  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    1/25

    BH VN G R ENERGY COMP NY LIMITED2 X 250 MW LIGNITE BASED THERMAL POWER PROJECT AT

    PADVA, BHAVNAGAR DISTRICT, GUJARAT, INDIA

    NOTICE INVITING EXPRESSION OF INTEREST (EOI)

    THROUGH INTERNATIONAL COMPETATIVE BIDDING (ICB)FOR PRE-QUALIFICATION REQUIREMENTS (PQR)

    FOR

    ASH HANDLING AND DISPOSAL SYSTEM

    TCE.5403A-570-EOI-004

    T T CONSULTING ENGINEERS LIMITED73/1, ST. MARKS ROAD

    BANGALORE 560 001

    INDIA

    SEPTEMBER 2010

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    2/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION::Contents

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 1 OF 1

    TATA Consulting Engineers Limited TCE FORM NO. 329

    ISSUER0

    CONTENTS

    Sl.

    No.

    Title Page nos.

    PURPOSE 1

    ABOUT BECL 1

    APPROACH TO SITE 2

    CONSULTANT 2

    SCOPE OF WORK 2

    QUALIFICATION REQUIREMENTS (QR) 5

    PARTICIPATION FEE 7

    TIME SCHEDULE FOR THE PROJECT 8

    EOI DOCUMENT SUBMISSION AND OPENING 10

    LANGUAGE 10

    SIGNATURE OF EOI DOCUMENT 10

    TIME AND DATE FOR RECEIPT OF EOI DOCUMENTS 12

    EOI DOCUMENTS OPENING 12

    ANNEXURE No. o fSheet(s)

    I LETTER OF CONSENT 1

    II JOINT DEED OF UNDERTAKING BY DESIGNCONSULTANT WITH CONTRACTOR (Indicativecondition)

    4

    III DOCUMENTS TO BE SUBMITTED AS PER QR 1

    IV CHECK LIST FOR SUBMISSION OF DOCUMENTS FOREOI

    4

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    3/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION: : PQR

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 1 OF 13

    TATAConsulting Engineers Limited

    ISSUER0

    TCE FORM NO. 329

    PURPOSE

    Bhavnagar Energy Company Limited (BECL) invites Expression of

    Interest (EOI) through International Competitive Bidding (ICB) route for

    Pre-Qualification Requirements from Bidders for Ash handling and

    Disposal system package for 2 x 250 MW Lignite based Thermal Power

    Project at village Padva, Bhavnagar Dist. in the State of Gujarat, India as

    per the Brief Scope of Work mentioned hereinafter.

    Tender specification documents will be issued only to the short listed

    Bidders among those Bidders who have submitted the EOI.

    ABOUT BECL:

    Bhavnagar Energy Company Limited, a joint venture company has been

    formed with GPCL, GSIL, GMDC, GIPCL, GNFC, GSFC & GACL as

    promoters. BECL has been promoted to exploit lignite resources in

    Bhavnagar District in Saurashtra region for power generation purposes.

    BECL is setting up 2 x 250 MW Lignite based Thermal Power Project at

    Village, Padva, Taluka Ghogha, District Bhavnagar. The Power Project

    of 2 x 250 MW is planned for implementation as per the following

    Schedule:

    Zero Date : December 2010 Placement of order

    for Ash handling and disposal system

    package.

    Completion of trial operation:1ststream - 20 months from zero date

    2ndstream - 22 months from zero date

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    4/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION: : PQR

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 2 OF 13

    TATAConsulting Engineers Limited

    ISSUER0

    TCE FORM NO. 329

    APPROACH TO SITE

    The project site details are:

    a) Site location Located at Village Padva, Taluka

    Ghogha, District Bhavnagar, is accessible

    by road

    b) Access by road Highway1.0 km from State highway

    (SH 25/1)

    c) Nearest railway station 25 kms at Bhavnagar

    d) Nearest airport Domestic Airport at Bhavnagar

    e) Nearest port Pipavav

    CONSULTANT

    TATA Consulting Engineers Limited (TCE), Bangalore are the Consulting

    Engineers for the project, appointed by BECL.

