Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector Design / Diagnostics / Gun & Injector Design / Diagnostics / Gun & Linac RF DesignLinac RF Design
E. BongE. Bong LCLS FACLCLS FAC
October 27, 2005October 27, 2005
LCLSLCLS
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector Design / Diagnostics / Injector Design / Diagnostics / Gun & Linac RF DesignGun & Linac RF Design
Installation Dates/Progress
Region Design
Diagnostics
Gun, Linac & RF
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector and Linac Installation DatesInjector and Linac Installation Dates
(RF phase: (RF phase: rfrf = 0 is at accelerating crest)= 0 is at accelerating crest)
SLAC linac tunnelSLAC linac tunnel research yardresearch yard
Linac-1Linac-1Aug-NovAug-Nov
20062006
Linac-2Linac-2July-SepJuly-Sep
20072007
Linac-3Linac-3July-SepJuly-Sep
20072007
BC-1BC-1Aug- NovAug- Nov
20062006
BC-2BC-2July-SepJuly-Sep
20072007 LTULTUOct 2007Oct 2007Dec 2007Dec 2007
DL-1DL-1Aug-NovAug-Nov
20062006
undulatorundulatorSLAC linacSLAC linac 21-1b21-1b21-1d21-1d XX
RF GunRF GunNov 2006Nov 2006
21-3b21-3b24-6d24-6d
25-1a25-1a30-8c30-8c
E-DumpE-DumpDec 2007Dec 2007Feb 2008Feb 2008
Inj VaultInj VaultJun-JulJun-Jul20062006
L0a&b
L0a&b
rfrfgungun
Installation in SLAC linac tunnel only during down-time
Linac-Linac-XXAug-NovAug-Nov
20062006
Linac Down: August – November 2006
July – September 2007
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector Installation
PORCU
PINE CATHODE
HOLDE
R
UHV A
LL METAL
GATE VALVES
SPOOLS FRO
M VALVE
SEAL
LONG B
ELLOWS
ASSEM
BLY
TREATMEN
T CHAM
BER
VACUU
M PUMPS
Drive Laser May 2006
Laser Launch July 2006
Gun Region July 2006
Accel Region June 2006
Heater Region June 2006
Wall Region October 2005
Injection Region Aug-Nov 2006
Spect Region Aug-Nov 2006
Waveguide through wall and up penetration October 2005
Gun installation November 2006 Following Hot Test in Klystron Lab
Injector Commissioning Start December 2006
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Region Design Status (2006 Install)Region Design Status (2006 Install)Gun Region In ProcessAccelerator Region In ProcessHeater Region In ProcessWall Region CompleteInsertion Region In ProcessSpectrometer Region Not StartedL1 CompleteLX CompleteBC1 Articulation Complete, beamline incomplete
Seeking engineering support from other SALC groups
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector Vault
Integration of region layouts, piping, cable trays, laser transport, waveguide and floor stands. Tray and water install first
Cable plant install to precede beamline component install
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector Waveguide Design
Installation penetration-wall October ’05
Installation Vault & Gallery Spring ’06
Design effort broken into penetration-wall runs, Gallery and Vault runs.
Detail drawings complete for penetration and gallery runs
3-D Layout integrated into Injector system assembly
Gun and structures fed from Li-20-6, 7 & 8 klystrons, T-Cav fed from Li-20-5d structure exhaust.
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector Gun Region
Installation July 2006 except gun November 2006
Region PDR October 31
Device reviews November
Gun review complete
Solenoid on orderYAG/OTR optics package design by Klystron engineering
Spectrometer bend in-house designBase support integrated with launch optics table support
Laser on-axis, not grazing incidence
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector Accelerator Region
Installation June 2006
Dual feed structure design and details complete and in fabrication
Quads on order
Solenoid on order
L0a and solenoid on common support girder to allow relative alignment in lab prior to install.
