epbd legislation in practice - challenges regarding compliance and quality of the works

45
EPBD legislation in practice: Challenges regarding compliance and quality of the works Peter Wouters Manager INIVE EEIG – Coordinator QUALICHeCK IEE/13/610/SIO2.675574 01/03/2014-28/02/2017

Upload: inive-eeig

Post on 28-Jul-2015

63 views

Category:

Government & Nonprofit


2 download

TRANSCRIPT

Page 1: EPBD legislation in practice - challenges regarding compliance and quality of the works

EPBD legislation in practice:Challenges regarding compliance

and quality of the worksPeter Wouters

Manager INIVE EEIG – Coordinator QUALICHeCK

IEE/13/610/SIO2.675574 01/03/2014-28/02/2017

Page 2: EPBD legislation in practice - challenges regarding compliance and quality of the works

Structure of the presentationAbout good compliance and good quality of the works

What kind of activities in QUALICHeCK?

Outcomes of QUALICHeCK

Some considerations about future challenges

Conclusions

Page 3: EPBD legislation in practice - challenges regarding compliance and quality of the works

Structure of the presentationAbout good compliance and good quality of the works

What kind of activities in QUALICHeCK?

Outcomes of QUALICHeCK

Some considerations about future challenges

Conclusions

Page 4: EPBD legislation in practice - challenges regarding compliance and quality of the works

Cost optimal requirements

NZEB

ZEB?

PEB??

(nearly zero)

(zero)

(positive)

ALL NEW BUILDINGS!!

Page 5: EPBD legislation in practice - challenges regarding compliance and quality of the works

… and you expect a good quality

You expect a reliable label

Page 6: EPBD legislation in practice - challenges regarding compliance and quality of the works

… and you expect a good quality

You expect a reliable label

Page 7: EPBD legislation in practice - challenges regarding compliance and quality of the works

… and you expect a good quality

Page 8: EPBD legislation in practice - challenges regarding compliance and quality of the works

2 societal expectations…• There should be (more) attention for compliance

with the EPC for new and renovated buildings

• There should be (more) attention for achieving a good quality of the works

Page 9: EPBD legislation in practice - challenges regarding compliance and quality of the works

=?Physical modelling

OK?

Components/systems asassumed in calculations?

Realoccupancy

≈?Are the works

correctly executed?

EPC

Page 10: EPBD legislation in practice - challenges regarding compliance and quality of the works

Energy certificates with respect to ventilation …EPC calculation• Efficiency of heat exchanger• Fan characteristics• Ductwork airtightness• Demand controlled ventilation• …• …

Execution of the works• Air flow rates• Acoustics• …• …

Observation:In many countries no or nearly

no control regardingcompliance of EPC

Observation:In many countries no or nearly

no control regardingreal performances

Page 11: EPBD legislation in practice - challenges regarding compliance and quality of the works

Poor design and execution

• Energy performances critical

• IAQ problematic• acoustics• Maintenance• …

Page 12: EPBD legislation in practice - challenges regarding compliance and quality of the works
Page 13: EPBD legislation in practice - challenges regarding compliance and quality of the works

Which problems are often observed?

• Air flow rates ( IAQ)• Acoustics: from system or from outside• Draught problems• Maintenance• …• Problems are found for all kind of systems• Good execution

exists and also notextremely difficult

Page 14: EPBD legislation in practice - challenges regarding compliance and quality of the works
Page 15: EPBD legislation in practice - challenges regarding compliance and quality of the works

2 objectives of QUALICHeCK project

• To set up a series of actions which should result in more attention and practical initiatives for actual compliance with the claimed energy performance for new and renovated buildings

i.e. ‘Boundary conditions which force people to do what they declare’;

• To set up a series of actions, which should result in more attention and practical initiatives for achieving a better quality of the works,

i.e. ‘Boundary conditions which stimulate and allow the building sector to deliver good quality of the works’.

