CHEC HK TKO Site - Environmental Protection Issue

TRANSCRIPT

Page 1: Environmental Protection Issue

CHEC270

Page 2: Environmental Protection Issue

Project Organization Chart

Page 3: Environmental Protection Issue

Environmental Protection Section

Organization Chart

Chris LauProject Director

Jimmy NgHQ Env.

Manager

Peter ChungProject Manager

Anson WongHSE Manager

Mathew FungConstruction Mgr

T.Y. HuiEnv.

Supervisor

S.T. Wong Env.

Supervisor

Env Rep

Subcon.Env Rep

Subcon.

Page 4: Environmental Protection Issue

Registration of Noise Generating Plant

Page 5: Environmental Protection Issue

Plants ID Labeled on The

Machine – Tower Crane

Page 6: Environmental Protection Issue

Plants ID Labeled on The

Machine – Excavator

Page 7: Environmental Protection Issue

Plants ID Labeled on The

Machine – Generator

Page 8: Environmental Protection Issue

Plants ID Labbled on The

Machine – Crawler Crane

Page 9: Environmental Protection Issue

Plants ID Labeled on The

Machine – Air Compressor

Page 10: Environmental Protection Issue

Plants ID Labeled on The

Machine – Circular Saw

Page 11: Environmental Protection Issue

Plants ID Labeled on The

Machine – Bar Bender

Page 12: Environmental Protection Issue

Plants ID Labeled on The

Machine – Piling Machine

Page 13: Environmental Protection Issue

Environmental Training

Mr. Jimmy Ng was briefing while all

of us listened carefully.

Page 14: Environmental Protection Issue

Environmental training

Page 15: Environmental Protection Issue

Training Then we add this issue into the Safety & Environmental

Induction Training. Moreover, Tool Box Training about:

“ Noise Control Ordinance/Permit to work system”

84 workers had attended. (The whole work force currently is

about 120.)

Page 16: Environmental Protection Issue

Restricted Hours Working

(RHW) is require.

Is the

works

involve

EMP?

• Return approved

PTW to ENV

Supervisor.

• ENV supervisor return

copy of approved

PTW to ENV Subcon

Rep.

• ENV Supervisor port

RHW info on RHW

notice board.

• Proceed with RHW

under full time ENV

Supervisor

supervision

Submit Permit-to-work

application form for RHW by

ENV. Subcon Rep. to ENV

Supervisor

Check if

EMP

involved

comply

with

CNP’s

conditions

Review &

Endorse

by CON

Manager

or HSE

Manager

Review

and

approve

by Project

Manager

Reduce

the no. of

EMP

involve if

possible

Find other solution

No

Yes

Yes

No

YesNo

Yes

No

Restricted Hours

Working Permit-to-work

(PTW) ProcedureYes

No

Page 17: Environmental Protection Issue

On Site monitoring

Page 18: Environmental Protection Issue

Enhancing of public concern

Page 19: Environmental Protection Issue

Disciplinary Action

In-house HSE rules has been reviewed

Working at “Restricted Working Hours”, $5000 will be

charged as HSE Promotion Fee.

If any prosecution is received due to the breach of legal

requirement, an administration fee of $30000 will be imposed

on top of the fine of the prosecution.

This reviewed in-house rules has been tabled in the weekly

meeting and posted at vicinity in site area.

Page 20: Environmental Protection Issue

The End.

It has always been our prime

concern about the onsite

Environmental performance. We

promise that we will keep our

monitoring and will have a continual

improvement. Thank you for your

kindly consideration