ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 8 (GROUP OF MINES) Satgram Area and Sripur Area Eastern Coalfields Limited Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) G. T. Road (West End) Asansol - 713 304 CMPDI ISO 9001:2008 Company

Upload: others

Post on 26-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

ENVIRONMENTAL STATEMENT

IN

FORM-V (Under Rule-14, Environmental protection Rules, 1986)

(2015-2016)

FOR

CLUSTER NO. – 8 (GROUP OF MINES)

Satgram Area and Sripur Area

Eastern Coalfields Limited

Prepared at

Regional Institute – I

Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.)

G. T. Road (West End) Asansol - 713 304

CMPDI

ISO 9001:2008 Company

Page 2: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

1

ENVIRONMENTAL STATEMENT FORM – V

Environmental statement for the financial year ending 31st March, 2016

Cluster No. – 8

FOR THE YEAR: 2015-16

CONTENTS

SL.NO. CHAPTER PARTICULARS PAGE NO.

1 CHAPTER-I INTRODUCTION 2-5

2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I ) 6-13

LIST OF ANNEXURES

ANNEXURE NO. PARTICULARS PAGE NO.

I AMBIENT AIR QUALITY AND HEAVY METAL ANALYSIS 14-16

II NOISE LEVEL REPORT 17-18

III WATER QUALITY REPORT – MINE WATER QUALITY

AND GROUND WATER QUALITY

19-22

IV WELL WATER LEVEL REPORT 23

PLATES

I LOCATION PLAN

II PLAN SHOWING LOCATION OF MONITORING STATIONS

Page 3: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

2

CHAPTER – I

INTRODUCTION 1.1 GENESIS:

The Gazette Notification vide G.S.R No. 329 (E) dated 13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R No. 386 (E) Dtd. 22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above and in fulfillment of condition laid out in the Environment Clearance granted by MoEF&CC, the work of Environmental Statement for Cluster No. 8 was entrusted to CMPDI by GM (Environment), Eastern Coalfields Limited.

1.2 DESCRIPTION OF THE MINES CLUSTER:

Prior to 2014 – 15, a large number of taken over mines from pre – nationalization period, mostly underground mines, in the old coalfields of Raniganj and Jharia did not have environmental clearance from the MoEF&CC and were operating on the basis of “Consents’ received from the respective PCBs. It was felt that if these mines could be brought under the ambit of EC, several measures for environmental protection and pollution control could be put in place. However, the work of obtaining EC for such mines, individually, would have taken a lot of time. To circumvent the problem, it was mooted that since the environmental problems being faced were of regional nature and not confined to individual mines alone, cluster/groups of such mines could be identified for preparing cluster-wise integrated EIA & EMPs, addressing such environmental concerns comprehensively and ensuring effective co-ordination of environmental control measures within each cluster. 13 such clusters were identified in the Raniganj Coalfield of ECL and EC has been obtained on the cluster approach for 12 such clusters. Cluster of Mines No. 8 is one of the clusters for which EC has been granted vide letter no. J-11015/107/2011-IA-II.(M) dated 19th March, 2015 for a combined peak capacity of 2.75 MTY and within a ML area of 8281 Ha. Cluster no. – 8 is located in the west-central portion of Raniganj Coalfields and are having lease boundaries adjacent to each other. They span over four geological blocks namely, Sripur, Satgram, Ningha, and Bhanora falling between latitudes 230 39’ N to 230 45’ N and longitudes 870 E to 870 6’ E. The area is well connected by roads and railways. Eastern Railway Topsi-Barabon Chord Railway Line passes through the lease hold area and the Andal-Baraboni branch line passes through the northern part of the block. It is also connected with the NH-2 through the all-weather metalled Asansol-Domohani Road at Asansol town which is about 5 kms to the south. The nearest railway station is Baraboni, which is 2 kms away from the block. The mines are administratively under Sripur and Satgram Areas of ECL. Location of cluster – 8 is shown in plate no. – 1.

Page 4: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

3

The composition of the cluster is tabulated as under: Name of Mine

Production capacity

(MTPA) ML

(ha) Life of Mine

(years) Normative Peak

Bhanora UG Mine 0.2 0.3 1330 >20

Girmint/KDI UG Mine 0.04 0.65 1981 >50

Sirpur UG Mine 0.014 0.024 2338 >20

Sirpur Seam Incline UG Mine 0.105 0.136 279 >25

Ningah UG Mine 0.040 0.100 1072 >50

Mithapur West UG & OC Patch 0.28 0.342 527 >50

Satgram UG Mine 0.85 1.200 754 >30

Total 1.53 2.75 8281 -

1. Bhanora UG At present, there is no production from the mine. 2. Girmint/KDI UG At present, there is no production from the mine. 3. Sripur UG At present, there is no production from the mine. 4. Sripur Seam Incline UG At present, Rana (R-V) seam is being worked manually by driving three drifts from Sripur (R-VI) seam. Total production during 2015 – 16 was 0.037 MT. 5. Ningha UG Dishergarh (R-IV) seam is being worked by B & P method. Presently depillaring with part-caving is going to be resorted to along with sand-stowing. Two numbers of SDLs are presently being used with further augmentation being considered. Total production during 2015 – 16 was 0.03 MT. 6. Mithapur West UG & OC At present, there is no production from the mine. Shovel-dumper combination will be used for the proposed OC patch. 7. Satgram UG At present R-IV and R-III seams are being worked in the mine. Both the seams are being developed by Bord & Pillar method of mining. The main equipment deployed is LHDs and belt conveyors. Total production during 2015 – 16 was 0.067 MT.

1.3 ENVIRONMENTAL SCENARIO:

CMPDI has been engaged to carry out routine Environmental monitoring of the clusters. The monitoring is carried out every fortnight by collecting 24 – hour samples for ambient air at 3 all - weather stations, 3 pre-monsoon stations and 3 post-monsoon station (based on local meteorology) and compared with NAAQS, 2009 for quality. Samples of mine water are also collected and analysed every fortnight and compared with the MoEF Schedule – VI for discharge of effluents into land / streams. A complete analysis of the mine discharge

Page 5: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

4

samples which includes heavy metals and salts is carried out once every year during December. Noise level is recorded at 4 locations. Groundwater level in the cluster area is monitored by taking measurements at 8 earmarked dugwells in the months of January, May, August and November every year. Samples of groundwater from these wells, which are also utilized by the local population for drinking and other domestic purposes, are analysed once in a year during May and compared with the IS 10500: 2012 standards for drinking water quality. For the year 2015 – 16, the monitoring could be started only from the second fortnight of May, 2015 owing to certain delays in fixation of monitoring stations subsequent to the grant of EC. Location of the monitoring stations of air, noise & water are shown in Plate- II. The environmental monitoring results for 21 fortnights ending 31st March, 2016 are appended as Annexures – I, II, III & IV. The environmental monitoring results for the year 2015-16 are summarized below:

AMBIENT AIR QUALITY The PM10 concentration was found in the range of 59.7 to 192 µg/m3 and exceeded the NAAQS, 2009 on 22 occasions out of 126 samples while it is in limit as per GSR 742 (E) dated 25.09.2000. The PM2.5 concentration was found in the range of 16.2 to 86.3 µg/m3 and exceeded the NAAQS, 2009 on 9 occasions out of 126 samples. The SO2 concentration remained below 10.0 µg/m3 and NOX concentration was in the range of 8.2 to 27 µg/m3 and was thus quite well within NAAQS, 2009. ENVIRONMENTAL STANDARDS:

(I) Environmental standard for Raniganj Coalfield vide MOEF, Govt. of India, Gazette

Notification No.GSR 742 (E) dated 25.09.2000 for 24 hourly samples at 500 meters from

dust generating point:

Station Category

Pollutant Concentration (µg/m3)

TSPM PM10 SO2 NOx

Industrial 700.0 300.0 120.0 120.0

Residential 200.0 100.0 80.0 80.0

Station

Category

Limits for noise (Leq) dB(A)

Day Time (6am-10pm)

Night Time (10pm-6am)

Industrial 75.0 70.0

Residential 55.0 45.0

(II) National Ambient Air Quality Standards (NAAQS), 2009 for residential, industrial

and rural areas for 24 hourly samples:

Pollutant PM10 PM2.5 SO2 NOX

Concentration (µg/m3) 100.0 60.0 80.0 80.0

Limits for noise

(Leq) dB(A)

Day Time (6am-9pm) Night Time (9pm-6am)

55.0 45.0

Page 6: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

5

WATER UTILISATION, QUALITY & GROUNDWATER LEVEL Part-B of the Environmental Statement proforma contains the detailed break-up of water consumption. The analysis results for the mine discharge water reveal that most of the parameters are within permissible limits prescribed by MoEF&CC as General Standards Schedule – VI for Class-‘A’ effluent (Effluent discharged into inland surface water) and IS 10500 for groundwater standards. In order to assess the impact of mining on the groundwater level, a network of 8 dugwells has been identified for monitoring of groundwater level in the months of January, May, August and November every year. Samples from these wells are collected and analysed during May every year and compared with IS 10500 standards for drinking water. Mine water and ground water analysis results are given in Annexure-III. Well water level results are given in Annexure – IV.

NOISE LEVEL The day time noise level was found in the range of 54 to 71.1 dB(A). The noise level recorded is within the permissible limits prescribed by MoEF&CC.

