( ) , 'I I ') , ) , ) , ) ( ) () C) ( ) ( ') (1 ( , \ ) Cl n () /) ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE POWER COMPANY LTD YEAR: 2010-2011 Sponsor: ARASMETA CAPTIVE POWER COMPANY PVT. LTD, Gopal Nagar, Janjgir - Champa District, Chhattisgarh Prepared by: I'?l:.MTA LABS .. _.. Determining Quality VIMTA Labs ltd., 142, IDA, Phase-II Cherlapally, Hyderabad - 500 051, India www.vimta.com September, 2011

Upload: dohuong

Post on 25-May-2018

236 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

( )

, 'I I

')

, )

, )

, )

( )

()

C)

( )

( ')

( 1

( , \ )

Cl

n

()

/)

ENVIRONMENTAL STATEMENT FOR

ARASMETA CAPTIVE POWER COMPANY LTD

YEAR: 2010-2011

Sponsor:

ARASMETA CAPTIVE POWER COMPANY PVT. LTD, Gopal Nagar, Janjgir - Champa District,

Chhattisgarh

Prepared by:

I'?l:.MTA LABS .. _..

Determining Quality

VIMTA Labs ltd., 142, IDA, Phase-II Cherlapally, Hyderabad - 500 051, India

www.vimta.com

September, 2011

Page 2: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

10

REPORT

! ()

, \ )

,)

()

o o o o n o o o o n ()

'~)

ARASMETA CAPTIVE POWER COMPANY PVT. LTD, GOPAL NAGAR, JANJGIR - CHAMPA DISTRICT,

CHHATTISGARH

Environmental Statement 2010-2011

September, 2011

For and on behalf of VIMTA Labs Limited

Approved by : E. Shvam Sundar

Signed f i\.~

---7/jf~··

Position : Associate Vice President (Env)

Date : September 26, 2011

This report has been prepared by Vimta Labs Limited with all reasonable skill, care and diligence within the terms of the contract with the client, incorporating our General Terms and Conditions of Business and taking account of the resources devoted to it by agreement with the client.

We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above.

This report is confidential to the client and we accept no responsibility of whotsoever noture to third parties to whom this report, or any port thereof, is made known. Any such party relies on the report at their own risk.

Page 3: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

()

()

() /

)\

\j

()

oo (J

ooooooo

o in

o o oo o ooo o oo o o ()

()

n

Chapter-l Introduction

n

Page 4: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

, , /

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Gopalnagar Janjgir-Champa District, Chhattisgarh

'-, Chapter-~

Introduction(

1.0 Introduction

Environmental Statement is a basic management tool, which is needed, rather than the conventional environmental management practices to evaluate the environmental performance and regulatory requirements.

\.. )

Realizing this need, Ministry of Environment and Forests has also made it mandatory for all the industrial operations, which require authorization under Environmental (Protection) Act 1986 in each financial year beginning from April 1992, to submit an Environmental Statement to the concerned State Pollution

c> Control Board.

Ci In order to comply with the statutory requirement as well as to maintain corporate image o in the region, recognizing the importance of comprehensive structural mechanism to

(~ ensure that the industrial activities do not cause any effects on environment, MIs \'" .J Arasmeta Captive Power Co. Pvt. Ltd. -KSK Energy Ventures Limited.,

entrusted VIMTA Labs Limited, Hyderabad the job of studying the various factors to prepare Environmental Statement.

c" The enclosed report details about the Environmental Statement for the Mis Arasmeta

C) Captive Power Co. Pvt. Ltd. Gopal Nagar, Chattisgarh for the year April 2010 - March 2011.

, " j 1.2 Project Setting

Arasmeta Captive Power Co. Pvt. Ltd, promoted by KSK Energy Ventures Limited, operates coal based Captive Power Plant of 43 MW capacity and the power generated is supplied to Cement Plant of Lafarge. The plant was commissioned in the year 2005. The Captive Power Plant is located adjacent to existing Cement Plant of Lafarge India Limited in Gopalnagar, Akaltara Tehsil of Janjgir - Champao District of Chhattisgarh.

() TABLE-I. 1

o DETAILS OF ENVIRONMENTAL SETTING IN 15 KM RADIUS FROM PROJECT SITE()

.I '" Sr• No.

1 A B C

._.--­ D ..

E F 2 3

4 5 6

Particulars , -'

C) Location Village Tehsil District State(' ..-' ..,)

Latitude

o Lonqitude Elevation above MSLo Geographical location in Toposheet Seismicity Present landuse Climate Condition (1II.1D­

Details

Arasmeta ( Gopal Nagar) Akaltara Janiqir-Champa Chhattisqarh 21°57'43" to 21°57'50" N 82°21'12" to 82°21'25" E 252 m 64-J/8, 64 K/1, 64 K/5

Zone-II Industrial Annual Max. Temperature - 47° C

VIMTA Labs Limited, Hyderabad C1-1

Page 5: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

,---------------------------------------~

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at GooalnaClar, JaniClir-Chamoa District, ChhattisClarh

Chapter-l Introduction

. )

\ )

)

-)

()

f,)

, )

( )

I ' "

, )

(j

I)

()

o n

Sr. No.

Particulars

Ambikapur)

Site specific Meteorological data

Details

Annual Min. Temperature ­ ]0 C Average Annual Rainfall - 1216 mm Predominant annual wind direction: N,W Average wind speed:7.7-kmph Maximum Temperature: 41.6°C Minimum Temperature: 21.0°C Total rainfall: 198.3 mm Predominant wind direction: SW, N Average wind speed: 13.4 kmph

7

8 Nearest Highway

Nearest Railway Station Nearest Airport Nearest Village Nearest Town Protected areas as per Wildlife Protection Act, 1972 (Elephant Corridors, Tiger Reserves, Sanctuaries, l\Iational parks, Conservation reserves, Community reserves) Reserved / Protected forests

Bilaspur - Janjgir Champa (NH 200, 5.6-km,E) Akaltara (l1.5-km-NE) Raipur (l20-Km-SW) Gopalnaqar(1.5-km,W) Bilaspur,(30-km,W) Nil in 15 km

Nil in 15 km Nil in 15 km Lilagar river (1.4 km, E) Plain land Nil in 15 km radius l\Iil in radius Arasmeta Cement Plant of Lafarge India Private Limited is adjacent to the plant.