Page 16: EPBD legislation in practice - challenges regarding compliance and quality of the works

Create boundary conditionsfor good compliance

Create boundary conditions

for a correct execution

Page 17: EPBD legislation in practice - challenges regarding compliance and quality of the works

Structure of the presentationAbout good compliance and good quality of the works

What kind of activities in QUALICHeCK?

Outcomes of QUALICHeCK

Some considerations about future challenges

Conclusions

Page 18: EPBD legislation in practice - challenges regarding compliance and quality of the works

Solutions

Easy access of compliant EPC input data

Towards more quality of the works

QUALICHeCK project (2014-2017)Status of compliance

and quality on the ground

Towards better compliance and effective penalties

Page 19: EPBD legislation in practice - challenges regarding compliance and quality of the works

4 focus areas in QUALICHeCK

Transmission characteristics

Ventilation and airtightness

Sustainable summer comfort techniques

Renewables in multi-energy systems

Page 20: EPBD legislation in practice - challenges regarding compliance and quality of the works

= National consortium

Page 21: EPBD legislation in practice - challenges regarding compliance and quality of the works

Structure of the presentationAbout good compliance and good quality of the works

What kind of activities in QUALICHeCK?

Outcomes of QUALICHeCK

Some considerations about future challenges

Conclusions

Page 22: EPBD legislation in practice - challenges regarding compliance and quality of the works

www.qualicheck-platform.eu

Page 23: EPBD legislation in practice - challenges regarding compliance and quality of the works
Page 24: EPBD legislation in practice - challenges regarding compliance and quality of the works

Solutions

Easy access of compliant EPC input data

Towards more quality of the works

Status of compliance and quality on the ground

Towards better compliance and effective penalties

Page 25: EPBD legislation in practice - challenges regarding compliance and quality of the works

0

3

6

9

12

15

NU

MBE

R O

F PR

OJE

CTS

OU

T O

F 15

EXA

MIN

EDExample from CYPRUS: Deviations between U-values

in EPC and the actual U-values

Page 26: EPBD legislation in practice - challenges regarding compliance and quality of the works

Example from FRANCE:Quality of ventilation systems in 1.287 new dwellings

44 % of multi-family dwellings don’t comply68% of single-family dwellings don’t comply

Page 27: EPBD legislation in practice - challenges regarding compliance and quality of the works

Example from the NetherlandsNovember 2014:

“Ventilation Improvement plan has failed”• This was a statement by Dutch minister• Context:

• Findings in 2012: 50% of new residential ventilation systems don’t work well• All stakeholders’ organisations signed in 2012 a declaration that in 2015 all systems should

function correctly• Reasons for failure:

• … lack of interest by clients• … economic pressure

Page 28: EPBD legislation in practice - challenges regarding compliance and quality of the works

0

150

300

450

600

750

900

1050

1200

B20

B18 B2 B22 B7 B17

B19 B8 B1 B16

B24

B23 B6 B25 B3 B10 B5 B4 B21

B15

B14 B9 B11

B12

B13

Deg

ree-

hour

s >

27̊C

(Kh)

Building

Requirement ≤150 K̊h

Example from ESTONIA: Assessment of overheating

Overall building results:17 out of 25 (68%) did not comply with the regulation

Page 29: EPBD legislation in practice - challenges regarding compliance and quality of the works

Example from SWEDEN:Airtightness of air distribution systems

Page 30: EPBD legislation in practice - challenges regarding compliance and quality of the works

Solutions

Easy access of compliant EPC input data

Towards more quality of the works

Status of compliance and quality on the ground

Towards better compliance and effective penalties

Page 31: EPBD legislation in practice - challenges regarding compliance and quality of the works
Page 32: EPBD legislation in practice - challenges regarding compliance and quality of the works
Page 33: EPBD legislation in practice - challenges regarding compliance and quality of the works

Special issues by QUALICHeCKfor REHVA Journal

3 special issues are planned:•1st issue August 2015•2nd issue around June 2016•3rd issue around February 2017

Page 34: EPBD legislation in practice - challenges regarding compliance and quality of the works

Procedures to obtain and prove compliant data

Robust legal procedures in case of non-compliance

Handling of non-compliance in practice

There should be clear procedures what must be done

There should be clear legal procedures how to decide on non-compliance and related actions

There should be an effective control and sanctions if non-compliance

Source book “Compliance in relation to EPC”! S

ocie

tal s

uppo

rt !