Page 7: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

6

CHAPTER - II ENVIRONMENTAL STATEMENT FORM– V

Environmental statement for the financial year ending March, 2016

PART – A SL. NO. HEADING PARTICULARS

(I) NAME AND ADDRESS OF THE

PROJECT

Cluster No. – 8 (Group of 7 mines of ECL)

i Bhanora UG Mine Bhanora Colliery, Sripur Area, Burdwan, West Bengal

ii Girmint/KDI UG Mine Girmint / KDI Colliery, Sripur Area, Burdwan, West Bengal

iii Sirpur UG Mine Sripur Colliery, Sripur Area, Burdwan, West Bengal

iv Sirpur Seam Incline UG Mine

v Ningha UG Mine Ningha Colliery, Sripur Area, Burdwan, West Bengal

vi Mithapur West UG & OC Patch Mithapur West Colliery, Satgram Area, Burdwan, West Bengal

vii Satgram UG Mine Satgram Colliery, Satgram Area, Burdwan, West Bengal

(II) INDUSTRY CATEGORY All mines in the cluster falls in red category

(III) PRODUCTION CAPACITY 2.75 MTY

(IV) YEAR OF ESTABLISHMENT All the UG mines in the cluster are taken over mines from

pre-nationalization period. OC patches are yet to start

production.

(V) DATE OF THE LAST

ENVIRONMENTAL STATEMENT SUBMITTED

The Environment Statement is being submitted for the first

time in the financial year 2015 – 16 after the grant of EC on 19th March, 2015.

PART – B WATER AND RAW MATERIAL CONSUMPTION

(I) WATER CONSUMPTION (Cu.m/day) 1. Bhanora UG

Sl.

No.

Particulars 2014-15 2015-16

A. MINING (Dust suppression, Firefighting, Others)

Nil Nil

B. COOLING

(in radiators of trucks/HEMM)

C. DOMESTIC

i Colony (Mine water)

TOTAL - -

2. Girmint/KDI UG

Sl.

No.

Particulars 2014-15 2015-16

A. MINING (Dust suppression, Firefighting, Others) 95 95

B. COOLING

(in radiators of trucks/HEMM)

0 0

C. DOMESTIC

i Colony (Mine water) 221.20 221.20

ii Colony (PHED water) 177 177

iii Water supplied to local communities 930 930

TOTAL 1423.20 1423.20

Page 8: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

7

3. Sripur UG Sl. No.

Particulars 2014-15 2015-16

A. MINING

Nil Nil

i Dust suppression

ii Fire fighting

iii Others (service building etc.)

B. COOLING (in radiators of trucks/HEMM)

C. DOMESTIC

TOTAL - -

4. Sripur Seam Incline UG

Sl. No.

Particulars 2014-15 2015-16

A. MINING (Dust suppression, Firefighting, Others) 120 120

B. COOLING

(in radiators of trucks/HEMM)

0 0

C. DOMESTIC

i Colony (Mine water) 280 280

ii Colony (PHED water) 224 224

iii Water supplied to local communities 535 535

TOTAL 1159 1159

5. Ningha UG

Sl. No.

Particulars 2014-15 2015-16

A. MINING (Dust suppression, Firefighting, Others) 226 226

B. COOLING (in radiators of trucks/HEMM)

0 0

C. DOMESTIC

i Colony (Mine water) 526.40 526.40

ii Colony (PHED water) 421 421

iii Water supplied to local communities 7516 7516

TOTAL 8689.40 8689.40

6. Mithapur West UG & OC

Sl.

No.

Particulars 2014-15 2015-16

A. MINING

Nil Nil

i Dust suppression

ii Fire fighting

iii Others (service building etc.)

B. COOLING

(in radiators of trucks/HEMM)

C. DOMESTIC

TOTAL - -

Page 9: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

8

7. Satgram UG Sl. No.

Particulars 2014-15 2015-16

A. MINING (Dust suppression, Firefighting, Others) 758 758

B. COOLING (in radiators of trucks/HEMM)

0 0

C. DOMESTIC

i Colony (Mine water) 1060 1060

ii Water supplied to local communities 2548 2548

TOTAL 4366 4366

(II) RAW MATERIAL CONSUMPTION :

1. Bhanora UG Name of raw

material

Name of

products

Consumption of raw material

(per unit of product output)

During previous

financial year

(2014-15)

During current

financial year

(2015-16)

1. Explosive

Coal Nil Nil 2. Diesel

3. Lubricants

2. Girmint/KDI UG

Name of raw

material

Name of

products

Consumption of raw material

(per unit of product output)

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive

Coal Nil Nil 2. Diesel

3. Lubricants

3. Sripur UG Name of raw material

Name of products

Consumption of raw material (per unit of product output)

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive

Coal Nil Nil 2. Diesel

3. Lubricants

Page 10: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

9

4. Sripur Seam Incline UG Name of raw material

Name of products

Consumption of raw material (per unit of product output)

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive

Coal

0.718 kg/te 0.470 kg/te

2. Diesel - -

3. Lubricants - -

5. Ningha UG

Name of raw material

Name of products

Consumption of raw material (per unit of product output)

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive

Coal

0.301 kg/te 0.217 kg/te

2. Diesel 0.048 l/te 0.043 l/te

3. Lubricants 0.157 l/te 0.149 l/te

6. Mithapur West UG & OC

Name of raw material

Name of products

Consumption of raw material (per unit of product output)

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive

Coal Nil Nil 2. Diesel

3. Lubricants

7. Satgram UG

Name of raw material

Name of products

Consumption of raw material (per unit of product output)

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive

Coal

0.552 kg/te 0.553 kg/te

2. Diesel - -

3. Lubricants - -

Page 11: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

10

PART – C POLLUTION GENERATED

Pollutio

n

Quantity of pollution generated Percentage variation from prescribed standards with

reasons

WATER Mine water discharge Analysis results

are given in Annexure-II.

The analysis results reveal that most of the parameters are

below permissible limits prescribed by MOEF as General

Standards for class ‘A’ effluent (Effluent discharged into inland surface water.)

AIR The main air pollutant is suspended

PM10 and PM2.5. The air quality results are appended as Annexure-I.

Ambient air quality results show that the values of SO2 and

NOx are within the prescribed standards barring few times at few sampling stations. The concentration level of PM10 has

exceeded limits on 22 occasions and that of PM2.5 has exceeded limits on 9 occasions as per NAAQS, 2009.

PART – D HAZARDOUS WASTE

(As specified under Hazardous Waste (Management and Handling) Rules, 1989)

1. Bhanora UG Hazardous waste Total quantity

During Previous

financial year

(2014-15)

During current

financial year

(2015-16)

Disposal

method

A) From process

i)Used oil

ii)Lead-Acid Batteries a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

Nil Nil

2. Girmint / KDI UG

Hazardous waste Total quantity

During Previous financial year

(2014-15)

During current financial year

(2015-16)

Disposal method

A) From process i)Used oil

ii)Lead-Acid Batteries

a. Automobile batteries b. Cap-lamp batteries

iii) Used Cotton waste iv) Metal Scrap

Nil Nil

Page 12: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

11

3. Sripur UG Hazardous waste Total quantity

During Previous financial year

(2014-15)

During current financial year

(2015-16)

Disposal method

A) From process

i)Used oil

ii)Lead-Acid Batteries a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

Nil Nil

4. Sripur Seam Incline UG

Hazardous waste Total quantity

During Previous

financial year (2014-15)

During current

financial year (2015-16)

Disposal

method

A) From process i)Used oil

ii)Lead-Acid Batteries

a. Automobile batteries b. Cap-lamp batteries

iii) Used Cotton waste iv) Metal Scrap

litres

Nos 255 Nos

Kg Kg

litres

Nil 100 Nos

Kg Kg

Dealt in

Part – F

5. Ningha UG

Hazardous waste Total quantity

During Previous

financial year

(2014-15)

During current

financial year

(2015-16)

Disposal

method

A) From process

i)Used oil ii)Lead-Acid Batteries

a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

litres

Nil Nos

75 Nos Kg

Kg

litres

Nil Nos

115 Nos Kg

Kg

Dealt in Part – F

6. Mithapur West UG & OC

Hazardous waste Total quantity

During Previous financial year

(2014-15)

During current financial year

(2015-16)

Disposal method

A) From process i)Used oil

ii)Lead-Acid Batteries a. Automobile batteries

b. Cap-lamp batteries

iii) Used Cotton waste iv) Metal Scrap

Nil Nil

Page 13: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

12

7. Satgram UG Hazardous waste Total quantity

During Previous financial year

(2014-15)

During current financial year

(2015-16)

Disposal method

A) From process

i)Used oil

ii)Lead-Acid Batteries a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

Nil litres

Nos

Nos Kg

Kg

Nil litres

Nos

Nos Kg

Kg

Dealt in

Part – F

Approximate values may be given where actual values are not available. **It has been dealt in Part – F. Note: a) The detail of used oil is to be given to concerned Pollution Control Board in Form-13 as per time mentioned in HW (M & H), Amendment Rules, 2003. b) The detail of disposal of Lead Acid batteries is to be given to concerned State Pollution Control Board in Form-VIII as per time mentioned in Batteries (M&H) Rules, 2001.

PART – E SOLID WASTE

Particulars Total quantity (In Million Cu.m)

During previous financial year

(2014-15)

During current financial year

(2015-16)

a) From process (Mining) - -

b) From pollution control facilities - -

c) Quantity recycled or reutilized back filled - -

PART – F

PLEASE SPECIFY THE CHARACTERISTICS (IN TERMS OF

CONCENTRATION AND QUANTUM) OF HAZARDOUS AS WELL AS SOLID

WASTE AND INDICATE THE DISPOSAL PRACTICE ADOPTED FOR BOTH

THESE CATEGORIES OF WASTE.