9 10 11 12 13

14 15 Hills/valleys

Streams/Rivers Topography Defence Installation Historical places Industries

16 17 18 19 20

Source: Vimta Labs Limited

1.3 Process Description

The 43 MW Power Plant has been constructed as a single unit configuration of 1 x 43 MW unit, with two boiler. The project involves two AFBC boiler, generating

n steam at 89 bars at 515°C with one Condensing Turbo Generator Set having generating capacity of 43 MW of power. The salient features of the power plantn are given in Table-1.2.

n

VIMTA Labs Limited, Hyderabad Cl-2

Page 6: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Gopalnagar, Janjgir-Champa District, Chhattisgarh

Chapter-1. Introduction

TABLE-1.2 SALIENT FEATURES OF POWER PLANT

)

)

)

)

)

( )

( )

()

()

( )

( )

( )

1.4

o ()

o ()

'i

o n n n n ()

J

)

. j

1.5

Sr.No. 1 2 3 4

5 6 7 8 9

10

11

Parameter Plant Capacity Capacity of Steam Generator Generator Fuel

Ash Generation Water Requirement and source Total wastewater generation Waste Water Treatment Fire Fighting System

Stack height and diameter at top (m) Air Pollution control Equipments

Description 1 x 43 MW 2 x 90 TPH AFBC type boiler 1 x 43 MW Coal - 0.3 MTPA from South Eastern Coal Fields 430 TPD 196 m3/hr from Lilahgarh River 19 m3/hr RO Plant Adequate fire fighting systems as per Tariff Advisory Committee (TAC) and OISD quidelines

85 m and 1.2 m

ESP with four fields for each boiler outlet Source: Arasmeta Captive Power Company Pvt. Ltd.

Scope of the study The study covers core area of 5 km radius circle with the Plant site as the center. The scope of study broadly includes: • To conduct literature review and to collect data relevant to the study area; • To undertake environmental monitoring so as to establish the baseline

environmental status of the study area; • To identify various eXisting pollution loads due to various activities in the

ambient levels; and • To identify critical environmental attributes required to be monitored.

Methodology of the Study

The consultants conducted reconnaissance survey and sampling locations were identified on the basis of:

• Predominant wind directions in the study area as recorded by Indian IVJeteorological Department (IMD) station at Ambikapur;

• Existing topography; location of surface water bodies like ponds, canals and rivers;

• Location of villages/towns/sensitive areas; • Accessibility, power availability and security of monitoring equipment; pollution

pockets in the area; • Areas which represent baseline conditions; and • Collection, collation and analysis of baseline data for various environmental

attributes. The field observations are used to:

• Identify extent of negative impacts on community/natural resources; and • Identify mitigation measures and monitoring requirements.

VIMTA Labs Limited, Hyderabad Cl-3/)

")

)

C)

Page 7: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Gopalnagar, Janjgir-Champa District, Chhattisgarh

Chapter-1 Introduction

)

()

Field studies have been conducted during April 2010 to March 2011 which will determine existing conditions of various environmental attributes.

1.6 Organization of the Report

The Environmental statement report is based on data generated for the year April 2010 - March 2011. The report consists of the following chapters;

Chapter 1.0 - Introduction

This chapter provides background information, location of the plant, process being adopted and scope of the study. It also provides the information about climatic conditions in general in the project area.

() Chapter 2.0 - Form - V

() Ministry of Environment and Forest has made it mandatory for all industries which require authorization under Environmental (Protection) act to submit an o Environment Statement, for each financial year to the concerned State Pollution

() Control Board. This chapter presents filled in Form-V along with the supporting documents.

Chapter 3.0 - Pollution Audit( ,

";I

This chapter presents detailed studies on Air quality, Water quality, Noise Quality in the 10 km radius taking the plant as the center, 3 sampling locations have been identified in 10 km radius in different direction and ambient air quality has

oooo

been studied extensively for four seasons of the year 2010 (Pre Monsoon, Monsoon, Post Monsoon, Winter Season) subsequently five ground water and five surface water samples have been collected and analyzed for various parameters in 10 km radius. The noise levels have been measured both in the plant for various equipments and at various human settlements within the 10-km radius. This chapter provides an insight of the existing pollution levels and provides the overall description of the existing environmental status during the operation of

n the plant.

() Chapter 4.0 - Safety and Energy Aspects

oon

This chapter provides information about various safety measures under taken by Mis. Arasmeta Captive Power Co. Pvt. Ltd, In view to safe guard manpower from the occupational health problems. This chapter also depicts the energy consumption for the captive power plant during 2010 - 11.

C) Chapter 5.0 - Auditor's comments

n n This chapter presents the exclusive comments on the existing pollution levels,

measures taken for abatement of pollution and recurring investment on operational maintenance of pollution control equipment.

VIMTA Labs Limited, Hyderabad Cl-4

Page 8: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

( " \ /

'/

i /

)

)

)

( )

()

()

o o ()

)

o 10

()

o o

o o n (J

iO

()

Chapter-2 Form-V

Page 9: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

.1 Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limite.d at Go alnagar, Janjgir-Champa District, Chhattisgarh _

Chapter-2 Form-V

FORM - V (See Rule 14)

Environmental Statement Report for the financial year ending the 31 st March, 2011.

)

( )

( ) (i) Name and address of the Owner/Occupier of the Industry, Operation or process.

( )

( )

() (ii) Industry Category

o (iii) Production capacity

()

(iv) Year of Establishment ( )

(\I

(v) Date of the last environmental Audit Report submitted

o

PART-A

Mr. R. Rameshkumar Director M/s. Arasmeta Captive Power Co. Pvt. Ltd., Gopal Nagar, Janjgir - Champa District Chattisgarh - 495663. Tel: 07817-234585 & Fax: 07817 - 234583

: Red Category - Hazardous Coal based Power Plant

: 43 MW

: 2006

: 29th September, 2010

PART-B

() Water and Raw Material Consumption

() (i) Water consumption, m

(j

o DM Plant: Cooling Towers:

() Domestic:

3/ day [Please refer Annexure 1]

Previous Year Current Year (2009 - 2010) (2010 - 2011)

121.5 166.8 2878.2 2240.2

9.7 29.8

Name of Product Water Consumption per unit of product(I

(J During the During the previous current

(J financial financial year (2009-2010) year (2010-11)n

Electricity 3.4 lit/KWh 3.3 lit/KWh

(ii) Raw Material consumption:

VIMTA Labs Limited, Hyderabad C2-1

Page 10: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

,-----c-------------.----------------------=----=-.-- ­Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Gopalnagar: Janjgir-Champa District, Chhattisqarh

Chapter-2 Form-V

Name of Raw Materials.