    I) SCOPE OF WORK

    The scope of work under the specification shall include design, engineering,

    manufacture, supply & delivery at site of plant & equipment, mechanical, I&C

    systems, electrical equipment and systems, technological steel structures, civil &

    building structural works, storage, handling at site, insurance, erection, painting,

    start-up, trial-operation, testing, commissioning and performance guarantee test,

    guarantee and warranty for ash handling and disposal system for 2 X 250 MW

    LIGNITE BASED TPP AT PADVA, BHAVNAGAR DIST. and hand over to the

    Purchaser an operating plant. The package shall include plant & equipment and

    all the auxiliary facilities as indicated below:-

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    5/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION: : PQR

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 3 OF 13

    TATAConsulting Engineers Limited

    ISSUER0

    TCE FORM NO. 329

    1. Bed Ash Handling System

    Chain conveyor system to convey bed ash from the bed ash coolers

    below the furnace bed to the intermediate bed ash surge hopper(ISH)

    and Dense phase pressure pneumatic conveying system to evacuate

    bed ash from ISH to the bed ash silos. The peak generation rate of bed

    ash from the SG of each Unit would be 140 TPH. There would be two

    (2) streams of bed ash handling system from the ISH up to the bed ash

    silos. The bed ash handling system from the ISH up to the silos would

    be in two or three stages. The anticipated bed ash handling system

    capacity of each stream would be about 140 TPH under emergency and

    70 TPH in continuous running mode.

    2. Fly Ash Handling System

    Dense phase pressure pneumatic conveying system to evacuate Fly

    ash from the fly ash hoppers of proposed Circulating Fluidizing Bed

    Combustion Steam Generators. The generation rate of fly ash from the

    SG of each Unit would be 65 TPH. The fly ash handling system from

    the fly ash hoppers up to the silos would be in two or three stages

    through fly ash ISH / intermediate silo to main silo. The anticipated fly

    ash handling system capacity would be about 130 TPH under

    emergency and 65 TPH in continuous running mode.

    3. Adequate capacity compressors for conveying the total ash (Bed ash

    and fly ash of two Units) to intermediate surge hoppers/ intermediate

    silos and from Intermediate surge hoppers to Main Silos.

    4. Adequate capacity blowers with heaters for fluidizing the ISH /

    intermediate silos, main silos and ESP hoppers.

    5. Complete arrangement / equipments for conveying the ash from both

    the Units to the destination as specified in the tender.

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    6/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION: : PQR

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 4 OF 13

    TATAConsulting Engineers Limited

    ISSUER0

    TCE FORM NO. 329

    6. Complete piping, valves, fittings and other accessories as required by

    the system.

    7. Necessary conveying equipments like ash conditioners, rotary feeders,telescopic chutes, etc.

    8. Handling and hoisting facilities including cranes, hoists, etc.

    9. Construction of ISHs /intermediate silos and main silos.

    10. Construction of control room, switchgear room, compressor building etc.

    11. Ventilation, Air conditioning system.

    12. HT/LT Switch gear, LT transformers and other electrics.

    13. Control and power cables.

    14. Control panels, desks, mimics, etc.

    15. Control and instrumentation including PLC panel systems.

    16. Area illumination.

    17. Complete civil work including supply of cement, steel and requiredmaterials, site grading and levelling, building for plant and equipment,control room building, Main RCC silos for ash storage with otherfoundations as required by the system, roads, drainage and pavementsetc.

    18. Ash disposal system for bed and fly ash.

    19. Any other facilities to complete the plant as per system requirement.

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    7/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION: : PQR

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 5 OF 13

    TATAConsulting Engineers Limited

    ISSUER0

    TCE FORM NO. 329

    II) QUALIFICATION REQUIREMENTS (QR)

    The EOI is open to any single Bidder who has supplied, erected and

    commissioned the following:

    1.0 At least one (1) number of Dense phase pressure pneumatic conveying

    system of capacity not less than Thirty Five (35) tonnes per hour for

    extracting the fly ash of coal/lignite-fired boiler in power plant and

    conveying ash to storage silo with minimum distance of Five hundred

    (500) meters. The above system should have been in satisfactory

    operation for a period of at least two (2) years as on the original

    scheduled date of EOI Document Opening

    OR

    2.0 At least one (1) number of dry fly ash handling system (Lean phase

    pneumatic conveying system) of capacity not less than thirty five (35)

    tonnes per hour for extracting the fly ash of coal/lignite-fired boiler in

    power plant and conveying ash to storage silo with minimum distance of

    two hundred (200) meters. The above system should have been in

    satisfactory operation for a period of at least two (2) years as on the

    original scheduled date of EOI Document Opening.