Hazardous waste generated is given in the table PART-D which has been deposited at area store disposal stock yard. Batteries are stored in Area Store from where replacement is taken. Metal scraps are declared and report is sent to HQ. The scraps are then auctioned and sold through HQ. Used oil are re-used as lubricants in coal tubs and friction roller.

Page 14: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

13

PART – G IMPACT OF POLLUTION CONTROL MEASURES ON CONSERVATION OF NATURAL RESOURCES AND CONSEQUENTLY ON COST OF PRODUCTION. In order to carry out mining in an eco-friendly manner following pollution control measures have been implemented.

1.0 AIR POLLUTION CONTROL MEASURES:

Surfacing of all service roads/permanent roads by asphalt. The un-metalled roads is kept free of ruts, potholes, etc. Regular maintenance of HEMM engines to limit emission of harmful exhaust fumes. Physical removal of dust from the roads. Greenbelts around quarry, industrial sites, service building area besides avenue

plantation along roads.

2.0 WATER POLLUTION CONTROL MEASURES: (for Mine/CHP/Workshop/Colony discharge water)

Filtered mine water is being supplied to inmates by installing slow sand filter in Satgram colliery.

3.0 NOISE POLLUTION CONTROL MEASURES:

Regular maintenance of machines and other equipment at Bunker and workshop including mine fan.

Providing green belt around core activity area, along road side in colony and in other vacant space.

All HEMM & light vehicles are provided with silencers.

Noise monitoring is being carried out regularly.

4.0 LAND RESOURCE MANAGEMENT:

5 Ha of subsided land have been planted upon in Sripur Seam Incline colliery.

PART – H

ADDITIONAL INVESTMENT PROPOSAL FOR ENVIRONMENTAL PROTECTION INCLUDING ABATEMENT OF POLLUTION. The following are the additional investment proposals for environmental protection:

The Environmental monitoring of the project will be continued fortnightly as per the guidelines of Ministry of Environment and Forest (MOEF).

The Environmental Statement report will be submitted for each financial year ending 31st March.

Necessary Consent for discharge may be taken from Competent Authority.

PART – I

ANY OTHER PARTICULAR IN RESPECTOF ENVIRONMENTAL PROTECTION AND ABATMENT OF POLLUTION. The Environmental Monitoring is carried out fortnightly for the project by CMPDI, RI-I as per the guideline of Ministry of Environment and Forest (MOEF) and based on the result thereof; colliery takes necessary action if needed.