Name of Products

Consumption of Raw Material per unit of output (Tons/KWH of Electricity)

( ) During the Previous financial

During the Current financial

Year 2009-2010 Year2010-2011

( j

\

Coal & LDO Oil Electricity 0.001066 0.000985

() PART-C

n Pollution Generated (Parameters as specified in the Consent issued)n

Pollution discharged to Environment/ unit of output

() (i) Pollutant Quantity of Percentage of

() Pollution variation from Generated Prescribed Standards()

( 1 (a) Water Please refer Annexure 2

(b) Air Please refer Annexure 3

PART-Do o Hazardous Wastes

(as specified under Hazardous Wastes/Management and Handling Rules, 1989) o

Hazardous Wastes Total Quantityo During the During the

() Previous current Financial financial Year 2009-2010 year 2010-2011

(a) From Process Waste Lubricant oil 213 lit. 221 lit.

(b) From Pollution Control Nil Nil Facility.

(c) Quantity recycled or Nil Nil re- uti Iized.

Waste Lubricant oil generated in the process will be sold to CECB authorized waste recyclers.

VIMTA Labs Limited, Hyderabad C2-2

.')

Page 11: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Gopalnagar, Janjgir-Champa District, Chhattisgarh

Chapter-2 Form-V

PART-E

Solid Wastes

,)

()

f)

( )

()

I ( ,

(a) From process Fly ash Bottom ash

(b) From Pollution Control facility

(c) Quantity recycled or re-utilized i) Bottom ash and Fly Ash

Total quantity During the During the Previous Current financial financial Year 2009-2010 year 2010-2011

1.42 Lac MT 1.26 Lac MT 0.51 Lac MT 0.17 Lac MT

Nil Nil

The total fly ash was sent to Mis. Larary~ IIIlJid Pvt. Ltd., for use in Portland Pozzolona Cement manufacturing. Bottom ash is being given to local villagers of the plant vicinity for filling of low lying area.

PART-F

o Please specify the characteristics On terms of concentration and quantum) of Hazardous as

o well as solid wastes and indicate disposal practice adopted for both these categories of waste.o 221 liters of waste oil is stored for sale to CECB authorized waste recyclers. The totalo generated fly ash was sent to Mis. Lafarge India Pvt. Ltd. for use in Portland Pozzolona Cement manufacturing. The generated bottom ash is giving to local villagers of the plant vicinity for filling of low lying area.

I',

PART-G

( ,,) Impact of the pollution abatement measures taken on conservation of natural resources

and on the cost of production:C) Regular monitoring of ambient air quality, stack emissions and effluent quality have been n taken up to evaluate the efficiency of the pollution control systems and control measures

Cl on the overall emissions from stack allll ill dll.lJient ail.

()

C)

VIMTA Labs Limited, Hyderabad C2-3

Page 12: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

Environin-ental Statement Report 2010-11 for Arasmeta Captive Power Company Limite~ at Go alna ar Jan· ir-Cham a District Chhattis arh

f--'--'------'------'----'-'--=-="-=-L...:::..-=-'~-'----~==LC....=---=.c=:....:...=.=_::..:..:..:cc==_=_='_""_=~ .. __ .

Chapter-2 Form-V

Cost details of pollution control equipment & environmental monitoring the year 2010-11 are as follows:

I. Revenue nature (Rs. In lakh)

a) Air pollution control Department Expense (including stores & spares)

b) Waste water treatment plant c) Solid waste disposal d) Noise assessment Rs. 194.84 Lakhs e) Fire protection/Fire fighting f) Greenbelt Development/Maintenance g) Environmental Monitoring h) Water cess

Total quantity of Products 306.257 MU

Cost per unit of product Rs. 0.064/­

, ) PART-H

Additional measures investment orooosal for environmental protection including abatement of pollution, prevention of pollution.

1. All internal black topped roads are replaced by RCC roads to reduce the fugitive dust emission inside the plant premises.

. \ 2. A massive tree plantation is in progress inside as well as outside of the

plant premises. Total 26100 no. of saplings were planted to develop Greenbelt surrounding the plant boundary on all four sides & the survival rate is 75%. Also small gardens are developed inside of the plant premises wherever the open space is available to improve the plant beautification.

3. A guard pond is constructed in the plant for storage of generated waste water and the same is fed to RO plant to recycle it for the process. Hence there is no discharge of waste water from the plant area and the unit is zero discharge unit.

4. Dust Extraction system for Primary & Secondary Crusher & water sprinkling i arrangement to the coal conveyor belt of Coal Handling area to reduce the fugitiveI f

I emission in the plant. , .. 5. Oil separator tank is constructed to remove any oil traces in effluent to avoid any

pollution of effluent by concentration of oil & grease in it. 6. Housekeeping is taking on top priority and engaged 20 no. of manpower for

maintaining neat and clean environment in the plant premises. \'\,

As already adequate measures have been taken for pollution control, no further capital investment is planned for the next financial year 2011 - 2012.

f)

VIMTA Labs Limited, Hyderabad C2-4 ~)

'J

Page 13: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Gopalnagar, Janjgir-Champa District, Chhattisgarh

Chapter-2 Form-V

PART-I

) Miscellaneous

\ ) Any other particulars for improving environment protection and abatement of pollution.

c \

J 1. Total 26100 no. of plants have been planted inside and outside of the plant premises to develop the Greenbelt up to March 2011. The survival rate of planted saplings is 75%.

) 2. The plantation of around 5000 no. of saplings for the financial year i.e., April 2011

) to March 2012 is being carried out to develop massive greenbelt around the plant periphery. A broad leaf & preferably local species trees are selected to develop a massive Greenbelt in & around the plant to maintain the surrounding as a green environment.

( )

Mr. G. V. Suresh Babu DGM (0. &. M.) MIs. Arasmeta Captive Power Co.Pvt.Ltd

C) Gopal Nagar, Jajngir - Champa District

C) Chattisgarh - 495663.

