Equipment & Materials Modules:Why You Need Them

Page 2: Equipment and Materials Modules: Why You Need Them

2

The Approach

Materials Module

Equipment Module

Questions & Answers

Page 3: Equipment and Materials Modules: Why You Need Them

3

Let’s Get Started

How Many of You Use

the Materials Module?

Page 4: Equipment and Materials Modules: Why You Need Them

4

Materials Basics (Two Types)

Receipt Required• The contractor allocates materials costs but

since they are variable there needs to be documented back up

Rate Defined• Rates pre-defined for specific materials

allowing allocation ONLY for that amount.

Page 5: Equipment and Materials Modules: Why You Need Them

5

Materials BasicsRate Defined

Pro• Controls locked in for

materials with negotiated rates such as project consumables

Con• Where costs vary money

could be lost if the material was purchased at a lower rate

• Does not work well for one-time purchases

Page 6: Equipment and Materials Modules: Why You Need Them

6

Materials Basics

Receipt Required• The contractor allocates materials costs but

since they are variable there needs to be documented back up

• Attach a PDF of the receipt for allocation

The Track advantage can best be described by examining the “receipt required” work flow

Page 7: Equipment and Materials Modules: Why You Need Them

PurchaseDocumentation

7

Materials - “the old way”

ContractorPurchased

Material

RequestorSign Off

On Receipt

A/PProcessing for Payment

PurchaseDocumentation Purchase

Documentation

ContractorInvoice

Page 8: Equipment and Materials Modules: Why You Need Them

8

Materials - “the old way”

A/PProcessing for Payment

PurchaseDocumentation

The Problems –• Time delays• Split deliveries• Filing systems / retention losses• Internal paper flow

Page 9: Equipment and Materials Modules: Why You Need Them

PurchaseDocumentation

9

Materials - “Receipt Required”

ContractorPurchased

Material

RequestorSign Off

On Receipt

A/PProcessing for Payment

ContractorAllocation

PurchaseDocumentation

Attachment

Approval

PurchaseDocumentation

Attachment

Page 10: Equipment and Materials Modules: Why You Need Them

10

Next…

How Many of You Use

the Equipment Module?

Page 11: Equipment and Materials Modules: Why You Need Them

11

Equipment

The Equipment Module offers two significant benefits

And one not often recognizedcontract bidding and management

One easily recognized work execution

Page 12: Equipment and Materials Modules: Why You Need Them

12

Equipment Module Rate Options

Hourly & Daily• Hourly rate with or without idle rate• Hourly rate with daily max with or without idle rate• Daily flat rate

Base / Over, Weekly / Monthly Rate• Hourly rate for base hours + over rate with or without idle rate• Weekly maximum hours with or without idle rate• Monthly maximum with or without idle rate

Page 13: Equipment and Materials Modules: Why You Need Them

13

Equipment Module Benefits

Work Execution• Near time review (next day allocation) allows company

personnel the ability to closely link billing to actual work in the field

• Error free charging, rates are locked in the system • Track automatically adjusts when hour threshold (daily,

weekly or monthly) is reached• Simplified ability to compare equipment billing rates for a

piece of equipment across multiple vendors • Internal resource re-deployment (A/P clerks to Track)

Page 14: Equipment and Materials Modules: Why You Need Them

14

Equipment Module BenefitsContractual (Bid and Bid Award)• The owner defines the rate structure to optimize their cost

advantage• Using Track’s format enables a consistent bidding process • The owner is able to introduce a standard set of equipment

bidding variables• Standardized equipment definitions enables ease of

comparison • Error free input with owner’s sign off as a controlling factor• Successful bidder’s rates are locked in

Page 15: Equipment and Materials Modules: Why You Need Them

Conclusion

15

Labor – Equipment - Material

Three parts of the comprehensive Track deliverables