EPM Solution: Executive Overview and DiscussionEPM Solution: Executive Overview and Discussion
James WrightChristopher Pond
1
Microsoft Enterprise Project Management
Agenda9:30 – 09:45 Introduction9:45 – 10:45 Microsoft Project Server 2010
James Wright – Principal Consultant10:45 – 11:00 Refreshments11:00 – 12:00 Microsoft Project Server 2010
12:00 – 13:00 Break
13:00 – 14:00 Microsoft SharePoint Server 2010Christopher Pond – Senior Consultant
14:00 – 14:15 Refreshments14:15 – 15:00 Microsoft SharePoint Server 2010
About CPS• Established 1995
• Experts in Microsoft EPM, SharePoint, Training, Resourcing & P3M Consulting
• Microsoft Gold Competency Partner
• Client list of over 700 organisations
• Only UK APMG Accredited Consulting Organisationthat can provide Microsoft EPM solutions & P3M consulting
• Over 11,000 delegates trained
• Project Server 2010 launch partner
European CoverageWorking in partnership with C&S and CXS, CPS offer international services throughout Europe.
Solutions• P3O Consulting
• PMO setup
• Recruitment
• Pre-packaged EPMofficeTM
• Client Specific EPM Deployments
• Hosted / SaaS
• SAP integration
• Dedicated support
• Training
• Development
Not only technology
Transparency of projects & operations
Consistency and Quality in processes & activities
Accountability of project performance and financial resources
Optimisation of projects to align with strategies
Invest in scalable, connectible, and extensible platforms
Business challenges and needsMore and more, businesses need:
Why change?• Deliver business improvement through change
– Become lean & competitive– Maximise value for taxpayers & shareholders– Can organisations repeatedly deliver more with limited resources?
• Business demands value in every project– Are resources being utilised efficiently? – Can we prioritise effectively? – Can we provide the necessary programme and project controls?
• The reasons will differ for each organisation
Example PPM benefits
People | Process | Organisation | Strategy | Technology
Strategy & Vision – the drivers for change and the vision of a future state to roadmap a feasible, path to get there.
Technology –Implemented to assist people carrying out the process.
People – Ensuring there is a focus on skills and competencies e.g. by providing multi-level training.eaton
Processes – common approach for people to collaborate around projects & programmes
Organisation - is there a “will” to support change
Another Way of Looking at it…
Org
anis
ation
Proc
ess
Peop
le
Tech
nolo
gy
Strategy & Vision
Fina
nce
HR
CRM
Chan
ge?
P3O
/ EP
M
Alignment with Business Objectives
Visibility & Control
Collaboration
EnterpriseProject
Management
Portfolio Management
Work Management
Demand Management Portfolio Selection Capacity Planning Portfolio Reporting
Resource Management Financial Management Project Reporting Project Scheduling Program Management
Time Reporting Team Collaboration Issue and Risk
In the organisation
Executives and Portfolio Managers
PMO, Resource and Project Managers
Project Team Members
5
Microsoft Project EvolutionFrom desktop scheduling to project & portfolio management
2010
SchedulingSimple reportingTask managementPrint Resource tracking
1987Program
Management
Portfolio Management
Reporting
Project Collaboration
ResourceManagement
FinancialManagement
2000200220032007
Source:“MarketScope for Project and Portfolio Management Applications”, GartnerResearch, June 2011
Microsoft received the highest rating possible with a Strong/Positive ratingJune 2011
Microsoft Project Server 2010 is a landmark release for Microsoft, and for PPM prospective users and existing Project Server customers
The MarketScope is copyrighted 2011 by Gartner, Inc. and is reused with permission. The MarketScope is an evaluation of a marketplace at and for a specific time period. It depicts Gartner's analysis of how certain vendors measure against criteria for that marketplace, as defined by Gartner. Gartner does not endorse any vendor, product or service depicted in the MarketScope, and does not advise technology users to select only those vendors with the highest rating. Gartner disclaims all warranties, express or implied, with respect to this research, including any warranties of merchantability or fitness for a particular purpose. This MarketScope graphic was published by Gartner, Inc. as part of a larger research note and should be evaluated in the context of the entire report. The Gartner report is available upon request from Microsoft.
Gartner gives highest ranking to MicrosoftGartner MarketScope for Project and Portfolio Management Applications
Current & Future
Bottom Up Project Management
Top DownPortfolio
Management
ManageSelectCreate Plan
Portfolio Prioritisation
Capacity Planning
Demand Management
Portfolio Optimisation
Portfolio Reporting
Business Case Definition
Project Scheduling
Issues and Risk Management
Project Reporting
Team Collaboration
Time Reporting
Resource Management
Solution components
Executives Resource Managers
Team Members
Project Managers / Planners
Line of Business Systems
Demonstration
Toolset Capability• End to end Project &
Portfolio Management
• Portfolio Selection & Prioritisation
• Capacity Planning
• Flexible scheduling
• Enhanced Reporting & Business Intelligence
Making the changean example
Establish ‘Organisational Will’ at the right level
Is the organisation engaged?
Devise a problem statement – to gain
stakeholder engagement
What issues do we currently face?
Appoint a Senior Responsible Owner
Which business person will lead the change?
Appoint a capable Project / Programme
Manager
Support effectivedelivery
Set the capability & benefit expectations
Measure success
Assess the current organisation state
to make change successful
Map out the vision
Keep short & long term needs visible
Prepare Benefits, a Business Case, Programme Brief,
Programme Preparation Plan & Vision statement
Perspective is essential
Example Road Map – an evolving approach
Project Register
Resource Pool
High Level Project Status Tracking
Detailed Project Schedule Management & Resource
Allocations
Phase Level Project Plans & Resource Allocations
Request Governance – Project Approval
Project Delivery Governance
Time Tracking through Authorisations
Risk and Issue Management
Annual Business Planning Cycle and
Portfolio Management
Milestone ReportingFinancial ManagementHigh Level Risks & IssuesStatus – RAG & Narrative
Governance WorkflowPortfolio Management
Detailed Risk & Issue Management & Tracking
Lifecycles and Stage Gates to Manage/Track Delivery of ProjectsCMMI/Adherence to Process
Collection of project requestsPrioritisation & approvalPortfolio management
Time and cost actuals
Resource ManagementTime & cost actuals
Detailed activity planning & trackingActivity level resource management
Capacity Planning at Role Level
Foundation
Release 1 Release 2 Release 3
TrainingTraining
System Configuration
System Configuration
Validation Testing
Validation Testing
DesignDesignPhase 4
Roll OutRoll Out
Example Implementation Plan
Technical Design and Installation
Technical Design and Installation
Month 4 Month 5 Month 6
Project ManagementProject Management
Month 7 Month 8 Month 9Month 1
IterativePrototyping
TrainingTraining
System Configuration
System Configuration
Validation Testing
Validation Testing
DesignDesign Phase 3
Roll OutRoll Out
Proof of ConceptWorkshops and Iterative
Prototyping
Proof of ConceptWorkshops and Iterative
Prototyping
Month 2 Month 3
TrainingTraining
System Configuration
System Configuration
Validation Testing
Validation Testing
DesignDesignPhase 1
Roll OutRoll Out TrainingTraining
System Configuration
System Configuration
Validation Testing
Validation Testing
DesignDesignPhase 2
Roll OutRoll Out
Month 10
Solutions• P3O Consulting
• PMO setup
• Recruitment
• Pre-packaged EPMofficeTM
• Client Specific EPM Deployments
• Hosted / SaaS
• SAP integration
• Dedicated support
• Training
• Development
Not only technology
Thank you for your time
We will follow up with slides & links