')

()

()

n C)

()

:J 'l ')

VIMTA Labs Limited, Hyderabad C2-5

Page 14: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

I

(

Environmental Statement-Report 2010-11 for Arasmeta Captive Power Company Limite' at Go alna ar Jan' ir-Cham a District Chhattis arh

Chapter-2 Form-Vd

,. )

( )

( )

()

'. )

o o o o n ()

o Cl

o o o o

ANNEXURE - 1 WATER BALANCE STATEMENT (m3 /day)

(2010 - 2011)

Water drawn from river 2436.8

Utilization Losses Recycle

A} Industrial

OM Plant

Requirement I Effluent

--166.8 166.8

Cooling Towers 2240.2 350.1 2178.3 61.9

B} Domestic

Canteen 7.6 0

Sanitation

10.2 2.5

13.7 0

Total

19.6 5.9

525.3 2199.6 61.922436.8

ANNEXURE - 2A PARTC

DATA OF INDUSTRIAL EFFLUENT (Guard Pond), (APRIL 2010 - MARCH 2011)

I," '" Month

April 2010

May 2010

June 2010

July 2010

August 2010

September 2010

October 2010

November 2010

December 2010

January 2011

February 2011

March 2011

"' .... ", l'otill Suspended sQlids Oil&Grease

pH ,"".

'." .. ,. mg/l;, I11gll ..

,.

7.2 03 <1.0 _. -- -­

7.3 <1.005

7.5 <1.004

7.6 10 <1.0

147.6 <1.0

7.3 18 <1.0

14 <1.07.5

7.2 16 <1.0

7.3 14 <1.0

7.6 <1.012

7.8 10 <1.0

7.8 10 <1.0

VIMTA Labs Limited, Hyderabad C2-6

Page 15: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Go alna ar Janjgir-Champa District, Chhattisgarh --.--------------1

Chapter-2 Form-V

. )

ANNEXURE - 2C )

PART - C ( )

WASTE WATER GENERATION AND POLLUTANT DISCHARGE . ) MAIN DRAIN EFFLUENT

')

( j Parameter

Total Suspended Solids (TSS)

Oil & Grease (O&G)

Quantity of Pollution Generated, TPA

0.529( )

( ) -( )

( )

Quantity of Pollution Generated, Kgs/ Lac Unit Electricity

0.173

-

o ()

o o C) ()

( ')

Average flow considered (Effluent) is 134.14 m3/day

Total quantity of wastewater generated during April 2010

2011 is 48961.66 m 3 •

ANNEXURE - 3A PART ­ C

[Source Emissions] (April 2010 ­ March 2011)

to March

n

o o o o ()

Coal fired Boiler 85 2.5 23.9 135.8

"Dust Concentration

37.8 48.3 303.2 375.4 195.3 242.9

Dust Control ~9ui .·.·en

ESPs

VIMTA Labs Limited, Hyderabad C2-7I)

Page 16: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Gooalnaaar, Janiair-Chamoa District, Chhattisgarh

Chapter-2 Form-V

(Monthly Source Emissions) (April 2010 - March 2011)

Sr. No. Month Particulate

Matter (mg/Nm3

)

S02 (mg/Nm3

)

NOx (mg/Nm3

)

1 April 2010 48.1 314.7 204.6

2 May 2010 46.2 320.7 214.6

3 June 2010 48.3 313.4 206.2

4 July 2010 46.6 321.3 212.6 _..

5 August 2010 48.2 313.4 201.3

6 September 2010 45.5 303.2 195.3

7 October 2010 47.2 318.1 208.4 -----._--- ----­

8

-­November 2010 38.6 322.5 220.3

9 December 2010 37.8 315.8 218.9

10 January 2011 39~6 325.3 224.8

11 February 2011 43.6 375.4 242.9

12 March 2011 41.4 313.5 218.6

, )

: )

: )

, )

( , , I

( )

, \, /

()

('l

( )

n ( '>

)

VIMTA Labs Limited, Hyderabad C2-B

Page 17: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

I

~ )

. )

" )

)

, )

( )

( )

C)

(')

; )

, )

()

( )

o o n (,

( , ()

Chapter-3 Pollution Audit

Page 18: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Gopalnagar, Janjgir-Champa District, Chhattisgarh

Chapter-3 Pollution Audit

3.0 Pollution Audit

The basic objective of pollution audit is to investigate the status/ efficiency of Environmental Management System and Equipment vis-a-vis the regulatory requ irements.

)

. ) The Environmental quality can be assessed by studying the following:

) 1. Air Quality

/) 2. Noise Monitoring 3. Waste Water quality

( )

3.1 Ambient Air Quality( )

The ambient air quality monitoring was carried out in three seasons (pre( ) monsoon, post monsoon, winter) of 2010 -11 at three locations around the plant

() area. And four locations inside the plant were monitored continuously for one year from April 2010 to March 2011. The details of ambient air quality monitoring

() locations are given in Table-3.1. The location of the selected station with reference to the project site is shown in the Figure-3.1.()

: ) TABLE-3.1 DETAILS OF AMBIENT AIR OUALITY MONITORING LOCATIONS

Distance from Plant

Location Direction w.r.tLocation Name Plant (Km)Code( )

...

o Inside the Premises

-AAQ 1 -Near Main Gate o -AAQ 2 Near DM Plant -o --AAQ 3 Near Raw Water Reservoir

o Outside the Premises

AAQ 5 NE 1.6

( ')

Amora Village 2.2

AAQ 7 Sonsari Village ESEAAQ 6

5.6Nariyara village E ( )

3.1.1 Frequency and Parameters for Sampling()

C) Ambient air quality monitoring has been carried out with a frequency of two days per week at three locations. The ambient air quality parameters along with their

() frequency of sampling are given in Table-3.2.

o (')

()

VIMTA Labs Limited, Hyderabad C3-1

Page 19: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

I

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Gopalnagar, Janjgir-Champa District, Chhattisgarh

Chapter-3 Pollution Audit

TABLE-3.2 MONITORED PARAMETERS AND FREQUENCY OF SAMPLING

, )

')

, )

Sr. No. Parameters Sampling Frequency 1 Particulate Matter 2.5 24 hourly sample twice a week 2 Particulate Matter 10 24 hourly sample twice a week 3 Sulphur Dioxide (502 ) 24 hourly sample twice a week 4 Oxides of Nitrogen (NOx ) 24 hourly sample twice a week

