Page 1: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector Design / Diagnostics / Gun & Injector Design / Diagnostics / Gun & Linac RF DesignLinac RF Design

E. BongE. Bong LCLS FACLCLS FAC

October 27, 2005October 27, 2005

LCLSLCLS

Page 2: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector Design / Diagnostics / Injector Design / Diagnostics / Gun & Linac RF DesignGun & Linac RF Design

Installation Dates/Progress

Region Design

Diagnostics

Gun, Linac & RF

Page 3: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector and Linac Installation DatesInjector and Linac Installation Dates

(RF phase: (RF phase: rfrf = 0 is at accelerating crest)= 0 is at accelerating crest)

SLAC linac tunnelSLAC linac tunnel research yardresearch yard

Linac-1Linac-1Aug-NovAug-Nov

20062006

Linac-2Linac-2July-SepJuly-Sep

20072007

Linac-3Linac-3July-SepJuly-Sep

20072007

BC-1BC-1Aug- NovAug- Nov

20062006

BC-2BC-2July-SepJuly-Sep

20072007 LTULTUOct 2007Oct 2007Dec 2007Dec 2007

DL-1DL-1Aug-NovAug-Nov

20062006

undulatorundulatorSLAC linacSLAC linac 21-1b21-1b21-1d21-1d XX

RF GunRF GunNov 2006Nov 2006

21-3b21-3b24-6d24-6d

25-1a25-1a30-8c30-8c

E-DumpE-DumpDec 2007Dec 2007Feb 2008Feb 2008

Inj VaultInj VaultJun-JulJun-Jul20062006

L0a&b

L0a&b

rfrfgungun

Installation in SLAC linac tunnel only during down-time

Linac-Linac-XXAug-NovAug-Nov

20062006

Linac Down: August – November 2006

July – September 2007

Page 4: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector Installation

PORCU

PINE CATHODE

HOLDE

R

UHV A

LL METAL

GATE VALVES

SPOOLS FRO

M VALVE

SEAL

LONG B

ELLOWS

ASSEM

BLY

TREATMEN

T CHAM

BER

VACUU

M PUMPS

Drive Laser May 2006

Laser Launch July 2006

Gun Region July 2006

Accel Region June 2006

Heater Region June 2006

Wall Region October 2005

Injection Region Aug-Nov 2006

Spect Region Aug-Nov 2006

Waveguide through wall and up penetration October 2005

Gun installation November 2006 Following Hot Test in Klystron Lab

Injector Commissioning Start December 2006

Page 5: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Region Design Status (2006 Install)Region Design Status (2006 Install)Gun Region In ProcessAccelerator Region In ProcessHeater Region In ProcessWall Region CompleteInsertion Region In ProcessSpectrometer Region Not StartedL1 CompleteLX CompleteBC1 Articulation Complete, beamline incomplete

Seeking engineering support from other SALC groups

Page 6: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector Vault

Integration of region layouts, piping, cable trays, laser transport, waveguide and floor stands. Tray and water install first

Cable plant install to precede beamline component install

Page 7: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector Waveguide Design

Installation penetration-wall October ’05

Installation Vault & Gallery Spring ’06

Design effort broken into penetration-wall runs, Gallery and Vault runs.

Detail drawings complete for penetration and gallery runs

3-D Layout integrated into Injector system assembly

Gun and structures fed from Li-20-6, 7 & 8 klystrons, T-Cav fed from Li-20-5d structure exhaust.

Page 8: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector Gun Region

Installation July 2006 except gun November 2006

Region PDR October 31

Device reviews November

Gun review complete

Solenoid on orderYAG/OTR optics package design by Klystron engineering

Spectrometer bend in-house designBase support integrated with launch optics table support

Laser on-axis, not grazing incidence

Page 9: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector Accelerator Region

Installation June 2006

Dual feed structure design and details complete and in fabrication

Quads on order

Solenoid on order

L0a and solenoid on common support girder to allow relative alignment in lab prior to install.

Page 10: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector Heater Region Design

Beamline segment Between Accelerators and Shielding Wall

Installation June 2006

Undulator installation 2007

Transverse structure on hand.