Page 15: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

14

Annexure – I AMBIENT AIR QUALITY

Station No

Station Name Month Fortnight Date of Sampling

PM10 PM2.5 SO2 NOx

8A1 Near Bhanora RS May Second 20-May-15 134.1 34.9 <10.0 16.7

8A1 Near Bhanora RS June First 03-Jun-15 120.3 29.3 <10.0 18.2

8A1 Near Bhanora RS June Second 18-Jun-15 112.5 27.2 <10.0 16.7

8A1 Near Bhanora RS July First 03-Jul-15 92.4 30.1 <10.0 18.1

8A1 Near Bhanora RS July Second 22-Jul-15 84.2 21.7 <10.0 18.5

8A1 Near Bhanora RS August First 12-Aug-15 86.8 22.7 <10.0 18.6

8A1 Near Bhanora RS August Second 21-Aug-15 88.1 22.0 <10.0 16.8

8A1 Near Bhanora RS September First 08-Sep-15 84.2 24.2 <10.0 16.8

8A1 Near Bhanora RS September Second 18-Sep-15 86.2 24.0 <10.0 14.9

8A1 Near Bhanora RS October First 08-Oct-15 90.1 26.8 <10.0 16.2

8A1 Near Bhanora RS October Second 29-Oct-15 89.3 28.8 <10.0 18.4

8A1 Near Bhanora RS November First 06-Nov-15 92.4 32.8 <10.0 16.2

8A1 Near Bhanora RS November Second 23-Nov-15 91.2 31.4 <10.0 17.2

8A1 Near Bhanora RS December First 08-Dec-15 90.4 30.3 <10.0 18.2

8A1 Near Bhanora RS December Second 21-Dec-15 89.2 32.7 <10.0 16.7

8A1 Near Bhanora RS January First 07-Jan-16 82.7 29.4 <10.0 14.8

8A1 Near Bhanora RS January Second 27-Jan-16 80.9 28.1 <10.0 15.7

8A1 Near Bhanora RS February First 02-Feb-16 118.3 37.4 <10.0 14.3

8A1 Near Bhanora RS February Second 16-Feb-16 119.4 38.2 <10.0 16.1

8A1 Near Bhanora RS March First 02-Mar-16 117.2 39.6 <10.0 14.8

8A1 Near Bhanora RS March Second 21-Mar-16 122.6 38.9 <10.0 15.8

8A2 In Shivdanga village May Second 20-May-15 82.5 22.1 <10.0 14.3

8A2 In Shivdanga village June First 03-Jun-15 80.2 26.8 <10.0 12.9

8A2 In Shivdanga village June Second 18-Jun-15 72.4 18.5 <10.0 14.0

8A2 In Shivdanga village July First 03-Jul-15 69.5 24.4 <10.0 14.9

8A2 In Shivdanga village July Second 28-Jul-15 66.8 19.3 <10.0 14.2

8A2 In Shivdanga village August First 11-Aug-15 62.1 21.0 <10.0 10.8

8A2 In Shivdanga village August Second 18-Aug-15 64.3 20.1 <10.0 12.8

8A2 In Shivdanga village September First 04-Sep-15 59.7 20.9 <10.0 12.5

8A2 In Shivdanga village September Second 25-Sep-15 62.1 21.4 <10.0 14.5

8A2 In Shivdanga village October First 13-Oct-15 69.4 22.7 <10.0 12.8

8A2 In Shivdanga village October Second 16-Oct-15 72.8 24.6 <10.0 14.6

8A2 In Shivdanga village November First 02-Nov-15 78.3 26.8 <10.0 16.5

8A2 In Shivdanga village November Second 16-Nov-15 79.3 28.1 <10.0 16.8

8A2 In Shivdanga village December First 03-Dec-15 84.7 28.4 <10.0 16.7

8A2 In Shivdanga village December Second 17-Dec-15 82.1 30.4 <10.0 14.9

8A2 In Shivdanga village January First 12-Jan-16 77.9 27.4 <10.0 12.4

8A2 In Shivdanga village January Second 28-Jan-16 78.1 26.4 <10.0 14.1

8A2 In Shivdanga village February First 05-Feb-16 88.6 38.9 <10.0 12.6

8A2 In Shivdanga village February Second 20-Feb-16 108.2 36.3 <10.0 14.2

8A2 In Shivdanga village March First 01-Mar-16 99.4 38.3 <10.0 16.2

8A2 In Shivdanga village March Second 16-Mar-16 104.2 40.7 <10.0 18.2

8A3 NEAR Jamuria RS May Second 19-May-15 84.3 24.5 <10.0 12.9

8A3 NEAR Jamuria RS June First 02-Jun-15 88.1 24.3 <10.0 10.7

8A3 NEAR Jamuria RS June Second 17-Jun-15 86.3 19.2 <10.0 12.7

8A3 NEAR Jamuria RS July First 02-Jul-15 88.2 31.4 <10.0 14.0

8A3 NEAR Jamuria RS July Second 22-Jul-15 76.2 20.6 <10.0 18.5

8A3 NEAR Jamuria RS August First 13-Aug-15 72.4 24.3 <10.0 14.2

8A3 NEAR Jamuria RS August Second 25-Aug-15 74.6 22.9 <10.0 16.5

8A3 NEAR Jamuria RS September First 09-Sep-15 74.3 26.8 <10.0 12.8

8A3 NEAR Jamuria RS September Second 16-Sep-15 78.4 24.9 <10.0 14.1

8A3 NEAR Jamuria RS October First 12-Oct-15 82.1 24.0 <10.0 13.5

Page 16: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

15

Station

No

Station Name Month Fortnight Date of

Sampling

PM10 PM2.5 SO2 NOx

8A3 NEAR Jamuria RS October Second 27-Oct-15 84.7 25.2 <10.0 14.7

8A3 NEAR Jamuria RS November First 12-Nov-15 89.3 28.3 <10.0 12.5

8A3 NEAR Jamuria RS November Second 27-Nov-15 88.6 27.3 <10.0 14.7

8A3 NEAR Jamuria RS December First 01-Dec-15 86.1 30.1 <10.0 16.2

8A3 NEAR Jamuria RS December Second 28-Dec-15 87.6 29.7 <10.0 15.3

8A3 NEAR Jamuria RS January First 15-Jan-16 80.1 26.9 <10.0 14.3

8A3 NEAR Jamuria RS January Second 18-Jan-16 82.4 27.9 <10.0 16.4

8A3 NEAR Jamuria RS February First 03-Feb-16 181.4 86.3 <10.0 14.8

8A3 NEAR Jamuria RS February Second 17-Feb-16 182.6 77.8 <10.0 12.9

8A3 NEAR Jamuria RS March First 05-Mar-16 180.7 78.1 <10.0 14.9

8A3 NEAR Jamuria RS March Second 22-Mar-16 156.7 79.4 <10.0 16.9

8A4 In Kashinathpur village October First 07-Oct-15 88.3 25.9 <10.0 22.9

8A4 In Kashinathpur village October Second 31-Oct-15 89.6 26.8 <10.0 24.8

8A4 In Kashinathpur village November First 05-Nov-15 90.7 27.2 <10.0 22.8

8A4 In Kashinathpur village November Second 17-Nov-15 91.4 29.2 <10.0 20.9

8A4 In Kashinathpur village December First 09-Dec-15 90.2 31.2 <10.0 16.6

8A4 In Kashinathpur village December Second 22-Dec-15 89.2 30.6 <10.0 18.4

8A4 In Kashinathpur village January First 01-Jan-16 92.6 30.8 <10.0 18.7

8A4 In Kashinathpur village January Second 21-Jan-16 94.7 31.9 <10.0 19.7

8A4 In Kashinathpur village February First 01-Feb-16 192.1 80.7 <10.0 18.2

8A4 In Kashinathpur village February Second 23-Feb-16 190.7 79.4 <10.0 16.4

8A4 In Kashinathpur village March First 04-Mar-16 192.1 80.6 <10.0 14.8

8A4 In Kashinathpur village March Second 19-Mar-16 164.4 82.1 <10.0 16.2

8A5 In Ranisayer village October First 11-Oct-15 69.4 22.4 <10.0 20.6

8A5 In Ranisayer village October Second 29-Oct-15 72.7 24.7 <10.0 22.3

8A5 In Ranisayer village November First 03-Nov-15 78.4 26.5 <10.0 20.2

8A5 In Ranisayer village November Second 27-Nov-15 79.6 28.7 <10.0 20.8

8A5 In Ranisayer village December First 10-Dec-15 79.4 29.8 <10.0 17.2

8A5 In Ranisayer village December Second 29-Dec-15 81.9 30.4 <10.0 19.6

8A5 In Ranisayer village January First 14-Jan-16 76.3 24.2 <10.0 16.9

8A5 In Ranisayer village January Second 30-Jan-16 78.7 26.9 <10.0 17.1

8A5 In Ranisayer village February First 08-Feb-16 89.6 38.6 <10.0 18.7

8A5 In Ranisayer village February Second 18-Feb-16 84.1 29.7 <10.0 17.8

8A5 In Ranisayer village March First 07-Mar-16 80.4 28.1 <10.0 18.5

8A5 In Ranisayer village March Second 26-Mar-16 78.6 36.9 <10.0 17.2

8A6 In Ikra village October First 05-Oct-15 68.2 22.3 <10.0 12.3

8A6 In Ikra village October Second 31-Oct-15 70.4 24.0 <10.0 14.1

8A6 In Ikra village November First 11-Nov-15 74.3 26.1 <10.0 16.4

8A6 In Ikra village November Second 20-Nov-15 78.8 27.4 <10.0 18.2

8A6 In Ikra village December First 04-Dec-15 78.9 28.1 <10.0 18.4

8A6 In Ikra village December Second 18-Dec-15 76.3 29.1 <10.0 19.4

8A6 In Ikra village January First 13-Jan-16 88.4 36.7 <10.0 19.3

8A6 In Ikra village January Second 28-Jan-16 90.1 34.2 <10.0 18.1

8A6 In Ikra village February First 04-Feb-16 88.4 36.7 <10.0 19.3

8A6 In Ikra village February Second 24-Feb-16 189.3 80.2 <10.0 18.6

8A6 In Ikra village March First 08-Mar-16 90.1 29.7 <10.0 16.4

8A6 In Ikra village March Second 25-Mar-16 92.7 30.1 <10.0 18.4

8A7 In Baraboni village May Second 19-May-15 132.1 36.3 <10.0 24.9

8A7 In Baraboni village June First 02-Jun-15 134.5 34.5 <10.0 22.4

8A7 In Baraboni village June Second 17-Jun-15 122.4 24.1 <10.0 23.4

8A7 In Baraboni village July First 02-Jul-15 118.6 36.5 <10.0 26.8

8A7 In Baraboni village July Second 29-Jul-15 80.1 20.1 <10.0 19.2

8A7 In Baraboni village August First 04-Aug-15 84.7 24.8 <10.0 20.8

8A7 In Baraboni village August Second 24-Aug-15 82.1 22.6 <10.0 18.6

Page 17: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

16

Station

No

Station Name Month Fortnight Date of

Sampling

PM10 PM2.5 SO2 NOx

8A7 In Baraboni village September First 14-Sep-15 87.7 25.1 <10.0 22.9

8A7 In Baraboni village September Second 28-Sep-15 86.1 26.2 <10.0 20.8

8A8 In Gopalbad village May Second 19-May-15 82.7 20.5 <10.0 16.4

8A8 In Gopalbad village June First 02-Jun-15 78.6 18.3 <10.0 18.1

8A8 In Gopalbad village June Second 17-Jun-15 70.4 18.9 <10.0 16.7

8A8 In Gopalbad village July First 02-Jul-15 72.1 24.3 <10.0 18.1

8A8 In Gopalbad village July Second 24-Jul-15 64.3 18.4 <10.0 18.4

8A8 In Gopalbad village August First 10-Aug-15 64.3 16.2 <10.0 18.3

8A8 In Gopalbad village August Second 26-Aug-15 66.4 17.2 <10.0 17.3

8A8 In Gopalbad village September First 08-Sep-15 60.4 18.4 <10.0 17.4

8A8 In Gopalbad village September Second 17-Sep-15 64.6 20.9 <10.0 19.2

8A9 In Prembazar village May Second 19-May-15 76.3 19.2 <10.0 8.2

8A9 In Prembazar village June First 02-Jun-15 74.3 19.5 <10.0 9.6

8A9 In Prembazar village June Second 17-Jun-15 70.1 17.8 <10.0 10.2

8A9 In Prembazar village July First 02-Jul-15 68.3 22.9 <10.0 9.3

8A9 In Prembazar village July Second 20-Jul-15 64.0 17.8 <10.0 10.8

8A9 In Prembazar village August First 06-Aug-15 60.9 17.3 <10.0 10.2

8A9 In Prembazar village August Second 18-Aug-15 62.1 18.1 <10.0 12.3

8A9 In Prembazar village September First 02-Sep-15 62.1 19.2 <10.0 8.7

8A9 In Prembazar village September Second 28-Sep-15 66.7 21.5 <10.0 9.5

HEAVY METAL ANALYSIS IN AIR Station

No Station Name Month Fortnight Date of

Sampling Arsenic Cadmium Chromium Mercury Nickel Lead

8A1 Near Bhanora RS September First 08-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.06

8A1 Near Bhanora RS March First 02-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

8A2 In Shivdanga village September First 04-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.04

8A2 In Shivdanga village March First 01-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

8A3 NEAR Jamuria RS September First 09-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.06

8A3 NEAR Jamuria RS March First 05-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

8A4 In Kashinathpur village March First 04-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

8A5 In Ranisayer village March First 07-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

8A6 In Ikra village March First 08-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

8A7 In Baraboni village September First 14-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.04

8A8 In Gopalbad village September First 08-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.05

8A9 In Prembazar village September First 02-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.06

Environmental standards: National Ambient Air Quality Standards (NAAQS) for residential, industrial and rural areas for 24 hourly/yearly samples:

Heavy Metal Arsenic (As) Cadmium (Cd)

Chromium (Cr)

Mercury Hg)

Nickel (Ni)

Lead (Pb)

Limit (µg/m3) 0.006 Not specified Not specified Not specified 0.02 0.5

Page 18: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

17

Annexure – II

NOISE LEVEL

Station No

Station Name Month Fortnight Date of Sampling

Noise Level dB(A)