5 Carbon Monoxide (CO) 8 Hourly samples thrice in a day and twice a week

, ) 3.1.2 Sampling and Analytical Techniques

( ) Total Suspended Particulate Matter (TSPM), PM2.5, PMI0, S02 and NOx ( )

Total Suspended Particulate Matter i.e" PM2.5 & PM10 present in ambient air is u sucked through the cyclone. Coarse and non-respirable dust is separated from the

air stream by centrifugal forces acting on the solid particles. These separated( ) particulates fall through the cyclone's conical hopper and collect in the sampling ( ) cap placed at the bottom, The fine dust « 10 microns) forming the respirable

fraction of the TSPM passes the cyclone and is retained by the filter paper. A :) tapping is proVided on the suction side of the blower to provide suction for

sampling air through a set of impingers. Samples of gases are drawn at a flow rate )

of 0.2 liters per minute (Ipm). ( )

TSPM and RPM have been estimated by gravimetric method. Modified West and () Gaeke Method (15-5182 Part-II, 1969) has been adopted for estimation of 502 •

Jacobs-Hochheiser method (15-5182 Part-IV, 1975) has been adopted for theU estimation of NOx; the details are given in Table-3.3.

o Calibration ()

Calibration charts have been prepared for all gaseous pollutants. The calibration is () carried out whenever new absorbing solutions are prepared. The following

techniques have been used for ambient air quality monitoring:( )

(") TABLE-3.3 TECHNIQUES USED FOR AMBIENT AIR QUALITY MONITORING

()

()

o o

Respirable Particulate Respirable Dust Sampler()

1 Fine Particulate Matter Fine Dust Sampler PM2.5 Gravimetric method

2 1.0Matter PM10 Gravimetric method

() 3 Sui hur Dioxide Modified West and Gaeke 4.0 4 Nitro en Oxides Jacob & Hochheiser 4.0 5 Carbon monoxide Gas Chromato ra h 0.01

VIMTA Labs Limited, Hyderabad C3-2

Page 20: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Gooalnaoar, Jan;oir-Chamoa District,_,C::.:h:.:.h:..:..=a-=.:tt:.:.i:=,so"'-=-,a.:...:rh=-=----­ ----i

Chapter-3 Pollution Audit

( )

( )

( , /

)

()

o o n (;

)

C) (,

n ()

(J

f,)

FIGURE-3.1 AMBIENT AIR OUALITY SAMPLING LOCATION

VIMTA Labs Limited, Hyderabad C3-3

Page 21: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

r ,

\ )

I \, )

(",j

(l

r'\ ,

( )

)

~-----. -,--------------.----------,--------~. '-'-1Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Go alnagar, Janjgir-Champa District, Chhattisgarh

Chapter-3 Pollution Audit

3.1.3 Presentation of Primary Data

The various statistical parameters like 98 th percentile, average, maximum and minimum concentrations for the study period have been computed from the observed raw data for all the AAQ monitoring stations. The summary of these results is presented in Table-3.4 and the results of ambient air quality monitored in side the plant area for one year during April 2010 to March 2011 are presented in Table - 3.5.

3.1.3.1 Observations on Primary Data

Around the Plant Area

PM2.5: The maximum and minimum concentrations in three seasons for PM2.5 were recorded as 27.4 I-lgjm3 at Nariyara Village and 18.3 fJ.gjm 3 at Amora Village respectively.

PM1.0: The maximum and minimum concentrations in three seasons for PM10 were recorded as 58.6 IJgjm3 at Amora Village and 41.2 fJ.gjm 3 at Amora Village respectively.

502 : The maximum and minimum 502 concentrations in three seasons were recorded as 9.6 IJg/m3 at 50nsari Village and 5.8 IJgjm3 at 50nsari Village respectively.

NOx: The maximum and minimum concentrations of I\lOx in three seasons were observed to be 12.9 fJ.gjm 3 at 50nsari Village and 7.2 I-lgjm3 at Amora Village respectively.

Inside the Plant Area

PM2.5: The maximum and minimum concentrations in three seasons for PM2.5 were recorded as 29.8 IJgjm3 and 19.5 fJ.gjm 3 respectively.

PM1.0: The maximum and minimum concentrations in three seasons for PM10 were recorded as 60.3 IJgjm3 and 40.1 fJ.gjm 3 respectively.

502 : The maximum and minimum 502 concentrations in three seasons were recorded as 13.8 1J9jm3 and 9.3 IJgjm3 respectively.

NOx: The maximum and minimum concentrations of NOx in three seasons were observed to be 16.3 fJ.gjm 3 and 10.6 IJgjm3 respectively.

VIMTA Labs Limited, Hyderabad C3-4

Page 22: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

- -~~~.~--~-----~~~-

) ~ ..J --.J ! . ) -~ ..', 0 -'"'"l ~. .-~> -" '--"; ,~ l~ 0 ~, 1-' , ,--­,-",' --/ '.J "-' '--..,:. "- . \.,.,.J ~......... .........1 ~ --../ .......;,.....r \~ ...J J ,--.-1 "---~' ',--, ''"-"r/ ~ /----....)

..... 'J' ""-' ....... .....j "..,/ "_J ~. ,,-,'

Environmental Statement Report 2010-11 Chhattisaarh

for Arasmeta Captive Power Company Limited at Gopalnagar, Janjgir-Champa District,

Chapter-3 Pollution Audit

TABLE-3.4 SUMMARY QF AMBIENT AIR QUALITY RESULTS

(APRIL 2010 MARCH 2011)

Station I' LocatiQ't. J ..." .. PM 2.5 PM 10 S02 NOx Code .'. , Min. Max. Avg. 98% Min Max. Avg. 98% Min. Max. Avg. 98% Min. Max. Avg. 98%

AAQ5 Amara Village 18.5 27.4 21.8 25.9 41.2 58.6 46.3 52.5 5.9 9.2 7.4 8.8 7.2 11.9 8.9 11.7 AAQ6 Sansari Village 18.6 26.8 21.9 26.3 44.5 55.7 50.1 55.5 5.8 9.6 7.4 9.2 7.4 12.6 9.0 12.3 AAQ7 Nariyara Village 18.3 26.7 22.2 26.3 42.1 56.6 49.1 55.7 5.9 9.4 7.4 8.9 7.3 12.9 9.1 12.7

Range 18.3 - 27.4 41.2 - 58.6 5.8 - 9.6 7.2 - 12.9

!