    3.0 In case of the Bidder meeting the QR in Cl. 2.0, he should have

    association with a design consultant under whose design a dense phase

    pressure pneumatic conveying system should have been in operation

    meeting the QR Cl 1.0. In such a case, the Bidder and the design

    consultant should along with the bid enclose a Letter of Consent (LOC)

    signed by both the parties. On award of contract, the Bidder and the

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    8/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION: : PQR

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 6 OF 13

    TATAConsulting Engineers Limited

    ISSUER0

    TCE FORM NO. 329

    design consultant shall submit a Joint Deed of Undertaking (JDU) duly

    executed by both parties for the successful performance of the system.

    4.0 Financial Requirements

    The Bidder shall be financially sound and shall have adequate financial

    resources to execute the contract concurrently with his other

    commitments and shall meet the following conditions.

    a) The Bidder shall have Positive Net Worth as per the latest audited

    financial statement.

    b) The Bidder shall have during the last three years, an Average Annual

    Turn Over of not less than Rs. 500 Million.

    c) The Bidder shall furnish his audited profit and loss account and

    balance sheet for the last three financial years.

    5.0 Documentary evidence to satisfy the qualifying requirements mentioned

    in 1.0 to 4.0 shall be furnished.

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    9/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION: : PQR

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 7 OF 13

    TATAConsulting Engineers Limited

    ISSUER0

    TCE FORM NO. 329

    III) Bidder shall note the following clauses and furnish confirmation for

    acceptance of these clauses in the EOI documents.

    1.0 The successful Bidder shall furnish a Contract Performance Guarantee in the

    form of an on demand Bank Guarantee for 10% of the total contract value for

    the faithful performance of the contract after the Letter Of Award (LOA).

    2.0 The scope of work of the Bidder shall be on the basis of single Bidder

    responsibility. The contract will be entered into only with the successful

    Bidder. He only shall be contractually bound to the Owner for the completion

    of the entire scope of works. Thus the Bidder shall be solely responsible and

    liable for all the technical, management and all other services required to

    complete the entire scope of work detailed in the tender specification.

    3.0 Sourcing of all equipment/systems should be with the approval of the

    Purchaser & only from the reputed manufacturers/suppliers/sub-vendors who

    have supplied at least one similar or larger size equipment/systems as

    stipulated in the tender specification each of which are in satisfactory

    operation for a minimum period of two years.

    4.0 A sample Format of Letter of Consent (LOC) to fulfill the Qualification

    Requirements Clause II (3.0) is enclosed as Annexure I. The bidder shall

    furnish the LOC indicating the Scope of work of the design consultant

    clearly detailed.

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    10/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION: : PQR

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 8 OF 13

    TATAConsulting Engineers Limited

    ISSUER0

    TCE FORM NO. 329

    5.0 A sample Format of Joint Deed of Undertaking (JDU) to fulfill the Qualifying

    Requirements clause II (3.0) is enclosed as Annexure II. The bidder shall

    furnish the Joint Deed of Undertaking (JDU) indicating the Scope of work of

    the Design Consultant clearly detailed. The bidder shall furnish the

    unsigned copy of the Joint Deed of Undertaking (JDU) in completely filled

    up form along with his EOI documents.

    6.0 The requirement of documentary evidence called for in Qualification

    Requirements Clause II (5.0) is indicated in Annexure III. The bidder shall

    comply with these requirements.

    7.0 The Bidder shall furnish the following details also along with EOI documents:

    o Contracts in hand/pending jobs and their status along with Value.

    o Major legal cases and their statutory liabilities.

    o Recent Coal or lignite based ash handling system executed with value.

    8.0 In case, certificate(s) submitted by the Bidder is found to be a forged one /

    bogus one, the Bidder will not only be disqualified for the tender but also

    would be blacklisted / debarred by BECL and the matter would be informed

    to other PSUs / Statutory Bodies.