8N1 Pit-top Girmint /K D I UG June Second 17-Jun-15 61.4

8N1 Pit-top Girmint /K D I UG June First 02-Jun-15 58.7

8N1 Pit-top Girmint /K D I UG July First 03-Jul-15 60.2

8N1 Pit-top Girmint /K D I UG September Second 22-Sep-15 70.1

8N1 Pit-top Girmint /K D I UG August First 11-Aug-15 68.8

8N1 Pit-top Girmint /K D I UG August Second 18-Aug-15 67.1

8N1 Pit-top Girmint /K D I UG September First 04-Sep-15 69.5

8N1 Pit-top Girmint /K D I UG October First 12-Oct-15 69.6

8N1 Pit-top Girmint /K D I UG October Second 16-Oct-15 70.6

8N1 Pit-top Girmint /K D I UG November First 06-Nov-15 71.0

8N1 Pit-top Girmint /K D I UG November Second 16-Nov-15 69.2

8N1 Pit-top Girmint /K D I UG December First 04-Dec-15 60

8N1 Pit-top Girmint /K D I UG December Second 29-Dec-15 69

8N1 Pit-top Girmint /K D I UG January First 02-Jan-16 64

8N1 Pit-top Girmint /K D I UG January Second 29-Jan-16 67

8N1 Pit-top Girmint /K D I UG February First 02-Feb-16 69

8N1 Pit-top Girmint /K D I UG February Second 16-Feb-16 64

8N1 Pit-top Girmint /K D I UG March First 01-Mar-16 69

8N1 Pit-top Girmint /K D I UG March Second 16-Mar-16 63

8N2 Pit-top Sripur Seam Incline UG June Second 18-Jun-15 66.1

8N2 Pit-top Sripur Seam Incline UG June First 02-Jun-15 62.9

8N2 Pit-top Sripur Seam Incline UG July First 03-Jul-15 64.7

8N2 Pit-top Sripur Seam Incline UG September Second 24-Sep-15 64.3

8N2 Pit-top Sripur Seam Incline UG August First 11-Aug-15 71.1

8N2 Pit-top Sripur Seam Incline UG August Second 18-Aug-15 69.8

8N2 Pit-top Sripur Seam Incline UG September First 04-Sep-15 63.4

8N2 Pit-top Sripur Seam Incline UG October First 07-Oct-15 66.4

8N2 Pit-top Sripur Seam Incline UG October Second 16-Oct-15 67.8

8N2 Pit-top Sripur Seam Incline UG November First 06-Nov-15 69.4

8N2 Pit-top Sripur Seam Incline UG November Second 17-Nov-15 65.6

8N2 Pit-top Sripur Seam Incline UG December First 04-Dec-15 63

8N2 Pit-top Sripur Seam Incline UG December Second 29-Dec-15 70

8N2 Pit-top Sripur Seam Incline UG January First 02-Jan-16 60

8N2 Pit-top Sripur Seam Incline UG January Second 29-Jan-16 62

8N2 Pit-top Sripur Seam Incline UG February First 05-Feb-16 57

8N2 Pit-top Sripur Seam Incline UG February Second 16-Feb-16 67

8N2 Pit-top Sripur Seam Incline UG March First 01-Mar-16 59

8N2 Pit-top Sripur Seam Incline UG March Second 16-Mar-16 69

8N3 Pit-top Ningah UG June Second 17-Jun-15 58.2

8N3 Pit-top Ningah UG June First 03-Jun-15 59.8

8N3 Pit-top Ningah UG July First 02-Jul-15 60.7

8N3 Pit-top Ningah UG September Second 16-Sep-15 60.2

8N3 Pit-top Ningah UG August First 11-Aug-15 67.2

8N3 Pit-top Ningah UG August Second 24-Aug-15 67.9

8N3 Pit-top Ningah UG September First 04-Sep-15 59.5

8N3 Pit-top Ningah UG October First 07-Oct-15 62.9

Page 19: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

18

Station

No

Station Name Month Fortnight Date of

Sampling

Noise Level

dB(A)