(All values are expressed in pgjm3)

Station Location L' Code ;, i

AAQ5 Amara Village AAQ6 Sansari Village AAQ7 Nariyara Village

,---Range

.,

Min. <0.01 <0.01 <0.01

.' C6H6 Max. Avg. <0.01 <0.01 <0.01 <0.01 <0.01 <0.01

< 0.01

98% <0.01 <0.01 <0.01

Min <0.01 <0.01 <0.01

Benzo Pvrene Max. Avg. <0.01 <0.01 <0.01 <0.01 <0.01 <0.01

< 0.01

98%

<0.01 <0.01 <0.01

Min. <0.06 <0.06 <0.06

Arsenic Max. Avg. <0.06 <0.06 <0.06 <0.06 <0.06 <0.06

< 0.06

98%

<0.06 <0.06 <0.06

Nickel I Min. I Max. Avg. i 98% i 1.0 1.4 1.2 1.4 I

1.0 1.4 1.2 1.3 1.0 1.4 1.2 1.3

1.0 - 1.4

(All values are expressed in pgjrrr)

VIMTA Labs Limited, Hyderabad C3-S

Page 23: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

----~~~~~----__~_~_~~~o_~

'/"--1 r- ~- r" ( ..~ r ,r--- f"\ .­.~~-J~:J:J:J o C "0 C '-.-/ -..-/ -..-/ ~) '-...! o '-...! V ~' "--' ,---.,I ""-/ "--..-- J ."'-/ '~' '-' .'--'" ',-, '"-,-,, '--.-'

Environmental Statement Report 2010-11 Chhattisgarh

for Arasmeta Captive Power Company Limited at Gopalnagar, .Janjgir-Champa District,

Chapter-3 Pollution Audit

station Location Lead 03 CO NH3 Code Min. Max. Avg. 98% Min Max. Avg. 98% Min. Max. Avg. 98% Min. ! Max. ! Avg. j 98% i

AAQ5 Amora Village 0.01 0.1 0.01 0.01 2.0 4.7 3.3 4.4 100 123 110 121 <10 <10 <10 <10

I <10 I I <10AAQ6 Sonsari Village 0.01 0.1 0.01 0.01 2.2 4.4 3.3 4.3 101 124 112 123 <10 <10

AAQ7 Nariyara Village 0.01 0.01 0.01 0.01 2.2 4.5 3.3 4.4 101 125 113 124 <10 <10 <10 I <10

Range 0.01 - 0.1 2.0 - 3.3 100 - 125 < 10

(All values are expressed in l4J/m3)

TABLE-3.5 SUMMARY OF AMBIENT AIR OUALITY RESULTS

(APRIL 2010 TO MARCH 2011)

Station Location ....,: PM 2.5 PM 10 S0 2 NOx Code Min. Max. Avg. 98% Min Max. Avg. 98% Min. Max. Avg. 98% Min. i Max. I Avg. i 98%

AAQl Near Main Gate 20.6 29.2 24.7 28.6 41.5 58.4 53.2 58.3 9.9 13.8 11.2 13.5 11.5 16.3 13.1 15.9

AAQ2 Raw Water Reservoir 22.5 29.8 25.4 29.3 46.3 60.3 54.0 60.3 9.3 13.5 11.2 13.4 10.6 16.3 12.6 15.8

AAQ3 OM Plant 19.5 26.7 22.7 25.9 40.1 55.3 48.4 54.4 9.6 12.0 10.6 11.9 10.6 15.3 12.4 15.1

Range 19.5 ­ 29.8 40.1 - 60.3 9.3 - 13.8 10.6 - 16.3

I

I

~

(All values are expressed in l4J/m3)

C3-6VIMTA Labs Limited, Hyderabad

Page 24: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

" '} \ ., . . ---, '\ -'\ '; "'; r. , '" ~, "/',U J J J ~ ~ ~ J ~ ~ 0 ~ ~ v -..J --.) '-' '-~

Environmental Statement Report 2010-11 Chhattisaarh

for Arasmeta Captive Power Company Limited at Gopalnagar, Janjgir-Champa District,

Chapter-3 Pollution Audit

Station ,'....... ~·.···ill ••. .~ C61"16 ,,', Benzo pyrene Arsenic Nickel code Location ·Min; Max. Avg. 98% ' Min. Max. Avg. 98% Min. Max. Avg. 98% Min. Max. Avg. 98%

AAQl Near Main Gate <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.06

<0.06 <0.06 <0.06 1.1 1.7 1.3 1.7

AAQ2 Raw water reservoir <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.06 <0.06 <0.06 <0.06

1.0 1.4 1.2 1.4

AAQ3 Near DM plant <0.01 <0.01 <0.01 <0.01 <0.0: <0.01 <0.01 <0.01

<0.06 <0.06 <0.06 <0.06 1.0 1.7 1.2 1.6

Range < 0.01 < 0.01 < 0.06 1.0 ­ 1.7

;

(All values are expressed in pg/m3.)

Station 1'" , .... I

., '

Lead 03 CO NH3 code Location Min. Max. Avg. 98% Min. Max. Avg. 98% Min. Max. Avg. 98% M" ! M I AIn. I ax.. vg. .98%

AAQl Near Main Gate 0.01 0.01 0.01 0.01 2.3 4.9 3.6 4.8 170 225 198 223 <10 <10 <10 <10 AAQ2 Raw water reservoir 0.01 0.01 0.01 0.01 2.3 4.8 3.5 4.7 163 220 188 216 <10 <10 <10 <10 AAQ3 Near DM plant

Range

0.01 0.01 0.01 0.01 2.4 4.6 3.4 4.5 164 216 189 215 <10 <10 <10 <10

0.01 2.3 - 4.9 163 - 225 < 10

(All values are expressed in pg/m3.),

VIMTA Labs Limited, Hyderabad C3-7

I

Page 25: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Gopalnagar, Janjgir-Champa District, Chhattisqarh

Chapter-3 Pollution Audit

3.2 Noise Level Monitoring

The noise levels were monitored in eight locations in and around the plant area during the year 2010 -2011 on monthly basis.

3.2.1 Identification of Sampling Locations

)

( )

A preliminary reconnaissance survey has been undertaken to identify the major noise generating sources in the area. Noise at different noise generating sources has been identified based on the activities in the Village area, ambient noise due to industries and traffic and the noise at sensitive areas like hospitals and schools. The noise monitoring has been conducted for determination of noise levels at 4 locations in the study area (out side of plant area), 4 locations inside of the plant area. The environment setting of each noise monitoring location is given in Table-3.6 and depicted in Figure-3.2.