    9.0 TIME SCHEDULE OF THE PROJECT

    First stream shall achieve successful completion of Trial operation within

    twenty 20 months and the second stream within twenty two 22 months from

    the date of letter of award.

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    11/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION: : PQR

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 9 OF 13

    TATAConsulting Engineers Limited

    ISSUER0

    TCE FORM NO. 329

    10.0 Notwithstanding anything stated above BECL reserves the right to verify all

    statements/information submitted to confirm the Bidders claim on

    experience and to asses the Bidders capability and capacity to perform the

    contract should the circumstances warrant such an assessment in the overall

    interest of the project.

    11.0 BECL reserves the right to reject any or all EOIs or cancel/withdraw theInvitation for EOI without assigning any reason whatsoever and in such case

    no Bidder/intending Bidder shall have any claim arising out of such action.

    12.0 The payment will be made in Indian Rupees only.

    13.0 The bidder cannot be an associate for other bidder(s) who are bidding for

    this Ash Handling System Expression of Interest.

    14.0 The bidder may furnish EOI with more than one associate(s) as design

    consultant as per QR condition II (3.0). However he is limited to choose

    while submitting the techno-commercial bid only one associate who are

    qualified for the conditions stipulated in the notice inviting EOI. No new

    associate will be permitted at the time of submitting the Techno commercial

    Bid.

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    12/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION: : PQR

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 10 OF 13

    TATAConsulting Engineers Limited

    ISSUER0

    TCE FORM NO. 329

    IV) PARTICIPATION FEE

    The Participation fee (non-refundable) for an amount of Indian Rupees

    25000 (Twenty five thousand) in the form of Demand Draft drawn from

    Nationalised Bank or Pay Order in favour of Bhavnagar Energy Company

    Limited, or US $ 550 payable at Gandhinagar, to be submitted along with

    the EOI documents. EOI documents received without the Participation

    fee will be rejected.

    V) EOI DOCUMENTS SUBMISSION AND OPENING

    1.0 The EOI documents shall be submitted in one original and three

    identical copies indicating clearly as original and copy.

    2.0 LANGUAGE

    The EOI documents prepared by the Bidder, and all correspondence and

    documents relating to the EOI shall be in the English language.

    3.0 SIGNATURE OF THE EOI DOCUMENTS

    3.1 The EOI must contain the name and place of business of the person or

    persons making the EOI and each page of the EOI must be signed and

    sealed by the Bidder with his usual signature. The name of all persons

    signing should be typed or printed below the signature.

    3.2 Satisfactory evidences of authority of the person signing on behalf of the

    Bidder shall be furnished with the Bid.

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    13/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION: : PQR

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 11 OF 13

    TATAConsulting Engineers Limited

    ISSUER0

    TCE FORM NO. 329

    3.3 The Bidders name stated on the proposal shall be the exact legal name of

    the firm.

    4.0 The EOI documents (one original and Three identical copies) bearing the

    EOI reference no. shall be submitted in SEALED COVERS / ENVELOPES

    to

    Managing Director

    Bhavnagar Energy Company Limited

    Block No. 8, 3rd Floor, Udyog Bhavan,

    Sector -11, Gandhinagar 382 011.

    Gujarat, India.

    5.0 The name of the Bidder and his address should be clearly indicated outside

    the covers. In addition, the envelope or container should indicate the "EOI

    reference No. and Name of the work for which the EOI is submitted, EOI

    opening date and time". EOI with no indication given on the outside of the

    envelope to indicate that it is an EOI which therefore gets opened before

    the due date shall be liable to be disqualified. All the pages of the EOI shall

    be serially numbered. The Bidders are instructed to properly paste the

    covers before applying wax seal and it is warned that failure to do so would

    result in rejection of such EOI.

    6.0 Submission of EOI documents through Fax, Telex, E-mail will not be

    accepted.

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    14/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION: : PQR

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 12 OF 13

    TATAConsulting Engineers Limited

    ISSUER0

    TCE FORM NO. 329

    7.0 EOI submitted without the proper documentary evidence to substantiate

    fulfilment of the qualifying requirements as specified are liable for rejection

    without assigning any reason.

