDULED BASE
1' -
11
1/4
"
2'-0 1/2"
4"
7'-0
"
F.F.
PLASTIC LAMINATE FINISH APPLIED TO3/4" PLYWOOD DOOR WITH SCHEDULEDHARDWARE AND LOCKS INSTALLED ASSPECIFIED.
PLASTIC LAMINATE FINISHON 1/2" PLYWOODPLASTIC LAMINATE FINISH ON 1/2"PLYWOOD SHELF SECURED TOINTERIOR MILLWORK WALLS
4" SCHEDULED BASE
MELAMINE INTERIOR ON ALL SURFACES
2 X 4 WOOD FRAMING1 X 4 WOOD NAILER
PLASTIC LAMINATE FINISH ON 1/2"PLYWOOD SHELF SECURED TOINTERIOR MILLWORK WALLS
3/4
"
11
"1
1"
12" X 12" X 3/8THICK MIRROR
1' -
1 1
/8"
3"
EQ
EQ
EQ
2' - 0 1/2"
EQ
4" SCHEDULED BASE3"
3/4
"4
"
7' -
0"
MELAMINE INTERIOR ON ALL SURFACES1/2" PLYWOOD FIXED SHELVES WITHMELAMINE FINISH
1/2" PLYWOOD FIXED SHELVES WITHMELAMINE FINISH
1/2" PLYWOOD FIXED SHELVES WITHMELAMINE FINISH
EQ
EQ
EQ
11
"1
1/2
"1
' - 6
3/4
"
3' - 0"
11
"3
/4"
4"
EQ
MELAMINE INTERIOR ON ALL SURFACES
4" SCHEDULED BASE
1' - 6" 1' - 6"
4" 4" SCHEDULED BASE
PLASTIC LAMINATE FINISH12" X 12" X 3/8THICK MIRROR
3' -
8"
4' - 0"
FACE OF PARTITION
2" X 4" WOOD FRAMING1/2" PLYWOOD WITH PLASTIC LAMINATE FINISH
1/2" PLYWOOD WITH PLASTIC LAMINATE FINISHLINE OF COUNTER TOP ABOVE2
' - 0
1/2
"
2 1/2"
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:51
:02
PM
1 1/2" = 1'-0"
PROJECT ISSUE DATE
13350
MILLWORK SECTIONS &
DETAILS
A7.60
ER
ME
L E
LE
ME
NT
AR
Y
INT
ER
IOR
RE
NO
VA
TIO
N 7
10
3
WO
OD
SM
AN
TR
AIL
,
HO
US
TO
N,
TX
77
04
0
1 1/2" = 1'-0"MILLWORK SECTION 2
1 1/2" = 1'-0"MILLWORK SECTION TEACHER CABINET 5
1 1/2" = 1'-0"MILLWORK SECTION TEACHER CABINET 2 6
1 1/2" = 1'-0"INTERIOR ELEVATION TEACHER CABINET 3 1 1/2" = 1'-0"EXTERIOR ELEVATION TEACHER CABINET 1
1 1/2" = 1'-0"MILLWORK PLAN 4
PLASTIC LAMINATE FINISH APPLIED TO 3/4"PLYWOOD DOOR WITH SCHEDULEDHARDWARE AND LOCKS INSTALLED ASSPECIFIED.
PLASTIC LAMINATE FINISHON 1/2" PLYWOOD
4" SCHEDULED BASE
MELAMINE INTERIOR ON ALL SURFACES
2 X 4 WOOD FRAMING1 X 4 WOOD NAILER
PLASTIC LAMINATE FINISH ON 1/2"PLYWOOD SHELF SECURED TO INTERIORMILLWORK WALLSPLASTIC LAMINATE FINISH ON 1/2" PLYWOODSHELF SECURED TO INTERIOR MILLWORKWALLS
4"
3"
1'-2"
2'-0"
7'-0
"
F.F.
PLASTIC LAMINATE FINISH ON 1/2" PLYWOODSHELF SECURED TO INTERIOR MILLWORKWALLSPLASTIC LAMINATE FINISH ON 1/2" PLYWOODSHELF SECURED TO INTERIOR MILLWORKWALLSPLASTIC LAMINATE FINISH ON 1/2" PLYWOODSHELF SECURED TO INTERIOR MILLWORKWALLS
PLASTIC LAMINATECLAD MDF BACKSPLASHPLASTIC LAMINATE CLADMDF DRAWER
GENERAL NOTES:1. ALL INTERIOR SURFACES TO BE MELAMINE FINISH2. ALL EXTERIOR SURFACES TO BE PLASTIC LAMINATE FINISH3. ALL SUBSTRATE MATERIAL TO BE 3/4" MDF, EXCEPT FOR 1/4"PLYWOOD CABINET BACKS, UNLESS NOTED OTHERWISE.