, )

. ) 3.2.2 Method of Monitoring

/)

( )

Sound Pressure Level (SPL) measurements were measured at all locations; one reading for every hour was taken for 24 hours. The day noise levels have been monitored during 6 am to 10 pm and night levels during 10 pm to 6 am at all the locations covered in 10-km radius of the study area.

TABLE-3.6 DETAILS OF NOISE MONITORING LOCATIONS

: )

( )

o ()

()

. ) r" )

( )

( )

Ii

.,Location £ocation Name

Code ' ..

Inside the Premises N1 Main Gate N2 Admin Buildinq N3 TG Floor N4 Boiler Feed Pump

Outside the Premises N5 Amora Villaqe N6 Sonsari Villaqe N7 Nariyara Village N8 Arasmeta Villaqe

Directionw;f;t Plant

----

NE ESE SE S

Distance from: . Plant (Krr1J. ..............................

----

1.6 2.2 4.4 0.5

VIMTA Labs Limited, Hyderabad C3-B

Page 26: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

I Captive-Power Company Limited

Chapter-3 Pollution Audit

2KM 1 rINoise Monitoring Locations

FIGURE-3.2 NOISE MONITORING LOCATION

)

r .J

()

, )

( )

( )

()

( !

o C~

n (")

(i

C) o o ()

\)

I)

)

)

N

t

22' .- D'

VIMTA Labs Limited, Hyderabad C3-9

Page 27: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited.·.1 at Go alnagar, Janjgir-Champa District, Chhattisgarh .. u

Chapter-3 Pollution Audit

3.2.3 Parameters Measured During Monitoring

For noise levels measured over a given period of time interval, it is possible to describe important features of noise using statistical quantities. This is calculated using the percent of the time certain noise levels are exceeding the time interval. The notation for

, ) the statistical quantities of noise levels are described below: • LlO is the noise level exceeded 10 per cent of the time;

! ) • LSD is the noise level exceeded 50 per cent of the time; and • L9D is the noise level exceeded 90 per cent of the time.

/ )

. , Equivalent Sound Pressure Level (Leq):'. ~

() The Leq is the equivalent continuous sound level which is equivalent to the same sound ( , energy as the actual fluctuating sound measured in the same period. This is necessary

)

because sound from noise source often fluctuates widely during a given period of time. This is calculated from the following equation:

( ) (L lO - L9D)2

Leq = LSD + ----------­60

( ) lcJay is defined as the equivalent noise level measured over a period of time during day (6 am to 10 pm). Lnight is defined as the equivalent noise level measured over a period of time during

r ) night (10 pm to 6 am). A noise rating developed by EPA for specification of community noise from all the

I(} sources is the Day-Night Sound Level, (lcJn)' (' " j Day-Night Sound Level (Ldn):

o The noise rating developed for community noise from all sources is the Day-Night

C) Sound Level (lcJn)' It is similar to a 24 hr equivalent sound level except that during night time period (10 pm to 6 am) a 10 dB (A) weighting penalty is added to the() instantaneous sound level before computing the 24 hr average.

( ) This night time penalty is added to account for the fact that noise during night when people usually sleep is judged as more annoying than the same noise during the day

(J time.

C) The lcJn for a given location in a community may be calculated from the hourly Leq's, by the following equation:

o 4ln = 10 log {lj24[16(10 Ld/1D) + 8 (10(Ln+10)/lD)]}

()

(') Where Ld is the equivalent sound level during the day time (6 am to 10 pm) and Ln is the equivalent sound level during the night time (10 pm to 6 am).

()

3.2.4 Presentation of Results

(J The statistical analysis is done for measured noise levels at 10 locations for once during study period. The parameters are analyzed for Lday, Lnight, and Ldn. These results are tabulated in Table-3.7, and details of noise measurement carried out inside of the plant area in 4 locations are given in Table-3.B.

VIMTA Labs Limited, Hyderabad C3-10

Page 28: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Gopalnagar, Janjgir-Champa District, Chhattisgarh

Chapter-3 Pollution Audit

TABLE-3.7

NOISE LEVELS IN THE STUDY AREA (APRIL 2010 - MARCH 2011)

Code Location L1D LSD L9D Leq Lday Lnight Ldn

N5 Amora Village 48.2-51.4 44.3-47.5 40.6-43.8 45.2-48.5 46.1-49.3 41.1-45.7 48.7-52.8

N6 Sonsari Village 45.9-50.0 42.0-46.1 38.3-44.3 43.0-47.1 43.8-48.5 40.2-44.3 47.3-51.4

N7 Nariyara Village 48.2-52.2 44.3-46.7 40.6-42.7 45.3-47.4 46.1-48.2 42.5-44.6 49.6-52.4

N8 Arasmeta Village 46.1-51.1 42.2-47.2 38.5-43.5 43.2-48.2 44.0-49.0 40.4-45.4 47.5-55.7" )

( \ )

TABLE-3.8

NOISE LEVELS INSIDE THE PLANT AREA (APRIL 2010 ­ MARCH 2011)

Code Location Noise Level Leq [dB(A}]

Min. Max. 1\11 Main Gate 65.5 74.5

N2 Admin Building 55.3 67.9

N3 TG Floor 71.6 78.1

1\14 Boiler Feed Pump 75.3 81.6

~ )

{ ~!

()

( , 3.3 Waste water quality ". )

( ) Waste water generated in the process is being monitored regularly on monthly basis dlllJe rulluwiny locations.

1. CIT Blow Down 2. Boiler Blow Down

( ") 3. DM Plant Reject and 4. Guard Pond

(j

The analysis results for the period from April 2010 to March 2011 are presented in() Table 3.9.

( )

)

VIMTA Labs Limited, Hyderabad C3-11)

Page 29: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

I Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited' at Gopalnagar, Janjgir-Champa District, Chhattisgarh

I

\ )

TABLE 3.9 , ) WASTE WATER (EFFLUENT) QUALITY (APRIL 2010 TO MARCH 2011)

I )

r)

( )

( )

( )

! ()

i '''­( 'J

I ~~: CT Blow Boiler Blow OM Plant Guard Pond Parameters UOM Down Down

Min. Max. Min. Max. Min. Max. Min. Max.