    8.0 BECL takes no responsibility for delay loss or no-receipt of documents or

    any letter sent by post either way.

    9.0 DATE AND TIME FOR RECEIPT OF EOI DOCUMENTS

    EOI Documents must reach this office on or before 14.30 Hours (IST) on

    14th October 2010. Any EOI offer received after the expiry of the time

    specified for receiving the EOI documents are liable for rejection.

    10.0 EOI DOCUMENTS OPENING

    The EOI documents received from the Bidders as above will be opened at

    Registered Office, BECL, on 15th October 2010 12.00 Hours (IST)

    onwards.

    11.0 The envelope containing Participation Fee as well as other documents

    sought for shall be opened on the date set for opening of the EOI in the

    presence of such Bidders who may be present. The Bidders are at liberty to

    be present or authorise their representatives not more than two to be

    present at the time of opening of EOI.

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    15/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION: : PQR

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 13 OF 13

    TATAConsulting Engineers Limited

    ISSUER0

    TCE FORM NO. 329

    12.0 Bidders clarifications if any shall reach BECL registered office on or before

    5thOctober 2010. For any clarification, please contact

    Managing Director

    Bhavnagar Energy Company Limited

    Block No. 8, 3rd Floor, Udyog Bhavan,

    Sector-11, Gandhinagar 382011.

    Gujarat, India.

    ON BEHALF OF BHAVNAGAR ENERGY COMPANY LIMITED

    MANAGING DIRECTOR (BECL)

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    16/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION:Annexure I

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 1 OF 1

    TATAConsulting Engineers Limited

    ISSUEP0

    TCE FORM NO. 329

    ANNEXURE-ILETTER OF CONSENT (LOC)

    We hereby declare that the under signed firms,

    1) Name and Complete address (The Bidder)

    2) Name and Complete address (The Associate)

    Have agreed to associate for the scope of work (to be detailed by the bidder while

    submitting his EOI document) Dense phase pressure pneumatic conveying system

    for 2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGAR DIST.. We also

    hereby jointly undertake the work of design, engineering, quality of manufacture /

    fabrication construction, timely delivery, erection and the successful performance of

    the Pressure operated pneumatic conveying dry ash collection system fully meeting

    the guarantee and also depute the associates technical experts from time to time

    for advise on procedures and guidance during erection, testing and commissioning

    to the contractors work / Owners Project site.

    If we become successful we shall furnish a Joint Deed of Undertaking as per the

    conditions in the sample JDU format. We also agree that the scope of work for the

    associate shall be as described in JDU.

    1. WITNESS For DESIGN CONSULTANT

    Signature:

    Name

    Designation: (Authorized Signatory)

    Office Address Seal of the Company

    2. WITNESS For Contractor

    Signature:

    Name

    Designation: (Authorized Signatory)

    Office Address Seal of the Company

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    17/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION:Annexure II

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 1 OF 4

    TATAConsulting Engineers Limited TCE FORM NO. 329

    ISSUER0

    ANNEXURE II

    JOINT DEED OF UNDERTAKING BY THE DESIGN CONSULTANT WITH THE

    CONTRACTOR

    (Indicative condition)

    This Deed of Undertaking executed this . . . . .. day of . . . . . . . . . . . . . . 20.. by . .

    . . . . . (Name of the Design Consultant. . . . . . . . . . . , a Company incorporated

    under the Law of the . . . (country) . . . . and having its Registered Office at . . .

    (complete address). . . . . . (Hereinafter called . . . . . . .. or DESIGN

    CONSULTANT which expression shall include its successors, executors and

    permitted assigns) and . . . . . . . . . . . . . . (Name of the contractor / vendor). . . . .,

    a Company incorporated under the law of . . . . . . . . . . . . . (Country) having its

    registered office at . . .. (Complete address) . . . . . . .(hereinafter called . . . . .. or

    Contractor which expression shall include its successors, executors and

    permitted assigns) in favour of Bhavnagar Energy Company Limited (BECL), A

    Company incorporated under the companies Act 1956 having its registered office

    at Gandhinagar (hereinafter called the Owner. Which expression shall include its

    successors, executors and assigns), WHEREAS the Owner is desirous of getting

    work of Design, Engineering, manufacture, supply, erection, testing and

    commissioning of Dense phase pressure pneumatic conveying system for the Ash

    handling system of the 2 X 250 MW LIGNITE BASED TPP AT PADVA,

    BHAVNAGAR DIST. done as per its specification No. . . .. . . AND WHEREAS

    . . . . . . .. (Contractor) submitted its Technical Proposal vide its letter No. . . . . . .