Procedures to obtain and prove compliant data

Page 35: EPBD legislation in practice - challenges regarding compliance and quality of the works

Procedures to obtain and prove compliant data

Robust legal procedures in case of non-compliance

Handling of non-compliance in practice

There should be clear procedures what must be done

There should be clear legal procedures how to decide on non-compliance and related actions

There should be an effective control and sanctions if non-compliance

! Soc

ieta

l sup

port

!Procedures to obtain and prove

compliant dataSTEP 1: Procedures to obtain and prove

compliant data

Page 36: EPBD legislation in practice - challenges regarding compliance and quality of the works

Procedures to obtain and prove compliant data

Robust legal procedures in case of non-compliance

Handling of non-compliance in practice

There should be clear procedures what must be done

There should be clear legal procedures how to decide on non-compliance and related actions

There should be an effective control and sanctions if non-compliance

! Soc

ieta

l sup

port

!Procedures to obtain and prove

compliant data

STEP 2: Robust legal procedures in case of non-compliance

Page 37: EPBD legislation in practice - challenges regarding compliance and quality of the works

Procedures to obtain and prove compliant data

Robust legal procedures in case of non-compliance

Handling of non-compliance in practice

There should be clear procedures what must be done

There should be clear legal procedures how to decide on non-compliance and related actions

There should be an effective control and sanctions if non-compliance

! Soc

ieta

l sup

port

!Procedures to obtain and prove

compliant data

STEP 3: Handling of non-compliance in practice

Page 38: EPBD legislation in practice - challenges regarding compliance and quality of the works

Timeline for both QUALICHeCK sourcebooks…

Page 39: EPBD legislation in practice - challenges regarding compliance and quality of the works

2nd QUALICHeCK conference Brussels September 4 2015

Focus on - “better compliance/quality of the works”- “ Review of EPBD recast?”

Page 40: EPBD legislation in practice - challenges regarding compliance and quality of the works

International QUALICHeCK workshops(Supported by REHVA)

Transmission characteristics

Ventilation and airtightness

Sustainable summer comfort techniques

Renewables in multi-energy systems

LUND - 16-17 March 2015

ATHENS – 9-10 March 2016

TALLINN – October 2016

LYON – ~January 2017

Page 41: EPBD legislation in practice - challenges regarding compliance and quality of the works

2nd QUALICHeCK workshop ‘Sustainable summer comfort’March 9-10 2016 Athens (Greece)

2-days workshopTechnologies to be covered:

• Solar control• Thermal mass • Ventilative cooling • Cool roofs • Daylighting

Page 42: EPBD legislation in practice - challenges regarding compliance and quality of the works

Structure of the presentationAbout good compliance and good quality of the works

What kind of activities in QUALICHeCK?

Outcomes of QUALICHeCK

Some considerations about future challenges

Conclusions

Page 43: EPBD legislation in practice - challenges regarding compliance and quality of the works

Some considerations about future challenges

•Should there be more attention by the Member States for compliance and quality of the works?

•Should these issues receive attention in the framework of a review of the EPBD?

Page 44: EPBD legislation in practice - challenges regarding compliance and quality of the works

Structure of the presentationAbout good compliance and good quality of the works

What kind of activities in QUALICHeCK?

Outcomes of QUALICHeCK

Some considerations about future challenges

Conclusions

Page 45: EPBD legislation in practice - challenges regarding compliance and quality of the works

Conclusions

• We have to be ambitious in terms of the requirements imposed for the energy performances of new and renovated buildings

• But it is also very important to create boundary conditions that:• Result in good compliance (a ‘reliable’ EPC)• Result in good quality of the works

The sole responsibility for the content of this presentation lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither the EASME nor the European Commission are responsible for any use that may be made of the information contained therein.