8N3 Pit-top Ningah UG October Second 27-Oct-15 64.1

8N3 Pit-top Ningah UG November First 06-Nov-15 65.6

8N3 Pit-top Ningah UG November Second 27-Nov-15 67.8

8N3 Pit-top Ningah UG December First 04-Dec-15 65

8N3 Pit-top Ningah UG December Second 29-Dec-15 62

8N3 Pit-top Ningah UG January First 02-Jan-16 70

8N3 Pit-top Ningah UG January Second 29-Jan-16 65

8N3 Pit-top Ningah UG February First 08-Feb-16 62

8N3 Pit-top Ningah UG February Second 23-Feb-16 54

8N3 Pit-top Ningah UG March First 07-Mar-16 57

8N3 Pit-top Ningah UG March Second 21-Mar-16 67

8N4 Pit-top Satgram UG June Second 18-Jun-15 60.7

8N4 Pit-top Satgram UG June First 03-Jun-15 62.8

8N4 Pit-top Satgram UG July First 02-Jul-15 64.0

8N4 Pit-top Satgram UG September Second 17-Sep-15 68.4

8N4 Pit-top Satgram UG August First 12-Aug-15 70.3

8N4 Pit-top Satgram UG August Second 24-Aug-15 68.5

8N4 Pit-top Satgram UG September First 04-Sep-15 66.8

8N4 Pit-top Satgram UG October First 05-Oct-15 67.2

8N4 Pit-top Satgram UG October Second 27-Oct-15 67.5

8N4 Pit-top Satgram UG November First 06-Nov-15 69.1

8N4 Pit-top Satgram UG November Second 27-Nov-15 68.3

8N4 Pit-top Satgram UG December First 04-Dec-15 67

8N4 Pit-top Satgram UG December Second 29-Dec-15 66

8N4 Pit-top Satgram UG January First 02-Jan-16 71

8N4 Pit-top Satgram UG January Second 29-Jan-16 62

8N4 Pit-top Satgram UG February First 03-Feb-16 64

8N4 Pit-top Satgram UG February Second 23-Feb-16 67

8N4 Pit-top Satgram UG March First 07-Mar-16 62

8N4 Pit-top Satgram UG March Second 21-Mar-16 59

Page 20: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

19

Annexure – III

Effluent Water Quality for 5 parameters

Station No

Station Name Month Fortnight Date of Sampling

pH TSS TDS O&G COD

8MW1 Girmint /K D I UG May Second 20-May-15 7.61 32 394 <2.0 16

8MW1 Girmint /K D I UG June Second 20-Jun-15 7.42 26 380 <2.0 16

8MW1 Girmint /K D I UG July First 02-Jul-15 7.74 26 386 <2.0 16

8MW1 Girmint /K D I UG August First 12-Aug-15 7.86 32 410 <2.0 14

8MW1 Girmint /K D I UG July Second 22-Jul-15 7.74 <25.0 388 <2.0 16

8MW1 Girmint /K D I UG August Second 21-Aug-15 7.74 <25.0 442 <2.0 16

8MW1 Girmint /K D I UG September First 04-Sep-15 7.86 26 453 <2.0 16

8MW1 Girmint /K D I UG June First 03-Jun-15 7.61 32 394 <2.0 16

8MW1 Girmint /K D I UG September Second 18-Sep-15 7.92 6 428 <2.0 16

8MW1 Girmint /K D I UG October First 08-Oct-15 8.36 5 452 <2.0 12

8MW1 Girmint /K D I UG October Second 23-Oct-15 7.94 9 482 <2.0 24

8MW1 Girmint /K D I UG November First 02-Nov-15 8.28 5 476 <2.0 16

8MW1 Girmint /K D I UG November Second 16-Nov-15 8.32 12 504 <2.0 24

8MW1 Girmint /K D I UG December Second 17-Dec-15 8.25 8 459 <2.0 24

8MW1 Girmint /K D I UG January First 15-Jan-16 8.21 15 468 <2.0 24

8MW1 Girmint /K D I UG January Second 27-Jan-16 8.21 12 475 <2.0 24

8MW1 Girmint /K D I UG February First 02-Feb-16 8.29 8 521 <2.0 16

8MW1 Girmint /K D I UG February Second 20-Feb-16 8.39 <5 468 <2.0 08

8MW1 Girmint /K D I UG March First 02-Mar-16 8.05 <5 521 <2.0 12

8MW1 Girmint /K D I UG March Second 21-Mar-16 8.19 8 541 <2.0 16

8MW2 Sripur Seam Incline UG May Second 20-May-15 7.65 30 342 <2.0 24

8MW2 Sripur Seam Incline UG June Second 17-Jun-15 7.52 <25.0 339 <2.0 24

8MW2 Sripur Seam Incline UG July First 02-Jul-15 7.62 26 342 <2.0 20

8MW2 Sripur Seam Incline UG August First 12-Aug-15 7.58 26 355 <2.0 22

8MW2 Sripur Seam Incline UG July Second 22-Jul-15 7.70 <25.0 345 <2.0 32

8MW2 Sripur Seam Incline UG August Second 24-Aug-15 7.64 <25.0 371 <2.0 20

8MW2 Sripur Seam Incline UG September First 04-Sep-15 7.60 <25.0 370 <2.0 20

8MW2 Sripur Seam Incline UG June First 05-Jun-15 7.65 30 342 <2.0 24

8MW2 Sripur Seam Incline UG September Second 18-Sep-15 7.94 10 422 <2.0 24

8MW2 Sripur Seam Incline UG October First 08-Oct-15 8.42 9 454 <2.0 20

8MW2 Sripur Seam Incline UG October Second 23-Oct-15 7.78 7 480 <2.0 16

8MW2 Sripur Seam Incline UG November First 06-Nov-15 8.08 5 488 <2.0 20

8MW2 Sripur Seam Incline UG November Second 16-Nov-15 8.28 8 516 <2.0 16

8MW2 Sripur Seam Incline UG December Second 17-Dec-15 7.69 7 444 <2.0 32

8MW2 Sripur Seam Incline UG January First 15-Jan-16 7.72 7 436 <2.0 16

8MW2 Sripur Seam Incline UG January Second 27-Jan-16 7.72 8 438 <2.0 16

8MW2 Sripur Seam Incline UG February First 04-Feb-16 8.28 7 468 <2.0 24

8MW2 Sripur Seam Incline UG February Second 20-Feb-16 8.27 6 436 <2.0 28

8MW2 Sripur Seam Incline UG March First 02-Mar-16 8.43 8 486 <2.0 24

8MW2 Sripur Seam Incline UG March Second 21-Mar-16 8.40 9 470 <2.0 16

8MW3 Ningah UG May Second 20-May-15 7.59 <25.0 634 <2.0 8

8MW3 Ningah UG June Second 16-Jun-15 7.41 <25.0 630 <2.0 8

8MW3 Ningah UG July First 02-Jul-15 7.79 <25.0 622 <2.0 24

8MW3 Ningah UG August First 12-Aug-15 9.27 <25.0 657 <2.0 12

8MW3 Ningah UG July Second 22-Jul-15 8.92 26 646 <2.0 16

8MW3 Ningah UG August Second 25-Aug-15 8.86 <25.0 672 <2.0 12

8MW3 Ningah UG September First 04-Sep-15 8.90 28 682 <2.0 10

8MW3 Ningah UG June First 05-Jun-15 7.59 <25.0 634 <2.0 8

8MW3 Ningah UG September Second 18-Sep-15 8.52 12 524 <2.0 20

8MW3 Ningah UG October First 08-Oct-15 8.62 8 438 <2.0 24

8MW3 Ningah UG October Second 27-Oct-15 7.86 6 520 <2.0 16

Page 21: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

20

Station

No

Station Name Month Fortnight Date of

Sampling

pH TSS TDS O&G COD

8MW3 Ningah UG November First 02-Nov-15 7.92 6 490 <2.0 28

8MW3 Ningah UG November Second 17-Nov-15 8.02 10 492 <2.0 24

8MW3 Ningah UG December Second 17-Dec-15 7.60 6 536 <2.0 24

8MW3 Ningah UG January First 15-Jan-16 7.56 6 549 <2.0 16

8MW3 Ningah UG January Second 27-Jan-16 7.62 7 563 <2.0 16

8MW3 Ningah UG February First 04-Feb-16 8.68 6 601 <2.0 24

8MW3 Ningah UG February Second 20-Feb-16 8.53 8 549 <2.0 20

8MW3 Ningah UG March First 02-Mar-16 8.52 10 603 <2.0 24

8MW3 Ningah UG March Second 21-Mar-16 8.50 7 637 <2.0 24

8MW4 Satgram UG May Second 20-May-15 7.62 28 472 <2.0 16

8MW4 Satgram UG July First 02-Jul-15 8.02 26 448 <2.0 24

8MW4 Satgram UG August First 12-Aug-15 7.56 26 449 <2.0 34

8MW4 Satgram UG July Second 29-Jul-15 7.48 <25.0 436 <2.0 24

8MW4 Satgram UG August Second 24-Aug-15 7.66 <25.0 410 <2.0 34

8MW4 Satgram UG June Second 16-Jun-15 8.41 <25.0 441 <2.0 28

8MW4 Satgram UG September First 04-Sep-15 7.74 30 401 <2.0 36

8MW4 Satgram UG June First 06-Jun-15 7.62 28 472 <2.0 16

8MW4 Satgram UG September Second 16-Sep-15 7.78 11 472 <2.0 24

8MW4 Satgram UG October First 08-Oct-15 8.54 7 492 <2.0 28

8MW4 Satgram UG October Second 27-Oct-15 7.74 8 524 <2.0 20

8MW4 Satgram UG November First 02-Nov-15 7.95 8 518 <2.0 24

8MW4 Satgram UG November Second 17-Nov-15 7.92 10 458 <2.0 20

8MW4 Satgram UG December Second 17-Dec-15 7.95 10 493 <2.0 16

8MW4 Satgram UG January First 15-Jan-16 8.06 17 513 <2.0 32

8MW4 Satgram UG January Second 27-Jan-16 8.09 15 517 <2.0 40

8MW4 Satgram UG February First 04-Feb-16 8.70 10 533 <2.0 32

8MW4 Satgram UG February Second 20-Feb-16 8.60 7 513 <2.0 36

8MW4 Satgram UG March First 08-Mar-16 8.71 12 535 <2.0 36

8MW4 Satgram UG March Second 16-Mar-16 8.56 6 548 <2.0 32

Effluent Water Quality Standards (MoEF Schedule – VI Standards)

Parameters pH TSS TDS Oil & Grease COD

Limit 5.5-9.0 100 Not Specified 10 250

Page 22: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

21

Annexure – III

Effluent Water Quality for full parameters (29 parameters)

Cluster 8 8 8 8 Effluent Water (MOEF Schedule-VI Standard)

Station No 8MW1 8MW2 8MW3 8MW4

Station Name Girmint /K D I UG

Sripur Seam Incline UG

Ningah UG Satgram UG

Month December December December December

Fortnight First First First First

Date of Sampling

08-Dec-15 09-Dec-15 09-Dec-15 08-Dec-15

Colour 4 4 3 3 Unobjectionable

Odour Unobjectionable

Unobjectionable Unobjectionable Unobjectionable Unobjectionable

TSS 10 16 12 14 100.0

pH 8.08 8.11 8.13 8.0 5.5-9.0

Temperature(

Deg C)

22.0 21.92 21.80 21.7 Shall not exceed 50C

above the receiving water temp

Oil & Grease <2.0 <2.0 <2.0 <2.0 10.0

Total Residual Chlorine

0.03 0.03 0.04 <0.02 1.0

Ammonical Nitrogen

0.42 0.52 0.62 0.35 50.0

Total Kjeldahi Nitrogen

1.37 1.48 1.62 1.48 100.0

Free Amonia <0.4 <0.4 <0.4 <0.4 5.0

BOD 3 5 3 4 30.0

COD 32 32 16 24 250.0

Arsenic <0.005 <0.005 <0.005 <0.005 0.2

Lead <0.005 <0.005 <0.005 <0.005 0.1

Hexavalent Chromium

0.02 0.04 0.03 0.02 0.1

Total Chromium

0.03 0.06 0.04 0.04 2.0

Copper 0.03 0.04 0.03 0.03 3.0

Zinc 0.03 0.04 0.05 0.03 5.0

Selenium <0.005 <0.005 <0.005 <0.005 0.05

Nickel <0.10 <0.10 <0.10 <0.10 3.0

Fluoride 0.32 0.65 0.36 0.47 2.0

Dissolved Phosphate

1.72 1.76 1.82 1.84 5.0

Sulphide 0.009 0.005 0.006 0.007 2.0

Phenolics <0.001 <0.001 <0.001 <0.001 1.0

Manganese 0.20 0.22 0.24 0.20 2.0

Iron 0.11 0.10 0.14 0.16 3.0

Nitrate Nitrogen

2.6 3.4 3.9 3.8 10.0

Cadmium <0.001 <0.001 <0.001 <0.001 0.003

Total Dissolved

Solids

454 445 506 480 Not Specified

Page 23: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

22

Annexure – III

GROUNDWATER QUALITY Cluster No 8 8 8 8 8 8 8 8

Indian Drinking Water Standard (IS-10500)

Station No 8GW1 8GW2 8GW3 8GW4 8GW5 8GW6 8GW7 8GW8

Station Name Dugwell at

Paharbera primary

school

Dugwell at

Baraboni RPF camp

Dugwell near

Gopalbad village primary school

Dugwell at

Prembazer village

near Maszid

Dugwell at

backside of

Jamuria Municipali

ty Coorporat

ion

Dugwell at Ikra Basanti

Bijoy high school

Dugwell at

Ranisayer more near Netai

Mahato house

Dugwell at

Kashinathpur more

near Ratibati

workshop

Month May'15 May'15 May'15 May'15 May'15 May'15 May'15 May'15

Fortnight Second Second Second Second Second Second Second Second

Date of sampling

11-May-15

11-May-15

11-May-15

12-May-15

12-May-15

12-May-15

11-May-15

11-May-15

Colour,Hazen unit Max

4 4 3 4 5 3 4 4 5

Odour Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Taste Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable

Turbidity,NTU Max

3.2 4.0 3.1 2.8 3.9 4.0 4.1 2.9 5

pH 7.59 7.19 7.39 7.87 7.56 7.34 7.37 7.30 6.5-8.5

Total Hardness

176 428 248 240 228 376 404 352 300.0

Iron <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 0.30

Chlorides 59 54 04 109 78 06 80 110 250.0

Res Free chlorine

<0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 0.20

Dissolved Solids

313 587 334 461 385 454 572 625 500.0

Calcium 52.8 99.2 57.6 68.8 57.6 81.6 84.8 81.6 75.0

Copper <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 0.05

Manganese <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 0.10

Sulphate 49 64 58 64 53 69 48 51 200.0

Nitrate 3.99 10.19 4.43 3.54 2.66 7.08 4.87 8.86 45.0

Fluoride 0.42 0.76 0.48 0.34 0.64 0.62 0.58 0.64 1.0

Selenium <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05

Arsenic <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05

Lead <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05

Zinc <0.01 <0.01 <0.01 0.03 <0.01 0.08 <0.01 <0.01 5.00

Hex Chromium

<0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.05

Boron <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 1.00

Coliforms (MPN)

Nil Nil Nil Nil Nil Nil Nil Nil Nil

Phenolics <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 0.001

Alkalinity 80 112 240 160 216 248 156 168 200.0

Page 24: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

Environmental Statement (Form-V) 2015-16 for Cluster No. 8 (Group of Mines) 2015-16

23

Annexure – IV

Groundwater Level

Station No

Station Name Month Fortnight Date of Sampling

Ground Water Level BGL (mtr)

8GWL1 Dugwell at Paharbera primary school May Second 18-May-15 6.45

8GWL1 Dugwell at Paharbera primary school November Second 26-Nov-15 2.25

8GWL1 Dugwell at Paharbera primary school January First 11-Jan-16 4.10

8GWL1 Dugwell at Paharbera primary school August Second 31-Aug-15 0.40

8GWL2 Dugwell at Baraboni RPF camp May Second 19-May-15 6.40

8GWL2 Dugwell at Baraboni RPF camp November Second 26-Nov-15 5.80

8GWL2 Dugwell at Baraboni RPF camp January First 11-Jan-16 7.30

8GWL2 Dugwell at Baraboni RPF camp August Second 31-Aug-15 2.30

8GWL3 Dugwell near Gopalbad village primary school May Second 19-May-15 8.25

8GWL3 Dugwell near Gopalbad village primary school November Second 26-Nov-15 2.75