    .. . dt. . . . . . . . . Based on technical assistance by M/s . . .. DESIGN

    CONSULTANT and whereas the contractor and the Design Consultant) have

    agreed that they would be jointly and severally bound and shall be responsible to

    the Owner for the successful performance of dense phase pressure pneumatic

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    18/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION:Annexure II

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 2 OF 4

    TATAConsulting Engineers Limited TCE FORM NO. 329

    ISSUER0

    conveying system for the Ash handling system fully meeting the parameters

    guaranteed as per the Owners specifications in terms of the Contract. NOW,

    THEREFORE, THIS UNDERTAKING witnessed as under:

    1. That in consideration of the award of contract by the Owner (hereinafter

    referred to as the Contract) we, the Design Consultant and Contractor do

    hereby declare and guarantee that we shall be jointly and severally bound

    to the BECL (Owner) for the successful performance of the dense phasepressure pneumatic conveying system for the Ash handling system of the 2

    X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGAR DIST. fully

    meeting the guarantee parameters as per the contract and further shall be

    fully responsible for the correctness of design and construction of dense

    phase pressure operated pneumatic conveying system in accordance with

    the contract specifications. Further, we the Design Consultant and the

    Contractor hold ourselves jointly responsible for the timely execution of all

    activities in accordance with the contract.2. Without prejudice to the generality of the Undertaking in Para 1 above, the

    methods of achieving the objectives set forth above shall be as follows:

    (a) The Design Consultant shall be responsible for the preparation of

    design, design calculation, design data and drawings for dense phase

    pressure pneumatic conveying system for the Ash handling system of

    the 2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGAR

    DIST. and shall provide all additional necessary technical assistance

    as required by the owner / purchaser in answering owner / purchasers

    queries by the way of correspondence and participation in co-

    ordination meetings during the execution of the contract to . . ..

    (Contractor) . . . . .. Further the Design Consultant shall extend their

    quality surveillance to the contractor during construction at the Owners

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    19/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION:Annexure II

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 3 OF 4

    TATAConsulting Engineers Limited TCE FORM NO. 329

    ISSUER0

    Project Site. Without prejudice to the overall responsibility of the

    Design Consultant as to the successful commissioning and

    performance of the equipment, the Design Consultant shall, in addition,

    depute technical experts from time to time to the Contractors

    work/Owners Project site, as mutually agreed upon between the

    Owner and the Contractor in accordance with the stipulation in the

    Contract.

    (b) The Contractor shall be responsible to manufacture that portion of the

    equipment to be manufactured at its works or its vendors works as per

    the Design Consultants design and to the Design Consultants quality

    acceptance level. Further, the Contractor shall erect, commission and

    carry out the testing of dense phase pressure pneumatic conveying

    system for the Ash handling system of the 2 X 250 MW LIGNITE

    BASED TPP AT PADVA, BHAVNAGAR DIST. fully meeting the

    parameters as per the Contract in accordance with the DesignConsultants advice, procedure and guidance. The Contractor will be

    responsible for the timely completion of all the activities related to the

    Contract

    3. In the event of any breach in the performance of the obligations set forth

    above, we the Design Consultant and the Contractor shall jointly and

    severally pay the loss or damage to the Owner on its demand except

    consequential damages namely loss of power, loss of profit, loss of interest.

    Further any extension of time, relaxation or indulgence by the Owner to the

    Contractor shall not prejudice the rights of the Owner under this

    Undertaking against the Design Consultant or the Contractor.

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    20/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION:Annexure II

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 4 OF 4

    TATAConsulting Engineers Limited TCE FORM NO. 329

    ISSUER0

    4. We, the Design Consultant and the Contractor agree that this undertaking

    shall be irrevocable and further agree that this Undertaking shall continue to

    be enforceable till the end of warranty period under the Contract. We

    further agree that this Undertaking shall be without prejudice to the various

    liabilities of the Contractor including Contract Performance Guarantee as

    well as other obligations of the Contractor in terms of the Contract.