Quads on order

OTR actuator design complete

Bend magnet specification complete ready to order

Need optics, chamber and steering coil & support designs

Page 11: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector Wall RegionSpans through shielding walls separating Injector Vault form Linac Housing.October 2005 installation includes pipes through walls and stopper. Required for installation in vault during Linac run. Balance of installation August 2006.Completed device designs: quadrupole, stopper, wire scanner, OTR actuator and component supports.

Page 12: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector Insertion Region

Uses OTR, Wire Scanner & Quad design from Wall Region

Installation ’06 DownLayout and interference study in progress

Page 13: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector Spectrometer Region

Mechanical Design not startedUses Quadrupoles, BPMs and YAG/OTRs & steering coils from other region designsNew Bend, Dump/FC, chambers and supportsInstallation Aug-Nov 2006Need additional engineering support matrixed from SLAC

Page 14: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

L1 Region DesignInstallation ’06 down

Detail Drawings Complete except SA-BPM modification

Uses existing shortened accelerator sections, injector quadrupoles and BPM bodies

Page 15: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Install ‘06 Down.XL4 Klystron fabrication complete. Waveguide fabrication starting.Waveguide details and structure support design complete.

X-Band System Design (LX)

Page 16: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

BC1 Region Design

Beamline segment from X-Band system to structure Li21-2b.

Installation – August 2006

Compressor articulation, mangets and chambers on order

Compressor diagnostics incomplete

Downstream emittance section design incomplete. Uses existing wire scanner, quadrupole, stopper and BPM designs.

Collaboration with UCLA on single shot bunch length monitor in place. However, mechanical design for BC1 instance not started.

Page 17: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector Installation October 2005

Page 18: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector/Linac DiagnosticsWire Scanners

mechanical design released, ready to build

BPMsSmall Aperture BPM on order (delivery 6 weeks late)Large Aperture BPM ready to detail (FDR)SA Mod for L1 need design work

TorroidsReady to release RFQ for build to specAdditional requirement for BCS at gun just recieved

Profile MonitorsActuator bodies on order, OTR head design completeOptics design starting (Klystron)Need YAG head design

Page 19: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector/Linac DiagnosticsCollimators

BC1 movable collimator design started but halted to pursue Injector designNeed collimator PRD

StoppersWall PPS stopper completeGun Spectrometer FC in designSAB Spectrometer FC need designBC1 stopper use existing Linac design

PurchasingEstablish multi-year delivery contracts to bulk-purchase diagnostics items

Page 20: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

RF Gun & SolenoidRF Gun design reviews complete in final detail.

Fabrication, assembly to solenoid & alignment to complete for August HP testing in Klystron test lab

Need design of bulk cooling water system for klystron lab hot test and vault installation

Page 21: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Dual Feed Structure Design

L0a and L0b both dual feed structures

Reviews of RF and mechanical designs complete

Detail drawings complete and released

Testing of existing structures completed

Fabrication of dual feed parts starting

Page 22: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

RF Design

LLRF preliminary design review held

Waveguide coupler design and fabrication completeConstruction of the PEPII phase shifter RF chassis is complete, calibration next month. Phase shifter control board fabrication next month. 476MHz master amplifier chassis in process of being tested in the Lab.

A 1:1 model of the S-band (2856 MHz) Phase Detector Cavity is being manufactured to start testing in October. The main RF parameters of the phase detector cavity calculated with Superfish program were presented during the "LCLS LLRF Preliminary Design Review"

Page 23: Eric Bong LCLS FAC Injector-Linac DesignBONG@slac.stanford.edu October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC

Eric BongLCLS FAC Injector-Linac Design [email protected] 27, 2005

Injector Design / Diagnostics / Injector Design / Diagnostics / Gun & Linac RF DesignGun & Linac RF Design

Conclusion

Progress is being made toward completing beamline and component design for 2006 installation supporting January 2007 commissioning but with some riskAdditional engineering manpower required for SAB Spectrometer, BC1 Downbeam segment, BC1 Chicane diagnostics and BC1 Single Shot Bunch Length MonitorVendor delivery delays could be criticalInjector Vault cable tray and water installation must be expedited