1 pH - 7.1 8.5 7.5 8.7 8.7 10.1 7.2 7.8

2 Total Dissolved

mgjL 1860 2362 26 53 1334 2690 141 1612Solids

Total 3 Suspended mgjL 4.0 9.0 2.0 8.0 3.0 30 3.0 18

Solids

4 Dissolved

mgjL 4.5 12 4.7 5.6 4.8 5.6 5.0 5.6Oxyqen Biochemical

I

5 Oxygen

mgjL 10 60

I

10 12 3.0 18 3.0 3.5Demand, (3 days at 27°C) Chemical I

6 Oxygen mgjL 8.0 2214 5.0 41.2 20 720 6.0 182 Demand

7 Chloride mgjL 72.1 235.6 1.4 10.6 66.2 863 28.4 192

8 Sulphate mgjL 0.16 180.5 0.18 2.3 70.9 130 50 93.5

9 Phosphate mgjL 0.19 0.73 0.04 0.7 <0.1 <0.1 0.1 0.16

10 Zinc mgjL <0.01 <0.01 0.02 0.05 <0.01 <0.01 0.01 0.05

11 Chromium mgjL 0.02 0.04 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01

12 Copper mgjL 0.01 0.04 0.01 0.02 0.03 0.1 <0.01 <0.01

13 Available

mgjL <0.2 <0.2 <0.2 <0.2 <0.2 <0.2 <0.2 <0.2chlorine

14 Iron mgjL 0.02 0.12 0.01 0.06 0.28 0.31 0.07 0.18

15 Oil & Grease mgjL <1.0 <1.0 <1.0 <1.0 <1..0 <1.0 <1.0 <1.0

( )

( )

o o o (l

()

n (j

)

VIMTA Labs Limited, Hyderabad C3-12

(]

Page 30: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

)

, )

)

r )

; \ )

f' )

( )

( \ , /

(',)

( )

i ()

Ie)

o .0

o (')

1 ()

(1

CI

o o n ( )

n

Chapter-4 Safety Aspects

Page 31: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Gopalnagar, Janjgir-Champa District, Chhattisqarh

Chapter-4 Safety Aspects

4.0 Safety Aspects

The following are the identified fire /accident-prone areas in Captive Power Plant. Some important areas are coal handling plant, LDO storage area, chlorine storage area & boiler house etc.

( ) 4.1 Fire fighting equipment

, , J Arasmeta Captive power plant has taken up adequate measure to safeguard the

'\ workers and property with the following steps

/

I. Approx 64 nos. different types of portable fire extinguishers are available

/ ) in the plant premises

, ) II Fire hydrant system consisting 40 nos. hydrant posts are installed in the plant premises.

III. Fire detection cum alarm system & manual call points are installed in the TG bUilding & electrical control points.

4.2 Safety function

In order to look after the plant safety activities (as per the Factories Act 1948), a . ) full time safety executive is appointed in the Factory. Some of the important

safety related activities viz plant safety audits, safety training, conducting safety (', ) meetings, testing of lifting equipments / tackles, procurement & inventory control

of various personal protective equipments & maintaining of safety statistics etc are looked after by the SED.

o During the year 2010-11, approx 2.43 lacs amount was spent on the safety & fire () related procurement / jobs.

()

() 4.3 Specific Energy Consumption

() Arasmeta Captive Power Co. Pvt. Ltd has provided a continuous energy

() monitoring system. Daily report of energy consumption is recorded for each of the equipments /department.

()

(j

() • Introduced variable frequency drive for boiler ID fan • Optimization of generator loading to improve efficiency • Reduction of number of equipment

()

')

VIMTA Labs Limited, Hyderabad C4-1

Page 32: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

i

r

, , ,/

)

1 )

, )

( )

()

. )

r , , i

()

o oo n ( )

r')

()

C)

I)

Chapter-S Auditor's Comments

o

Page 33: ENVIRONMENTAL STATEMENT FOR ARASMETA CAPTIVE … · environmental statement for arasmeta captive power company ltd. ... and oisd quidelines . ... 121.5 . 166.8 2878.2 2240.2 9.7

( ,

"j

_. -------------------,-- ­Environmental Statement Report 2010-11 for Arasmeta Captive Power Company Limited at Gopalna.gar, Janjgir-Champa District,.C/J.hattisg,-=a..:..crh:..:. ---1

Chapter-S Auditor's Comments

5.0 AUDITOR'S COMMENTS

-/

This report presents the findings of study carried out to prepare the Environmental Statement for the year 2010-2011, for MIs. Arasmeta

, \ Captive Power Co. Pvt. Ltd., Gopalnagar, Chattisgarh.)

) I. The present air quality shows that the maximum SPM concentration , )

among the air quality monitoring locations around the plant premises within the 10-km radius as 27.4 I-Ig/m3 and 58.6 I-Ig/m3.This concentration was observed at Amora village. And the maximum concentration of PM2.5 & PM10 inside the plant area is observed to be 29.8 I-Ig/m3 and 60.3 I-Ig/m3'The concentration of SPM in the region is found to be well within

f) the permissible limits prescribed by CPCB.

() II. Similarly the concentrations of S02 and NOx in air are also within the limits

C) with maximum values of 9.6 and 12.9 I-Ig/m3 respectively, around the plant area.

(J III. Good house keeping is in practice to reduce the fugitive emissions from the operations.o

IV. The total amount of generated fly ash in the process is being sent to Lafarge India Pvt. Ltd. for use in manufacturing of cement.

( '. V. The water quality is observed to be without any significant change that can

\ / not cause damage to the existing biotic systems. VI. ACPCPL has established an RO plant of 49 m 3/hr capacity to treat the

waste water generated in the process to recycle/reuse back in the process o to reduce the water consumption.

VII. The waste oil generated from the plant machinery is being sent to CECBo authorized rec c1ers.

o VIII.

o IX. The Captive power plant has taken up the plantation program to develop 31 stthe Greenbelt around the periphery of the plant area. As on marcho 2011, the total of 26100 plants was planted and about 5,000 samplings

() are proposed for plantation in 2011-12. X. The project authorities have spent II.i;&.I~flIIJli for Operation and

n Maintenance of the Air & Water Pollution Control equipment and other pollution control activities and for safety aspects.

(J

o Findings reviewed & passed:

o o

E. Shyam Sundarn Asso.Vice President (Env.)