    5. The Performance, rights and responsibility of the Parties shall be inaccordance with the Contract and further the liability of the Contractor /

    Design Consultant under this undertaking shall not in any case exceed the

    limits as stipulated in the Contract.

    IN WITNESS WHEREOF the Design Consultant and the Contractor have, through

    their authorized representatives executed this Undertaking and affixed Common

    Seals of their respective Companies, on the day, month and year first above

    mentioned.1. WITNESS Design Consultant

    Signature:

    Name

    Designation: (Authorized Signatory)

    Office Address Seal of the Company

    2. WITNESS For Contractor

    Signature:

    Name

    Designation: (Authorized Signatory)

    Office Address Seal of the Company

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    21/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION:Annexure III

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 1 OF 1

    TATAConsulting Engineers Limited TCE FORM NO. 329

    ISSUER0

    ANNEXURE-III

    Documents to be submitted by the bidder as per QR clause 1.0 to 3.0

    The documentary evidence to be submitted by the bidder in the form of

    performance certificate, supply order copy etc. must contain the following details.

    1. It should be in the letterhead of the issuing firm.

    2. It should be dated.

    3. Name and designation of the signing person should be clearly discernable.

    4. The number and capacity of the dense phase pressure pneumatic system /dry

    fly ash handling system (Lean phase pneumatic conveying system) as per QR

    should be clearly indicated.

    5. The name and address of the firm who has executed, supply, erection and

    commissioning of the plant considered along with type of fuel.

    6. Satisfactory operation of the dense phase / vacuum / pressure pneumaticconveying system in the ash handling plant considered from . . . . . . . . . . . . till

    date.

    7. The distance of conveying to be indicated for the above system.

    8. Location of the plant in which the system mentioned above is working.

    9. Bidders/ Design Consultant is requested to furnish contact address, phone and

    fax numbers and E-mail address to clarify any of the details mentioned above.

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    22/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION:Annexure IV

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 1 OF 4

    TATAConsulting Engineers Limited TCE FORM NO. 329

    ISSUER0

    CHECK LIST FOR SUBMISSION OF DOCUMENTS FOR EOI

    Bidder is requested to fill this check list and ensure that all details / documents have beenfurnished as called for in the EOI along with duly filled in, signed & stamped Checklist witheach copy of the EOI documents.

    SI.No.

    EOI SI.No.

    PQR REQUIREMENTBIDDER TO

    CONFIRM WITHTICK MARK

    PAGENUMBER

    1. II, 1.0 At least one (1) number of Dense phase pressurepneumatic conveying system of capacity not lessthan Thirty Five (35) tonnes per hour for extractingthe fly ash of coal/lignite-fired boiler in power plantand conveying ash to storage silo with minimumdistance of Five hundred (500) meters. The abovesystem should have been in satisfactory operationfor a period of at least two (2) years as on theoriginal scheduled date of EOI Document Opening

    OR

    2. II, 2.0 At least one (1) number of dry fly ash handlingsystem (Lean phase pneumatic conveying system)

    of capacity not less than thirty five (35) tonnes perhour for extracting the fly ash of coal/lignite-firedboiler in power plant and conveying ash to storagesilo with minimum distance of two hundred (200)meters. The above system should have been insatisfactory operation for a period of at least two(2) years as on the original scheduled date of EOIDocument Opening.

    3. II, 3.0 In case of the Bidder meeting the QR in Cl. 2.0, heshould have association with a design consultantunder whose design a dense phase pressurepneumatic conveying system should have been in

    operation meeting the QR Cl 1.0. In such a case,the Bidder and the design consultant should alongwith the bid enclose a Letter of Consent (LOC)signed by both the parties. On award of contract,the Bidder and the design consultant shall submit aJoint Deed of Undertaking (JDU) duly executed byboth parties for the successful performance of thesystem.

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    23/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION:Annexure IV

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 2 OF 4

    TATAConsulting Engineers Limited TCE FORM NO. 329

    ISSUER0

    SI.No.

    EOI SI.No.