8GWL3 Dugwell near Gopalbad village primary school January First 11-Jan-16 3.90

8GWL3 Dugwell near Gopalbad village primary school August First 04-Aug-15 2.30

8GWL4 Dugwell at Prembazer village near Maszid May Second 19-May-15 9.90

8GWL4 Dugwell at Prembazer village near Maszid November Second 26-Nov-15 1.05

8GWL4 Dugwell at Prembazer village near Maszid January First 11-Jan-16 1.60

8GWL4 Dugwell at Prembazer village near Maszid August First 04-Aug-15 0.65

8GWL5 Dugwell at backside of Jamuria Municipality Coorporation

May Second 22-May-15 6.95

8GWL5 Dugwell at backside of Jamuria Municipality Coorporation

November Second 26-Nov-15 5.90

8GWL5 Dugwell at backside of Jamuria Municipality Coorporation

January First 13-Jan-16 6.90

8GWL5 Dugwell at backside of Jamuria Municipality Coorporation

August First 04-Aug-15 1.30

8GWL6 Dugwell at Ikra Basanti Bijoy high school May Second 22-May-15 10.20

8GWL6 Dugwell at Ikra Basanti Bijoy high school November Second 18-Nov-15 4.85

8GWL6 Dugwell at Ikra Basanti Bijoy high school January Second 30-Jan-16 7.50

8GWL6 Dugwell at Ikra Basanti Bijoy high school August Second 31-Aug-15 2.50

8GWL7 Dugwell at Ranisayer more near Netai Mahato house

May Second 22-May-15 8.30

8GWL7 Dugwell at Ranisayer more near Netai Mahato house

November Second 18-Nov-15 3.15

8GWL7 Dugwell at Ranisayer more near Netai Mahato house

January First 13-Jan-16 3.90

8GWL7 Dugwell at Ranisayer more near Netai Mahato house

August Second 31-Aug-15 3.05

8GWL8 Dugwell at Kashinathpur more near Ratibati workshop

May Second 21-May-15 3.45

8GWL8 Dugwell at Kashinathpur more near Ratibati workshop

November Second 24-Nov-15 3.10

8GWL8 Dugwell at Kashinathpur more near Ratibati workshop

January Second 20-Jan-16 3.40

8GWL8 Dugwell at Kashinathpur more near Ratibati workshop

August Second 31-Aug-15 0.65

Page 25: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

ENIVORMENTAL STATEMENT FOR CLUSTER-8

CMPDIISO 9001 Company

H Q XX X XXX X XX

0

LOCATION PLAN

CUSTOMER: EASTERN COALFIELDS LIMITED JOB NO 111438

SUBJECT:

CLUSTER-8 ECL

PLATE NO. 1

Page 26: ENVIRONMENTAL STATEMENT IN FORM-V · section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued

E

.

R

.

A

n

d

a

l

L

o

o

p

0500M 1500M

VE11

RRN

CMPDI

EASTERN COALFIELDS LTD.

RS

Kalipahari

RS

Raniganj

RS

RS

Jamuria

RS

Ikra

RS

Toposi

RS

Sonachora

N

u

n

i

a

K

h

a

l

P

u

n

t

a

K

h

a

l

Napur Bil

Mejia Bil

Raja Bandh

G

.

T

.

R

o

a

d

B

y

e

-

P

a

s

s

D

i

v

e

r

s

i

o

n

o

f

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

QQ

Nunia Jore

E

.

R

ly

.

K

a

s

t

a

B

r

a

n

c

h

E

.

R

l

y

.

A

n

d

a

l

L

o

o

p

R.S.

A

J

A

Y

R

I

V

E

R

N

a

n

i

d

J

o

r

s

W

s

D

M

a

i

n

L

i

n

e

E

.

R

a

i

l

w

a

y

S

.

E

.

R

a

i

l

w

a

y

M

a

i

n

L

i

n

e

S

.

E

.

R

a

i

l

w

a

y

M

a

i

n

L

i

n

e

E

.

R

.

I

k

r

a

B

r

a

n

c

h

N

unia Jore

Chinchuria

RS

E

.

R

l

y

.

I

k

r

a

b

r

a

n

c

h

E.Rly.Toposi-Baraboni Chord

N

u

n

i

a

K

h

a

l

P

u

n

t

a

K

h

a

l

D

a

m

o

d

a

r

N

a

l

a

Damoda

R A N I G A N J

Prembazar

Lalbazar

Patharchur

Sankhari

Kumardiha

Parui

Tarapur

Mejia

Rangamatia

Kalidaspur

Parbatipur

Jemua

Lakhsmanband

Tegharia

Jorsa

Mohana

Kastara

Kendana

Jugibag

Ghusra

Barduari

ArdhagramBhului

Kalikapur

Perubad

Lalbazar

Durlavpur

Gopalnagar

Bharra

Sahebdanga

Jordanga

Harakbad

Salma

Bakulia

Majit

Siaghir

Fatakduar

Searsol

Mahabir

Narainkuri

Egara

Kankardanga

Amkula

Damalia

Amritnagar

East Nimcha

Harabhanga

Tirat

Babladanga

Chelad

Belebathan

Jamari

Chalbalpur

Jaykaynagar

Bogra

Chapui

Saora

Ratibati

Kashinathpur

Kumardiha

Ghusick

Ashtadanga

Damra

Jamdov

Mallackpara

Kalipahari

Katagoria

Ranisayer

Bijpur

Mithapur

Satgram

Berala

Balanpur

Mondalpur

Banali

Joba

Kendulia

Joba

Chanda

Shivdanga

Kurtidanga

Ushagram

Ningha

Keshabganj

Murgachori

Nischantapur

Kankhaya

Bonbishnupur

Satpukhuria

Khalrui

Gomaria

Bagrasola

Majiara

Bhanora

Charanpur

Pariharpur

Kaithi

Sripur

Baijantipur

Akhalpur

Damodarpur

Sekpur

Ikra

Sarthakpur

Hormadanga

Nandi

Jambad

Sattore

Taltore

Layekdanga

Shibpur

Jhiladanga

Shyamsunderpur

Faridpur

Taradanga

DomohaniBaraboni

Samuldihi

Jamalpur

Darbardanga

NabasanBrajdihi

Bheleni

Tamra

Sira

Konda

Chora

Haripur

Khaskenda

North Jambad

Dahuka

Chichuria

Chichuria

Dobrana

Haripur

Chora

Nutan Madanpur

Baktarnagar

Palasban

Babuisol

Ballavpur

Kumarbazar

Gajadar Kajora

Pure Kajora

Kajora

Bahula

Parashkol

Jambad

Harishpur

Beniadidanga

Dhandardihi

Mangalpur

Sonachora

Kuldanga

New Konda

Shaldanga

Belbaid

Kunustoria

Toposi

Banshra

Amrasota

Jot Janki

Bijaynagar

Dhasal

Dhasal

Krishnanagar

Bahadurpur

Chakdola

Kumar Jamsol

Jamsol

Hijalgora Chak Tulsi

Jawdanga

Shymla

Bhuri

Bagdiha

Kharimati

Rakhakura

Sindrichak

Natundih

Khosnagar

Jhapradhura

Shitadhura

Katanidangal

Kelejora

Rampur

Puchra

Domohani

Beldanga

Gopalbad

Moldanga

Khyerkunda

Kashidanga

Sanyasi

Khayerbad

Kapistha

Narayanpur

Jamgram

Kalipathar

Khayerban

Madanpur

Sarsathali

Amulia

Shirishdanga

Rashunpur

Barhra

Pahargora

Paharpur

Madantanr

Nayakpur

Madhudanga

Jaynagar

Dishermohan

Beldanga

Barakunri

Madhabpur

Diguli

Churulia

Baguli

Lado

Kasta

Gobindpur

Andhaira

Sultanpur

Taldanga

Chinchurbil

Beldanga

Karrabad

Santaldih

Binul

Birkulti

Bhendi

Afzalpur

Lachmanpur

Barkola

Parsundih

Tulsipara

Mohidnagar

Husumnagar

Arjunsali

Bindudih

Hosenpur

Belpahari

Gourbazar

Pariharpur

Chhotalia

Chhota Rampur

Nandal

Baradanga

Mahanpur

Shrirampur

Mahishmura

Muktarchandi

Phulberia

Balaram Chak

Patol

Alkusha

JanardansayerThekedanga

Balkunda

Madhai Chak

Sadhna

Radhaballabpur

LahatShyamdih

Lalganj

Pahargora

Parbatpur

Maniddanga

Karrabdih

Paniphala

Palasban

Sidabari

Baradanga

Ashanboni

Rebatijubati

Taldanga

Baradanga

Itapara

Raghunath Chak

Baliapur

Amdiha

Bila

Raniganja

Amtala

Kanskuli

Hansipahari

Achhra

Manhara

Keshurdih

Kirtanmela

Chayanpur

Kansanko

Dabar

Manhara

Dharaspur

Paharpur

Khayerbandh

Kalya

Ketoban

Kadwa

Kalikamali

Kantapahari

Mirzapur

Aliganja

Kijo

Batadang

Gourangdih

Digalpahari

Pachurlo

Chhotkara

Satta

Rangdabhit

Kasbidanga

Alipur

Panuria

Gobindpur

Apisgram

Narsingbandh

Burnpur

Dihika

Shyamdihi

Madandihi

Kiradih

Saldanga

Suryanagar

Mithani

Baradhemo

Bidyanandapur

karanbera

Pathmohona

Ranisar

Bangram

Rangapara

Bandangal

Kuilapur

Jorpara

Damodar

Purushottampur

Dharampur

Nakrasota

Hirapur

Barachak

Gopalpur

Bartoria

Shanrmara

Bara Dighari

Jagatdih

Phatepur

Narsamuda

Santa

Burungdanga

Santalgaon

Kalajhoria

Dhanua

Danga Mohosila

Talkunri

Dipopara

Mohisila Colony

ASANSOL

Ismail

Gurgurpara

Nabaghanti

Baradanga

Barathol

Shyambandh

Rahamatnagar

Nathundih

Mahujuri

Shitala

Dhadka

Petuasalani

Jamdob

Mohisila

Kalla

Naktikanyapur

Kalikapur

Sitarampur

Lachipur

Ramjibanpur

Sudi

Raghunathbati

Ethora

Sarakdih

Ganrui

Marichkota

Angaria

Sitakanyapur

Napara

Madanpur

Bansarakdih

Monoharbahal

Panchgachia

Palashdiha

Nuni

Jayramdanga

Baropukuria

Saragdih

Haripur

Mucchadanga

Sitadanga

Chinchuria

Dhadka

Churulia

Colony

I

.