RE
FE
R T
O E
LE
VA
TIO
NS
4"
1 1
/2"
EQ
UA
LE
QU
AL
EQ
UA
L
2' - 0"
4"
MELAMINE CLADMDF BACK PANEL1 X WOOD NAILERCUT TO SIZE
2 X 4 WOODFRAMING3"
1/4
"1
/4"
1/4
"
4"
5"
5"
5"
5"
6"
RE
FE
R T
O E
LE
VA
TIO
NS
2' - 0"MELAMINE INTERIORON ALL SURFACESPLASTIC LAMINATEFINISH ON 1/2"PLYWOOD SHELFSECURED TO INTERIORMILLWORK WALLS
4"
3"
MELAMINE CLADMDF BACK PANEL1 X WOOD NAILERCUT TO SIZE
2 X 4 WOODFRAMING
PLASTIC LAMINATE CLAD MDFBACKSPLASH AND COUNTER TOP3/4" PLASTIC LAMINATECLAD CABINET DOOR
3"
MELAMINE CLADMDF BACK PANEL1 X WOOD NAILERCUT TO SIZE
2 X 4 WOODFRAMING4
"
1 1
/2"
2' -
6"SCHEDULEDMILLWORK HARDWARE
2' - 0"
FULL HEIGHT PLYWOOD DOOR WITHPLASTIC LAMINATE APPLIED FINISHSCHEDULED HARDWARE ANDLOCKS INSTALLED AS SPECIFIED.
PLASTIC LAMINATE FINISHON 1/2" PLYWOOD
4" SCHEDULED BASE
MELAMINE INTERIOR ON ALL SURFACES
2 X 4 WOOD FRAMING1 X 4 WOOD NAILER
4"
3"
1'-2"
2'-0"
7'-0
"
F.F.
PLASTIC LAMINATE FINISH ON 1/2" PLYWOODSHELF SECURED TO INTERIOR MILLWORKWALLSPLASTIC LAMINATE FINISH ON 1/2" PLYWOODSHELF SECURED TO INTERIOR MILLWORKWALLSPLASTIC LAMINATE FINISH ON 1/2" PLYWOODSHELF SECURED TO INTERIOR MILLWORKWALLS
LEVEL 10' - 0"
2
A7.60
5
A7.61
4' - 0" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 3' - 0"
LEVEL 10' - 0"
4' - 0" 8' - 0" 1' - 6" 3' - 2"
5
A7.60
6
A7.60
3
A7.61
2
A7.61
4
A7.61
7' -
0"
1 1/2" = 1'-0"STORAGE MILLWORK SECTION 1
1 1/2" = 1'-0"THREE DRAWER BASE CABINET 2
1 1/2" = 1'-0"OPEN SHELF BASE CABINET 3
1 1/2" = 1'-0"BASE CABINET W/ FULL HEIGHT DOOR 4
TYPICAL MILLWORK GENERAL NOTES
1 1/2" = 1'-0"LARGE STORAGE CABINET W/ THREE SHELVES 5
Drawing Number
Project Number
Drawing Name
Project Name
Issue
DescriptionDateNo.
Scale:
ARCHI*TECHNICS/ 3, INC.
5555 WEST LOOP SOUTH STE #400
BELLAIRE, TEXAS 77401
ARCHITECTURE
URBAN DESIGN
INTERIORS
CONSTRUCTION MANAGEMENT
C:\
Re
vit
Lo
cal F
iles\
11
_2
6_
20
13
_e
rme
ll re
no
vatio
n_
c mitc
he
ll.rv
t
12
/24
/20
13 2
:51
:04
PM
As indicated
PROJECT ISSUE DATE
13350
MILLWORK SECTION &
DETAILS
A7.61
ER
ME
L E
LE
ME
NT
AR
Y
INT
ER
IOR
RE
NO
VA
TIO
N 7
10
3
WO
OD
SM
AN
TR
AIL
,
HO
US
TO
N,
TX
77
04
0
3/8" = 1'-0"TYPICAL COMPUTER STATION TYPE A1 7
3/8" = 1'-0"TYPICAL TEACHER STATION TYPE A 6