    PQR REQUIREMENTBIDDER TO

    CONFIRM WITHTICK MARK

    PAGENUMBER

    4. II, 4.0 Financial Requirements:

    The Bidder shall be financially sound and shallhave adequate financial resources to execute thecontract concurrently with his other commitmentsand shall meet the following conditions.

    5. II, 4.0

    a.

    The Bidder shall have Positive Net Worth as per

    the latest audited financial statement.

    6. II, 4.0b.

    The Bidder shall have during the last three years,an Average Annual Turn Over of not less than Rs.500 Million.

    7. II, 4.0c.

    The Bidder shall furnish his audited profit and lossaccount and balance sheet for the last threefinancial years.

    8. II, 5.0 Documentary evidence to satisfy the qualifyingrequirements mentioned in 1.0 to 3.0 shall befurnished.

    9. III, 1.0 The successful Bidder shall furnish a ContractPerformance Guarantee in the form of an ondemand Bank Guarantee for 10% of the totalcontract value for the faithful performance of thecontract after the Letter Of Award (LOA).

    10. III, 2.0 The scope of work of the Bidder shall be on thebasis of single Bidder responsibility. The contractwill be entered into only with the successful Bidder.He only shall be contractually bound to the Ownerfor the completion of the entire scope of works.Thus the Bidder shall be solely responsible and

    liable for all the technical, management and allother services required to complete the entirescope of work detailed in the tender specification.

    11. III, 3.0 Sourcing of all equipment/systems should be withthe approval of the Purchaser & only from thereputed manufacturers/suppliers/sub-vendors whohave supplied at least one similar or larger size

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    24/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION:Annexure IV

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 3 OF 4

    TATAConsulting Engineers Limited TCE FORM NO. 329

    ISSUER0

    SI.No.

    EOI SI.No.

    PQR REQUIREMENTBIDDER TO

    CONFIRM WITHTICK MARK

    PAGENUMBER

    equipment/systems as stipulated in the tenderspecification each of which are in satisfactoryoperation for a minimum period of two years.

    12. III, 4.0 A sample Format of Letter of Consent (LOC) tofulfill the Qualification Requirements Clause II (3.0)is enclosed as Annexure I. The bidder shall furnishthe LOC indicating the Scope of work of the design

    consultant clearly detailed.

    13. III, 5.0 A sample Format of Joint Deed of Undertaking(JDU) to fulfill the Qualifying Requirements clauseII (3.0) is enclosed as Annexure II. The bidder shallfurnish the Joint Deed of Undertaking (JDU)indicating the Scope of work of the DesignConsultant clearly detailed. The bidder shall furnishthe unsigned copy of the Joint Deed ofUndertaking (JDU) in completely filled up formalong with his EOI documents.

    14. III, 6.0 The requirement of documentary evidence called

    for in Qualification Requirements Clause II (5.0) isindicated in Annexure III. The bidder shall complywith these requirements.

    15. III, 7.0 The Bidder shall furnish the following details alsoalong with EOI documents:

    15.1 Contracts in hand/pending jobs and their statusalong with Value.

    15.2 Major legal cases and their statutory liabilities.

    15.3 Recent Coal or lignite based ash handling system

    executed with value.

  • 7/22/2019 EOI for Ash Handling and Disposal System (AHS)_72

    25/25

    SPEC. NO.TCE.5403A-570-EOI-004

    BHAVNAGAR ENERGY COMPANY LIMITED

    2 X 250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGARDIST.

    SECTION:Annexure IV

    ASH HANDLING AND DISPOSAL SYSTEM SHEET 4 OF 4

    ISSUER0

    SI.No.

    EOI SI.No.

    PQR REQUIREMENTBIDDER TO

    CONFIRM WITHTICK MARK

    PAGENUMBER

    16. IV. PARTICIPATION FEE

    The Participation fee (non-refundable) for anamount of Indian Rupees 25000 (Twenty fivethousand) in the form of Demand Draft drawn fromNationalised Bank or Pay Order in favour ofBhavnagar Energy Company Limited, payableat Gandhinagar, to be submitted along with theEOI documents.

    SIGNATURE

    NAME

    COMPANY SEAL DESIGNATION

    COMPANY

    DATE