O

.

C

.

P

I

P

E

L

I

N

E

UnitChakbagakhas

JOREKURI

BELDANGA KHASTEWARI'S -

PALASHTHALIKASTA

PARIHARPUR

KASTA BENGALCOLLIERY

EAST PARSUNDICOLLIERY

AURANG COLLIERY

BARMONDIA

KALIDASPUR

ARDHAGRAM

GOURANGDIH-BEGUNIA(BARREN)

GOURANGDIH

MOHANPURSANGRAMGARH

B H A N O R A

A N D D A M R A

K A L I P A H A R I

G H U S I C K

S R I P U R

D H E MO M A I N

P A T M O H A N A

BELBAID

KRISHNANAGAR

DHANDADIH

BANSRA

EAST SEARSOLECOLLIERY

PARASEA

KENDA AREA

POTTERY COLLIERY

POTTERYMAHABIR

REALRANIGANJCOLLIERY

TOPOSI

KUNUSTORIA

SATGRAM

MITHAPUR

MAHABIR

JEMEHARI

J.K.NAGAR

AMRITNAGAR

NORTH SEARSOLERATIBATI

NIMCHA

KUARDIHI

HARIPUR

KRISHNANAGAR

BAHULA

JAMBAD

LOWER KENDA

NABAKAJORA

NEW KENDA

MADHABPUR

LACHHIPUR

GHANASHYAM

HARIPUR UGP

No.29

Debu Qry.

No.30

Running

No.28

Inc.13

Inc.14

No.27

Gourangdih O.C.P.

No.31

Khoirabad Fire Project Filled-up

Inc.6

Inc.4&5

No.26

Filled-up Filled-upNo.21

No.22 Filled-up

No.23Mohonpur O.C.P.RunningNo.32 No.24

Filled-up

No.19

Inc.(Spl. Seam)

Filled-up

No.20

Inc.

No.17

No.18Inc.

Inc.Inc.

No.15

No.16

No.14

Ranga

No.25

Inc.8

Pit-10

PitPit

Pit-11

Pit-5 Pit-6

Pit-5Pit-6

PitPit-1

Pit-2

Pit-2Pit-1

Pit

Pit

Pit-3

Pit-1Pit-2

Pit

Pit-2Pit-1

Pit-5

Pit

Pit-1

Pit-2

Pit-APit-BPit-C

Pit

Pit-6

Pit-4Pit-5

Pit-6Pit-7

Pit-2

Pit-1

Pit-2 Pit-1

Pit

Pit-1Pit-2

Pit-1Pit-3

Pit-1Pit-2

Pit-3

Pit-2

Pit-2Inc-2

Inc-6Inc-7

Pit-1

Pit-9

Pit-2

Pit-5

Pit-6Pit-3

Inc-2

Inc-6Inc-7

Inc-5

Pit-2

Inc-4

Pit-BPit-A

Inc-6Inc-5Inc-1

Inc-3Inc-4

Inc-7Inc-8

A.S.

Pit-44

Pit-1

Pit-45

Pit-2Pit-3

Pit-1Pit-2

Pit-30

Pit-37Pit-35

Pit-34

Pit-33

Pit-39

Pit-29

Pit-6Pit-1

Pit-3Pit-4

Pit-5

Pit-1Pit-2

Pit-5Pit-15A

Pit-4

Pit-7

Pit-17Pit-16

Pit-5Pit-14Pit-13

Pit-3

Pit-2

Pit-10Inc-2

Pit-1

Pit-11

Inc.-2

Pit-4Pit-5

Pit-1

Pit-4Pit-3

Pit-3

Pit-1Pit-2

Pits

inc.-1

Pit-2

Pit-3

Pit-3

Pit-12Pit-11

Pit-18

Pit-1

Pit-14

Pit-13 Pit-2

Pit-2

Pit-14

Pit-1

Pit-2

Pit-11Pit-12

Pit-1Pit-4

Pit-1pit-2

ASInc.-1

Pit-4

Inc.-2

Pit-1Pit-10

Pit-2

ASAS

ASPit-4

Pit-3Pit-6

Pit-2

Pit-6Pit-4Pit-3 Pit-5

Pit-3

Pit-1Pit-7

Pit-4Pit-2

Pit-7

Pit-7

Pit-4Pit-5

Pit-6

Pit-6

Pit-2

Pit-3Pit-3Pit-2

Pit-1

Pit-7

Pit-8

Pit-3

Pit-4

Pit-6

Pit-7Pit-5Pit-4

Pit-8

Pit-8

Pit-1

Pit-3Pit-4

Pit-8

Pit-5

Pit-3Pit-4

Pit-5

Pit-2

Pit-17Pit-6

pit-3pit-4

pit-1Pit-2Pit-1

Pit-4

Pit-4

Pit-4Pit-5

Pit-1Pit-2

pit-6pit-3

Pit-1Pit-2

Pit-3Pit-1

Pit-10

Pit-11

Pit-7

Pit-2Pit-3

Pit-9

pit-2

Pit-1Pit-2

pit-6

pit-12Pit-11

Pit-1

Pit-8

Pit-7

Pit-4Pit-3Pit-2

Pit-1

Pit-4

Pit-5

Pit-APit-B

Pit-3

Pit-2Pit-1

Pit-5

PIT-1

Running

PITPITPIT

PITINC.

PIT

PIT-2

PITPIT INC. INC.

INC.

PIT

PIT-3PIT-4

PITINC.

PITINC.INC.

PITINC.INC.

PIT

INC.-2PIT-1AS

PIT-2ASINC.

INC.PIT

PIT PIT

PLATE NO.- 2

8

ENVIRONMENTAL STATEMENT OF CLUSTER - 8

Behari

Hirenban

Hambazar

Pagarbari

Dighit

Bagjata

Kukbrakuri

Anandapur

Kesharkund

Bhitargarh

Chandbad

LOCATION OF

MONITORING STATIONS

N I N G H A

G I R M I N T

Kachcha Road

Protected Forest

Reserved Forest

SAND

Built Up

Road (ECL/NH)

Water Bodies

(River, Nala, Dam)

River/Nalah

Permanent Air Station

Pre - monsoon

Post - monsoon

Predominant Wind Direction

during October - March (Post - Monsoon)

Predominant Wind Direction

during April - September

(Pre - Monsoon & Monsoon Period)

8A4

8A5

8A6

8A7

8A8

8A9

8A2

8A1

8A3

Station Code Type of Station Name of StationAIR QUALITY MONITORING STATIONS

8A1 Permanent Air Station Near Bhanora RS8A2

Post monsoon Air Station

In Shivdanga Village8A3 Near Jamuria RS8A4 In Kashinathpur Village8A5 In Ranishayar Village8A6 In Ikra Village8A7 In Baraboni Village

Post monsoon Air StationPost monsoon Air StationPre monsoon Air Station

Station Code Name of Station (Workplace)NOISE SAMPLING STATIONS

8N1 Girmint / K D I UG8N2 Sripur seam Incline UG8N3 Ningha UG

Station Code Mine/Effluent Water StationMINE/ EFFLUENT WATER STATIONS

8MW1 Girmint / K D I UG8MW2 Sripur seam Inline UG

Station Code Location of Dug WellGROUND WATER LEVEL

8GWL1 Dugwell at Paharbera Primary school8GWL2 Dugwell at Baraboni RPF camp8GWL38GWL48GWL5 Dugwell at backside of Jamuria Municipality

Dugwell near Gopalbad village Primary schoolDugwell at Prembazar Village near maszid

8A8 In Gopalbad VillagePre monsoon Air Station8A9 In Prembazar VillagePre monsoon Air Station

Permanent Air StationPermanent Air Station

8N4 Satgram UG

8N18N2

8N4

8N3

8MW38MW4

Ningha UGSatgram UG

8MW18MW2

8MW3

8MW4

8GWL6 Dugwell at Ikra Basanti Bijay High school8GWL7 Dugwell at Ranishayar more near Netai Mahato house8GWL8 Dugwell at Kashinathpur more near Ratibati workshop

8GWL2

8GWL3

8GWL4

8GWL5

8GWL6

8GWL7

8GWL8

8GWL1