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector Heater Region Design
Beamline segment Between Accelerators and Shielding Wall
Installation June 2006
Undulator installation 2007
Transverse structure on hand.
Quads on order
OTR actuator design complete
Bend magnet specification complete ready to order
Need optics, chamber and steering coil & support designs
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector Wall RegionSpans through shielding walls separating Injector Vault form Linac Housing.October 2005 installation includes pipes through walls and stopper. Required for installation in vault during Linac run. Balance of installation August 2006.Completed device designs: quadrupole, stopper, wire scanner, OTR actuator and component supports.
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector Insertion Region
Uses OTR, Wire Scanner & Quad design from Wall Region
Installation ’06 DownLayout and interference study in progress
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector Spectrometer Region
Mechanical Design not startedUses Quadrupoles, BPMs and YAG/OTRs & steering coils from other region designsNew Bend, Dump/FC, chambers and supportsInstallation Aug-Nov 2006Need additional engineering support matrixed from SLAC
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
L1 Region DesignInstallation ’06 down
Detail Drawings Complete except SA-BPM modification
Uses existing shortened accelerator sections, injector quadrupoles and BPM bodies
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Install ‘06 Down.XL4 Klystron fabrication complete. Waveguide fabrication starting.Waveguide details and structure support design complete.
X-Band System Design (LX)
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
BC1 Region Design
Beamline segment from X-Band system to structure Li21-2b.
Installation – August 2006
Compressor articulation, mangets and chambers on order
Compressor diagnostics incomplete
Downstream emittance section design incomplete. Uses existing wire scanner, quadrupole, stopper and BPM designs.
Collaboration with UCLA on single shot bunch length monitor in place. However, mechanical design for BC1 instance not started.
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector Installation October 2005
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector/Linac DiagnosticsWire Scanners
mechanical design released, ready to build
BPMsSmall Aperture BPM on order (delivery 6 weeks late)Large Aperture BPM ready to detail (FDR)SA Mod for L1 need design work
TorroidsReady to release RFQ for build to specAdditional requirement for BCS at gun just recieved
Profile MonitorsActuator bodies on order, OTR head design completeOptics design starting (Klystron)Need YAG head design
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector/Linac DiagnosticsCollimators
BC1 movable collimator design started but halted to pursue Injector designNeed collimator PRD
StoppersWall PPS stopper completeGun Spectrometer FC in designSAB Spectrometer FC need designBC1 stopper use existing Linac design
PurchasingEstablish multi-year delivery contracts to bulk-purchase diagnostics items
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
RF Gun & SolenoidRF Gun design reviews complete in final detail.
Fabrication, assembly to solenoid & alignment to complete for August HP testing in Klystron test lab
Need design of bulk cooling water system for klystron lab hot test and vault installation
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Dual Feed Structure Design
L0a and L0b both dual feed structures
Reviews of RF and mechanical designs complete
Detail drawings complete and released
Testing of existing structures completed
Fabrication of dual feed parts starting
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
RF Design
LLRF preliminary design review held
Waveguide coupler design and fabrication completeConstruction of the PEPII phase shifter RF chassis is complete, calibration next month. Phase shifter control board fabrication next month. 476MHz master amplifier chassis in process of being tested in the Lab.
A 1:1 model of the S-band (2856 MHz) Phase Detector Cavity is being manufactured to start testing in October. The main RF parameters of the phase detector cavity calculated with Superfish program were presented during the "LCLS LLRF Preliminary Design Review"
Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005
Injector Design / Diagnostics / Injector Design / Diagnostics / Gun & Linac RF DesignGun & Linac RF Design
Conclusion
Progress is being made toward completing beamline and component design for 2006 installation supporting January 2007 commissioning but with some riskAdditional engineering manpower required for SAB Spectrometer, BC1 Downbeam segment, BC1 Chicane diagnostics and BC1 Single Shot Bunch Length MonitorVendor delivery delays could be criticalInjector Vault cable tray and water installation must be expedited